EACH TO THEIR OWN: THE TRAJECTORIES OF LARGE SCALE
LANDFILLS AND THEIR INTERNATIONAL COUNTERPARTS
Roslyn Florie-George || 2nd May 2017
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories2
The RETHMANN Group
Global Leader in Logistics and Waste Services
▪ Turnover: 12,200 Mio. €
▪ Employees: 62,900
▪ Turnover: 6,400 m €
▪ Employees: 31,200
▪ Turnover: 4,200 m €
▪ Employees: 25,000
▪ Turnover: 1,600 m €
▪ Employees: 6,700
Turnovers are consolidated
▪ Contract logistics
▪ Freight logistics
▪ Port logistics
▪ Public transport
▪ Water management
▪ Waste and recycling management
▪ High-quality goods from animal
by-products
▪ Producer of renewable energy
▪ Service provider for the agricultural
and food sector
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories3
REMONDIS Global
Locations
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories4
The Stats
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories5
The Scorecard
International Facilities
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories6
REMONDIS Australia
Key Landfill Operations
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories7
REMONDIS Australia
Key Landfill Operations
Landfill Government Client Throughput
(tpa)
Features
Rochedale
Landfill
Brisbane City Council 450,000
World class facility with
gas capture of 3,500MWh
per annum.
Swanbank
Landfill
Ipswich City Council &
Brisbane City Council
600,000
Landfill gas recovery and
power generation.
Springmount
Landfill
Cassowary Coast Regional
Council, Cook Shire Council and
Tablelands Regional Council
100,000
Joint venture with
FGF Developments Pty Ltd.
Hogan’s Pocket
Landfill
Mackay Regional Council 95,000
Highly engineered landfill
with landfill gas recovery.
Mugga Lane
Landfill
ACT Territory and Municipal
Services
250,000
Landfill gas recovery and
first KPI based landfill
contract.
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories8
Mugga Lane Landfill
ACT
 Timeline:
 1970s: Opened
 1975: Source separated streams recycled
 1984: Leachate management systems
 1998: LFG flare installed
 2000: LFG generator installed
 2007: Mixed streams recycled
 Site Characteristics:
 KPI based contract
 Composting, C&D recycling, re-use centre
and transfer station on site
 Services the Canberra region
 No landfill levy
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories9
Swanbank Landfill
Queensland
 Timeline:
 1997: Opened
 2002: ReOrganic LFG energy program
 2003: Ipswich Council Awards
 2008: Leachate pond upgrades
 2011: Brisbane floods
 2012: LFG power generation
 2013: WMAA innovation award
 2017: 20th Anniversary
 2025: Stage 1 closure
 2065: Stage 2 closure
 Site Characteristics:
 First privately owned and operated
engineered landfill in Queensland
 250ha of former coal mines
 Services SE Queensland
 No landfill levy
 Monocell for high level contaminated
wastes
 Largest landfill to use phytocap technology
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories10
REMONDIS International
Key Landfill Operations
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories11
REMONDIS International
Key Landfill Operations
Landfill Operator Voidspace (m3)
Lippewerk Factory Landfill REMONDIS 8 million
Wesendorf Central Landfill REMONDIS 2 million
Hubbelrath Central Landfill AWISTA (73% REMONDIS) 4.5 million
Am Turm Landfill AWM (67% REMONDIS) 4.8 million
Stern Landfill
Deponiegesellschaft Ostvorpommern mbH
(37% REMONDIS)
1.5 million
Kapiteltal Landfill
ZAK (in partnership with REMEX (REMONDIS
subsidiary))
14 million
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories12
Lippewerk Factory Landfill
Lünen, Germany
 Timeline:
 1938 – 1990: Bauxite processing site with
adjacent landfill
 1993: Site purchased by REMONDIS and
developed into an industrial recycling
centre; landfill continues to be in use
 Site Characteristics:
 Landfill services the largest industrial
recycling centre in Europe
 Receives 100,000tpa+ of residual material
(from 1,034,000tpa of incoming material)
 Residual from metal slag recycling and
sodium aluminate manufacturing
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories13
Kapiteltal Landfill
Kaiserslautern, Germany
 Timeline:
 1975: Opened
 2006: Decommissioned
 2013: Planning approval granted for “new
on old” cell design to extend life
 2016: Landfill re-opened to receive treated
waste (mineral waste)
 Site Characteristics:
 Public private partnership
 Project extended landfill life by 35 years
 90ha site
 Originally designed for untreated MSW
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories14
Landfill Trajectories
Germany
2010+: landfill mining trials/“old on new”
2005+: Centrally located MBTs and incinerators established
2005: Stockpiling of untreated baled waste
2004: Over supply of untreated waste and reduced gate fees prior to ban
1993: No organic waste (>3%) to be sent to landfill by 2005 (landfill ban)
Purpose built facilities with landfill gas management systems
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories15
Landfill Trajectories
Australia
Recycling facilities established alongside existing landfill assets
Government funded recycling infrastructure grants (typically in high landfill levy regions)
Landfill levies progressively introduced (vary state to state)
Landfill gas systems implemented in response to regulation and carbon pricing
Quarries and mines converted into landfills
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories16
Drivers of Change
Australia and Germany
 Legislation
 Carbon management
 Landfill levies
 Landfill bans (e.g. no unprocessed waste into landfill)
 Commodity markets
 Viability of recycling vs. landfill
 Energy markets
 Electricity and steam users
 Urban encroachment
 Social license to operate
 Land availability
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories17
Conclusions
 Landfill continues to be critical in an integrated waste management system
 Landfill dependency has changed (reduced but not eliminated)
 Level of reliance dependent on:
 Regulatory intervention: bans, levies, carbon
 Incentives: infrastructure grants for resource recovery operations
 Germany’s landfills are approximately 15-20 years ahead of Australia’s landfills
 Landfill bans on organic waste
 Nation and European wide directives
 Future of landfilling:
 Australia: integrated resource recovery parks / precincts that leverage existing landfill
licenses
 Germany: landfill mining and “new on old” landfill designs
May 2017 | REMONDIS Australia Pty Ltd
REMONDIS Australia: Landfill Trajectories18
Questions?
The
Circular Economy
in the
Asia Pacific Region
www.keepasiabeautiful.org

