UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering ! Environmental Sciences
Construction Materials Testing ! Private Provider / Building Inspection
5561 Florida Mining Boulevard South  Jacksonville, Florida 32257  (904) 296-0757  Fax (904) 296-0748
March 20, 2009
Roger Chastain
The Tower Group
11315 Business Park Blvd.
Jacksonville, Florida 32256
Reference: Proposal
Dear Sir:
Universal Engineering Sciences (UES), Inc. is pleased to present this proposal to provide
Construction Materials Testing for the referenced project. This proposal includes a project approach
based on our recent discussions with The Tower Group-OHL. Our understanding of the project is also
based on our view of the project plans and specifications provided to us. This proposal describes our
understanding of the project information and provides our proposed scope of services, schedule, and
estimating budget.
We understand that you intended to construct a two story East Wing, three story West Wing, Dining
Hall Expansion, Pre-engineering Weapon Canopy and Covered Dining Patio at the RTI Camp Blanding
Facility consisting of concrete block masonry and steel structure. Constructed features include
masonry and structural steel. The construction will also include adjacent pavement areas.
Construction Material Quality Assurance Testing Services
The purpose of the testing services will be to evaluate whether components meet quality requirements
in accordance with the project requirements for the project. We feel the best approach to this project is
to provide a senior engineering technician(s) as needed for observation and testing of the materials
used in the construction of this project. Those activities will include but are not limited to:
 Earthwork testing
 Foundation testing
 Grout Testing
 Structural steel
We will provide copies of test results and observations to you, City Building Officials, the contractor,
and other parties you designate. A Professional Engineer registered in Florida will review and sign
these reports. Final reports will be provided on a monthly basis. Field copies are available daily for
review.
OFFICES IN:
 Clermont
 Daytona Beach
 DeBary
 Fort Myers
 Gainesville
 Hollywood
 Jacksonville
 Ocala
 Orlando
 Palm Coast
 Rockledge
 Sarasota
 St. Augustine
 Tampa
 West Palm Beach
Proposed Schedule
We are prepared to begin upon receipt of written authorization to proceed. We understand our total
scope for the project should be completed in less than 12 months from the date of authorization. We
do not control the construction schedule or the contractor’s activities, therefore we can only estimate
the time required based on past experience on similar projects.
Availability of Personnel
Our Jacksonville office includes a staff of 50, including 6 Professional Engineers, 1 Special Inspector
(Rick Kushner, P.E.), 2 Certified Welding Inspectors, 8 delegate inspectors, a certified laboratory, and
15 field technicians.
Our intention is to designate one or more of our Jacksonville staff professionals, and one or more field
technicians to this project for the respective services so that we maintain project inspection and testing
continuity and consistency. Other Jacksonville UES staff will assist as needed for laboratory services
and report preparation. We ask that 24 to 48 hour notice be given so that we can schedule our staff
resources.
Should you desire, we can provide full time dedicated staff professionals and field technicians. We
