Project Value Network
Shareholder
Value
Outcome
Value
Stakeholder
Value
Effort
Value
Project
Scorecar
d
Statistical
Project
Control
Stakeholde
r
Deploymen
t
What we control in the effort should deploy outcomes that reflect where we expect
to find the project’s value as described in the project’s scorecard.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 3
The Tree Swing Problem
what marketing
suggested
what management
approved
as designed by
engineers
what was
manufactured
as maintenance
installed it
What customers
wanted
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 4
Topics and Objectives
• Strategic Thinking: Understanding stakeholder
perceptions about the project’s value
• Filters in the PVN: How will we organize the
stakeholders into segments having compatible
views about value?
• Constancy of Purpose: Understanding
comparative advantage as stable needs having
dynamic tolerances
• Stakeholder Schematics: Coordinating
comparative advantage as a horizontal chain
of value
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 5
Session Agenda
Stakeholder Perspective:
Identifying Needs for Requirement Definition
1. Perceptions of value lead to expectations
2. Compatibility of expectations as segmentation basis
3. Stable needs but dynamic expectations
4. Describing expectation as a tolerance
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 6
The Fundamental Challenge in Project Management:
Maximizing Project Value by Managing Satisfaction
“If I had to reduce my message for management to just a few words, I'd say it all
had to do with reducing variation”
—W. Edwards Deming
“The central problem of management in all its aspects...is to understand better the
meaning of variation, and to extract the information contained in variation.”
—Lloyd S. Nelson
Maximize
Project
Value
Prerequisite
Maximize
Inflow
RequirementObjective
Minimize
Outflow
Minimum Required-
ALAP
Maximum Desired-
AFAP
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 7
Framework of 7 Basic Questions for the PVS
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 8
Change
of Goals
Stakeholder Satisfaction: Impact of Dissatisfaction
PM barriers:
Conflicts and Goal Changes have
Strong negative effects on project
success
One major source of variation:
Conflicting and Changing
Stakeholder Satisfaction
Strategy:
Avoid changes by identifying
stakeholder needs
Conflicts
Success
+.41
-.21
-.20
R2= 39%
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 9
Stakeholder Satisfaction and Market Value
1999 Macpherson Publishing, Alexandra, New Zealand
From an article by Steve Hoisington of IBM Rochester.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 10
Stakeholder Satisfaction: Quality Problems & Repurchase
Decision
87
50
74
45
83
53
83
53
0
20
40
60
80
100
Automotive
Service
Financial
Services
Packaged
Goods
High Tech
Equipment
No Problem Problem
%WillingtoRepurchase
Source: J. Goodman, “Measuring and Quantifying the Market Payoff of Improved Quality and Service,”Quest
for Excellence IV Conference, February 4, 1992.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 11
Stakeholder Satisfaction: Impact of Dissatisfaction
Proportion of unhappy customers who will repurchase
(Complaints valued at over $100)
Source: J. A. Goodman and D. S. Ward in Direct Marketing (December, 1993).
Did Not Complain
Complaints Not
Resolved
Complaints
Resolved
Complaints
Resolved Quickly
37%
46%
70%
95%
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 12
Stakeholder Satisfaction: Impact of Dissatisfaction
What is your percentage of dissatisfied customers?
– Only 4 out of 100 dissatisfied customers complain!
– Each dissatisfied customer tells 8 to10 people about
his/her dissatisfaction
Market Impact?
– 1000 reported customer complaints are approximately
25,000 dissatisfied customers!
– 25,000 dissatisfied customers are expected to
communicate their dissatisfaction to approximately
225,000 people!
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 13
Creating Stakeholder Value
• Customers buy on value. Value as an advantage is
determined by comparing quality relative to price.
– Quality includes all the non-price attributes that count in the
purchase decision--both product and service.
– Value (price and quality) is not an absolute expectation. It leads
to expectations which can be expressed as tolerances relative to
stakeholders’ perceptions about what is possible.
Value
Quality
Price
Product
Service
Initial Price
Life Cycle Costs
