SlideShare a Scribd company logo
1 of 4
Download to read offline
Simon Smith 1 of 4 | Page
<	
	
Profile: Over 15 years of experience in various aspects of the construction industry.
• Strong relationships with industry majors Chevron, KBR, Leightons and
Southern Water.
• Large Network of Australian based suppliers, subcontractors and
consultants
• Capable leader with extensive personnel management experience
with both large and small construction teams
• Strong subcontract management skills and commercial awareness
• Experience includes delivery of marine, civil and commercial projects,
site and design based.
• Strong technical and problem solving capability
• Strong safety focus.
• Local Australian (WA) and International experience (Mexico and the
United Kingdom). Exposure working within multi-cultural teams.
Qualifications
2001 Bachelor of Science (Honours) in Civil Engineering
University of Portsmouth
Career History
2012 – 2016 Leighton Contractors www.leightoncontractors.com.au
Leighton Contractors is CIMIC Group’s construction arm, with operations
across Australia, New Zealand and Papua New Guinea.
	
Senior Project Engineer/ Civil Discipline Team Manager (Barrow Island -
WA)
• Working closely with Chevron and Kellogg Joint Venture partners,
complete major civil work packages (up to $200m) for the LNG
processing plant.
• Manage site-based construction, leading a team of up to 25
multidisciplinary Engineers (civil, piping and electrical), with oversight
of a production team of up to 140.
• Manage sub-contractors for Specialist Works (diving, tunnelling,
Reinforced Concrete, epoxy coating and geotechnical works).
• Discipline Lead for Civil’s/ RC Works including planning, forecasting
and reporting works.
• Managed bulk and detailed earthworks including geotechnical team
against site compliance
• Overseeing the resolution of technical/design and constructability
queries
	
	
Simon Smith MIEAust – Senior Project Engineer/Technical Professional
Perth Western Australia t: 0438 865 899 e: simon.smith180376@gmail.com
Simon Smith 2 of 4 | Page
• Develop and implement of the site temporary works process as the
Temporary Works Coordinator and Designer.
• Management of the Permit to Work team and development of
systems and safe working practices for working around live services
• Maintain a strong safety focus as part of the site Senior Leadership
Team. Deliver and attend daily pre start, weekly meetings and actively
involvement in safety walks on site to drive a culture of safety
awareness.
2006 - 2012 Costain Joint Venture/ Costain Construction www.costain.com
Founded in 1865, Costain provides engineering solutions to projects across
the rail, highways, power, water, oil and gas and nuclear sectors.
	
2009 – 2012 Senior Project Engineer/ Assistant Chief Engineer (Brighton & Hove Waste
Water Plant - UK)
• Oversaw various aspects of the site-based construction
(Civil/Commercial and Mechanical) completion of the flagship
Southern Water Wastewater treatment works ($400million).
• Managed and developed a team of over 12 Project and Graduate
Engineers.
• Carried out design coordination. Acted as the key interface between
the client, in-house design Engineers and subcontractors.
• Temporary Works and Logistics Manager. Delivered temporary works
appreciation information sessions with Graduate/site Engineers.
• Held accountability as the Appointed Person for all cranes on site.
Coordinated lift plans documentation.
• Responsible for Lean Management and implementation of “Just in
Time’ planning.
• Responsible for service installation and commisioning
• Ensured strict adherence to site based safety policy and procedures.
Wrote and reviewed risk assessments and method statements for
specific tasks and engineered a control to eliminate and reduce the
risks.
2008 – 2009 Senior Project Engineer/ Sub Agent (Belvedere Riverside Jetty – London,
UK)
• Managed the construction of a 250m T-Head jetty including fendering
and a 120 tonne weighbridge. Project value $60million. Managed a
team of four Engineers.
• Supervised all onsite steel work erection. Managed the offsite
fabrication of 500 tonnes of structural steelwork required for the jetty
substructure (UK and Ireland)
• Liaised with clients and dealt with technical queries.
• Carried out weekly planning and progress reporting. Responsible for
ensuring safety methodology of working over water was in place and
risk assessments completed
2007 – 2008 Senior Project Engineer (Costa Azul LNG Breakwater - Baja Mexico)
Simon Smith 3 of 4 | Page
• Oversaw the offshore construction of a 1km long breakwater
consisting of the planning and installation of 12 concrete caissons
($350million).
• Responsible for the management of up to six Civil Engineers.
• Management of Scour Installation and a dive team of up to 12.
• Coordinated ballasting of caissons, barge and material delivery, and
underwater concrete repairs.
• Ensured strict adherence to company safety policy and procedures.
2006 – 2007 Senior Project Engineer/ Sub Agent (Chichester WWTW Upgrade - UK)
• Involved with the construction of a $50m wastewater treatment plant
upgrade including the direct management of four Engineers.
• Planned and managed deep drainage works and tie-in works to
existing plant. Coordinated site temporary works and craneage.
• Coordinated design considerations between client and principle
design team and client- Southern Water.
2004 - 2006 John Mowlem Construction
John Mowlem Construction provides engineering and construction
services throughout the UK.
	
