ALSDE SES Application
                        Technical Assistance
                         February 25, 2011
    Please use these instructions to view the ALSDE Federal Programs webinar titled:
             “Supplemental Educational Services RFA Technical Assistance Session.”

To access the recording, follow these steps:
1)    Go to the link https://alsde.webex.com.
2)    Click on the Training Center tab.
3)    On the left side of the page, click “Recorded Sessions.”
4)    Select “SES RFA Technical Assistance Session.”
5)    You may view or download the session.

Or copy and paste this link into your browser:
https://alsde.webex.com/alsde/lsr.php?AT=pb&SP=TC&rID=48486782&act=pb&rKey=89fca88745c8828d


      Supplemental Educational Services RFA Technical Assistance Session-20110225
      1600-1
      February 25, 2011, 11:07 am Central Time
      53 mins
Keys To A Successful SES Provider Application
     Alabama Department of Education
                  2011-2012
Supplemental Educational
   Services: What it is..and isn’t!
       Alabama State Department of Education
   SES Provider Technical Assistance…Feb. 25, 2011
…Provides extra academic assistance for low-income
  students who are attending Title I schools that
  have failed to make state goals (AYP) for three or
  more years
…Allows students opportunities to increase or
  strengthen academic performance in the areas of
  reading, language arts, and mathematics
               …Not “homework” help…
NCLB Requirements

   Each state must       Definition is used
    establish a            to measure the
    definition of          academic
    adequate yearly        achievement of
    progress (AYP)         schools and
    for each school.       districts over
                           time.
NCLB Requirements

   Alabama determines Adequate Yearly
    Progress (AYP) by administering
    achievement tests, based on state
    academic content standards, to
    students Grades 3-8 and the Alabama
    High School Graduation Exam in high
    school.
Components of AYP
        Annual Goals for Reading and
                Mathematics
Percentage of students scoring in a proficient
range or higher
         Other Academic Indicators
Attendance
Graduation Rate
              Participation Rate
Percent of students actually taking assessments
Sample Timeline For School
        Improvement (SI)
First Yr   2007-08 Did not make
                   AYP

Second     2008-09 Did not make
Yr                 AYP

SI         2009-   1st year of    Must offer Public
Year 1     2010    Improvement    School Choice

SI         2010-   2nd year of    Must offer Public
Year 2     2011    Improvement    School Choice and
                                  Supplemental
                                  Educational Services
Title I Schools in
School Improvement:
School Improvement         School Improvement
Year 1                     Year 2
 School Choice             School Choice and
  Students will be given     SES
  the option to transfer     Added to School
  to a higher performing     Choice is eligibility to
  public school within       receive Supplemental
  the district.              Educational Services
                             (SES).
Accountability

 Work toward the goal of 100 percent
  proficiency for all students by 2013-
  14.
 Provide measurable objectives for all
  children and for specific groups.
Title I Schools That Do
            Not Make AYP…
   After 2 consecutive years
     Receive School Improvement
      status; Construct a plan for
      improvement to strengthen instruction;
      Address the causes of low achievement
      and professional learning opportunities.
     School Choice must be offered to all
      students (unless the school district does
      not have another “choice” school).
Who Is Eligible For SES?

   Children from low-income families
    (based on free/reduced meal status)
    attending Title I schools in need of
    improvement.
   There are extenuating circumstances
    for a district offering SES to Title I
    schools in Year 1.
Responsibilities
   ALSDE – identifies the schools in which SES will be
    offered and which providers will be approved to
    deliver SES.
   School Districts – provide parents with easy-to-
    understand information concerning SES.
   Providers – communicate with parents and
    districts openly and periodically.
   Parents – choose a preferred SES provider from
    state list and inform the school district of their
    choice.
Establishing Priorities
In rare circumstances in which
the number of students
requesting services exceeds the
amount the school district can
fund, systems must give priority
to students who are the lowest
achieving low income.
Available services should
          include…
 Tutoring
 Accelerating  support for
 academic intervention.
 Note: All instruction must take
 place outside the regular school
 day.
Computer-Based Technology

   Some areas may have a limited
    number of providers, so organizations
    that provide distance learning
    technology should be considered.
   Providers that utilize distance learning
    do not have different criteria for
    eligibility.
Provider Profile:               May be….