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 14
Stakeholder Value by Accident
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 15
Traditional QFD: Definition
QFD (Quality Function Deployment):
• Is a detailed system for translating the needs
and wishes of the consumer into design
requirements for products or services.
– Developed in Japan by Dr. Yoji Akao and Dr. Shigeru
Mizuno
– Purpose: assure customer satisfaction
– Primary concept: value
– Tools: 7 management & planning tools
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 16
QFD Advantages
QFD has fewer engineering changes and adjustments!
NumberofChanges
Time
Traditional
Development
QDF
Development
1st Day of
Production Adapted from Sullivan, 1996
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 17
Applying QFD: The Strategic Decision
Allocation of Resources
QFD requires substantial initial investments
vs.
Traditional management requires increasing
investments
Resources
Time
Traditional
QDF
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 18
QFD Advantages
• Shorter development time (30% - 50%)
• Fewer engineering changes (25% - 50%)
• Reduced introduction costs
• Satisfaction of consumer needs and desires
• Improved product manufacturability
• Commonality of language
• Development of a ready reference for the future
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 19
QFD Goals
• Increase market share
• Design value into the product
• Translate subjective statements into objective
requirements
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 20
QFD Development Process Steps
Identify the Market
Select a Product Concept
Design Product
Design Manufacturing
Prioritize Customer Segments
Understand Customer Needs
And Context, Translate into
Engineering Language
Select the Best Concept
Generate New Concepts
Target Cost
Prioritize Development Projects
Establish Targets
Establish Relationships between
Manufacturing Conditions and
Product Performance
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 21
Decomposition of
Needs into
Tolerances and
Operating Limits
Quantifies the
Acceptable
Comparative
Advantage. text
Product
Planning
Needs
Design
Targets
Feature
Deployment
Design
Targets
Feature
Specs
Workflow
Planning
Feature
Specs
Process
Tolerances
Work
Package
Planning
Process
Tolerances
Operating
Limits
If
New, Important, or Difficult,
Then
Define
Else
Defer Effort Until Required
Focusing Criteria
Needs
Design Targets
Feature Specs
Process Tolerances
Operating Limits
Need Hierarchy
Outputs are caused by tasks.
Value-added tasks should:
• Change the output
• Solve a need by meeting
design targets.
design for
deployment
of best
comparative
advantage
Using a modified QFD
framework,
• Plan the product.
• Plan the workflow.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 22
Stakeholder Management
To avoid goal changes and dissatisfied customers?
1. Plan and implement customer value by creating
output value
2. Apply QFD concepts at the project level
3. Manage customer satisfaction during the project
4. Manage the customer relationships
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 23
Simplified Need Identification: Definitions
Needs:
Necessity, a condition in which something necessary or desirable is
required or wanted; a requirement.
Expectations:
The condition of looking forward to something
Specifications:
A detailed description of design criteria for a piece of work
Requirements:
Something that is required; a necessity; A requirement is a singular
documented need of what a particular product or service should
be or do.
Functional requirements - Describe system features or things the
system must do.
Non-functional requirements - Describe properties the system must
have (e.g. performance, availability, accessibility).
Constraints - Limits the development in some way.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 24
Simplified Need Identification: Need Definition
A need is:
• a condition requiring relief;
• anything that is necessary but lacking;
• necessitate: require as useful, just, or proper;
• a want: have need of …
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 25
Simplified Need Identification: Categories of Need
Customer satisfaction is influenced
by a variety of needs.
Undocumented
Needs
Documented
Needs
Necessary
Satisfiers
Desirable
Satisfiers
Customs &
Hidden
Motivators
Exciters
Regulations,
Specs, &
Standards
Negotiating
Positions
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 26
Simplified Need Identification: Customer Voice
