SlideShare a Scribd company logo
1 of 4
Curriculum Vitae
PURUSHOTTAM CHAUHAN ADDRESS
Email : purushottamchauhan85@gmail.com House No. 3, Thala Road, Khushipura,
Mob. : +919561460987, +918421394071 Chandbarh, Bhopal (M.P.) – 462010 INDIA
=======================================================================================
====
Introduction:-Telecommunication professional with the 10 Years of Experience in Maintenance,
Deployment, Troubleshooting Integration, Commissioning, Quality testing.
Hands on Expertise: -
Deployment & Maintenance – Fiber Roll out (48 & 96 Fiber), HDD, ROW, LM, IBD & GIS Updation, MH,
Cable Blowing, POI, ILA & Tower’s (FDP, FMS & FDMS Termination), Splicing, OTDR, Power Meter, Cable
Locator. MW based wireless network --Nokia BTS (Ultra, Flexi, Mini Ultra, Metro
and Multi-Radio), BSC (Ultra, Flexi). Transmission Equipment’s (Ceragon IP 10 IDU, FIU,RRI,
FHY IDU, NEC, Ceragon IDU, SDH Tejas Mux) Infra Devices – ALL Tower Civil
Foundation & Erection, Electrical, PIU, SMPS, Battery Bank, DG Installation.
Working Experience:-
Present Status: Himachal Futuristic Communication Limited
Designation : City Construction Manager
Location: Jalgaon since 27 December 2013 to Till Date.
Job Responsibilities (ISP): -
• Responsible for OFC execution across intracity in Bhusawal Area.
• OFC Trenching work- Labour, JCB, Pock land, Pock land Breaker, Blasting, By taking proper ROW
Permission and by using Proper protection at every default locations like Culverts, Bridge, Hard rock,
clamping etc.
• Trenching, Ducting, Chambers Installation, Cable Blowing, Ear thing, Termination, Splicing, OFC Project
all work by taking proper Lat-longs and 3 point locations.
• HDD Machine: for crossing railways, bridges and areas where Open trench not possible.
• Provide Feedback for site planning, in-building solutions planning & optimization.
• Proposing small cells requirement, coordinating their deployment, & coverage verification.
• Periodical Drive/walk test of Macro site, small cell & Wi-Fi.
• Planning for the Proper Execution Of new rollout with providing survey reports & possible queries with
other information intracity routes within the planned timelines, specified quality.
• ROW management at with Railway, PWD, NHAI, Municipal Corporation, Grampanchayat etc.
Department to ensure ROW permissions to deliver the project with in timelines.
• Link testing and Fiber Rectification with 0.22 dB/km loss. Testing of MUX's through SDH Analyzer (like
ANT 20, Network Analyzer, OTDR, LSPM).
• Performing continuous activity for improving network health condition, like outages for splicing, patch
cod change, equipment up gradation & trouble shooting for the proper maintenance and to minimize
fault.
• Making of Documents like ABD, NPE, IFC and ITP’S. OFC all paper works, for the related chambers,
route markers, couplers, fiber terminating Etc.
• Adherence to the same Co-ordination with all vendors to ensure timely payment.
Professional Experience:- 3 year’s experience in NOKIA SIEMENS NETWORKS (Airtel Network) Wardha
August 2012 to December 2013 and Bilaspur since September 2008 to March 2011 as O & M Engineer.
Job Responsibilities:–
• Operation & Maintenance of BSS equipments like BSC, BTS, SDH, PDH, Microwave, and Mux.
• Extensive knowledge of Installation, Commissioning, integration, TRX and Antenna Addition.
• New BTS, Cabinet Expansion, Troubleshooting and maintenance of NOKIA BSC3i Low/CAP & BSC3i
Hi/CAP.
• Now I am handling more than 96 BTS sites & Two BSCs.
• Nokia 2G BTS- Ultra, Flexi, Metro, Flexi Multi Radio BTS and 3G BTS Node B.
• Transmission PDH & SDH- ( FIU, FXC RRI, E1/T1, FIFA, FIPA, FIQA, FIQB, FTFA, FTFB, FTIB, ODU, Flexi
Hybrid, Flexi Packet Radio, IP10, NEC, CERAGON and Tejas Mux).
• Performs HW & SW Upgrades of BSC, BTS, AC, DG, PIU, Power Plant, Battery bank, Transmission
Equipment’s like FIU, Tejas, FHY IDU, IP10 IDU etc.
• Coordinating with operators regarding new Roaming definitions, Testing and Roaming related Issues.
• Implementation of SDH ring and trafic shifting from PDH to SDH to BTSOL and re-parenting of BSC and
cell sites. Transmission of E1 media to the sites via Microwave and media from BSC to BTS's.
• Responsible for Troubleshooting and Optimization of network KPI’s like SD Drop, TCH Drop, SD
Blocking, TCH Blocking, SD congestion, TCH congestion. Doing Acceptance testing (AT) Of BTS, VSWR
Measurement, Power Measurement of each sector and Alarm testing.
• Alarm Rectification in Nokia BSC and Resolution of quality of services related issues at cell Sites.
• Like path imbalance, BER, RF losses, Interference in All Nokia BTS Equipments.
BTS and Microwave Project:-
2 years experience in Mangalam Infra Solutions Pvt. Ltd. tenure September 2011 to July 2012 and RT
