The document describes a conflict in a project between maximizing quality and staying within budget. Specifically, the purchase manager wants to use high quality cement for the swimming pool bottom, but the project manager believes this will exceed the $10,000 budget. An evaporating cloud model is used to analyze the conflict. The model shows the two requirements of meeting budget and maximizing quality cause a conflict through their prerequisites. By checking the assumptions in the model, alternatives are identified such as obtaining high quality materials at a lower price or allocating less budget to other areas.
On Thursday, February 23, Kegler Brown’s Construction lawyers, Don Gregory and Mike Madigan, presented an informative strategy session on ways to deal with central Ohio’s labor shortage and diversity and inclusion goals.
MBA 6951, Managing Complex Projects 1 Course Learning.docxaryan532920
MBA 6951, Managing Complex Projects 1
Course Learning Outcomes for Unit IV
Upon completion of this unit, students should be able to:
1. Determine the necessary elements of a resource requirements plan.
2. Outline the cost of activities in relation to the project budget.
3. Determine the earned value of work performed.
Reading Assignment
Chapter 6:
Resource Utilization
Chapter 7:
Determining Costs, Budget, and Earned Value
Unit Lesson
Estimating the Cost
There are several types of budgeting. Many organizations use a combination of the strategies, depending on
where they are in the life cycle of a project.
Analogous estimating (or top-down) is used when few details are known about a project. It is often used in
the early stages of a project and based on previous projects of a similar nature. For example, if a builder is
building homes in a subdivision that average $200,000 for a four-bedroom home, and $175,000 for a three-
bedroom home, an analogous estimate for a typical buyer of a four-bedroom home would be $200,000.
It is usually less accurate, but it is cheaper to produce analogous estimates. It is most reliable when previous
projects are very similar and the preparers have expertise in building estimates.
Bottom-up estimating is used when most of the details are known about a project. It is often used in the
later stages of a project. Typically, estimators, or the people who are doing the work, look at each activity and
estimate the cost of that activity. The costs are aggregated into an overall budget. For example, when that
same builder walks through a model home with a potential buyer and the buyer selects all of the fixtures,
lighting, floor coverings, and so on and identifies all of the requested options, he or she can build a much
more accurate budget. In most cases, this budget is much higher. That $200,000 could easily grow into a
$240,000 budget.
Bottom-up estimating is usually more reliable, but it costs more to produce because these estimates take
longer to create.
Fixed costs are costs that remain constant regardless of the duration of a project or scale of business
activity. For example, a purchase of a crane or computer system is the same cost regardless of the duration
of the project.
Variable costs are costs that vary with time or resource changes. For example, hourly labor costs are
dependent on the number of hours.
UNIT IV STUDY GUIDE
Planning, Performing, and
Controlling the Project—Part 3
MBA 6951, Managing Complex Projects 2
UNIT x STUDY GUIDE
Title
Resolving Resource Conflicts
A project manager (PM) can address resource conflicts in a variety of ways, but the first step is to realize
there is a conflict. If the project team builds a schedule using a scheduling tool like Microsoft Project, the PM
can run an overallocated resource report.
Once the overallocation is identified, there are several key strategies to address them: ...
Question 1 Artifacts” in the Scrum terminology are the equiva.docxIRESH3
Question 1
“Artifacts” in the Scrum terminology are the equivalent of deliverables in other project management approaches. Which one of the following is not an artifact created with Scrum?
a.
Daily Scrum log
b.
Burndown chart
c.
Product backlog
d.
Sprint backlog
Question 2
Projects cost money. The expense is spread over the entire project life cycle. Spending on which one of the following is most likely to lower the life cycle cost of the project?
a.
In defining user requirements accurately
b.
In procuring the latest development tools
c.
In conducting extensive quality control
d.
In implementing the change requests
Question 3
Projects have many requirements and it is difficult to ensure that every requirement has been implemented successfully. Which of the following tools will make it easier to do this?
a.
Requirements documentation
b.
Requirements management plan
c.
Requirements traceability matrix
d.