Satisfiers Moments of Truth Expectations
Broad aspect of need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
The tolerance expressed as
central tendency and
dispersion.
One-word label. How
customer talks about
satisfaction.
Names comparison
opportunity as an event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
convenience. go shopping,
to drive 5 to 15 minutes to
find a shopping center.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 27
Simplified Need Identification: Customer Voice
Satisfiers Moments of Truth Expectations
I want … When I hear about …, I expect …
Accuracy.
the construction process used
to build the house,
USL = 150 days,
LSL = 30 days,
Target = 90 days to
complete construction.
Reliability.
the process used for curing the
concrete foundation,
USL = 12 days,
LSL = 2 days,
Target = 7 days to cure.
When the house is built in under 3 hours,
• I perceive the accuracy of construction to be …?
When the concrete is pronounced cured in 20 minutes,
• I perceive its reliability to be …?
I perceive …
• Fear,
• Uncertainty,
• Doubt …
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 28
Exercise: Simplified QFD for the 4-Hour House
I expect …When I …,I want …
ExpectationsMoments of TruthSatisfiers
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 29
Understand Need: Simplified QFD Information
Satisfiers Moments of Truth Expectations
Broad aspect of
need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
Tolerance for variation
expressed as central
tendency and dispersion.
One-word label.
How customer talks
about satisfaction.
Names comparison
opportunity as an
event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
maintainability. redecorate the house,
to spend $0 to $1,000 for
repair problems.
Example: The 4-Hour House should be easy to maintain.
Ambiguous attribute of satisfier;
must translate into hard expectation.
Soft Expectation
Measurable attribute of a satisfier;
a performance benchmark. If met,
should lead to satisfaction.
Hard Expectation
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 30
Simplified QFD Information
Satisfiers Moments of Truth Expectations
Broad aspect of
need.
When experience
is compared with
expectation, opinion of
satisfaction is formed.
The tolerance expressed
as central tendency and
dispersion.
One-word label.
How customer talks
about satisfaction.
Names comparison
opportunity as an
event.
Tolerance sets the
acceptable uncertainty for
outcomes and effort.
I want … When I …, I expect …
size.
learn about the
available living space,
to find 2,400 sq. ft. +/-
200 sq. ft. of useable
living space in the house.
Example: The house should be of sufficient size.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 31
Project QFD: Essential Chain
critical chain essential path
QFD is the theoretical foundation for project QFD:
– critical chain — best basis for managing schedule
– essential path — best basis for managing value
Delivering value to customers is the prime directive for project
managers of product development projects
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 32
Appendix
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 33
Appendix
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 34
Appendix: Analyzing Stakeholder Data
7 TQM Management & Planning Tools
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 35
Appendix: Quantifying Acceptable Variation using SPC Concepts
LQL: Limiting Quality Level for rate of nonconformances which can be
tolerated by the stakeholder’s workflow.
AQL: Level of nonconformances expected out of the effort’s workflow.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 36
Cp and Cpk Describe the Balance in Acceptable Uncertainty
LCL UCL
µ-1σ-2σ-3σ +1σ +2σ +3σ
Inherent Capability if Cp = 1.0 = Cpk
LSL USL
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
Inherent Capability = Tolerance Tolerance = 2 * Inherent Capability
LCL UCL
Inherent Capability if Cp = 2.0 = Cpk
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
LSL USL
µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ
Tolerance = 1.33 * Inherent Capability
LCL UCL
Inherent Capability if Cp = 1.33 = Cpk
Tolerance
{x|x = LSL ≤ x ≤ USL}
{x|x = LCL ≤ x ≤ UCL}
LSL USL
µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ
Minimum for 6-sigma Quality
Inherent Capability if Cp = 2.0; Cpk ≥ 1.5
Tolerance
{x|x = LSL ≤ x ≤ USL}
LSL USL
+1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ
µ
LCL UCL
{x|x = LCL ≤ x ≤ UCL}

