What Is?
Definition of Different IT
Terminologies
What is Information
Technology:
 Information technology (IT) is the
application of computers and
telecommunications equipment to store,
retrieve, transmit and manipulate data,
often in the context of a business or other
enterprise.
What is Software:
 Computer software, or just software, is any
set of machine-readable instructions
(most often in the form of a computer
program) that directs a computer's
processor to perform specific operations.
The term is used to contrast with
computer hardware, the physical objects
(processor and related devices) that carry
out the instructions. Hardware and
software require each other and neither
has any value without the other.
What is Networking:
 A computer network or data network is a
telecommunications network that allows
computers to exchange data. The
connections (network links) between
networked computing devices (network
nodes) are established using either cable
media or wireless media. The best-known
computer network is the Internet.
What is Database:
 A database is an organized collection of
data. The data are typically organized to
model relevant aspects of reality in a way
that supports processes requiring this
information. For example, modeling the
availability of rooms in hotels in a way that
supports finding a hotel with vacancies.
What is Cloud Computing:
 Cloud computing is a colloquial
expression used to describe a variety of
different types of computing concepts
that involve a large number of computers
connected through a real-time
communication network (typically the
Internet). Cloud computing is a jargon
term[citation needed] without a
commonly accepted unequivocal
scientific or technical definition.
What is SQL:
 SQL, Structured Query Language is a special-
purpose programming language designed
for managing data held in a relational
database management system (RDBMS).
Originally based upon relational algebra and
tuple relational calculus, SQL consists of a
data definition language and a data
manipulation language. The scope of SQL
includes data insert, query, update and
delete, schema creation and modification,
and data access control. Although SQL is
often described as, and to a great extent is, a
declarative language (4GL), it also includes
procedural elements.
What is Sharepoint:
 Microsoft SharePoint is a Web application
platform developed by Microsoft. First
launched in 2001, SharePoint has
historically been associated with intranet,
content management and document
management, but recent versions have
significantly broader capabilities. It is the
dominant software for creating
organizational intranets with a recent
survey indicating that around 50% of all
intranets are developed using SharePoint.
What is ERP:
 Enterprise resource planning (ERP) is a
cross-functional enterprise system driven
by an integrated suite of software
modules that supports the basic internal
business processes of a company. ERP
gives a company an integrated real-time
view of its core business processes such as
production, order processing, and
inventory management, tied together by
ERP applications software and a common
database maintained by a database
management systems.
What is CRM:
 Customer relationship management
(CRM) is a model for managing a
company’s interactions with current and
future customers. It involves using
technology to organize, automate, and
synchronize sales, marketing, customer
service, and technical support.
What is Java:
 Java is a general-purpose, concurrent,
class-based, object-oriented computer
programming language that is specifically
designed to have as few implementation
dependencies as possible. It is intended
to let application developers "write once,
run anywhere" (WORA), meaning that
code that runs on one platform does not
need to be recompiled to run on another.
What is Web Application:
 A web-based application is any
application that uses a web browser as a
client. The term may also mean a
computer software application that is
coded in a browser-supported
programming language (such as
JavaScript, combined with a browser-
rendered markup language like HTML)
and reliant on a common web browser to
render the application executable.
What is a Smartphone:
 A smartphone, or smart phone, is a mobile
phone built on a mobile operating system,
with more advanced computing
capability and connectivity than a
feature phone. The first smartphones
combined the functions of a personal
digital assistant (PDA) with a mobile
phone.
What is Android:
 Android is a Linux-based operating system
designed primarily for touchscreen mobile
devices such as smartphones and tablet
computers. Initially developed by
Android, Inc., which Google backed
financially and later bought in 2005.
What is Apple TV:
 Apple TV is a digital media receiver
developed and sold by Apple Inc. It is a
small form factor network appliance
designed to play digital content from the
iTunes Store, Netflix, Hulu Plus, YouTube,
Flickr, iCloud, MLB.tv, NBA League Pass,
NHL GameCenter…
What is 3g:
 3G, short for third Generation, is the third
generation of mobile telecommunications
technology. 3G telecommunication
networks support services that provide an
information transfer rate of at least 200
kbit/s.
What is 4g:
 In telecommunications, 4G is the fourth
generation of mobile phone mobile
communication technology standards. It
is a successor to the third generation (3G)
standards. A 4G system provides mobile
ultra-broadband Internet access, for
example to laptops with USB wireless
modems, to smartphones, and to other
mobile devices. Conceivable applications
include amended mobile web access, IP
telephony, gaming services, high-
definition mobile TV, video conferencing,
3D television, and cloud computing.
