Analysis of an identified problem on the project level with an
Evaporating Cloud Model
Conflict description:
In the following conflict cloud model, I would like to show you a typical conflict
between two of the fundamental requirements in general project plans, budget
and the quality. Assume that the project goal is to build a swimming pool with
a budget of $10,000. Purchase department manager wants to maximize the
quality of the swimming pool’s button, so he wants to purchase high quality
cement when paving the button ground. However, the project manager
opposes this idea with the point that if they use that certain high quality
cement, they will exceed the total budget. In fact, both of them try to maximize
the project’s goal achievement at the same time, but they cannot avoid the
conflict.
Model description:
In the following model, we can see that, in order to maximize the goal
achievement (A), the project needs to meet two requirements, including B:
achievement the project goal within the total budget which means the cost of
the swimming pool cannot exceed $10,000, C: maximize the quality of the
project which means the swimming pool should be built in best quality. So, in
order to meet requirement B, we have prerequisite D that the purchase
manager should not purchase high quality cement to build the button ground;
otherwise it will raise the total cost of the swimming pool. In order to meet
requirement C, we have prerequisite that they should use the high quality
cement. In this way, the perquisites cause conflict. The assumptions between
each logic chain are shown on the arrows in the chart.
To solve the identified conflict show above, the first way is to find out whether
prerequisite D block the requirement C, or whether block B. we can see
that, if the project team don’t use high quality product they absolutely cannot
maximize the quality of the whole project, on the other hand, if they use high
quality product, they might exceed the total budget as the project manager
said. So we need to go to next step to dig a solution.
In this step, we will try to check the assumptions being made by both sides in
the conflict. If any of these assumptions is not valid, it means there is a break
point in the logic, and we can find a third alternative to solve the situation.
A
C
B
D
When checking the assumptions between requirement B and prerequisite D,
we find out that assumption 1” High quality products are expensive” is not
necessary true, because maybe there are some ways to obtain high quality
product with a low price. For example, the company can sign a long term
contact with the product supplier so that they can get a discount or compare
many suppliers before choosing one of them to get a satisfied price.
Meanwhile, assumption 3 is not necessary true neither, since the project
manager can allocate fewer budgets in other parts of the project which will not
affect the whole project quality significantly.
Now, we check the assumptions between C and , then we can find out that
assumption 2, 3, 4 are not necessary true, because high quality product
sometimes cannot lead to high quality project with poor producing procedures
while normal materials with high quality performance can also achieve high
quality project goal. What’s more, they should always concern about budget
when purchasing materials.
All in all, to solve this conflict, I suggest that the project manager can allocate
fewer budgets in other parts of the plan after weighting the importance of
them, or they try other way to obtain high quality materials with a low price, or
they can just use normal materials but with high performance procedures to
achieve the project goal.

More Related Content

Similar to Yiheng deng hw1

PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
MoncefMakni1
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
Artonline Home
 
Full length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folksFull length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folks
Sudharsan Purushothaman
 
Booming City Seminar.pdf
Booming City Seminar.pdfBooming City Seminar.pdf
Booming City Seminar.pdf
Kegler Brown Hill + Ritter
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
Lwj Welson
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
Lwj Welson
 
CEE526 Paper for Group 33 (Bowen, Bhanu)
CEE526 Paper for Group 33 (Bowen, Bhanu)CEE526 Paper for Group 33 (Bowen, Bhanu)
CEE526 Paper for Group 33 (Bowen, Bhanu)Bowen Deng
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
Mohamed Saeed
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
Kshitij Yelkar MBA/PMP/CSM/ICP-ACC
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
wendyteosy
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
Timun Loh
 
Guaranteed maximum contracts
Guaranteed maximum contractsGuaranteed maximum contracts
Guaranteed maximum contractsPaul Gogulski
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
hiewliming
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 MBA 6951, Managing Complex Projects 1 Course Learning.docx MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
aryan532920
 
PMP Exam Sample Questions 9
PMP Exam Sample Questions 9PMP Exam Sample Questions 9
PMP Exam Sample Questions 9
OSP International LLC
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
IRESH3
 
PMP Exam Q & A
PMP Exam Q & APMP Exam Q & A
PMP Exam Q & A
OSP International LLC
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
OSP International LLC
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lee Pei Gie
 

Similar to Yiheng deng hw1 (20)

PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 
Full length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folksFull length mock test useful for PMP Exam folks
Full length mock test useful for PMP Exam folks
 
Booming City Seminar.pdf
Booming City Seminar.pdfBooming City Seminar.pdf
Booming City Seminar.pdf
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
CEE526 Paper for Group 33 (Bowen, Bhanu)
CEE526 Paper for Group 33 (Bowen, Bhanu)CEE526 Paper for Group 33 (Bowen, Bhanu)
CEE526 Paper for Group 33 (Bowen, Bhanu)
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Guaranteed maximum contracts
Guaranteed maximum contractsGuaranteed maximum contracts
Guaranteed maximum contracts
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 MBA 6951, Managing Complex Projects 1 Course Learning.docx MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
Pp report
Pp reportPp report
Pp report
 
PMP Exam Sample Questions 9
PMP Exam Sample Questions 9PMP Exam Sample Questions 9
PMP Exam Sample Questions 9
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
 
PMP Exam Q & A
PMP Exam Q & APMP Exam Q & A
PMP Exam Q & A
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 

More from henry KKK

Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributeshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slideshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_shenry KKK
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slideshenry KKK
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_casehenry KKK
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slideshenry KKK
 
Week05 reading
Week05 readingWeek05 reading
Week05 readinghenry KKK
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercisehenry KKK
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013henry KKK
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsethenry KKK
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013henry KKK
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013henry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_shenry KKK
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cchenry KKK
 

More from henry KKK (20)

Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_s
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slides
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cc
 

Recently uploaded

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 

Yiheng deng hw1

  • 1. Student’s name: Yiheng, Deng Student’s ID: 0435 Professor: Thomas Lechler Course ID: MGT 610 Date: 1/26/2013 Analysis of an identified problem on the project level with an Evaporating Cloud Model Conflict description: In the following conflict cloud model, I would like to show you a typical conflict between two of the fundamental requirements in general project plans, budget and the quality. Assume that the project goal is to build a swimming pool with a budget of $10,000. Purchase department manager wants to maximize the quality of the swimming pool’s button, so he wants to purchase high quality cement when paving the button ground. However, the project manager opposes this idea with the point that if they use that certain high quality cement, they will exceed the total budget. In fact, both of them try to maximize the project’s goal achievement at the same time, but they cannot avoid the conflict. Model description: In the following model, we can see that, in order to maximize the goal achievement (A), the project needs to meet two requirements, including B: achievement the project goal within the total budget which means the cost of the swimming pool cannot exceed $10,000, C: maximize the quality of the project which means the swimming pool should be built in best quality. So, in order to meet requirement B, we have prerequisite D that the purchase manager should not purchase high quality cement to build the button ground; otherwise it will raise the total cost of the swimming pool. In order to meet requirement C, we have prerequisite that they should use the high quality
  • 2. cement. In this way, the perquisites cause conflict. The assumptions between each logic chain are shown on the arrows in the chart. To solve the identified conflict show above, the first way is to find out whether prerequisite D block the requirement C, or whether block B. we can see that, if the project team don’t use high quality product they absolutely cannot maximize the quality of the whole project, on the other hand, if they use high quality product, they might exceed the total budget as the project manager said. So we need to go to next step to dig a solution. In this step, we will try to check the assumptions being made by both sides in the conflict. If any of these assumptions is not valid, it means there is a break point in the logic, and we can find a third alternative to solve the situation. A C B D
  • 3. When checking the assumptions between requirement B and prerequisite D, we find out that assumption 1” High quality products are expensive” is not necessary true, because maybe there are some ways to obtain high quality product with a low price. For example, the company can sign a long term contact with the product supplier so that they can get a discount or compare many suppliers before choosing one of them to get a satisfied price. Meanwhile, assumption 3 is not necessary true neither, since the project manager can allocate fewer budgets in other parts of the project which will not affect the whole project quality significantly. Now, we check the assumptions between C and , then we can find out that assumption 2, 3, 4 are not necessary true, because high quality product sometimes cannot lead to high quality project with poor producing procedures while normal materials with high quality performance can also achieve high quality project goal. What’s more, they should always concern about budget when purchasing materials. All in all, to solve this conflict, I suggest that the project manager can allocate fewer budgets in other parts of the plan after weighting the importance of them, or they try other way to obtain high quality materials with a low price, or they can just use normal materials but with high performance procedures to achieve the project goal.