SlideShare a Scribd company logo
WASTE DISPOSAL
&
RECYCLING
ABIN BABU
MBA ( CE & QS )
A13559015043
PROCUREMENT & SUPPLYCHAIN MANAGEMENT
SEM4
■ Sustainable waste management involves managing waste in a environmentally sound
,socially satisfactory and techno economically viable manner
Construction waste
production in india
Kg/sqm
New construction 40-60
Demolition 400-600
Repair works 40-50
City Waste production
(tonne/day )
Delhi 4600
Ahmedabad 700
Chennai 2500
Factors affecting waste generation
Factors
Low
availability
of land
Old buildings
Trends in
renovation &
recycling
Labour cost
Demolition
High rate of
urbanisation
Concrete Brick
asphalt Metal
Timber Plastic
excavation stone Soil & sand
Concrete • Crushing techniques
• Low grade roads as base /subbase
Brick • Reuse of bricks
• Reuse in roads as base/subbase
Asphalt • Reclaimed & recycled asphalt pavement
• 100 % recyclable
Plastic • Can be recycled in low grade plastic
productions
• Proper collection is very important
Timber • Reuse of furniture after touch work
• Infrastructure timber – poles ,sleepers
Metal • 95 % recycled material is steel and iron
• If rust free can be recycled
Stone • Crushing & reusing
• Decoration works
Soil & sand • Unless reused in site ,requires treatment
and disposal
Waste disposal
■ As per construction & demolition waste management rules 2016
■ Have provisions for generator and local authority
■ Generator has the responsibility for collection ,segregation and storage of waste
■ Generator also has to ensure the avoidance of mixing of C&D waste and solid waste
■ Generator also has to prepare waste management plan and get it approved by local
authority (20 tonnes /day or 300 tonnes /month )
■ Waste collected has to be kept in premises or dumped to designated sites ( landfills ) or
should be handed over for treatment
■ Authority has the responsibility of
– Development of strategy for waste management
– Collection and transportation of waste
– Maintenance of records
– Instalation of processing facilities
Solid waste management plan
■ Should contain
– Responsibilities of stakeholders
– Waste identification and its
management
– disposal of waste
– Communication and training
– Measuring and monitoring
– documentation
THANKYOU

More Related Content

Similar to Waste disposal &recycling

Current status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptxCurrent status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptx
washifahmednaqib
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
Dr K M SONI
 
Solid wast management
Solid wast management Solid wast management
Solid wast management
Vijay Krishna
 
Waste-Managementppt.pptx
Waste-Managementppt.pptxWaste-Managementppt.pptx
Waste-Managementppt.pptx
JunarCano2
 
Solid wast mangement
Solid wast mangementSolid wast mangement
Solid wast mangementVijay Krishna
 
Waste Management Methods.pptx
Waste Management Methods.pptxWaste Management Methods.pptx
Waste Management Methods.pptx
ssuser54b5c5
 
Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014) Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014)
PAS_Team
 
durgesh ppt mswm.pptx
durgesh ppt mswm.pptxdurgesh ppt mswm.pptx
durgesh ppt mswm.pptx
DilipPaytm
 
Waste management.pptx
Waste management.pptxWaste management.pptx
Waste management.pptx
RohanRathod47
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02priyesh12
 
Solid waste
Solid wasteSolid waste
Solid waste
Prachi Wakode
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
Saleh Sayem
 
Solid waste management
Solid waste managementSolid waste management
Solid waste managementRosidah Saad
 
Construction demolition waste
Construction demolition wasteConstruction demolition waste
Construction demolition waste
Ranjan Kumar Lal
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
Subham Goyal
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
tarun choudhary
 
Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10
Zero Waste Scotland
 
Minning waste management
Minning waste managementMinning waste management
Minning waste management
Mubbara Arshad
 

Similar to Waste disposal &recycling (20)

Current status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptxCurrent status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptx
 
Landfill - Basics
Landfill - BasicsLandfill - Basics
Landfill - Basics
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
Solid wast management
Solid wast management Solid wast management
Solid wast management
 
Waste-Managementppt.pptx
Waste-Managementppt.pptxWaste-Managementppt.pptx
Waste-Managementppt.pptx
 
Solid wast mangement
Solid wast mangementSolid wast mangement
Solid wast mangement
 
Waste Management Methods.pptx
Waste Management Methods.pptxWaste Management Methods.pptx
Waste Management Methods.pptx
 
Lynch Total Waste Solutions 2016
Lynch Total Waste Solutions 2016Lynch Total Waste Solutions 2016
Lynch Total Waste Solutions 2016
 
Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014) Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014)
 
durgesh ppt mswm.pptx
durgesh ppt mswm.pptxdurgesh ppt mswm.pptx
durgesh ppt mswm.pptx
 
Waste management.pptx
Waste management.pptxWaste management.pptx
Waste management.pptx
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02
 
Solid waste
Solid wasteSolid waste
Solid waste
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Construction demolition waste
Construction demolition wasteConstruction demolition waste
Construction demolition waste
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
 
Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10
 
Minning waste management
Minning waste managementMinning waste management
Minning waste management
 

More from EVERSENDAI ENGINEERING (L.L.C.)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
EVERSENDAI ENGINEERING (L.L.C.)
 