Outsourcing Services Pvt. Ltd. Bhopal (M.P.) tenure December 2007 to August 2008 as Project Coordinator
for Huawei, Alcatel-Lucent, Ericsson BTS and NEC Microwave Project.
• Installation, Commissioning, integration of Huawei 3900 BTS (Indoor & Outdoor), Alcatel-Lucent C4400
BTS and Ericsson RBS2954 & RBS2964 BTS.
• Implementation, Co-ordination and Management of GSM Project comprising of new Sites.
• MW Link Set Up, Required RSL, Alignments & Link Maintenance.
• BTS Alarm verification with OMCR, call testing of new sites, VSWR measurement.
• Cabinet & Sector Expansion as per requirements of operator.
• Coordinating with vendors and Customer End for Project Rollout.
• Coordination with Installation of BTS, Microwave, Battery Bank, Power Plant, AMF Panel.
• Installation, Commissioning, integration of Microwave SDH/PDH Link (NEC, CERAGON, Nokia).
• Responsible for NMS Visibility of Transmission SDH & PDH Nodes.
• Responsible for Acceptance Test co-ordination and completion ATP and handover sites to MS team.
POI Testing Project:-
9 Months experience in TECHNO FIBER INDUSTRIES, Bhopal (M.P.) as Transmission Engineer for
RCOM/HUTCH/Aircel/Idea POI testing project. Tenure Jan. 2007 to Sep. 2007 worked in following areas:-
• Working on POI-Testing, SDH-Testing, and OFC-TESTING to perform Acceptance Test of point of
interconnecting by the presence of a DDF between PSTN end and the GSM Service provider.
• In this Certain Test as Bit error ratio, Input and Output jitter perform, Stability Test and Cable Loss.
• Responsible for End to End media augmentation with other operators and Lease line providers.
• Responsible for Implementation & Conversion of Transmission media as per requirement.
• Responsible for Transmission & POI fault trouble shooting and availability.
Civil & Electrical Project:-
1.6 years experience in RUKMANI TELECOM, Bhopal (M.P.) as Project Engineer for RCOM / HUTCH/Idea
Civil & Electrical project. Tenure June 2005 to December 2006 worked in following areas:-
• Site survey for GBM, GBT, RTT sites.
• Coordinating with Electrical, Civil, Foundation, Erection and Mast Work.
• Responsible for all the documentation of Related Billing, Handover & ROW issue at site.
• Handling the Installation & Commissioning of DG, SMPS, PIU, Battery Bank, SMPS, SERVO, ODC and all
Related Equipments.
• Checking and built a new Earthing source so that all the equipments should must be proper.
• As well billing and Related Documentation of Site Handover and Other issue.
• Planning to setup new sites (GBT, RTT and POLE) according to demand of client.
• Handling the site problems up to handover to O&M.
Technical Instruments Handled:-
• OTDR Testing – ANDO 7250, Splicing – ILSINTECH, Optical Laser Source/Power meter (Acterna).
• Optical Attenuator (Aishwarya), E1 Tester (Acterna), ANT 20(Acterna), Network Analyzer (HP), VSWR.
• NOKIA BSC3i Low/CAP & BSC3i Hi/CAP. NOKIA BTS (Ultra, Flexi & Metro).
• Huawei BTS 3900 (Indoor & Outdoor), Ericsson RBS2954 & RBS2964 BTS.
• Alcatel-Lucent C4400. NEC PDH/SDH/NEOi, Tejas Mux (STM-1 & STM-4).
Job Responsibilities (ISP):–
• Acceptance Testing & Taking Charge of Sites from contractor for like Tejas Networks, ECI.
• Eth cross connect preparation by pass cross connects preparation, Point to point link testing.
• SDH equipment Installation & Commission NEC, CERAGON and TEJAS MUX. End to end Ethernet testing
with
• Ethernet Tester and SDH analyzing. Handling of various subcontractors on installation activities.
Training Program:-
• Five day installation & commissioning training of NEC PNMS & PM Card Design at Bhopal.
• Seven-day installation, commissioning, troubleshooting of O&M training of transmission equipment for
BSC, MUX, BTS, Microwave, which includes planning used by Airtel Network at Bilaspur.
Educational Qualification: -
• Completed Diploma in Electronics & Telecommunication Engineering From Samrat Ashok
Technological Institute at Vidisha (M.P.) in 2005 with 62% aggregate.
• 12th Std from Govt. High Sec. School, Bhopal (M.P.) in 2002.
• 10th Std from Vidhya Niketan High School, Bhopal (M.P.) in 2000.
Strengths:-
Experience of team Management & decision-making, Good Communication Skills.
Personal Information:-
Father’s Name : Shri Ram Nandan Prasad
Address : H. No. 3, Thala Road, Khushipura, Chandbarh, Bhopal (M.P.)–462010 INDIA
Email ID : purushottamchauhan85@gmail.com, p.chauhan1985@gmail.com
Mobile No. : +919561460987, +918421394071
Date of birth : 05/01/1985
Marital Status : Married
Language Known : [A] English [B] Hindi
Joining Time : 15 Days.
Passport Number : H-O143270
Declaration:-
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.
Place :- Bhusawal (M.H.) PURUSHOTTAM CHAUHAN
------------------------------- ----------------------
(Date) (Signature)

