Teaching in  Blended   &   Online  Learning Environments
    http://todaysmeet.com/blend   Ask questions! Provide feedback! Collaborate with others!
Introductions Kim Bell-  Client Services [email_address] @kibel77    Tiffany Kelley-  Instructional Support [email_address] @techietiff68  Angela Christopher-  Enrollment [email_address] @avchristopher www.AestheTECH.weebly.com/blog.html
  Agenda Overview of the e 4 TN program Blended learning   Teaching online   Interactive Tools: Web 2.0
 
What is a primary reason teachers do not incorporate more differentiated instruction? lack of… Time Resources Support
According to John Watson, online learning has become an increasingly important component of K-12 education with the growth being driven primarily by state-led online programs. Watson, John. "Blending Learning: The Convergence of Online and Face-to-Face Education."  Promising Practices in Online Learning  (2010): 18.
www.e4tn.org   Tennessee’s State Led Online Program
e 4 TN  is a grant funded initiative that provides Tennessee teachers the opportunity to develop online Carnegie credit courses that are rigorous, engaging and aligned to Tennessee standards, to include core courses and electives such as foreign languages.
Dan Long Executive Director - Assessment , Evaluation, Research and e-Learning dan.long@state.tn.us 615.253.5031 Dr. Wendy Oliver Director,  e 4 TN , Leadership Team 423.209.8810 [email_address]
 
 
Think? If you could meet the needs of diverse learners…
How does blended learning fit into current conceptions of online learning? How does blended learning help engage students and support their academic success? How are online learning and face-to-face instruction being combined effectively? Is blended learning meeting unique student needs that neither fully online nor face-to-face models can achieve? What digital content and curricula are being used in blended learning?
Group Work NACOL  “ Blended Learning: The Convergence of Online and Face-to-Face Education”
Standards Based Curriculum  https://www.e4tn.org Students and Parents Course Catalog Course Outline: Learning Objects and TN Standards Correlation
What does digital content look like? https://www.e4tn.org   Click “Go to Class” Username: e4tnfacilitator Password: spring2011
Blended Learning in Action Freshman Academy Physics
Scope and Sequence Resources Available to TN Teachers and Administrators… Audit Curriculum
Teaching Strategies Blended vs. Online
Teaching: Blended vs. Online Blended Teaching "F2F enhancement" F2F teaching combined with Online Components Student performance better than F2F alone 1 Benefits: flexibility  allows for better use of time during F2F appeals to multiple learning styles current information Online Teaching   "F2F Alternative"   Strictly online   Student performance same as F2F 1 Benefits:   flexibility   review often   "quiet" students inclined to communicate curriculum - real time updates
Blended Teaching "Overall, the meta-analysis found that students who took part of their class online performed better, on average, than those taking the same course through traditional face to face instruction." -  USDOE's "Evaluation of Evidence-Based Practices in Online Learning" 1 "Blended learning, combining the best elements of online and face-to-face education, is likely to emerge as the predominant teaching model of the future."  3 -   Promising Practices in Online Learning: Blended Learning: The Convergence of Online and Face-to-Face Education  
Blended Teaching  Shift from lecture to student centered learning Use of web-based resources to supplement, add dimension or perspective videos interactive sites  collaboration student created products Teacher acts as facilitator   Students take ownership of learning   Best of Both Worlds
Online Teaching  Learning Management System (LMS) Teacher acts as Facilitator Engaging Learning Environment  Asynchronous teacher and student accessing at different times Synchronous teacher and student online at same time Schedule Flexibility                    Let's login as an online teacher!     www.d2l-e4tn.org  
 
VOCAL V isible O rganized C ompassionate A nalytical L ead by Example Adopted from John Savery -  http://www.ncolr.org/jiol/issues/pdf/9.3.2.pdf
How can online teachers engage these 21 st  century students? Graphics Color Videos Links
Graphics & Color Let’s try it!
Videos Let’s try it!
Links Let’s try it!
  Web 2.0 Interactive Technology
  by:  Scott McLeod, J.D., Ph.D .
