Sulphuric Acid Plant
Converter Replacement Projects
© Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 2
Grigory Lwow
1942 – 2014
In Memory of
© Copyright 2015, Chemetics Inc. All rights reserved.
Presentation Outline
 Main Factors to Consider
 Technology change
 Fabrication Strategy
 3 Case Studies
 Project 1 – Canada
 Project 2 – USA
 Project 3 – Brazil
 Conclusions
26/10/2015 Slide 3
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects in General…
 Largest piece of process equipment in acid plant
 Traditional discussions when replacing a Converter
 Space constraints
 New foundation vs. existing foundation
 Technology change
 Materials of construction
 Internal heat exchangers and/or superheater
 Fabrication Strategy – modular Converter approach
 Opportunity for capacity increase
 Replace aging equipment
 Preheater evaluation
 New ducting
 Catalyst
 Shutdown time for tie-in
26/10/2015 Slide 4
© Copyright 2015, Chemetics Inc. All rights reserved.
Technology Change
26/10/2015
Bed # 1
Bed # 2
Bed # 3
Bed # 4
Carbon Steel
bricklined
Converter
Stainless Steel
Converter
Stainless Steel
Converter with
Internal Exchangers
Bed # 4
Bed # 3
Bed # 1
Bed # 2
Slide 5
© Copyright 2015, Chemetics Inc. All rights reserved.
Technology Change
Enthusiasts Visionaries Pragmatists Conservatives Skeptics
Diffusion of Innovation Principle
26/10/2015 Slide 6
© Copyright 2015, Chemetics Inc. All rights reserved.
Technology Change
Stainless Steel Converters with Internal Exhangers
Enthusiasts Visionaries Pragmatists Conservatives Skeptics
Diffusion of Innovation Principle
26/10/2015 Slide 7
© Copyright 2015, Chemetics Inc. All rights reserved.
Fabrication Strategy
 Converters rarely can be
shipped in 1 piece
3 options:
 On site “stick build” fabrication
(raw plate supply – 100% on
site fabrication)
 On site “knock-down”
fabrication (cut, rolled, bevelled
pieces done in shop and
supplied to field – > 75% on site
fabrication)
 Modularize fabrication (> 80%
shop fabrication & < 20% on
site fabrication)
26/10/2015 Slide 8
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Recent Case Studies
 2011 – Project 1 – Canada
 2013 – Project 2 – USA
 2014 – Project 3 – Brazil
26/10/2015 Slide 9
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
 1100 mtpd metallurgical acid plant
 Converter Diagnostic
 +25 year old carbon steel brick-lined Converter
 Equipment reaching end of service life
 Structural integrity of Converter compromised – shell thinning
 Extended plant shutdowns for major repairs
 Project
 Technology upgrade to SS Converter on new foundation
 Internal exchanger to reduce ducting costs and reduce footprint
 Replace cold and inter gas/gas heat exchangers
 Construct new Converter next to operating plant
 Tie-in during 28 day general maintenance shutdown
 Re-use old catalyst and combine with new catalyst
26/10/2015 Slide 10
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada – Chemetics® Scope of Work
 EPS
 Engineering
 Complete basic and detailed engineering
 All disciplines
 Procurement
 Modular Converter supply
 13.3m diameter Converter (3+1 configuration)
 14 months (12 months fabrication w/5 months installation overlap)
 Gas/gas exchanger supply
 All materials supply
 Field Services
 Construction advisory services
 Mechanical check-out
 Commissioning advisory services
26/10/2015 Slide 11
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 12
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 13
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 14
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 15
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 16
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 17
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 18
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 19
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 20
© Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 21
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 22
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 23
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 24
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Xstrata Nickel
26/10/2015 Slide 25
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 26
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 27
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 1 – Canada
26/10/2015 Slide 28
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
 1800 mtpd sulphur burning acid plant
 Converter Diagnostic
 +30 year old carbon steel brick-lined Converter
 Equipment reached end of service life
 Frequent gas leaks
 Plant shutdowns for repairs
 Project
 Technology upgrade to SS Converter on new foundation
 Internal gas exchangers to reduce ducting costs
 Construct new Converter next to operating plant
 Supply Converter in modules to reduce construction costs and overall
project schedule
 Tie-in during 19 day general maintenance shutdown
 All new catalyst
26/10/2015 Slide 29
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA – Chemetics® Scope of Work
 EPS
 Engineering
 Complete basic and detailed engineering
 All disciplines
 Procurement
 Modular Converter supply
 11.7m diameter Converter (3+1 configuration)
 Accelerated schedule
 14 months (12 months fabrication w/3 months installation)
 Site Services
 Construction advisory services
 Mechanical check-out
 Commissioning advisory services
26/10/2015 Slide 30
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 31
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 32
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 33
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 34
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 35
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 36
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 37
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 38
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 39
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 40
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 41
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 42
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 43
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 44
© Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 45
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 46
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 2 – USA
26/10/2015 Slide 47
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
 1400 mtpd sulphur burning acid plant
 Converter Diagnostic
 +30 year old carbon steel brick-lined Converter
 Equipment reaching end of service life
 Frequent ducting gas leaks
