L3-M1-U1.4 Costs analysis
• A fundamental breaktrough is occurring in building controls,
driven by a new generation of powerful Internet of Things
(IoT) devices.
• These networked sensors and controls can be quickly and
cost-effectively deployed in commercial buildings and
industrial sites to generate large amounts of valuable data
for analytics and automation.
L3-M1-U1.4 Costs analysis
• Building managers benefit from this granular new data and
control capability with the ability to fine-tune processes at a
greater number of building systems to lower energy and
maintenance costs.
• The resulting savings can provide compelling return on
investment (ROI), even for buildings under 100,000 square
feet.
L3-M1-U1.4 Costs analysis
• Building management systems (BMS) or building automation systems
(BAS) are the traditional solution to addressing the problem of energy
waste.
• The average cost to deploy a basic BMS is about $2.30 per square
foot, equivalent to $250,000 for a 100,000 square foot building.
• This cost means low ROI is a challenge, which limits most BMS
deployments to the major subsystems, such as HVAC and lighting in
high-traffic areas, and of only the largest buildings, over 100,000
square feet.
L3-M1-U1.4 Costs analysis
• BMS is rarely deployed into buildings under 100,000 square
feet, which constitute about 90% of the total building stock in
the U.S.
• Even in the 10% of larger buildings, BMS often isn’t used in
low-traffic areas such as warehouses, stockrooms, or garages,
or to distributed equipment such as pumps, generators, or
parking lot lights on campuses and industrialsites.
• Hundreds of millions of square feet of real estate and millions
of remote equipment assets are not monitored or managed at
all for energy or operational savings.
L3-M1-U1.4 Costs analysis
• Solutions are now arriving in the form of IoT-generation
connected devices.
• Advancements in sensor and controls technology now enable a
new wave of advanced, non-invasive, cost-effective, and quick-
to-install products.
• Because properly-deployed and connected IoT products can
overcome the capital barriers of installing traditional BMS, a
vanguard applicationfor these devices is for energy
management in buildings and remote equipment.
L3-M1-U1.4 Costs analysis
• For the first time, these new products can be cost-effectively
deployed by non-specialized personnel and extend the reach of
existing BMS systems,
• or even begin to replace BMS in mainstream applicationsin
under-100,000 square foot buildings.
• The “big data” these new IoT devices generate can be gathered
into cloud-basedmanagement and analytics services via
existing networks, and the devices can be easily monitored and
controlled by facilities managers via smartphones and tablets.
L3-M1-U1.4 Costs analysis
• Focusing on HVAC, lighting, and some types of
electrical loads, it is reasonable to expect savings in
the range of 10% to 25% when implementing proactive
energy management programs in mid-sized buildings.
Source:
https://www.iotone.com/
L3-M1-U1.4 Costs analysis
• Adding IoT-based controls and monitoring to a building can
cost from just $5,000 to $50,000, which is a fraction of
traditional BMS costs.
• The process typically requires a systems integrator or in-house
electrician and IT network professional.
• An energy engineering specialist is recommended to analyze
the data and make recommendations on process optimization
and automation in order to maximize savings.
L3-M1-U1.4 Costs analysis
• Focusing on HVAC, lighting, and some types of electrical loads, it is reasonable
to expect savings in the range of 10% to 25% when implementing proactive
energy management programs in mid-sized buildings.
• For a typical 75,000 square foot building, this equates to an annual potential
savings of $15,000 to $50,000 per year.
• Some buildings can save over $100,000 annually, and ROI can occur in six months
to two years. Beyond the pure monetary savings, additional benefits related to
sustainability and environmental stewardship can also be realized, with detailed
data to support them.
L3-M1-U1.4 Costs analysis
Solving the interoperability challenges
• Perhaps the biggest challenge to providing cost-effective, high-ROI energy
management to mid-sized buildings has been the lack of interoperability
between devices.
• The interoperability problem is compounded by the need to interconnect both