 School entity            Non-profit   or
  (public or private)      for profit
                           organization
 Institution     of
  higher
                           Faith-based
  learning      (public
  or private)
                           organization
THE
APPLICATION
2011-2012 SES Application

   The SES Application for the 2011-
    2012 school year can be found on the
    homepage of the ALSDE’s website at
    www.alsde.edu. Look below “Hot
    Topics” and click on “Click Here for
    Additional Hot Topics.” Scroll down to
    find the application that was released
    on February 4th.
Application Process
•   Applications are submitted
    once per year.
•   Applications are read by a
    committee of outside
    reviewers who score them
    using an evaluation rubric.
Application Process, cont.

   New providers are added to the
    provider list that is posted on
    the Alabama State Department
    of Education website,
    www.alsde.edu.
   School districts inform parents
    of the opportunity for SES.
Part I: Basic Program
             Information
   Description of the program
     Location of delivery
     Length of tutoring sessions
     Grades served
     Special groups, if applicable
     Transportation arrangements, if
      applicable
     Complete all 23 items of information
Item 23:LEAs and Number
       of Students to Serve
   Select the LEAs/schools that you wish to serve.
    Place an “X” in the “To Serve” column, then write
    the minimum number of students that you will
    require to sign up for your program to conduct a
    class.
   Note that the schools on this chart are schools
    that received SES during the current school year.
    Any new schools that might be added for the
    2011-2012 school year will not be announced until
    the first week in August. Approved providers will
    be allowed to update their lists at that time.
Important Note

 On item #23, you have the option to
  select that you are willing to serve
  statewide (all schools that qualify for
  SES).
 Caution: If you select this box (which
  is the first on the list), you must be
  prepared to serve all schools, both
  rural and urban, but failure to follow-
  up with all eligible systems is not a
  good thing.
Staff
 Indicate who will be teaching.
 Give details on tutor qualifications.
 Describe what training and on-going
  support tutors will receive.
 Outline how the SES provider intends
  to provide substitutes or notify the
  LEA when students should not remain
  after school for tutoring.
Part II: Program Overview

   Program Overview is a summary of
    your program in a format that will be
    used in publications given to parents,
    schools, and districts. Be sure to
    include the seven required items.
Part III: Program
Narratives (Sections A-K)
 Complete all sections and adhere to
  page limits that are noted for sections
  A-K.
 Address all elements in each section.
  Elements not addressed will cause the
  application to be eliminated from the
  approval process.
Part III: Section B

 If you propose to serve K-8 in
  reading, be sure to include Appendix
  A.
 If you propose to serve K-8 in math,
  be sure to include Appendix B.
 If you propose to serve grades 9-12,
  be sure to include Appendix C.
Program Content
 Program must be consistent with
  instruction programs of the school
  district and Alabama academic
  content standards.
 Resources may be used that have
  been developed for other venues but
  lessons are based solely on the AL
  State Courses of Study.
Most Recent
        AL Courses of Study

Mathematics
English/Language Arts COS
 1. Go to www.alsde.edu.
 2. Click on “Sections.”
 3. Click on “Classroom
     Improvement.”
 4. Click on “Publications.”
Program Effectiveness
 Provide evidence that what your
  company has done or plans to do will
  be effective.
 Strategies that have worked or have
  a high probability of working.
 Provide data that demonstrates
  students have achieved using your
  program.
Part III: Section D

   Appendix D should include samples
    of all instruments used to evaluate,
    monitor, and track student progress
    throughout the duration of the
    program.
Part III: Section E

   BE SPECIFIC! Keep in mind that
    communication should be on-going,
    but progress reports should be given
    at least monthly.

   Outline the step-by-step process that
    will be followed by your tutors and
    staff.
Part III: Section F

   Communication with parents is
    required at least monthly through
    progress reports.