Section Engineer/ Site Engineer (Spinnaker Tower, Portsmouth - UK)
• Oversaw the site-based construction of a 170m high landmark
commercial structure on the south coast of the UK. Project value
$50million.
• Responsible for the management of two Engineers.
• Carried out management, planning and quality control of
construction, including Marine Piling, 3m Deep Raft Foundation, Slip
Forming Contractor and cladding glazing contractor
2003 - 2004 Aecom (Scott Wilson Consultants) www.aecom.com/uk/
Scott Wilson Consultants was a UK based engineering design consultancy.
It is now owned by Aecom. This was a one year design placement
arranged in conjunction with John Mowlem
Design Engineer (UK)
• Responsible for the design and construction supervision of an
emergency evacuation simulator at HMS Sultan. Liaised with client,
architects and contractors.
• Carried out detailed design work for reinforced concrete and
structural steelwork projects.
• Checking of construction drawings prior to issue to contractors
2001 - 2002 John Mowlem Construction
Graduate Engineer (UK)
• Sole Engineer responsible for setting out and quality control of the
Hook Railway embarkment stabilisation. Project value $1million.
Professional Memberships
Simon Smith 4 of 4 | Page
• Australian Institute of Engineers (Chartered Accreditation expected May 2016)
• Member of the Institute of Chartered Engineers (UK)
References
Excellent references provided upon request.policy development, design,

More Related Content

What's hot

JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
M Marshall Resume 2015
M Marshall Resume 2015M Marshall Resume 2015
M Marshall Resume 2015Matt Marshall
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensedkevin quigley
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Sean Clark
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CVRupert Davison
 
James Boyd Gas Industry 12.2015
James Boyd Gas Industry 12.2015James Boyd Gas Industry 12.2015
James Boyd Gas Industry 12.2015Jim (James) Boyd
 
2.4.15 CV full history
2.4.15 CV full history2.4.15 CV full history
2.4.15 CV full historyChris Christou
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerPeter Storey
 

What's hot (20)

Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
Cv (1)
Cv (1)Cv (1)
Cv (1)
 
Resume with System 3
Resume with System 3Resume with System 3
Resume with System 3
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
wayne prescott cv
wayne prescott cvwayne prescott cv
wayne prescott cv
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
M Marshall Resume 2015
M Marshall Resume 2015M Marshall Resume 2015
M Marshall Resume 2015
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
Daniel-Brady
Daniel-BradyDaniel-Brady
Daniel-Brady
 
Ambulance Station - Beverley
Ambulance Station - BeverleyAmbulance Station - Beverley
Ambulance Station - Beverley
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016Clark Mulhern Construction - Sep 2016
Clark Mulhern Construction - Sep 2016
 
TOMS RESUME
TOMS RESUMETOMS RESUME
TOMS RESUME
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
 
James Boyd Gas Industry 12.2015
James Boyd Gas Industry 12.2015James Boyd Gas Industry 12.2015
James Boyd Gas Industry 12.2015
 
Phillip Rose - CV
Phillip Rose - CVPhillip Rose - CV
Phillip Rose - CV
 
2.4.15 CV full history
2.4.15 CV full history2.4.15 CV full history
2.4.15 CV full history
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-Manager
 

Viewers also liked

Behind the net curtains
Behind the net curtainsBehind the net curtains
Behind the net curtainsBecky Marsh
 
Linea del tiempo line.do
Linea del tiempo line.do Linea del tiempo line.do
Linea del tiempo line.do mariagv23
 
Christopher nolan
Christopher nolanChristopher nolan
Christopher nolanBecky Marsh
 
Redesigning female motorcycle wear
Redesigning female motorcycle wearRedesigning female motorcycle wear
Redesigning female motorcycle wearCarmen Schweizer
 
