Task Scheduler
Creating and Running Tasks Through
Task Scheduler
Task Manager and Co.
6/30/2014
Running a Basic Task on Task Scheduler.........................................................2
Opening Task Scheduler........................................................................................................2
Beginning to Create a Basic Task.........................................................................................3
Setting a Task Reminder........................................................................................................5
Creating a Task Reminder on a Daily Basis .............................................................................. 6
Creating a Task Reminder on a Weekly Basis ........................................................................... 7
Creating a Task Reminder on a One Time Basis....................................................................... 8
Creating a Task Reminder when the Computer Starts .............................................................. 9
Creating a Task Reminder when the User Logs On.................................................................. 9
Creating a Task Reminder when a Specified Event is Logged................................................... 9
Setting the Task to Perform an Action .............................................................................10
Setting the Task to Start A Program....................................................................................... 10
Setting the Task to Send an E-mail......................................................................................... 11
Setting the Task to Display a Message.................................................................................... 12
Finishing the Creation of Basic Task.................................................................................13
The Basic Task Summary ....................................................................................................... 14
Display Running Tasks........................................................................................................... 14
Running a Basic Task on Task Scheduler
Task Scheduler is a program designed for Users who want to create reminders for important events
such as important business projects, or work that needs to be done on the computer. Users can
customize the date and time of the reminders and how they are reminded by Task Scheduler. Task
Scheduler is already preloaded onto the User’s computer with windows 7.
Opening Task Scheduler
Click Start at the bottom left hand of the screen.
Click on All Programs then click on the Accessories folder (Figure 1-1).
Figure 1-1
Go down and click on the System Tools Folder.
Open Task Scheduler (Figure 1-2).
Figure 1-2
Beginning to Create a Basic Task
Click on Create Basic Task…It is located on the right hand of the screen, underneath Actions
(Figure 1-3).
Figure 1-3
Type in what task that will be performed in the Name dialogue box. Then type supplementary
information or an explanation of the task in the Description dialogue box (Figure 1-4).
Click Next.
Figure 1-4
Setting a Task Reminder
Next, the Task Trigger window will open. Select from one of the seven options of the desired time
to be reminded of said task (Figure 1-5).
Figure 1-5
Click Next.
Creating a Task Reminder on a Daily Basis
Select the desired start date on the top left of the screen and the time to be reminded on the top
right. Underneath, the User will select how many days they want to be reminded to perform said
task (Figure 1-6).
Figure 1-6
Click Next once completed.
Creating a Task Reminder on a Weekly Basis
Select the desired start date and time. Below, enter how many weeks that the Reminder will be sent
and what days the Reminder will be sent on (Figure 1-7).
Figure 1-7
Creating a Task Reminder on a One Time Basis
Select the desired date and time for the Reminder to be sent (Figure 1-8).
Figure 1-8
Creating a Task Reminder when the Computer
Starts
The Reminder will automatically be sent the next time the computer is turned on.
Creating a Task Reminder when the User Logs On
The Reminder will automatically be sent the next time the User Logs on. It is set to the desktop, or
user account, that is currently on. If there is another User Account that the Reminder needs to be
sent to, log off and sign onto that account then create the task reminder.
Creating a Task Reminder when a Specified Event is
Logged
Create the trigger by selecting the specified action in log. If the event ID is known, type that in for
an accurate triggering time. The event ID does not need to be known, however (Figure 1-9).
Figure 1-9
Setting the Task to Perform an Action
The User will now choose which way they would like to be reminded. The User will have three
options: To automatically Start the Program, for the reminder to be sent by e-mail, or to display the
message in a window.
Setting the Task to Start A Program
Select Browse to find the desired program to start. Add Argument is optional and is only intended
for programs that take command line arguments. Start In is also optional and can be used if the user
knows the exact command line for the file (Figure 1-10).
Figure 1-10
Setting the Task to Send an E-mail
Enter the desired e-mail in From and To. The e-mail sending the message will be typed into From,
and the e-mail that will be receiving the message will be in To.
The title of the e-mail is to be written in the Subject text box. Write a message that expounds or
explains any supplementary information that is needed in the Text textbox.
If there is a program or file needed to be sent along with the e-mail, select it in Attachment using
the Browse… button.
The SMTP server is the program that will help send the e-mail. The User does not need to select a
program, however it is suggested (Figure 1-11).
Figure 1-11
Setting the Task to Display a Message
Write the information that will be displayed at the top of the window in Title. The note that will be
displayed is typed in the Message text box (Figure 1-12).
Figure 1-12
The display message will appear as a pop-up window (Figure 1-13).
Figure 1-13
Finishing the Creation of Basic Task
When all of the required information has been filled out, Task Scheduler will give an overview of the
task. If there is anything wrong, the user may go back to make the correct changes.
The Basic Task Summary
Look over the Basic Task Summary to make sure that the name of the task, the description of the
task, the action of the task, the trigger method, and the task reminder are correct (Figure 1-14).
Figure 1-14
Click Finish.
Display Running Tasks
Click on Display All Running Tasks underneath Action on the Main Window of Task Scheduler,.
A window will appear and show all current running tasks (Figure 1-15).
Select the desired task in the window and click End Task to end all tasks.
Figure 1-15