   Be sure to include samples of the
    progress reports used by your
    company in Appendix E.
Part III: Section G
   Submit the resumes’ of those who will
    serve as the representatives and/or
    coordinators of your company in Alabama
    in Appendix F.

   If personnel for Alabama have not yet been
    hired, include resumes’ for those people
    with whom we would be working until
    Alabama “reps” are hired.
Part III: Section H
      Financial Soundness
 In the past, most applications that did
  not make it through to the reading
  process failed to include appropriate
  information for this section.
 Include ALL information requested for
  each of the items in #1-#6.
Part III: Section H, Item #6

   All companies MUST be able to prove that
    they are financially sound. The ALSDE will
    accept only one of two documents and they
    are: 1) a copy of an unqualified opinion for
    the company’s annual financial statement
    audit that has been completed within the
    last two years and certified by a CPA or
    audit firm.
Part III: Section H, #6
             (continued)
   Or the company may submit an original
    letter that qualifies as “an irrevocable
    financial letter of credit” in the amount of
    at least $75,000 to document financial
    viability. This letter must be on original
    clearly visible letterhead from the banking
    or financial institution with the appropriate
    financial institution officer’s signature in
    blue ink with contact information.
Part III, Section H, #6
             (continued)
   The submission of any other types of
    financial documents for this section will not
    be accepted.
   NOTE: Bank officials will be contacted by
    phone to verify letters. Letters found to be
    fraudulent or that are signed by
    unauthorized personnel will cause the
    application to automatically be disqualified.
Part III, Section K
    Advertising and Incentives
 The TOTAL amount of incentives for
  each child may not exceed $50.00.
 Describe in detail how you plan to
  advertise your services.
 Describe incentives offered to
  students, as well as tutors.
Required SES Provider
            Summary

   Complete the two pages for this
    section for dissemination to the public
    regarding your services.

   Do not leave any box blank.
Assurances Form
   All applications must have a signed
    Assurances form in blue ink.

   Remember that “Assurances” are
    signed promises that companies must
    adhere to at all times.
Contact Information

   If after reviewing this information you
    still have questions regarding the
    application, please contact:
            Sherry Coleman
       ALSDE Education Specialist
    Supplemental Educational Services
          scoleman@alsde.edu
IT’S Not About Money…it’s
     ABOUT CHILDREN

