Submit Search
Upload
System Design and Analysis 1
•
Download as PPT, PDF
•
61 likes
•
38,374 views
Boeun Tim
Follow
Technology
Education
Report
Share
Report
Share
1 of 70
Download now
Recommended
Over view of system analysis and design
Over view of system analysis and design
Saroj Dhakal
System Analysis and Design
System Analysis and Design
Dr. C.V. Suresh Babu
System Analysis and Design slides by yared yenealem DTU Ethiopia
System Analysis and Design slides by yared yenealem DTU Ethiopia
Debre Tabor University
analysis and design of information system
analysis and design of information system
Renu Sharma
System development life cycle
System development life cycle
Yaswanth Babu Gummadivelli
System analysis and design
System analysis and design
LOKESH KUMAR
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
fentrekin
System Analysis and Design
System Analysis and Design
Yohan Gunathilaka
Recommended
Over view of system analysis and design
Over view of system analysis and design
Saroj Dhakal
System Analysis and Design
System Analysis and Design
Dr. C.V. Suresh Babu
System Analysis and Design slides by yared yenealem DTU Ethiopia
System Analysis and Design slides by yared yenealem DTU Ethiopia
Debre Tabor University
analysis and design of information system
analysis and design of information system
Renu Sharma
System development life cycle
System development life cycle
Yaswanth Babu Gummadivelli
System analysis and design
System analysis and design
LOKESH KUMAR
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
fentrekin
System Analysis and Design
System Analysis and Design
Yohan Gunathilaka
System analysis and design
System analysis and design
Kiruthika Veerappan Nagappan
System Analysis and Design (SAD)
System Analysis and Design (SAD)
Sachith Perera
Information System Development
Information System Development
IamPe Khamkhum
System Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU Ethiopia
Debre Tabor University
Structured systems analysis and design methodology
Structured systems analysis and design methodology
Vatsana Technologies Pte Ltd
information system analysis and design
information system analysis and design
EndalkachewYazie1
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
anumayived
System design
System design
Gheethu Joy
Presentation on uml
Presentation on uml
Shruti Dalela
System Analysis and Design
System Analysis and Design
Aamir Abbas
MIS-executive information system
MIS-executive information system
Rohit Raina
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
Uttar Tamang ✔
SYSTEM ANALYSIS AND DESIGN Assignment help
SYSTEM ANALYSIS AND DESIGN Assignment help
john mayer
System Analysis and design Class 1
System Analysis and design Class 1
Dr. Mazin Mohamed alkathiri
System Analysis and Design
System Analysis and Design
Joel Briza
Decision tree- System analysis and design
Decision tree- System analysis and design
Prof.Nilesh Magar
Overview of UML Diagrams
Overview of UML Diagrams
Manish Kumar
Analysis modeling
Analysis modeling
Inocentshuja Ahmad
Software Design - SDLC Model
Software Design - SDLC Model
Amity University | FMS - DU | IMT | Stratford University | KKMI International Institute | AIMA | DTU
system analysis and design Chap005
system analysis and design Chap005
Nderitu Muriithi
Chapter 2
Chapter 2
MarchGuzl Maishh
Week 10
Week 10
adrenal
More Related Content
What's hot
System analysis and design
System analysis and design
Kiruthika Veerappan Nagappan
System Analysis and Design (SAD)
System Analysis and Design (SAD)
Sachith Perera
Information System Development
Information System Development
IamPe Khamkhum
System Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU Ethiopia
Debre Tabor University
Structured systems analysis and design methodology
Structured systems analysis and design methodology
Vatsana Technologies Pte Ltd
information system analysis and design
information system analysis and design
EndalkachewYazie1
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
anumayived
System design
System design
Gheethu Joy
Presentation on uml
Presentation on uml
Shruti Dalela
System Analysis and Design
System Analysis and Design
Aamir Abbas
MIS-executive information system
MIS-executive information system
Rohit Raina
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
Uttar Tamang ✔
SYSTEM ANALYSIS AND DESIGN Assignment help
SYSTEM ANALYSIS AND DESIGN Assignment help
john mayer
System Analysis and design Class 1
System Analysis and design Class 1
Dr. Mazin Mohamed alkathiri
System Analysis and Design
System Analysis and Design
Joel Briza
Decision tree- System analysis and design
Decision tree- System analysis and design
Prof.Nilesh Magar
Overview of UML Diagrams
Overview of UML Diagrams
Manish Kumar
Analysis modeling
Analysis modeling
Inocentshuja Ahmad
Software Design - SDLC Model
Software Design - SDLC Model
Amity University | FMS - DU | IMT | Stratford University | KKMI International Institute | AIMA | DTU
system analysis and design Chap005
system analysis and design Chap005
Nderitu Muriithi
What's hot
(20)
System analysis and design
System analysis and design
System Analysis and Design (SAD)
System Analysis and Design (SAD)
Information System Development
Information System Development
System Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU Ethiopia
Structured systems analysis and design methodology
Structured systems analysis and design methodology
information system analysis and design
information system analysis and design
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
System design
System design
Presentation on uml
Presentation on uml
System Analysis and Design
System Analysis and Design
MIS-executive information system
MIS-executive information system
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
SYSTEM ANALYSIS AND DESIGN Assignment help
SYSTEM ANALYSIS AND DESIGN Assignment help
System Analysis and design Class 1
System Analysis and design Class 1
System Analysis and Design
System Analysis and Design
