VALUE ADDED VS. NON-VALUEADDED ACTIVITIES
What is value?How do we identifyactivitiesthat add value and those that do not add value?
Value cansimplybe definedassomethingacustomeriswillingtopayto receive.If acustomerisnot
willingtopay forit,thenthere is novalue.Forexample,let'ssayyourcompanymanufactureswidgets
and youofferfree 24-7 customersupportfor yourwidgets.Toprovide the bestcustomerservice you
alwayshave at leastone knowledgeable technicianavailabletoanswercustomerquestions24hours a
day,sevendaysa week.Onthe otherhand,your competitoronlyoffersemail support,withaguarantee
of gettingananswerwithin48 hours,andtheysell theirwidgetsfor5% lessthanthe price of your
widgets.Because of theirlowerprice youare losingseveral majorcustomerstoyourcompetitorevery
month.If thisis the complete story,whatismostlikelythe problem?
Your customersdonot place much value onhaving24-7, live customersupport.Theypreferthe lower
price.That places24-7 customersupportinthe categoryof waste.
DefiningValue
Everythingwe doeitheraddsvalue ordoesnotadd value tothe productor service ourcompanysells.
Who determineswhethervalue isbeingadded?The customerdoes.
Let's take the example of areceptionistwhoworksforamanufacturingcompanythatmakeswidgets.
Doesthispersonadd value tothe widgets?Whoare the “customers”thispersonisserving?Her
customersare the people whoneedtomeetwithpeoplefromoutsidethe company.Thatmeansher
customersare people inthe purchasing,administration,HR,andengineeringdepartments.The
receptionistisalsoprotectingthe company'sproprietyinformationbyonlyallowingauthorizedpeople
to enterthe building.Sothe receptionist's“customers”—the peopleshe isprovidingaservice for— are
all internal customers.If the receptionistisnotprovidingvalue forthose customersthatexceedthe cost
of havinga receptionist,theywill eitherbe replacedorthe receptionistpositioneliminated. Anythingor
anyone whodoesnotadd value iswaste.
Keepinmindthatthe receptionistisalsoindirectlyaddingvalue tothe productsyourcompanyshipsto
your customers.Bysavingtime forotherpeople inyourcompany,andprotectingyourcompany's
assets,there isvalue addedtothe productyou are selling.
Value Addedvs. Non-Value Added– The SevenWastes
Lean manufacturingprinciplesdivide waste intosevencategories.
 Waiting(idle) times
 Excessmotion(transportation)
 Handling(movingthings)
 Excessor uselessinventory
 Overprocessing
 Overproduction
 Defects
In addition,whentalkingaboutvalue addedvs.non-value addedactivitieswe needtoinclude the
categoryof requiredactivitiesonthe non-value addedside.Let'slookateach of these,startingwith
requiredactivities.
Value Addedvs. Non-Value Added– RequiredActivities
Requiredactivitiesare those whichmustbe done,buttheydonotnecessarilyaddvalue foreither
internal orexternal customers.The mostcommonrequiredactivitiesare those requiredbylaw or
governmentregulations.Whilesome requiredactivitiesdoaddvalue,inmanycasestheyare activities
that mustbe done,buttheyaddno value.However,thatdoesnotmeantheycannotbe optimized,
eliminatingwaste, toreduce the costsof the requiredactivities.
Some people categorizebusinessactivitiessuchasHR (hiring) andbuildingmaintenance asrequired
businessactivitiesthatdonot add value.However,these activitiesare notnon-valueaddingrequired
activities.Forexample,findingandhiringthe rightpeople,atthe time whentheyare needed,anddoing
it efficiently,addsvalue.Anorganization'shumanresourcesare itsmostimportantresources.The HR
departmentisprovidingavaluable service toeach of the otherdepartmentswithinthe organization,
that inturn allowsthemtodo a betterjobof addingvalue tothe productstheyproduce.
WaitingTime: Thisisone of the most obviouswastesanditclearlydoesnotaddvalue.Forexample,if a
machine operatoriskillingtimewaitingforthe nextbatchof componentstoarrive,there iswaste that
can be eliminatedthroughbetterscheduling.However,notall waitingtime iswastedtime.
Let's saythat a worker'sjobisto unloadlarge blocksof woodfroma palletandplace themintothe inlet
hopperof a finishingmachine.He unloadsthemasquicklyaspossiblesothatthe forkliftwiththe pallet
can performothertasks,and thenhe waitsabouttenminutesforthe nextpallettoarrive.Isthiswaiting
time wastedtime?Notnecessarily. Insome jobs“waitingtime”canbe valuable resttime thatworkers
needif theyare to continue todo theirjobwell.
However,inthe exampleabove,thereare numerousopportunitiesforimprovementsforeliminating