More Related Content

Viewers also liked

Ganadores De Los Pintores Paisajistas
Ganadores De Los Pintores PaisajistasGanadores De Los Pintores Paisajistas
Ganadores De Los Pintores Paisajistas
guest841bb3
 
Npwpd card
Npwpd cardNpwpd card
Npwpd card
IDCardMalang
 
NWS_M008_Mon09NOV2015.PDF
NWS_M008_Mon09NOV2015.PDFNWS_M008_Mon09NOV2015.PDF
NWS_M008_Mon09NOV2015.PDF
Elaine Cooney
 
Presenatacion Edunet Second Life 27 06 07
Presenatacion Edunet Second Life 27 06 07Presenatacion Edunet Second Life 27 06 07
Presenatacion Edunet Second Life 27 06 07
Juan Acevedo Miño
 
IWE Enrico Caso
IWE Enrico CasoIWE Enrico Caso
IWE Enrico CasoEnrico Cas
 
AñO 2 Nº 8 Diciembre 1989
AñO 2 Nº 8 Diciembre 1989AñO 2 Nº 8 Diciembre 1989
AñO 2 Nº 8 Diciembre 1989
maranchon
 
Narrow lanes Phase 2 TMA01 C
Narrow lanes Phase 2 TMA01 CNarrow lanes Phase 2 TMA01 C
Narrow lanes Phase 2 TMA01 Cjames berry
 
Web 2
Web 2Web 2
Wumba Oculovisual Outreach
Wumba Oculovisual OutreachWumba Oculovisual Outreach
Wumba Oculovisual Outreach
Ifeoma Obiorah
 
TMA01 Site location plan
TMA01 Site location planTMA01 Site location plan
TMA01 Site location planjames berry
 
NWS_M005_Thu29OCT2015.PDF
NWS_M005_Thu29OCT2015.PDFNWS_M005_Thu29OCT2015.PDF
NWS_M005_Thu29OCT2015.PDF
Elaine Cooney
 
10297612
1029761210297612
10297612
Silvia Spessato
 
Wreslters
WresltersWreslters
Wreslters
Andero Anto
 
Electromagnetic foundations of solar radiation collection
Electromagnetic foundations of solar radiation collectionElectromagnetic foundations of solar radiation collection
Electromagnetic foundations of solar radiation collection
Fernanda Valerio
 
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV B
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV BTotal closure from Bucklowhill to Bowdon Diversion TMA03 REV B
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV Bjames berry
 
COC
COCCOC
Eleição da PIPA
Eleição da PIPAEleição da PIPA
Eleição da PIPA
Gastão Monteiro Moutinho
 
K.Kαβάφης (εργασία μαθήτριας)
K.Kαβάφης (εργασία μαθήτριας)K.Kαβάφης (εργασία μαθήτριας)
K.Kαβάφης (εργασία μαθήτριας)
philologiama
 
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
ΕΥΗ ΚΑΡΟΥΝΙΑ
 
Σωτήρης Αδ. Εργασία μαθητή
Σωτήρης Αδ. Εργασία μαθητήΣωτήρης Αδ. Εργασία μαθητή
Σωτήρης Αδ. Εργασία μαθητή
mvourtsian
 

Viewers also liked (20)

Ganadores De Los Pintores Paisajistas
Ganadores De Los Pintores PaisajistasGanadores De Los Pintores Paisajistas
Ganadores De Los Pintores Paisajistas
 
Npwpd card
Npwpd cardNpwpd card
Npwpd card
 
NWS_M008_Mon09NOV2015.PDF
NWS_M008_Mon09NOV2015.PDFNWS_M008_Mon09NOV2015.PDF
NWS_M008_Mon09NOV2015.PDF
 
Presenatacion Edunet Second Life 27 06 07
Presenatacion Edunet Second Life 27 06 07Presenatacion Edunet Second Life 27 06 07
Presenatacion Edunet Second Life 27 06 07
 