More Related Content

What's hot

2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin 2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
SevernEstuary
 
Bp present panel
Bp present panelBp present panel
Bp present panelbp
 
Eco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- CraigEco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- Craig
7391456
 
Coburg a new paradigm for water supply
Coburg   a new paradigm for water supplyCoburg   a new paradigm for water supply
Coburg a new paradigm for water supplyNEXTDC
 
Gerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, MorlaisGerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, Morlais
Emma Pawlowski
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Albania Energy Association
 
Porto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaPorto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in Africa
Tristan Wiggill
 
Overall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developmentsOverall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developments
Albania Energy Association
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port LandsideAnthony Jones
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
Albania Energy Association
 
Stephen Wade, director, Legat Owen
Stephen Wade, director, Legat OwenStephen Wade, director, Legat Owen
Stephen Wade, director, Legat Owen
Emma Pawlowski
 
LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014Balint Laszlo
 
Namport overview
Namport overviewNamport overview
Namport overview
Tristan Wiggill
 
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
Squamish-Lillooet Regional District (Canada)
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
jonathan st-pierre
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
Naoise
 
Cleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackCleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackPhil Sinclair
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Albania Energy Association
 

What's hot (20)

2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin 2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
 
Bp present panel
Bp present panelBp present panel
Bp present panel
 
Eco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- CraigEco Match - MCPC Conference- Craig
Eco Match - MCPC Conference- Craig
 
Coburg a new paradigm for water supply
Coburg   a new paradigm for water supplyCoburg   a new paradigm for water supply
Coburg a new paradigm for water supply
 
Gerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, MorlaisGerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, Morlais
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
 
Porto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in AfricaPorto De Caio: The new gateway to trade in Africa
Porto De Caio: The new gateway to trade in Africa
 
Overall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developmentsOverall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developments
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
 
Stephen Wade, director, Legat Owen
Stephen Wade, director, Legat OwenStephen Wade, director, Legat Owen
Stephen Wade, director, Legat Owen
 
Bee Creek Sewer Line
Bee Creek Sewer LineBee Creek Sewer Line
Bee Creek Sewer Line
 
LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014LondonPowerTunnelsSep2014
LondonPowerTunnelsSep2014
 
Namport overview
Namport overviewNamport overview
Namport overview
 
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
SLRD - Bralorne Sewer Upgrade: Project Update (June 28, 2018)
 
Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)Infc of infc slideshow april 7 (002)
Infc of infc slideshow april 7 (002)
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
 
Cleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackCleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio track
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
 

Similar to The Trajectories of Large Scale Landfills and their International Counterparts

ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
European Sustainable Phosphorus Platform
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Association for Project Management
 
Implementation of CE principles in the remediation of a former paper mill site
Implementation of CE principles in the remediation of a former paper mill siteImplementation of CE principles in the remediation of a former paper mill site
Implementation of CE principles in the remediation of a former paper mill site
IES / IAQM
 
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASEUNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
iQHub
 
Turning Waste into a Resource - James Pike, Suez Environement
Turning Waste into a Resource - James Pike, Suez EnvironementTurning Waste into a Resource - James Pike, Suez Environement
Turning Waste into a Resource - James Pike, Suez Environement
Go Green
 
Copenhagen københavn(1)
Copenhagen københavn(1)Copenhagen københavn(1)
Copenhagen københavn(1)
Anis Nabila
 
Task 4;copenhagen, (københavn),
Task 4;copenhagen, (københavn),Task 4;copenhagen, (københavn),
Task 4;copenhagen, (københavn),
adahmisnan
 
CaBA conference 2015 III
CaBA conference 2015  IIICaBA conference 2015  III
CaBA conference 2015 III
CaBASupport
 
An Camas Mor
An Camas MorAn Camas Mor
An Camas Mor
An CamasMor
 
Controlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy PlanControlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy Plan
EMEX
 
Japan waste rec tech
Japan  waste rec techJapan  waste rec tech
Japan waste rec tech
ssuser3fe5ea
 
Canada Climate Solutions, with narration, by Guy Dauncey
Canada Climate Solutions, with narration, by Guy DaunceyCanada Climate Solutions, with narration, by Guy Dauncey
Canada Climate Solutions, with narration, by Guy Dauncey
Guy Dauncey
 
UK waste sector market opportunities
UK waste sector market opportunitiesUK waste sector market opportunities
UK waste sector market opportunities
Ricardo Energy & Environment
 
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
Sitra / Ekologinen kestävyys
 
Water quality and marine litter: Policy issues, relevance of MBIs, key findings
 Water quality and marine litter: Policy issues, relevance of MBIs, key findings Water quality and marine litter: Policy issues, relevance of MBIs, key findings
Water quality and marine litter: Policy issues, relevance of MBIs, key findings
Institute for European Environmental Policy (IEEP)
 
Business session
Business session  Business session
Business session
jennykur
 
Standing Conference 9th November Mea Richard Davies
Standing Conference 9th November Mea Richard DaviesStanding Conference 9th November Mea Richard Davies
Standing Conference 9th November Mea Richard DaviesMarches Energy Agency
 
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
UK Carbon Capture and Storage Research Centre
 
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
Mieke Barbé
 

Similar to The Trajectories of Large Scale Landfills and their International Counterparts (20)

James Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study ExamplesJames Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study Examples
 
ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
ENE3 - From discussion to implementation: phosphorus recovery from sewage slu...
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
 
Implementation of CE principles in the remediation of a former paper mill site
Implementation of CE principles in the remediation of a former paper mill siteImplementation of CE principles in the remediation of a former paper mill site
Implementation of CE principles in the remediation of a former paper mill site
 