welcome an opportunity to sit down with you to discuss your specific needs.
Estimated Budget
Attached is our estimated project budget for the proposed services. Our proposed budget estimate for
materials testing is $15,360.00 ($4,020.00 for Site & $11,340.00 for Building) at this time. If the
stated time period, our proposed number of units and scope of activities does not change, this amount
will be valid. If the time period, number of units, or scope of activities changed, our fee must change
accordingly at our standard rates. We can provide a refined fee estimate once the detailed
construction is provided to us.
Acknowledgement
Thank you for the opportunity to submit this proposal. We look forward to working with you on the RTI
Phase IV facility at Camp Blanding. We ask that you please call if you have questions or would like to
discuss this proposal.
Respectfully submitted,
Universal Engineering Sciences,
Tony Hemmerly
Business Development Representative
Enclosures: Budget Estimating
2009J-267
Soils and Earthwork Laboratory Testing
Atterberg Limits 80.00$ EA
Grain Size Distribution 65.00$ EA
Percent Fines (Wash #200) 25.00$ EA
Hydrometer Analysis with Grain Size Distribution 100.00$ EA
Organic Content Determination 30.00$ EA
Moisture Content 6.00$ EA
Soil Classification (Includes Atterberg, Organic, Gradation, Wash 200) 185.00$ EA
Specific Gravity (Fine Aggregate / Soils) 115.00$ EA
Specific Gravity (Course Aggregate) 75.00$ EA
Permeability Test Constant Head 140.00$ EA
pH Determination of Soils 40.00$ EA
Resistivity Test of Soils 55.00$ EA
Chloride Determination of Soils 45.00$ EA
Sulfate Content of Soils 45.00$ EA
Corrosion Series for Soils (pH, R, Cl, Su) 155.00$ EA
Lime rock Bearing Ratio (LBR), 4 Points 250.00$ EA
Standard or Modified Proctor, 4 Points 85.00$ EA
Soils and Earthwork Field Testing
Field Density Test (Minimum 4 Test per Trip) 19.00$ EA
Lime rock Thickness in Conjunction with Density Test 5.00$ EA
Sample Pickup (Proctors and LBR if Separate Trip Required) 45.00$ EA
Soil Monitor (Includes Muck Removal and Proof Rolling) 55.00$ HR
Concrete, Grout, and Block Testing
85.00$ EA
Additional Cylinders 10.00$ EA
Slump Test 10.00$ EA
Air Content Test 20.00$ EA
Making and Testing Flexural Beams (each) 85.00$ EA
Compressive Strength of Concrete Cylinders, Beams or Grout (FOB Lab) 15.00$ EA
Concrete Coring Mobilization 125.00$ EA
Obtaining and Testing Concrete Cores 85.00$ EA
Patching Concrete Core Holes 10.00$ EA
Floor Flatness / Levelness Equipment Charge 100.00$ EA
Floor Flatness / Levelness Testing 900.00$ DAY
Rebound Hammer Testing (Min 4hr) 85.00$ HR
Concrete Moisture Emissions (each test) 125.00$ EA
Compressive Strength of Hollow Masonry Prisms (Set of 3) 165.00$ EA
Compressive Strength of Grouted Masonry Prisms (Set of 3) 185.00$ EA
Molding and Testing of 2" Mortar Cubes 80.00$ EA
Making and Testing of Grout Prisms (Set of 4) 110.00$ EA
Drill Shaft Inspector (Includes Boring Logs FDOT Certified) 65.00$ HR
Concrete Inspector Level II (FDOT Certified) 65.00$ HR
Concrete Sampling (Includes Sampling up to 4 Specimens,
UNIVERSAL ENGINEERING SCIENCES, INC
CONSTRUCTION MATERIAL TESTING & INSPECTION SERVICES
2009 Standard Fee Schedule
UES Proposal Number
Asphalt Testing
Asphalt Concrete Plant Inspection (FDOT Certified) 65.00$ HR
Asphalt Roadway Inspection (FDOT Certified) 65.00$ HR
Extraction Gradation 195.00$ EA
Asphalt Coring Mobilization (Man and Equipment ) 125.00$ EA
