Systems Analysis and Design
Key Ideas ,[object Object],[object Object]
Key Ideas ,[object Object],[object Object]
THE SYSTEMS DEVELOPMENT LIFE CYCLE
Major Attributes of the Life Cycle ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Project Phases ,[object Object],[object Object],[object Object],[object Object]
A simple process for making lunch
[object Object],[object Object],[object Object],[object Object],[object Object],Planning
[object Object],[object Object],[object Object],[object Object],[object Object],Analysis
[object Object],[object Object],[object Object],[object Object],[object Object],Design
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Implementation
Processes and Deliverables Process Product Planning Analysis Design Implementation System Request Feasibility Analysis Workplan System Proposal System  Specification New System and  Maintenance Plan
SYSTEM DEVELOPMENT METHODOLOGIES
What Is a Methodology? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Waterfall Development Methodology
Pros and Cons of the Waterfall Methodology Pros Cons Identifies systems  requirements long  before programming  begins Minimizes changes to  requirements as project progresses Design must be  specified on paper  before programming  begins Long time between  system proposal and  delivery of new  system
Parallel Development Methodology
Pros and Cons of Parallel Development Methodology Pros Cons Reduces Schedule Time Less Chance of Rework Still Uses Paper Documents Sub-projects May Be Difficult to Integrate
Rapid Application Development ,[object Object],[object Object],[object Object],[object Object],[object Object]
Three RAD Categories ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Phased Development Methodology Insert Figure 1-4 here
Pros and Cons of Phased Development Methodology Pros Cons Users Get a System To Use Quickly  Users Can Identify Additional Needs For Later Versions Users Work with a System that is Intentionally  Incomplete
How Prototyping Works
Pros and Cons of Prototyping Methodology Pros Cons Users Interact with Prototype Very Quickly  Users Can Identify Needed Changes And Refine Real Requirements Tendency to do Superficial Analysis Initial Design  Decisions May Be Poor
Throwaway Prototyping
Pros and Cons of Throwaway Prototyping Methodology Pros Cons Risks are Minimized  Important Issues are Understood Before the Real System is Built May Take Longer Than Prototyping
Agile Development: Extreme Programming
Pros and Cons of Agile Methodologies Pros Cons Fast Delivery of Results  Works Well in Projects With Undefined or Changing Requirements Requires Discipline Works Best in  Small Projects Requires Much User Input
Criteria for Selecting the Appropriate Methodology ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
TEAM ROLES AND SKILLS
Information Systems Roles ,[object Object],[object Object],[object Object],[object Object],[object Object]
Summary ,[object Object],[object Object],[object Object]

More Related Content

What's hot

System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and DesignJoel Briza
 
System analysis and design chapter 2
System analysis and design chapter 2System analysis and design chapter 2
System analysis and design chapter 2Einrez Pugao
 
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...Uttar Tamang ✔
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)fentrekin
 
Object Oriented Analysis and Design
Object Oriented Analysis and DesignObject Oriented Analysis and Design
Object Oriented Analysis and DesignHaitham El-Ghareeb
 
User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15koolkampus
 
system analysis and design Chap005
 system analysis and design  Chap005 system analysis and design  Chap005
system analysis and design Chap005Nderitu Muriithi
 
System Design and Analysis 1
System Design and Analysis 1System Design and Analysis 1
System Design and Analysis 1Boeun Tim
 
information system analysis and design
information system analysis and designinformation system analysis and design
information system analysis and designEndalkachewYazie1
 
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptxChapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptxanumayived
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)Showkot Usman
 
System development life cycle (sdlc)
System development life cycle (sdlc)System development life cycle (sdlc)
System development life cycle (sdlc)Mukund Trivedi
 
Business Process Modeling
Business Process ModelingBusiness Process Modeling
Business Process ModelingCarlos J. Costa
 
System Design Presentation
System Design PresentationSystem Design Presentation
System Design PresentationSCOUT9989
 