waste.Forexample,whydoesapersonneedtophysicallymovelarge blocksof wood.Mightthere be a
betterwayof doingthisusingmachinery?
The definitionof waitingtime isidletime inwhichsomeone whocouldbe doingsomethingisdoing
nothing.Eliminatingorreducingthisidle timeiseliminatingwaste andimprovingthe value added
activities.
ExcessMotion: The term “excessmotion”referstothe movementof materials,supplies,and
equipment. Inthe above example,whyisaforkliftbringingblocksof wood fromone locationto
anotherlocation?Let'ssaythat in thisexample woodiscutintoblocksina sawingoperation,then
movedtoa warehouse forstorage,andthenmovedonpalletstothe locationwhere aworkerloadsthe
woodblocksintothe finishingmachine.Excessmotioncanbe eliminatedbyhavingthe finishing
machine nearthe sawingoperation.The woodisthencutto the right size andimmediatelypassedto
the finishingmachine,eliminatingthe needtomove itinandout of a warehouse.The excess motion
(transportationwaste) of the woodhasbeeneliminated.
ExcessHandling: Excesshandlingreferstothe unnecessaryactivitiesof workersandthe unnecessary
handlingof products,machines,andequipment.Inthe above example,whymustaworkermove the
blocksof woodfrom a palletintothe hopperof the finishingmachine?Whatif the blocksof woodcame
out of the saw machine andwentdirectlyintothe finishingmachine?The woodblocksnolongerneed
to be handledbyan employee,eliminatingthatwaste.
ExcessInventory: Inventorycostsmoneyforthe storage space as well astaxesonthe inventory.
Inventoryincreasesthe risksof shrinkage,spoilage,andobsolescence.Italsoincreaseshandlingcostsas
itemsneedtobe movedinand outof inventory,andman-hoursmustbe usedtocountthe inventoryon
a regularbasis.Onlya minimal,absolute necessaryinventoryshouldbe maintainedsuchthatit isadding
value tothe final productorservice.Excessinventoryiswaste.
Let's lookat our woodblockexample again.Inaweekthe sawingoperationcanproduce enoughwood
blocksto keepthe finishingmachinesuppliedforamonth.Since the sawingoperationdoesthe cutting
for a numberof otherproducts,it makeswoodblocksfora week,withthe blocksbeingstoredina
warehouse until theyare neededlaterinthe month.Itdoesthe same for three otherproducts.The
resultisfourwarehouses,eachcapable of holdingamonth'ssupplyof the material neededtomake a
product.
But whatif the cuttingoperationspendsjustone dayoneachproduct? Each day itmakesenoughfor
fourdays of operationof the finishingprocessforeachproduct.The resultisthat each warehouse only
needstostore four daysworthof material insteadof fourweeks.The inventorystorage costsalongwith
the associatedriskshave justbeencutby 75% as the resultof eliminatingexcessinventory.
Over-processing:Over-processmeansthatmore workisbeingputintoa product or service thanis
neededbythe final customer.If the finishingprocessforthe woodblocksincludesapplyingtencoatsof
high-qualityepoxypaintwithsandingandpolishingbetweeneachstep,butthe customeronlyrequires
that the finishedblocksbe paintedblack,there istoomuchworkgoingintothe finishingprocess –
meaningthe extrawork(andepoxypaint) isbeingwasted.
Overproduction:Overproductionmeansmakingmore productthanwhatis immediatelyneeded.If
more woodblocksare beingproducedthanare beingsold,theywill accumulate inawarehouse.This
may make sense if mostwoodblocksare soldduringthe fourweekspriortoChristmasand supplyneeds
to be builtupprior to the holidayseason.Inmostcases,over-productionresultsinhighlevelsof
wasteful inventory.
Defects:Defective productsmustbe thrownoutor fixed.Defective servicesmustbe done over.Doing
thingsrightthe firsttime isessential toeliminatingwaste.While eliminatingall defectsmayseemlike an
impossible task,there are leanmethodssuchasPoka-Yoke,thatare soeffective ateliminatingdefects
that theyalsoeliminatethe needtoinspectfordefects,producingevengreatersavings.
Value Addedvs. Non-Value Added– The Needfor Signsand Labels
The properuse of labelsandsignswill aidyoureffortstoreduce andeliminatewaste.Forexample,they
communicate neededinformationsuchasnew or revisedoperatingproceduresatthe place andtime
where the informationisneeded.Theyprovidedirections,guidingpeople safelytotheirdestinations.
Andtheyprovide critical safetyinformationandidentifythe locationsof safetyequipment.However,
signsand labelsonlyworkif theyare posted,theirmessageisclear,theyremaininplace,andare
readable.