IWE Enrico Caso
IWE Enrico CasoIWE Enrico Caso
IWE Enrico Caso
 
AñO 2 Nº 8 Diciembre 1989
AñO 2 Nº 8 Diciembre 1989AñO 2 Nº 8 Diciembre 1989
AñO 2 Nº 8 Diciembre 1989
 
Narrow lanes Phase 2 TMA01 C
Narrow lanes Phase 2 TMA01 CNarrow lanes Phase 2 TMA01 C
Narrow lanes Phase 2 TMA01 C
 
Web 2
Web 2Web 2
Web 2
 
Wumba Oculovisual Outreach
Wumba Oculovisual OutreachWumba Oculovisual Outreach
Wumba Oculovisual Outreach
 
TMA01 Site location plan
TMA01 Site location planTMA01 Site location plan
TMA01 Site location plan
 
NWS_M005_Thu29OCT2015.PDF
NWS_M005_Thu29OCT2015.PDFNWS_M005_Thu29OCT2015.PDF
NWS_M005_Thu29OCT2015.PDF
 
10297612
1029761210297612
10297612
 
Wreslters
WresltersWreslters
Wreslters
 
Electromagnetic foundations of solar radiation collection
Electromagnetic foundations of solar radiation collectionElectromagnetic foundations of solar radiation collection
Electromagnetic foundations of solar radiation collection
 
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV B
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV BTotal closure from Bucklowhill to Bowdon Diversion TMA03 REV B
Total closure from Bucklowhill to Bowdon Diversion TMA03 REV B
 
COC
COCCOC
COC
 
Eleição da PIPA
Eleição da PIPAEleição da PIPA
Eleição da PIPA
 
K.Kαβάφης (εργασία μαθήτριας)
K.Kαβάφης (εργασία μαθήτριας)K.Kαβάφης (εργασία μαθήτριας)
K.Kαβάφης (εργασία μαθήτριας)
 
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
ΤΑ ΜΑΓΙΚΑ ΜΑΞΙΛΑΡΙΑ,ΕΥΓΕΝΙΟΣ ΤΡΙΒΙΖΑΣ,ΑΓΓΕΛΟΣ,Α2
 
Σωτήρης Αδ. Εργασία μαθητή
Σωτήρης Αδ. Εργασία μαθητήΣωτήρης Αδ. Εργασία μαθητή
Σωτήρης Αδ. Εργασία μαθητή
 

Similar to Task manager and Co

How to Create Tasks in MS Outlook?
How to Create Tasks in MS Outlook?How to Create Tasks in MS Outlook?
How to Create Tasks in MS Outlook?
peterb8
 
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docxMS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
rosemarybdodson23141
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
rosemarybdodson23141
 
Software engineering modeling lab lectures
Software engineering modeling lab lecturesSoftware engineering modeling lab lectures
Software engineering modeling lab lectures
marwaeng
 
A Primavera Tutorial
A Primavera TutorialA Primavera Tutorial
A Primavera Tutorial
Aaron Anyaakuu
 
Paymo 3 - Get Started Guide
Paymo 3 - Get Started GuidePaymo 3 - Get Started Guide
Paymo 3 - Get Started Guide
Paymo
 
Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docx
wkyra78
 
Sentrifugo 2.1 Time Management Guide
Sentrifugo 2.1 Time Management GuideSentrifugo 2.1 Time Management Guide
Sentrifugo 2.1 Time Management Guide
Sentrifugo open source HRMS
 
GEIT 3341 DATABASE I LAB 2 GEIT 3341 Database I
GEIT 3341  DATABASE I  LAB 2  GEIT 3341 Database I  GEIT 3341  DATABASE I  LAB 2  GEIT 3341 Database I
GEIT 3341 DATABASE I LAB 2 GEIT 3341 Database I
MatthewTennant613
 
Sketch Assignment - Task Management
Sketch Assignment - Task ManagementSketch Assignment - Task Management
Sketch Assignment - Task Management
Suraj Rao
 
Chapter 13 Reports 2-5-15
Chapter 13 Reports 2-5-15Chapter 13 Reports 2-5-15
Chapter 13 Reports 2-5-15
Beth Horner
 
Managing multiple tasks
Managing multiple tasksManaging multiple tasks
Managing multiple tasks
John Robinson
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
MuhammadZahidQazi
 
