SlideShare a Scribd company logo
29th
October 2015
Global Street Design Program – NACTO, Austin
THE CROSSWALK LAB
(an initiative of Centre for Green Mobility)
The Crosswalk Lab
Traffic Junction management through improved design
Traffic Police Municipal Corporation
Vijay Crossing
Narol Crossing
Traffic Management, Signaling Plan & Design
PUBLIC CONNECT | The Crosswalk Lab
The Crosswalk Lab
Traffic Junction management through improved design
STUDY AREA DEFINING
SURVEYS
ANALYSIS
STREET AUDIT:
PERCEPTION STUDY
MEASUREMENT FOR DRAWING
TRAFFIC :
PEAK HOUR VEDIOGRAPHY
UNDERSTANDING OF TRAFFIC
BEHAVIOUR
SIGNAL PHASING
PREPARATION OF DRAWING
VOLUME COUNT ANALYSIS
SIGNAL PHASING
DEMONSTRATION & COLLECTING EVIDENCE
PROPOSAL TO MUNICIPAL CORPORATION
PUBLIC CONNECT | TCL – Vijay Crossing
Feedback before the experiment
Shopkeepers, Pedestrians and Motorists
What we have needs to
change
What we have is alright
PUBLIC CONNECT | TCL – Vijay Crossing
High number of pedestrians
PUBLIC CONNECT | TCL – Vijay Crossing
Issues
Parking at intersection and footpath
Conflict between traffic, pedestrians and parked vehicles
No safe crossing path for pedestrians
High speed of turning vehicles
High incidence of wrong turning vehicles
Left lane: 8 m
C- 2400 PCU
D- 166 PCU
6.9% Used
Left lane: 8 m
C- 2400 PCU
D- 187 PCU
7.9 % Used
PUBLIC CONNECT | TCL – Vijay Crossing
PUBLIC CONNECT | TCL – Vijay Crossing
TowardsUNIVERSITY
Towards DRIVE-IN
TowardsDARPAN
towards COMMERCE
Phase 1
50 sec
Phase 3
50 sec
Phase 4
50 sec
Existing signal cycle:
200 sec
Phase 2
50 sec
PUBLIC CONNECT | TCL – Vijay Crossing
TowardsUNIVERSITY
Towards DRIVE-IN
TowardsDARPAN
towards COMMERCE
Phase 1
45 sec
Phase 2
15 sec
Phase 3
40 sec
Phase 4
15 sec
2548PCU/hr
1200 PCU/hr
500PCU/hr
500 PCU/hr
Proposed signal cycle:
115 sec
Reduction by
20seconds in each
arm
Phase 2
15 sec
PUBLIC CONNECT | TCL – Vijay Crossing
Maximum speed at left turn:50 kmph
Maximum speed at right turn: 20 kmph
Maximum speed at straight:40 kmph
PUBLIC CONNECT | TCL – Vijay Crossing
No lane discipline
Wide open left turns
Unguided road space
8 m
Too wide carriage way
Delay in junction clearance
8 m
PUBLIC CONNECT | TCL – Vijay Crossing
No sight distance for pedestrians
Left turn with high speed
Unsafe pedestrians
PUBLIC CONNECT | TCL – Vijay Crossing
Unsafe pedestrians
Island covered by greenery
Mix of traffic
Unrestrictive u turn
No refuge while crossing at
junction – median too far – too
narrow
PUBLIC CONNECT | TCL – Vijay Crossing
PUBLIC CONNECT | TCL – Vijay Crossing
PUBLIC CONNECT | TCL – Vijay Crossing
PUBLIC CONNECT | TCL – Vijay Crossing
Improving SAFETY while crossing the road
Safe left turns
Improving SAFETY while crossing the road
Speed reduced by 60%
Improving SAFETY while crossing the road
A space to wait while crossingImproved and constrained turning – notice the police standing in the refuge
Junction Re-design
Existing Situation – No clear space for cyclists and pedestrians which is blocked by parked
vehicles
Junction Re-design
New Situation – Space created for cyclists and pedestrians by aligning parking away from
edge.
Junction Re-design
New Situation – Space created for cyclists and pedestrians by aligning parking away from
edge.
Improving SAFETY while crossing the road
A space to wait while crossing
A space to wait while crossing
PUBLIC CONNECT | TCL – Vijay Crossing
A space to wait while crossingReduction in wrong side - No extra space
PUBLIC CONNECT | TCL – Vijay Crossing
DAY 0
Implementation
Improving SAFETY while crossing the road
Day 1
Slow left turns
Improving SAFETY while crossing the road
Day 1
Slow U turns
Improving SAFETY while crossing the road
Day 1
Parking getting organized
Improving SAFETY while crossing the road
Day 2
Improving SAFETY while crossing the road
Day 1
More walking space,
But parking persists
Day 2
Improving SAFETY while crossing the road
Day 1
Refuge helps
Day 3
Improving SAFETY while crossing the road
Day
Parking back to its original position
Day 3
Improving SAFETY while crossing the road
Day
Much talking to people helps
Day 3
Improving SAFETY while crossing the road
Day
Parking getting organized again
Day 4
Talking talking and more talking to people
To get them to understand new parking space
Improving SAFETY while crossing the road
Day 5
Much discipline observed
Improving SAFETY while crossing the road
Day 5
Improving SAFETY while crossing the road
Observed managed parking
Issues on street (Shopkeepers)
IMPACT
Do you feel street safe? (pedestrians)
IMPACT
THE IMPACT
Geometric Design of Junction
Pedestrian safety at the junction. High Increase
Safety for cyclists at the junction. Little Increase
High turning speeds. Reduced by 60%
High incidence of wrong lane driving (opposite currents). Reduced by 90%
Large wait time at junctions. Decrease by 35%
Managing traffic. Easy
PUBLIC CONNECT | TCL – Vijay Crossing
The Crosswalk Lab