legacy equipment in the buildings
• There are dozens of protocol standards and literally hundreds of different
implementations just among the best-in-class of these devices.
L3-M1-U1.4 Costs analysis
Data Are Expensive to Acquire & Utilize
• The cost of sensors has dropped precipitously in recent years. In 2004,the
average cost per sensor was $1.30.In 2020,the average cost per sensor is
expected to be $0.38.Unfortunately, the cost reductions in sensors have not
resulted in a significant decrease in the cost of a full BMS installation.
• As of 2014,the cost to deploy a basic BMS was at least $2.50per square foot
and could be as high as $7.00 per square foot. While the cost of sensors has
plummeted, the cost of equipment controls has remained stubbornly high.
L3-M1-U1.4 Costs analysis
There May be Limited Value for Data
• Datahave little value on its own. A data set is only as good as the insights that
can be derived.
• In the case of BMS data, insights usually involve equipment schedules, set
points, and systemconfiguration optimizations.
• For example, by identifying that the HVAC system is running when the
building is unoccupied, a building can make significant reductions to
operating expenses through utility consumption.
L3-M1-U1.4 Costs analysis
• Likewise, highly granular data sets around startup and shutdown processes may yield
optimization insights for system configuration.
• There are plenty of examples of poorly configured building management systems that can
yield significant savings if optimized.
• However, this is much more likely to be the case in unique building types, such as hotels and
stadiums that have constantly varying occupancy rates and schedules. For office and
multifamily apartment buildings, which have relatively consistent schedules and occupancy
rates year-round, the BMS may already be close to optimized.
• While there is likely to be “performance drift” in any building type over time, the point is
that no amount of data will yield significant results if the system is already close to
optimized and rarely requires changes.
L3-M1-U1.4 Costs analysis
Scalability
• The final limitation of using BMS data to optimize a portfolio of buildings is the
inherent lack of scalability.
• Perhaps each building in the portfolio has the same BMS vendor, but that is highly
unlikely.
• Each vendor is going to have its own proprietary data protocol, which requires a
developing and maintaining a number of different processes and integrations.
• Not only is this hard to manage and maintain, but the BMS vendors often have
competing products and thus are incentivized to make their data inaccessible to
third parties.
L3-M1-U1.4 Costs analysis
• While part of the difficulty of extracting BMS data may be competitive, there is also
a legitimate concern about security.
• Building data is not only valuable to competitors, because it is tied to controls of
building equipment, it can be extremely dangerous to occupancy if manipulated.
• There is also the consideration that a portfolio will contain a mix of properties with
and without building management systems installed.
• Leveraging BMS data to find operational waste may be effective in portions of the
portfolio, but a separate solution will be required for the buildings without a BMS.
• This requires an additional round of diligence and technology evaluations that will
slow down rollout and stifle scalability. The point is, relying on BMS data to drive
operational improvements will necessarily run into scalability issues.
Resources
https://cdn2.hubspot.net/hubfs/612214/Case%20Studies%20an
d%20WPs/Defining_the_Growing_Market_for_AFDD_Whitepape
r.pdf
Thank you for your attention.
https://pixabay.com/illustrations/thank-you-polaroid-letters-2490552/
Disclaimer
For further information, relatedto the VET4SBO project, please visit the project’swebsite at https://smart-building-
operator.euor visit us at https://www.facebook.com/Vet4sbo.
Downloadour mobile app at https://play.google.com/store/apps/details?id=com.vet4sbo.mobile.
This project (2018-1-RS01-KA202-000411) has been funded with support from the European Commission (Erasmus+
Programme). Thispublicationreflects the views only of the author, and the Commission cannot be held responsible
for any use which may be made of the informationcontainedtherein.

