SlideShare a Scribd company logo
Page 1
Closing Cockpit Setup (Source: Financials Expert)
With mySAP ERP Central Component (ECC) 5.0 and 6.0, SAP provides a set of seven tools that you can
link and schedule together to speed up all types of closing cycles — monthly, quarterly, and year end. I’ll
briefly describe each tool and provide a bit more in-depth description of the least-well-known and most
under-used of these tools — SAP Closing Cockpit. For a summary of the other six tools, see the sidebar,
“mySAP ERP Fast Close Tools." Closing Cockpit is divided into two basic parts: a template and a task
list. I’ll discuss the template in the next section.
Closing Cockpit Template
Figure 1 displays a typical Closing Cockpit template. You can configure the template from scratch or you
can start with a delivered template from SAP. No matter which type of Closing Cockpit you use, you can
configure a monthly closing template once and then reuse it multiple times as the year progresses. Within
this view, you can see three primary information panels found within any Closing Cockpit template.
Figure 1
The three primary information panels of a Closing Cockpit template
The first information panel on the left contains the template task list. You can configure the complete task
list containing the closing steps, called tasks, here. You can configure these tasks individually, and then
attach them to transaction codes, job programs, or job variants. In Figure 1, this task list is located on the
left side of the screen and set up to run the assigned tasks in Controlling Area 1000 and Company Code
5 (0005).
You can configure the task list to include any other controlling areas and company codes within your
system. The individual tasks are assigned to separate folders within the task list hierarchy. The folders
can correspond to the major activities found within each closing schedule. For example, in this simple
view the major steps in the closing task list are: opening the next period for posting (Open Next Period);
using Accrual Engine to calculate and post accruals (FI Accrual Processing); processing CO month-end
using a cost allocation cycle in CO (CO Month End Processing); using the new G/L for FI cash allocation
(Cash Allocation PCA’s – Bal Sheets); reconciling inter-company data (Inter-Company Reconciliation);
and locking the closing period (Close Last Period). Depending on your choice, the task can link directly to
a transaction code, program, or program variant. Each task type selection offers different options
depending on the user requirements.
Page 2
Note
The names listed in these steps are the folder names. The actual steps are listed under each folder.
Closing Cockpit Task List
The second key feature of the template is scheduling the various tasks, which appears in the top-right
panel of Figure 1. This scheduling is based on a 0 day basis. A monthly close often is the first day of the
new accounting period. In the Offst/Time column, you can see the scheduling begins on -1 and ends on
+1 day. That means that the various scheduled tasks operate on either side of a specific date once the
user copies the template into a specific task list that users select from a specific date. Also, note that in
addition to the day schedule, the template owner schedules each task to begin at a specific time during
the day.
The third key feature of the template is the ability to control task execution sequence by linking or setting
dependencies among tasks, which you can see in the lower- right panel of Figure 1. This means you can
set priorities among tasks to ensure that the various tasks execute in order of precedence. In this
example, you do not want the CO cycle to run prior to executing the monthly accrual that posts additional
expenses into the CO cost centers.
By setting the dependencies as shown in the lower-right section in Figure 2, with task priority from the
bottom up, you must run the five tasks in the following order: the FI accrual (FI Accrual Processing), CO
month- end allocations (CO Month End Processing), FI cash balance sheet distribution (Cash Allocation
PCA’s – Bal Sheets), inter-company reconciliation (Inter-Company Reconciliation), and finally closing the
last period (Close Last Period). In fact, if the user for some reason activates the CO cycle manually prior
to the FI accrual, an error status flag results and the job halts, followed by a posted message within the
task list stating that the FI accrual must run successfully prior to the CO cycle. Note that this example
