By Ashwini Kumar
            10it21
Contents
 Introduction
 History
 Main functionality
 Browser’s main components
 working of each components
 Features
 Future Trends and Ongoing research
 Conclusion
History
 The first web browser was invented in 1990 by Sir Tim
    Berners-Lee. It was called WorldWideWeb (no spaces)
    and was later renamed Nexus.Later
   -Microsoft responded with its Internet Explorer in
    1995.
   Opera debuted in 1996.
   -In 1998,mozila foundation released firefox .
   -Apple's Safari had its first beta release in January
    2003.e.t.c
Main
functionality

The browser main
functionality is to
present the web
resource you choose
by requesting it
from server and
display it on the
browser window
 Web browsers communicate with web servers
  primarily using HTTP (hyper-text transfer protocol) to
  fetch webpages.
 Web Pages are located by means of a URL (uniform
  resource locator), which is treated as an address.
 Many browsers also support a variety of other URL
  types and their corresponding protocols, such as ftp:
  for FTP (file transfer protocol), and https: for HTTPS
  (an SSL encrypted version of HTTP).
Browser’s Main Component
 The user interface - this includes the address bar, back/forward
    button, bookmarking menu etc.
   The browser engine - the interface for querying and
    manipulating the rendering engine.
   The rendering engine - responsible for displaying the requested
    content.
   Networking - used for network calls, like HTTP requests.
   JavaScript interpreter-Used to parse and execute the JavaScript
    code.
   Data storage-The browser needs to save all sorts of data on the
    hard disk, for examples, cookies. The new HTML specification
    (HTML5) defines 'web database' which is a complete (although
    light) database in the browser.
   UI backend - used for drawing basic widgets like combo boxes
    and windows
Main component of a browser
 Rendering Engine includes:
1. Rendering Process
2. Rendering Modes
3. Dynamic Pages
4. Resource Loading
Rendering Process
 Load the HTML
 Parse it
 Apply styles
 Build frames
 Layout the frames (flow)
 Paint the frames
 display
Rendering Engine
 The responsibility of the rendering engine is
  rendering, that is display of the requested contents on
  the browser screen.
 By default the rendering engine can display HTML and
  XML documents and images.
 It can display other types through a plug-in (a browser
  extension). An example is displaying PDF using a PDF
  viewer plug-in.
Features
 HTTP and HTTPS
 HTML, XMLand XHTML
 Cascading Style Sheets
 JavaScript
 RSS(rich site summary)
 Bookmarks
 Caching
 Plugins like pdf reader,video player e.t.c
Conclusion
 Web Browser is efficient application for fetching
    resources.
   It uses different protocol .
   Rendering Engine responsible for displaying webpages
   Parser helps in translation of html.
   It provides many functionality such as plug in.
   They’ll help the web community imagine and create a
    future of great, innovative web apps.
   Thank You

Web browser

  • 1.
  • 2.
    Contents  Introduction  History Main functionality  Browser’s main components  working of each components  Features  Future Trends and Ongoing research  Conclusion
  • 4.
    History  The firstweb browser was invented in 1990 by Sir Tim Berners-Lee. It was called WorldWideWeb (no spaces) and was later renamed Nexus.Later  -Microsoft responded with its Internet Explorer in 1995.  Opera debuted in 1996.  -In 1998,mozila foundation released firefox .  -Apple's Safari had its first beta release in January 2003.e.t.c
  • 5.
    Main functionality The browser main functionalityis to present the web resource you choose by requesting it from server and display it on the browser window
  • 6.
     Web browserscommunicate with web servers primarily using HTTP (hyper-text transfer protocol) to fetch webpages.  Web Pages are located by means of a URL (uniform resource locator), which is treated as an address.  Many browsers also support a variety of other URL types and their corresponding protocols, such as ftp: for FTP (file transfer protocol), and https: for HTTPS (an SSL encrypted version of HTTP).
  • 7.
    Browser’s Main Component The user interface - this includes the address bar, back/forward button, bookmarking menu etc.  The browser engine - the interface for querying and manipulating the rendering engine.  The rendering engine - responsible for displaying the requested content.  Networking - used for network calls, like HTTP requests.  JavaScript interpreter-Used to parse and execute the JavaScript code.  Data storage-The browser needs to save all sorts of data on the hard disk, for examples, cookies. The new HTML specification (HTML5) defines 'web database' which is a complete (although light) database in the browser.  UI backend - used for drawing basic widgets like combo boxes and windows
  • 8.
  • 10.
     Rendering Engineincludes: 1. Rendering Process 2. Rendering Modes 3. Dynamic Pages 4. Resource Loading
  • 11.
    Rendering Process  Loadthe HTML  Parse it  Apply styles  Build frames  Layout the frames (flow)  Paint the frames  display
  • 12.
    Rendering Engine  Theresponsibility of the rendering engine is rendering, that is display of the requested contents on the browser screen.  By default the rendering engine can display HTML and XML documents and images.  It can display other types through a plug-in (a browser extension). An example is displaying PDF using a PDF viewer plug-in.
  • 13.
    Features  HTTP andHTTPS  HTML, XMLand XHTML  Cascading Style Sheets  JavaScript  RSS(rich site summary)  Bookmarks  Caching  Plugins like pdf reader,video player e.t.c
  • 14.
    Conclusion  Web Browseris efficient application for fetching resources.  It uses different protocol .  Rendering Engine responsible for displaying webpages  Parser helps in translation of html.  It provides many functionality such as plug in.  They’ll help the web community imagine and create a future of great, innovative web apps.
  • 15.
    Thank You