More Related Content

What's hot

Bms system
Bms  systemBms  system
Bms system
BUKAR ALI KIME
 
MACH system benefits Net Present values
MACH system benefits Net Present valuesMACH system benefits Net Present values
MACH system benefits Net Present values
alexlancashire
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
Muhammad Asad Rashid
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data Centers
Schneider Electric
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
Ali Mirfallah
 
Engineer the Future Now!
Engineer the Future Now!Engineer the Future Now!
Engineer the Future Now!
Schneider Electric
 
Best Practices & Recommended Architectures Gb
Best Practices & Recommended Architectures GbBest Practices & Recommended Architectures Gb
Best Practices & Recommended Architectures Gb
mehtakandy
 
Optimization of loss minimization using facts in deregulated power systems
Optimization of loss minimization using facts in deregulated power systemsOptimization of loss minimization using facts in deregulated power systems
Optimization of loss minimization using facts in deregulated power systems
Alexander Decker
 
11.optimization of loss minimization using facts in deregulated power systems
11.optimization of loss minimization using facts in deregulated power systems11.optimization of loss minimization using facts in deregulated power systems
11.optimization of loss minimization using facts in deregulated power systems
Alexander Decker
 
Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based Approach
Schneider Electric
 
Measurement validation peak load reduction
Measurement validation peak load reductionMeasurement validation peak load reduction
Measurement validation peak load reduction
Schneider Electric
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
SP Home Run Inc.
 
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Schneider Electric
 
Building Automation: The scope for energy and CO2 savings
Building Automation: The scope for energy and CO2 savingsBuilding Automation: The scope for energy and CO2 savings
Building Automation: The scope for energy and CO2 savings
Leonardo ENERGY
 
Building Information Modelling (BIM) and Integrated buliding management syste...
Building Information Modelling (BIM) and Integrated buliding management syste...Building Information Modelling (BIM) and Integrated buliding management syste...
Building Information Modelling (BIM) and Integrated buliding management syste...
Bipasa Das
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
Schneider Electric
 
Data-center SDN
Data-center  SDN Data-center  SDN
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
Schneider Electric
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
Schneider Electric
 
The smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutionsThe smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutions
Schneider Electric
 

What's hot (20)

Bms system
Bms  systemBms  system
Bms system
 
MACH system benefits Net Present values
MACH system benefits Net Present valuesMACH system benefits Net Present values
MACH system benefits Net Present values
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
 
The Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data CentersThe Data Center Evolution and Pre-Fab Data Centers
The Data Center Evolution and Pre-Fab Data Centers
 
Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
 
Engineer the Future Now!
Engineer the Future Now!Engineer the Future Now!
Engineer the Future Now!
 
Best Practices & Recommended Architectures Gb
Best Practices & Recommended Architectures GbBest Practices & Recommended Architectures Gb
Best Practices & Recommended Architectures Gb
 
Optimization of loss minimization using facts in deregulated power systems
Optimization of loss minimization using facts in deregulated power systemsOptimization of loss minimization using facts in deregulated power systems
Optimization of loss minimization using facts in deregulated power systems
 
11.optimization of loss minimization using facts in deregulated power systems
11.optimization of loss minimization using facts in deregulated power systems11.optimization of loss minimization using facts in deregulated power systems
11.optimization of loss minimization using facts in deregulated power systems
 
Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based Approach
 
Measurement validation peak load reduction
Measurement validation peak load reductionMeasurement validation peak load reduction
Measurement validation peak load reduction
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...
 
Building Automation: The scope for energy and CO2 savings
Building Automation: The scope for energy and CO2 savingsBuilding Automation: The scope for energy and CO2 savings
Building Automation: The scope for energy and CO2 savings
 
Building Information Modelling (BIM) and Integrated buliding management syste...
Building Information Modelling (BIM) and Integrated buliding management syste...Building Information Modelling (BIM) and Integrated buliding management syste...
Building Information Modelling (BIM) and Integrated buliding management syste...
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Data-center SDN
Data-center  SDN Data-center  SDN
Data-center SDN
 
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
 
The smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutionsThe smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutions
 

Similar to VET4SBO Level 3 module 1 - unit 4 - 0.009 en

Metasys – Redefining Modern Building Management Identified by 360Quadrant
Metasys – Redefining Modern Building Management Identified by 360QuadrantMetasys – Redefining Modern Building Management Identified by 360Quadrant
Metasys – Redefining Modern Building Management Identified by 360Quadrant
Emily Jones
 
VET4SBO Level 3 module 1 - unit 1 - 0.009 en
VET4SBO Level 3   module 1 - unit 1 - 0.009 enVET4SBO Level 3   module 1 - unit 1 - 0.009 en
VET4SBO Level 3 module 1 - unit 1 - 0.009 en
Karel Van Isacker
 