assumes the typical FI accruals should run and post the accrual amounts into the CO cost centers prior to
the CO cost allocation cycles; therefore, the dependencies are set to avoid an early activation of the CO
cost allocation cycles.
Figure 2
Dependencies among tasks
Page 3
Additional Closing Cockpit Template Points
Here are some additional tips to remember regarding the Closing Cockpit template. The example shown
in this article is very simple; undoubtedly, the template required within your environment will be more
complex. During the template configuration you should ensure that you have a clear understanding of the
closing steps and the order in which you must complete them. Next, you have to decide how to execute
each task within the template — either manually or with a job variant. The option you choose depends on
how automatic or hands-off you wish the task list to be. If you want to control how to start and execute
each task, then you can start each task by hand; if you wish the tasks to start at a scheduled time without
manual intervention, you can configure them with a job variant.
Finally, it is quite easy to make changes to Closing Cockpit as required. The executable task list is simply
a copy of the most current template configuration. Closing Cockpit uses any changes that you make
within the template master in the next closing cycle, copying the task list from the new, revised Closing
Cockpit template.
Copy the Template into a Task List
Once you’ve completed the template configuration, the next step is copying the template into a usable
and executable task list. Figure 3 displays the actual configuration window to copy the template into an
executable task list.
Figure 3
Set up the task list
The key required fields when setting up the task list are Key Date and Status. The major difference
between the task list and the template is that you can only execute the tasks from a task list that is in
Released status and tied to a Key Date that you use for day-by-day scheduling of each task. You can set
up multiple task lists at one time, such as an entire year’s closing task lists.
In this example, I’ve copied the template into a task list and assigned a specific date of 10/31/2006.
Further, the new task list is identified as a monthly schedule task list, assigned to post into Posting Period
10 during Fiscal Year 2006. Finally, the Status is set to Released, which means the task list becomes
active and available for use. Also with this setting the task list automatically schedules tasks and executes
them based on the key date assigned to the task list.
Figure 4 displays the newly configured, ready-to-execute task list. At first glance, you might notice how
similar it is to the template. However, some significant differences exist. The three columns circled
in Figure 4 — Status, Spool, and JobDisplay — contain job status information. Remember, the major
difference between the template and the task list is that you have to use the task list to execute the
various tasks. These three columns display the status and results of each task as it completes. Also,
Page 4
within the Status column, an indicator light appears to set the task status as successful, still running, or
ended with an error.
Figure 4
Configured task list
At this point, the task list can execute the tasks according to the assigned schedule. The system arrives
at the assigned schedule by setting a specific calendar date and time to execute the task in the task list
based on the scheduled day of the task. The first tasks scheduled in the October 31 task list are Edit
Accrual Objects for existing objects and Set Up Accrual Engine Transaction for new accrual engines
(Figure 4). The execute icon tells the user that the task list owner must execute these tasks manually.
Also, according to the assigned schedule, the system could complete them one day earlier than the task
list key date, or October 30. You can confirm this setting under the Offst/Time column where these tasks
are set for a -1 day.
The next two tasks, Open Next Period for Posting and Calculate and Post Accruals, are also manual
executables. These indicate that there is no status update to the closing cockpits, but you have to
remember to check these tasks off manually. Next are two tasks that are configured as job variants,
identified by the right arrow icon . These tasks use the assigned job variant to execute the CO allocation
and FI cash distribution: CO Cost Allocation – Fast Close and Balance Sheet Cash Allocations. They run
automatically based on the scheduled time. As you can see, the CO allocation is scheduled to run at
