SlideShare a Scribd company logo
1 of 2
Download to read offline
P A P E RPOSITION
	14 	No. 275 - August 2014 ELECTRA
The Path towards HVDC Grids
Prepared by Bjarne Andersen,
Chairman SC B4 on behalf of the Technical Committee
The widespread interest in incorporating large amounts of
renewable energy into the AC transmission grid, principally
from wind and solar generation, has revealed shortcomings
in the existing infrastructure. In Europe the major wind
resources are in the North West in locations that are remote
from the major load centres. The existing grid infrastructure
in these areas is relatively weak and unable to carry the power
potentially produced by the wind power plants. A similar
situation exists in the South of Europe and North Africa,
where there is the potential for large amounts of solar power
generation, but lacking transmission systems for bringing
the power to the market. In the USA there is abundant wind
power generation capability in the Mid-West and solar power
in the South – West, but again these sites are remote from the
major load centres. Bottlenecks in the AC grids will restrict
the power flows from remote generation sites to the load
centres.
One solution becoming increasingly credible because of
technological developments and the difficulties in persuading
the public to allow the building of new overhead lines, is to
overlay the existing AC grid with a DC grid that can transport
the power over long distances effectively and efficiently. In
Europe there are proposals to integrate off-shore wind power
generation into the AC grid using an HVDC grid. Germany's
path to a new energy policy, has as one of the key elements
a new power superhighway involving the latest HVDC
technology. Solar power generation in North Africa could be
transported to Europe via HVDC links, and another proposal
is for a Mediterranean Ring using AC and DC grids linking
the nations which border the sea. In the US a submarine
interconnector from New Jersey to Maryland and Delaware,
which will also connect to multiple off-shore wind farms
is proposed. In China multi-terminal HVDC Schemes are
being designed, and HVDC Grids are being considered.
Figure 1a: multiple point to point HVDC schemes.
Figure 1b: HVDC Grid
HVDC Grids are likely to require converter stations with
larger ratings (dc voltage and power) than is presently
available, and therefore they will be more expensive.
However, the development and design of higher rating is
not considered to be an insurmountable problem. Similarly,
higher voltage DC cables are also likely to be required for
HVDC Grids, but no doubt these can be provided, if the
market for such cables can be seen to exist.
Current Cigre activities towards HVDC Grids is proceeding
well, but there is still a large amount of work to be done,
before planners can use the guidelines to start to develop
the functional specification for equipment to be connected
to specific HVDC Grids. It should be remembered that AC
Grids have been developing for more than 100 years, and the
creation of HVDC Grids will be a major task, which will take
tens of years.
In the author’s opinion the real question is not if, but
rather how and when the design and building of a HVDC
Grid will start.
In reality, the activity will most likely start by building
larger and larger multi-terminal systems. Some of these may
include special equipment margins in an attempt to facilitate
connection to a future HVDC Grid. However, without prior
planning, e.g. taking into account the larger direct voltage
range and equipment stresses (e.g. surge arrester energy
duties) that are likely to be experienced when operating in
a HVDC grid, operational constraints such as reduced active
and/or reactive power ranges for some converter stations
may have to be imposed. The provision of fast DC circuit
breakers may reduce some of the equipment stresses, since
injection of energy into the fault can be quickly curtailed.
PAPER
P O S I T I O N
No. 275 - August 2014 ELECTRA	 15
The main issues delaying the implementation of a
HVDC grid are in the author’s opinion the following:
	 There is still a lot of work to be done to define
the stresses to which equipment in the HVDC grid
will be exposed. This work need to be done by the
organisation which will develop and design the
future HVDC Grid.
	 There is still a lot of work to be done to ensure
that equipment from different manufacturers can
be connected to the HVDC Grid without extensive
investigations and tests. This will result from
work done by Cigre and Standards institutions.
	 The magnitude of the investment which will be
needed whilst economies are only slowly emerging
from a recession.
	 Regulatory regimes which focus on short term cost
& efficiency but which fail to properly incentivise
long term strategic development needs.
	 Uncertainty resulting from energy policies which
are often relatively short term.
	 Political issues associated with an HVDC Grid
potentially covering many different countries,
which may have different energy policies and
security concerns.
The equipment in an HVDC Grid need to be
designed taking into account the conditions and
requirements that would apply within the HVDC
Grid. There will of course, at least initially, be some
additional cost associated with the design of the
equipment for the duties in the HVDC Grid, i.e. a
new point to point scheme designed to be capable
of incorporation in a HVDC Grid, would cost more
than a simple point to point scheme. Therefore,
developers of new point to point schemes need to
either have a business case for future proofing the
scheme, or to receive a subsidy covering the additional
costs, otherwise the simplest and lowest cost solution
is likely to be specified.
It is hoped that the work done and in progress within
CIGRE on HVDC grids will help clarify the issues
associated with their design and implementation, and
will enable Developers of HVDC schemes, Network
Operators and Governments looking for solutions
to the transmission of vast amounts of intermittent
renewable energy to make the right decisions.
HVDC Grids are feasible, but much work is
still needed, before they can become tomorrow’s
economic solution.
For further information, a longer Paper: "HVDC
Grids - Overview of CIGRE Activities and Personal
Views", by Dr Bjarne R Andersen, Chairman SC B4 is
available on www.e-cigre.org, refence ELT_275_2	 
VISIT US AT CIGRÉ SESSION
IN PARIS 24–29 AUGUST 2014
BOOTH NO. 262
Innovation leader since 1904
QUALITY
ASSURANCE
IN THE FACTORY
AND ON-SITE
1913 1923 1936 1958
1967
1974
1983
1992
2001
1994
1973
20122013 20082010
www.highvolt.de
WE ENHANCE YOUR
QUALITY SYSTEM BY:
complete HV test, measuring
and evaluation solutions
testing in the factory and on-site
full integration in the
manufacturing process
fast, competent and reliable service