 Frequent plant shutdowns for repairs
 Project
 Technology upgrade to SS Converter on new foundation
 New Internal exchanger and Superheater to reduce ducting costs
 Replace Inter and Final economizers
 Replace almost all plant ducting
 Size converter for increased plant capacity 1600 mtpd
 Construct new (knock down) Converter next to operating plant
 Tie-in during general maintenance shutdown
 Re-use old catalyst and combine with new catalyst
26/10/2015 Slide 48
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil – Chemetics® Scope of Work
 E+S
 Engineering
 Basic engineering – all disciplines
 Detailed engineering – proprietary equipment and ducting
 Field Services
 Construction advisory services
 Mechanical check-out
 Commissioning advisory services
 Project
 11.85m diameter Converter (3+1 configuration)
 Built on-site – some large pieces shipped to site
 12 months (7 months pre-fabrication w/5 months installation)
26/10/2015 Slide 49
© Copyright 2015, Chemetics Inc. All rights reserved.
Chemetics® Sulphur Burning Acid Plant Converter
26/10/2015 Slide 50
Bed # 4
Bed # 3
Bed # 1
Bed # 2
© Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 51
Bed # 4
Bed # 3
Bed # 1
Bed # 2
Superheater
Inter Reheat
Exchanger
SO2 from
Boiler
SO2/SO3
to IAT
SO3 to
Econ. / FAT
SO2 from Cold
Reheat Exch.
Steam
Chemetics® Sulphur Burning Acid Plant Converter
Flow Path
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 52
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 53
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 54
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
Novo Conversor 3:1 (11.85 m Ø x 21.45 m H)
– Super Aquecedor Interno
– Tocador “Inter Reheat” Interno
Novo Economizador Final
Novo Inter Economizador
26/10/2015 Slide 55
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 56
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 57
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 58
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 59
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 60
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 61
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 62
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 63
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 64
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 65
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 66
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 67
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Project 3 – Brazil
26/10/2015 Slide 68
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Retrofit References – Last 20 years
Startup Country Beds SS
Converter
Internal Heat
Exchangers
New
Foundation
Modular
2015 Confidential 4 Yes Yes (2) Yes Yes
2014 Canada 4 Yes Yes (2) Yes Yes
2014 Brazil 4 Yes Yes (2) Yes No
2013 USA 4 Yes Yes (1) Yes Yes
2012 Canada 4 Yes Yes (1) Yes Yes
2010 UK 4 Yes No Yes No
2006 USA 4 Yes Yes (1) Yes No
2006 Canada 4 Yes No Yes No
2000 Sweden 5 Yes Yes (1) Yes No
1999 RSA 4 Yes No No No
1999 Netherlands 1 Yes Yes (1) Yes No
1995 USA 4 Yes Yes No No
26/10/2015 Slide 69
© Copyright 2015, Chemetics Inc. All rights reserved.
Converter Replacement Projects
Conclusions
 Most common solutions in Converter replacement projects
 New SS converter on new foundation
 Internal exchangers for space limitations and ducting costs
 Install Converter while plant is operating and then tie-in new ducting
during a general maintenance shutdown (<30 days)
 Take advantage of overall project to replace other aging equipment
 Capacity increase is common, but only if existing equipment can
perform increased capacity – project sometimes executed in phases
 Modular Converter approach to reduce construction costs (large
crane) and increase fabrication quality becoming more common
 Emission guarantee with all new catalyst or activity tested existing
catalyst
26/10/2015 Slide 70
© Copyright 2015, Chemetics Inc. All rights reserved.
Thank you for your attention.
Questions?
26/10/2015 Slide 71
© Copyright 2015, Chemetics Inc. All rights reserved.
Copyright
Copyright of all published material including photographs, drawings and images in this document remains
vested in Jacobs and third party contributors as appropriate. Accordingly, neither the whole nor any part
of this document shall be reproduced in any form nor used in any manner without express prior
permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or
removed from any reproduction.
26/10/2015 Slide 72
© Copyright 2015, Chemetics Inc. All rights reserved.
Disclaimer
This Presentation includes and is based, inter alia, on forward-looking information and statements that
are subject to risks and uncertainties that could cause actual results to differ. These statements and this
Presentation are based on current expectations, estimates and projections about global economic
conditions, the economic conditions of the regions and industries that are major markets for Jacobs
Engineering Group Inc. (including subsidiaries and affiliates) lines of business. These expectations,
estimates and projections are generally identifiable by statements containing words such as “expects”,
“believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ
materially from those expectations include, among others, economic and market conditions in the
geographic areas and industries that are or will be major markets for Jacobs’ businesses, oil prices,
market acceptance of new products and services, changes in governmental regulations, interest rates,
fluctuations in currency exchange rates and such other factors as may be discussed from time to time in
the Presentation. Although Jacobs Engineering Group Inc. believes that its expectations and the
Presentation are based upon reasonable assumptions, it can give no assurance that those expectations
will be achieved or that the actual results will be as set out in the Presentation. Jacobs Engineering
Group Inc. is making no representation or warranty, expressed or implied, as to the accuracy, reliability or
completeness of the Presentation, and neither Jacobs Engineering Inc. nor any of its directors, officers or
employees will have any liability to you or any other persons resulting from your use.
Jacobs consists of many legally independent entities, constituting their own separate identities. Jacobs is
used as the common brand or trade mark for most of these entities. In this presentation we may
sometimes use “Jacobs”, “we” or “us” when we refer to Jacobs companies in general or where no useful
purpose is served by identifying any particular Jacobs company.
26/10/2015 Slide 73