Employee engagement brief
Employee engagement briefEmployee engagement brief
Employee engagement briefJeremy Old
 
Baseline versus number of fringes
Baseline versus number of fringesBaseline versus number of fringes
Baseline versus number of fringesAdrian Schubert
 
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEA PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEIbrahim Yusuf Salihu
 

Viewers also liked (14)

Phillip.Gilbert.CLU
Phillip.Gilbert.CLUPhillip.Gilbert.CLU
Phillip.Gilbert.CLU
 
Behind the net curtains
Behind the net curtainsBehind the net curtains
Behind the net curtains
 
Rapid Now and Later
Rapid Now and LaterRapid Now and Later
Rapid Now and Later
 
TUMIOFreeWifi
TUMIOFreeWifiTUMIOFreeWifi
TUMIOFreeWifi
 
cv-geenashiban
cv-geenashibancv-geenashiban
cv-geenashiban
 
WWARS
WWARSWWARS
WWARS
 
Linea del tiempo line.do
Linea del tiempo line.do Linea del tiempo line.do
Linea del tiempo line.do
 
Kirsty Emmerth
Kirsty EmmerthKirsty Emmerth
Kirsty Emmerth
 
Christopher nolan
Christopher nolanChristopher nolan
Christopher nolan
 
Redesigning female motorcycle wear
Redesigning female motorcycle wearRedesigning female motorcycle wear
Redesigning female motorcycle wear
 
Employee engagement brief
Employee engagement briefEmployee engagement brief
Employee engagement brief
 
Baseline versus number of fringes
Baseline versus number of fringesBaseline versus number of fringes
Baseline versus number of fringes
 
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEA PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
 
2016 joan castellano mba msn bsn rn (2).doc x
2016 joan castellano mba msn bsn rn (2).doc x2016 joan castellano mba msn bsn rn (2).doc x
2016 joan castellano mba msn bsn rn (2).doc x
 

Similar to Smith, Simon- Resume - Master

Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Ross Ullman
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Dockarl luke
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016Kim Barry
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13iain_cameron
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally
 
Cv presentation jun13
Cv presentation jun13Cv presentation jun13
Cv presentation jun13iain_cameron
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Emma Attwood
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGsiavashn
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro PE
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin JacobsMartin Jacobs
 

Similar to Smith, Simon- Resume - Master (20)

Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
CV JBNov14
CV JBNov14CV JBNov14
CV JBNov14
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
Cv presentation jun13
Cv presentation jun13Cv presentation jun13
Cv presentation jun13
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs
 