Interactive Tools Interactive  User generated content Collective knowledge   Youtube  Wikipedia Google Docs  Facebook Twitter Real time Artificial Intelligence Semantic Intelligent search  behavioral advertising Bing's reference search Google Map App (real time driving conditions, traffic, & street views) Web 3.0 Web 2.0
TPACK Total PACKage Content = what we teach   Pedagogy = how we teach Technology = how to use achieve learning goals
Why? e are preparing our children for jobs that do not exist today.    e need life-long learners.       e need to make the learning "stick."  W   W   W
Many tools
We NEED  Life-Long Learners Where do we start?
You  do not have to be an expert.  YOUR students become the  experts!
Let's try... Twiddla:  http://www.twiddla.com/
TypeWith.me   http://www.typewith.me/
It's about learning...  • teach them  HOW  to learn       • ENGAGE  them, let them engage       • make it  MEANINGFUL       • let them be  PRODUCTIVE
Shared knowledge Wikis-  Coast to Coast Blogs – Mrs. Cassidy’s Classroom Blog Social Networks-  ArtEd 2.0 Edmoto
ToonDoo www.toondoo.com Let's try it!
Maps   Google Earth –  Memphis  Mapwing –  Coral Reefs Nike+ -  Physical Education
Digital Stories VoiceThread  –  Romare Bearden Prezi –  Landslides Animoto –  Stockmarket
Collaboration Let’s try it!
Keep collaborating!                   Edmodo   Gliffy  -
More...  Voki Google Docs Diigo  and  Delicious
Web 2.0 for Blended &  Online Learning Group projects Student products (video, audio, e-portfolios)   Differentiated instruction    Embed artifacts directly into a class wiki, webpage, or learning management system (Voicethread, Wordle, Audacity, etc.)
Want more? 21 Things For The 21st Century Educator  - The purpose of this resource is to provide "Just in Time" training through an online interface for K-12 educators based on the National Educational Technology Standards for Teachers (NETS-T).
Thank you! Find these links & more at on the conference wiki
References 1 Evaluation of Evidence-Based Practices in Online Learning      - http://www2.ed.gov/rschstat/eval/tech/evidence-based-practices/finalreport.pdf 2 Fast Facts about Online Learning      - http://www.inacol.org/press/docs/nacol_fast_facts.pdf 3 Promising Practices in Online Learning: Blended Learning: The Convergence of Online and Face-to-Face Education      - http://www.inacol.org/research/promisingpractices/NACOL_PP-BlendedLearning-lr.pdf Be VOCAL, Characteristics of Successful Online Instructors - John R. Savery, University of Akron   TPACK Graphic:  http://tpack.org/ 

Teaching in Blended and Online Learning Environments

  • 1.
    Teaching in Blended   & Online Learning Environments
  • 2.
      http://todaysmeet.com/blend   Ask questions! Provide feedback! Collaborate with others!
  • 3.
    Introductions Kim Bell- Client Services [email_address] @kibel77   Tiffany Kelley- Instructional Support [email_address] @techietiff68 Angela Christopher- Enrollment [email_address] @avchristopher www.AestheTECH.weebly.com/blog.html
  • 4.
      Agenda Overviewof the e 4 TN program Blended learning   Teaching online   Interactive Tools: Web 2.0
  • 5.
  • 6.
    What is aprimary reason teachers do not incorporate more differentiated instruction? lack of… Time Resources Support
  • 7.
    According to JohnWatson, online learning has become an increasingly important component of K-12 education with the growth being driven primarily by state-led online programs. Watson, John. "Blending Learning: The Convergence of Online and Face-to-Face Education." Promising Practices in Online Learning (2010): 18.
  • 8.
    www.e4tn.org Tennessee’s State Led Online Program
  • 9.
    e 4 TN is a grant funded initiative that provides Tennessee teachers the opportunity to develop online Carnegie credit courses that are rigorous, engaging and aligned to Tennessee standards, to include core courses and electives such as foreign languages.
  • 10.