More Related Content

What's hot (7)

The bicycle network
The bicycle networkThe bicycle network
The bicycle network
 
City of Salina Brochure - Bicycle Laws
City of Salina Brochure -  Bicycle LawsCity of Salina Brochure -  Bicycle Laws
City of Salina Brochure - Bicycle Laws
 
Fulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 WorkshopFulton Market Streetscape - July 15th, 2014 Workshop
Fulton Market Streetscape - July 15th, 2014 Workshop
 
City of Salina Brochure-The Law Regarding Riding Bicycles
City of Salina Brochure-The Law Regarding Riding BicyclesCity of Salina Brochure-The Law Regarding Riding Bicycles
City of Salina Brochure-The Law Regarding Riding Bicycles
 
Transit Mode Selection Tool Development Phase 2 Poster_Carly_Queen
Transit Mode Selection Tool Development Phase 2 Poster_Carly_QueenTransit Mode Selection Tool Development Phase 2 Poster_Carly_Queen
Transit Mode Selection Tool Development Phase 2 Poster_Carly_Queen
 
Annanagar audit presentation part2
Annanagar audit presentation part2Annanagar audit presentation part2
Annanagar audit presentation part2
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
 

Similar to The Crosswalk Lab

Traffic Calming In Fort Worth
Traffic Calming In Fort WorthTraffic Calming In Fort Worth
Traffic Calming In Fort Worth
Justin Flowers
 
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
zataraik
 

Similar to The Crosswalk Lab (20)

Tactical Urbanism - examples from India
Tactical Urbanism - examples from IndiaTactical Urbanism - examples from India
Tactical Urbanism - examples from India
 
Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building Envelopes
 
Redesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, WarangalRedesigning of Pochamma Maidan Junction, Warangal
Redesigning of Pochamma Maidan Junction, Warangal
 
Final power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rlFinal power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rl
 
