SlideShare a Scribd company logo
©2012 Vector Consulting Group. All Rights Reserved.
www.vectorconsulting.inwww.vectorconsulting.in
VCG employs the 'Theory of Constraints’ philosophy to bring about quantum
jump in performance of organizations in its target industry clusters.
LEVERAGING
THE POTENTIAL
RetailConsumer
Goods
Equipment
Manufacturing
Engineering
& Construction
Automobile &
Auto Components
©2012 Vector Consulting Group. All Rights Reserved.
202, Orion Business Park, Kapurbawdi Naka,
Ghodbunder Road, Thane (West) – 400610
Phone: +91 22 2589 5896
Fax: +91 22 2589 5897
Email: vcg@vectorconsulting.in
Web: www.vectorconsulting.in
TOC Insights - Operations
Sep 18, 2012
2
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
3
Only 20% of the Japanese
Companies have implemented
Lean/Six Sigma/TQM/TPM
Its not that the remaining 80%
didn't try. These firms tried, but failed
repeatedly.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
4
Did they fail because
of lack of seriousness?
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
5
Did they fail because
lack of efforts?
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
6
Did they fail because lack
of Knowledge?
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
7
Not really!!
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 02
8
The firms tried and failed repeatedly because:
Their Production Environment were
fundamental different from Toyota.
TPS was developed for Toyota.
You cannot “Copy Paste” solution of one
environment to the other environment!
©2012 Vector Consulting Group. All Rights Reserved. 9
Reality of implementation of
Lean / Six Sigma / TQM / TPM
©2012 Vector Consulting Group. All Rights Reserved.
An Insight
10
Application is specific, do
not force them on your
production environments.
01
Concepts are general, learn
them and design application
for your environment.
02
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
11
The assembly line
developed for the Ford Model T
began operation on December 1,
1913. It had immense influence
on the world.
Assembly Lines (FORD)
Features
• Flow line concept introduced for Mass Production.
• Flow means inventories in the operation are moving.
• Inventories are controlled by limiting space
between work-stations.
What happens
when space is
full?
Production stops i.e. in
essence local efficiencies
are abolished (Against
conventional wisdom of
100% efficiency).
Limitations
Single Product lines
where facilities are
dedicated for each
component.
Output is
lost when
production
stops?
Focusing mechanism
now available to
eliminate shortages.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
12
AssemblyLines
(FORD)
Part
02
Generic Concepts
Improving flow (or equivalently lead time) is the
primary objective of operations.
This primary objective should be translated into a
practical mechanism that guides operation when not
to produce (i.e. prevent over-production).
Local efficiencies must be
abolished.
A focusing process to
balance flow must be
in place.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
13
LEAN / TPS (TOYOTA)
Challenges
to introduce
FORD
system to
TOYOTA
Demand for small quantities of a
variety of cars, hence dedicated
lines could not be justified.
Space cannot be used to limit
inventories because:
If components are unavailable,
then Assembly would stop.
If space is full, feeder
lines would stop.
Solution was realized when Taichi Ohno heard about Super-Markets
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
14
Part
02
LEAN/TPS
(TOYOTA)
Features
• Flow is the most important element of TPS
• In place of Space, Kanban System introduced to limit
the inventory
• Only when an allocated container is used, production of
that container is triggered (No Card ..... No Production)
Frequent switching for small lots means
more set-ups and hence loss of production
• Just-in-time Evolved i.e. produce only those items which are
required in the very short-term.
• Set-up reduction techniques were developed (called Lean).
• Kanban was further used to guide process improvement efforts.
• Gradual reduction in Containers (FIVE WHYs introduced to guide
improvement efforts).
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
15
Part
03
LEAN/TPS
(TOYOTA)
Almost
everyone has
implemented
TPS, but still
no one has
achieved the
same
Productivity
numbers as
Toyota ...
Why?
Answer lies in the process of
choosing local improvements
Conventional companies use cost savings as
the parameter to decide local improvements
whereas Toyota uses “Flow Improvement”.
E.g. Setup Reduction was never done to
gain cost savings, rather it was done to
create better availability at a faster rate.
E.g. Quality was not improved to save trivial
costs, rather it was improved to remove
disruptions caused by defective part.
No focus on squeezing better prices from
supplier or cut payroll cost (manpower
reduction), rather full energy is spent on
improving the flow.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
16
Part
04
LEAN/TPS
(TOYOTA)
End Results
Focusing on Flow instead of local cost considerations
resulted in a much better lower cost per unit.
Abolishing local efficiencies resulted in much higher
efficiency of the workforce.
Important Insight
All cost reductions have a ceiling
(can cost be made ZERO?).
Improvement efforts have diminishing returns.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
17
Part
05
LEAN/TPS
(TOYOTA)
Generic
Concepts