More Related Content

What's hot

Co2 removal through solvent and membrane
Co2 removal through solvent and membraneCo2 removal through solvent and membrane
Co2 removal through solvent and membraneRashesh Shah
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and coolingirrraju1976
 
Treatment of crude oils
Treatment of crude oilsTreatment of crude oils
Treatment of crude oilsKarnav Rana
 
Cement plant operations handbook 7th
Cement plant operations handbook 7thCement plant operations handbook 7th
Cement plant operations handbook 7thVu Jacson
 
Microsoft power point dip tube failure
Microsoft power point   dip tube failureMicrosoft power point   dip tube failure
Microsoft power point dip tube failurepradeepdeepi
 
Constant Volume Batch Reactor
Constant Volume Batch ReactorConstant Volume Batch Reactor
Constant Volume Batch ReactoriMentor Education
 
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Episode 3 :  Production of  Synthesis Gas  by Steam Methane ReformingEpisode 3 :  Production of  Synthesis Gas  by Steam Methane Reforming
Episode 3 : Production of Synthesis Gas by Steam Methane ReformingSAJJAD KHUDHUR ABBAS
 
Burner bible
Burner bibleBurner bible
Burner biblesimmsos
 
Theory and Operation of Methanation Catalyst
Theory and Operation of Methanation CatalystTheory and Operation of Methanation Catalyst
Theory and Operation of Methanation CatalystGerard B. Hawkins
 
CATALYTIC REFORMING
CATALYTIC REFORMINGCATALYTIC REFORMING
CATALYTIC REFORMINGtranslateds
 
Fundamentals of sour water stripping
Fundamentals of sour water strippingFundamentals of sour water stripping
Fundamentals of sour water strippingAbhinav Gupta
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
Methanol Plant Design
Methanol Plant DesignMethanol Plant Design
Methanol Plant DesignMaan M
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical OperationsGerard B. Hawkins
 
Normal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen PlantsNormal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen PlantsGerard B. Hawkins
 
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading ConsiderationsWater-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading ConsiderationsGerard B. Hawkins
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Gerard B. Hawkins
 
11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_AdsorbentsMico Siahaan
 

What's hot (20)

Co2 removal through solvent and membrane
Co2 removal through solvent and membraneCo2 removal through solvent and membrane
Co2 removal through solvent and membrane
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and cooling
 
Treatment of crude oils
Treatment of crude oilsTreatment of crude oils
Treatment of crude oils
 
Cement plant operations handbook 7th
Cement plant operations handbook 7thCement plant operations handbook 7th
Cement plant operations handbook 7th
 
Microsoft power point dip tube failure
Microsoft power point   dip tube failureMicrosoft power point   dip tube failure
Microsoft power point dip tube failure
 
Constant Volume Batch Reactor
Constant Volume Batch ReactorConstant Volume Batch Reactor
Constant Volume Batch Reactor
 
