Project Execution in Changing Times - Focus on the EssentialsEndeavor Management
Many approaches are being taken to reduce the cost of capital developments as the current performance of megaprojects has not significantly improved over the last decade. There are essential elements that permeate the project execution lifecycle and contribute to improved project performance.
Project Execution in Changing Times - Focus on the EssentialsEndeavor Management
Many approaches are being taken to reduce the cost of capital developments as the current performance of megaprojects has not significantly improved over the last decade. There are essential elements that permeate the project execution lifecycle and contribute to improved project performance.
CRM 101: Session 3: Less is More - How to Plan a Successful CRM RolloutSugarCRM
Most implementations fail because they are too complex. Technology Advisors’ Sam Biardo explains the difference between thorough and complicated and will illustrate ways you can plan for the important parts of a CRM rollout without getting sidetracked by details that aren’t so important. Learn what causes project failures, how to prevent them, and what techniques you can use to make your CRM project successful.
In our day today life we often need to manage project for various reasons. For efficiently
managing a project, project analysis, monitoring team development, controlling, Gantt chart,
critical paths, life cycles, consequences, administration panel are the crucial part. Project
administration is the craft of dealing with the undertaking and its deliverables with a perspective
to create completed items or administration. There are numerous routes in which a task can be
completed and the path in which it is executed is undertaking administration.
An Introduction to Extreme Programming (XP) Development Methodology Process i...Salus One Ed
This presentation provides a both novices and experienced development resources a comprehensive introduction to XP processes and management in healthcare provider and health insurance organizations.
Learn about the customer benefits, how to engage the process, process narratives, supporting toolsets and suggested methodologies and more.
Offering the right product and the technology needed for that. Intelligent services for feature elicitation, prioritization, release optimization, development and evaluation.
Project Management – Technology – Operating – Consulting Excellence
HJK Consulting Engineers GmbH is an independent, multi-discipline consultancy service supplier in engineering & manufacturing, process & business consulting, operational services to mining, metallurgical, oil & gas and power generation industries, project implementation services (green & brown field, turnarounds), dual vocational training, supplemented with special emphasis on energy saving and recovery.
As member of International Project Management Association (IPMA), Austrian Association of Consulting Engineers (ACA, FIDIC & EFAC), Austrian Society of Engineers & Architects (OIAV), Austrian Society of Chartered Engineers (SVV) it is our self-conception that clients' will receive first class service in the fields of the company’s activities.
CRM 101: Session 3: Less is More - How to Plan a Successful CRM RolloutSugarCRM
Most implementations fail because they are too complex. Technology Advisors’ Sam Biardo explains the difference between thorough and complicated and will illustrate ways you can plan for the important parts of a CRM rollout without getting sidetracked by details that aren’t so important. Learn what causes project failures, how to prevent them, and what techniques you can use to make your CRM project successful.
In our day today life we often need to manage project for various reasons. For efficiently
managing a project, project analysis, monitoring team development, controlling, Gantt chart,
critical paths, life cycles, consequences, administration panel are the crucial part. Project
administration is the craft of dealing with the undertaking and its deliverables with a perspective
to create completed items or administration. There are numerous routes in which a task can be
completed and the path in which it is executed is undertaking administration.
An Introduction to Extreme Programming (XP) Development Methodology Process i...Salus One Ed
This presentation provides a both novices and experienced development resources a comprehensive introduction to XP processes and management in healthcare provider and health insurance organizations.
Learn about the customer benefits, how to engage the process, process narratives, supporting toolsets and suggested methodologies and more.
Offering the right product and the technology needed for that. Intelligent services for feature elicitation, prioritization, release optimization, development and evaluation.
Project Management – Technology – Operating – Consulting Excellence
HJK Consulting Engineers GmbH is an independent, multi-discipline consultancy service supplier in engineering & manufacturing, process & business consulting, operational services to mining, metallurgical, oil & gas and power generation industries, project implementation services (green & brown field, turnarounds), dual vocational training, supplemented with special emphasis on energy saving and recovery.
As member of International Project Management Association (IPMA), Austrian Association of Consulting Engineers (ACA, FIDIC & EFAC), Austrian Society of Engineers & Architects (OIAV), Austrian Society of Chartered Engineers (SVV) it is our self-conception that clients' will receive first class service in the fields of the company’s activities.
물+소금을 전기분해하여 성질이 다른 두 가지 종류의 Solution (차아염소산수 + 알칼리수)을 생성하는 친환경전해소독수 생성장치 PathoSans 시스템을 소개합니다.
더욱 자세한 정보는 www.spray.co.kr에서 확인 가능하며, 상담 및 데모&생성 용액 샘플 요청은 032-821-5633 또는 info@spray.co.kr로 연락주시기 바랍니다.