More Related Content

What's hot

Lean Waste
Lean WasteLean Waste
Lean Waste
Sumon Kumar Kundu
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
Nigel Thurlow
 
Warehouse decesion model
Warehouse decesion modelWarehouse decesion model
Warehouse decesion model
Keshar Khadka
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
Arunnima B S
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
sarah bridge
 
Supply chain management & case study
Supply chain management & case studySupply chain management & case study
Supply chain management & case study
Dhruv Patel
 
Lean principles
Lean principlesLean principles
Lean principles
Anand Subramaniam
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
skchawla4
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
Ronald Shewchuk
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
Pramod A
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
Ãbhîläşh Mãňü
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
Julian Kalac P.Eng
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
Azmir Latif Beg
 
Value Analysis
Value AnalysisValue Analysis
Value Analysis
Jaja Manalaysay-Cruz
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
bwu.nl
 
Lean Management
Lean ManagementLean Management
Lean Management
Andreas Hägglund
 
Process mapping
Process mappingProcess mapping
Process mapping
Paulo Ramos
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project ppt
Deepak Joshi
 
The 5 Lean principles
The 5 Lean principlesThe 5 Lean principles
The 5 Lean principles
Johnny Kinsella
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 

What's hot (20)

Lean Waste
Lean WasteLean Waste
Lean Waste
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Warehouse decesion model
Warehouse decesion modelWarehouse decesion model
Warehouse decesion model
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Supply chain management & case study
Supply chain management & case studySupply chain management & case study
Supply chain management & case study
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Value Analysis
Value AnalysisValue Analysis
Value Analysis
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Manufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project pptManufacturing Cost Reduction Project ppt
Manufacturing Cost Reduction Project ppt
 
The 5 Lean principles
The 5 Lean principlesThe 5 Lean principles
The 5 Lean principles
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 

Similar to Value added vs non value added

Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docxRead the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
makdul
 
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike ThelenDifficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Association for Manufacturing Excellence
 
Floor Ready Services, Inc.
Floor Ready Services, Inc.Floor Ready Services, Inc.
Floor Ready Services, Inc.
floorready
 
Infor SX.e Functional Areas Brochure
Infor SX.e Functional Areas BrochureInfor SX.e Functional Areas Brochure
Infor SX.e Functional Areas Brochure
Michell8240
 
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docxby Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
clairbycraft
 