Improving flow (or equivalently lead time)
is a primary objective of operations.
This primary objective should be
translated into a practical mechanism that
guides the operation when not to produce
(prevents overproduction).
Ford used space; Ohno used inventory.
Local efficiencies must be abolished.
Ford used dedicated lines; Ohno
introduced JIT & Lean techniques.
A focusing process to balance flow must
be in place. Ford used direct observation.
Ohno used gradual reduction of the
number of containers and then gradual
reduction of parts per container.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
18
Part
06
LEAN/TPS(TOYOTA
ProductionSystem)
Boundaries
of TPS
Works in Stable environments i.e.
the processes and the products
do not change significantly for a
considerable length of time.
Demand over time per product
should be relatively stable.
E.g. Toyota has
only 1 time
change yearly
per model.
Combine specific
techniques of
Lean with cost
saving programs.
Total load placed by orders on
the various types of resources
must be relatively stable.
Imagine holding
containers for items which
have sporadic demand.
When load changes
frequently, promising firm
due dates is challenging.
Typical way of
implementing
Lean in most
companies
Is this
really a true
implementa-
tion of Lean?
©2012 Vector Consulting Group. All Rights Reserved. 19
Theory of Constraint
Way of Production
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part01
20
Core
Principles
Flow is the most important
objective of Operations.
Practical Mechanism to
avoid Over-Production.
Achieved by ensuring
synchronization from everywhere
achieved by reducing lead times
cross the chain.
Local Efficiencies are
abolished.
Restrict release of material ahead
of time (suitable for unstable
environments as it is less sensitive
to disruptions in flow.
Buffer Management (BM) and Load
control are put in place.
Focusing process to balance
flow must be in place.
Analysis of Blacks & Reds guide
the improvement efforts.
©2012 Vector Consulting Group. All Rights Reserved.
Bottleneck
Basics 03 - TOC way of Production - Part02
21
Abolishment of Local Efficiencies
If C is to be used 100%
• There has to be Continuous bank of work in front of “C”.
• Whenever, there are disruptions in “A” or “B”; not only they have to ensure
that “C” is fed but also the Bank is rebuilt. Which means “A” / “B” should
have excess capacity than “C”.
• Similarly, incase of disruptions in “D”; not only it has to produce what “C”
is producing, “D” also has to clear the backlog created by “C”. Which again
means “D” has excess capacity than “C”.
A B C D
By this very definition, “A” / “B” / “D” should have much more capacity than “C” just
to keep “C” 100% busy. If so then local efficiencies at places other than “C” have to be
abolished otherwise inventory will hit the roofs.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part03
22
Time Based Mechanism to control WIP
Problem of using Space to control WIP between Workstations
• E.g. Conveyers, Trolleys, etc.
• When space is full, production stops which may not mean 100% utilization
of Bottleneck (“C”) resource.
• WIP in front of Bottleneck and Space after the Bottleneck is a function of
the “Normal Disruptions” at upstream & downstream resources.
o Typically the WIP is designed to be kept to bare minimum which
can result in production loss.
A B C D
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part04
23
Time Based Mechanism to control WIP
In TOC,
• WIP in the system is not artificially restrained between every 2 work
centers; rather it is controlled for the entire system allowing the effects of
Murphy to be absorbed throughout the system and yet protect the due
dates.
• Unlike Kanban, WIP is not maintained everywhere in the system. Rather it
is maintained only where needed i.e. to ensure 100% utilization of
bottleneck.
A B C D
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part05
24
Concept of Lead Time
• Most of the time, order is waiting in queues in front of the
resources.
• Generally the time actually spent working on an order is less
than 10% of the total lead time.
• Therefore at times of Urgency, material can moved very fast
through the system.
Total Lead Time
Waiting TimeTouch Time
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part06
25
Choke The Release
• Small lead times cause too much expediting (termed as “Hand-2-mouth”)
• Large lead times cause Jams, missed priorities
• Stables zone is in the middle and hence “Choke the Release” is done by
cutting WIP by half
ManagementAttention
Time Buffer Size
Insufficient
Reaction
time
Jams,
Missed
priorities
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part07
26
Priority System
• Just “Choking the Release” i.e. reducing WIP by half will not result in
more than 90% due date performance.
• Therefore a simple yet robust priority system is needed to guide
operations.
• Buffer Management gives clear priority to all the work-centers to
effectively plan and execute orders.
Reduced Lead Time
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part08
27
Focusing Mechanism (POOGI)
• Analysis of RED orders every week.
• Identifying the top reason for REDs and eliminating it.
40%
30%
20%
10%
Material availability Manpower availability Machine availability Utilities availability
Red Reasons
©2012 Vector Consulting Group. All Rights Reserved.©2012 Vector Consulting Group. All Rights Reserved.
Thank You
):