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASEUNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
 
Turning Waste into a Resource - James Pike, Suez Environement
Turning Waste into a Resource - James Pike, Suez EnvironementTurning Waste into a Resource - James Pike, Suez Environement
Turning Waste into a Resource - James Pike, Suez Environement
 
Copenhagen københavn(1)
Copenhagen københavn(1)Copenhagen københavn(1)
Copenhagen københavn(1)
 
Task 4;copenhagen, (københavn),
Task 4;copenhagen, (københavn),Task 4;copenhagen, (københavn),
Task 4;copenhagen, (københavn),
 
CaBA conference 2015 III
CaBA conference 2015  IIICaBA conference 2015  III
CaBA conference 2015 III
 
An Camas Mor
An Camas MorAn Camas Mor
An Camas Mor
 
Controlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy PlanControlling the Energy Cost through a Waste Strategy Plan
Controlling the Energy Cost through a Waste Strategy Plan
 
Japan waste rec tech
Japan  waste rec techJapan  waste rec tech
Japan waste rec tech
 
Canada Climate Solutions, with narration, by Guy Dauncey
Canada Climate Solutions, with narration, by Guy DaunceyCanada Climate Solutions, with narration, by Guy Dauncey
Canada Climate Solutions, with narration, by Guy Dauncey
 
UK waste sector market opportunities
UK waste sector market opportunitiesUK waste sector market opportunities
UK waste sector market opportunities
 
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
Peter Laybourn 11.10.2013: Connecting industry, creating opportunity through ...
 
Water quality and marine litter: Policy issues, relevance of MBIs, key findings
 Water quality and marine litter: Policy issues, relevance of MBIs, key findings Water quality and marine litter: Policy issues, relevance of MBIs, key findings
Water quality and marine litter: Policy issues, relevance of MBIs, key findings
 
Business session
Business session  Business session
Business session
 
Standing Conference 9th November Mea Richard Davies
Standing Conference 9th November Mea Richard DaviesStanding Conference 9th November Mea Richard Davies
Standing Conference 9th November Mea Richard Davies
 
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
 
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
Bruxelles Environnement - Céline Schaar (Smart Waste Sorting & Recycling)
 

More from Circular Economy Asia

The Most Efficient Form of Renewable Energy
The Most Efficient Form of Renewable EnergyThe Most Efficient Form of Renewable Energy
The Most Efficient Form of Renewable Energy
Circular Economy Asia
 
Trends and Issues for Eco-Tourism and Sustainable Tourism
Trends and Issues for Eco-Tourism and Sustainable TourismTrends and Issues for Eco-Tourism and Sustainable Tourism
Trends and Issues for Eco-Tourism and Sustainable Tourism
Circular Economy Asia
 
Sustainable Tourism in France
Sustainable Tourism in FranceSustainable Tourism in France
Sustainable Tourism in France
Circular Economy Asia
 
Sustainable Tourism in Mauritius
Sustainable Tourism in MauritiusSustainable Tourism in Mauritius
Sustainable Tourism in Mauritius
Circular Economy Asia
 
Sustainable Tourism Policy in Korea
Sustainable Tourism Policy in KoreaSustainable Tourism Policy in Korea
Sustainable Tourism Policy in Korea
Circular Economy Asia
 
The Evolution of Souvenirs
The Evolution of SouvenirsThe Evolution of Souvenirs
The Evolution of Souvenirs
Circular Economy Asia
 
Food Recycling Law in Japan
Food Recycling Law in JapanFood Recycling Law in Japan
Food Recycling Law in Japan
Circular Economy Asia
 
Organic Waste into CNG Vehicle Fuel
Organic Waste into CNG Vehicle FuelOrganic Waste into CNG Vehicle Fuel
Organic Waste into CNG Vehicle Fuel
Circular Economy Asia
 