More Related Content

What's hot

Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Cv ian barlow 2016 summary
Cv ian barlow 2016 summaryCv ian barlow 2016 summary
Cv ian barlow 2016 summaryIan Barlow
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CVMuhammad Naeem
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 

What's hot (20)

B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Resume
ResumeResume
Resume
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Cv ian barlow 2016 summary
Cv ian barlow 2016 summaryCv ian barlow 2016 summary
Cv ian barlow 2016 summary
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 

Similar to Telecom Resume (20)

Sukanta_CV
Sukanta_CVSukanta_CV
Sukanta_CV
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
CV_Satyendra
CV_SatyendraCV_Satyendra
CV_Satyendra
 
arun kumar
arun kumararun kumar
arun kumar
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Yogesh_Resume
Yogesh_ResumeYogesh_Resume
Yogesh_Resume
 
Pushpendra_Dhama_CV
Pushpendra_Dhama_CVPushpendra_Dhama_CV
Pushpendra_Dhama_CV
 
Zaheer cv latest
Zaheer cv latestZaheer cv latest
Zaheer cv latest
 
Resume_Bivas Paul_1
Resume_Bivas Paul_1Resume_Bivas Paul_1
Resume_Bivas Paul_1
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Resume of Md. Bellal Hossain
Resume of Md. Bellal HossainResume of Md. Bellal Hossain
Resume of Md. Bellal Hossain
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
RAN_CV_Gyanendra Patel
RAN_CV_Gyanendra PatelRAN_CV_Gyanendra Patel
RAN_CV_Gyanendra Patel
 