More Related Content

What's hot

Systematic Innovation in Software Using TRIZ
Systematic Innovation in Software Using TRIZSystematic Innovation in Software Using TRIZ
Systematic Innovation in Software Using TRIZ
Michael Kalika
 
Case study of dell
Case study of dellCase study of dell
Case study of dell
MUZAMMIL KHAN
 
Case study dell inc
Case study dell incCase study dell inc
Case study dell inc
Yihsuan LEE
 
Future of Work
Future of WorkFuture of Work
Future of Work
Naully Nicolas
 
DELL Marketing STRETEGY
 DELL Marketing STRETEGY DELL Marketing STRETEGY
DELL Marketing STRETEGY
rishi rathod
 
Innovation and creativity 05 innovative people
Innovation and creativity 05 innovative peopleInnovation and creativity 05 innovative people
Innovation and creativity 05 innovative people
Kamal AL MASRI
 
Philips Analysis on Innovation
Philips Analysis on InnovationPhilips Analysis on Innovation
Philips Analysis on Innovation
Omar Andazola
 
The computer for the 21st century
The computer for the 21st centuryThe computer for the 21st century
The computer for the 21st centuryFatih Özlü
 
case study on dell company
case study on dell companycase study on dell company
case study on dell company
HARSH JAIN
 
ISRAEL Startup nation
ISRAEL Startup nation ISRAEL Startup nation
ISRAEL Startup nation
MORE THAN DIGITAL
 
HP Megatrends: 2019 Update
HP Megatrends: 2019 UpdateHP Megatrends: 2019 Update
HP Megatrends: 2019 Update
Andrew Bolwell
 
Fixing Fevicol - Case Study
Fixing Fevicol - Case StudyFixing Fevicol - Case Study
Fixing Fevicol - Case StudyRohit Dhoundiyal
 
The goal by eliyahu m
The goal by eliyahu mThe goal by eliyahu m
The goal by eliyahu m
rishikesh kumar_xiss
 
Lenovo case study, strategy and SWOT analysis
Lenovo case study, strategy and SWOT analysisLenovo case study, strategy and SWOT analysis
Lenovo case study, strategy and SWOT analysis
simeonedl
 
Innovation
InnovationInnovation
Innovation
i4VC
 
Dell india
Dell india Dell india
Dell india
Gandhi Yash
 
Dell presentation
Dell presentationDell presentation
Dell presentation
'Shantunu Ghosh'
 
Frugal Innovation: A New Disruptive Business Paradigm
Frugal Innovation: A New Disruptive Business ParadigmFrugal Innovation: A New Disruptive Business Paradigm
Frugal Innovation: A New Disruptive Business Paradigm
Dr. Amit Kapoor
 

What's hot (20)

Systematic Innovation in Software Using TRIZ
Systematic Innovation in Software Using TRIZSystematic Innovation in Software Using TRIZ
Systematic Innovation in Software Using TRIZ
 
Case study of dell
Case study of dellCase study of dell
Case study of dell
 
dell
delldell
dell
 
Case study dell inc
Case study dell incCase study dell inc
Case study dell inc
 
Future of Work
Future of WorkFuture of Work
Future of Work
 
DELL Marketing STRETEGY
 DELL Marketing STRETEGY DELL Marketing STRETEGY
DELL Marketing STRETEGY
 
Innovation and creativity 05 innovative people
Innovation and creativity 05 innovative peopleInnovation and creativity 05 innovative people
Innovation and creativity 05 innovative people
 
Philips Analysis on Innovation
Philips Analysis on InnovationPhilips Analysis on Innovation
Philips Analysis on Innovation
 