Add _Edit_Delete_tasks in officetimer
Add _Edit_Delete_tasks in officetimerAdd _Edit_Delete_tasks in officetimer
Add _Edit_Delete_tasks in officetimer
OfficeTimer
 
Add edit delete_task_office_timer
Add edit delete_task_office_timerAdd edit delete_task_office_timer
Add edit delete_task_office_timer
OfficeTimer
 
Smart todolist
Smart todolistSmart todolist
Smart todolist
AppSheet
 
How to assembly the work environment (recipe #1001, but with practical details)
How to assembly the work environment (recipe #1001, but with practical details)How to assembly the work environment (recipe #1001, but with practical details)
How to assembly the work environment (recipe #1001, but with practical details)
Nazar Budchanyi
 
open project tool
open project toolopen project tool
open project tool
Ngu Khine
 
Wireframes do today
Wireframes   do todayWireframes   do today
Wireframes do today
vipul80
 
Closing+cockpit
Closing+cockpitClosing+cockpit
Closing+cockpit
Arup Nandi
 

Similar to Task manager and Co (20)

How to Create Tasks in MS Outlook?
How to Create Tasks in MS Outlook?How to Create Tasks in MS Outlook?
How to Create Tasks in MS Outlook?
 
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docxMS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
 
Software engineering modeling lab lectures
Software engineering modeling lab lecturesSoftware engineering modeling lab lectures
Software engineering modeling lab lectures
 
A Primavera Tutorial
A Primavera TutorialA Primavera Tutorial
A Primavera Tutorial
 
Paymo 3 - Get Started Guide
Paymo 3 - Get Started GuidePaymo 3 - Get Started Guide
Paymo 3 - Get Started Guide
 
Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docx
 
Sentrifugo 2.1 Time Management Guide
Sentrifugo 2.1 Time Management GuideSentrifugo 2.1 Time Management Guide
Sentrifugo 2.1 Time Management Guide
 
GEIT 3341 DATABASE I LAB 2 GEIT 3341 Database I
GEIT 3341  DATABASE I  LAB 2  GEIT 3341 Database I  GEIT 3341  DATABASE I  LAB 2  GEIT 3341 Database I
GEIT 3341 DATABASE I LAB 2 GEIT 3341 Database I
 
Sketch Assignment - Task Management
Sketch Assignment - Task ManagementSketch Assignment - Task Management
Sketch Assignment - Task Management
 
Chapter 13 Reports 2-5-15
Chapter 13 Reports 2-5-15Chapter 13 Reports 2-5-15
Chapter 13 Reports 2-5-15
 
Managing multiple tasks
Managing multiple tasksManaging multiple tasks
Managing multiple tasks
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
 
Add _Edit_Delete_tasks in officetimer
Add _Edit_Delete_tasks in officetimerAdd _Edit_Delete_tasks in officetimer
Add _Edit_Delete_tasks in officetimer
 
Add edit delete_task_office_timer
Add edit delete_task_office_timerAdd edit delete_task_office_timer
Add edit delete_task_office_timer
 
Smart todolist
Smart todolistSmart todolist
Smart todolist
 
How to assembly the work environment (recipe #1001, but with practical details)
How to assembly the work environment (recipe #1001, but with practical details)How to assembly the work environment (recipe #1001, but with practical details)
How to assembly the work environment (recipe #1001, but with practical details)
 
open project tool
open project toolopen project tool
open project tool
 
Wireframes do today
Wireframes   do todayWireframes   do today
Wireframes do today
 