Project scope statement
Question 4
Developing a good work breakdown structure (WBS) is a challenging task. A set of good principles are available to aid in developing a good WBS with a corresponding dictionary. Which one of the following does not belong to this set?
a.
Project managers should develop the WBS alone before sharing with other project team members
b.
In the WBS a unit of work should be represented only once
c.
Each WBS item must be described fully in the WBS dictionary
d.
Only one team member will be responsible for a WBS item
Question 5
You are managing a project in which a few deadlines have been missed. Now, you are under pressure to get the project back on track to finish by the scheduled end date. You find that it is possible to fast track some of the activities. What does this mean?
a.
Do some activities in parallel when they were originally planned to be sequential
b.
Add more resources to some activities to complete them sooner
c.
Remove some of the activities in the critical path
d.
Outsource some of the activities to experts
Question 6
You have been asked to manage a product development project. Which of the following costs cannot be a cost of this project?
a.
Labor
b.
Advertisement
c.
Electricity
d.
Equipment
Question 7
Organizations take various approaches for the selection of projects. One such approach is to act on an impetus. Which one of the following is not an impetus for project selection?
a.
Situations that have the potential to limit the growth of the organization
b.
Situations that have the potential to improve the growth of the organization
c.
Situations that are compatible with the project manager’s experience
d.
Situations that are imposed on the organization by a regulatory authority
Question 8
A project has accurate cost estimates. It is still important to prepare a project budget. Which one of the following is not a reason for creating the project budget?
a.
To create a cost baseline
b.
To have a more accurate project cost
c.
To evaluate project progress
d ...
QUESTION :
Taylor’s University is intending to build a branch campus in Kota Kinabalu, Sabah. Based on Taylor’s University plan they require the branch campus to be operational in mid-2019. Your quantity surveying firm, Innovative Cost Consultant Sdn. Bhd., of which you are a director, has been appointed to provide advice on the procurement system and the tendering methods that are to be adopted in carrying out the project.
The management of the University has informed you that the following requirements are of priority:
i) Cost to completion to be within the budget fixed.
ii) Timely delivery of the facility in order to commence operation in mid- 2019.
You are required to prepare a report to Taylor’s University recommending the procurement system and the tendering method to be adopted.
In your report you shall consider the procurement systems commonly used. You shall list out and explain the advantages and disadvantages of each system before making your recommendation.
As for the tendering methods, you shall consider all the three methods; i.e. open, selective and direct negotiation methods. Similarly you are to describe the advantages and disadvantages of each method before arriving at your recommendation.
Your report shall clearly explain your reasons for your recommendations.
Based on the above recommendations you are also required to prepare a simple programme or schedule in a form of bar chart showing the various activities commencing from the confirmation of the procurement system until completion of the project.
On Thursday, February 23, Kegler Brown’s Construction lawyers, Don Gregory and Mike Madigan, presented an informative strategy session on ways to deal with central Ohio’s labor shortage and diversity and inclusion goals.
MBA 6951, Managing Complex Projects 1 Course Learning.docxaryan532920
MBA 6951, Managing Complex Projects 1
Course Learning Outcomes for Unit IV
Upon completion of this unit, students should be able to:
1. Determine the necessary elements of a resource requirements plan.
2. Outline the cost of activities in relation to the project budget.
3. Determine the earned value of work performed.
Reading Assignment
Chapter 6:
Resource Utilization
Chapter 7:
Determining Costs, Budget, and Earned Value
Unit Lesson
Estimating the Cost
There are several types of budgeting. Many organizations use a combination of the strategies, depending on
where they are in the life cycle of a project.
Analogous estimating (or top-down) is used when few details are known about a project. It is often used in
the early stages of a project and based on previous projects of a similar nature. For example, if a builder is
building homes in a subdivision that average $200,000 for a four-bedroom home, and $175,000 for a three-
bedroom home, an analogous estimate for a typical buyer of a four-bedroom home would be $200,000.