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docxby Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
clairbycraft
 
by Nanda Lankalapalli (32) (Copyright © 2018 - All right
by Nanda Lankalapalli (32) (Copyright © 2018 - All rightby Nanda Lankalapalli (32) (Copyright © 2018 - All right
by Nanda Lankalapalli (32) (Copyright © 2018 - All right
ChereCoble417
 
What is your burning platform
What is your burning platformWhat is your burning platform
What is your burning platform
The Change Consultancy
 
VALUE CREATION
VALUE CREATIONVALUE CREATION
VALUE CREATION
rowenamaramba
 
High Point Presentation
High Point PresentationHigh Point Presentation
High Point Presentation
Sian_Teasdale
 
Get flexid
Get flexidGet flexid
Get flexid
Anand Banerjee
 
Honest Experimentation by Jonathan Bertfield
 Honest Experimentation by Jonathan Bertfield Honest Experimentation by Jonathan Bertfield
Honest Experimentation by Jonathan Bertfield
AgileSparks
 
Maximizing Project Relationships
Maximizing Project RelationshipsMaximizing Project Relationships
Maximizing Project Relationships
Ignition Consulting Group
 
2 21122 kip_us_wp_beyond_best_practices
2 21122 kip_us_wp_beyond_best_practices2 21122 kip_us_wp_beyond_best_practices
2 21122 kip_us_wp_beyond_best_practices
Svetlana Belyaeva
 
How to Thrive in a Post-AOR World
How to Thrive in a Post-AOR WorldHow to Thrive in a Post-AOR World
How to Thrive in a Post-AOR World
Ignition Consulting Group
 
Value of a Facility Assessment
Value of a Facility AssessmentValue of a Facility Assessment
Value of a Facility Assessment
Heather Zaloudik
 
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docxInnovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
maoanderton
 
Agile that works_and_the_tools_we_love
Agile that works_and_the_tools_we_loveAgile that works_and_the_tools_we_love
Agile that works_and_the_tools_we_love
Reload! A/S
 
Pre production techniques
Pre production techniquesPre production techniques
Pre production techniques
savnnahryan11
 
Digital Technology - THINK Improvement
Digital Technology - THINK Improvement Digital Technology - THINK Improvement
Digital Technology - THINK Improvement
Aman Deep Dubey
 

Similar to Value added vs non value added (20)

Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docxRead the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
Read the case If the Shoe Fits (and Even if It Doesnt)  Custome.docx
 
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike ThelenDifficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
 
Floor Ready Services, Inc.
Floor Ready Services, Inc.Floor Ready Services, Inc.
Floor Ready Services, Inc.
 
Infor SX.e Functional Areas Brochure
Infor SX.e Functional Areas BrochureInfor SX.e Functional Areas Brochure
Infor SX.e Functional Areas Brochure
 
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docxby Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
by Nanda Lankalapalli32Copyright © 2018 - All rights are r.docx
 
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docxby Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
by Nanda Lankalapalli (32) (Copyright © 2018 - All right.docx
 
by Nanda Lankalapalli (32) (Copyright © 2018 - All right
by Nanda Lankalapalli (32) (Copyright © 2018 - All rightby Nanda Lankalapalli (32) (Copyright © 2018 - All right
by Nanda Lankalapalli (32) (Copyright © 2018 - All right
 
What is your burning platform
What is your burning platformWhat is your burning platform
What is your burning platform
 
VALUE CREATION
VALUE CREATIONVALUE CREATION
VALUE CREATION
 
High Point Presentation
High Point PresentationHigh Point Presentation
High Point Presentation
 
Get flexid
Get flexidGet flexid
Get flexid
 
Honest Experimentation by Jonathan Bertfield
 Honest Experimentation by Jonathan Bertfield Honest Experimentation by Jonathan Bertfield
Honest Experimentation by Jonathan Bertfield
 
Maximizing Project Relationships
Maximizing Project RelationshipsMaximizing Project Relationships
Maximizing Project Relationships
 
2 21122 kip_us_wp_beyond_best_practices
2 21122 kip_us_wp_beyond_best_practices2 21122 kip_us_wp_beyond_best_practices
2 21122 kip_us_wp_beyond_best_practices
 