09:00:00 and the FI cash distribution is scheduled to run at 17:45:00.
Also, again note the task dependencies settings at the bottom of the display. These three tasks must
execute successfully in order, from bottom to top. The CO cycle and FI cash allocation do not run if they
do not follow the accrual task completion.
In Figure 5, the system activates the task list automatically based on the key date and it is now in mid-
execution. In the top section, you can now see status indicators, spool files, and job logs available for
review. Starting from the top, you can see that the first two tasks were not executed. They do not have
green markers in the Status column, as they are not part of the normal closing process. The note
icon tells the task list owner that these tasks were not required. The owner of the specific task created
and posted the note.
Page 5
Figure 5
Task list executed
The next task Open Next Period for Posting has a green status. The person responsible for initiating this
task assigned the task to convey that you must complete it during the monthly closing cycle. Also, the
task owner entered a note in the task list stating that everything is fine and the closing process can
proceed.
The next two job variants, Calculate and Post Accruals and CO Cost Allocation – Fast Close, have kicked
off the CO cycle and the FI cash distribution cycles at the scheduled time. Each job completed
successfully and the system posts job logs and spool files automatically and ready for review.
The next task I/C Data Select (inter-company data selection) is manually executable and is scheduled for
18:00:00.
mySAP ERP Fast Close Tools
mySAP ERP provides several tools in addition to SAP Closing Cockpit that you can use according to your
individual needs. It is not necessary to employ all these tools to speed up the closing schedule, but these
are the ones that would likely have the most impact:
SAP NetWeaver Portal. SAP NetWeaver Portal provides a customizable single access point to SAP tools.
Accrual Engine. This is a new feature in mySAP ERP that automatically calculates and posts an accrual
based on changing requirements. For example, beginning at the first of the year, accounting establishes
an automatic accrual to allocate expected income from future rents received. During the year, the amount
received does not match the planned amount and you must reset the accrual. As a result of this
unplanned change, Accrual Engine can automatically recalculate the necessary monthly accrual amount
to ensure the accrual account zeroes out at month end. This eliminates the need to constantly verify and
recalculate the monthly accrual as circumstances change.
Inter-Company Reconciliation. One of the most time-consuming tasks for the closing process is
reconciling cross- posting between different divisions. Users often perform this tedious task in Microsoft
Excel spreadsheets, which takes a long time and can lead to inaccurate results. SAP’s inter- company
Page 6
reconciliation tool provides a cockpit-type option where you can review, adjust, and reconcile all postings
as required.
Business Consolidations. Once you have reconciled the inter-company transactions, the next step often is
to consolidate or roll up numbers. The new BW/SAP NetWeaver BI InfoCube-based version of SAP’s
consolidation tool automates this task. If you link it to the new G/L, you can save even more time as the
new G/L eliminates the need for the data staging ledger that is required using the classic G/L version.
mySAP Corporate Performance Monitor (CPM). mySAP CPM offers a highly visible graphic view of
results against plan and further analysis of the results against the overall corporate strategy. The
management cockpit presents the plan-to-actual view in a graphical/dashboard format. SAP Balanced
Scorecard in Strategic Enterprise Management (SEM) allows management to compare the current and
forecast results against the overall corporate objectives and strategy.
New G/L in mySAP ERP 2004 and mySAP ERP 2005. Of all the tools SAP provides, the new G/L is likely
the one tool to save the most time in the typical financial closing cycle. For example, the new G/L
eliminates many of the closing cycle data reconciliation steps — you no longer need FI/CO reconciliation
transaction KALC. Also, the new G/L eliminates the month- end build you had to perform via transaction
IKEK of the Profit Center Accounting (PCA) balances of A/P or A/R balances. Instead, the new G/L
generates a real- time balance sheet posting at the time of document entry.