The computer for the 21st century
The computer for the 21st centuryThe computer for the 21st century
The computer for the 21st century
 
case study on dell company
case study on dell companycase study on dell company
case study on dell company
 
ISRAEL Startup nation
ISRAEL Startup nation ISRAEL Startup nation
ISRAEL Startup nation
 
HP Megatrends: 2019 Update
HP Megatrends: 2019 UpdateHP Megatrends: 2019 Update
HP Megatrends: 2019 Update
 
Fixing Fevicol - Case Study
Fixing Fevicol - Case StudyFixing Fevicol - Case Study
Fixing Fevicol - Case Study
 
The goal by eliyahu m
The goal by eliyahu mThe goal by eliyahu m
The goal by eliyahu m
 
Lenovo case study, strategy and SWOT analysis
Lenovo case study, strategy and SWOT analysisLenovo case study, strategy and SWOT analysis
Lenovo case study, strategy and SWOT analysis
 
Innovation
InnovationInnovation
Innovation
 
Dell india
Dell india Dell india
Dell india
 
Dell presentation
Dell presentationDell presentation
Dell presentation
 
Disruptive innovation
Disruptive innovationDisruptive innovation
Disruptive innovation
 
Frugal Innovation: A New Disruptive Business Paradigm
Frugal Innovation: A New Disruptive Business ParadigmFrugal Innovation: A New Disruptive Business Paradigm
Frugal Innovation: A New Disruptive Business Paradigm
 

Viewers also liked

TRIZ + TOC
TRIZ + TOCTRIZ + TOC
TRIZ + TOC
[note.bene]
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Vector Consulting Group
 
Dealing with variety in supply chain
Dealing with variety in supply chainDealing with variety in supply chain
Dealing with variety in supply chain
Vector Consulting Group
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainVector Consulting Group
 
How do i learn toc on my own
How do i learn toc on my ownHow do i learn toc on my own
How do i learn toc on my own
Rajeev Athavale
 
TOC Mining Operations general appreciation
TOC Mining Operations general appreciationTOC Mining Operations general appreciation
TOC Mining Operations general appreciation
Arrie van Niekerk
 
Improving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryImproving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing Theory
Andrew Rusling
 
Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study
Vector Consulting Group
 
Tata Motors Limited - Vendors Meet 2017
Tata Motors Limited - Vendors Meet 2017Tata Motors Limited - Vendors Meet 2017
Tata Motors Limited - Vendors Meet 2017
Vector Consulting Group
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
Vector Consulting Group
 
About vector consulting group
About vector consulting groupAbout vector consulting group
About vector consulting group
Vector Consulting Group
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
Matthew Philip
 
Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study
Vector Consulting Group
 
Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case Study
Vector Consulting Group
 
TOC diagnosis
TOC diagnosisTOC diagnosis
TOC diagnosis
Marek Wrona
 
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff CoxUnderstanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
AGI - Goldratt Institute
 
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
Laz Allen
 

Viewers also liked (19)

TRIZ + TOC
TRIZ + TOCTRIZ + TOC
TRIZ + TOC
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...
 
Insights on Managing People by VCG
Insights on Managing People by VCGInsights on Managing People by VCG
Insights on Managing People by VCG
 
Nuggets on Auto Industry
Nuggets on Auto IndustryNuggets on Auto Industry
Nuggets on Auto Industry
 
Dealing with variety in supply chain
Dealing with variety in supply chainDealing with variety in supply chain
Dealing with variety in supply chain
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply Chain
 
How do i learn toc on my own
How do i learn toc on my ownHow do i learn toc on my own
How do i learn toc on my own
 
TOC Mining Operations general appreciation
TOC Mining Operations general appreciationTOC Mining Operations general appreciation
TOC Mining Operations general appreciation
 
Improving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryImproving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing Theory
 
Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study Equipment Manufacturing Industry Case Study
Equipment Manufacturing Industry Case Study
 
Tata Motors Limited - Vendors Meet 2017
Tata Motors Limited - Vendors Meet 2017Tata Motors Limited - Vendors Meet 2017
Tata Motors Limited - Vendors Meet 2017
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
 
About vector consulting group
About vector consulting groupAbout vector consulting group
About vector consulting group
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study Engineering & Construction Industry Case Study
Engineering & Construction Industry Case Study
 
Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case Study
 
TOC diagnosis
TOC diagnosisTOC diagnosis
TOC diagnosis
 
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff CoxUnderstanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
 
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
Solving Problems with Theory of Constraints Current Reality Trees @ Lean Agil...
 