More Related Content

What's hot

Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhavPMI_IREP_TP
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadirPMI_IREP_TP
 
CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016Rahul Jain
 
Presentation by lakshmi varagan d
Presentation by lakshmi varagan dPresentation by lakshmi varagan d
Presentation by lakshmi varagan dPMI_IREP_TP
 
Social Media Business Case
Social Media Business Case Social Media Business Case
Social Media Business Case
Demand Metric
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesaiPMI_IREP_TP
 
Riskallocationmodel
RiskallocationmodelRiskallocationmodel
RiskallocationmodelMartin Ellis
 
Presentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPresentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPMI_IREP_TP
 
Presentation by dattatraya pathak
Presentation by dattatraya pathakPresentation by dattatraya pathak
Presentation by dattatraya pathakPMI_IREP_TP
 
Innovation strategyroadmap ppt
Innovation strategyroadmap pptInnovation strategyroadmap ppt
Innovation strategyroadmap pptJoe Hines
 
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATION
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATIONACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATION
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATIONWILLIAM YAMOAH
 
CRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
CRM 101: Session 3: Less is More - How to Plan a Successful CRM RolloutCRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
CRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
SugarCRM
 
Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandraPMI_IREP_TP
 
Managing projects
Managing projectsManaging projects
Managing projects
Novoraj Roy
 
An Introduction to Extreme Programming (XP) Development Methodology Process i...
An Introduction to Extreme Programming (XP) Development Methodology Process i...An Introduction to Extreme Programming (XP) Development Methodology Process i...
An Introduction to Extreme Programming (XP) Development Methodology Process i...
Salus One Ed
 
Introduction to business analysis
Introduction to business analysisIntroduction to business analysis
Introduction to business analysis
Michael Kramarenko
 
Product Innovation Roadmap
Product Innovation RoadmapProduct Innovation Roadmap
Product Innovation Roadmap
Guenther Ruhe
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 

What's hot (19)

Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhav
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016CGV - Corporate Presentation 2016
CGV - Corporate Presentation 2016
 
Presentation by lakshmi varagan d
Presentation by lakshmi varagan dPresentation by lakshmi varagan d
Presentation by lakshmi varagan d
 
Social Media Business Case
Social Media Business Case Social Media Business Case
Social Media Business Case
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesai
 
Riskallocationmodel
RiskallocationmodelRiskallocationmodel
Riskallocationmodel
 
Presentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPresentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajan
 
Presentation by dattatraya pathak
Presentation by dattatraya pathakPresentation by dattatraya pathak
Presentation by dattatraya pathak
 
Innovation strategyroadmap ppt
Innovation strategyroadmap pptInnovation strategyroadmap ppt
Innovation strategyroadmap ppt
 
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATION
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATIONACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATION
ACHIEVING PROJECT SUCCESS THROUGH EFFECTIVE PROJECT REQUIREMENTS ELICITATION
 
CRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
CRM 101: Session 3: Less is More - How to Plan a Successful CRM RolloutCRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
CRM 101: Session 3: Less is More - How to Plan a Successful CRM Rollout
 
Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandra
 
Venkatavaradan_V
Venkatavaradan_VVenkatavaradan_V
Venkatavaradan_V
 
Managing projects
Managing projectsManaging projects
Managing projects
 
An Introduction to Extreme Programming (XP) Development Methodology Process i...
An Introduction to Extreme Programming (XP) Development Methodology Process i...An Introduction to Extreme Programming (XP) Development Methodology Process i...
An Introduction to Extreme Programming (XP) Development Methodology Process i...
 
Introduction to business analysis
Introduction to business analysisIntroduction to business analysis
Introduction to business analysis
 
Product Innovation Roadmap
Product Innovation RoadmapProduct Innovation Roadmap
Product Innovation Roadmap
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 

Viewers also liked

스프레이시스템코리아
스프레이시스템코리아스프레이시스템코리아
스프레이시스템코리아
스프레이시스템코리아
 
Your reliable Consulting and Engineering source
Your reliable Consulting and Engineering sourceYour reliable Consulting and Engineering source
Your reliable Consulting and Engineering source
Hans-Joerg Klapf
 
Surface Tension of Water - Controlling Dust
Surface Tension of Water - Controlling DustSurface Tension of Water - Controlling Dust
Surface Tension of Water - Controlling Dust
Dave Reiniger
 
스프레이시스템 Pathosans 소개자료
스프레이시스템 Pathosans 소개자료스프레이시스템 Pathosans 소개자료
스프레이시스템 Pathosans 소개자료
스프레이시스템코리아
 
Tj65 소개자료
Tj65 소개자료Tj65 소개자료
Lebon Co. Profile
Lebon Co. ProfileLebon Co. Profile
Lebon Co. ProfileM.H Miyar
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsethenry KKK
 
The Basic of Airless Spraying
The Basic of Airless SprayingThe Basic of Airless Spraying
The Basic of Airless Spraying
Andreas Ambar Purwanto
 
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
Spraying Systems do Brasil
 
Spraying Systems Co., Korea
Spraying Systems Co., KoreaSpraying Systems Co., Korea
Spraying Systems Co., Korea
스프레이시스템코리아
 

Viewers also liked (10)