More Related Content

Similar to Closing+cockpit

Closingcockpit
ClosingcockpitClosingcockpit
Closingcockpit
adityafico
 
The closing cockpit is a very powerful tool in SAP Financial System which pro...
The closing cockpit is a very powerful tool in SAP Financial System which pro...The closing cockpit is a very powerful tool in SAP Financial System which pro...
The closing cockpit is a very powerful tool in SAP Financial System which pro...
reddygrk2008
 
Closing cockpit configuration document
Closing cockpit configuration documentClosing cockpit configuration document
Closing cockpit configuration document
learnstraightsap
 
Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01
Muhammad Mujahid PMP®, PSP®, SP®, APMC®
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
SHAZEBALIKHAN1
 
Oracle HRMS Fast Formula
Oracle HRMS Fast FormulaOracle HRMS Fast Formula
Oracle HRMS Fast Formula
runjithrocking
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and Traps
InSync Conference
 
Closing cockpit v 1.3
Closing cockpit v 1.3Closing cockpit v 1.3
Closing cockpit v 1.3
Intelligroup, Inc.
 
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docxProject Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
wkyra78
 
Massmaintenance
MassmaintenanceMassmaintenance
Massmaintenance
David Chan
 
Closing Cockpit Ver6
Closing Cockpit Ver6Closing Cockpit Ver6
Closing Cockpit Ver6
Gan Sha
 
Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docx
wkyra78
 
100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps
InSync Conference
 
Sd billing plan
Sd billing planSd billing plan
Sd billing plan
Rao RV
 
ENGR 131 Elementary Computer ProgrammingTeam IN – Instructor
ENGR 131  Elementary Computer ProgrammingTeam IN – InstructorENGR 131  Elementary Computer ProgrammingTeam IN – Instructor
ENGR 131 Elementary Computer ProgrammingTeam IN – Instructor
TanaMaeskm
 
Scoring documentation
Scoring documentationScoring documentation
Scoring documentation
Fatima Khalid
 
Oracle payroll-subledger accounting integration
Oracle payroll-subledger accounting integrationOracle payroll-subledger accounting integration
Oracle payroll-subledger accounting integration
Baker Khader Abdallah, PMP
 
Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892
HariharanMS5
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
MuhammadZahidQazi
 
Say hola to new orange scrum enterprise updates
Say hola to new orange scrum enterprise updatesSay hola to new orange scrum enterprise updates
Say hola to new orange scrum enterprise updates
Orangescrum
 

Similar to Closing+cockpit (20)

Closingcockpit
ClosingcockpitClosingcockpit
Closingcockpit
 
The closing cockpit is a very powerful tool in SAP Financial System which pro...
The closing cockpit is a very powerful tool in SAP Financial System which pro...The closing cockpit is a very powerful tool in SAP Financial System which pro...
The closing cockpit is a very powerful tool in SAP Financial System which pro...
 
Closing cockpit configuration document
Closing cockpit configuration documentClosing cockpit configuration document
Closing cockpit configuration document
 
Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
Oracle HRMS Fast Formula
Oracle HRMS Fast FormulaOracle HRMS Fast Formula
Oracle HRMS Fast Formula
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and Traps
 
Closing cockpit v 1.3
Closing cockpit v 1.3Closing cockpit v 1.3
Closing cockpit v 1.3
 
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docxProject Priority MatrixProject NameProject Priority MatrixConstrai.docx
Project Priority MatrixProject NameProject Priority MatrixConstrai.docx
 
Massmaintenance
MassmaintenanceMassmaintenance
Massmaintenance
 
Closing Cockpit Ver6
Closing Cockpit Ver6Closing Cockpit Ver6
Closing Cockpit Ver6
 
Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docx
 
100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps
 
Sd billing plan
Sd billing planSd billing plan
Sd billing plan
 
ENGR 131 Elementary Computer ProgrammingTeam IN – Instructor
ENGR 131  Elementary Computer ProgrammingTeam IN – InstructorENGR 131  Elementary Computer ProgrammingTeam IN – Instructor
ENGR 131 Elementary Computer ProgrammingTeam IN – Instructor
 
Scoring documentation
Scoring documentationScoring documentation
Scoring documentation
 
Oracle payroll-subledger accounting integration
Oracle payroll-subledger accounting integrationOracle payroll-subledger accounting integration
Oracle payroll-subledger accounting integration
 
Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892Sdbillingplan 150626203646-lva1-app6892
Sdbillingplan 150626203646-lva1-app6892
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
 
Say hola to new orange scrum enterprise updates
Say hola to new orange scrum enterprise updatesSay hola to new orange scrum enterprise updates
Say hola to new orange scrum enterprise updates
 

Recently uploaded

在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
5spllj1l
 
Machine Learning in Business - A power point presentation.pptx
Machine Learning in Business - A power point presentation.pptxMachine Learning in Business - A power point presentation.pptx
Machine Learning in Business - A power point presentation.pptx
mimiroselowe
 
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptxOAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
hiddenlevers
 
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
5spllj1l
 
The Impact of Generative AI and 4th Industrial Revolution
The Impact of Generative AI and 4th Industrial RevolutionThe Impact of Generative AI and 4th Industrial Revolution
The Impact of Generative AI and 4th Industrial Revolution
Paolo Maresca
 