Smith, Simon- Resume - Master

  • 1. Simon Smith 1 of 4 | Page < Profile: Over 15 years of experience in various aspects of the construction industry. • Strong relationships with industry majors Chevron, KBR, Leightons and Southern Water. • Large Network of Australian based suppliers, subcontractors and consultants • Capable leader with extensive personnel management experience with both large and small construction teams • Strong subcontract management skills and commercial awareness • Experience includes delivery of marine, civil and commercial projects, site and design based. • Strong technical and problem solving capability • Strong safety focus. • Local Australian (WA) and International experience (Mexico and the United Kingdom). Exposure working within multi-cultural teams. Qualifications 2001 Bachelor of Science (Honours) in Civil Engineering University of Portsmouth Career History 2012 – 2016 Leighton Contractors www.leightoncontractors.com.au Leighton Contractors is CIMIC Group’s construction arm, with operations across Australia, New Zealand and Papua New Guinea. Senior Project Engineer/ Civil Discipline Team Manager (Barrow Island - WA) • Working closely with Chevron and Kellogg Joint Venture partners, complete major civil work packages (up to $200m) for the LNG processing plant. • Manage site-based construction, leading a team of up to 25 multidisciplinary Engineers (civil, piping and electrical), with oversight of a production team of up to 140. • Manage sub-contractors for Specialist Works (diving, tunnelling, Reinforced Concrete, epoxy coating and geotechnical works). • Discipline Lead for Civil’s/ RC Works including planning, forecasting and reporting works. • Managed bulk and detailed earthworks including geotechnical team against site compliance • Overseeing the resolution of technical/design and constructability queries Simon Smith MIEAust – Senior Project Engineer/Technical Professional Perth Western Australia t: 0438 865 899 e: simon.smith180376@gmail.com
  • 2. Simon Smith 2 of 4 | Page • Develop and implement of the site temporary works process as the Temporary Works Coordinator and Designer. • Management of the Permit to Work team and development of systems and safe working practices for working around live services • Maintain a strong safety focus as part of the site Senior Leadership Team. Deliver and attend daily pre start, weekly meetings and actively involvement in safety walks on site to drive a culture of safety awareness. 2006 - 2012 Costain Joint Venture/ Costain Construction www.costain.com Founded in 1865, Costain provides engineering solutions to projects across the rail, highways, power, water, oil and gas and nuclear sectors. 2009 – 2012 Senior Project Engineer/ Assistant Chief Engineer (Brighton & Hove Waste Water Plant - UK) • Oversaw various aspects of the site-based construction (Civil/Commercial and Mechanical) completion of the flagship Southern Water Wastewater treatment works ($400million). • Managed and developed a team of over 12 Project and Graduate Engineers. • Carried out design coordination. Acted as the key interface between the client, in-house design Engineers and subcontractors. • Temporary Works and Logistics Manager. Delivered temporary works appreciation information sessions with Graduate/site Engineers. • Held accountability as the Appointed Person for all cranes on site. Coordinated lift plans documentation. • Responsible for Lean Management and implementation of “Just in Time’ planning. • Responsible for service installation and commisioning • Ensured strict adherence to site based safety policy and procedures. Wrote and reviewed risk assessments and method statements for specific tasks and engineered a control to eliminate and reduce the risks. 2008 – 2009 Senior Project Engineer/ Sub Agent (Belvedere Riverside Jetty – London, UK) • Managed the construction of a 250m T-Head jetty including fendering and a 120 tonne weighbridge. Project value $60million. Managed a team of four Engineers. • Supervised all onsite steel work erection. Managed the offsite fabrication of 500 tonnes of structural steelwork required for the jetty substructure (UK and Ireland) • Liaised with clients and dealt with technical queries. • Carried out weekly planning and progress reporting. Responsible for ensuring safety methodology of working over water was in place and risk assessments completed 2007 – 2008 Senior Project Engineer (Costa Azul LNG Breakwater - Baja Mexico)
  • 3. Simon Smith 3 of 4 | Page • Oversaw the offshore construction of a 1km long breakwater consisting of the planning and installation of 12 concrete caissons ($350million). • Responsible for the management of up to six Civil Engineers. • Management of Scour Installation and a dive team of up to 12. • Coordinated ballasting of caissons, barge and material delivery, and underwater concrete repairs. • Ensured strict adherence to company safety policy and procedures. 2006 – 2007 Senior Project Engineer/ Sub Agent (Chichester WWTW Upgrade - UK) • Involved with the construction of a $50m wastewater treatment plant upgrade including the direct management of four Engineers. • Planned and managed deep drainage works and tie-in works to existing plant. Coordinated site temporary works and craneage. • Coordinated design considerations between client and principle design team and client- Southern Water. 2004 - 2006 John Mowlem Construction John Mowlem Construction provides engineering and construction services throughout the UK. Section Engineer/ Site Engineer (Spinnaker Tower, Portsmouth - UK) • Oversaw the site-based construction of a 170m high landmark commercial structure on the south coast of the UK. Project value $50million. • Responsible for the management of two Engineers. • Carried out management, planning and quality control of construction, including Marine Piling, 3m Deep Raft Foundation, Slip Forming Contractor and cladding glazing contractor 2003 - 2004 Aecom (Scott Wilson Consultants) www.aecom.com/uk/ Scott Wilson Consultants was a UK based engineering design consultancy. It is now owned by Aecom. This was a one year design placement arranged in conjunction with John Mowlem Design Engineer (UK) • Responsible for the design and construction supervision of an emergency evacuation simulator at HMS Sultan. Liaised with client, architects and contractors. • Carried out detailed design work for reinforced concrete and structural steelwork projects. • Checking of construction drawings prior to issue to contractors 2001 - 2002 John Mowlem Construction Graduate Engineer (UK) • Sole Engineer responsible for setting out and quality control of the Hook Railway embarkment stabilisation. Project value $1million. Professional Memberships
  • 4. Simon Smith 4 of 4 | Page • Australian Institute of Engineers (Chartered Accreditation expected May 2016) • Member of the Institute of Chartered Engineers (UK) References Excellent references provided upon request.policy development, design,