스프레이시스템코리아
스프레이시스템코리아스프레이시스템코리아
스프레이시스템코리아
 
Your reliable Consulting and Engineering source
Your reliable Consulting and Engineering sourceYour reliable Consulting and Engineering source
Your reliable Consulting and Engineering source
 
Surface Tension of Water - Controlling Dust
Surface Tension of Water - Controlling DustSurface Tension of Water - Controlling Dust
Surface Tension of Water - Controlling Dust
 
스프레이시스템 Pathosans 소개자료
스프레이시스템 Pathosans 소개자료스프레이시스템 Pathosans 소개자료
스프레이시스템 Pathosans 소개자료
 
Tj65 소개자료
Tj65 소개자료Tj65 소개자료
Tj65 소개자료
 
Lebon Co. Profile
Lebon Co. ProfileLebon Co. Profile
Lebon Co. Profile
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
 
The Basic of Airless Spraying
The Basic of Airless SprayingThe Basic of Airless Spraying
The Basic of Airless Spraying
 
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
Soluções para Controle de Poluição - Controle de Poeira em Pontos de Transfer...
 
Spraying Systems Co., Korea
Spraying Systems Co., KoreaSpraying Systems Co., Korea
Spraying Systems Co., Korea
 

Similar to Week07 slides 2013_s

Lecture04 slides
Lecture04 slidesLecture04 slides
Lecture04 slideshenry KKK
 
Lecture04 p vscorecard
Lecture04 p vscorecardLecture04 p vscorecard
Lecture04 p vscorecardtoushi0616
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013henry KKK
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slideshenry KKK
 
What is the business value of my project?
What is the business value of my project?What is the business value of my project?
What is the business value of my project?
Joe Raynus
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
Aggregage
 
Integrating the users logic into Requirements Engineering
Integrating the users logic into Requirements EngineeringIntegrating the users logic into Requirements Engineering
Integrating the users logic into Requirements Engineering
Sofia Ouhbi
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
 
M Sc Pm Lecture No 4 Risk
M Sc Pm Lecture No 4    RiskM Sc Pm Lecture No 4    Risk
M Sc Pm Lecture No 4 RiskHoang Vuong
 
Why project management is hard
Why project management is hardWhy project management is hard
Why project management is hard
PMILebanonChapter
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
Caltech
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
Panos Fitsilis
 
Hoshin Kanri Strategic Planning
Hoshin Kanri Strategic PlanningHoshin Kanri Strategic Planning
Hoshin Kanri Strategic Planning
avscully
 
Strategic Planning Workshop Demo
Strategic Planning Workshop DemoStrategic Planning Workshop Demo
Strategic Planning Workshop DemoTom Sauder, P.Eng.
 
Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)
Mikkel Brahm
 
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
RomanaVysatova
 
Roberto Evaristo - Doing more with less
Roberto Evaristo - Doing more with lessRoberto Evaristo - Doing more with less
Roberto Evaristo - Doing more with lessSIKM
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalAndrew Huseman
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 

Similar to Week07 slides 2013_s (20)

Lecture04 slides
Lecture04 slidesLecture04 slides
Lecture04 slides
 
Lecture04 p vscorecard
Lecture04 p vscorecardLecture04 p vscorecard
Lecture04 p vscorecard
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slides
 
What is the business value of my project?
What is the business value of my project?What is the business value of my project?
What is the business value of my project?
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
Integrating the users logic into Requirements Engineering
Integrating the users logic into Requirements EngineeringIntegrating the users logic into Requirements Engineering
Integrating the users logic into Requirements Engineering
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
M Sc Pm Lecture No 4 Risk
M Sc Pm Lecture No 4    RiskM Sc Pm Lecture No 4    Risk
M Sc Pm Lecture No 4 Risk
 
Why project management is hard
Why project management is hardWhy project management is hard
Why project management is hard
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
 
ETCA_2
ETCA_2ETCA_2
ETCA_2
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
Hoshin Kanri Strategic Planning
Hoshin Kanri Strategic PlanningHoshin Kanri Strategic Planning
Hoshin Kanri Strategic Planning
 
Strategic Planning Workshop Demo
Strategic Planning Workshop DemoStrategic Planning Workshop Demo
Strategic Planning Workshop Demo
 
Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)
 
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
Nuclear Sector Deal webinar series 2021. Cost reduction in nuclear new build....
 
