1. Work Summery
Skilled RF Engineer with extensive experience in all phases of wireless network
implementation Experience in planning, designing, optimizing and testing of 2G to
4G network and device.
Working Experience:
1. Designation : TELECOM COORDINATOR [RAND].
Duration : From 05.06.2007 to 11.11.2008.
Designation : PROJECT IN CHARGE [O&M, DHAKA-NORTH].
Duration : From 12.11.2008 to till 28.02.2010.
Designation : PROJECT COORDINATOR [AFFS WITH FM-200].
Duration : From 12.11.2008 to till 28.02.2010.
Designation : ASSISTANT MANAGER.
Duration : From 01.03.2010 to 29.06.2013.
Company : Dynamic Engineering & Technology Sdn. Bhd.
Area of Work:
• Installation, Commissioning and integration RBS 2000 family of Ericsson
with Mini Link installation and commissioning.
• Installation, Commissioning and integration BTS 240,241 & BS82 family of
Siemens with NEC PASSO Link neo installation and commissioning.
• Manage documentation for LOS survey & transmission links (RF) also RFTI.
• Monitor CM & PM Team of O & M Project of Banglalink Dhaka-North as a
Project in Charge
• Monitor subcontractor’s activities & progress, supervise subcontractor
engineers.
• Work as a Coordinator of Advanced Fire Fighting System with FM-200
• Work as a Senior Executive of Procurement & Business Development.
2. My Completed Projects are as following:-
• Work as TI Coordinator of LOS & RF survey of Region-1 Phase-1A of
Ericsson-Warid project with NOKIA
• Work as TI Coordinator RBS installation , Commissioning of Ericsson –
Warid R-1,P-1A & Project-37 with Mini Link installation and commissioning
• Work as a PAT Coordinator of R-1 , P-1A & R-3, P-1A,1B,1C
• Work as Rollout coordinator of Banglalink Fixed Asset Audit-2008
• Work as Rollout coordinator of Banglalink Fixed Asset Audit-2009
• Work as a Coordinator of AFFS with FM-200 at Banglalink MSC (Eunoos
Center, Dhaka & Akunji Tower,Khulna)
• Work as a Project in Charge of O&M, Banglalink (Dhaka-North)
• Work as a Lab in Charge of Detec Engineering Service Limited.
2. Designation : SITE ENGINEER.
Duration : From 04.11.2006 to 31.05.2007.
Designation : PROJECT MANAGER.
Duration : From 01.07.2013 to 25.01.2014.
Company : Global Telecom Pvt. Intl. (GTL)
Area of Work:
• RF Network Planning, Design, Optimization, Commissioning and Testing
• Link Budget, Propagation & Traffic Analysis, Frequency, Cell Site and PN
Planning
• Drive test data analysis, Neighbor list optimization, RF/ Physical
Parameter Tuning
• Microwave link & Topology Design, LOS Survey, FCC/PCN Licensing,
Spectrum Management
Overall Areas of Expertise
• Installation, Commissioning, troubleshooting Ericsson RBS 2106i, 2206.
• Installation, Commissioning and configure 2-2-2, 4-4-4, 6-6-6, 8-8-8 of
Ericsson RBS.
• Installation, Commissioning, troubleshooting Siemens BTS XL240 , BS 82
,XL241
• Installation, commissioning, troubleshooting Ericsson Radio System
MINILINK TN for PDH links.
3. • Installation, commissioning, troubleshooting NEC PASSO Link Neo
• Installation, commissioning and configure 1+0, 1+1, 2+0, 2+2, Hot Standby
(HSB).
• Installation and alignment of 0.3m, 0.6m, 1.2m and 1.8m antenna.
• Well experienced in Line of Sight survey (Mirror/High Power Lamp test,
Topological survey).
• Well experienced in Radio Frequency (RF) & RFTI Survey.
• Fault identification& rectification of ELTEK, EMERSON rectifier, AVR related
problem.
• Having experience in Preventive Maintenance (PM) in Operation &
Maintenance (O&M) Dept.
• Having experience in Corrective Maintenance (CM) in Operation &
Maintenance (O&M) Dept.
• Using test equipment Site Master (Anritsu S331D , S331L & S331E) for
testing VSWR, DTF & Cable Loss.
• Using test equipment PIM Master (Anritsu MW82119 A & 1st
Generation) for
testing PIM, DTP, Noise floor & Interference problem.
• Using BTS Master (Anritsu 8222B ) for testing Spectrogram, Signal Strength
Meter, Received Signal Strength Indicator (RSSI), Interference Mapping ,
Field Strength, Occupied Bandwidth, Channel Power, ACPR, AM/FM/SSB
Demodulation, C/I, Gated Sweep.
• Using test equipment BER Tester (Sun Lite E1 SS265) for testing Bit Error
Rate (BER).
Other Tools:
Power Reflection Meter-NRT (R&S) and Directional Power Sensor NRT-Z43 also
familiar with GPS, Theo do light, Signal Generator, Racal Instrument, Microwave
Data counter, Universal Counter, Huntron Tracker, Path loss, MapInfo, Agilent
ADS, Spectrum & Network Analyzer (Agilent and Anritsu), and Anritsu tools etc.
Working Country: Bangladesh, Malaysia, Thailand & Bhutan
Training Tour: China, Japan & Korea
4. Academic History :
• Ahsanullah University of Science & Technology, Dhaka
Bachelor of Science in Electrical & Electronic Engineering (2007 )
CGPA : 3.25/ 4.0
• B.A.F. Shaheen College, Dhaka Cantonment
Higher Secondary Certificate (H.S.C-2001)
1st
division (64.2%)
• Armanitola Government High School
Secondary School Certificate (S.S.C-1999)
1st
division (82.6%)
Subject of Thesis:
• Performance Analysis of a Wireless Communication Link with TURBO
Coding Technique to reduce Bit Error Rate (BER) for 4G Mobile.
Supervised by –
Dr. Satya Prasad Majumder.
Professor & Head of, Dept. of EEE, BUET. Mobile: +8801819198050.
Personal Information:
Father’s & Mother’s Name: Md. Khalil Miah & Razia Sultana
Date of Birth: 01st
July 1984
Contact Detail: bellal.eee59@gmail.com & +1347-754-3491
Address: 8815 168th
St. Jamaica, NY-11432 , US
Nationality: Bangladeshi
I do hereby declare that the information provided in my Resume as above is true
to the best of my knowledge and belief.
Md. Bellal Hossain