Microsoft Smart Buildings White Paper
Microsoft Smart Buildings White PaperMicrosoft Smart Buildings White Paper
Microsoft Smart Buildings White Paper
Microsoft India
 
Advanced facility management
Advanced facility managementAdvanced facility management
Advanced facility management
Vishnu Namboodiri.V
 
intelligentbuilding.pptx
intelligentbuilding.pptxintelligentbuilding.pptx
intelligentbuilding.pptx
DeeshaKhamar1
 
Intelligent management of electrical systems in industries
Intelligent management of electrical systems in industriesIntelligent management of electrical systems in industries
Intelligent management of electrical systems in industries
pushpeswar reddy
 
Energy performance in mission critical facilities
Energy performance in mission critical facilitiesEnergy performance in mission critical facilities
Energy performance in mission critical facilities
Alcides Villarreal Polo
 
Convergence - What is it really good for?
Convergence - What is it really good for?Convergence - What is it really good for?
Convergence - What is it really good for?
BSRIA
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based Maintenance
Frederic Baudart, CMRP
 
Leveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilitiesLeveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilities
Bassam Gomaa
 
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site FacilitiesLeveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
Schneider Electric
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial Internet
GE_India
 
Going Modular? Lessons learned from 500 modular data center implementations
Going Modular?  Lessons learned from 500 modular data center implementations Going Modular?  Lessons learned from 500 modular data center implementations
Going Modular? Lessons learned from 500 modular data center implementations
John M. Kundtz ☛ Associate Partner / Sales Mgr / BDE
 
iBMS - SmartCity fundamentals (Example)
iBMS - SmartCity fundamentals (Example)iBMS - SmartCity fundamentals (Example)
iBMS - SmartCity fundamentals (Example)
nick_gtg
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
Karel Van Isacker
 
IES Faculty - Big Data in Building Services
IES Faculty - Big Data in Building ServicesIES Faculty - Big Data in Building Services
IES Faculty - Big Data in Building Services
IES VE
 
Competitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra IndustryCompetitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra Industry
Amit Singh
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
Schneider Electric
 
Data Centre Overview
Data Centre OverviewData Centre Overview
Data Centre Overview
Logicalis
 
Logicalis - Data Centre Overview
Logicalis - Data Centre OverviewLogicalis - Data Centre Overview
Logicalis - Data Centre Overview
Logicalis
 

Similar to VET4SBO Level 3 module 1 - unit 4 - 0.009 en (20)

Metasys – Redefining Modern Building Management Identified by 360Quadrant
Metasys – Redefining Modern Building Management Identified by 360QuadrantMetasys – Redefining Modern Building Management Identified by 360Quadrant
Metasys – Redefining Modern Building Management Identified by 360Quadrant
 
VET4SBO Level 3 module 1 - unit 1 - 0.009 en
VET4SBO Level 3   module 1 - unit 1 - 0.009 enVET4SBO Level 3   module 1 - unit 1 - 0.009 en
VET4SBO Level 3 module 1 - unit 1 - 0.009 en
 
Microsoft Smart Buildings White Paper
Microsoft Smart Buildings White PaperMicrosoft Smart Buildings White Paper
Microsoft Smart Buildings White Paper
 
Advanced facility management
Advanced facility managementAdvanced facility management
Advanced facility management
 
intelligentbuilding.pptx
intelligentbuilding.pptxintelligentbuilding.pptx
intelligentbuilding.pptx
 
Intelligent management of electrical systems in industries
Intelligent management of electrical systems in industriesIntelligent management of electrical systems in industries
Intelligent management of electrical systems in industries
 
Energy performance in mission critical facilities
Energy performance in mission critical facilitiesEnergy performance in mission critical facilities
Energy performance in mission critical facilities
 
Convergence - What is it really good for?
Convergence - What is it really good for?Convergence - What is it really good for?
Convergence - What is it really good for?
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based Maintenance
 
Leveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilitiesLeveraging cloud based building management systems for multi-site facilities
Leveraging cloud based building management systems for multi-site facilities
 
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site FacilitiesLeveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial Internet
 