Telecom Resume

  • 1. Curriculum Vitae PURUSHOTTAM CHAUHAN ADDRESS Email : purushottamchauhan85@gmail.com House No. 3, Thala Road, Khushipura, Mob. : +919561460987, +918421394071 Chandbarh, Bhopal (M.P.) – 462010 INDIA ======================================================================================= ==== Introduction:-Telecommunication professional with the 10 Years of Experience in Maintenance, Deployment, Troubleshooting Integration, Commissioning, Quality testing. Hands on Expertise: - Deployment & Maintenance – Fiber Roll out (48 & 96 Fiber), HDD, ROW, LM, IBD & GIS Updation, MH, Cable Blowing, POI, ILA & Tower’s (FDP, FMS & FDMS Termination), Splicing, OTDR, Power Meter, Cable Locator. MW based wireless network --Nokia BTS (Ultra, Flexi, Mini Ultra, Metro and Multi-Radio), BSC (Ultra, Flexi). Transmission Equipment’s (Ceragon IP 10 IDU, FIU,RRI, FHY IDU, NEC, Ceragon IDU, SDH Tejas Mux) Infra Devices – ALL Tower Civil Foundation & Erection, Electrical, PIU, SMPS, Battery Bank, DG Installation. Working Experience:- Present Status: Himachal Futuristic Communication Limited Designation : City Construction Manager Location: Jalgaon since 27 December 2013 to Till Date. Job Responsibilities (ISP): - • Responsible for OFC execution across intracity in Bhusawal Area. • OFC Trenching work- Labour, JCB, Pock land, Pock land Breaker, Blasting, By taking proper ROW Permission and by using Proper protection at every default locations like Culverts, Bridge, Hard rock, clamping etc. • Trenching, Ducting, Chambers Installation, Cable Blowing, Ear thing, Termination, Splicing, OFC Project all work by taking proper Lat-longs and 3 point locations. • HDD Machine: for crossing railways, bridges and areas where Open trench not possible. • Provide Feedback for site planning, in-building solutions planning & optimization. • Proposing small cells requirement, coordinating their deployment, & coverage verification. • Periodical Drive/walk test of Macro site, small cell & Wi-Fi. • Planning for the Proper Execution Of new rollout with providing survey reports & possible queries with other information intracity routes within the planned timelines, specified quality. • ROW management at with Railway, PWD, NHAI, Municipal Corporation, Grampanchayat etc. Department to ensure ROW permissions to deliver the project with in timelines. • Link testing and Fiber Rectification with 0.22 dB/km loss. Testing of MUX's through SDH Analyzer (like ANT 20, Network Analyzer, OTDR, LSPM). • Performing continuous activity for improving network health condition, like outages for splicing, patch cod change, equipment up gradation & trouble shooting for the proper maintenance and to minimize fault. • Making of Documents like ABD, NPE, IFC and ITP’S. OFC all paper works, for the related chambers, route markers, couplers, fiber terminating Etc. • Adherence to the same Co-ordination with all vendors to ensure timely payment.
  • 2. Professional Experience:- 3 year’s experience in NOKIA SIEMENS NETWORKS (Airtel Network) Wardha August 2012 to December 2013 and Bilaspur since September 2008 to March 2011 as O & M Engineer. Job Responsibilities:– • Operation & Maintenance of BSS equipments like BSC, BTS, SDH, PDH, Microwave, and Mux. • Extensive knowledge of Installation, Commissioning, integration, TRX and Antenna Addition. • New BTS, Cabinet Expansion, Troubleshooting and maintenance of NOKIA BSC3i Low/CAP & BSC3i Hi/CAP. • Now I am handling more than 96 BTS sites & Two BSCs. • Nokia 2G BTS- Ultra, Flexi, Metro, Flexi Multi Radio BTS and 3G BTS Node B. • Transmission PDH & SDH- ( FIU, FXC RRI, E1/T1, FIFA, FIPA, FIQA, FIQB, FTFA, FTFB, FTIB, ODU, Flexi Hybrid, Flexi Packet Radio, IP10, NEC, CERAGON and Tejas Mux). • Performs HW & SW Upgrades of BSC, BTS, AC, DG, PIU, Power Plant, Battery bank, Transmission Equipment’s like FIU, Tejas, FHY IDU, IP10 IDU etc. • Coordinating with operators regarding new Roaming definitions, Testing and Roaming related Issues. • Implementation of SDH ring and trafic shifting from PDH to SDH to BTSOL and re-parenting of BSC and cell sites. Transmission of E1 media to the sites via Microwave and media from BSC to BTS's. • Responsible for Troubleshooting and Optimization of network KPI’s like SD Drop, TCH Drop, SD Blocking, TCH Blocking, SD congestion, TCH congestion. Doing Acceptance testing (AT) Of BTS, VSWR Measurement, Power Measurement of each sector and Alarm testing. • Alarm Rectification in Nokia BSC and Resolution of quality of services related issues at cell Sites. • Like path imbalance, BER, RF losses, Interference in All Nokia BTS Equipments. BTS and Microwave Project:- 2 years experience in Mangalam Infra Solutions Pvt. Ltd. tenure September 2011 to July 2012 and RT Outsourcing