직경 12.2m까지의 탱크에 이용가능한 TankJet 65 탱크 세척 노즐을 소개합니다.
360° 완벽한 커버리지를 제공하기 위해 일직선형 노즐은 다축으로 회전합니다.
사중 노즐 허브는 조밀한 세척 패턴과 빠른 사이클 시간을 제공합니다.
더욱 자세한 정보는 www.spray.co.kr에서 확인 가능하며, 상담 요청은 032-821-5633 또는 info@spray.co.kr로 연락주시기 바랍니다.
Spraying Systems Co., Korea was founded in 1994 as one of global manufacturing facilities of Spraying Systems Co. Spraying Systems Co. was founded 77 years ago in the Chicago area. We have ten manufacturing locations around the world and many of sales offices in more than 90 countries to provide local sales and technical support. We provide engineering and application assistance to help customers optimize their spray applications. Our sales engineers are dedicated specialists in spray technology.
Please visit our website www.spray.co.kr , or contact us +82-32-821-5633
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
The degree of maturity of your product management organization can directly drive your ability to satisfy customers and become more profitable. Our Product Management Organizational Health Checklist and on-demand webinar can help.
Talking points agenda:
Why Project Management rules the world?
Why the demand for project professionals is extremely high?
Change through innovation in the form of project
The evident Question: Why managing projects is so Hard?
Learning objectives:
Through this session you will understand and learn the importance of soft skills rather than methodologies as well as “Balancing Project Management Hard Skills and Soft Skills.”
Many organizations struggle with implementing process improvement. A key enabler is the skill of the change agent. This presentation examines the core skills and concepts needed to be an effective change agent.
Architecting the Enterprise (in a SAFe Context)Mikkel Brahm
Walk-through of a Way of Working with Enterprise Architecture in a SAFe context in a larger Bank. What is EA, How to Steer, How to Govern, How to Lead, and how to wrestle with an emerging Future.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesHolger Mueller
Holger Mueller of Constellation Research shares his key takeaways from SAP's Sapphire confernece, held in Orlando, June 3rd till 5th 2024, in the Orange Convention Center.
Recruiting in the Digital Age: A Social Media MasterclassLuanWise
In this masterclass, presented at the Global HR Summit on 5th June 2024, Luan Wise explored the essential features of social media platforms that support talent acquisition, including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Week07 slides 2013_s
1. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 1
MGT610
Lecture 7
Stakeholder Perspective:
Identifying Needs for Requirement Definition
2. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 2
Project Value Network
Shareholder
Value
Outcome
Value
Stakeholder
Value
Effort
Value
Project
Scorecar
d
Statistical
Project
Control
Stakeholde
r
Deploymen
t
What we control in the effort should deploy outcomes that reflect where we expect
to find the project’s value as described in the project’s scorecard.
3. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 3
The Tree Swing Problem
what marketing
suggested
what management
approved
as designed by
engineers
what was
manufactured
as maintenance
installed it
What customers
wanted
4. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 4
Topics and Objectives
• Strategic Thinking: Understanding stakeholder
perceptions about the project’s value
• Filters in the PVN: How will we organize the
stakeholders into segments having compatible
views about value?
• Constancy of Purpose: Understanding
comparative advantage as stable needs having
dynamic tolerances
• Stakeholder Schematics: Coordinating
comparative advantage as a horizontal chain
of value
5. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 5
Session Agenda
Stakeholder Perspective:
Identifying Needs for Requirement Definition
1. Perceptions of value lead to expectations
2. Compatibility of expectations as segmentation basis
3. Stable needs but dynamic expectations
4. Describing expectation as a tolerance
6. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 6
The Fundamental Challenge in Project Management:
Maximizing Project Value by Managing Satisfaction
“If I had to reduce my message for management to just a few words, I'd say it all
had to do with reducing variation”
—W. Edwards Deming
“The central problem of management in all its aspects...is to understand better the
meaning of variation, and to extract the information contained in variation.”
—Lloyd S. Nelson
Maximize
Project
Value
Prerequisite
Maximize
Inflow
RequirementObjective
Minimize
Outflow
Minimum Required-
ALAP
Maximum Desired-
AFAP
7. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 7
Framework of 7 Basic Questions for the PVS
8. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 8
Change
of Goals
Stakeholder Satisfaction: Impact of Dissatisfaction
PM barriers:
Conflicts and Goal Changes have
Strong negative effects on project
success
One major source of variation:
Conflicting and Changing
Stakeholder Satisfaction
Strategy:
Avoid changes by identifying
stakeholder needs
Conflicts
Success
+.41
-.21
-.20
R2= 39%
9. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 9
Stakeholder Satisfaction and Market Value
1999 Macpherson Publishing, Alexandra, New Zealand
From an article by Steve Hoisington of IBM Rochester.
10. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 10
Stakeholder Satisfaction: Quality Problems & Repurchase
Decision
87
50
74
45
83
53
83
53
0
20
40
60
80
100
Automotive
Service
Financial
Services
Packaged
Goods
High Tech
Equipment
No Problem Problem
%WillingtoRepurchase
Source: J. Goodman, “Measuring and Quantifying the Market Payoff of Improved Quality and Service,”Quest
for Excellence IV Conference, February 4, 1992.
11. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 11
Stakeholder Satisfaction: Impact of Dissatisfaction
Proportion of unhappy customers who will repurchase
(Complaints valued at over $100)
Source: J. A. Goodman and D. S. Ward in Direct Marketing (December, 1993).
Did Not Complain
Complaints Not
Resolved
Complaints
Resolved
Complaints
Resolved Quickly
37%
46%
70%
95%
12. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 12
Stakeholder Satisfaction: Impact of Dissatisfaction
What is your percentage of dissatisfied customers?
– Only 4 out of 100 dissatisfied customers complain!
– Each dissatisfied customer tells 8 to10 people about
his/her dissatisfaction
Market Impact?
– 1000 reported customer complaints are approximately
25,000 dissatisfied customers!
– 25,000 dissatisfied customers are expected to
communicate their dissatisfaction to approximately
225,000 people!
13. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 13
Creating Stakeholder Value
• Customers buy on value. Value as an advantage is
determined by comparing quality relative to price.
– Quality includes all the non-price attributes that count in the
purchase decision--both product and service.
– Value (price and quality) is not an absolute expectation. It leads
to expectations which can be expressed as tolerances relative to
stakeholders’ perceptions about what is possible.
Value
Quality
Price
Product
Service
Initial Price
Life Cycle Costs
14. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 14
Stakeholder Value by Accident
15. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 15
Traditional QFD: Definition
QFD (Quality Function Deployment):
• Is a detailed system for translating the needs
and wishes of the consumer into design
requirements for products or services.
– Developed in Japan by Dr. Yoji Akao and Dr. Shigeru
Mizuno
– Purpose: assure customer satisfaction
– Primary concept: value
– Tools: 7 management & planning tools
16. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 16
QFD Advantages
QFD has fewer engineering changes and adjustments!
NumberofChanges
Time
Traditional
Development
QDF
Development
1st Day of
Production Adapted from Sullivan, 1996
17. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 17
Applying QFD: The Strategic Decision
Allocation of Resources
QFD requires substantial initial investments
vs.
Traditional management requires increasing
investments
Resources
Time
Traditional
QDF
18. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 18
QFD Advantages
• Shorter development time (30% - 50%)
• Fewer engineering changes (25% - 50%)
• Reduced introduction costs
• Satisfaction of consumer needs and desires
• Improved product manufacturability
• Commonality of language
• Development of a ready reference for the future
19. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 19
QFD Goals
• Increase market share
• Design value into the product
• Translate subjective statements into objective
requirements
20. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 20
QFD Development Process Steps
Identify the Market
Select a Product Concept
Design Product
Design Manufacturing
Prioritize Customer Segments
Understand Customer Needs
And Context, Translate into
Engineering Language
Select the Best Concept
Generate New Concepts
Target Cost
Prioritize Development Projects
Establish Targets
Establish Relationships between
Manufacturing Conditions and
Product Performance
21. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 21
Decomposition of
Needs into
Tolerances and
Operating Limits
Quantifies the
Acceptable
Comparative
Advantage. text
Product
Planning
Needs
Design
Targets
Feature
Deployment
Design
Targets
Feature
Specs
Workflow
Planning
Feature
Specs
Process
Tolerances
Work
Package
Planning
Process
Tolerances
Operating
Limits
If
New, Important, or Difficult,
Then
Define
Else
Defer Effort Until Required
Focusing Criteria
Needs
Design Targets
Feature Specs
Process Tolerances
Operating Limits
Need Hierarchy
Outputs are caused by tasks.
Value-added tasks should:
• Change the output
• Solve a need by meeting
design targets.
design for
deployment
of best
comparative
advantage
Using a modified QFD
framework,
• Plan the product.
• Plan the workflow.
22. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 22
Stakeholder Management
To avoid goal changes and dissatisfied customers?
1. Plan and implement customer value by creating
output value
2. Apply QFD concepts at the project level
3. Manage customer satisfaction during the project
4. Manage the customer relationships
23. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 23
Simplified Need Identification: Definitions
Needs:
Necessity, a condition in which something necessary or desirable is
required or wanted; a requirement.