Going Modular? Lessons learned from 500 modular data center implementations
Going Modular?  Lessons learned from 500 modular data center implementations Going Modular?  Lessons learned from 500 modular data center implementations
Going Modular? Lessons learned from 500 modular data center implementations
 
iBMS - SmartCity fundamentals (Example)
iBMS - SmartCity fundamentals (Example)iBMS - SmartCity fundamentals (Example)
iBMS - SmartCity fundamentals (Example)
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
 
IES Faculty - Big Data in Building Services
IES Faculty - Big Data in Building ServicesIES Faculty - Big Data in Building Services
IES Faculty - Big Data in Building Services
 
Competitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra IndustryCompetitive Strategies Benchmarking in Datacenter Infra Industry
Competitive Strategies Benchmarking in Datacenter Infra Industry
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Data Centre Overview
Data Centre OverviewData Centre Overview
Data Centre Overview
 
Logicalis - Data Centre Overview
Logicalis - Data Centre OverviewLogicalis - Data Centre Overview
Logicalis - Data Centre Overview
 

More from Karel Van Isacker

DIGITOUR IO4: Manual for trainers GR
DIGITOUR IO4: Manual for trainers GRDIGITOUR IO4: Manual for trainers GR
DIGITOUR IO4: Manual for trainers GR
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainees GR
DIGITOUR IO4: Manual for trainees GRDIGITOUR IO4: Manual for trainees GR
DIGITOUR IO4: Manual for trainees GR
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ESDIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ES
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainers ES
DIGITOUR IO4: Manual for trainers ESDIGITOUR IO4: Manual for trainers ES
DIGITOUR IO4: Manual for trainers ES
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ESDIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ES
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainers NL
DIGITOUR IO4: Manual for trainers NLDIGITOUR IO4: Manual for trainers NL
DIGITOUR IO4: Manual for trainers NL
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainees NL
DIGITOUR IO4: Manual for trainees NLDIGITOUR IO4: Manual for trainees NL
DIGITOUR IO4: Manual for trainees NL
Karel Van Isacker
 
EcologyKM company presentation 2022 new
EcologyKM company presentation 2022 newEcologyKM company presentation 2022 new
EcologyKM company presentation 2022 new
Karel Van Isacker
 
EcologyKM company presentation 2022
EcologyKM company presentation 2022EcologyKM company presentation 2022
EcologyKM company presentation 2022
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainees EN
DIGITOUR IO4: Manual for trainees ENDIGITOUR IO4: Manual for trainees EN
DIGITOUR IO4: Manual for trainees EN
Karel Van Isacker
 
DIGITOUR IO4: Manual for trainers EN
DIGITOUR IO4: Manual for trainers ENDIGITOUR IO4: Manual for trainers EN
DIGITOUR IO4: Manual for trainers EN
Karel Van Isacker
 
DIPCE How to use platform and mobile apps EL
DIPCE How to use platform and mobile apps ELDIPCE How to use platform and mobile apps EL
DIPCE How to use platform and mobile apps EL
Karel Van Isacker
 
DIPCE IO3: How to use platform and mobile apps ES
DIPCE IO3: How to use platform and mobile apps ESDIPCE IO3: How to use platform and mobile apps ES
DIPCE IO3: How to use platform and mobile apps ES
Karel Van Isacker
 
HIPPOTHERAPY and sensory processing BG
HIPPOTHERAPY and sensory processing BGHIPPOTHERAPY and sensory processing BG
HIPPOTHERAPY and sensory processing BG
Karel Van Isacker
 
HIPPOTHERAPY and sensory processing TR
HIPPOTHERAPY and sensory processing TRHIPPOTHERAPY and sensory processing TR
HIPPOTHERAPY and sensory processing TR
Karel Van Isacker
 
HIPPOTHERAPY and sensory processing EN
HIPPOTHERAPY and sensory processing ENHIPPOTHERAPY and sensory processing EN
HIPPOTHERAPY and sensory processing EN
Karel Van Isacker
 