It is usually less accurate, but it is cheaper to produce analogous estimates. It is most reliable when previous
projects are very similar and the preparers have expertise in building estimates.
Bottom-up estimating is used when most of the details are known about a project. It is often used in the
later stages of a project. Typically, estimators, or the people who are doing the work, look at each activity and
estimate the cost of that activity. The costs are aggregated into an overall budget. For example, when that
same builder walks through a model home with a potential buyer and the buyer selects all of the fixtures,
lighting, floor coverings, and so on and identifies all of the requested options, he or she can build a much
more accurate budget. In most cases, this budget is much higher. That $200,000 could easily grow into a
$240,000 budget.
Bottom-up estimating is usually more reliable, but it costs more to produce because these estimates take
longer to create.
Fixed costs are costs that remain constant regardless of the duration of a project or scale of business
activity. For example, a purchase of a crane or computer system is the same cost regardless of the duration
of the project.
Variable costs are costs that vary with time or resource changes. For example, hourly labor costs are
dependent on the number of hours.
UNIT IV STUDY GUIDE
Planning, Performing, and
Controlling the Project—Part 3
MBA 6951, Managing Complex Projects 2
UNIT x STUDY GUIDE
Title
Resolving Resource Conflicts
A project manager (PM) can address resource conflicts in a variety of ways, but the first step is to realize
there is a conflict. If the project team builds a schedule using a scheduling tool like Microsoft Project, the PM
can run an overallocated resource report.
Once the overallocation is identified, there are several key strategies to address them: ...
Question 1 Artifacts” in the Scrum terminology are the equiva.docxIRESH3
Question 1
“Artifacts” in the Scrum terminology are the equivalent of deliverables in other project management approaches. Which one of the following is not an artifact created with Scrum?
a.
Daily Scrum log
b.
Burndown chart
c.
Product backlog
d.
Sprint backlog
Question 2
Projects cost money. The expense is spread over the entire project life cycle. Spending on which one of the following is most likely to lower the life cycle cost of the project?
a.
In defining user requirements accurately
b.
In procuring the latest development tools
c.
In conducting extensive quality control
d.
In implementing the change requests
Question 3
Projects have many requirements and it is difficult to ensure that every requirement has been implemented successfully. Which of the following tools will make it easier to do this?
a.
Requirements documentation
b.
Requirements management plan
c.
Requirements traceability matrix
d.
Project scope statement
Question 4
Developing a good work breakdown structure (WBS) is a challenging task. A set of good principles are available to aid in developing a good WBS with a corresponding dictionary. Which one of the following does not belong to this set?
a.
Project managers should develop the WBS alone before sharing with other project team members
b.
In the WBS a unit of work should be represented only once
c.
Each WBS item must be described fully in the WBS dictionary
d.
Only one team member will be responsible for a WBS item
Question 5
You are managing a project in which a few deadlines have been missed. Now, you are under pressure to get the project back on track to finish by the scheduled end date. You find that it is possible to fast track some of the activities. What does this mean?
a.
Do some activities in parallel when they were originally planned to be sequential
b.
Add more resources to some activities to complete them sooner
c.
Remove some of the activities in the critical path
d.
Outsource some of the activities to experts
Question 6
You have been asked to manage a product development project. Which of the following costs cannot be a cost of this project?
a.
Labor
b.
Advertisement
c.
Electricity
d.
Equipment
Question 7
Organizations take various approaches for the selection of projects. One such approach is to act on an impetus. Which one of the following is not an impetus for project selection?
a.
Situations that have the potential to limit the growth of the organization
b.
Situations that have the potential to improve the growth of the organization
c.
Situations that are compatible with the project manager’s experience
d.
Situations that are imposed on the organization by a regulatory authority
Question 8
A project has accurate cost estimates. It is still important to prepare a project budget. Which one of the following is not a reason for creating the project budget?
a.
To create a cost baseline
b.
To have a more accurate project cost
c.
To evaluate project progress
d ...