More Related Content

What's hot

Vehicle to grid technology
Vehicle to grid technologyVehicle to grid technology
Vehicle to grid technologyMD. Anamul Haque
 
V2G State of the art technology
V2G State of the art technologyV2G State of the art technology
V2G State of the art technologyMarco Tognoli
 
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim George
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim GeorgePowering Sydney's Future Forum June 2014 - Relability Standards - Tim George
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim GeorgeTransGrid AU
 
V2G Cohort: The Future
V2G Cohort: The FutureV2G Cohort: The Future
V2G Cohort: The FutureKTN
 
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...DesignTeam8
 
V2G and G2V power transfer issues
V2G and G2V power transfer issuesV2G and G2V power transfer issues
V2G and G2V power transfer issuesMohd Javed
 
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTION
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTIONENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTION
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTIONDesignTeam8
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...CALSTART
 
V2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S MullenV2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S Mullenmull0197
 
SMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSSMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSkenduko
 
Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)GuidoBacker1
 
CTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsCTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsDave Bryant
 
Matthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyMatthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyGuidoBacker1
 
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSEV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSDesignTeam8
 
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWERFlinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWERjames hamilton
 
Grid to vehicle concept
Grid to vehicle conceptGrid to vehicle concept
Grid to vehicle conceptIhave4
 
HVDC System a Need for Future Power Transmission
HVDC System a Need for Future Power TransmissionHVDC System a Need for Future Power Transmission
HVDC System a Need for Future Power Transmissionijtsrd
 
Reliable energy ashgabat chris cook
Reliable energy ashgabat chris cookReliable energy ashgabat chris cook
Reliable energy ashgabat chris cookChrisJCook
 
EA Technology Electricity North West Savings Case Study
EA Technology Electricity North West Savings Case StudyEA Technology Electricity North West Savings Case Study
EA Technology Electricity North West Savings Case StudyThorne & Derrick International
 

What's hot (20)

Vehicle to grid technology
Vehicle to grid technologyVehicle to grid technology
Vehicle to grid technology
 
V2G State of the art technology
V2G State of the art technologyV2G State of the art technology
V2G State of the art technology
 
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim George
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim GeorgePowering Sydney's Future Forum June 2014 - Relability Standards - Tim George
Powering Sydney's Future Forum June 2014 - Relability Standards - Tim George
 