HIPPOTHERAPY MODULE 14 BG
HIPPOTHERAPY MODULE 14 BGHIPPOTHERAPY MODULE 14 BG
HIPPOTHERAPY MODULE 14 BG
Karel Van Isacker
 
HIPPOTHERAPY MODULE 13 BG
HIPPOTHERAPY MODULE 13 BGHIPPOTHERAPY MODULE 13 BG
HIPPOTHERAPY MODULE 13 BG
Karel Van Isacker
 
HIPPOTHERAPY MODULE 12 BG
HIPPOTHERAPY MODULE 12 BGHIPPOTHERAPY MODULE 12 BG
HIPPOTHERAPY MODULE 12 BG
Karel Van Isacker
 
HIPPOTHERAPY MODULE 11 BG
HIPPOTHERAPY MODULE 11 BGHIPPOTHERAPY MODULE 11 BG
HIPPOTHERAPY MODULE 11 BG
Karel Van Isacker
 

More from Karel Van Isacker (20)

DIGITOUR IO4: Manual for trainers GR
DIGITOUR IO4: Manual for trainers GRDIGITOUR IO4: Manual for trainers GR
DIGITOUR IO4: Manual for trainers GR
 
DIGITOUR IO4: Manual for trainees GR
DIGITOUR IO4: Manual for trainees GRDIGITOUR IO4: Manual for trainees GR
DIGITOUR IO4: Manual for trainees GR
 
DIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ESDIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ES
 
DIGITOUR IO4: Manual for trainers ES
DIGITOUR IO4: Manual for trainers ESDIGITOUR IO4: Manual for trainers ES
DIGITOUR IO4: Manual for trainers ES
 
DIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ESDIGITOUR IO4: Manual for trainees ES
DIGITOUR IO4: Manual for trainees ES
 
DIGITOUR IO4: Manual for trainers NL
DIGITOUR IO4: Manual for trainers NLDIGITOUR IO4: Manual for trainers NL
DIGITOUR IO4: Manual for trainers NL
 
DIGITOUR IO4: Manual for trainees NL
DIGITOUR IO4: Manual for trainees NLDIGITOUR IO4: Manual for trainees NL
DIGITOUR IO4: Manual for trainees NL
 
EcologyKM company presentation 2022 new
EcologyKM company presentation 2022 newEcologyKM company presentation 2022 new
EcologyKM company presentation 2022 new
 
EcologyKM company presentation 2022
EcologyKM company presentation 2022EcologyKM company presentation 2022
EcologyKM company presentation 2022
 
DIGITOUR IO4: Manual for trainees EN
DIGITOUR IO4: Manual for trainees ENDIGITOUR IO4: Manual for trainees EN
DIGITOUR IO4: Manual for trainees EN
 
DIGITOUR IO4: Manual for trainers EN
DIGITOUR IO4: Manual for trainers ENDIGITOUR IO4: Manual for trainers EN
DIGITOUR IO4: Manual for trainers EN
 
DIPCE How to use platform and mobile apps EL
DIPCE How to use platform and mobile apps ELDIPCE How to use platform and mobile apps EL
DIPCE How to use platform and mobile apps EL
 
DIPCE IO3: How to use platform and mobile apps ES
DIPCE IO3: How to use platform and mobile apps ESDIPCE IO3: How to use platform and mobile apps ES
DIPCE IO3: How to use platform and mobile apps ES
 
HIPPOTHERAPY and sensory processing BG
HIPPOTHERAPY and sensory processing BGHIPPOTHERAPY and sensory processing BG
HIPPOTHERAPY and sensory processing BG
 
HIPPOTHERAPY and sensory processing TR
HIPPOTHERAPY and sensory processing TRHIPPOTHERAPY and sensory processing TR
HIPPOTHERAPY and sensory processing TR
 
HIPPOTHERAPY and sensory processing EN
HIPPOTHERAPY and sensory processing ENHIPPOTHERAPY and sensory processing EN
HIPPOTHERAPY and sensory processing EN
 