    Dan Long ExecutiveDirector - Assessment , Evaluation, Research and e-Learning dan.long@state.tn.us 615.253.5031 Dr. Wendy Oliver Director, e 4 TN , Leadership Team 423.209.8810 [email_address]
  • 11.
  • 12.
  • 13.
    Think? If youcould meet the needs of diverse learners…
  • 14.
    How does blendedlearning fit into current conceptions of online learning? How does blended learning help engage students and support their academic success? How are online learning and face-to-face instruction being combined effectively? Is blended learning meeting unique student needs that neither fully online nor face-to-face models can achieve? What digital content and curricula are being used in blended learning?
  • 15.
    Group Work NACOL “ Blended Learning: The Convergence of Online and Face-to-Face Education”
  • 16.
    Standards Based Curriculum https://www.e4tn.org Students and Parents Course Catalog Course Outline: Learning Objects and TN Standards Correlation
  • 17.
    What does digitalcontent look like? https://www.e4tn.org Click “Go to Class” Username: e4tnfacilitator Password: spring2011
  • 18.
    Blended Learning inAction Freshman Academy Physics
  • 19.
    Scope and SequenceResources Available to TN Teachers and Administrators… Audit Curriculum
  • 20.
  • 21.
    Teaching: Blended vs.Online Blended Teaching "F2F enhancement" F2F teaching combined with Online Components Student performance better than F2F alone 1 Benefits: flexibility  allows for better use of time during F2F appeals to multiple learning styles current information Online Teaching   "F2F Alternative"   Strictly online   Student performance same as F2F 1 Benefits:   flexibility   review often   "quiet" students inclined to communicate curriculum - real time updates
  • 22.
    Blended Teaching "Overall,the meta-analysis found that students who took part of their class online performed better, on average, than those taking the same course through traditional face to face instruction." - USDOE's "Evaluation of Evidence-Based Practices in Online Learning" 1 "Blended learning, combining the best elements of online and face-to-face education, is likely to emerge as the predominant teaching model of the future." 3 -  Promising Practices in Online Learning: Blended Learning: The Convergence of Online and Face-to-Face Education  
  • 23.
    Blended Teaching Shift from lecture to student centered learning Use of web-based resources to supplement, add dimension or perspective videos interactive sites collaboration student created products Teacher acts as facilitator   Students take ownership of learning   Best of Both Worlds
  • 24.
    Online Teaching Learning Management System (LMS) Teacher acts as Facilitator Engaging Learning Environment  Asynchronous teacher and student accessing at different times Synchronous teacher and student online at same time Schedule Flexibility                  Let's login as an online teacher!    www.d2l-e4tn.org  
  • 25.
  • 26.
    VOCAL V isibleO rganized C ompassionate A nalytical L ead by Example Adopted from John Savery - http://www.ncolr.org/jiol/issues/pdf/9.3.2.pdf
  • 27.
    How can onlineteachers engage these 21 st century students? Graphics Color Videos Links
  • 28.
    Graphics & ColorLet’s try it!
  • 29.
  • 30.
  • 31.
      Web 2.0Interactive Technology
  • 32.
      by:  ScottMcLeod, J.D., Ph.D .
  • 33.
    Interactive Tools Interactive User generated content Collective knowledge   Youtube Wikipedia Google Docs Facebook Twitter Real time Artificial Intelligence Semantic Intelligent search  behavioral advertising Bing's reference search Google Map App (real time driving conditions, traffic, & street views) Web 3.0 Web 2.0
  • 34.
    TPACK Total PACKageContent = what we teach   Pedagogy = how we teach Technology = how to use achieve learning goals
  • 35.
    Why? e arepreparing our children for jobs that do not exist today.   e need life-long learners.       e need to make the learning "stick." W   W   W
  • 36.
  • 37.
    We NEED Life-Long Learners Where do we start?
  • 38.
    You donot have to be an expert. YOUR students become the experts!
  • 39.
    Let's try... Twiddla: http://www.twiddla.com/
  • 40.
  • 41.
    It's about learning... • teach them  HOW to learn   • ENGAGE  them, let them engage   • make it MEANINGFUL   • let them be PRODUCTIVE
  • 42.
