Sulphuric Acid PlantConverter Replacement Projects - Chemetics - COBRAS 2015
•
Download as PPTX, PDF
•
4 likes
•
3,810 views
COBRAS
Follow
Presentation - COBRAS 2015
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 73
Download now
Recommended
04 petrochemical precursor ethylene and propylene
04 petrochemical precursor ethylene and propylene
Naveen Choudhary
MerOx
MerOx
Fahad Khan(tomeetfahad@gmail.com)
Amine gas treating
Amine gas treating
simachem
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Student
Ring formation in kilns
Ring formation in kilns
pradeepdeepi
Petroleum and Crude oil quality
Petroleum and Crude oil quality
Khawar Nehal khawar.nehal@atrc.net.pk
Ammonia plant fundamentals
Ammonia plant fundamentals
Prem Baboo
G14 butyl rubber
G14 butyl rubber
Norasheila Mohd Saad
Recommended
04 petrochemical precursor ethylene and propylene
04 petrochemical precursor ethylene and propylene
Naveen Choudhary
MerOx
MerOx
Fahad Khan(tomeetfahad@gmail.com)
Amine gas treating
Amine gas treating
simachem
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Student
Ring formation in kilns
Ring formation in kilns
pradeepdeepi
Petroleum and Crude oil quality
Petroleum and Crude oil quality
Khawar Nehal khawar.nehal@atrc.net.pk
Ammonia plant fundamentals
Ammonia plant fundamentals
Prem Baboo
G14 butyl rubber
G14 butyl rubber
Norasheila Mohd Saad
Co2 removal through solvent and membrane
Co2 removal through solvent and membrane
Rashesh Shah
Burning and cooling
Burning and cooling
irrraju1976
Treatment of crude oils
Treatment of crude oils
Karnav Rana
Cement plant operations handbook 7th
Cement plant operations handbook 7th
Vu Jacson
Microsoft power point dip tube failure
Microsoft power point dip tube failure
pradeepdeepi
Constant Volume Batch Reactor
Constant Volume Batch Reactor
iMentor Education
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
SAJJAD KHUDHUR ABBAS
Burner bible
Burner bible
simmsos
Theory and Operation of Methanation Catalyst
Theory and Operation of Methanation Catalyst
Gerard B. Hawkins
CATALYTIC REFORMING
CATALYTIC REFORMING
translateds
14 phenolic resins 2
14 phenolic resins 2
Naveen Choudhary
Fundamentals of sour water stripping
Fundamentals of sour water stripping
Abhinav Gupta
111658903 kiln-burning-systems
111658903 kiln-burning-systems
Ingrid McKenzie
Amines
Amines
Gerard B. Hawkins
Methanol Plant Design
Methanol Plant Design
Maan M
Steam Reforming - Practical Operations
Steam Reforming - Practical Operations
Gerard B. Hawkins
Normal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen Plants
Gerard B. Hawkins
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
Gerard B. Hawkins
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Gerard B. Hawkins
11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents
Mico Siahaan
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
COBRAS
The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015
COBRAS
More Related Content
What's hot
Co2 removal through solvent and membrane
Co2 removal through solvent and membrane
Rashesh Shah
Burning and cooling
Burning and cooling
irrraju1976
Treatment of crude oils
Treatment of crude oils
Karnav Rana
Cement plant operations handbook 7th
Cement plant operations handbook 7th
Vu Jacson
Microsoft power point dip tube failure
Microsoft power point dip tube failure
pradeepdeepi
Constant Volume Batch Reactor
Constant Volume Batch Reactor
iMentor Education
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
SAJJAD KHUDHUR ABBAS
Burner bible
Burner bible
simmsos
Theory and Operation of Methanation Catalyst
Theory and Operation of Methanation Catalyst
Gerard B. Hawkins
CATALYTIC REFORMING
CATALYTIC REFORMING
translateds
14 phenolic resins 2
14 phenolic resins 2
Naveen Choudhary
Fundamentals of sour water stripping
Fundamentals of sour water stripping
Abhinav Gupta
111658903 kiln-burning-systems
111658903 kiln-burning-systems
Ingrid McKenzie
Amines
Amines
Gerard B. Hawkins
Methanol Plant Design
Methanol Plant Design
Maan M
Steam Reforming - Practical Operations
Steam Reforming - Practical Operations
Gerard B. Hawkins
Normal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen Plants
Gerard B. Hawkins
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
Gerard B. Hawkins
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Gerard B. Hawkins
11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents
Mico Siahaan
What's hot
(20)
Co2 removal through solvent and membrane
Co2 removal through solvent and membrane
Burning and cooling
Burning and cooling
Treatment of crude oils
Treatment of crude oils
Cement plant operations handbook 7th
Cement plant operations handbook 7th
Microsoft power point dip tube failure
Microsoft power point dip tube failure
Constant Volume Batch Reactor
Constant Volume Batch Reactor
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Burner bible
Burner bible
Theory and Operation of Methanation Catalyst
Theory and Operation of Methanation Catalyst
CATALYTIC REFORMING
CATALYTIC REFORMING
14 phenolic resins 2
14 phenolic resins 2
Fundamentals of sour water stripping
Fundamentals of sour water stripping
111658903 kiln-burning-systems
111658903 kiln-burning-systems
Amines
Amines
Methanol Plant Design
Methanol Plant Design
Steam Reforming - Practical Operations
Steam Reforming - Practical Operations
Normal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen Plants