Cost Effective Conversion of Biogas to Bio-CNG 2012
Cost Effective Conversion of Biogas to Bio-CNG 2012Cost Effective Conversion of Biogas to Bio-CNG 2012
Cost Effective Conversion of Biogas to Bio-CNG 2012
Circular Economy Asia
 
Entrepreneurship Models on Biogas for Rural Areas
Entrepreneurship Models on Biogas for Rural AreasEntrepreneurship Models on Biogas for Rural Areas
Entrepreneurship Models on Biogas for Rural Areas
Circular Economy Asia
 
E-Commerce and Omni Channel
E-Commerce and Omni ChannelE-Commerce and Omni Channel
E-Commerce and Omni Channel
Circular Economy Asia
 
Education for a Circular Economy
Education for a Circular EconomyEducation for a Circular Economy
Education for a Circular Economy
Circular Economy Asia
 
Circular Economy for Plastics 2015
Circular Economy for Plastics 2015Circular Economy for Plastics 2015
Circular Economy for Plastics 2015
Circular Economy Asia
 
Circular Business Plan
Circular Business PlanCircular Business Plan
Circular Business Plan
Circular Economy Asia
 
Conscious Company Infographic
Conscious Company InfographicConscious Company Infographic
Conscious Company Infographic
Circular Economy Asia
 
Why Become a Conscious Company 2017
Why Become a Conscious Company 2017Why Become a Conscious Company 2017
Why Become a Conscious Company 2017
Circular Economy Asia
 
Bhutan Sustainable Tourism
Bhutan Sustainable TourismBhutan Sustainable Tourism
Bhutan Sustainable Tourism
Circular Economy Asia
 
EPR for ELV in The Netherlands
EPR for ELV in The NetherlandsEPR for ELV in The Netherlands
EPR for ELV in The Netherlands
Circular Economy Asia
 
EPR End of Life Vehicles
EPR End of Life VehiclesEPR End of Life Vehicles
EPR End of Life Vehicles
Circular Economy Asia
 
Auto Industry Views on EPR on ELV Recycling
Auto Industry Views on EPR on ELV RecyclingAuto Industry Views on EPR on ELV Recycling
Auto Industry Views on EPR on ELV Recycling
Circular Economy Asia
 

More from Circular Economy Asia (20)

The Most Efficient Form of Renewable Energy
The Most Efficient Form of Renewable EnergyThe Most Efficient Form of Renewable Energy
The Most Efficient Form of Renewable Energy
 
Trends and Issues for Eco-Tourism and Sustainable Tourism
Trends and Issues for Eco-Tourism and Sustainable TourismTrends and Issues for Eco-Tourism and Sustainable Tourism
Trends and Issues for Eco-Tourism and Sustainable Tourism
 
Sustainable Tourism in France
Sustainable Tourism in FranceSustainable Tourism in France
Sustainable Tourism in France
 
Sustainable Tourism in Mauritius
Sustainable Tourism in MauritiusSustainable Tourism in Mauritius
Sustainable Tourism in Mauritius
 
Sustainable Tourism Policy in Korea
Sustainable Tourism Policy in KoreaSustainable Tourism Policy in Korea
Sustainable Tourism Policy in Korea
 
The Evolution of Souvenirs
The Evolution of SouvenirsThe Evolution of Souvenirs
The Evolution of Souvenirs
 
Food Recycling Law in Japan
Food Recycling Law in JapanFood Recycling Law in Japan
Food Recycling Law in Japan
 
Organic Waste into CNG Vehicle Fuel
Organic Waste into CNG Vehicle FuelOrganic Waste into CNG Vehicle Fuel
Organic Waste into CNG Vehicle Fuel
 
Cost Effective Conversion of Biogas to Bio-CNG 2012
Cost Effective Conversion of Biogas to Bio-CNG 2012Cost Effective Conversion of Biogas to Bio-CNG 2012
Cost Effective Conversion of Biogas to Bio-CNG 2012
 