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
AntoniaOwensDetwiler
 
Using Online job postings and survey data to understand labour market trends
Using Online job postings and survey data to understand labour market trendsUsing Online job postings and survey data to understand labour market trends
Using Online job postings and survey data to understand labour market trends
Labour Market Information Council | Conseil de l’information sur le marché du travail
 
Does teamwork really matter? Looking beyond the job posting to understand lab...
Does teamwork really matter? Looking beyond the job posting to understand lab...Does teamwork really matter? Looking beyond the job posting to understand lab...
Does teamwork really matter? Looking beyond the job posting to understand lab...
Labour Market Information Council | Conseil de l’information sur le marché du travail
 
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
bresciafarid233
 
How to Use Payment Vouchers in Odoo 18.
How to Use Payment Vouchers in  Odoo 18.How to Use Payment Vouchers in  Odoo 18.
How to Use Payment Vouchers in Odoo 18.
FinShe
 
Dr. Alyce Su Cover Story - China's Investment Leader
Dr. Alyce Su Cover Story - China's Investment LeaderDr. Alyce Su Cover Story - China's Investment Leader
Dr. Alyce Su Cover Story - China's Investment Leader
msthrill
 
Discover the Future of Dogecoin with Our Comprehensive Guidance
Discover the Future of Dogecoin with Our Comprehensive GuidanceDiscover the Future of Dogecoin with Our Comprehensive Guidance
Discover the Future of Dogecoin with Our Comprehensive Guidance
36 Crypto
 
Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)
AntoniaOwensDetwiler
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
taqyea
 
South Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma TranscriptSouth Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma Transcript
ynfqplhm
 
Fabular Frames and the Four Ratio Problem
Fabular Frames and the Four Ratio ProblemFabular Frames and the Four Ratio Problem
Fabular Frames and the Four Ratio Problem
Majid Iqbal
 
Upanishads summary with explanations of each upnishad
Upanishads summary with explanations of each upnishadUpanishads summary with explanations of each upnishad
Upanishads summary with explanations of each upnishad
ajaykumarxoxo04
 
International Sustainability Standards Board
International Sustainability Standards BoardInternational Sustainability Standards Board
International Sustainability Standards Board
Kumar Ramaiah
 
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
5spllj1l
 
RMIT University degree offer diploma Transcript
RMIT University degree offer diploma TranscriptRMIT University degree offer diploma Transcript
RMIT University degree offer diploma Transcript
cahyrnui
 

Recently uploaded (20)

在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
在线办理(GU毕业证书)美国贡萨加大学毕业证学历证书一模一样
 
Machine Learning in Business - A power point presentation.pptx
Machine Learning in Business - A power point presentation.pptxMachine Learning in Business - A power point presentation.pptx
Machine Learning in Business - A power point presentation.pptx
 
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptxOAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
OAT_RI_Ep20 WeighingTheRisks_May24_Trade Wars.pptx
 
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
快速办理(SMU毕业证书)南卫理公会大学毕业证毕业完成信一模一样
 
The Impact of Generative AI and 4th Industrial Revolution
The Impact of Generative AI and 4th Industrial RevolutionThe Impact of Generative AI and 4th Industrial Revolution
The Impact of Generative AI and 4th Industrial Revolution
 
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
 
Using Online job postings and survey data to understand labour market trends
Using Online job postings and survey data to understand labour market trendsUsing Online job postings and survey data to understand labour market trends
Using Online job postings and survey data to understand labour market trends
 
Does teamwork really matter? Looking beyond the job posting to understand lab...
Does teamwork really matter? Looking beyond the job posting to understand lab...Does teamwork really matter? Looking beyond the job posting to understand lab...
Does teamwork really matter? Looking beyond the job posting to understand lab...
 
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
Tdasx: In-Depth Analysis of Cryptocurrency Giveaway Scams and Security Strate...
 
How to Use Payment Vouchers in Odoo 18.
How to Use Payment Vouchers in  Odoo 18.How to Use Payment Vouchers in  Odoo 18.
How to Use Payment Vouchers in Odoo 18.
 