How to Thrive in a Post-AOR World
How to Thrive in a Post-AOR WorldHow to Thrive in a Post-AOR World
How to Thrive in a Post-AOR World
 
Value of a Facility Assessment
Value of a Facility AssessmentValue of a Facility Assessment
Value of a Facility Assessment
 
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docxInnovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
Innovation ExerciseStageCustomer FocusedYour customers…How to inno.docx
 
Agile that works_and_the_tools_we_love
Agile that works_and_the_tools_we_loveAgile that works_and_the_tools_we_love
Agile that works_and_the_tools_we_love
 
Pre production techniques
Pre production techniquesPre production techniques
Pre production techniques
 
Digital Technology - THINK Improvement
Digital Technology - THINK Improvement Digital Technology - THINK Improvement
Digital Technology - THINK Improvement
 

More from Anwar Iqbal

Transport choosing mode of transport
Transport choosing mode of transportTransport choosing mode of transport
Transport choosing mode of transport
Anwar Iqbal
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
Anwar Iqbal
 
Service vs utility
Service vs utilityService vs utility
Service vs utility
Anwar Iqbal
 
Active listening
Active listeningActive listening
Active listening
Anwar Iqbal
 
Contract theory
Contract theoryContract theory
Contract theory
Anwar Iqbal
 
A ship's tender
A ship's tenderA ship's tender
A ship's tender
Anwar Iqbal
 
Nickel and dimed
Nickel and dimedNickel and dimed
Nickel and dimed
Anwar Iqbal
 
20 80 rule
20 80 rule20 80 rule
20 80 rule
Anwar Iqbal
 

More from Anwar Iqbal (8)

Transport choosing mode of transport
Transport choosing mode of transportTransport choosing mode of transport
Transport choosing mode of transport
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Service vs utility
Service vs utilityService vs utility
Service vs utility
 
Active listening
Active listeningActive listening
Active listening
 
Contract theory
Contract theoryContract theory
Contract theory
 
A ship's tender
A ship's tenderA ship's tender
A ship's tender
 
Nickel and dimed
Nickel and dimedNickel and dimed
Nickel and dimed
 
20 80 rule
20 80 rule20 80 rule
20 80 rule
 

Recently uploaded

1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
es4hjcss
 
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
ocqunu
 
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for EntrepreneursComplete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Kopa Global Technologies
 
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptxExploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Elastostar Rubber Corporation
 
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
es4hjcss
 
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
ftiiassociation
 

Recently uploaded (6)

1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
 
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
 
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for EntrepreneursComplete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
 
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptxExploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
 
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
 
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
VYAPAR TRENDS JUNE-2024 e-EDITION (VOL-2, ISSUE-05)
 