Entrepreneurship Models on Biogas for Rural Areas
Entrepreneurship Models on Biogas for Rural AreasEntrepreneurship Models on Biogas for Rural Areas
Entrepreneurship Models on Biogas for Rural Areas
 
E-Commerce and Omni Channel
E-Commerce and Omni ChannelE-Commerce and Omni Channel
E-Commerce and Omni Channel
 
Education for a Circular Economy
Education for a Circular EconomyEducation for a Circular Economy
Education for a Circular Economy
 
Circular Economy for Plastics 2015
Circular Economy for Plastics 2015Circular Economy for Plastics 2015
Circular Economy for Plastics 2015
 
Circular Business Plan
Circular Business PlanCircular Business Plan
Circular Business Plan
 
Conscious Company Infographic
Conscious Company InfographicConscious Company Infographic
Conscious Company Infographic
 
Why Become a Conscious Company 2017
Why Become a Conscious Company 2017Why Become a Conscious Company 2017
Why Become a Conscious Company 2017
 
Bhutan Sustainable Tourism
Bhutan Sustainable TourismBhutan Sustainable Tourism
Bhutan Sustainable Tourism
 
EPR for ELV in The Netherlands
EPR for ELV in The NetherlandsEPR for ELV in The Netherlands
EPR for ELV in The Netherlands
 
EPR End of Life Vehicles
EPR End of Life VehiclesEPR End of Life Vehicles
EPR End of Life Vehicles
 
Auto Industry Views on EPR on ELV Recycling
Auto Industry Views on EPR on ELV RecyclingAuto Industry Views on EPR on ELV Recycling
Auto Industry Views on EPR on ELV Recycling
 

Recently uploaded

ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 

Recently uploaded (20)

ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 

The Trajectories of Large Scale Landfills and their International Counterparts

  • 1. EACH TO THEIR OWN: THE TRAJECTORIES OF LARGE SCALE LANDFILLS AND THEIR INTERNATIONAL COUNTERPARTS Roslyn Florie-George || 2nd May 2017
  • 2. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories2 The RETHMANN Group Global Leader in Logistics and Waste Services ▪ Turnover: 12,200 Mio. € ▪ Employees: 62,900 ▪ Turnover: 6,400 m € ▪ Employees: 31,200 ▪ Turnover: 4,200 m € ▪ Employees: 25,000 ▪ Turnover: 1,600 m € ▪ Employees: 6,700 Turnovers are consolidated ▪ Contract logistics ▪ Freight logistics ▪ Port logistics ▪ Public transport ▪ Water management ▪ Waste and recycling management ▪ High-quality goods from animal by-products ▪ Producer of renewable energy ▪ Service provider for the agricultural and food sector
  • 3. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories3 REMONDIS Global Locations
  • 4. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories4 The Stats
  • 5. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories5 The Scorecard International Facilities
  • 6. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories6 REMONDIS Australia Key Landfill Operations
  • 7. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories7 REMONDIS Australia Key Landfill Operations Landfill Government Client Throughput (tpa) Features Rochedale Landfill Brisbane City Council 450,000 World class facility with gas capture of 3,500MWh per annum. Swanbank Landfill Ipswich City Council & Brisbane City Council 600,000 Landfill gas recovery and power generation. Springmount Landfill Cassowary Coast Regional Council, Cook Shire Council and Tablelands Regional Council 100,000 Joint venture with FGF Developments Pty Ltd. Hogan’s Pocket Landfill Mackay Regional Council 95,000 Highly engineered landfill with landfill gas recovery. Mugga Lane Landfill ACT Territory and Municipal Services 250,000 Landfill gas recovery and first KPI based landfill contract.
  • 8. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories8 Mugga Lane Landfill ACT  Timeline:  1970s: Opened  1975: Source separated streams recycled  1984: Leachate management systems  1998: LFG flare installed  2000: LFG generator installed  2007: Mixed streams recycled  Site Characteristics:  KPI based contract  Composting, C&D recycling, re-use centre and transfer station on site  Services the Canberra region  No landfill levy
  • 9. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories9 Swanbank Landfill Queensland  Timeline:  1997: Opened  2002: ReOrganic LFG energy program  2003: Ipswich Council Awards  2008: Leachate pond upgrades  2011: Brisbane floods  2012: LFG power generation  2013: WMAA innovation award  2017: 20th Anniversary  2025: Stage 1 closure  2065: Stage 2 closure  Site Characteristics:  First privately owned and operated engineered landfill in Queensland  250ha of former coal mines  Services SE Queensland  No landfill levy  Monocell for high level contaminated wastes  Largest landfill to use phytocap technology
  • 10. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories10 REMONDIS International Key Landfill Operations
  • 11. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories11 REMONDIS International Key Landfill Operations Landfill Operator Voidspace (m3) Lippewerk Factory Landfill REMONDIS 8 million Wesendorf Central Landfill REMONDIS 2 million Hubbelrath Central Landfill AWISTA (73% REMONDIS) 4.5 million Am Turm Landfill AWM (67% REMONDIS) 4.8 million Stern Landfill Deponiegesellschaft Ostvorpommern mbH (37% REMONDIS) 1.5 million Kapiteltal Landfill ZAK (in partnership with REMEX (REMONDIS subsidiary)) 14 million
  • 12. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories12 Lippewerk Factory Landfill Lünen, Germany  Timeline:  1938 – 1990: Bauxite processing site with adjacent landfill  1993: Site purchased by REMONDIS and developed into an industrial recycling centre; landfill continues to be in use  Site Characteristics:  Landfill services the largest industrial recycling centre in Europe  Receives 100,000tpa+ of residual material (from 1,034,000tpa of incoming material)  Residual from metal slag recycling and sodium aluminate manufacturing
  • 13. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories13 Kapiteltal Landfill Kaiserslautern, Germany  Timeline:  1975: Opened  2006: Decommissioned  2013: Planning approval granted for “new on old” cell design to extend life  2016: Landfill re-opened to receive treated waste (mineral waste)  Site Characteristics:  Public private partnership  Project extended landfill life by 35 years  90ha site  Originally designed for untreated MSW
  • 14. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories14 Landfill Trajectories Germany 2010+: landfill mining trials/“old on new” 2005+: Centrally located MBTs and incinerators established 2005: Stockpiling of untreated baled waste 2004: Over supply of untreated waste and reduced gate fees prior to ban 1993: No organic waste (>3%) to be sent to landfill by 2005 (landfill ban) Purpose built facilities with landfill gas management systems
  • 15. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories15 Landfill Trajectories Australia Recycling facilities established alongside existing landfill assets Government funded recycling infrastructure grants (typically in high landfill levy regions) Landfill levies progressively introduced (vary state to state) Landfill gas systems implemented in response to regulation and carbon pricing Quarries and mines converted into landfills
  • 16. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories16 Drivers of Change Australia and Germany  Legislation  Carbon management  Landfill levies  Landfill bans (e.g. no unprocessed waste into landfill)  Commodity markets  Viability of recycling vs. landfill  Energy markets  Electricity and steam users  Urban encroachment  Social license to operate  Land availability
  • 17. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories17 Conclusions  Landfill continues to be critical in an integrated waste management system  Landfill dependency has changed (reduced but not eliminated)  Level of reliance dependent on:  Regulatory intervention: bans, levies, carbon  Incentives: infrastructure grants for resource recovery operations  Germany’s landfills are approximately 15-20 years ahead of Australia’s landfills  Landfill bans on organic waste  Nation and European wide directives  Future of landfilling:  Australia: integrated resource recovery parks / precincts that leverage existing landfill licenses  Germany: landfill mining and “new on old” landfill designs
  • 18. May 2017 | REMONDIS Australia Pty Ltd REMONDIS Australia: Landfill Trajectories18 Questions?
  • 19. The Circular Economy in the Asia Pacific Region www.keepasiabeautiful.org