Similar to Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraints (TOC) as applied to field of manufacturing management

Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
Mohammed Hamed Ahmed Soliman
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps Transformation
Bart Driscoll
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
Ashima Kandari
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
IRJET Journal
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
vivatechijri
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
ssusera34210
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
itititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeudeditititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeuded
sampadakhopade
 
About the Zero Deviation Lifecycle
About the Zero Deviation LifecycleAbout the Zero Deviation Lifecycle
About the Zero Deviation Lifecycle
Steve Ross-Talbot
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesAna Galindo
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatra
DANANG WID
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET Journal
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
ssuser8d9a25
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
mohamedibrahim219956
 
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
Itential
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
Utkan Uluçay, MSc., CDDP
 
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons LearnedVMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
VMworld
 

Similar to Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraints (TOC) as applied to field of manufacturing management (20)

Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps Transformation
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
itititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeudeditititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeuded
 
About the Zero Deviation Lifecycle
About the Zero Deviation LifecycleAbout the Zero Deviation Lifecycle
About the Zero Deviation Lifecycle
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom Challenges
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatra
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...How to Select High Impact Use Cases to Drive a Successful Network Automation ...
How to Select High Impact Use Cases to Drive a Successful Network Automation ...
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
 
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons LearnedVMworld 2013: SDDC IT Operations Transformation:  Multi-customer Lessons Learned
VMworld 2013: SDDC IT Operations Transformation: Multi-customer Lessons Learned
 

More from Vector Consulting Group

Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Vector Consulting Group
 
Introduction to Vector Consulting Group
Introduction to Vector Consulting Group Introduction to Vector Consulting Group
Introduction to Vector Consulting Group
Vector Consulting Group
 
What is Theory of Constraints?
What is Theory of Constraints?What is Theory of Constraints?
What is Theory of Constraints?
Vector Consulting Group
 
About - Vector Consulting Group
About - Vector Consulting Group About - Vector Consulting Group
About - Vector Consulting Group
Vector Consulting Group
 
Textile Industry case study
Textile Industry case studyTextile Industry case study
Textile Industry case study
Vector Consulting Group
 
Auto Industry Case Study
Auto Industry Case Study Auto Industry Case Study
Auto Industry Case Study
Vector Consulting Group
 
An After Thought on the After Market
An After Thought on the After MarketAn After Thought on the After Market
An After Thought on the After Market
Vector Consulting Group
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chain
Vector Consulting Group
 
Auto Industry Outlook 2012
Auto Industry Outlook 2012Auto Industry Outlook 2012
Auto Industry Outlook 2012
Vector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Vector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicVector Consulting Group
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel Performance
Vector Consulting Group
 
TOC's role in IT success
TOC's role in IT successTOC's role in IT success
TOC's role in IT success
Vector Consulting Group
 

More from Vector Consulting Group (13)

Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
 
Introduction to Vector Consulting Group
Introduction to Vector Consulting Group Introduction to Vector Consulting Group
Introduction to Vector Consulting Group
 
What is Theory of Constraints?
What is Theory of Constraints?What is Theory of Constraints?
What is Theory of Constraints?
 
About - Vector Consulting Group
About - Vector Consulting Group About - Vector Consulting Group
About - Vector Consulting Group
 
Textile Industry case study
Textile Industry case studyTextile Industry case study
Textile Industry case study
 
Auto Industry Case Study
Auto Industry Case Study Auto Industry Case Study
Auto Industry Case Study
 
An After Thought on the After Market
An After Thought on the After MarketAn After Thought on the After Market
An After Thought on the After Market
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chain
 
Auto Industry Outlook 2012
Auto Industry Outlook 2012Auto Industry Outlook 2012
Auto Industry Outlook 2012
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: Infographic
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel Performance
 
TOC's role in IT success
TOC's role in IT successTOC's role in IT success
TOC's role in IT success
 

Recently uploaded

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 

Recently uploaded (20)

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 

Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraints (TOC) as applied to field of manufacturing management

