The Burke View Court Sewer Emergency project addresses a broken 16-inch sanitary asbestos cement sewer pipe crossing a stream tributary to Pohick Creek. The break was found when Wastewater Collection Division investigated a report of a sanitary sewer overflow. It was determined that the line had been broken during a private dredging operation in the forebay of a pond. The pipe that was broken was under the stream and did not have casement around the pipe. The broken pipe segment was replaced and upgraded with a steel casing pipe to mitigate future damage. The project was substantially completed February 2, 2021.
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Burke View Court Sewer Emergency Repair
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Project No. WW-000028-019
Braddock District
February 19, 2020
Burke View Court Emergency Sewer Repair
2. Project Details
Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Description:
The Burke View Court Sewer Emergency project addresses a broken 16-inch sanitary asbestos cement sewer pipe
crossing a stream tributary to Pohick Creek. The break was found when Wastewater Collection Division investigated a
report of a sanitary sewer overflow. It was determined that the line had been broken during a private dredging
operation in the forebay of a pond. The pipe that was broken was under the stream and did not have casement
around the pipe. The broken pipe segment was replaced and upgraded with a steel casing pipe to mitigate future
damage. The project was substantially completed February 2, 2021.
Project Overview:
• Approximately 340-feet of 16-inch asbestos cement sewer pipe was replaced with PVC and encased with 32-inch
steel pipe in the segment that crosses under the stream.
• A new manhole was installed at the upstream location to allow bypass pumping of the existing manhole so the
new line segment could be completed.
• Rip rap bank stabilization was installed at the location of the newly installed line to protect the pipe from erosion.
Project Team:
• Avan Baggett, P.E., Wastewater Design and Construction Division
• Colleen Block, P. E., Wastewater Design and Construction Division
• Matthew Doyle, P.E., Wastewater Design and Construction Division
• Sara Ferrance, P.E., Wastewater Collection Division
• Dewberry-Engineer
• Patriot Development Corporation-Contractor
3. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Braddock District, Tax Map No. 78-3
Map of project area to be posted here.
4. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Project Overview
5. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Pre-Existing Conditions
Existing Gravity Main Creek Crossing.
The existing was removed and the
new PVC Gravity Main was installed in
same alignment.
Location of the
damaged section
of Gravity Main
6. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Pre-Existing Conditions after Bypass Established
Temporary
Bypass Pumps
and Piping
Discharge
Manhole for the
bypass
7. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Steel Casement and Stream Crossing Placement
32-inch Steel
Casement Piping
16-inch being
installed inside the
casement crossing
the stream
8. Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Completed Project
New Rip Rap
New PVC Gravity Main with
casement across stream
New Manhole
New PVC Gravity Main with
casement across stream
9. Before After
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Burke View Court Emergency Sewer Repair
Sewer stream crossing location before and after repair
10. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Burke View Court Emergency Sewer Repair
Capital Facilities/Wastewater Design and Construction Division/Collections Branch
Sharon North, M.A., Section Chief, Communications
703-324-8455, TTY 711
Sharon.North@fairfaxcounty.gov
or
Irene Haske, Communications Specialist
703-324-5821, TTY 711
Irene.Haske@fairfaxcounty.gov