Thank You
Created By:
Cygnismedia.com
Data: Wikipedia

What is? Different IT Terms and Definition

  • 1.
    What Is? Definition ofDifferent IT Terminologies
  • 2.
    What is Information Technology: Information technology (IT) is the application of computers and telecommunications equipment to store, retrieve, transmit and manipulate data, often in the context of a business or other enterprise.
  • 3.
    What is Software: Computer software, or just software, is any set of machine-readable instructions (most often in the form of a computer program) that directs a computer's processor to perform specific operations. The term is used to contrast with computer hardware, the physical objects (processor and related devices) that carry out the instructions. Hardware and software require each other and neither has any value without the other.
  • 4.
    What is Networking: A computer network or data network is a telecommunications network that allows computers to exchange data. The connections (network links) between networked computing devices (network nodes) are established using either cable media or wireless media. The best-known computer network is the Internet.
  • 5.
    What is Database: A database is an organized collection of data. The data are typically organized to model relevant aspects of reality in a way that supports processes requiring this information. For example, modeling the availability of rooms in hotels in a way that supports finding a hotel with vacancies.
  • 6.
    What is CloudComputing:  Cloud computing is a colloquial expression used to describe a variety of different types of computing concepts that involve a large number of computers connected through a real-time communication network (typically the Internet). Cloud computing is a jargon term[citation needed] without a commonly accepted unequivocal scientific or technical definition.
  • 7.
    What is SQL: SQL, Structured Query Language is a special- purpose programming language designed for managing data held in a relational database management system (RDBMS). Originally based upon relational algebra and tuple relational calculus, SQL consists of a data definition language and a data manipulation language. The scope of SQL includes data insert, query, update and delete, schema creation and modification, and data access control. Although SQL is often described as, and to a great extent is, a declarative language (4GL), it also includes procedural elements.
  • 8.
    What is Sharepoint: Microsoft SharePoint is a Web application platform developed by Microsoft. First launched in 2001, SharePoint has historically been associated with intranet, content management and document management, but recent versions have significantly broader capabilities. It is the dominant software for creating organizational intranets with a recent survey indicating that around 50% of all intranets are developed using SharePoint.
  • 9.
    What is ERP: Enterprise resource planning (ERP) is a cross-functional enterprise system driven by an integrated suite of software modules that supports the basic internal business processes of a company. ERP gives a company an integrated real-time view of its core business processes such as production, order processing, and inventory management, tied together by ERP applications software and a common database maintained by a database management systems.
  • 10.
    What is CRM: Customer relationship management (CRM) is a model for managing a company’s interactions with current and future customers. It involves using technology to organize, automate, and synchronize sales, marketing, customer service, and technical support.
  • 11.
    What is Java: Java is a general-purpose, concurrent, class-based, object-oriented computer programming language that is specifically designed to have as few implementation dependencies as possible. It is intended to let application developers "write once, run anywhere" (WORA), meaning that code that runs on one platform does not need to be recompiled to run on another.
  • 12.
    What is WebApplication:  A web-based application is any application that uses a web browser as a client. The term may also mean a computer software application that is coded in a browser-supported programming language (such as JavaScript, combined with a browser- rendered markup language like HTML) and reliant on a common web browser to render the application executable.
  • 13.
    What is aSmartphone:  A smartphone, or smart phone, is a mobile phone built on a mobile operating system, with more advanced computing capability and connectivity than a feature phone. The first smartphones combined the functions of a personal digital assistant (PDA) with a mobile phone.
  • 14.
    What is Android: Android is a Linux-based operating system designed primarily for touchscreen mobile devices such as smartphones and tablet computers. Initially developed by Android, Inc., which Google backed financially and later bought in 2005.
  • 15.
    What is AppleTV:  Apple TV is a digital media receiver developed and sold by Apple Inc. It is a small form factor network appliance designed to play digital content from the iTunes Store, Netflix, Hulu Plus, YouTube, Flickr, iCloud, MLB.tv, NBA League Pass, NHL GameCenter…
  • 16.
    What is 3g: 3G, short for third Generation, is the third generation of mobile telecommunications technology. 3G telecommunication networks support services that provide an information transfer rate of at least 200 kbit/s.
  • 17.
    What is 4g: In telecommunications, 4G is the fourth generation of mobile phone mobile communication technology standards. It is a successor to the third generation (3G) standards. A 4G system provides mobile ultra-broadband Internet access, for example to laptops with USB wireless modems, to smartphones, and to other mobile devices. Conceivable applications include amended mobile web access, IP telephony, gaming services, high- definition mobile TV, video conferencing, 3D television, and cloud computing.
  • 18.