Asphalt Cores Tested for Thickness / Density 30.00$ EA
Max Specific Gravity of Asphalt 150.00$ EA
Sample Pickup (If Separate Trip Required) 45.00$ EA
Structural Steel and Welding Inspection
Inspection of Structural Steel and Welding (Min 4hr per trip) 65.00$ HR
Certified Welding Inspector (Min 4hr per Trip) 65.00$ HR
Bolt Torque Inspection (Min 4hr per Trip) 65.00$ HR
Bolt Pull Testing (Each Bolt) + Minimum 4hr Inspector Rate per Trip 18.00$ EA
Ultrasonic Testing Quoted Per Job
Magnetic Particle Testing Quoted Per Job
Liquid Dye Penetrant Testing Quoted Per Job
Radiography Testing Quoted Per Job
Vibration Monitoring Technician Rate (Min 8hr per Trip) 55.00$ HR
Vibration Monitoring Equipment Rate Quoted Per Job
Pile Driving Monitoring 55.00$ HR
Auger Cast Monitoring 55.00$ HR
Material, Geotechnical, Environmental Engineering, and Technical Services
Threshold Delegate (4hr Min) 65.00$ HR
PPI Inspector (4hr Min) 75.00$ HR
Senior Engineer, P.E. 125.00$ HR
Project Engineer 100.00$ HR
Staff Engineer 80.00$ HR
Engineering Technician 48.00$ HR
QC Manager (FDOT Certified) 55.00$ HR
Fire Proof Testing (Pull Test and Thickness) (4hr Min) 55.00$ HR
Fire Proof Material Testing (Density, Moisture) 55.00$ HR
Turbidity Testing Quoted Per Job
Standby, Travel, Weekend, and Holiday Time
Weekends and Holiday Rates (standard rate multiplied by 1.35).
Travel Time (Round Trip) Quoted Per Job
THESE FEES ARE SUBJECT TO NEGOTIATIONS BASED ON SPECIFIC PROJECT SIZE AND DURATION.
UNIT PRICES ARE GOOD UNTIL DECEMBER 31, 2009.
THIS FEE SCHEDULE IS CONFIDENTIAL AND ONLY APPLIES TO SPECIFIC PROJECTS FOR APPROVED CLIENTS.
UES Proposal Number 2009J-267
UNIVERSAL ENGINEERING SCIENCES, INC
CONSTRUCTION MATERIAL TESTING & INSPECTION SERVICES
2009 Fee Schedule
UNIVERSAL ENGINEERING SCIENCES, INC.
Universal Engineering Sciences, Inc. (UES) is pleased to provide the services described below. The purpose of this document is to
describe the terms under which the services will be provided and to obtain formal authorization.
PROJECT NAME:
PROJECT LOCATION:
CLIENT NAME:
Date: September 11, 2010
Phone#
CLIENT ADDRESS:
Fax No.
Email:
II. Contract Documents. The following documents form part of this Agreement and are incorporated herein by
referral:
A. UES General Conditions.
B. UES Proposal
Dated:
C. Plans, reports, specifications, and other documents provided by the Client prior to this Agreement date.
D. Other exhibits marked and described as
follows:
In the event of any inconsistency or conflict among the Contract Documents, the provisions in the Contract Document first listed above
shall govern.
III. Authority to proceed and for payment. (To be completed by Client)
If the invoice is to mailed to another client than listed above please provide the information for that client in the fields listed below:
Firm:
Social Security Number or
Federal Identification
Number:
Address:
Attention : Title:
IN WITNESS WHEREOF, the parties have caused this agreement to be executed by their duly authorized representatives.
WORK AUTHORIZATION/ PROPOSAL ACCEPTANCE FORM
I. As Shown UES Proposal No. 2009J-xxxx (attached)
September 11, 2010
CLIENT: UNIVERSAL ENGINEERING SCIENCES, INC.
BY (Signature):
BY
(Signature):
TYPED NAME: TYPED NAME: Tony Hemmerly
TITLE: TITLE: Business Development Representative
DATE: DATE: September 11, 2010
RETURN EXECUTED COPIES TO
UNIVERSAL ENGINEERING SCIENCES
5561 Florida Mining Boulevard South, Jacksonville, Florida 32257-3648
TELEPHONE: 904-296-0757 / FAX: 904-296-0748