HIPPOTHERAPY MODULE 14 BG
HIPPOTHERAPY MODULE 14 BGHIPPOTHERAPY MODULE 14 BG
HIPPOTHERAPY MODULE 14 BG
 
HIPPOTHERAPY MODULE 13 BG
HIPPOTHERAPY MODULE 13 BGHIPPOTHERAPY MODULE 13 BG
HIPPOTHERAPY MODULE 13 BG
 
HIPPOTHERAPY MODULE 12 BG
HIPPOTHERAPY MODULE 12 BGHIPPOTHERAPY MODULE 12 BG
HIPPOTHERAPY MODULE 12 BG
 
HIPPOTHERAPY MODULE 11 BG
HIPPOTHERAPY MODULE 11 BGHIPPOTHERAPY MODULE 11 BG
HIPPOTHERAPY MODULE 11 BG
 

Recently uploaded

C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 

Recently uploaded (20)

C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 

VET4SBO Level 3 module 1 - unit 4 - 0.009 en

  • 1. ECVET Training for Operatorsof IoT-enabledSmart Buildings (VET4SBO) 2018-1-RS01-KA202-000411 Level: 3 (three) Module: 1 Interdependencies of building operation sub-systems Unit 1.4 Costs analysis
  • 2. L3-M1-U1.4 Costs analysis • A fundamental breaktrough is occurring in building controls, driven by a new generation of powerful Internet of Things (IoT) devices. • These networked sensors and controls can be quickly and cost-effectively deployed in commercial buildings and industrial sites to generate large amounts of valuable data for analytics and automation.
  • 3. L3-M1-U1.4 Costs analysis • Building managers benefit from this granular new data and control capability with the ability to fine-tune processes at a greater number of building systems to lower energy and maintenance costs. • The resulting savings can provide compelling return on investment (ROI), even for buildings under 100,000 square feet.
  • 4. L3-M1-U1.4 Costs analysis • Building management systems (BMS) or building automation systems (BAS) are the traditional solution to addressing the problem of energy waste. • The average cost to deploy a basic BMS is about $2.30 per square foot, equivalent to $250,000 for a 100,000 square foot building. • This cost means low ROI is a challenge, which limits most BMS deployments to the major subsystems, such as HVAC and lighting in high-traffic areas, and of only the largest buildings, over 100,000 square feet.
  • 5. L3-M1-U1.4 Costs analysis • BMS is rarely deployed into buildings under 100,000 square feet, which constitute about 90% of the total building stock in the U.S. • Even in the 10% of larger buildings, BMS often isn’t used in low-traffic areas such as warehouses, stockrooms, or garages, or to distributed equipment such as pumps, generators, or parking lot lights on campuses and industrialsites. • Hundreds of millions of square feet of real estate and millions of remote equipment assets are not monitored or managed at all for energy or operational savings.
  • 6. L3-M1-U1.4 Costs analysis • Solutions are now arriving in the form of IoT-generation connected devices. • Advancements in sensor and controls technology now enable a new wave of advanced, non-invasive, cost-effective, and quick- to-install products. • Because properly-deployed and connected IoT products can overcome the capital barriers of installing traditional BMS, a vanguard applicationfor these devices is for energy management in buildings and remote equipment.
  • 7. L3-M1-U1.4 Costs analysis • For the first time, these new products can be cost-effectively deployed by non-specialized personnel and extend the reach of existing BMS systems, • or even begin to replace BMS in mainstream applicationsin under-100,000 square foot buildings. • The “big data” these new IoT devices generate can be gathered into cloud-basedmanagement and analytics services via existing networks, and the devices can be easily monitored and controlled by facilities managers via smartphones and tablets.
  • 8. L3-M1-U1.4 Costs analysis • Focusing on HVAC, lighting, and some types of electrical loads, it is reasonable to expect savings in the range of 10% to 25% when implementing proactive energy management programs in mid-sized buildings. Source: https://www.iotone.com/
  • 9. L3-M1-U1.4 Costs analysis • Adding IoT-based controls and monitoring to a building can cost from just $5,000 to $50,000, which is a fraction of traditional BMS costs. • The process typically requires a systems integrator or in-house electrician and IT network professional. • An energy engineering specialist is recommended to analyze the data and make recommendations on process optimization and automation in order to maximize savings.
  • 10. L3-M1-U1.4 Costs analysis • Focusing on HVAC, lighting, and some types of electrical loads, it is reasonable to expect savings in the range of 10% to 25% when implementing proactive energy management programs in mid-sized buildings. • For a typical 75,000 square foot building, this equates to an annual potential savings of $15,000 to $50,000 per year. • Some buildings can save over $100,000 annually, and ROI can occur in six months to two years. Beyond the pure monetary savings, additional benefits related to sustainability and environmental stewardship can also be realized, with detailed data to support them.