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents
Viewers also liked
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
COBRAS
The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015
COBRAS
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
COBRAS
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
COBRAS
Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015
COBRAS
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
COBRAS
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
COBRAS
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
COBRAS
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
COBRAS
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
COBRAS
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
COBRAS
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
COBRAS
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
COBRAS
Mercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - Galvani
COBRAS
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
COBRAS
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
COBRAS
Sulphuric acid plant case solution
Sulphuric acid plant case solution
Chaku
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Sergio Joao
King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4
Drishti Bhalla
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
SlideShare
Viewers also liked
(20)
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
Mercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - Galvani
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Sulphuric acid plant case solution
Sulphuric acid plant case solution
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
Similar to Sulphuric Acid PlantConverter Replacement Projects - Chemetics - COBRAS 2015
Lifting Solution For Compressor House
Lifting Solution For Compressor House
Samuel Farley
projects
projects
Man Singh
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
Antonio Biasiolo
Lyes boudiaf
Lyes boudiaf
Lyes Boudiaf
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
DOE Office of River Protection
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Paul Warrington
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
Thane Heins Regenerative Acceleration Generator Technology
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
John Glenning
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
Global CCS Institute
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
Daniel Donatelli
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Process Ecology Inc
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_Council
John Glenning
Gana Khaidav -May-2015
Gana Khaidav -May-2015
Gana Khaidav
khalid mowafy CV
khalid mowafy CV
khalid elmowafy
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomson
Ken Thomson
Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21
Sentient Science
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
Enercare Inc.
Portable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny Craft
IndiaMART InterMESH Limited
cv_overview 2016
cv_overview 2016
Damon Hughes
Similar to Sulphuric Acid PlantConverter Replacement Projects - Chemetics - COBRAS 2015
(20)
Lifting Solution For Compressor House
Lifting Solution For Compressor House
projects
projects
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
Lyes boudiaf
Lyes boudiaf
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_Council
Gana Khaidav -May-2015
Gana Khaidav -May-2015
khalid mowafy CV
khalid mowafy CV
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomson
Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
Portable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny Craft
cv_overview 2016
cv_overview 2016
Recently uploaded
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
slot gacor bisa pakai pulsa
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZTE
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
rakeshbaidya232001
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
AbhinavSharma374939
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Tsuyoshi Horigome
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
GDSCAESB
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
RajaP95
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Recently uploaded
(20)
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Sulphuric Acid PlantConverter Replacement Projects - Chemetics - COBRAS 2015
1.
© Copyright 2015,
Chemetics Inc. All rights reserved. Sulphuric Acid Plant Converter Replacement Projects
2.
© Copyright 2015,
Chemetics Inc. All rights reserved.26/10/2015 Slide 2 Grigory Lwow 1942 – 2014 In Memory of
3.
© Copyright 2015,
Chemetics Inc. All rights reserved. Presentation Outline Main Factors to Consider Technology change Fabrication Strategy 3 Case Studies Project 1 – Canada Project 2 – USA Project 3 – Brazil Conclusions 26/10/2015 Slide 3
4.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects in General… Largest piece of process equipment in acid plant Traditional discussions when replacing a Converter Space constraints New foundation vs. existing foundation Technology change Materials of construction Internal heat exchangers and/or superheater Fabrication Strategy – modular Converter approach Opportunity for capacity increase Replace aging equipment Preheater evaluation New ducting Catalyst Shutdown time for tie-in 26/10/2015 Slide 4
5.