Roberto Evaristo - Doing more with less
Roberto Evaristo - Doing more with lessRoberto Evaristo - Doing more with less
Roberto Evaristo - Doing more with less
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation Final
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 

More from henry KKK

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3henry KKK
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2henry KKK
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1henry KKK
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributeshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slideshenry KKK
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slideshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slideshenry KKK
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_casehenry KKK
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slideshenry KKK
 
Week05 reading
Week05 readingWeek05 reading
Week05 readinghenry KKK
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercisehenry KKK
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013henry KKK
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013henry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 

More from henry KKK (20)

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slides
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slides
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 

Recently uploaded

Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 

Recently uploaded (20)

Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 

Week07 slides 2013_s

  • 1. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 1 MGT610 Lecture 7 Stakeholder Perspective: Identifying Needs for Requirement Definition
  • 2. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 2 Project Value Network Shareholder Value Outcome Value Stakeholder Value Effort Value Project Scorecar d Statistical Project Control Stakeholde r Deploymen t What we control in the effort should deploy outcomes that reflect where we expect to find the project’s value as described in the project’s scorecard.
  • 3. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 3 The Tree Swing Problem what marketing suggested what management approved as designed by engineers what was manufactured as maintenance installed it What customers wanted
  • 4. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 4 Topics and Objectives • Strategic Thinking: Understanding stakeholder perceptions about the project’s value • Filters in the PVN: How will we organize the stakeholders into segments having compatible views about value? • Constancy of Purpose: Understanding comparative advantage as stable needs having dynamic tolerances • Stakeholder Schematics: Coordinating comparative advantage as a horizontal chain of value
  • 5. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 5 Session Agenda Stakeholder Perspective: Identifying Needs for Requirement Definition 1. Perceptions of value lead to expectations 2. Compatibility of expectations as segmentation basis 3. Stable needs but dynamic expectations 4. Describing expectation as a tolerance
  • 6. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 6 The Fundamental Challenge in Project Management: Maximizing Project Value by Managing Satisfaction “If I had to reduce my message for management to just a few words, I'd say it all had to do with reducing variation” —W. Edwards Deming “The central problem of management in all its aspects...is to understand better the meaning of variation, and to extract the information contained in variation.” —Lloyd S. Nelson Maximize Project Value Prerequisite Maximize Inflow RequirementObjective Minimize Outflow Minimum Required- ALAP Maximum Desired- AFAP
  • 7. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 7 Framework of 7 Basic Questions for the PVS
  • 8. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 8 Change of Goals Stakeholder Satisfaction: Impact of Dissatisfaction PM barriers: Conflicts and Goal Changes have Strong negative effects on project success One major source of variation: Conflicting and Changing Stakeholder Satisfaction Strategy: Avoid changes by identifying stakeholder needs Conflicts Success +.41 -.21 -.20 R2= 39%
  • 9. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 9 Stakeholder Satisfaction and Market Value 1999 Macpherson Publishing, Alexandra, New Zealand From an article by Steve Hoisington of IBM Rochester.
  • 10. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 10 Stakeholder Satisfaction: Quality Problems & Repurchase Decision 87 50 74 45 83 53 83 53 0 20 40 60 80 100 Automotive Service Financial Services Packaged Goods High Tech Equipment No Problem Problem %WillingtoRepurchase Source: J. Goodman, “Measuring and Quantifying the Market Payoff of Improved Quality and Service,”Quest for Excellence IV Conference, February 4, 1992.
  • 11. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 11 Stakeholder Satisfaction: Impact of Dissatisfaction Proportion of unhappy customers who will repurchase (Complaints valued at over $100) Source: J. A. Goodman and D. S. Ward in Direct Marketing (December, 1993). Did Not Complain Complaints Not Resolved Complaints Resolved Complaints Resolved Quickly 37% 46% 70% 95%