Successful SES application

  • 1.
    ALSDE SES Application Technical Assistance February 25, 2011 Please use these instructions to view the ALSDE Federal Programs webinar titled: “Supplemental Educational Services RFA Technical Assistance Session.” To access the recording, follow these steps: 1) Go to the link https://alsde.webex.com. 2) Click on the Training Center tab. 3) On the left side of the page, click “Recorded Sessions.” 4) Select “SES RFA Technical Assistance Session.” 5) You may view or download the session. Or copy and paste this link into your browser: https://alsde.webex.com/alsde/lsr.php?AT=pb&SP=TC&rID=48486782&act=pb&rKey=89fca88745c8828d Supplemental Educational Services RFA Technical Assistance Session-20110225 1600-1 February 25, 2011, 11:07 am Central Time 53 mins
  • 2.
    Keys To ASuccessful SES Provider Application Alabama Department of Education 2011-2012
  • 3.
    Supplemental Educational Services: What it is..and isn’t! Alabama State Department of Education SES Provider Technical Assistance…Feb. 25, 2011 …Provides extra academic assistance for low-income students who are attending Title I schools that have failed to make state goals (AYP) for three or more years …Allows students opportunities to increase or strengthen academic performance in the areas of reading, language arts, and mathematics …Not “homework” help…
  • 4.
    NCLB Requirements  Each state must  Definition is used establish a to measure the definition of academic adequate yearly achievement of progress (AYP) schools and for each school. districts over time.
  • 5.
    NCLB Requirements  Alabama determines Adequate Yearly Progress (AYP) by administering achievement tests, based on state academic content standards, to students Grades 3-8 and the Alabama High School Graduation Exam in high school.
  • 6.
    Components of AYP Annual Goals for Reading and Mathematics Percentage of students scoring in a proficient range or higher Other Academic Indicators Attendance Graduation Rate Participation Rate Percent of students actually taking assessments
  • 7.
    Sample Timeline ForSchool Improvement (SI) First Yr 2007-08 Did not make AYP Second 2008-09 Did not make Yr AYP SI 2009- 1st year of Must offer Public Year 1 2010 Improvement School Choice SI 2010- 2nd year of Must offer Public Year 2 2011 Improvement School Choice and Supplemental Educational Services
  • 8.
    Title I Schoolsin School Improvement: School Improvement School Improvement Year 1 Year 2  School Choice  School Choice and Students will be given SES the option to transfer Added to School to a higher performing Choice is eligibility to public school within receive Supplemental the district. Educational Services (SES).
  • 9.
    Accountability  Work towardthe goal of 100 percent proficiency for all students by 2013- 14.  Provide measurable objectives for all children and for specific groups.
  • 10.
    Title I SchoolsThat Do Not Make AYP…  After 2 consecutive years  Receive School Improvement status; Construct a plan for improvement to strengthen instruction; Address the causes of low achievement and professional learning opportunities.  School Choice must be offered to all students (unless the school district does not have another “choice” school).
  • 11.
    Who Is EligibleFor SES?  Children from low-income families (based on free/reduced meal status) attending Title I schools in need of improvement.  There are extenuating circumstances for a district offering SES to Title I schools in Year 1.
  • 12.
    Responsibilities  ALSDE – identifies the schools in which SES will be offered and which providers will be approved to deliver SES.  School Districts – provide parents with easy-to- understand information concerning SES.  Providers – communicate with parents and districts openly and periodically.  Parents – choose a preferred SES provider from state list and inform the school district of their choice.
  • 13.
    Establishing Priorities In rarecircumstances in which the number of students requesting services exceeds the amount the school district can fund, systems must give priority to students who are the lowest achieving low income.
  • 14.
    Available services should include…  Tutoring  Accelerating support for academic intervention. Note: All instruction must take place outside the regular school day.
  • 15.
    Computer-Based Technology  Some areas may have a limited number of providers, so organizations that provide distance learning technology should be considered.  Providers that utilize distance learning do not have different criteria for eligibility.
  • 16.
    Provider Profile: May be….  School entity  Non-profit or (public or private) for profit organization  Institution of higher  Faith-based learning (public or private) organization
  • 17.
  • 18.
    2011-2012 SES Application  The SES Application for the 2011- 2012 school year can be found on the homepage of the ALSDE’s website at www.alsde.edu. Look below “Hot Topics” and click on “Click Here for Additional Hot Topics.” Scroll down to find the application that was released on February 4th.
  • 19.
    Application Process • Applications are submitted once per year. • Applications are read by a committee of outside reviewers who score them using an evaluation rubric.
  • 20.
    Application Process, cont.  New providers are added to the provider list that is posted on the Alabama State Department of Education website, www.alsde.edu.  School districts inform parents of the opportunity for SES.
  • 21.
    Part I: BasicProgram Information  Description of the program  Location of delivery  Length of tutoring sessions  Grades served  Special groups, if applicable  Transportation arrangements, if applicable  Complete all 23 items of information
  • 22.