Decision tree- System analysis and design
Decision tree- System analysis and design
Overview of UML Diagrams
Overview of UML Diagrams
Analysis modeling
Analysis modeling
Software Design - SDLC Model
Software Design - SDLC Model
system analysis and design Chap005
system analysis and design Chap005
Similar to System Design and Analysis 1
Chapter 2
Chapter 2
MarchGuzl Maishh
Week 10
Week 10
adrenal
Week 10
Week 10
adrenal
Overview Of System Development Life Cycle (SDLC)
Overview Of System Development Life Cycle (SDLC)
Nicole Savoie
System developement methods
System developement methods
sachinsreekumar
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.ppt
MarissaPedragosa
Sdlc
Sdlc
Waheed Iqbal Boss
Health Informatics- Module 2-Chapter 1.pptx
Health Informatics- Module 2-Chapter 1.pptx
Arti Parab Academics
Presentation2
Presentation2
Ashams Joseph
Development of information system chap 2
Development of information system chap 2
amanuelayde1
Online auction system srs riport
Online auction system srs riport
Dilip Prajapati
mis ch2.pptx
mis ch2.pptx
Teshome48
system development life cycle
system development life cycle
SuhleemAhmd
Online auction system srs riport
Online auction system srs riport
Dilip Prajapati
Different Approaches To Sys Bldg
Different Approaches To Sys Bldg
USeP
Object oriented analysis and design unit- i
Object oriented analysis and design unit- i
Shri Shankaracharya College, Bhilai,Junwani
Mba it unit 3 ppt
Mba it unit 3 ppt
Suguna Ramya
Mba it unit 3 ppt
Mba it unit 3 ppt
Suguna Ramya
Mba it unit 3 ppt
Mba it unit 3 ppt
Suguna Ramya
RAD - System i - Presentation
RAD - System i - Presentation
Chuck Walker
Similar to System Design and Analysis 1
(20)
Chapter 2
Chapter 2
Week 10
Week 10
Week 10
Week 10
Overview Of System Development Life Cycle (SDLC)
Overview Of System Development Life Cycle (SDLC)
System developement methods
System developement methods
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.ppt
Sdlc
Sdlc
Health Informatics- Module 2-Chapter 1.pptx
Health Informatics- Module 2-Chapter 1.pptx
Presentation2
Presentation2
Development of information system chap 2
Development of information system chap 2
Online auction system srs riport
Online auction system srs riport
mis ch2.pptx
mis ch2.pptx
system development life cycle
system development life cycle
Online auction system srs riport
Online auction system srs riport
Different Approaches To Sys Bldg
Different Approaches To Sys Bldg
Object oriented analysis and design unit- i
Object oriented analysis and design unit- i
Mba it unit 3 ppt
Mba it unit 3 ppt
Mba it unit 3 ppt
Mba it unit 3 ppt
Mba it unit 3 ppt
Mba it unit 3 ppt
RAD - System i - Presentation
RAD - System i - Presentation
Recently uploaded
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
Enterprise Knowledge
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April Automation LPDG
MarianaLemus7
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
Lorenzo Miniero
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
Pixlogix Infotech
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
Slibray Presentation
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Wonjun Hwang
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
gvaughan
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
Miki Katsuragi
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
Fwdays
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
charlottematthew16
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Safe Software
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
hariprasad279825
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
ScyllaDB
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions
costume and set research powerpoint presentation
costume and set research powerpoint presentation
phoebematthew05
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
Commit University
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
Florian Wilhelm
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
Fwdays
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
Addepto
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
Padma Pradeep
Recently uploaded
(20)
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April Automation LPDG
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
costume and set research powerpoint presentation
costume and set research powerpoint presentation
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
System Design and Analysis 1
1.
Systems Analysis and
Design Third Edition Alan Dennis, Barbara Haley Wixom, and Roberta Roth John Wiley & Sons, Inc. Slides by Candace S. Garrod Red Rocks Community College
2.
Planning Chapter 1
3.
The Systems Development
Life Cycle (SDLC)
4.
5.
6.
7.
Phase I: Planning
8.
9.
Two Planning Steps
10.
11.
Phase II: Analysis
12.
13.
14.
15.
Phase III: Design
16.
17.
18.
Phase IV: Implementation
19.
20.
Three Implementation Steps
21.
22.
Systems Development Methodologies
23.
24.
25.
Data-centered Methodologies
26.
27.
Object-oriented Methodologies
28.
29.
Category I of
the System Development Methodology: Structured Design
30.
31.
Waterfall Development
32.
33.
34.
Waterfall Development-based Methodology
35.
Parallel Development
36.
37.
A general design
for the entire system is performed and then the project is divided into a series of distinct subprojects.
38.
Category II of
the System Development Methodology: Rapid Application Development (RAD)
39.
40.
41.
Phased Development
42.
43.
Phased Development-based Methodology
44.
Prototyping
45.
46.
Prototyping-based Methodology
47.
48.
Throwaway Prototyping
49.
50.
Throwaway Prototyping-based Methodology
51.
Category III of
the System Development Methodology: Agile Development
52.
53.
Extreme Programming (XP)
54.
55.
56.
An Extreme Programming-based
Methodology
57.
Selecting the Appropriate
Development Methodology
58.
59.
Criteria for Selecting
a Methodology
60.
61.
62.
63.
64.
65.
66.
67.
68.
Project Team Roles
69.
70.
Download now