V2G Cohort: The Future
V2G Cohort: The FutureV2G Cohort: The Future
V2G Cohort: The Future
 
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
 
V2G and G2V power transfer issues
V2G and G2V power transfer issuesV2G and G2V power transfer issues
V2G and G2V power transfer issues
 
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTION
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTIONENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTION
ENABLING FLEET CHARGING DEPLOYMENT USING “GRID TO PLUG” CHARGING SOLUTION
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
 
V2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S MullenV2G Opportunities And Impacts E3 2008 S Mullen
V2G Opportunities And Impacts E3 2008 S Mullen
 
SMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSSMART V2G APPPLICATIONS
SMART V2G APPPLICATIONS
 
Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)
 
CTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsCTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissions
 
Matthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT GermanyMatthias Löbermann - TenneT Germany
Matthias Löbermann - TenneT Germany
 
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSEV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
 
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWERFlinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
Flinders Island Isolated Power System (IPS) Connect 2016 H KUMAR SOLOMON POWER
 
Grid to vehicle concept
Grid to vehicle conceptGrid to vehicle concept
Grid to vehicle concept
 
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
 
HVDC System a Need for Future Power Transmission
HVDC System a Need for Future Power TransmissionHVDC System a Need for Future Power Transmission
HVDC System a Need for Future Power Transmission
 
Reliable energy ashgabat chris cook
Reliable energy ashgabat chris cookReliable energy ashgabat chris cook
Reliable energy ashgabat chris cook
 
EA Technology Electricity North West Savings Case Study
EA Technology Electricity North West Savings Case StudyEA Technology Electricity North West Savings Case Study
EA Technology Electricity North West Savings Case Study
 

Similar to The Path towards HVDC Grids

HVAC.pptx
HVAC.pptxHVAC.pptx
HVAC.pptxSachiv3
 
A Review on HVDC Circuit Breakers
A Review on HVDC Circuit BreakersA Review on HVDC Circuit Breakers
A Review on HVDC Circuit Breakersijtsrd
 
Heuristic remedial actions in the reliability assessment of high voltage dire...
Heuristic remedial actions in the reliability assessment of high voltage dire...Heuristic remedial actions in the reliability assessment of high voltage dire...
Heuristic remedial actions in the reliability assessment of high voltage dire...IJECEIAES
 
A review on hvdc circuit breakers
A review on hvdc circuit breakersA review on hvdc circuit breakers
A review on hvdc circuit breakersJuly Carranza
 
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...IRJET Journal
 
DC-AC HYBRID GRID BY DHRUVIN PATEL
DC-AC HYBRID GRID BY DHRUVIN PATELDC-AC HYBRID GRID BY DHRUVIN PATEL
DC-AC HYBRID GRID BY DHRUVIN PATELDHRUVIN PATEL
 
Briefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBriefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBlack & Veatch
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA Power System Operation
 
A deterministic method of distributed generation hosting capacity calculatio...
A deterministic method of distributed generation hosting  capacity calculatio...A deterministic method of distributed generation hosting  capacity calculatio...
A deterministic method of distributed generation hosting capacity calculatio...IJECEIAES
 
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...Power System Operation
 
hvdc transimission line
hvdc transimission linehvdc transimission line
hvdc transimission lineMohd Sohail
 
Green Power Superhighways
Green Power SuperhighwaysGreen Power Superhighways
Green Power Superhighwaysmegglest
 
Modelling and Operation of HVDC Based Power Transmission System
Modelling and Operation of HVDC Based Power Transmission SystemModelling and Operation of HVDC Based Power Transmission System
Modelling and Operation of HVDC Based Power Transmission Systemijtsrd
 
Why And Why Not To Go For HVDC?
Why And Why Not To Go For HVDC?Why And Why Not To Go For HVDC?
Why And Why Not To Go For HVDC?IOSR Journals
 
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...Projectsatbangalore
 
energy dispatch using virtual power plant
energy dispatch using virtual power plantenergy dispatch using virtual power plant
energy dispatch using virtual power plantGAUTAMKUMAR868
 

Similar to The Path towards HVDC Grids (20)

HVAC.pptx
HVAC.pptxHVAC.pptx
HVAC.pptx
 
A Review on HVDC Circuit Breakers
A Review on HVDC Circuit BreakersA Review on HVDC Circuit Breakers
A Review on HVDC Circuit Breakers
 
Heuristic remedial actions in the reliability assessment of high voltage dire...
Heuristic remedial actions in the reliability assessment of high voltage dire...Heuristic remedial actions in the reliability assessment of high voltage dire...
Heuristic remedial actions in the reliability assessment of high voltage dire...
 