REQUIREMENT ENGINEERING
REQUIREMENT ENGINEERINGREQUIREMENT ENGINEERING
REQUIREMENT ENGINEERINGSaqib Raza
 
analysis and design of information system
analysis and design of information systemanalysis and design of information system
analysis and design of information systemRenu Sharma
 
Software requirement and specification
Software requirement and specificationSoftware requirement and specification
Software requirement and specificationAman Adhikari
 

What's hot (20)

System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
 
System analysis and design chapter 2
System analysis and design chapter 2System analysis and design chapter 2
System analysis and design chapter 2
 
Unit 2
Unit 2Unit 2
Unit 2
 
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
System Development Life Cycle (SDLC), Types of SDLC | Waterfall Model and Spi...
 
Software design
Software designSoftware design
Software design
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
 
Object Oriented Analysis and Design
Object Oriented Analysis and DesignObject Oriented Analysis and Design
Object Oriented Analysis and Design
 
User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15
 
system analysis and design Chap005
 system analysis and design  Chap005 system analysis and design  Chap005
system analysis and design Chap005
 
System Design and Analysis 1
System Design and Analysis 1System Design and Analysis 1
System Design and Analysis 1
 
information system analysis and design
information system analysis and designinformation system analysis and design
information system analysis and design
 
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptxChapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
Chapter 1- INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN by DEEPA (1).pptx
 
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
 
System development life cycle (sdlc)
System development life cycle (sdlc)System development life cycle (sdlc)
System development life cycle (sdlc)
 
Business Process Modeling
Business Process ModelingBusiness Process Modeling
Business Process Modeling
 
System Design Presentation
System Design PresentationSystem Design Presentation
System Design Presentation
 
REQUIREMENT ENGINEERING
REQUIREMENT ENGINEERINGREQUIREMENT ENGINEERING
REQUIREMENT ENGINEERING
 
analysis and design of information system
analysis and design of information systemanalysis and design of information system
analysis and design of information system
 
Ooad unit – 1 introduction
Ooad unit – 1 introductionOoad unit – 1 introduction
Ooad unit – 1 introduction
 
Software requirement and specification
Software requirement and specificationSoftware requirement and specification
Software requirement and specification
 

Viewers also liked

System analysis and design
System analysis and design System analysis and design
System analysis and design Razan Al Ryalat
 
System Analysis And Design Management Information System
System Analysis And Design Management Information SystemSystem Analysis And Design Management Information System
System Analysis And Design Management Information Systemnayanav
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system designRahul Hedau
 
System Analysis and Design Proposal presentation
System Analysis and Design Proposal presentationSystem Analysis and Design Proposal presentation
System Analysis and Design Proposal presentationLeslie Ybañez
 
Introduction to system analysis and design
Introduction to system analysis and designIntroduction to system analysis and design
Introduction to system analysis and designTwene Peter
 
AUTOMATED LIBRARY MANAGEMENT SYSTEM
AUTOMATED LIBRARY MANAGEMENT SYSTEMAUTOMATED LIBRARY MANAGEMENT SYSTEM
AUTOMATED LIBRARY MANAGEMENT SYSTEMAbhishek Kumar
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design Sutharshan Sharma
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemCharitha Gamage
 
Management Information System (MIS)
Management Information System (MIS)Management Information System (MIS)
Management Information System (MIS)Navneet Jingar
 
U7 ha thao software development
U7 ha thao software developmentU7 ha thao software development
U7 ha thao software developmentandynova
 
System Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU EthiopiaSystem Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU EthiopiaDebre Tabor University
 
Alternative Methodologies for Systems Development
Alternative Methodologies for Systems Development Alternative Methodologies for Systems Development
Alternative Methodologies for Systems Development Sunderland City Council
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systemsOnline
 

Viewers also liked (19)

System analysis and design
System analysis and design System analysis and design
System analysis and design
 
System Analysis And Design Management Information System
System Analysis And Design Management Information SystemSystem Analysis And Design Management Information System
System Analysis And Design Management Information System
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
 
System Analysis and Design Proposal presentation
System Analysis and Design Proposal presentationSystem Analysis and Design Proposal presentation
System Analysis and Design Proposal presentation
 