QUESTION :
Taylor’s University is intending to build a branch campus in Kota Kinabalu, Sabah. Based on Taylor’s University plan they require the branch campus to be operational in mid-2019. Your quantity surveying firm, Innovative Cost Consultant Sdn. Bhd., of which you are a director, has been appointed to provide advice on the procurement system and the tendering methods that are to be adopted in carrying out the project.
The management of the University has informed you that the following requirements are of priority:
i) Cost to completion to be within the budget fixed.
ii) Timely delivery of the facility in order to commence operation in mid- 2019.
You are required to prepare a report to Taylor’s University recommending the procurement system and the tendering method to be adopted.
In your report you shall consider the procurement systems commonly used. You shall list out and explain the advantages and disadvantages of each system before making your recommendation.
As for the tendering methods, you shall consider all the three methods; i.e. open, selective and direct negotiation methods. Similarly you are to describe the advantages and disadvantages of each method before arriving at your recommendation.
Your report shall clearly explain your reasons for your recommendations.
Based on the above recommendations you are also required to prepare a simple programme or schedule in a form of bar chart showing the various activities commencing from the confirmation of the procurement system until completion of the project.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
1. Student’s name: Yiheng, Deng
Student’s ID: 0435
Professor: Thomas Lechler
Course ID: MGT 610
Date: 1/26/2013
Analysis of an identified problem on the project level with an
Evaporating Cloud Model
Conflict description:
In the following conflict cloud model, I would like to show you a typical conflict
between two of the fundamental requirements in general project plans, budget
and the quality. Assume that the project goal is to build a swimming pool with
a budget of $10,000. Purchase department manager wants to maximize the
quality of the swimming pool’s button, so he wants to purchase high quality
cement when paving the button ground. However, the project manager
opposes this idea with the point that if they use that certain high quality
cement, they will exceed the total budget. In fact, both of them try to maximize
the project’s goal achievement at the same time, but they cannot avoid the
conflict.
Model description:
In the following model, we can see that, in order to maximize the goal
achievement (A), the project needs to meet two requirements, including B:
achievement the project goal within the total budget which means the cost of
the swimming pool cannot exceed $10,000, C: maximize the quality of the
project which means the swimming pool should be built in best quality. So, in
order to meet requirement B, we have prerequisite D that the purchase
manager should not purchase high quality cement to build the button ground;
otherwise it will raise the total cost of the swimming pool. In order to meet
requirement C, we have prerequisite that they should use the high quality
2. cement. In this way, the perquisites cause conflict. The assumptions between
each logic chain are shown on the arrows in the chart.
To solve the identified conflict show above, the first way is to find out whether
prerequisite D block the requirement C, or whether block B. we can see
that, if the project team don’t use high quality product they absolutely cannot
maximize the quality of the whole project, on the other hand, if they use high
quality product, they might exceed the total budget as the project manager
said. So we need to go to next step to dig a solution.
In this step, we will try to check the assumptions being made by both sides in
the conflict. If any of these assumptions is not valid, it means there is a break
point in the logic, and we can find a third alternative to solve the situation.
A
C
B
D
3. When checking the assumptions between requirement B and prerequisite D,
we find out that assumption 1” High quality products are expensive” is not
necessary true, because maybe there are some ways to obtain high quality
product with a low price. For example, the company can sign a long term
contact with the product supplier so that they can get a discount or compare
many suppliers before choosing one of them to get a satisfied price.
Meanwhile, assumption 3 is not necessary true neither, since the project
manager can allocate fewer budgets in other parts of the project which will not
affect the whole project quality significantly.
Now, we check the assumptions between C and , then we can find out that
assumption 2, 3, 4 are not necessary true, because high quality product
sometimes cannot lead to high quality project with poor producing procedures
while normal materials with high quality performance can also achieve high
quality project goal. What’s more, they should always concern about budget
when purchasing materials.
All in all, to solve this conflict, I suggest that the project manager can allocate
fewer budgets in other parts of the plan after weighting the importance of
them, or they try other way to obtain high quality materials with a low price, or
they can just use normal materials but with high performance procedures to
achieve the project goal.