More Related Content

What's hot

sunil k v document.DOCX
sunil k v document.DOCXsunil k v document.DOCX
sunil k v document.DOCXSunil K.V
 
Epsilon Powerpoint
Epsilon PowerpointEpsilon Powerpoint
Epsilon Powerpointaminsadekmmp
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
Elpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez
 
QA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWQA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWMilen Kurian
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01RafiUllah U
 
CV of Quality mechanical-naren...
CV of Quality mechanical-naren...CV of Quality mechanical-naren...
CV of Quality mechanical-naren...Narendra Kumar Pal
 
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)Sara Pope
 
Stefan Holmes_CV_2016_condensed
Stefan Holmes_CV_2016_condensedStefan Holmes_CV_2016_condensed
Stefan Holmes_CV_2016_condensedStefan Holmes
 
RESUME MAHESH M RAVAL
RESUME MAHESH M RAVALRESUME MAHESH M RAVAL
RESUME MAHESH M RAVALMAHESH RAVAL
 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2Tim Jones
 

What's hot (20)

Tallion_Resume 2014
Tallion_Resume 2014Tallion_Resume 2014
Tallion_Resume 2014
 
qaiser shahzad cv
qaiser shahzad cvqaiser shahzad cv
qaiser shahzad cv
 
sunil k v document.DOCX
sunil k v document.DOCXsunil k v document.DOCX
sunil k v document.DOCX
 
Tallion_Resume 2014
Tallion_Resume 2014Tallion_Resume 2014
Tallion_Resume 2014
 
Epsilon Powerpoint
Epsilon PowerpointEpsilon Powerpoint
Epsilon Powerpoint
 
my cv
my cvmy cv
my cv
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 
Elpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez Cert Welder
Elpidio Gomez Cert Welder
 
QA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEWQA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEW
 
JAMES AJIBOYE RESUME-2016
JAMES AJIBOYE  RESUME-2016JAMES AJIBOYE  RESUME-2016
JAMES AJIBOYE RESUME-2016
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01
 
CV of Quality mechanical-naren...
CV of Quality mechanical-naren...CV of Quality mechanical-naren...
CV of Quality mechanical-naren...
 
QA QC MECH ENGG
QA QC MECH ENGGQA QC MECH ENGG
QA QC MECH ENGG
 
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
 
Stefan Holmes_CV_2016_condensed
Stefan Holmes_CV_2016_condensedStefan Holmes_CV_2016_condensed
Stefan Holmes_CV_2016_condensed
 
RESUME MAHESH M RAVAL
RESUME MAHESH M RAVALRESUME MAHESH M RAVAL
RESUME MAHESH M RAVAL
 
Prakesh Welding Foreman CV
Prakesh Welding Foreman CVPrakesh Welding Foreman CV
Prakesh Welding Foreman CV
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2
 

Similar to UES LUMP SUM PROPOSAL-PDF (20)

SLM150045_draft SOQ
SLM150045_draft SOQSLM150045_draft SOQ
SLM150045_draft SOQ
 
wsa
wsawsa
wsa
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015
 
Resume
ResumeResume
Resume
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resume
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
wsa
wsawsa
wsa
 
Precast QA/QC Manager
Precast QA/QC Manager Precast QA/QC Manager
Precast QA/QC Manager
 
Precast QAQC Manager CV
Precast QAQC Manager CVPrecast QAQC Manager CV
Precast QAQC Manager CV
 
Pcv.pdf
Pcv.pdfPcv.pdf
Pcv.pdf
 
TRANSONIC
TRANSONICTRANSONIC
TRANSONIC
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation Slides
 
Resume
ResumeResume
Resume
 
Sanjay's C.V
Sanjay's C.VSanjay's C.V
Sanjay's C.V
 
CV.C
CV.CCV.C
CV.C
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
 
Forensic
ForensicForensic
Forensic
 
CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)CV's__Komkrit_Choompol 2016(Update)
CV's__Komkrit_Choompol 2016(Update)
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 

More from Suzanne Goldsberry

More from Suzanne Goldsberry (12)

PROPERTY PROFILE TEMPLATE-JAX
PROPERTY PROFILE TEMPLATE-JAXPROPERTY PROFILE TEMPLATE-JAX
PROPERTY PROFILE TEMPLATE-JAX
 
List of duties at PHH
List of duties at PHHList of duties at PHH
List of duties at PHH
 
Most current Word test results
Most current Word test resultsMost current Word test results
Most current Word test results
 
Most recent Outlook testing results
Most recent Outlook testing resultsMost recent Outlook testing results
Most recent Outlook testing results
 
Most recent Excel test results
Most recent Excel test resultsMost recent Excel test results
Most recent Excel test results
 