Dr. Alyce Su Cover Story - China's Investment Leader
Dr. Alyce Su Cover Story - China's Investment LeaderDr. Alyce Su Cover Story - China's Investment Leader
Dr. Alyce Su Cover Story - China's Investment Leader
 
Discover the Future of Dogecoin with Our Comprehensive Guidance
Discover the Future of Dogecoin with Our Comprehensive GuidanceDiscover the Future of Dogecoin with Our Comprehensive Guidance
Discover the Future of Dogecoin with Our Comprehensive Guidance
 
Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
 
South Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma TranscriptSouth Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma Transcript
 
Fabular Frames and the Four Ratio Problem
Fabular Frames and the Four Ratio ProblemFabular Frames and the Four Ratio Problem
Fabular Frames and the Four Ratio Problem
 
Upanishads summary with explanations of each upnishad
Upanishads summary with explanations of each upnishadUpanishads summary with explanations of each upnishad
Upanishads summary with explanations of each upnishad
 
International Sustainability Standards Board
International Sustainability Standards BoardInternational Sustainability Standards Board
International Sustainability Standards Board
 
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
在线办理(UMASS毕业证书)马萨诸塞大学阿默斯特分校毕业证完成信一模一样
 
RMIT University degree offer diploma Transcript
RMIT University degree offer diploma TranscriptRMIT University degree offer diploma Transcript
RMIT University degree offer diploma Transcript
 

