SlideShare a Scribd company logo
1 of 2
Resume of Susan Hall
Pg 1 of 2
Susan Grabner Hall
7502 Dahlia Dr.
Mentor on the Lake, Ohio 44060
(440) 725-7655
Job Objective Obtain a challenging position as a Laboratory Technician where I can apply
my technical skills with a growing company to help achieve optimum
utilization of its resources and maximum profits
Education Willoughby South High School – 4 years
Bowling Green State University – 1 year
Business Administration
Employment
11/94 – Present Avery Dennison - Specialty Tape Division / Vancive Medical Technologies
3/11-Present Medical Quality Technician
 Generate supplier and customer specification files
 Audit all clean room materials for shipment
 Review converting job bags for accuracy
 Assemble and review all medical tape batch records (Release Form, Batch
Record Cover Sheet, Shop Packet, Line Clearance Form, copy of Customer
Certification Letter)
 Pull supplier certifications from database, review and approve before use
 Age testing/destructive testing on converted products
 Medical device testing
 Incoming raw material inspections
 Streamline finishing batch records
11/94 – 11/04 Process Operator
 Slitter operator /line packer
 Slitter set-up for orders, slit width accuracy check of knife bar
 Material order data entry
 Order prep: obtain materials, packaging supplies, cutting stakes for pallets
 Tow motor operator
 Rework of non-conforming material
 Operation of both stand up and sit down rewinders
 Read customer specs to ensure good product and proper packaging
 Coating Operator for I-7/I-4/I-6 Coaters
 PMA Lab Technician
 Set up silicone process to apply to material
 Set up print station for printing of material
Resume of Susan Hall
Pg 2 of 2
 MFGPro – scrap material, backflush components, FIFO materials
 Made drums of silicone for products being coated
11/04 – 3/11 CP/Industrial Quality Technician
 Green Belt Certified
 Internal audit trained
 Comprise customer cert letters
 Prepare and enter Supplier Corrective Action Reports (SCAR’s)
 Finish goods testing of materials
 Test equipment experience: MTS Machine, Minolta Color, Shear Ovens,
Infra-red Scanner, TLMI Release Tester, Silicone Asoma, Sulfur Asoma
 Assisted CP R&D with testing, data entry
 Enter customer complaints, assist in corrective action investigation
 Compile test data into customer certification letters
 Manage product retains
 Generated supplier spec certification files
 Sample prep for finished goods testing
 Evaluate customer material returns
 Manage MRB cage (quarantine cage)
 Managed Contract Review Database for CP Product
5/84 – 9/84 Fasson/Avery Dennison International – Painesville, Ohio
Machine Helper (Summer)
 Machine loading and unloading operations
 Inspect for faulty materials
 Line-pack materials to be shipped
6/85 – 1/86 Commercial Anodizing – Willoughby, Ohio
Anodizing Assistant
 Prepare parts to be anodized
 Pack parts to be shipped
Additional Skills
Microsoft Excel, Microsoft Word, Microsoft Access, MFGPro, Prod Specs,
PSS2, Power Point, MES

More Related Content

What's hot

Challenges and solutions for fluid interfaces in life science diagnostics
Challenges and solutions for fluid interfaces in life science diagnosticsChallenges and solutions for fluid interfaces in life science diagnostics
Challenges and solutions for fluid interfaces in life science diagnosticsRick Welch
 
Pilot plant scale up techniques used in pharmaceutical manufacturing
Pilot plant scale up techniques used in pharmaceutical manufacturingPilot plant scale up techniques used in pharmaceutical manufacturing
Pilot plant scale up techniques used in pharmaceutical manufacturingProf. Dr. Basavaraj Nanjwade
 
Pilot plant scale up for parentrals
Pilot plant scale up for parentralsPilot plant scale up for parentrals
Pilot plant scale up for parentralsParag Behura
 
Anthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plantAnthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plantAnthony Melvin Crasto Ph.D
 
Carol Chadwick Sutton Resume
Carol Chadwick Sutton  Resume Carol Chadwick Sutton  Resume
Carol Chadwick Sutton Resume Carol Sutton
 
Avi damari RESUME 2016
Avi damari RESUME 2016Avi damari RESUME 2016
Avi damari RESUME 2016Avi Damari
 