© Copyright 2015,
Chemetics Inc. All rights reserved. Technology Change 26/10/2015 Bed # 1 Bed # 2 Bed # 3 Bed # 4 Carbon Steel bricklined Converter Stainless Steel Converter Stainless Steel Converter with Internal Exchangers Bed # 4 Bed # 3 Bed # 1 Bed # 2 Slide 5
6.
© Copyright 2015,
Chemetics Inc. All rights reserved. Technology Change Enthusiasts Visionaries Pragmatists Conservatives Skeptics Diffusion of Innovation Principle 26/10/2015 Slide 6
7.
© Copyright 2015,
Chemetics Inc. All rights reserved. Technology Change Stainless Steel Converters with Internal Exhangers Enthusiasts Visionaries Pragmatists Conservatives Skeptics Diffusion of Innovation Principle 26/10/2015 Slide 7
8.
© Copyright 2015,
Chemetics Inc. All rights reserved. Fabrication Strategy Converters rarely can be shipped in 1 piece 3 options: On site “stick build” fabrication (raw plate supply – 100% on site fabrication) On site “knock-down” fabrication (cut, rolled, bevelled pieces done in shop and supplied to field – > 75% on site fabrication) Modularize fabrication (> 80% shop fabrication & < 20% on site fabrication) 26/10/2015 Slide 8
9.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Recent Case Studies 2011 – Project 1 – Canada 2013 – Project 2 – USA 2014 – Project 3 – Brazil 26/10/2015 Slide 9
10.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 1100 mtpd metallurgical acid plant Converter Diagnostic +25 year old carbon steel brick-lined Converter Equipment reaching end of service life Structural integrity of Converter compromised – shell thinning Extended plant shutdowns for major repairs Project Technology upgrade to SS Converter on new foundation Internal exchanger to reduce ducting costs and reduce footprint Replace cold and inter gas/gas heat exchangers Construct new Converter next to operating plant Tie-in during 28 day general maintenance shutdown Re-use old catalyst and combine with new catalyst 26/10/2015 Slide 10
11.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada – Chemetics® Scope of Work EPS Engineering Complete basic and detailed engineering All disciplines Procurement Modular Converter supply 13.3m diameter Converter (3+1 configuration) 14 months (12 months fabrication w/5 months installation overlap) Gas/gas exchanger supply All materials supply Field Services Construction advisory services Mechanical check-out Commissioning advisory services 26/10/2015 Slide 11
12.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 12
13.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 13
14.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 14
15.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 15
16.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 16
17.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 17
18.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 18
19.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 19
20.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 20
21.
© Copyright 2015,
Chemetics Inc. All rights reserved.26/10/2015 Slide 21
22.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 22
23.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 23
24.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 24
25.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Xstrata Nickel 26/10/2015 Slide 25
26.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 26
27.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 27
28.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 28
29.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 1800 mtpd sulphur burning acid plant Converter Diagnostic +30 year old carbon steel brick-lined Converter Equipment reached end of service life Frequent gas leaks Plant shutdowns for repairs Project Technology upgrade to SS Converter on new foundation Internal gas exchangers to reduce ducting costs Construct new Converter next to operating plant Supply Converter in modules to reduce construction costs and overall project schedule Tie-in during 19 day general maintenance shutdown All new catalyst 26/10/2015 Slide 29
30.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA – Chemetics® Scope of Work EPS Engineering Complete basic and detailed engineering All disciplines Procurement Modular Converter supply 11.7m diameter Converter (3+1 configuration) Accelerated schedule 14 months (12 months fabrication w/3 months installation) Site Services Construction advisory services Mechanical check-out Commissioning advisory services 26/10/2015 Slide 30
31.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 31
32.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 32
33.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 33
34.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 34
35.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 35
36.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 36
37.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 37
38.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 38
39.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 39
40.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 40
41.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 41
42.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 42
43.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 43
44.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 44
45.