    Item 23:LEAs andNumber of Students to Serve  Select the LEAs/schools that you wish to serve. Place an “X” in the “To Serve” column, then write the minimum number of students that you will require to sign up for your program to conduct a class.  Note that the schools on this chart are schools that received SES during the current school year. Any new schools that might be added for the 2011-2012 school year will not be announced until the first week in August. Approved providers will be allowed to update their lists at that time.
  • 23.
    Important Note  Onitem #23, you have the option to select that you are willing to serve statewide (all schools that qualify for SES).  Caution: If you select this box (which is the first on the list), you must be prepared to serve all schools, both rural and urban, but failure to follow- up with all eligible systems is not a good thing.
  • 24.
    Staff  Indicate whowill be teaching.  Give details on tutor qualifications.  Describe what training and on-going support tutors will receive.  Outline how the SES provider intends to provide substitutes or notify the LEA when students should not remain after school for tutoring.
  • 25.
    Part II: ProgramOverview  Program Overview is a summary of your program in a format that will be used in publications given to parents, schools, and districts. Be sure to include the seven required items.
  • 26.
    Part III: Program Narratives(Sections A-K)  Complete all sections and adhere to page limits that are noted for sections A-K.  Address all elements in each section. Elements not addressed will cause the application to be eliminated from the approval process.
  • 27.
    Part III: SectionB  If you propose to serve K-8 in reading, be sure to include Appendix A.  If you propose to serve K-8 in math, be sure to include Appendix B.  If you propose to serve grades 9-12, be sure to include Appendix C.
  • 28.
    Program Content  Programmust be consistent with instruction programs of the school district and Alabama academic content standards.  Resources may be used that have been developed for other venues but lessons are based solely on the AL State Courses of Study.
  • 29.
    Most Recent AL Courses of Study Mathematics English/Language Arts COS 1. Go to www.alsde.edu. 2. Click on “Sections.” 3. Click on “Classroom Improvement.” 4. Click on “Publications.”
  • 30.
    Program Effectiveness  Provideevidence that what your company has done or plans to do will be effective.  Strategies that have worked or have a high probability of working.  Provide data that demonstrates students have achieved using your program.
  • 31.
    Part III: SectionD  Appendix D should include samples of all instruments used to evaluate, monitor, and track student progress throughout the duration of the program.
  • 32.
    Part III: SectionE  BE SPECIFIC! Keep in mind that communication should be on-going, but progress reports should be given at least monthly.  Outline the step-by-step process that will be followed by your tutors and staff.
  • 33.
    Part III: SectionF  Communication with parents is required at least monthly through progress reports.  Be sure to include samples of the progress reports used by your company in Appendix E.
  • 34.
    Part III: SectionG  Submit the resumes’ of those who will serve as the representatives and/or coordinators of your company in Alabama in Appendix F.  If personnel for Alabama have not yet been hired, include resumes’ for those people with whom we would be working until Alabama “reps” are hired.
  • 35.
    Part III: SectionH Financial Soundness  In the past, most applications that did not make it through to the reading process failed to include appropriate information for this section.  Include ALL information requested for each of the items in #1-#6.
  • 36.
    Part III: SectionH, Item #6  All companies MUST be able to prove that they are financially sound. The ALSDE will accept only one of two documents and they are: 1) a copy of an unqualified opinion for the company’s annual financial statement audit that has been completed within the last two years and certified by a CPA or audit firm.
  • 37.
    Part III: SectionH, #6 (continued)  Or the company may submit an original letter that qualifies as “an irrevocable financial letter of credit” in the amount of at least $75,000 to document financial viability. This letter must be on original clearly visible letterhead from the banking or financial institution with the appropriate financial institution officer’s signature in blue ink with contact information.
  • 38.
    Part III, SectionH, #6 (continued)  The submission of any other types of financial documents for this section will not be accepted.  NOTE: Bank officials will be contacted by phone to verify letters. Letters found to be fraudulent or that are signed by unauthorized personnel will cause the application to automatically be disqualified.
  • 39.
    Part III, SectionK Advertising and Incentives  The TOTAL amount of incentives for each child may not exceed $50.00.  Describe in detail how you plan to advertise your services.  Describe incentives offered to students, as well as tutors.
  • 40.
    Required SES Provider Summary  Complete the two pages for this section for dissemination to the public regarding your services.  Do not leave any box blank.
  • 41.
    Assurances Form  All applications must have a signed Assurances form in blue ink.  Remember that “Assurances” are signed promises that companies must adhere to at all times.
  • 42.
    Contact Information  If after reviewing this information you still have questions regarding the application, please contact: Sherry Coleman ALSDE Education Specialist Supplemental Educational Services scoleman@alsde.edu
  • 43.
    IT’S Not AboutMoney…it’s ABOUT CHILDREN