Uttipec Meeting Walking
Uttipec Meeting WalkingUttipec Meeting Walking
Uttipec Meeting Walking
 
Livable Burbank
Livable BurbankLivable Burbank
Livable Burbank
 
Immokalee's Crosswalk Future - Walkable Community
Immokalee's Crosswalk Future - Walkable CommunityImmokalee's Crosswalk Future - Walkable Community
Immokalee's Crosswalk Future - Walkable Community
 
Traffic Calming In Fort Worth
Traffic Calming In Fort WorthTraffic Calming In Fort Worth
Traffic Calming In Fort Worth
 
Improving Walkability, And Pedestrian Safety And Convenience
Improving Walkability, And Pedestrian Safety And ConvenienceImproving Walkability, And Pedestrian Safety And Convenience
Improving Walkability, And Pedestrian Safety And Convenience
 
Bike East Bay
Bike East BayBike East Bay
Bike East Bay
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Quality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat cityQuality and safety assesment of pedestrians sidewalk in panipat city
Quality and safety assesment of pedestrians sidewalk in panipat city
 
Streets and Transportation
Streets and TransportationStreets and Transportation
Streets and Transportation
 
new traffic system proposal for 3rd world country
new traffic system proposal for 3rd world country new traffic system proposal for 3rd world country
new traffic system proposal for 3rd world country
 
Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
[Transportation] 2. kulrathna(colombo)
[Transportation] 2. kulrathna(colombo)[Transportation] 2. kulrathna(colombo)
[Transportation] 2. kulrathna(colombo)
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Pedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a cityPedestrians safety assessment & sidewalk quality study in a city
Pedestrians safety assessment & sidewalk quality study in a city
 
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 

Recently uploaded

Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
anasabutalha2013
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
Jaime Brown
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 

Recently uploaded (14)

CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
 
BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designer
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 