Introduction to system analysis and design
Introduction to system analysis and designIntroduction to system analysis and design
Introduction to system analysis and design
 
AUTOMATED LIBRARY MANAGEMENT SYSTEM
AUTOMATED LIBRARY MANAGEMENT SYSTEMAUTOMATED LIBRARY MANAGEMENT SYSTEM
AUTOMATED LIBRARY MANAGEMENT SYSTEM
 
Software design methodologies
Software design methodologiesSoftware design methodologies
Software design methodologies
 
System analysis
System analysisSystem analysis
System analysis
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design
 
Project Proposal document for Hotel Management System
Project Proposal document for Hotel Management SystemProject Proposal document for Hotel Management System
Project Proposal document for Hotel Management System
 
Management Information System (MIS)
Management Information System (MIS)Management Information System (MIS)
Management Information System (MIS)
 
U7 ha thao software development
U7 ha thao software developmentU7 ha thao software development
U7 ha thao software development
 
System Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU EthiopiaSystem Analysis and Design slides by Belew yenealem DTU Ethiopia
System Analysis and Design slides by Belew yenealem DTU Ethiopia
 
System design
System designSystem design
System design
 
System design
System designSystem design
System design
 
Alternative Methodologies for Systems Development
Alternative Methodologies for Systems Development Alternative Methodologies for Systems Development
Alternative Methodologies for Systems Development
 
Precis
PrecisPrecis
Precis
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
 
Input and output design
Input and output designInput and output design
Input and output design
 

Similar to System Analysis and Design

8.2 system analysis and design
8.2 system analysis and design8.2 system analysis and design
8.2 system analysis and designKhan Yousafzai
 
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptSystem_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptMarissaPedragosa
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.pptssuser1facb81
 
SCD2_Systems_Overview.ppt
SCD2_Systems_Overview.pptSCD2_Systems_Overview.ppt
SCD2_Systems_Overview.pptazeem46gf
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.pptAhmedBaagar
 
pertemuan 1 system dev
pertemuan 1 system devpertemuan 1 system dev
pertemuan 1 system devlumaeducation
 
Different Approaches To Sys Bldg
Different Approaches To Sys BldgDifferent Approaches To Sys Bldg
Different Approaches To Sys BldgUSeP
 
Information Systems Development and Acquisition
Information Systems Development and AcquisitionInformation Systems Development and Acquisition
Information Systems Development and AcquisitionYonathan Hadiputra
 

Similar to System Analysis and Design (20)

8.2 system analysis and design
8.2 system analysis and design8.2 system analysis and design
8.2 system analysis and design
 
Ch01
Ch01Ch01
Ch01
 
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptSystem_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.ppt
 
Presentation2
Presentation2Presentation2
Presentation2
 
pertemuan 1.ppt
pertemuan 1.pptpertemuan 1.ppt
pertemuan 1.ppt
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.ppt
 
SCD2_Systems_Overview.ppt
SCD2_Systems_Overview.pptSCD2_Systems_Overview.ppt
SCD2_Systems_Overview.ppt
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.ppt
 
SDLC slides 1.pdf
SDLC slides 1.pdfSDLC slides 1.pdf
SDLC slides 1.pdf
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.ppt
 
Systems_Overview.ppt
Systems_Overview.pptSystems_Overview.ppt
Systems_Overview.ppt
 
pertemuan 1 system dev
pertemuan 1 system devpertemuan 1 system dev
pertemuan 1 system dev
 
Week 10
Week 10Week 10
Week 10
 
Week 10
Week 10Week 10
Week 10
 
Different Approaches To Sys Bldg
Different Approaches To Sys BldgDifferent Approaches To Sys Bldg
Different Approaches To Sys Bldg
 
