Six Sigma in Action:
                 Demonstrating Customer Value

                         Print Server Availability
                         for GE Medical Systems




Master Black Belt: Steven Bonacorsi
UNIX Print Server Availability

Customer Profile – UNIX CAD users in CT, PET, X-Ray and                               Before:                                 Process Capability Analysis for Total Time
Nuclear Engineering Groups                                                                                                                   USL
                                                                                       Process Data
                                                                              USL                   1.00000

Business Problem & Impact                                                     Target
                                                                              LSL
                                                                                                              *
                                                                                                              *
When the UNIX Print Services went down the average time to resolve            Mean                  8.77610
                                                                              Sample N                       96
issue is 8.8 days. UNIX Client Support Team has targeted time to resolve      StDev (ST)              7.5033
Print Server issues is <24 hours.                                             StDev (LT)            30.1394



Measure & Analyze                                                              Potential (ST) Capability
                                                                              Cp                              *
Data Collection: Printing problem calls was measured by Clarify.              CPU                      -0.35
                                                                              CPL                             *
Root Causes: Nature of transferring the trouble call to a different trouble   Cpk                      -0.35

call tracking system that the UNIX Administrators use and coordinating        Cpm                             *
                                                                                                                      -100          -50          0           50          100           150          200         250

both groups to troubleshoot the printing problem.                                  Overall (LT) Capability                   Observed Performance             Expected ST Performance               Expected LT Perform
                                                                              Pp                              *         PPM < LSL                    *       PPM < LSL                   *         PPM < LSL

Improve & Control                                                             PPU
                                                                              PPL          After:
                                                                                                       -0.09
                                                                                                              *
                                                                                                                        PPM > USL
                                                                                                                        PPM Total
                                                                                                                                          531250.00          PPM > USL          849983.13
                                                                                                                                    Process Capability Analysis for Total Total (
                                                                                                                                       531250.00 PPM Total 849983.13  PPM Time
                                                                                                                                                                                                   PPM > USL           601
                                                                                                                                                                                                                       601
Rename all print queues to a standard naming format that will identify        Ppk                      -0.09

there location and printer type in the queue name. This will reduce                                                                                                                                 USL
                                                                                        Process Data
confusion in printer location and printer capabilities. Giving UNIX CAD       USL                        1.000
users access to newer printer models and features not before available to     Target                              *
                                                                              LSL                                 *
them on the UNIX Print Servers.                                               Mean                       0.354
                                                                              Sample N                        16

Results/Benefits                                                              StDev (ST)
                                                                              StDev (LT)
                                                                                                    0.318853
                                                                                                    0.400810
• Defects - 96 defects in 9 months to only 1 in 5 months.
• Calls to Helpdesk – 96 in 9 months to 16 in 5 Months.                         Potential (ST) Capability
                                                                              Cp                                  *
• Total Ticket Time - 8.8 days to less than 1 day.                            CPU                            0.68

• Maintenance savings by using NT Boxes $2708                                 CPL
                                                                              Cpk                            0.68
                                                                                                                  *


• Labor Savings of $23, 044                                                   Cpm                                 *
                                                                                                                        -1.0              -0.5                0.0                0.5                 1.0


                                                                                   Overall (LT) Capability                     Observed Performance                  Expected ST Performance                Expected L

   Savings of over $25K, Response time 9 days to < 24 hours!                  Pp
                                                                              PPU
                                                                              PPL
                                                                                                             0.54
                                                                                                                  *


                                                                                                                  *
                                                                                                                             PPM < LSL
                                                                                                                             PPM > USL
                                                                                                                             PPM Total
                                                                                                                                                 62500.00
                                                                                                                                                 62500.00
                                                                                                                                                         *          PPM < LSL
                                                                                                                                                                    PPM > USL
                                                                                                                                                                    PPM Total
                                                                                                                                                                                               *
                                                                                                                                                                                        21381.92
                                                                                                                                                                                        21381.92
                                                                                                                                                                                                           PPM < LSL
                                                                                                                                                                                                           PPM > USL
                                                                                                                                                                                                           PPM Total
                                                                              Ppk                            0.54

More Related Content

More from Steven Bonacorsi

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingSteven Bonacorsi
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsSteven Bonacorsi
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sSteven Bonacorsi
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study PromappSteven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilSteven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI GlobalSteven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonaldsSteven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis EnergySteven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study PromappSteven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case StudySteven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans OlexSteven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma TemplatesSteven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studiesSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 

More from Steven Bonacorsi (20)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 

Print Server Availability Six Sigma Case Study

  • 1. Six Sigma in Action: Demonstrating Customer Value Print Server Availability for GE Medical Systems Master Black Belt: Steven Bonacorsi
  • 2. UNIX Print Server Availability Customer Profile – UNIX CAD users in CT, PET, X-Ray and Before: Process Capability Analysis for Total Time Nuclear Engineering Groups USL Process Data USL 1.00000 Business Problem & Impact Target LSL * * When the UNIX Print Services went down the average time to resolve Mean 8.77610 Sample N 96 issue is 8.8 days. UNIX Client Support Team has targeted time to resolve StDev (ST) 7.5033 Print Server issues is <24 hours. StDev (LT) 30.1394 Measure & Analyze Potential (ST) Capability Cp * Data Collection: Printing problem calls was measured by Clarify. CPU -0.35 CPL * Root Causes: Nature of transferring the trouble call to a different trouble Cpk -0.35 call tracking system that the UNIX Administrators use and coordinating Cpm * -100 -50 0 50 100 150 200 250 both groups to troubleshoot the printing problem. Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Perform Pp * PPM < LSL * PPM < LSL * PPM < LSL Improve & Control PPU PPL After: -0.09 * PPM > USL PPM Total 531250.00 PPM > USL 849983.13 Process Capability Analysis for Total Total ( 531250.00 PPM Total 849983.13 PPM Time PPM > USL 601 601 Rename all print queues to a standard naming format that will identify Ppk -0.09 there location and printer type in the queue name. This will reduce USL Process Data confusion in printer location and printer capabilities. Giving UNIX CAD USL 1.000 users access to newer printer models and features not before available to Target * LSL * them on the UNIX Print Servers. Mean 0.354 Sample N 16 Results/Benefits StDev (ST) StDev (LT) 0.318853 0.400810 • Defects - 96 defects in 9 months to only 1 in 5 months. • Calls to Helpdesk – 96 in 9 months to 16 in 5 Months. Potential (ST) Capability Cp * • Total Ticket Time - 8.8 days to less than 1 day. CPU 0.68 • Maintenance savings by using NT Boxes $2708 CPL Cpk 0.68 * • Labor Savings of $23, 044 Cpm * -1.0 -0.5 0.0 0.5 1.0 Overall (LT) Capability Observed Performance Expected ST Performance Expected L Savings of over $25K, Response time 9 days to < 24 hours! Pp PPU PPL 0.54 * * PPM < LSL PPM > USL PPM Total 62500.00 62500.00 * PPM < LSL PPM > USL PPM Total * 21381.92 21381.92 PPM < LSL PPM > USL PPM Total Ppk 0.54