THANK YOU FROM MARK SHAW
THANK YOU FROM MARK SHAWTHANK YOU FROM MARK SHAW
THANK YOU FROM MARK SHAW
 
LOOP PROPOSAL
LOOP PROPOSALLOOP PROPOSAL
LOOP PROPOSAL
 
Jacksonville OpsReport 6-28-2014
Jacksonville OpsReport 6-28-2014Jacksonville OpsReport 6-28-2014
Jacksonville OpsReport 6-28-2014
 
Mortgage Stability 20120420
Mortgage Stability 20120420Mortgage Stability 20120420
Mortgage Stability 20120420
 
Final PP 7-2014 - RP Meeting 7-23-14 final
Final PP 7-2014 - RP Meeting 7-23-14 finalFinal PP 7-2014 - RP Meeting 7-23-14 final
Final PP 7-2014 - RP Meeting 7-23-14 final
 
Letter of recommendation - 2
Letter of recommendation - 2Letter of recommendation - 2
Letter of recommendation - 2
 
S Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IHS Goldsberry - 2013 Performance Assessment - IH
S Goldsberry - 2013 Performance Assessment - IH
 

UES LUMP SUM PROPOSAL-PDF

  • 1. UNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering ! Environmental Sciences Construction Materials Testing ! Private Provider / Building Inspection 5561 Florida Mining Boulevard South  Jacksonville, Florida 32257  (904) 296-0757  Fax (904) 296-0748 March 20, 2009 Roger Chastain The Tower Group 11315 Business Park Blvd. Jacksonville, Florida 32256 Reference: Proposal Dear Sir: Universal Engineering Sciences (UES), Inc. is pleased to present this proposal to provide Construction Materials Testing for the referenced project. This proposal includes a project approach based on our recent discussions with The Tower Group-OHL. Our understanding of the project is also based on our view of the project plans and specifications provided to us. This proposal describes our understanding of the project information and provides our proposed scope of services, schedule, and estimating budget. We understand that you intended to construct a two story East Wing, three story West Wing, Dining Hall Expansion, Pre-engineering Weapon Canopy and Covered Dining Patio at the RTI Camp Blanding Facility consisting of concrete block masonry and steel structure. Constructed features include masonry and structural steel. The construction will also include adjacent pavement areas. Construction Material Quality Assurance Testing Services The purpose of the testing services will be to evaluate whether components meet quality requirements in accordance with the project requirements for the project. We feel the best approach to this project is to provide a senior engineering technician(s) as needed for observation and testing of the materials used in the construction of this project. Those activities will include but are not limited to:  Earthwork testing  Foundation testing  Grout Testing  Structural steel We will provide copies of test results and observations to you, City Building Officials, the contractor, and other parties you designate. A Professional Engineer registered in Florida will review and sign these reports. Final reports will be provided on a monthly basis. Field copies are available daily for review. OFFICES IN:  Clermont  Daytona Beach  DeBary  Fort Myers  Gainesville  Hollywood  Jacksonville  Ocala  Orlando  Palm Coast  Rockledge  Sarasota  St. Augustine  Tampa  West Palm Beach
  • 2. Proposed Schedule We are prepared to begin upon receipt of written authorization to proceed. We understand our total scope for the project should be completed in less than 12 months from the date of authorization. We do not control the construction schedule or the contractor’s activities, therefore we can only estimate the time required based on past experience on similar projects. Availability of Personnel Our Jacksonville office includes a staff of 50, including 6 Professional Engineers, 1 Special Inspector (Rick Kushner, P.E.), 2 Certified Welding Inspectors, 8 delegate