SlideShare a Scribd company logo
SYED IMRAN HUSSAIN
RF DT Engineer at Relacom Private Limited, inaqvi95@yahoo.com Imran.Hussain@relacom.com.pk
PROFILE
I have worked experienced in KOMKONSULT from Feb 2014 to April 2016 as RF Engineer. Now I
am work in Relacom from April 2016 to continue. Experience in this field 3 years and 10 months
SKILLS
Tems investigation 9 to 18.2 Nemo Outdoor
MapInfo 9, 11 Nemo Handy
Tems pocket Google Earth
Nemo Analyzer Genex Probe
Microsoft Office Nemo Innvex
ACCOMPLISHED
Work on different project and operators. Start new project with my company known as mergco
work as team lead, reporting and training my colleagues.
 Mergeco (Warid , Mobilink) swap project
 Mobilink Swap project
 Mobilink Swap Customers Complain
 Mobilink NRO Site
 IOBM Ufone project (Nemo)
 Bench marking in Nokia (Nemo)
 Telenor swap Multan region
 Zong 3G swap Lahore, Multan, Sahiwal, etc.
 Zong roll out
 Telenor LTE NRO
 Warid LTE NRO sites
 IBS installation & Designing
PROFESSIONAL EXPEREINCE
• 2G and 3G KPI monitoring using sys logs.
• Identification of faults and issues during the drive test e.g. sector swaps (complete & partial).
• BCCH clashes, Handover failures, Call drops, bad Quality and Rx level patches, missing
Neighbors, overshoots etc.
• Perform CQT (Call Quality Test) and Identify exact TRx (MAIO).
• Recommend Hard and soft parameter changes to improve live network performance.
• Direct co-ordination with OMC for adding missing neighbors, removing frequency
Clashes and other activities needed during Drive Test.
• Create log files and then import these log files at MAPINFO for the purpose of Reporting.
• Recently Covered Hot Spot Coverage Areas of Multan by Performing Walk Test and Drive Test.
• 2G/3G/LTE SSV DT using TEMS Investigation & Nemo Outdoor
• Short/long calling test to monitor RSCP, Ec/No, RSSI, UE Tx Power, BLER.
• 3G testing including cell reselections.
• Handovers in 3g ( soft, softer and IRAT )
• Perform IRAT Hos from 3G to 2G.
• 3G testing including data (HSPA+, HSDPA, HSUPA, R99).
• Troubleshooting Pilot Pollution of cells.
• 3G site audit including azimuth, Electrical and mechanical tilt.
• Drive Test (Pre Drive, Post Drive, Optimization).
• New Site & Cluster Optimization Benchmarking drive tests using TEMS Investigation.
• Verification of planning data during the drive test.
• Identification of faults and issues during the drive test e.g. sector Swap,
Scrambling Codes clashes, Handover failures, Call drops, bad Quality and Ec/No patches, missing
Neighbors, Mute calls and overshoots Reasons for bad Quality patches.
• Analyzing drive test log files to detect eventual problems and recommend changes to fix those
problems.
• LTE SSVs performed.
• LTE Handovers
• LTE throughput analyzing.
• Pre and Post Walk Test
• Pre and Post walk test analysis Report
• IBS DAS designing and Planning
• AutoCAD Site layout
• Create log files and then import these log files at MAPINFO for the purpose of Reporting.
EDUCATION
Proposed Role RF Engineer
Name of Staff SyedImranhussain
Date of Birth 05-April-1989
Nationality Pakistan
Education Matric (Science), DAE (Electrical), B.Tech(Electric) UETLahore 2, MA International
Relations2013
Mobiles No +92-314-6082167 345-2029254

More Related Content

What's hot (20)

ZUBAIR BAIG
ZUBAIR BAIGZUBAIR BAIG
ZUBAIR BAIG
 
JOHN HENRY CASTILLO_CV
JOHN HENRY CASTILLO_CVJOHN HENRY CASTILLO_CV
JOHN HENRY CASTILLO_CV
 
Updated
UpdatedUpdated
Updated
 
Uzair's CV
Uzair's CVUzair's CV
Uzair's CV
 
Mustafa Iqbal Cv
Mustafa Iqbal CvMustafa Iqbal Cv
Mustafa Iqbal Cv
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
Naveen Singh New C.V
Naveen Singh New C.VNaveen Singh New C.V
Naveen Singh New C.V
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
Naveed RF Engineer
Naveed RF EngineerNaveed RF Engineer
Naveed RF Engineer
 
3G RF Optimization CV
3G RF Optimization CV3G RF Optimization CV
3G RF Optimization CV
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 

Viewers also liked

SCFT report
SCFT reportSCFT report
SCFT report
anil parmar
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
Devendra Tiwari
 
Day 1 LTE Technology Overview
Day 1 LTE Technology OverviewDay 1 LTE Technology Overview
Day 1 LTE Technology Overviewmahesh savita
 
ABOUT SCFT & CLUSTER AT
ABOUT SCFT & CLUSTER AT ABOUT SCFT & CLUSTER AT
ABOUT SCFT & CLUSTER AT
Subhash Kumar
 
219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance
ashok kumar
 
4g interview-question
4g interview-question4g interview-question
4g interview-question
Manpreet Singh
 
Oss vs drive test pdcp throughput
Oss vs drive test pdcp throughputOss vs drive test pdcp throughput
Oss vs drive test pdcp throughput
Subhash Kumar
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1mahesh savita
 
1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil
Satish Jadav
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems
Ishaque uddin
 
Ericsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSSEricsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSS
Md Shameem
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
Yogender Singh Rana
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
Jean de la Sagesse
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-ref
Abd Yehia
 