Quality Resume(1)
Quality Resume(1)Quality Resume(1)
Quality Resume(1)Mitch Bentz
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.VikramMadane1
 
Tiera Lopez-professionals
Tiera Lopez-professionalsTiera Lopez-professionals
Tiera Lopez-professionalstiera lopez
 

What's hot (20)

PBergin-Holbrook resume 2016
PBergin-Holbrook resume 2016PBergin-Holbrook resume 2016
PBergin-Holbrook resume 2016
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
Challenges and solutions for fluid interfaces in life science diagnostics
Challenges and solutions for fluid interfaces in life science diagnosticsChallenges and solutions for fluid interfaces in life science diagnostics
Challenges and solutions for fluid interfaces in life science diagnostics
 
Pilot plant scale up techniques used in pharmaceutical manufacturing
Pilot plant scale up techniques used in pharmaceutical manufacturingPilot plant scale up techniques used in pharmaceutical manufacturing
Pilot plant scale up techniques used in pharmaceutical manufacturing
 
Pilot plant design for tablets and capsules
Pilot plant design for tablets and capsulesPilot plant design for tablets and capsules
Pilot plant design for tablets and capsules
 
Pilot plant scale up for parentrals
Pilot plant scale up for parentralsPilot plant scale up for parentrals
Pilot plant scale up for parentrals
 
Anthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plantAnthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plant
 
curriculum1
curriculum1curriculum1
curriculum1
 
J Perrin2 (1)
J Perrin2 (1)J Perrin2 (1)
J Perrin2 (1)
 
Carol Chadwick Sutton Resume
Carol Chadwick Sutton  Resume Carol Chadwick Sutton  Resume
Carol Chadwick Sutton Resume
 
0 2008 Ct Capabilities
0 2008 Ct Capabilities0 2008 Ct Capabilities
0 2008 Ct Capabilities
 
Resume_17.02.12[1 Flxi rtf
Resume_17.02.12[1 Flxi rtfResume_17.02.12[1 Flxi rtf
Resume_17.02.12[1 Flxi rtf
 
Avi damari RESUME 2016
Avi damari RESUME 2016Avi damari RESUME 2016
Avi damari RESUME 2016
 
Quality Resume(1)
Quality Resume(1)Quality Resume(1)
Quality Resume(1)
 
Syam scale up
Syam scale upSyam scale up
Syam scale up
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.
 
SITE MASTER FILE
SITE MASTER FILESITE MASTER FILE
SITE MASTER FILE
 
cv 1
cv 1cv 1
cv 1
 
Resume
ResumeResume
Resume
 
Tiera Lopez-professionals
Tiera Lopez-professionalsTiera Lopez-professionals
Tiera Lopez-professionals
 

Viewers also liked (19)

LG_Resume_SEP2016
LG_Resume_SEP2016LG_Resume_SEP2016
LG_Resume_SEP2016
 
Kari Barefoot Resume 116
Kari Barefoot Resume 116Kari Barefoot Resume 116
Kari Barefoot Resume 116
 
Amit_Patil_Resume
Amit_Patil_ResumeAmit_Patil_Resume
Amit_Patil_Resume
 
Mariam Lucas Resume
Mariam Lucas ResumeMariam Lucas Resume
Mariam Lucas Resume
 
resumeRMD
resumeRMDresumeRMD
resumeRMD
 
Resume
ResumeResume
Resume
 
Aisha Bennett Resume
Aisha Bennett ResumeAisha Bennett Resume
Aisha Bennett Resume
 
Anthony M Seuferer - Resume
Anthony M Seuferer - ResumeAnthony M Seuferer - Resume
Anthony M Seuferer - Resume
 
Steve Vidal Resume
Steve Vidal ResumeSteve Vidal Resume
Steve Vidal Resume
 
WWC resume
WWC resumeWWC resume
WWC resume
 
Lisa LaGrasta Resume 2
Lisa LaGrasta Resume 2Lisa LaGrasta Resume 2
Lisa LaGrasta Resume 2
 
S Butler Resume G 2015
S Butler Resume G 2015S Butler Resume G 2015
S Butler Resume G 2015
 
Anita DeBenedetti Resume (1)
Anita DeBenedetti Resume (1)Anita DeBenedetti Resume (1)
Anita DeBenedetti Resume (1)
 
