TBM in tunnels
• Tunnel Boring Machine works, we will divide its components into three
parts:
• Cutting Head (front)
• Tunnel Field (middle)
• Trailing Gear (rear)
•
• Tbm for Hard Rocks-shielded or open-type TBMs is used to excavate
rocks with the help of disc cutters which are mounted on the cutter head.
• the excavated rocks are transferred to the belt conveyor through the cutter
head openings.
• These rocks are then run through multiple conveyors to get them removed
from the tunnel.
• The Soft Ground TBMs have three main types of TBMs:
• Slurry Shield
• when the ground conditions are granular with very high water pressure.
• the cutter head with pressurized slurry, which is also used as a transporting medium when mixed with the excavated material
before it is pumped to the cutter head back
• spoil from the slurry are filtered using the Slurry separation plants to reuse it in the construction process.
• Earth Pressure Balance
• when the soft groundwater is less than 7 bars of pressure.
• the cutter head not only uses disc cutter but also a combination of tungsten carbide cutting bits, drag picks and carbide disc
cutters.
• where the excavated material supports the tunnel face. It later gets plasticized with the help of slurry such that it is transportable.
• The spoil is then transferred into a TBM with the help of a screw conveyor that allows the pressure to remain balanced without any
use of slurry.
• Open Face Type
• method of excavating with no frontal support, relying on the fact that the ground being excavated will stand up with no support for
a brief period, making it suitable to be used with rock types having strength up to 10MPa.
• Stages of TBM Construction
•
• Excavate the launching and retrieve shaft
• Assemble the TBM at the launching shaft
• Cut and excavate the tunnel
• The TBM then arrives in the retrieval shaft and gets dismantled for
transportation.
Tunnel Boring Machine and applications in real world
Tunnel Boring Machine and applications in real world

More Related Content

Similar to Tunnel Boring Machine and applications in real world

Dredging equipment
Dredging equipmentDredging equipment
Dredging equipmentSwarna Rajan
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
surekha1287
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
RohitGhosh42
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
Mijanur Rahman
 
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptxEQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
NishantKumarMehta
 
Excavator machinepptx
Excavator machinepptxExcavator machinepptx
Excavating machine
Excavating machineExcavating machine
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
ChinnuNinan
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
Shivananda Roy
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
Shyam Anandjiwala
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology
GAURAV. H .TANDON
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
1971995
 
Presentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxPresentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptx
Ayushsharma131736
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
VATSAL PATEL
 
Introduction to excavator
Introduction to excavatorIntroduction to excavator
Introduction to excavator
AmeerHamzakhanbaba
 
Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
Sujith Velloor Sudarsanakumar Nair
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
BalpreetSingh47890
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
vikrantsingh170151
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipmentTareq Shreehah
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machine
VISHAL KUMAR SINGH
 

Similar to Tunnel Boring Machine and applications in real world (20)

Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptxEQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
EQUIPMENT AND STEP INVOLVED IN LIBREATION AND COMMINUTION (1).pptx
 
Excavator machinepptx
Excavator machinepptxExcavator machinepptx
Excavator machinepptx
 
Excavating machine
Excavating machineExcavating machine
Excavating machine
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Presentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxPresentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptx
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Introduction to excavator
Introduction to excavatorIntroduction to excavator
Introduction to excavator
 
Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machine
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Tunnel Boring Machine and applications in real world

  • 2. • Tunnel Boring Machine works, we will divide its components into three parts: • Cutting Head (front) • Tunnel Field (middle) • Trailing Gear (rear) • • Tbm for Hard Rocks-shielded or open-type TBMs is used to excavate rocks with the help of disc cutters which are mounted on the cutter head. • the excavated rocks are transferred to the belt conveyor through the cutter head openings. • These rocks are then run through multiple conveyors to get them removed from the tunnel.
  • 3. • The Soft Ground TBMs have three main types of TBMs: • Slurry Shield • when the ground conditions are granular with very high water pressure. • the cutter head with pressurized slurry, which is also used as a transporting medium when mixed with the excavated material before it is pumped to the cutter head back • spoil from the slurry are filtered using the Slurry separation plants to reuse it in the construction process. • Earth Pressure Balance • when the soft groundwater is less than 7 bars of pressure. • the cutter head not only uses disc cutter but also a combination of tungsten carbide cutting bits, drag picks and carbide disc cutters. • where the excavated material supports the tunnel face. It later gets plasticized with the help of slurry such that it is transportable. • The spoil is then transferred into a TBM with the help of a screw conveyor that allows the pressure to remain balanced without any use of slurry. • Open Face Type • method of excavating with no frontal support, relying on the fact that the ground being excavated will stand up with no support for a brief period, making it suitable to be used with rock types having strength up to 10MPa.
  • 4. • Stages of TBM Construction • • Excavate the launching and retrieve shaft • Assemble the TBM at the launching shaft • Cut and excavate the tunnel • The TBM then arrives in the retrieval shaft and gets dismantled for transportation.