Closing+cockpit

  • 1. Page 1 Closing Cockpit Setup (Source: Financials Expert) With mySAP ERP Central Component (ECC) 5.0 and 6.0, SAP provides a set of seven tools that you can link and schedule together to speed up all types of closing cycles — monthly, quarterly, and year end. I’ll briefly describe each tool and provide a bit more in-depth description of the least-well-known and most under-used of these tools — SAP Closing Cockpit. For a summary of the other six tools, see the sidebar, “mySAP ERP Fast Close Tools." Closing Cockpit is divided into two basic parts: a template and a task list. I’ll discuss the template in the next section. Closing Cockpit Template Figure 1 displays a typical Closing Cockpit template. You can configure the template from scratch or you can start with a delivered template from SAP. No matter which type of Closing Cockpit you use, you can configure a monthly closing template once and then reuse it multiple times as the year progresses. Within this view, you can see three primary information panels found within any Closing Cockpit template. Figure 1 The three primary information panels of a Closing Cockpit template The first information panel on the left contains the template task list. You can configure the complete task list containing the closing steps, called tasks, here. You can configure these tasks individually, and then attach them to transaction codes, job programs, or job variants. In Figure 1, this task list is located on the left side of the screen and set up to run the assigned tasks in Controlling Area 1000 and Company Code 5 (0005). You can configure the task list to include any other controlling areas and company codes within your system. The individual tasks are assigned to separate folders within the task list hierarchy. The folders can correspond to the major activities found within each closing schedule. For example, in this simple view the major steps in the closing task list are: opening the next period for posting (Open Next Period); using Accrual Engine to calculate and post accruals (FI Accrual Processing); processing CO month-end using a cost allocation cycle in CO (CO Month End Processing); using the new G/L for FI cash allocation (Cash Allocation PCA’s – Bal Sheets); reconciling inter-company data (Inter-Company Reconciliation); and locking the closing period (Close Last Period). Depending on your choice, the task can link directly to a transaction code, program, or program variant. Each task type selection offers different options depending on the user requirements.
  • 2. Page 2 Note The names listed in these steps are the folder names. The actual steps are listed under each folder. Closing Cockpit Task List The second key feature of the template is scheduling the various tasks, which appears in the top-right panel of Figure 1. This scheduling is based on a 0 day basis. A monthly close often is the first day of the new accounting period. In the Offst/Time column, you can see the scheduling begins on -1 and ends on +1 day. That means that the various scheduled tasks operate on either side of a specific date once the user copies the template into a specific task list that users select from a specific date. Also, note that in addition to the day schedule, the template owner schedules each task to begin at a specific time during the day. The third key feature of the template is the ability to control task execution sequence by linking or setting dependencies among tasks, which you can see in the lower- right panel of Figure 1. This means you can set priorities among tasks to ensure that the various tasks execute in order of precedence. In this example, you do not want the CO cycle to run prior to executing the monthly accrual that posts additional expenses into the CO cost centers. By setting the dependencies as shown in the lower-right section in Figure 2, with task priority from the bottom up, you must run the five tasks in the following order: the FI accrual (FI Accrual Processing), CO month- end allocations (CO Month End Processing), FI cash balance sheet distribution (Cash Allocation PCA’s – Bal Sheets), inter-company reconciliation (Inter-Company Reconciliation), and finally closing the last period (Close Last Period). In fact, if the user for some reason activates the CO cycle manually prior to the FI accrual, an error status flag results and the job halts, followed by a posted message within the task list stating that the FI accrual must run successfully prior to the CO cycle. Note that this example assumes the typical FI accruals should run and post the accrual amounts into the CO cost centers prior to the CO cost allocation cycles; therefore, the dependencies are set to avoid an early activation of the CO cost allocation cycles. Figure 2 Dependencies among tasks
  • 3. Page 3 Additional Closing Cockpit Template Points Here are some additional tips to remember regarding the Closing Cockpit template. The example shown in this article is very simple; undoubtedly, the template required within your environment will be more complex. During the template configuration you should ensure that you have a clear understanding of the closing steps and the order in which you must complete them. Next, you have to decide how to execute each task within the template — either manually or with a job variant. The option you choose depends on how automatic or hands-off you wish the task list to be. If you want to control how to start and execute each task, then you can start each task by hand; if you wish the tasks to start at a scheduled time without manual intervention, you can configure them with a job variant. Finally, it is quite easy to make changes to Closing Cockpit as required. The executable task list is simply a copy of the most current template configuration. Closing Cockpit uses any changes that you make within the template master in the next closing cycle, copying the task list from the new, revised Closing Cockpit template. Copy the Template into a Task List Once you’ve completed the template configuration, the next step is copying the template into a usable and executable task list. Figure 3 displays the actual configuration window to copy the template into an executable task list. Figure 3 Set up the task list The key required fields when setting up the task list are Key Date and Status. The major difference between the task list and the template is that you can only execute the tasks from a task list that is in Released status and tied to a Key Date that you use for day-by-day scheduling of each task. You can set up multiple task lists at one time, such as an entire year’s closing task lists. In this example, I’ve copied the template into a task list and assigned a specific date of 10/31/2006. Further, the new task list is identified as a monthly schedule task list, assigned to post into Posting Period 10 during Fiscal Year 2006. Finally, the Status is set to Released, which means the task list becomes active and available for use. Also with this setting the task list automatically schedules tasks and executes them based on the key date assigned to the task list. Figure 4 displays the newly configured, ready-to-execute task list. At first glance, you might notice how similar it is to the template. However, some significant differences exist. The three columns circled in Figure 4 — Status, Spool, and JobDisplay — contain job status information. Remember, the major difference between the template and the task list is that you have to use the task list to execute the various tasks. These three columns display the status and results of each task as it completes. Also,