    Shared knowledge Wikis- Coast to Coast Blogs – Mrs. Cassidy’s Classroom Blog Social Networks- ArtEd 2.0 Edmoto
  • 43.
  • 44.
    Maps Google Earth – Memphis Mapwing – Coral Reefs Nike+ - Physical Education
  • 45.
    Digital Stories VoiceThread – Romare Bearden Prezi – Landslides Animoto – Stockmarket
  • 46.
  • 47.
    Keep collaborating!                  Edmodo   Gliffy -
  • 48.
    More... VokiGoogle Docs Diigo and Delicious
  • 49.
    Web 2.0 forBlended &  Online Learning Group projects Student products (video, audio, e-portfolios)   Differentiated instruction   Embed artifacts directly into a class wiki, webpage, or learning management system (Voicethread, Wordle, Audacity, etc.)
  • 50.
    Want more? 21Things For The 21st Century Educator - The purpose of this resource is to provide "Just in Time" training through an online interface for K-12 educators based on the National Educational Technology Standards for Teachers (NETS-T).
  • 51.
    Thank you! Findthese links & more at on the conference wiki
  • 52.
    References 1 Evaluationof Evidence-Based Practices in Online Learning     - http://www2.ed.gov/rschstat/eval/tech/evidence-based-practices/finalreport.pdf 2 Fast Facts about Online Learning     - http://www.inacol.org/press/docs/nacol_fast_facts.pdf 3 Promising Practices in Online Learning: Blended Learning: The Convergence of Online and Face-to-Face Education     - http://www.inacol.org/research/promisingpractices/NACOL_PP-BlendedLearning-lr.pdf Be VOCAL, Characteristics of Successful Online Instructors - John R. Savery, University of Akron   TPACK Graphic: http://tpack.org/ 

Editor's Notes

  • #3 We will be talking about Web 2.o tools later in the session... Anyone used TodaysMeet?  If so- tell us about it...   This is a site that allows you to quickly create a "chat room" where people can interact in real time about a topic.  Connect with your audience in realtime.    Use TodaysMeet for each participant to introduce themselves: Name, school, content area, & tech level (expert tech junkie, intermediate, learning beginner, brand new)   How could this be used in the classroom?   Encourage people to use the live stream to make comments or ask questions and then use that feedback to tailor your presentation, sharpen your points, and address audience needs.
  • #22 Hey Tiffany - Add any links you want to the conference wiki:  I've set it up already:   http://martininstitute.wikispaces.com/Teaching+with+Blended+and+Online+Learning+Environments
  • #23 You can have your cake and eat it too! Best of both worlds.
  • #26 What are these students doing? Emailing, Texting, Watching videos, Checking their online class? They are always connected and as their online teacher, we should be as well. *** Go to the Discussion Board and answer the Opening Question ***
  • #27 Explain what VOCAL stands for
  • #28 Teachers are expected to create an environment where their “presence” is always recognized. What will they do if the sense you are not there?
  • #29 Graphics – choose a related graphic on current topic , holiday or event. Create a dedicated folder in My Pictures that pertain only to your course. Color – use colored text and backgrounds (in moderation) to draw their attention . 10 pt black arial text does not scream “read me” Why must we do this? Students don’t always read directions or news items! Let’s Try it Go to PPT Search for Clipart or Photo suitable for background Insert Clipart or Photo Insert a text box with “news” information; make text box transparent You can use the whole slide if necessary Save As .jpg Go to D2L Add a News item; insert image Tip : If you teach the same course over and over, save all of your news items in a PPT so you can easily edit dates, etc.
  • #30 Videos – Incorporate videos from Discovery Streaming and other web sites (get permission for those, of course!) Make your own – many tools out there Animoto Jing What if the video is in an unacceptable format? www.zamzar.com How to attach As an attachment Embed code As a Quicklink ( must have url) Let’s Try it Animoto Jing
  • #31 Links - use to link to simulations, games, news articles, etc. Let’s Try it Choose Insert Quicklink in the text editor in News
  • #32 So far... Talked about blended learning, and creating a visually engaging online learning experience Let's take it one step further and discuss Web 2.0. Q: It is how we engage those kids in the cell phone photo from earlier!