© Copyright 2015,
Chemetics Inc. All rights reserved.26/10/2015 Slide 45
46.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 46
47.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 47
48.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 1400 mtpd sulphur burning acid plant Converter Diagnostic +30 year old carbon steel brick-lined Converter Equipment reaching end of service life Frequent ducting gas leaks Frequent plant shutdowns for repairs Project Technology upgrade to SS Converter on new foundation New Internal exchanger and Superheater to reduce ducting costs Replace Inter and Final economizers Replace almost all plant ducting Size converter for increased plant capacity 1600 mtpd Construct new (knock down) Converter next to operating plant Tie-in during general maintenance shutdown Re-use old catalyst and combine with new catalyst 26/10/2015 Slide 48
49.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil – Chemetics® Scope of Work E+S Engineering Basic engineering – all disciplines Detailed engineering – proprietary equipment and ducting Field Services Construction advisory services Mechanical check-out Commissioning advisory services Project 11.85m diameter Converter (3+1 configuration) Built on-site – some large pieces shipped to site 12 months (7 months pre-fabrication w/5 months installation) 26/10/2015 Slide 49
50.
© Copyright 2015,
Chemetics Inc. All rights reserved. Chemetics® Sulphur Burning Acid Plant Converter 26/10/2015 Slide 50 Bed # 4 Bed # 3 Bed # 1 Bed # 2
51.
© Copyright 2015,
Chemetics Inc. All rights reserved.26/10/2015 Slide 51 Bed # 4 Bed # 3 Bed # 1 Bed # 2 Superheater Inter Reheat Exchanger SO2 from Boiler SO2/SO3 to IAT SO3 to Econ. / FAT SO2 from Cold Reheat Exch. Steam Chemetics® Sulphur Burning Acid Plant Converter Flow Path
52.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 52
53.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 53
54.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 54
55.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil Novo Conversor 3:1 (11.85 m Ø x 21.45 m H) – Super Aquecedor Interno – Tocador “Inter Reheat” Interno Novo Economizador Final Novo Inter Economizador 26/10/2015 Slide 55
56.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 56
57.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 57
58.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 58
59.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 59
60.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 60
61.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 61
62.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 62
63.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 63
64.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 64
65.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 65
66.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 66
67.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 67
68.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 68
69.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Retrofit References – Last 20 years Startup Country Beds SS Converter Internal Heat Exchangers New Foundation Modular 2015 Confidential 4 Yes Yes (2) Yes Yes 2014 Canada 4 Yes Yes (2) Yes Yes 2014 Brazil 4 Yes Yes (2) Yes No 2013 USA 4 Yes Yes (1) Yes Yes 2012 Canada 4 Yes Yes (1) Yes Yes 2010 UK 4 Yes No Yes No 2006 USA 4 Yes Yes (1) Yes No 2006 Canada 4 Yes No Yes No 2000 Sweden 5 Yes Yes (1) Yes No 1999 RSA 4 Yes No No No 1999 Netherlands 1 Yes Yes (1) Yes No 1995 USA 4 Yes Yes No No 26/10/2015 Slide 69
70.
© Copyright 2015,
Chemetics Inc. All rights reserved. Converter Replacement Projects Conclusions Most common solutions in Converter replacement projects New SS converter on new foundation Internal exchangers for space limitations and ducting costs Install Converter while plant is operating and then tie-in new ducting during a general maintenance shutdown (<30 days) Take advantage of overall project to replace other aging equipment Capacity increase is common, but only if existing equipment can perform increased capacity – project sometimes executed in phases Modular Converter approach to reduce construction costs (large crane) and increase fabrication quality becoming more common Emission guarantee with all new catalyst or activity tested existing catalyst 26/10/2015 Slide 70
71.
© Copyright 2015,
Chemetics Inc. All rights reserved. Thank you for your attention. Questions? 26/10/2015 Slide 71
72.
© Copyright 2015,
Chemetics Inc. All rights reserved. Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Jacobs and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. 26/10/2015 Slide 72
73.
© Copyright 2015,
Chemetics Inc. All rights reserved. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Jacobs Engineering Group Inc. (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Jacobs’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Jacobs Engineering Group Inc. believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Jacobs Engineering Group Inc. is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Jacobs Engineering Inc. nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Jacobs consists of many legally independent entities, constituting their own separate identities. Jacobs is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Jacobs”, “we” or “us” when we refer to Jacobs companies in general or where no useful purpose is served by identifying any particular Jacobs company. 26/10/2015 Slide 73