  • 4. Page 4 within the Status column, an indicator light appears to set the task status as successful, still running, or ended with an error. Figure 4 Configured task list At this point, the task list can execute the tasks according to the assigned schedule. The system arrives at the assigned schedule by setting a specific calendar date and time to execute the task in the task list based on the scheduled day of the task. The first tasks scheduled in the October 31 task list are Edit Accrual Objects for existing objects and Set Up Accrual Engine Transaction for new accrual engines (Figure 4). The execute icon tells the user that the task list owner must execute these tasks manually. Also, according to the assigned schedule, the system could complete them one day earlier than the task list key date, or October 30. You can confirm this setting under the Offst/Time column where these tasks are set for a -1 day. The next two tasks, Open Next Period for Posting and Calculate and Post Accruals, are also manual executables. These indicate that there is no status update to the closing cockpits, but you have to remember to check these tasks off manually. Next are two tasks that are configured as job variants, identified by the right arrow icon . These tasks use the assigned job variant to execute the CO allocation and FI cash distribution: CO Cost Allocation – Fast Close and Balance Sheet Cash Allocations. They run automatically based on the scheduled time. As you can see, the CO allocation is scheduled to run at 09:00:00 and the FI cash distribution is scheduled to run at 17:45:00. Also, again note the task dependencies settings at the bottom of the display. These three tasks must execute successfully in order, from bottom to top. The CO cycle and FI cash allocation do not run if they do not follow the accrual task completion. In Figure 5, the system activates the task list automatically based on the key date and it is now in mid- execution. In the top section, you can now see status indicators, spool files, and job logs available for review. Starting from the top, you can see that the first two tasks were not executed. They do not have green markers in the Status column, as they are not part of the normal closing process. The note icon tells the task list owner that these tasks were not required. The owner of the specific task created and posted the note.
  • 5. Page 5 Figure 5 Task list executed The next task Open Next Period for Posting has a green status. The person responsible for initiating this task assigned the task to convey that you must complete it during the monthly closing cycle. Also, the task owner entered a note in the task list stating that everything is fine and the closing process can proceed. The next two job variants, Calculate and Post Accruals and CO Cost Allocation – Fast Close, have kicked off the CO cycle and the FI cash distribution cycles at the scheduled time. Each job completed successfully and the system posts job logs and spool files automatically and ready for review. The next task I/C Data Select (inter-company data selection) is manually executable and is scheduled for 18:00:00. mySAP ERP Fast Close Tools mySAP ERP provides several tools in addition to SAP Closing Cockpit that you can use according to your individual needs. It is not necessary to employ all these tools to speed up the closing schedule, but these are the ones that would likely have the most impact: SAP NetWeaver Portal. SAP NetWeaver Portal provides a customizable single access point to SAP tools. Accrual Engine. This is a new feature in mySAP ERP that automatically calculates and posts an accrual based on changing requirements. For example, beginning at the first of the year, accounting establishes an automatic accrual to allocate expected income from future rents received. During the year, the amount received does not match the planned amount and you must reset the accrual. As a result of this unplanned change, Accrual Engine can automatically recalculate the necessary monthly accrual amount to ensure the accrual account zeroes out at month end. This eliminates the need to constantly verify and recalculate the monthly accrual as circumstances change. Inter-Company Reconciliation. One of the most time-consuming tasks for the closing process is reconciling cross- posting between different divisions. Users often perform this tedious task in Microsoft Excel spreadsheets, which takes a long time and can lead to inaccurate results. SAP’s inter- company
  • 6. Page 6 reconciliation tool provides a cockpit-type option where you can review, adjust, and reconcile all postings as required. Business Consolidations. Once you have reconciled the inter-company transactions, the next step often is to consolidate or roll up numbers. The new BW/SAP NetWeaver BI InfoCube-based version of SAP’s consolidation tool automates this task. If you link it to the new G/L, you can save even more time as the new G/L eliminates the need for the data staging ledger that is required using the classic G/L version. mySAP Corporate Performance Monitor (CPM). mySAP CPM offers a highly visible graphic view of results against plan and further analysis of the results against the overall corporate strategy. The management cockpit presents the plan-to-actual view in a graphical/dashboard format. SAP Balanced Scorecard in Strategic Enterprise Management (SEM) allows management to compare the current and forecast results against the overall corporate objectives and strategy. New G/L in mySAP ERP 2004 and mySAP ERP 2005. Of all the tools SAP provides, the new G/L is likely the one tool to save the most time in the typical financial closing cycle. For example, the new G/L eliminates many of the closing cycle data reconciliation steps — you no longer need FI/CO reconciliation transaction KALC. Also, the new G/L eliminates the month- end build you had to perform via transaction IKEK of the Profit Center Accounting (PCA) balances of A/P or A/R balances. Instead, the new G/L generates a real- time balance sheet posting at the time of document entry.