Laws company act
Laws company actLaws company act
Hrm
HrmHrm
construction planning
construction planningconstruction planning
construction planning
EVERSENDAI ENGINEERING (L.L.C.)
 
basic qs notes
basic qs notesbasic qs notes
statistics basic
statistics basicstatistics basic
Sustainability
Sustainability Sustainability
Stratergy notes 2
Stratergy notes 2Stratergy notes 2
Strategy note 1
Strategy note 1Strategy note 1
Qhsem
Qhsem Qhsem
Project planning notes
Project planning notesProject planning notes
Project planning notes
EVERSENDAI ENGINEERING (L.L.C.)
 
Quantity surveying notes......
Quantity surveying notes......  Quantity surveying notes......
Quantity surveying notes......
EVERSENDAI ENGINEERING (L.L.C.)
 
stakeholder management
stakeholder managementstakeholder management
stakeholder management
EVERSENDAI ENGINEERING (L.L.C.)
 
construction Contracts
construction Contractsconstruction Contracts
construction Contracts
EVERSENDAI ENGINEERING (L.L.C.)
 
Bim notes
Bim notesBim notes
Basic civil notes
Basic civil notesBasic civil notes
Reinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinnerReinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinner
EVERSENDAI ENGINEERING (L.L.C.)
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
EVERSENDAI ENGINEERING (L.L.C.)
 

More from EVERSENDAI ENGINEERING (L.L.C.) (20)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Laws company act
Laws company actLaws company act
Laws company act
 
Hrm
HrmHrm
Hrm
 
construction planning
construction planningconstruction planning
construction planning
 
Bim notes
Bim notesBim notes
Bim notes
 
basic qs notes
basic qs notesbasic qs notes
basic qs notes
 
statistics basic
statistics basicstatistics basic
statistics basic
 
Sustainability
Sustainability Sustainability
Sustainability
 
Stratergy notes 2
Stratergy notes 2Stratergy notes 2
Stratergy notes 2
 
Strategy note 1
Strategy note 1Strategy note 1
Strategy note 1
 
Qhsem
Qhsem Qhsem
Qhsem
 
Project planning notes
Project planning notesProject planning notes
Project planning notes
 
Quantity surveying notes......
Quantity surveying notes......  Quantity surveying notes......
Quantity surveying notes......
 
stakeholder management
stakeholder managementstakeholder management
stakeholder management
 
Finance
FinanceFinance
Finance
 
construction Contracts
construction Contractsconstruction Contracts
construction Contracts
 
Bim notes
Bim notesBim notes
Bim notes
 
Basic civil notes
Basic civil notesBasic civil notes
Basic civil notes
 
Reinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinnerReinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinner
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 

Recently uploaded

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Waste disposal &recycling

  • 1. WASTE DISPOSAL & RECYCLING ABIN BABU MBA ( CE & QS ) A13559015043 PROCUREMENT & SUPPLYCHAIN MANAGEMENT SEM4
  • 2. ■ Sustainable waste management involves managing waste in a environmentally sound ,socially satisfactory and techno economically viable manner Construction waste production in india Kg/sqm New construction 40-60 Demolition 400-600 Repair works 40-50 City Waste production (tonne/day ) Delhi 4600 Ahmedabad 700 Chennai 2500
  • 3. Factors affecting waste generation Factors Low availability of land Old buildings Trends in renovation & recycling Labour cost Demolition High rate of urbanisation
  • 4. Concrete Brick asphalt Metal Timber Plastic excavation stone Soil & sand Concrete • Crushing techniques • Low grade roads as base /subbase Brick • Reuse of bricks • Reuse in roads as base/subbase Asphalt • Reclaimed & recycled asphalt pavement • 100 % recyclable Plastic • Can be recycled in low grade plastic productions • Proper collection is very important Timber • Reuse of furniture after touch work • Infrastructure timber – poles ,sleepers Metal • 95 % recycled material is steel and iron • If rust free can be recycled Stone • Crushing & reusing • Decoration works Soil & sand • Unless reused in site ,requires treatment and disposal
  • 5. Waste disposal ■ As per construction & demolition waste management rules 2016 ■ Have provisions for generator and local authority ■ Generator has the responsibility for collection ,segregation and storage of waste ■ Generator also has to ensure the avoidance of mixing of C&D waste and solid waste ■ Generator also has to prepare waste management plan and get it approved by local authority (20 tonnes /day or 300 tonnes /month ) ■ Waste collected has to be kept in premises or dumped to designated sites ( landfills ) or should be handed over for treatment ■ Authority has the responsibility of – Development of strategy for waste management – Collection and transportation of waste – Maintenance of records – Instalation of processing facilities
  • 6. Solid waste management plan ■ Should contain – Responsibilities of stakeholders – Waste identification and its management – disposal of waste – Communication and training – Measuring and monitoring – documentation
  • 7.