  • 11. L3-M1-U1.4 Costs analysis Solving the interoperability challenges • Perhaps the biggest challenge to providing cost-effective, high-ROI energy management to mid-sized buildings has been the lack of interoperability between devices. • The interoperability problem is compounded by the need to interconnect both legacy equipment in the buildings • There are dozens of protocol standards and literally hundreds of different implementations just among the best-in-class of these devices.
  • 12. L3-M1-U1.4 Costs analysis Data Are Expensive to Acquire & Utilize • The cost of sensors has dropped precipitously in recent years. In 2004,the average cost per sensor was $1.30.In 2020,the average cost per sensor is expected to be $0.38.Unfortunately, the cost reductions in sensors have not resulted in a significant decrease in the cost of a full BMS installation. • As of 2014,the cost to deploy a basic BMS was at least $2.50per square foot and could be as high as $7.00 per square foot. While the cost of sensors has plummeted, the cost of equipment controls has remained stubbornly high.
  • 13. L3-M1-U1.4 Costs analysis There May be Limited Value for Data • Datahave little value on its own. A data set is only as good as the insights that can be derived. • In the case of BMS data, insights usually involve equipment schedules, set points, and systemconfiguration optimizations. • For example, by identifying that the HVAC system is running when the building is unoccupied, a building can make significant reductions to operating expenses through utility consumption.
  • 14. L3-M1-U1.4 Costs analysis • Likewise, highly granular data sets around startup and shutdown processes may yield optimization insights for system configuration. • There are plenty of examples of poorly configured building management systems that can yield significant savings if optimized. • However, this is much more likely to be the case in unique building types, such as hotels and stadiums that have constantly varying occupancy rates and schedules. For office and multifamily apartment buildings, which have relatively consistent schedules and occupancy rates year-round, the BMS may already be close to optimized. • While there is likely to be “performance drift” in any building type over time, the point is that no amount of data will yield significant results if the system is already close to optimized and rarely requires changes.
  • 15. L3-M1-U1.4 Costs analysis Scalability • The final limitation of using BMS data to optimize a portfolio of buildings is the inherent lack of scalability. • Perhaps each building in the portfolio has the same BMS vendor, but that is highly unlikely. • Each vendor is going to have its own proprietary data protocol, which requires a developing and maintaining a number of different processes and integrations. • Not only is this hard to manage and maintain, but the BMS vendors often have competing products and thus are incentivized to make their data inaccessible to third parties.
  • 16. L3-M1-U1.4 Costs analysis • While part of the difficulty of extracting BMS data may be competitive, there is also a legitimate concern about security. • Building data is not only valuable to competitors, because it is tied to controls of building equipment, it can be extremely dangerous to occupancy if manipulated. • There is also the consideration that a portfolio will contain a mix of properties with and without building management systems installed. • Leveraging BMS data to find operational waste may be effective in portions of the portfolio, but a separate solution will be required for the buildings without a BMS. • This requires an additional round of diligence and technology evaluations that will slow down rollout and stifle scalability. The point is, relying on BMS data to drive operational improvements will necessarily run into scalability issues.
  • 18. Thank you for your attention. https://pixabay.com/illustrations/thank-you-polaroid-letters-2490552/
  • 19. Disclaimer For further information, relatedto the VET4SBO project, please visit the project’swebsite at https://smart-building- operator.euor visit us at https://www.facebook.com/Vet4sbo. Downloadour mobile app at https://play.google.com/store/apps/details?id=com.vet4sbo.mobile. This project (2018-1-RS01-KA202-000411) has been funded with support from the European Commission (Erasmus+ Programme). Thispublicationreflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the informationcontainedtherein.