Ch01
Ch01Ch01
Ch01
 
Mba it unit 3 ppt
Mba it unit 3 pptMba it unit 3 ppt
Mba it unit 3 ppt
 
Mba it unit 3 ppt
Mba it unit 3 pptMba it unit 3 ppt
Mba it unit 3 ppt
 
Mba it unit 3 ppt
Mba it unit 3 pptMba it unit 3 ppt
Mba it unit 3 ppt
 
Information Systems Development and Acquisition
Information Systems Development and AcquisitionInformation Systems Development and Acquisition
Information Systems Development and Acquisition
 

More from Dr. C.V. Suresh Babu (20)

Data analytics with R
Data analytics with RData analytics with R
Data analytics with R
 
Association rules
Association rulesAssociation rules
Association rules
 
Clustering
ClusteringClustering
Clustering
 
Classification
ClassificationClassification
Classification
 
Blue property assumptions.
Blue property assumptions.Blue property assumptions.
Blue property assumptions.
 
Introduction to regression
Introduction to regressionIntroduction to regression
Introduction to regression
 
DART
DARTDART
DART
 
Mycin
MycinMycin
Mycin
 
Expert systems
Expert systemsExpert systems
Expert systems
 
Dempster shafer theory
Dempster shafer theoryDempster shafer theory
Dempster shafer theory
 
Bayes network
Bayes networkBayes network
Bayes network
 
Bayes' theorem
Bayes' theoremBayes' theorem
Bayes' theorem
 
Knowledge based agents
Knowledge based agentsKnowledge based agents
Knowledge based agents
 
Rule based system
Rule based systemRule based system
Rule based system
 
Formal Logic in AI
Formal Logic in AIFormal Logic in AI
Formal Logic in AI
 
Production based system
Production based systemProduction based system
Production based system
 
Game playing in AI
Game playing in AIGame playing in AI
Game playing in AI
 
Diagnosis test of diabetics and hypertension by AI
Diagnosis test of diabetics and hypertension by AIDiagnosis test of diabetics and hypertension by AI
Diagnosis test of diabetics and hypertension by AI
 
A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”
 
A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”A study on “impact of artificial intelligence in covid19 diagnosis”
A study on “impact of artificial intelligence in covid19 diagnosis”
 

Recently uploaded

Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonhttgc7rh9c
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use CasesTechSoup
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of PlayPooky Knightsmith
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningMarc Dusseiller Dusjagr
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesSHIVANANDaRV
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 

Recently uploaded (20)

Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Our Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdfOur Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdf
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 

System Analysis and Design

  • 2.
  • 3.
  • 5.
  • 6.
  • 7. A simple process for making lunch
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Processes and Deliverables Process Product Planning Analysis Design Implementation System Request Feasibility Analysis Workplan System Proposal System Specification New System and Maintenance Plan
  • 14.
  • 16. Pros and Cons of the Waterfall Methodology Pros Cons Identifies systems requirements long before programming begins Minimizes changes to requirements as project progresses Design must be specified on paper before programming begins Long time between system proposal and delivery of new system
  • 18. Pros and Cons of Parallel Development Methodology Pros Cons Reduces Schedule Time Less Chance of Rework Still Uses Paper Documents Sub-projects May Be Difficult to Integrate
  • 19.
  • 20.
  • 21. Phased Development Methodology Insert Figure 1-4 here
  • 22. Pros and Cons of Phased Development Methodology Pros Cons Users Get a System To Use Quickly Users Can Identify Additional Needs For Later Versions Users Work with a System that is Intentionally Incomplete
  • 24. Pros and Cons of Prototyping Methodology Pros Cons Users Interact with Prototype Very Quickly Users Can Identify Needed Changes And Refine Real Requirements Tendency to do Superficial Analysis Initial Design Decisions May Be Poor
  • 26. Pros and Cons of Throwaway Prototyping Methodology Pros Cons Risks are Minimized Important Issues are Understood Before the Real System is Built May Take Longer Than Prototyping
  • 28. Pros and Cons of Agile Methodologies Pros Cons Fast Delivery of Results Works Well in Projects With Undefined or Changing Requirements Requires Discipline Works Best in Small Projects Requires Much User Input
  • 29.
  • 30. TEAM ROLES AND SKILLS
  • 31.
  • 32.