A review on hvdc circuit breakers
A review on hvdc circuit breakersA review on hvdc circuit breakers
A review on hvdc circuit breakers
 
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
 
System Black Start with DER
System Black Start with DER System Black Start with DER
System Black Start with DER
 
DC-AC HYBRID GRID BY DHRUVIN PATEL
DC-AC HYBRID GRID BY DHRUVIN PATELDC-AC HYBRID GRID BY DHRUVIN PATEL
DC-AC HYBRID GRID BY DHRUVIN PATEL
 
Briefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power DeliveryBriefing: Understanding and De-Risking EV Charging Power Delivery
Briefing: Understanding and De-Risking EV Charging Power Delivery
 
Dc building power
Dc building powerDc building power
Dc building power
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA
 
A deterministic method of distributed generation hosting capacity calculatio...
A deterministic method of distributed generation hosting  capacity calculatio...A deterministic method of distributed generation hosting  capacity calculatio...
A deterministic method of distributed generation hosting capacity calculatio...
 
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
 
hvdc transimission line
hvdc transimission linehvdc transimission line
hvdc transimission line
 
Low cost DC_Nanogrids_2015
Low cost DC_Nanogrids_2015Low cost DC_Nanogrids_2015
Low cost DC_Nanogrids_2015
 
Green Power Superhighways
Green Power SuperhighwaysGreen Power Superhighways
Green Power Superhighways
 
Modelling and Operation of HVDC Based Power Transmission System
Modelling and Operation of HVDC Based Power Transmission SystemModelling and Operation of HVDC Based Power Transmission System
Modelling and Operation of HVDC Based Power Transmission System
 
Why And Why Not To Go For HVDC?
Why And Why Not To Go For HVDC?Why And Why Not To Go For HVDC?
Why And Why Not To Go For HVDC?
 
F010143843
F010143843F010143843
F010143843
 
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...
Comparison of the Modular Multilevel DC Converter and the Dual-Active Bridge ...
 
energy dispatch using virtual power plant
energy dispatch using virtual power plantenergy dispatch using virtual power plant
energy dispatch using virtual power plant
 

More from Power System Operation

Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsPower System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemePower System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 