Corinne R. Paiva_Resume (1)
Corinne R. Paiva_Resume (1)Corinne R. Paiva_Resume (1)
Corinne R. Paiva_Resume (1)
 
TREBESH RESUME
TREBESH RESUMETREBESH RESUME
TREBESH RESUME
 
staff_performance_formb
staff_performance_formbstaff_performance_formb
staff_performance_formb
 
MK Resume
MK ResumeMK Resume
MK Resume
 
Resume of Patricia A Taylor -2017[275]
Resume of Patricia A Taylor -2017[275]Resume of Patricia A Taylor -2017[275]
Resume of Patricia A Taylor -2017[275]
 
Venita resume 7.2015
Venita resume 7.2015Venita resume 7.2015
Venita resume 7.2015
 

Similar to Sue (Resume) (2)

Tyler Garlock Resume
Tyler Garlock ResumeTyler Garlock Resume
Tyler Garlock ResumeTyler Garlock
 
Jodi's Resume 2016
Jodi's Resume 2016Jodi's Resume 2016
Jodi's Resume 2016Jodi Orgeron
 
Resume Dean Johnson
Resume Dean JohnsonResume Dean Johnson
Resume Dean JohnsonDean Johnson
 
FABIAN DOUGLAS+Resume1215 (1)
FABIAN DOUGLAS+Resume1215 (1)FABIAN DOUGLAS+Resume1215 (1)
FABIAN DOUGLAS+Resume1215 (1)Fabian Douglas
 
Tammy Flory 2017
Tammy Flory 2017Tammy Flory 2017
Tammy Flory 2017Tammy Flory
 
Pilot plant scaleuptechnique
Pilot plant scaleuptechniquePilot plant scaleuptechnique
Pilot plant scaleuptechniquejiten patel
 
Pilot scaleuptechnique
Pilot scaleuptechniquePilot scaleuptechnique
Pilot scaleuptechniquejiten patel
 
Pilot scaleuptechnique
Pilot scaleuptechniquePilot scaleuptechnique
Pilot scaleuptechniquejiten patel
 
Renee martin resume 2016
Renee martin resume 2016Renee martin resume 2016
Renee martin resume 2016Renee Martin
 
Donald_Sharp2.9.1.1
Donald_Sharp2.9.1.1Donald_Sharp2.9.1.1
Donald_Sharp2.9.1.1Donald Sharp
 
Manufacturing_AssociateWarehouse-2
Manufacturing_AssociateWarehouse-2Manufacturing_AssociateWarehouse-2
Manufacturing_AssociateWarehouse-2Trisha Smith
 
3-4-15 David Resume
3-4-15 David Resume3-4-15 David Resume
3-4-15 David ResumeDavid Rogers
 
Abdurab numan resume2
Abdurab numan resume2Abdurab numan resume2
Abdurab numan resume2Abdurab Numan
 

Similar to Sue (Resume) (2) (20)

Timberly 2015
Timberly 2015Timberly 2015
Timberly 2015
 
Tyler Garlock Resume
Tyler Garlock ResumeTyler Garlock Resume
Tyler Garlock Resume
 
Jodi's Resume 2016
Jodi's Resume 2016Jodi's Resume 2016
Jodi's Resume 2016
 
Resume Dean Johnson
Resume Dean JohnsonResume Dean Johnson
Resume Dean Johnson
 
Karen 0710 resume
Karen 0710 resumeKaren 0710 resume
Karen 0710 resume
 
FABIAN DOUGLAS+Resume1215 (1)
FABIAN DOUGLAS+Resume1215 (1)FABIAN DOUGLAS+Resume1215 (1)
FABIAN DOUGLAS+Resume1215 (1)
 
STEVEN VANSKIVER resume
STEVEN VANSKIVER resumeSTEVEN VANSKIVER resume
STEVEN VANSKIVER resume
 
Mary Ann Zapata CV
Mary Ann Zapata CVMary Ann Zapata CV
Mary Ann Zapata CV
 
Tammy Flory 2017
Tammy Flory 2017Tammy Flory 2017
Tammy Flory 2017
 
Pilot plant scaleuptechnique
Pilot plant scaleuptechniquePilot plant scaleuptechnique
Pilot plant scaleuptechnique
 