Value added vs non value added

  • 1. VALUE ADDED VS. NON-VALUEADDED ACTIVITIES What is value?How do we identifyactivitiesthat add value and those that do not add value? Value cansimplybe definedassomethingacustomeriswillingtopayto receive.If acustomerisnot willingtopay forit,thenthere is novalue.Forexample,let'ssayyourcompanymanufactureswidgets and youofferfree 24-7 customersupportfor yourwidgets.Toprovide the bestcustomerservice you alwayshave at leastone knowledgeable technicianavailabletoanswercustomerquestions24hours a day,sevendaysa week.Onthe otherhand,your competitoronlyoffersemail support,withaguarantee of gettingananswerwithin48 hours,andtheysell theirwidgetsfor5% lessthanthe price of your widgets.Because of theirlowerprice youare losingseveral majorcustomerstoyourcompetitorevery month.If thisis the complete story,whatismostlikelythe problem? Your customersdonot place much value onhaving24-7, live customersupport.Theypreferthe lower price.That places24-7 customersupportinthe categoryof waste. DefiningValue Everythingwe doeitheraddsvalue ordoesnotadd value tothe productor service ourcompanysells. Who determineswhethervalue isbeingadded?The customerdoes. Let's take the example of areceptionistwhoworksforamanufacturingcompanythatmakeswidgets. Doesthispersonadd value tothe widgets?Whoare the “customers”thispersonisserving?Her customersare the people whoneedtomeetwithpeoplefromoutsidethe company.Thatmeansher customersare people inthe purchasing,administration,HR,andengineeringdepartments.The receptionistisalsoprotectingthe company'sproprietyinformationbyonlyallowingauthorizedpeople to enterthe building.Sothe receptionist's“customers”—the peopleshe isprovidingaservice for— are all internal customers.If the receptionistisnotprovidingvalue forthose customersthatexceedthe cost of havinga receptionist,theywill eitherbe replacedorthe receptionistpositioneliminated. Anythingor anyone whodoesnotadd value iswaste. Keepinmindthatthe receptionistisalsoindirectlyaddingvalue tothe productsyourcompanyshipsto your customers.Bysavingtime forotherpeople inyourcompany,andprotectingyourcompany's assets,there isvalue addedtothe productyou are selling. Value Addedvs. Non-Value Added– The SevenWastes Lean manufacturingprinciplesdivide waste intosevencategories.  Waiting(idle) times  Excessmotion(transportation)  Handling(movingthings)  Excessor uselessinventory  Overprocessing  Overproduction  Defects
  • 2. In addition,whentalkingaboutvalue addedvs.non-value addedactivitieswe needtoinclude the categoryof requiredactivitiesonthe non-value addedside.Let'slookateach of these,startingwith requiredactivities. Value Addedvs. Non-Value Added– RequiredActivities Requiredactivitiesare those whichmustbe done,buttheydonotnecessarilyaddvalue foreither internal orexternal customers.The mostcommonrequiredactivitiesare those requiredbylaw or governmentregulations.Whilesome requiredactivitiesdoaddvalue,inmanycasestheyare activities that mustbe done,buttheyaddno value.However,thatdoesnotmeantheycannotbe optimized, eliminatingwaste, toreduce the costsof the requiredactivities. Some people categorizebusinessactivitiessuchasHR (hiring) andbuildingmaintenance asrequired businessactivitiesthatdonot add value.However,these activitiesare notnon-valueaddingrequired activities.Forexample,findingandhiringthe rightpeople,atthe time whentheyare needed,anddoing it efficiently,addsvalue.Anorganization'shumanresourcesare itsmostimportantresources.The HR departmentisprovidingavaluable service toeach of the otherdepartmentswithinthe organization, that inturn allowsthemtodo a betterjobof addingvalue tothe productstheyproduce. WaitingTime: Thisisone of the most obviouswastesanditclearlydoesnotaddvalue.Forexample,if a machine operatoriskillingtimewaitingforthe nextbatchof componentstoarrive,there iswaste that can be eliminatedthroughbetterscheduling.However,notall waitingtime iswastedtime. Let's saythat a worker'sjobisto unloadlarge blocksof woodfroma palletandplace themintothe inlet hopperof a finishingmachine.He unloadsthemasquicklyaspossiblesothatthe forkliftwiththe pallet can performothertasks,and thenhe waitsabouttenminutesforthe nextpallettoarrive.Isthiswaiting time wastedtime?Notnecessarily. Insome jobs“waitingtime”canbe valuable resttime thatworkers needif theyare to continue todo theirjobwell. However,inthe exampleabove,thereare