  • 1. ©2012 Vector Consulting Group. All Rights Reserved. www.vectorconsulting.inwww.vectorconsulting.in VCG employs the 'Theory of Constraints’ philosophy to bring about quantum jump in performance of organizations in its target industry clusters. LEVERAGING THE POTENTIAL RetailConsumer Goods Equipment Manufacturing Engineering & Construction Automobile & Auto Components
  • 2. ©2012 Vector Consulting Group. All Rights Reserved. 202, Orion Business Park, Kapurbawdi Naka, Ghodbunder Road, Thane (West) – 400610 Phone: +91 22 2589 5896 Fax: +91 22 2589 5897 Email: vcg@vectorconsulting.in Web: www.vectorconsulting.in TOC Insights - Operations Sep 18, 2012 2
  • 3. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 3 Only 20% of the Japanese Companies have implemented Lean/Six Sigma/TQM/TPM Its not that the remaining 80% didn't try. These firms tried, but failed repeatedly.
  • 4. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 4 Did they fail because of lack of seriousness?
  • 5. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 5 Did they fail because lack of efforts?
  • 6. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 6 Did they fail because lack of Knowledge?
  • 7. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 7 Not really!!
  • 8. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 02 8 The firms tried and failed repeatedly because: Their Production Environment were fundamental different from Toyota. TPS was developed for Toyota. You cannot “Copy Paste” solution of one environment to the other environment!
  • 9. ©2012 Vector Consulting Group. All Rights Reserved. 9 Reality of implementation of Lean / Six Sigma / TQM / TPM
  • 10. ©2012 Vector Consulting Group. All Rights Reserved. An Insight 10 Application is specific, do not force them on your production environments. 01 Concepts are general, learn them and design application for your environment. 02
  • 11. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 11 The assembly line developed for the Ford Model T began operation on December 1, 1913. It had immense influence on the world. Assembly Lines (FORD) Features • Flow line concept introduced for Mass Production. • Flow means inventories in the operation are moving. • Inventories are controlled by limiting space between work-stations. What happens when space is full? Production stops i.e. in essence local efficiencies are abolished (Against conventional wisdom of 100% efficiency). Limitations Single Product lines where facilities are dedicated for each component. Output is lost when production stops? Focusing mechanism now available to eliminate shortages.
  • 12. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 12 AssemblyLines (FORD) Part 02 Generic Concepts Improving flow (or equivalently lead time) is the primary objective of operations. This primary objective should be translated into a practical mechanism that guides operation when not to produce (i.e. prevent over-production). Local efficiencies must be abolished. A focusing process to balance flow must be in place.
  • 13. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 13 LEAN / TPS (TOYOTA) Challenges to introduce FORD system to TOYOTA Demand for small quantities of a variety of cars, hence dedicated lines could not be justified. Space cannot be used to limit inventories because: If components are unavailable, then Assembly would stop. If space is full, feeder lines would stop. Solution was realized when Taichi Ohno heard about Super-Markets
  • 14. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 14 Part 02 LEAN/TPS (TOYOTA) Features • Flow is the most important element of TPS • In place of Space, Kanban System introduced to limit the inventory • Only when an allocated container is used, production of that container is triggered (No Card ..... No Production) Frequent switching for small lots means more set-ups and hence loss of production • Just-in-time Evolved i.e. produce only those items which are required in the very short-term. • Set-up reduction techniques were developed (called Lean). • Kanban was further used to guide process improvement efforts. • Gradual reduction in Containers (FIVE WHYs introduced to guide improvement efforts).
  • 15. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 15 Part 03 LEAN/TPS (TOYOTA) Almost everyone has implemented TPS, but still no one has achieved the same Productivity numbers as Toyota ... Why? Answer lies in the process of choosing local improvements Conventional companies use cost savings as the parameter to decide local improvements whereas Toyota uses “Flow Improvement”. E.g. Setup Reduction was never done to gain cost savings, rather it was done to create better availability at a faster rate. E.g. Quality was not improved to save trivial costs, rather it was improved to remove disruptions caused by defective part. No focus on squeezing better prices from supplier or cut payroll cost (manpower reduction), rather full energy is spent on improving the flow.
  • 16. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 16 Part 04 LEAN/TPS (TOYOTA) End Results Focusing on Flow instead of local cost considerations resulted in a much better lower cost per unit. Abolishing local efficiencies resulted in much higher efficiency of the workforce. Important Insight All cost reductions have a ceiling (can cost be made ZERO?). Improvement efforts have diminishing returns.