  • 12. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 12 Stakeholder Satisfaction: Impact of Dissatisfaction What is your percentage of dissatisfied customers? – Only 4 out of 100 dissatisfied customers complain! – Each dissatisfied customer tells 8 to10 people about his/her dissatisfaction Market Impact? – 1000 reported customer complaints are approximately 25,000 dissatisfied customers! – 25,000 dissatisfied customers are expected to communicate their dissatisfaction to approximately 225,000 people!
  • 13. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 13 Creating Stakeholder Value • Customers buy on value. Value as an advantage is determined by comparing quality relative to price. – Quality includes all the non-price attributes that count in the purchase decision--both product and service. – Value (price and quality) is not an absolute expectation. It leads to expectations which can be expressed as tolerances relative to stakeholders’ perceptions about what is possible. Value Quality Price Product Service Initial Price Life Cycle Costs
  • 14. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 14 Stakeholder Value by Accident
  • 15. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 15 Traditional QFD: Definition QFD (Quality Function Deployment): • Is a detailed system for translating the needs and wishes of the consumer into design requirements for products or services. – Developed in Japan by Dr. Yoji Akao and Dr. Shigeru Mizuno – Purpose: assure customer satisfaction – Primary concept: value – Tools: 7 management & planning tools
  • 16. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 16 QFD Advantages QFD has fewer engineering changes and adjustments! NumberofChanges Time Traditional Development QDF Development 1st Day of Production Adapted from Sullivan, 1996
  • 17. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 17 Applying QFD: The Strategic Decision Allocation of Resources QFD requires substantial initial investments vs. Traditional management requires increasing investments Resources Time Traditional QDF
  • 18. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 18 QFD Advantages • Shorter development time (30% - 50%) • Fewer engineering changes (25% - 50%) • Reduced introduction costs • Satisfaction of consumer needs and desires • Improved product manufacturability • Commonality of language • Development of a ready reference for the future
  • 19. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 19 QFD Goals • Increase market share • Design value into the product • Translate subjective statements into objective requirements
  • 20. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 20 QFD Development Process Steps Identify the Market Select a Product Concept Design Product Design Manufacturing Prioritize Customer Segments Understand Customer Needs And Context, Translate into Engineering Language Select the Best Concept Generate New Concepts Target Cost Prioritize Development Projects Establish Targets Establish Relationships between Manufacturing Conditions and Product Performance
  • 21. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 21 Decomposition of Needs into Tolerances and Operating Limits Quantifies the Acceptable Comparative Advantage. text Product Planning Needs Design Targets Feature Deployment Design Targets Feature Specs Workflow Planning Feature Specs Process Tolerances Work Package Planning Process Tolerances Operating Limits If New, Important, or Difficult, Then Define Else Defer Effort Until Required Focusing Criteria Needs Design Targets Feature Specs Process Tolerances Operating Limits Need Hierarchy Outputs are caused by tasks. Value-added tasks should: • Change the output • Solve a need by meeting design targets. design for deployment of best comparative advantage Using a modified QFD framework, • Plan the product. • Plan the workflow.
  • 22. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 22 Stakeholder Management To avoid goal changes and dissatisfied customers? 1. Plan and implement customer value by creating output value 2. Apply QFD concepts at the project level 3. Manage customer satisfaction during the project 4. Manage the customer relationships
  • 23. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 23 Simplified Need Identification: Definitions Needs: Necessity, a condition in which something necessary or desirable is required or wanted; a requirement. Expectations: The condition of looking forward to something Specifications: A detailed description of design criteria for a piece of work Requirements: Something that is required; a necessity; A requirement is a singular documented need of what a particular product or service should be or do. Functional requirements - Describe system features or things the system must do. Non-functional requirements - Describe properties the system must have (e.g. performance, availability, accessibility). Constraints - Limits the development in some way.
  • 24. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 24 Simplified Need Identification: Need Definition A need is: • a condition requiring relief; • anything that is necessary but lacking; • necessitate: require as useful, just, or proper; • a want: have need of …