Closing+cockpit
Closing+cockpitClosing+cockpit
Closing+cockpit
 

Task manager and Co

  • 1. TASK MANAGER AND CO. Task Scheduler Creating and Running Tasks Through Task Scheduler Task Manager and Co. 6/30/2014
  • 2. Running a Basic Task on Task Scheduler.........................................................2 Opening Task Scheduler........................................................................................................2 Beginning to Create a Basic Task.........................................................................................3 Setting a Task Reminder........................................................................................................5 Creating a Task Reminder on a Daily Basis .............................................................................. 6 Creating a Task Reminder on a Weekly Basis ........................................................................... 7 Creating a Task Reminder on a One Time Basis....................................................................... 8 Creating a Task Reminder when the Computer Starts .............................................................. 9 Creating a Task Reminder when the User Logs On.................................................................. 9 Creating a Task Reminder when a Specified Event is Logged................................................... 9 Setting the Task to Perform an Action .............................................................................10 Setting the Task to Start A Program....................................................................................... 10 Setting the Task to Send an E-mail......................................................................................... 11 Setting the Task to Display a Message.................................................................................... 12 Finishing the Creation of Basic Task.................................................................................13 The Basic Task Summary ....................................................................................................... 14 Display Running Tasks........................................................................................................... 14
  • 3. Running a Basic Task on Task Scheduler Task Scheduler is a program designed for Users who want to create reminders for important events such as important business projects, or work that needs to be done on the computer. Users can customize the date and time of the reminders and how they are reminded by Task Scheduler. Task Scheduler is already preloaded onto the User’s computer with windows 7. Opening Task Scheduler Click Start at the bottom left hand of the screen. Click on All Programs then click on the Accessories folder (Figure 1-1). Figure 1-1 Go down and click on the System Tools Folder. Open Task Scheduler (Figure 1-2).
  • 4. Figure 1-2 Beginning to Create a Basic Task Click on Create Basic Task…It is located on the right hand of the screen, underneath Actions (Figure 1-3).
  • 5. Figure 1-3 Type in what task that will be performed in the Name dialogue box. Then type supplementary information or an explanation of the task in the Description dialogue box (Figure 1-4). Click Next.
  • 6. Figure 1-4 Setting a Task Reminder Next, the Task Trigger window will open. Select from one of the seven options of the desired time to be reminded of said task (Figure 1-5).
  • 7. Figure 1-5 Click Next. Creating a Task Reminder on a Daily Basis Select the desired start date on the top left of the screen and the time to be reminded on the top right. Underneath, the User will select how many days they want to be reminded to perform said task (Figure 1-6).
  • 8. Figure 1-6 Click Next once completed. Creating a Task Reminder on a Weekly Basis Select the desired start date and time. Below, enter how many weeks that the Reminder will be sent and what days the Reminder will be sent on (Figure 1-7).
  • 9. Figure 1-7 Creating a Task Reminder on a One Time Basis Select the desired date and time for the Reminder to be sent (Figure 1-8).
  • 10. Figure 1-8 Creating a Task Reminder when the Computer Starts The Reminder will automatically be sent the next time the computer is turned on. Creating a Task Reminder when the User Logs On The Reminder will automatically be sent the next time the User Logs on. It is set to the desktop, or user account, that is currently on. If there is another User Account that the Reminder needs to be sent to, log off and sign onto that account then create the task reminder. Creating a Task Reminder when a Specified Event is Logged Create the trigger by selecting the specified action in log. If the event ID is known, type that in for an accurate triggering time. The event ID does not need to be known, however (Figure 1-9).
  • 11. Figure 1-9 Setting the Task to Perform an Action The User will now choose which way they would like to be reminded. The User will have three options: To automatically Start the Program, for the reminder to be sent by e-mail, or to display the message in a window. Setting the Task to Start A Program Select Browse to find the desired program to start. Add Argument is optional and is only intended for programs that take command line arguments. Start In is also optional and can be used if the user knows the exact command line for the file (Figure 1-10).
  • 12. Figure 1-10 Setting the Task to Send an E-mail Enter the desired e-mail in From and To. The e-mail sending the message will be typed into From, and the e-mail that will be receiving the message will be in To. The title of the e-mail is to be written in the Subject text box. Write a message that expounds or explains any supplementary information that is needed in the Text textbox. If there is a program or file needed to be sent along with the e-mail, select it in Attachment using the Browse… button. The SMTP server is the program that will help send the e-mail. The User does not need to select a program, however it is suggested (Figure 1-11).
  • 13. Figure 1-11 Setting the Task to Display a Message Write the information that will be displayed at the top of the window in Title. The note that will be displayed is typed in the Message text box (Figure 1-12).
  • 14. Figure 1-12 The display message will appear as a pop-up window (Figure 1-13). Figure 1-13 Finishing the Creation of Basic Task When all of the required information has been filled out, Task Scheduler will give an overview of the task. If there is anything wrong, the user may go back to make the correct changes.
  • 15. The Basic Task Summary Look over the Basic Task Summary to make sure that the name of the task, the description of the task, the action of the task, the trigger method, and the task reminder are correct (Figure 1-14). Figure 1-14 Click Finish. Display Running Tasks Click on Display All Running Tasks underneath Action on the Main Window of Task Scheduler,. A window will appear and show all current running tasks (Figure 1-15). Select the desired task in the window and click End Task to end all tasks.