Viewers also liked (15)

SCFT report
SCFT reportSCFT report
SCFT report
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
 
Day 1 LTE Technology Overview
Day 1 LTE Technology OverviewDay 1 LTE Technology Overview
Day 1 LTE Technology Overview
 
ABOUT SCFT & CLUSTER AT
ABOUT SCFT & CLUSTER AT ABOUT SCFT & CLUSTER AT
ABOUT SCFT & CLUSTER AT
 
219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance219905365 lte-kp is-and-acceptance
219905365 lte-kp is-and-acceptance
 
4g interview-question
4g interview-question4g interview-question
4g interview-question
 
Oss vs drive test pdcp throughput
Oss vs drive test pdcp throughputOss vs drive test pdcp throughput
Oss vs drive test pdcp throughput
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems
 
Ericsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSSEricsson commond list, BSS+NSS=OSS
Ericsson commond list, BSS+NSS=OSS
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-ref
 
Umts Kpi
Umts KpiUmts Kpi
Umts Kpi
 

Similar to Syed imran Hussain (Resume)

CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_HanifNajmudin Hanif
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE usman ghani
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra singh jadon
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jibran
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
Muhammad Waqas Khan-Resume
Muhammad Waqas Khan-ResumeMuhammad Waqas Khan-Resume
Muhammad Waqas Khan-ResumeWaqas Khan
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
sunil Saini
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra singh jadon
 

Similar to Syed imran Hussain (Resume) (20)

Naqash
NaqashNaqash
Naqash
 
Faisal Aziz CV
Faisal Aziz CVFaisal Aziz CV
Faisal Aziz CV
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE Optimization
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Muhammad Waqas Khan-Resume
Muhammad Waqas Khan-ResumeMuhammad Waqas Khan-Resume
Muhammad Waqas Khan-Resume
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Ashraf Ali
Ashraf AliAshraf Ali
Ashraf Ali
 
Aleem Ashraf CV
Aleem Ashraf CV Aleem Ashraf CV
Aleem Ashraf CV
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Updated CV MNK
Updated CV MNKUpdated CV MNK
Updated CV MNK
 

Syed imran Hussain (Resume)

  • 1. SYED IMRAN HUSSAIN RF DT Engineer at Relacom Private Limited, inaqvi95@yahoo.com Imran.Hussain@relacom.com.pk PROFILE I have worked experienced in KOMKONSULT from Feb 2014 to April 2016 as RF Engineer. Now I am work in Relacom from April 2016 to continue. Experience in this field 3 years and 10 months SKILLS Tems investigation 9 to 18.2 Nemo Outdoor MapInfo 9, 11 Nemo Handy Tems pocket Google Earth Nemo Analyzer Genex Probe Microsoft Office Nemo Innvex ACCOMPLISHED Work on different project and operators. Start new project with my company known as mergco work as team lead, reporting and training my colleagues.  Mergeco (Warid , Mobilink) swap project  Mobilink Swap project  Mobilink Swap Customers Complain  Mobilink NRO Site  IOBM Ufone project (Nemo)  Bench marking in Nokia (Nemo)  Telenor swap Multan region  Zong 3G swap Lahore, Multan, Sahiwal, etc.  Zong roll out  Telenor LTE NRO  Warid LTE NRO sites  IBS installation & Designing
  • 2. PROFESSIONAL EXPEREINCE • 2G and 3G KPI monitoring using sys logs. • Identification of faults and issues during the drive test e.g. sector swaps (complete & partial). • BCCH clashes, Handover failures, Call drops, bad Quality and Rx level patches, missing Neighbors, overshoots etc. • Perform CQT (Call Quality Test) and Identify exact TRx (MAIO). • Recommend Hard and soft parameter changes to improve live network performance. • Direct co-ordination with OMC for adding missing neighbors, removing frequency Clashes and other activities needed during Drive Test. • Create log files and then import these log files at MAPINFO for the purpose of Reporting. • Recently Covered Hot Spot Coverage Areas of Multan by Performing Walk Test and Drive Test. • 2G/3G/LTE SSV DT using TEMS Investigation & Nemo Outdoor • Short/long calling test to monitor RSCP, Ec/No, RSSI, UE Tx Power, BLER. • 3G testing including cell reselections. • Handovers in 3g ( soft, softer and IRAT ) • Perform IRAT Hos from 3G to 2G. • 3G testing including data (HSPA+, HSDPA, HSUPA, R99). • Troubleshooting Pilot Pollution of cells. • 3G site audit including azimuth, Electrical and mechanical tilt. • Drive Test (Pre Drive, Post Drive, Optimization). • New Site & Cluster Optimization Benchmarking drive tests using TEMS Investigation. • Verification of planning data during the drive test. • Identification of faults and issues during the drive test e.g. sector Swap, Scrambling Codes clashes, Handover failures, Call drops, bad Quality and Ec/No patches, missing Neighbors, Mute calls and overshoots Reasons for bad Quality patches. • Analyzing drive test log files to detect eventual problems and recommend changes to fix those problems. • LTE SSVs performed. • LTE Handovers • LTE throughput analyzing. • Pre and Post Walk Test • Pre and Post walk test analysis Report • IBS DAS designing and Planning • AutoCAD Site layout • Create log files and then import these log files at MAPINFO for the purpose of Reporting.
  • 3. EDUCATION Proposed Role RF Engineer Name of Staff SyedImranhussain Date of Birth 05-April-1989 Nationality Pakistan Education Matric (Science), DAE (Electrical), B.Tech(Electric) UETLahore 2, MA International Relations2013 Mobiles No +92-314-6082167 345-2029254