The Path towards HVDC Grids

  • 1. P A P E RPOSITION 14 No. 275 - August 2014 ELECTRA The Path towards HVDC Grids Prepared by Bjarne Andersen, Chairman SC B4 on behalf of the Technical Committee The widespread interest in incorporating large amounts of renewable energy into the AC transmission grid, principally from wind and solar generation, has revealed shortcomings in the existing infrastructure. In Europe the major wind resources are in the North West in locations that are remote from the major load centres. The existing grid infrastructure in these areas is relatively weak and unable to carry the power potentially produced by the wind power plants. A similar situation exists in the South of Europe and North Africa, where there is the potential for large amounts of solar power generation, but lacking transmission systems for bringing the power to the market. In the USA there is abundant wind power generation capability in the Mid-West and solar power in the South – West, but again these sites are remote from the major load centres. Bottlenecks in the AC grids will restrict the power flows from remote generation sites to the load centres. One solution becoming increasingly credible because of technological developments and the difficulties in persuading the public to allow the building of new overhead lines, is to overlay the existing AC grid with a DC grid that can transport the power over long distances effectively and efficiently. In Europe there are proposals to integrate off-shore wind power generation into the AC grid using an HVDC grid. Germany's path to a new energy policy, has as one of the key elements a new power superhighway involving the latest HVDC technology. Solar power generation in North Africa could be transported to Europe via HVDC links, and another proposal is for a Mediterranean Ring using AC and DC grids linking the nations which border the sea. In the US a submarine interconnector from New Jersey to Maryland and Delaware, which will also connect to multiple off-shore wind farms is proposed. In China multi-terminal HVDC Schemes are being designed, and HVDC Grids are being considered. Figure 1a: multiple point to point HVDC schemes. Figure 1b: HVDC Grid HVDC Grids are likely to require converter stations with larger ratings (dc voltage and power) than is presently available, and therefore they will be more expensive. However, the development and design of higher rating is not considered to be an insurmountable problem. Similarly, higher voltage DC cables are also likely to be required for HVDC Grids, but no doubt these can be provided, if the market for such cables can be seen to exist. Current Cigre activities towards HVDC Grids is proceeding well, but there is still a large amount of work to be done, before planners can use the guidelines to start to develop the functional specification for equipment to be connected to specific HVDC Grids. It should be remembered that AC Grids have been developing for more than 100 years, and the creation of HVDC Grids will be a major task, which will take tens of years. In the author’s opinion the real question is not if, but rather how and when the design and building of a HVDC Grid will start. In reality, the activity will most likely start by building larger and larger multi-terminal systems. Some of these may include special equipment margins in an attempt to facilitate connection to a future HVDC Grid. However, without prior planning, e.g. taking into account the larger direct voltage range and equipment stresses (e.g. surge arrester energy duties) that are likely to be experienced when operating in a HVDC grid, operational constraints such as reduced active and/or reactive power ranges for some converter stations may have to be imposed. The provision of fast DC circuit breakers may reduce some of the equipment stresses, since injection of energy into the fault can be quickly curtailed.
  • 2. PAPER P O S I T I O N No. 275 - August 2014 ELECTRA 15 The main issues delaying the implementation of a HVDC grid are in the author’s opinion the following:  There is still a lot of work to be done to define the stresses to which equipment in the HVDC grid will be exposed. This work need to be done by the organisation which will develop and design the future HVDC Grid.  There is still a lot of work to be done to ensure that equipment from different manufacturers can be connected to the HVDC Grid without extensive investigations and tests. This will result from work done by Cigre and Standards institutions.  The magnitude of the investment which will be needed whilst economies are only slowly emerging from a recession.  Regulatory regimes which focus on short term cost & efficiency but which fail to properly incentivise long term strategic development needs.  Uncertainty resulting from energy policies which are often relatively short term.  Political issues associated with an HVDC Grid potentially covering many different countries, which may have different energy policies and security concerns. The equipment in an HVDC Grid need to be designed taking into account the conditions and requirements that would apply within the HVDC Grid. There will of course, at least initially, be some additional cost associated with the design of the equipment for the duties in the HVDC Grid, i.e. a new point to point scheme designed to be capable of incorporation in a HVDC Grid, would cost more than a simple point to point scheme. Therefore, developers of new point to point schemes need to either have a business case for future proofing the scheme, or to receive a subsidy covering the additional costs, otherwise the simplest and lowest cost solution is likely to be specified. It is hoped that the work done and in progress within CIGRE on HVDC grids will help clarify the issues associated with their design and implementation, and will enable Developers of HVDC schemes, Network Operators and Governments looking for solutions to the transmission of vast amounts of intermittent renewable energy to make the right decisions. HVDC Grids are feasible, but much work is still needed, before they can become tomorrow’s economic solution. For further information, a longer Paper: "HVDC Grids - Overview of CIGRE Activities and Personal Views", by Dr Bjarne R Andersen, Chairman SC B4 is available on www.e-cigre.org, refence ELT_275_2  VISIT US AT CIGRÉ SESSION IN PARIS 24–29 AUGUST 2014 BOOTH NO. 262 Innovation leader since 1904 QUALITY ASSURANCE IN THE FACTORY AND ON-SITE 1913 1923 1936 1958 1967 1974 1983 1992 2001 1994 1973 20122013 20082010 www.highvolt.de WE ENHANCE YOUR QUALITY SYSTEM BY: complete HV test, measuring and evaluation solutions testing in the factory and on-site full integration in the manufacturing process fast, competent and reliable service