  • 17. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 17 Part 05 LEAN/TPS (TOYOTA) Generic Concepts Improving flow (or equivalently lead time) is a primary objective of operations. This primary objective should be translated into a practical mechanism that guides the operation when not to produce (prevents overproduction). Ford used space; Ohno used inventory. Local efficiencies must be abolished. Ford used dedicated lines; Ohno introduced JIT & Lean techniques. A focusing process to balance flow must be in place. Ford used direct observation. Ohno used gradual reduction of the number of containers and then gradual reduction of parts per container.
  • 18. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 18 Part 06 LEAN/TPS(TOYOTA ProductionSystem) Boundaries of TPS Works in Stable environments i.e. the processes and the products do not change significantly for a considerable length of time. Demand over time per product should be relatively stable. E.g. Toyota has only 1 time change yearly per model. Combine specific techniques of Lean with cost saving programs. Total load placed by orders on the various types of resources must be relatively stable. Imagine holding containers for items which have sporadic demand. When load changes frequently, promising firm due dates is challenging. Typical way of implementing Lean in most companies Is this really a true implementa- tion of Lean?
  • 19. ©2012 Vector Consulting Group. All Rights Reserved. 19 Theory of Constraint Way of Production
  • 20. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part01 20 Core Principles Flow is the most important objective of Operations. Practical Mechanism to avoid Over-Production. Achieved by ensuring synchronization from everywhere achieved by reducing lead times cross the chain. Local Efficiencies are abolished. Restrict release of material ahead of time (suitable for unstable environments as it is less sensitive to disruptions in flow. Buffer Management (BM) and Load control are put in place. Focusing process to balance flow must be in place. Analysis of Blacks & Reds guide the improvement efforts.
  • 21. ©2012 Vector Consulting Group. All Rights Reserved. Bottleneck Basics 03 - TOC way of Production - Part02 21 Abolishment of Local Efficiencies If C is to be used 100% • There has to be Continuous bank of work in front of “C”. • Whenever, there are disruptions in “A” or “B”; not only they have to ensure that “C” is fed but also the Bank is rebuilt. Which means “A” / “B” should have excess capacity than “C”. • Similarly, incase of disruptions in “D”; not only it has to produce what “C” is producing, “D” also has to clear the backlog created by “C”. Which again means “D” has excess capacity than “C”. A B C D By this very definition, “A” / “B” / “D” should have much more capacity than “C” just to keep “C” 100% busy. If so then local efficiencies at places other than “C” have to be abolished otherwise inventory will hit the roofs.
  • 22. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part03 22 Time Based Mechanism to control WIP Problem of using Space to control WIP between Workstations • E.g. Conveyers, Trolleys, etc. • When space is full, production stops which may not mean 100% utilization of Bottleneck (“C”) resource. • WIP in front of Bottleneck and Space after the Bottleneck is a function of the “Normal Disruptions” at upstream & downstream resources. o Typically the WIP is designed to be kept to bare minimum which can result in production loss. A B C D
  • 23. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part04 23 Time Based Mechanism to control WIP In TOC, • WIP in the system is not artificially restrained between every 2 work centers; rather it is controlled for the entire system allowing the effects of Murphy to be absorbed throughout the system and yet protect the due dates. • Unlike Kanban, WIP is not maintained everywhere in the system. Rather it is maintained only where needed i.e. to ensure 100% utilization of bottleneck. A B C D
  • 24. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part05 24 Concept of Lead Time • Most of the time, order is waiting in queues in front of the resources. • Generally the time actually spent working on an order is less than 10% of the total lead time. • Therefore at times of Urgency, material can moved very fast through the system. Total Lead Time Waiting TimeTouch Time
  • 25. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part06 25 Choke The Release • Small lead times cause too much expediting (termed as “Hand-2-mouth”) • Large lead times cause Jams, missed priorities • Stables zone is in the middle and hence “Choke the Release” is done by cutting WIP by half ManagementAttention Time Buffer Size Insufficient Reaction time Jams, Missed priorities
  • 26. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part07 26 Priority System • Just “Choking the Release” i.e. reducing WIP by half will not result in more than 90% due date performance. • Therefore a simple yet robust priority system is needed to guide operations. • Buffer Management gives clear priority to all the work-centers to effectively plan and execute orders. Reduced Lead Time
  • 27. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part08 27 Focusing Mechanism (POOGI) • Analysis of RED orders every week. • Identifying the top reason for REDs and eliminating it. 40% 30% 20% 10% Material availability Manpower availability Machine availability Utilities availability Red Reasons
  • 28. ©2012 Vector Consulting Group. All Rights Reserved.©2012 Vector Consulting Group. All Rights Reserved. Thank You ):