  • #33 Read & think about it.  Yes it is Controversial... Some of you may agree Some of you may be angered by this statement – the blogger who posted the image received over 60 comments from educators We are not telling you what to to think - We challenge you to think about the resources available and to make the best instructional decisions to facilitate learning. 
  • #34 Web 2.0 = ?   Examples - we use these everyday   Q: Does anyone currently use Web 2.0 tools in the f2f classroom?  Teaching online? Web 3.0 = information is groups so that computers and humans can both understand it
  • #36 Why would should we go to the trouble of learning new technologies when we have SPI's, EOC's, etc. 
  • #37 There are thousands of educationally appropriate and engaging tools available to you and your students!
  • #38 Given the global nature of economy and industry, educators must teach our children to think and creatively solve problems with the intention that youth are prepared for innovation and the advancement of society.  Necessity dictates that we cultivate the development of creative, skilled, life long learners. Whether physical or online, students who actively engage with content take responsibility for their own learning. Teachers who are well versed in technology, pedagogy and content no longer ask themselves “How do I use this technology?”  Research recommends that teachers ask, "Why do I want to use this technology?“ Preparing students for jobs that currently do not exist. They must work in a global economy. The framework for 21 st century learning, America says that WE are falling short. Our students need to become problem solvers – to date we have been falling short….
  • #39 You do not have to be an expert
  • #40 Twiddla is a web-based meeting platform (think collaborative whiteboard).   Why is it imporant to engage our students with Internet technologies and online content?
  • #41 TypeWith.me is the a web-based word processor that allows people to work together in really real-time. When multiple people edit the same document simultaneously, any changes are instantly reflected on everyone's screen. The result is a new and productive way to collaborate on text documents, useful for meeting notes, drafting sessions, education, team programming, and more.    How might this tool be useful in the classroom?
  • #42 Remember...
  • #43 Wiki - collaborative web pages created by multiple users. Users can write and edit information and the content can be continuously changing. Wikis can include video, audio, & text. Blogs - write, react and share in a multi-media format. Social Networks - online communities of individuals with common interests. Find & share resources!
  • #44 Think of a topic you have been working on this week with your students... how could use use this tool?  How could your students use this tool?
  • #45 Google Earth Tours – teachers & students can create a tour, map out a route, calculate distances, look at topography, space, moon, etc How do you find and share tours? Mapwing – use digital photos, scanned images, and/or create a digital drawing of a room, building. Use cardnial points, Add additional photos to create a 365 degree view from one room. Add text descriptions, Nike+ App -
  • #46 Voice Thread – free educational accounts. Create group conversations with images, audio or text comments and live drawing tools. Prezi – presentation tool, create non-linear presentations, zooming in and out around one slide. Animoto- create videos from pictures, video clips and music.
  • #47 Collaboration with Web 2.0 Tools – Promotes higher order thinking; students like variety Let’s Try it VoiceThread – use them from year to year; delete comments Wordle – use words from Discussion board to create - engage
  • #48 With Gliffy online diagram software, you can easily create professional-quality flowcharts, diagrams, floor plans, technical drawings, and more. The online diagram editor makes it easier than ever to create great looking drawings.   Edmodo is a social learning network for teachers, students and schools on the Web. Teachers and students worldwide use Edmodo every day to connect and collaborate in a secure, fun environment. Our free network offers a safe and easy way to post classroom materials, share helpful links and videos, and access homework, grades and school-wide notices. 
  • #49 Wordle Generates word clouds by giving prominence to words that appear more frequently. Student use: Brainstorming meaning of vocabulary words Analyzing Speeches, Articles and Books Displaying poll results Comparing & Contrasting of Topics Analyzing / Describing Characters Voki- create a character or avatar, add a background, add text and watch them speak. Embed to blogs, web pages & wikis. Educational ideas include – foreign language dictionary, historical speaches, tutorial introductions… Social bookmarking – access and share your favorite internet resources from any Internet connection
  • #51 The tutorial videos are very good!