Services Pvt. Ltd. Bhopal (M.P.) tenure December 2007 to August 2008 as Project Coordinator for Huawei, Alcatel-Lucent, Ericsson BTS and NEC Microwave Project. • Installation, Commissioning, integration of Huawei 3900 BTS (Indoor & Outdoor), Alcatel-Lucent C4400 BTS and Ericsson RBS2954 & RBS2964 BTS. • Implementation, Co-ordination and Management of GSM Project comprising of new Sites. • MW Link Set Up, Required RSL, Alignments & Link Maintenance. • BTS Alarm verification with OMCR, call testing of new sites, VSWR measurement. • Cabinet & Sector Expansion as per requirements of operator. • Coordinating with vendors and Customer End for Project Rollout. • Coordination with Installation of BTS, Microwave, Battery Bank, Power Plant, AMF Panel. • Installation, Commissioning, integration of Microwave SDH/PDH Link (NEC, CERAGON, Nokia). • Responsible for NMS Visibility of Transmission SDH & PDH Nodes. • Responsible for Acceptance Test co-ordination and completion ATP and handover sites to MS team. POI Testing Project:- 9 Months experience in TECHNO FIBER INDUSTRIES, Bhopal (M.P.) as Transmission Engineer for RCOM/HUTCH/Aircel/Idea POI testing project. Tenure Jan. 2007 to Sep. 2007 worked in following areas:- • Working on POI-Testing, SDH-Testing, and OFC-TESTING to perform Acceptance Test of point of interconnecting by the presence of a DDF between PSTN end and the GSM Service provider. • In this Certain Test as Bit error ratio, Input and Output jitter perform, Stability Test and Cable Loss.
  • 3. • Responsible for End to End media augmentation with other operators and Lease line providers. • Responsible for Implementation & Conversion of Transmission media as per requirement. • Responsible for Transmission & POI fault trouble shooting and availability. Civil & Electrical Project:- 1.6 years experience in RUKMANI TELECOM, Bhopal (M.P.) as Project Engineer for RCOM / HUTCH/Idea Civil & Electrical project. Tenure June 2005 to December 2006 worked in following areas:- • Site survey for GBM, GBT, RTT sites. • Coordinating with Electrical, Civil, Foundation, Erection and Mast Work. • Responsible for all the documentation of Related Billing, Handover & ROW issue at site. • Handling the Installation & Commissioning of DG, SMPS, PIU, Battery Bank, SMPS, SERVO, ODC and all Related Equipments. • Checking and built a new Earthing source so that all the equipments should must be proper. • As well billing and Related Documentation of Site Handover and Other issue. • Planning to setup new sites (GBT, RTT and POLE) according to demand of client. • Handling the site problems up to handover to O&M. Technical Instruments Handled:- • OTDR Testing – ANDO 7250, Splicing – ILSINTECH, Optical Laser Source/Power meter (Acterna). • Optical Attenuator (Aishwarya), E1 Tester (Acterna), ANT 20(Acterna), Network Analyzer (HP), VSWR. • NOKIA BSC3i Low/CAP & BSC3i Hi/CAP. NOKIA BTS (Ultra, Flexi & Metro). • Huawei BTS 3900 (Indoor & Outdoor), Ericsson RBS2954 & RBS2964 BTS. • Alcatel-Lucent C4400. NEC PDH/SDH/NEOi, Tejas Mux (STM-1 & STM-4). Job Responsibilities (ISP):– • Acceptance Testing & Taking Charge of Sites from contractor for like Tejas Networks, ECI. • Eth cross connect preparation by pass cross connects preparation, Point to point link testing. • SDH equipment Installation & Commission NEC, CERAGON and TEJAS MUX. End to end Ethernet testing with • Ethernet Tester and SDH analyzing. Handling of various subcontractors on installation activities. Training Program:- • Five day installation & commissioning training of NEC PNMS & PM Card Design at Bhopal. • Seven-day installation, commissioning, troubleshooting of O&M training of transmission equipment for BSC, MUX, BTS, Microwave, which includes planning used by Airtel Network at Bilaspur. Educational Qualification: -
  • 4. • Completed Diploma in Electronics & Telecommunication Engineering From Samrat Ashok Technological Institute at Vidisha (M.P.) in 2005 with 62% aggregate. • 12th Std from Govt. High Sec. School, Bhopal (M.P.) in 2002. • 10th Std from Vidhya Niketan High School, Bhopal (M.P.) in 2000. Strengths:- Experience of team Management & decision-making, Good Communication Skills. Personal Information:- Father’s Name : Shri Ram Nandan Prasad Address : H. No. 3, Thala Road, Khushipura, Chandbarh, Bhopal (M.P.)–462010 INDIA Email ID : purushottamchauhan85@gmail.com, p.chauhan1985@gmail.com Mobile No. : +919561460987, +918421394071 Date of birth : 05/01/1985 Marital Status : Married Language Known : [A] English [B] Hindi Joining Time : 15 Days. Passport Number : H-O143270 Declaration:- I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place :- Bhusawal (M.H.) PURUSHOTTAM CHAUHAN ------------------------------- ---------------------- (Date) (Signature)