Pilot scaleuptechnique
Pilot scaleuptechniquePilot scaleuptechnique
Pilot scaleuptechnique
 
Pilot scaleuptechnique
Pilot scaleuptechniquePilot scaleuptechnique
Pilot scaleuptechnique
 
Renee martin resume 2016
Renee martin resume 2016Renee martin resume 2016
Renee martin resume 2016
 
Donald_Sharp2.9.1.1
Donald_Sharp2.9.1.1Donald_Sharp2.9.1.1
Donald_Sharp2.9.1.1
 
Manufacturing_AssociateWarehouse-2
Manufacturing_AssociateWarehouse-2Manufacturing_AssociateWarehouse-2
Manufacturing_AssociateWarehouse-2
 
Nicholas Abbruzzese Resume
Nicholas Abbruzzese ResumeNicholas Abbruzzese Resume
Nicholas Abbruzzese Resume
 
R.Pillado_Resume
R.Pillado_ResumeR.Pillado_Resume
R.Pillado_Resume
 
3-4-15 David Resume
3-4-15 David Resume3-4-15 David Resume
3-4-15 David Resume
 
Abdurab numan resume2
Abdurab numan resume2Abdurab numan resume2
Abdurab numan resume2
 
Lawrence R
Lawrence RLawrence R
Lawrence R
 

Sue (Resume) (2)

  • 1. Resume of Susan Hall Pg 1 of 2 Susan Grabner Hall 7502 Dahlia Dr. Mentor on the Lake, Ohio 44060 (440) 725-7655 Job Objective Obtain a challenging position as a Laboratory Technician where I can apply my technical skills with a growing company to help achieve optimum utilization of its resources and maximum profits Education Willoughby South High School – 4 years Bowling Green State University – 1 year Business Administration Employment 11/94 – Present Avery Dennison - Specialty Tape Division / Vancive Medical Technologies 3/11-Present Medical Quality Technician  Generate supplier and customer specification files  Audit all clean room materials for shipment  Review converting job bags for accuracy  Assemble and review all medical tape batch records (Release Form, Batch Record Cover Sheet, Shop Packet, Line Clearance Form, copy of Customer Certification Letter)  Pull supplier certifications from database, review and approve before use  Age testing/destructive testing on converted products  Medical device testing  Incoming raw material inspections  Streamline finishing batch records 11/94 – 11/04 Process Operator  Slitter operator /line packer  Slitter set-up for orders, slit width accuracy check of knife bar  Material order data entry  Order prep: obtain materials, packaging supplies, cutting stakes for pallets  Tow motor operator  Rework of non-conforming material  Operation of both stand up and sit down rewinders  Read customer specs to ensure good product and proper packaging  Coating Operator for I-7/I-4/I-6 Coaters  PMA Lab Technician  Set up silicone process to apply to material  Set up print station for printing of material
  • 2. Resume of Susan Hall Pg 2 of 2  MFGPro – scrap material, backflush components, FIFO materials  Made drums of silicone for products being coated 11/04 – 3/11 CP/Industrial Quality Technician  Green Belt Certified  Internal audit trained  Comprise customer cert letters  Prepare and enter Supplier Corrective Action Reports (SCAR’s)  Finish goods testing of materials  Test equipment experience: MTS Machine, Minolta Color, Shear Ovens, Infra-red Scanner, TLMI Release Tester, Silicone Asoma, Sulfur Asoma  Assisted CP R&D with testing, data entry  Enter customer complaints, assist in corrective action investigation  Compile test data into customer certification letters  Manage product retains  Generated supplier spec certification files  Sample prep for finished goods testing  Evaluate customer material returns  Manage MRB cage (quarantine cage)  Managed Contract Review Database for CP Product 5/84 – 9/84 Fasson/Avery Dennison International – Painesville, Ohio Machine Helper (Summer)  Machine loading and unloading operations  Inspect for faulty materials  Line-pack materials to be shipped 6/85 – 1/86 Commercial Anodizing – Willoughby, Ohio Anodizing Assistant  Prepare parts to be anodized  Pack parts to be shipped Additional Skills Microsoft Excel, Microsoft Word, Microsoft Access, MFGPro, Prod Specs, PSS2, Power Point, MES