inspectors, a certified laboratory, and 15 field technicians. Our intention is to designate one or more of our Jacksonville staff professionals, and one or more field technicians to this project for the respective services so that we maintain project inspection and testing continuity and consistency. Other Jacksonville UES staff will assist as needed for laboratory services and report preparation. We ask that 24 to 48 hour notice be given so that we can schedule our staff resources. Should you desire, we can provide full time dedicated staff professionals and field technicians. We welcome an opportunity to sit down with you to discuss your specific needs. Estimated Budget Attached is our estimated project budget for the proposed services. Our proposed budget estimate for materials testing is $15,360.00 ($4,020.00 for Site & $11,340.00 for Building) at this time. If the stated time period, our proposed number of units and scope of activities does not change, this amount will be valid. If the time period, number of units, or scope of activities changed, our fee must change accordingly at our standard rates. We can provide a refined fee estimate once the detailed construction is provided to us. Acknowledgement Thank you for the opportunity to submit this proposal. We look forward to working with you on the RTI Phase IV facility at Camp Blanding. We ask that you please call if you have questions or would like to discuss this proposal. Respectfully submitted, Universal Engineering Sciences, Tony Hemmerly Business Development Representative Enclosures: Budget Estimating
  • 3. 2009J-267 Soils and Earthwork Laboratory Testing Atterberg Limits 80.00$ EA Grain Size Distribution 65.00$ EA Percent Fines (Wash #200) 25.00$ EA Hydrometer Analysis with Grain Size Distribution 100.00$ EA Organic Content Determination 30.00$ EA Moisture Content 6.00$ EA Soil Classification (Includes Atterberg, Organic, Gradation, Wash 200) 185.00$ EA Specific Gravity (Fine Aggregate / Soils) 115.00$ EA Specific Gravity (Course Aggregate) 75.00$ EA Permeability Test Constant Head 140.00$ EA pH Determination of Soils 40.00$ EA Resistivity Test of Soils 55.00$ EA Chloride Determination of Soils 45.00$ EA Sulfate Content of Soils 45.00$ EA Corrosion Series for Soils (pH, R, Cl, Su) 155.00$ EA Lime rock Bearing Ratio (LBR), 4 Points 250.00$ EA Standard or Modified Proctor, 4 Points 85.00$ EA Soils and Earthwork Field Testing Field Density Test (Minimum 4 Test per Trip) 19.00$ EA Lime rock Thickness in Conjunction with Density Test 5.00$ EA Sample Pickup (Proctors and LBR if Separate Trip Required) 45.00$ EA Soil Monitor (Includes Muck Removal and Proof Rolling) 55.00$ HR Concrete, Grout, and Block Testing 85.00$ EA Additional Cylinders 10.00$ EA Slump Test 10.00$ EA Air Content Test 20.00$ EA Making and Testing Flexural Beams (each) 85.00$ EA Compressive Strength of Concrete Cylinders, Beams or Grout (FOB Lab) 15.00$ EA Concrete Coring Mobilization 125.00$ EA Obtaining and Testing Concrete Cores 85.00$ EA Patching Concrete Core Holes 10.00$ EA Floor Flatness / Levelness Equipment Charge 100.00$ EA Floor Flatness / Levelness Testing 900.00$ DAY Rebound Hammer Testing (Min 4hr) 85.00$ HR Concrete Moisture Emissions (each test) 125.00$ EA Compressive Strength of Hollow Masonry Prisms (Set of 3) 165.00$ EA Compressive Strength of Grouted Masonry Prisms (Set of 3) 185.00$ EA Molding and Testing of 2" Mortar Cubes 80.00$ EA Making and Testing of Grout Prisms (Set of 4) 110.00$ EA Drill Shaft Inspector (Includes Boring Logs FDOT Certified) 65.00$ HR Concrete Inspector Level II (FDOT Certified) 65.00$ HR Concrete Sampling (Includes Sampling up to 4 Specimens, UNIVERSAL ENGINEERING SCIENCES, INC CONSTRUCTION MATERIAL TESTING & INSPECTION SERVICES 2009 Standard Fee Schedule UES Proposal Number