  • 25. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 25 Simplified Need Identification: Categories of Need Customer satisfaction is influenced by a variety of needs. Undocumented Needs Documented Needs Necessary Satisfiers Desirable Satisfiers Customs & Hidden Motivators Exciters Regulations, Specs, & Standards Negotiating Positions
  • 26. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 26 Simplified Need Identification: Customer Voice Satisfiers Moments of Truth Expectations Broad aspect of need. When experience is compared with expectation, opinion of satisfaction is formed. The tolerance expressed as central tendency and dispersion. One-word label. How customer talks about satisfaction. Names comparison opportunity as an event. Tolerance sets the acceptable uncertainty for outcomes and effort. I want … When I …, I expect … convenience. go shopping, to drive 5 to 15 minutes to find a shopping center.
  • 27. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 27 Simplified Need Identification: Customer Voice Satisfiers Moments of Truth Expectations I want … When I hear about …, I expect … Accuracy. the construction process used to build the house, USL = 150 days, LSL = 30 days, Target = 90 days to complete construction. Reliability. the process used for curing the concrete foundation, USL = 12 days, LSL = 2 days, Target = 7 days to cure. When the house is built in under 3 hours, • I perceive the accuracy of construction to be …? When the concrete is pronounced cured in 20 minutes, • I perceive its reliability to be …? I perceive … • Fear, • Uncertainty, • Doubt …
  • 28. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 28 Exercise: Simplified QFD for the 4-Hour House I expect …When I …,I want … ExpectationsMoments of TruthSatisfiers
  • 29. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 29 Understand Need: Simplified QFD Information Satisfiers Moments of Truth Expectations Broad aspect of need. When experience is compared with expectation, opinion of satisfaction is formed. Tolerance for variation expressed as central tendency and dispersion. One-word label. How customer talks about satisfaction. Names comparison opportunity as an event. Tolerance sets the acceptable uncertainty for outcomes and effort. I want … When I …, I expect … maintainability. redecorate the house, to spend $0 to $1,000 for repair problems. Example: The 4-Hour House should be easy to maintain. Ambiguous attribute of satisfier; must translate into hard expectation. Soft Expectation Measurable attribute of a satisfier; a performance benchmark. If met, should lead to satisfaction. Hard Expectation
  • 30. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 30 Simplified QFD Information Satisfiers Moments of Truth Expectations Broad aspect of need. When experience is compared with expectation, opinion of satisfaction is formed. The tolerance expressed as central tendency and dispersion. One-word label. How customer talks about satisfaction. Names comparison opportunity as an event. Tolerance sets the acceptable uncertainty for outcomes and effort. I want … When I …, I expect … size. learn about the available living space, to find 2,400 sq. ft. +/- 200 sq. ft. of useable living space in the house. Example: The house should be of sufficient size.
  • 31. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 31 Project QFD: Essential Chain critical chain essential path QFD is the theoretical foundation for project QFD: – critical chain — best basis for managing schedule – essential path — best basis for managing value Delivering value to customers is the prime directive for project managers of product development projects
  • 32. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 32 Appendix
  • 33. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 33 Appendix
  • 34. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 34 Appendix: Analyzing Stakeholder Data 7 TQM Management & Planning Tools
  • 35. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 35 Appendix: Quantifying Acceptable Variation using SPC Concepts LQL: Limiting Quality Level for rate of nonconformances which can be tolerated by the stakeholder’s workflow. AQL: Level of nonconformances expected out of the effort’s workflow.
  • 36. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 36 Cp and Cpk Describe the Balance in Acceptable Uncertainty LCL UCL µ-1σ-2σ-3σ +1σ +2σ +3σ Inherent Capability if Cp = 1.0 = Cpk LSL USL Tolerance {x|x = LSL ≤ x ≤ USL} {x|x = LCL ≤ x ≤ UCL} Inherent Capability = Tolerance Tolerance = 2 * Inherent Capability LCL UCL Inherent Capability if Cp = 2.0 = Cpk Tolerance {x|x = LSL ≤ x ≤ USL} {x|x = LCL ≤ x ≤ UCL} LSL USL µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ Tolerance = 1.33 * Inherent Capability LCL UCL Inherent Capability if Cp = 1.33 = Cpk Tolerance {x|x = LSL ≤ x ≤ USL} {x|x = LCL ≤ x ≤ UCL} LSL USL µ +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ Minimum for 6-sigma Quality Inherent Capability if Cp = 2.0; Cpk ≥ 1.5 Tolerance {x|x = LSL ≤ x ≤ USL} LSL USL +1σ +2σ +3σ-1σ-2σ-3σ +4σ-4σ-5σ-6σ +5σ +6σ µ LCL UCL {x|x = LCL ≤ x ≤ UCL}