Expectations:
The condition of looking forward to something
Specifications:
A detailed description of design criteria for a piece of work
Requirements:
Something that is required; a necessity; A requirement is a singular
documented need of what a particular product or service should
be or do.
Functional requirements - Describe system features or things the
system must do.
Non-functional requirements - Describe properties the system must
have (e.g. performance, availability, accessibility).
Constraints - Limits the development in some way.
24. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 24
Simplified Need Identification: Need Definition
A need is:
• a condition requiring relief;
• anything that is necessary but lacking;
• necessitate: require as useful, just, or proper;
• a want: have need of …
25. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 25
Simplified Need Identification: Categories of Need
Customer satisfaction is influenced
by a variety of needs.
Undocumented
Needs
Documented
Needs
Necessary
Satisfiers
Desirable
Satisfiers
Customs &
Hidden
Motivators
Exciters
Regulations,
Specs, &
Standards
Negotiating
Positions
26. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 26
Simplified Need Identification: Customer Voice
Satisfiers Moments of Truth Expectations
Broad aspect of need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
The tolerance expressed as
central tendency and
dispersion.
One-word label. How
customer talks about
satisfaction.
Names comparison
opportunity as an event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
convenience. go shopping,
to drive 5 to 15 minutes to
find a shopping center.
27. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 27
Simplified Need Identification: Customer Voice
Satisfiers Moments of Truth Expectations
I want … When I hear about …, I expect …
Accuracy.
the construction process used
to build the house,
USL = 150 days,
LSL = 30 days,
Target = 90 days to
complete construction.
Reliability.
the process used for curing the
concrete foundation,
USL = 12 days,
LSL = 2 days,
Target = 7 days to cure.
When the house is built in under 3 hours,
• I perceive the accuracy of construction to be …?
When the concrete is pronounced cured in 20 minutes,
• I perceive its reliability to be …?
I perceive …
• Fear,
• Uncertainty,
• Doubt …
28. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 28
Exercise: Simplified QFD for the 4-Hour House
I expect …When I …,I want …
ExpectationsMoments of TruthSatisfiers
29. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 29
Understand Need: Simplified QFD Information
Satisfiers Moments of Truth Expectations
Broad aspect of
need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
Tolerance for variation
expressed as central
tendency and dispersion.
One-word label.
How customer talks
about satisfaction.
Names comparison
opportunity as an
event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
maintainability. redecorate the house,
to spend $0 to $1,000 for
repair problems.
Example: The 4-Hour House should be easy to maintain.
Ambiguous attribute of satisfier;
must translate into hard expectation.
Soft Expectation
Measurable attribute of a satisfier;
a performance benchmark. If met,
should lead to satisfaction.
Hard Expectation
30. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 30
Simplified QFD Information
Satisfiers Moments of Truth Expectations
Broad aspect of
need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
The tolerance expressed
as central tendency and
dispersion.
One-word label.
How customer talks
about satisfaction.
Names comparison
opportunity as an
event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
size.
learn about the
available living space,
to find 2,400 sq. ft. +/-
200 sq. ft. of useable
living space in the house.
Example: The house should be of sufficient size.
31. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 31
Project QFD: Essential Chain
critical chain essential path
QFD is the theoretical foundation for project QFD:
– critical chain — best basis for managing schedule
– essential path — best basis for managing value
Delivering value to customers is the prime directive for project
managers of product development projects
32. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 32
Appendix
33. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 33
Appendix
34. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 34
Appendix: Analyzing Stakeholder Data
7 TQM Management & Planning Tools
35. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 35
Appendix: Quantifying Acceptable Variation using SPC Concepts
LQL: Limiting Quality Level for rate of nonconformances which can be
tolerated by the stakeholder’s workflow.
AQL: Level of nonconformances expected out of the effort’s workflow.
36. Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 36
Cp and Cpk Describe the Balance in Acceptable Uncertainty
LCL UCL
µ-1σ-2σ-3σ +1σ +2σ +3σ
Inherent Capability if Cp = 1.0 = Cpk
LSL USL
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
Inherent Capability = Tolerance Tolerance = 2 * Inherent Capability
LCL UCL
Inherent Capability if Cp = 2.0 = Cpk
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
LSL USL
µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ
Tolerance = 1.33 * Inherent Capability
LCL UCL
Inherent Capability if Cp = 1.33 = Cpk
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
LSL USL
µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ
Minimum for 6-sigma Quality
Inherent Capability if Cp = 2.0; Cpk ≥ 1.5
Tolerance
{x|x = LSL ≤ x ≤ USL}
LSL USL
+1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ
µ
LCL UCL
{x|x = LCL ≤ x ≤ UCL}