  • 4. Asphalt Testing Asphalt Concrete Plant Inspection (FDOT Certified) 65.00$ HR Asphalt Roadway Inspection (FDOT Certified) 65.00$ HR Extraction Gradation 195.00$ EA Asphalt Coring Mobilization (Man and Equipment ) 125.00$ EA Asphalt Cores Tested for Thickness / Density 30.00$ EA Max Specific Gravity of Asphalt 150.00$ EA Sample Pickup (If Separate Trip Required) 45.00$ EA Structural Steel and Welding Inspection Inspection of Structural Steel and Welding (Min 4hr per trip) 65.00$ HR Certified Welding Inspector (Min 4hr per Trip) 65.00$ HR Bolt Torque Inspection (Min 4hr per Trip) 65.00$ HR Bolt Pull Testing (Each Bolt) + Minimum 4hr Inspector Rate per Trip 18.00$ EA Ultrasonic Testing Quoted Per Job Magnetic Particle Testing Quoted Per Job Liquid Dye Penetrant Testing Quoted Per Job Radiography Testing Quoted Per Job Vibration Monitoring Technician Rate (Min 8hr per Trip) 55.00$ HR Vibration Monitoring Equipment Rate Quoted Per Job Pile Driving Monitoring 55.00$ HR Auger Cast Monitoring 55.00$ HR Material, Geotechnical, Environmental Engineering, and Technical Services Threshold Delegate (4hr Min) 65.00$ HR PPI Inspector (4hr Min) 75.00$ HR Senior Engineer, P.E. 125.00$ HR Project Engineer 100.00$ HR Staff Engineer 80.00$ HR Engineering Technician 48.00$ HR QC Manager (FDOT Certified) 55.00$ HR Fire Proof Testing (Pull Test and Thickness) (4hr Min) 55.00$ HR Fire Proof Material Testing (Density, Moisture) 55.00$ HR Turbidity Testing Quoted Per Job Standby, Travel, Weekend, and Holiday Time Weekends and Holiday Rates (standard rate multiplied by 1.35). Travel Time (Round Trip) Quoted Per Job THESE FEES ARE SUBJECT TO NEGOTIATIONS BASED ON SPECIFIC PROJECT SIZE AND DURATION. UNIT PRICES ARE GOOD UNTIL DECEMBER 31, 2009. THIS FEE SCHEDULE IS CONFIDENTIAL AND ONLY APPLIES TO SPECIFIC PROJECTS FOR APPROVED CLIENTS. UES Proposal Number 2009J-267 UNIVERSAL ENGINEERING SCIENCES, INC CONSTRUCTION MATERIAL TESTING & INSPECTION SERVICES 2009 Fee Schedule
  • 5. UNIVERSAL ENGINEERING SCIENCES, INC. Universal Engineering Sciences, Inc. (UES) is pleased to provide the services described below. The purpose of this document is to describe the terms under which the services will be provided and to obtain formal authorization. PROJECT NAME: PROJECT LOCATION: CLIENT NAME: Date: September 11, 2010 Phone# CLIENT ADDRESS: Fax No. Email: II. Contract Documents. The following documents form part of this Agreement and are incorporated herein by referral: A. UES General Conditions. B. UES Proposal Dated: C. Plans, reports, specifications, and other documents provided by the Client prior to this Agreement date. D. Other exhibits marked and described as follows: In the event of any inconsistency or conflict among the Contract Documents, the provisions in the Contract Document first listed above shall govern. III. Authority to proceed and for payment. (To be completed by Client) If the invoice is to mailed to another client than listed above please provide the information for that client in the fields listed below: Firm: Social Security Number or Federal Identification Number: Address: Attention : Title: IN WITNESS WHEREOF, the parties have caused this agreement to be executed by their duly authorized representatives. WORK AUTHORIZATION/ PROPOSAL ACCEPTANCE FORM I. As Shown UES Proposal No. 2009J-xxxx (attached) September 11, 2010 CLIENT: UNIVERSAL ENGINEERING SCIENCES, INC. BY (Signature): BY (Signature): TYPED NAME: TYPED NAME: Tony Hemmerly TITLE: TITLE: Business Development Representative DATE: DATE: September 11, 2010 RETURN EXECUTED COPIES TO UNIVERSAL ENGINEERING SCIENCES 5561 Florida Mining Boulevard South, Jacksonville, Florida 32257-3648 TELEPHONE: 904-296-0757 / FAX: 904-296-0748