numerousopportunitiesforimprovementsforeliminating waste.Forexample,whydoesapersonneedtophysicallymovelarge blocksof wood.Mightthere be a betterwayof doingthisusingmachinery? The definitionof waitingtime isidletime inwhichsomeone whocouldbe doingsomethingisdoing nothing.Eliminatingorreducingthisidle timeiseliminatingwaste andimprovingthe value added activities. ExcessMotion: The term “excessmotion”referstothe movementof materials,supplies,and equipment. Inthe above example,whyisaforkliftbringingblocksof wood fromone locationto anotherlocation?Let'ssaythat in thisexample woodiscutintoblocksina sawingoperation,then movedtoa warehouse forstorage,andthenmovedonpalletstothe locationwhere aworkerloadsthe woodblocksintothe finishingmachine.Excessmotioncanbe eliminatedbyhavingthe finishing machine nearthe sawingoperation.The woodisthencutto the right size andimmediatelypassedto the finishingmachine,eliminatingthe needtomove itinandout of a warehouse.The excess motion (transportationwaste) of the woodhasbeeneliminated. ExcessHandling: Excesshandlingreferstothe unnecessaryactivitiesof workersandthe unnecessary handlingof products,machines,andequipment.Inthe above example,whymustaworkermove the
  • 3. blocksof woodfrom a palletintothe hopperof the finishingmachine?Whatif the blocksof woodcame out of the saw machine andwentdirectlyintothe finishingmachine?The woodblocksnolongerneed to be handledbyan employee,eliminatingthatwaste. ExcessInventory: Inventorycostsmoneyforthe storage space as well astaxesonthe inventory. Inventoryincreasesthe risksof shrinkage,spoilage,andobsolescence.Italsoincreaseshandlingcostsas itemsneedtobe movedinand outof inventory,andman-hoursmustbe usedtocountthe inventoryon a regularbasis.Onlya minimal,absolute necessaryinventoryshouldbe maintainedsuchthatit isadding value tothe final productorservice.Excessinventoryiswaste. Let's lookat our woodblockexample again.Inaweekthe sawingoperationcanproduce enoughwood blocksto keepthe finishingmachinesuppliedforamonth.Since the sawingoperationdoesthe cutting for a numberof otherproducts,it makeswoodblocksfora week,withthe blocksbeingstoredina warehouse until theyare neededlaterinthe month.Itdoesthe same for three otherproducts.The resultisfourwarehouses,eachcapable of holdingamonth'ssupplyof the material neededtomake a product. But whatif the cuttingoperationspendsjustone dayoneachproduct? Each day itmakesenoughfor fourdays of operationof the finishingprocessforeachproduct.The resultisthat each warehouse only needstostore four daysworthof material insteadof fourweeks.The inventorystorage costsalongwith the associatedriskshave justbeencutby 75% as the resultof eliminatingexcessinventory. Over-processing:Over-processmeansthatmore workisbeingputintoa product or service thanis neededbythe final customer.If the finishingprocessforthe woodblocksincludesapplyingtencoatsof high-qualityepoxypaintwithsandingandpolishingbetweeneachstep,butthe customeronlyrequires that the finishedblocksbe paintedblack,there istoomuchworkgoingintothe finishingprocess – meaningthe extrawork(andepoxypaint) isbeingwasted. Overproduction:Overproductionmeansmakingmore productthanwhatis immediatelyneeded.If more woodblocksare beingproducedthanare beingsold,theywill accumulate inawarehouse.This may make sense if mostwoodblocksare soldduringthe fourweekspriortoChristmasand supplyneeds to be builtupprior to the holidayseason.Inmostcases,over-productionresultsinhighlevelsof wasteful inventory. Defects:Defective productsmustbe thrownoutor fixed.Defective servicesmustbe done over.Doing thingsrightthe firsttime isessential toeliminatingwaste.While eliminatingall defectsmayseemlike an impossible task,there are leanmethodssuchasPoka-Yoke,thatare soeffective ateliminatingdefects that theyalsoeliminatethe needtoinspectfordefects,producingevengreatersavings. Value Addedvs. Non-Value Added– The Needfor Signsand Labels The properuse of labelsandsignswill aidyoureffortstoreduce andeliminatewaste.Forexample,they communicate neededinformationsuchasnew or revisedoperatingproceduresatthe place andtime where the informationisneeded.Theyprovidedirections,guidingpeople safelytotheirdestinations. Andtheyprovide critical safetyinformationandidentifythe locationsof safetyequipment.However, signsand labelsonlyworkif theyare posted,theirmessageisclear,theyremaininplace,andare readable.