The Crosswalk Lab

  • 1. 29th October 2015 Global Street Design Program – NACTO, Austin THE CROSSWALK LAB (an initiative of Centre for Green Mobility)
  • 2. The Crosswalk Lab Traffic Junction management through improved design Traffic Police Municipal Corporation Vijay Crossing Narol Crossing Traffic Management, Signaling Plan & Design
  • 3. PUBLIC CONNECT | The Crosswalk Lab The Crosswalk Lab Traffic Junction management through improved design STUDY AREA DEFINING SURVEYS ANALYSIS STREET AUDIT: PERCEPTION STUDY MEASUREMENT FOR DRAWING TRAFFIC : PEAK HOUR VEDIOGRAPHY UNDERSTANDING OF TRAFFIC BEHAVIOUR SIGNAL PHASING PREPARATION OF DRAWING VOLUME COUNT ANALYSIS SIGNAL PHASING DEMONSTRATION & COLLECTING EVIDENCE PROPOSAL TO MUNICIPAL CORPORATION
  • 4. PUBLIC CONNECT | TCL – Vijay Crossing Feedback before the experiment Shopkeepers, Pedestrians and Motorists What we have needs to change What we have is alright
  • 5. PUBLIC CONNECT | TCL – Vijay Crossing High number of pedestrians
  • 6. PUBLIC CONNECT | TCL – Vijay Crossing Issues Parking at intersection and footpath Conflict between traffic, pedestrians and parked vehicles No safe crossing path for pedestrians High speed of turning vehicles High incidence of wrong turning vehicles
  • 7. Left lane: 8 m C- 2400 PCU D- 166 PCU 6.9% Used Left lane: 8 m C- 2400 PCU D- 187 PCU 7.9 % Used PUBLIC CONNECT | TCL – Vijay Crossing
  • 8. PUBLIC CONNECT | TCL – Vijay Crossing TowardsUNIVERSITY Towards DRIVE-IN TowardsDARPAN towards COMMERCE Phase 1 50 sec Phase 3 50 sec Phase 4 50 sec Existing signal cycle: 200 sec Phase 2 50 sec
  • 9. PUBLIC CONNECT | TCL – Vijay Crossing TowardsUNIVERSITY Towards DRIVE-IN TowardsDARPAN towards COMMERCE Phase 1 45 sec Phase 2 15 sec Phase 3 40 sec Phase 4 15 sec 2548PCU/hr 1200 PCU/hr 500PCU/hr 500 PCU/hr Proposed signal cycle: 115 sec Reduction by 20seconds in each arm Phase 2 15 sec
  • 10. PUBLIC CONNECT | TCL – Vijay Crossing Maximum speed at left turn:50 kmph Maximum speed at right turn: 20 kmph Maximum speed at straight:40 kmph
  • 11. PUBLIC CONNECT | TCL – Vijay Crossing No lane discipline Wide open left turns Unguided road space 8 m Too wide carriage way Delay in junction clearance 8 m
  • 12. PUBLIC CONNECT | TCL – Vijay Crossing No sight distance for pedestrians Left turn with high speed Unsafe pedestrians
  • 13. PUBLIC CONNECT | TCL – Vijay Crossing Unsafe pedestrians Island covered by greenery Mix of traffic Unrestrictive u turn No refuge while crossing at junction – median too far – too narrow
  • 14. PUBLIC CONNECT | TCL – Vijay Crossing
  • 15. PUBLIC CONNECT | TCL – Vijay Crossing
  • 16. PUBLIC CONNECT | TCL – Vijay Crossing
  • 17. PUBLIC CONNECT | TCL – Vijay Crossing
  • 18. Improving SAFETY while crossing the road Safe left turns
  • 19. Improving SAFETY while crossing the road Speed reduced by 60%
  • 20. Improving SAFETY while crossing the road A space to wait while crossingImproved and constrained turning – notice the police standing in the refuge
  • 21. Junction Re-design Existing Situation – No clear space for cyclists and pedestrians which is blocked by parked vehicles
  • 22. Junction Re-design New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.
  • 23. Junction Re-design New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.
  • 24. Improving SAFETY while crossing the road A space to wait while crossing
  • 25. A space to wait while crossing PUBLIC CONNECT | TCL – Vijay Crossing
  • 26. A space to wait while crossingReduction in wrong side - No extra space PUBLIC CONNECT | TCL – Vijay Crossing
  • 27. DAY 0 Implementation Improving SAFETY while crossing the road
  • 28. Day 1 Slow left turns Improving SAFETY while crossing the road
  • 29. Day 1 Slow U turns Improving SAFETY while crossing the road
  • 30. Day 1 Parking getting organized Improving SAFETY while crossing the road
  • 31. Day 2 Improving SAFETY while crossing the road Day 1 More walking space, But parking persists
  • 32. Day 2 Improving SAFETY while crossing the road Day 1 Refuge helps
  • 33. Day 3 Improving SAFETY while crossing the road Day Parking back to its original position
  • 34. Day 3 Improving SAFETY while crossing the road Day Much talking to people helps
  • 35. Day 3 Improving SAFETY while crossing the road Day Parking getting organized again
  • 36. Day 4 Talking talking and more talking to people To get them to understand new parking space Improving SAFETY while crossing the road
  • 37. Day 5 Much discipline observed Improving SAFETY while crossing the road
  • 38. Day 5 Improving SAFETY while crossing the road Observed managed parking
  • 39. Issues on street (Shopkeepers) IMPACT
  • 40. Do you feel street safe? (pedestrians) IMPACT
  • 41. THE IMPACT Geometric Design of Junction Pedestrian safety at the junction. High Increase Safety for cyclists at the junction. Little Increase High turning speeds. Reduced by 60% High incidence of wrong lane driving (opposite currents). Reduced by 90% Large wait time at junctions. Decrease by 35% Managing traffic. Easy PUBLIC CONNECT | TCL – Vijay Crossing