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
Episode 3 :  Production of  Synthesis Gas  by Steam Methane ReformingEpisode 3 :  Production of  Synthesis Gas  by Steam Methane Reforming
Episode 3 : Production of Synthesis Gas by Steam Methane Reforming
 
Burner bible
Burner bibleBurner bible
Burner bible
 
Theory and Operation of Methanation Catalyst
Theory and Operation of Methanation CatalystTheory and Operation of Methanation Catalyst
Theory and Operation of Methanation Catalyst
 
CATALYTIC REFORMING
CATALYTIC REFORMINGCATALYTIC REFORMING
CATALYTIC REFORMING
 
14 phenolic resins 2
14 phenolic resins 214 phenolic resins 2
14 phenolic resins 2
 
Fundamentals of sour water stripping
Fundamentals of sour water strippingFundamentals of sour water stripping
Fundamentals of sour water stripping
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
Amines
AminesAmines
Amines
 
Methanol Plant Design
Methanol Plant DesignMethanol Plant Design
Methanol Plant Design
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical Operations
 
Normal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen PlantsNormal Operation of Steam Reformers on Hydrogen Plants
Normal Operation of Steam Reformers on Hydrogen Plants
 
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading ConsiderationsWater-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
 
11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents11_6044K_High_Perfor_Adsorbents
11_6044K_High_Perfor_Adsorbents
 

Viewers also liked

Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...COBRAS
 
The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015COBRAS
 
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...COBRAS
 
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015COBRAS
 
Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015COBRAS
 
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...COBRAS
 
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE. PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE. COBRAS
 
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015COBRAS
 
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...COBRAS
 
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...COBRAS
 
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...COBRAS
 
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...COBRAS
 
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico -  Combustion Solutions - ...Votorantim Metais…do niquel para o ácido sulfurico -  Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...COBRAS
 
Mercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - GalvaniMercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - GalvaniCOBRAS
 
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
 Condensação em Processos de Parada e Partida  em plantas de H2SO4 - David Mi... Condensação em Processos de Parada e Partida  em plantas de H2SO4 - David Mi...
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...COBRAS
 
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015COBRAS
 
Sulphuric acid plant case solution
Sulphuric acid plant case solutionSulphuric acid plant case solution
Sulphuric acid plant case solutionChaku
 
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...Sergio Joao
 
King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4Drishti Bhalla
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksSlideShare
 

Viewers also liked (20)

Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
Sulphuric Acid: A challenge for materials and sealing systems for centrifugal...
 
The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015The BAYQIK® Technology - COBRAS 2015
The BAYQIK® Technology - COBRAS 2015
 
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
DEBOTTLENECKING METALLURGICAL AND SULPHUR-BURNING SULPHURIC ACID PLANTS: CAPA...
 
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
The art of troubleshooting mist eliminators - Begg Cousland - COBRAS 2015
 
Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015Sulfur Handling - Outotec - COBRAS 2015
Sulfur Handling - Outotec - COBRAS 2015
 
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
Novos desenvolvimentos da BASF para catalisadores de ácido sulfúrico - BASF -...
 
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE. PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
PRODUCCIÓN DE ÁCIDO SULFÚRICO CODELCO CHILE.
 
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
Falla en tanque de almacenamiento de ácido - Southern Copper Peru - COBRAS 2015
 
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
Tailor-made catalyst solutions to meet the demands for lower SO2 emissions - ...
 
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...Topsoe wsa technology for small compact sulfuric acid production units - Hald...
Topsoe wsa technology for small compact sulfuric acid production units - Hald...
 
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
Desafios de conduzir uma partida de planta de ácido sulfúrico sem exceder os ...
 
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
Fiberbed: Velas e suas Aplicações no Ácido Sulfúrico - Clark Solutions - COBR...
 
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico -  Combustion Solutions - ...Votorantim Metais…do niquel para o ácido sulfurico -  Combustion Solutions - ...
Votorantim Metais…do niquel para o ácido sulfurico - Combustion Solutions - ...
 
Mercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - GalvaniMercado Nacional de Ácido Sulfúrico - Galvani
Mercado Nacional de Ácido Sulfúrico - Galvani
 
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
 Condensação em Processos de Parada e Partida  em plantas de H2SO4 - David Mi... Condensação em Processos de Parada e Partida  em plantas de H2SO4 - David Mi...
Condensação em Processos de Parada e Partida em plantas de H2SO4 - David Mi...
 
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
Como Estão Seus Tanques de Ácido? - MB consultores - COBRAS 2015
 
Sulphuric acid plant case solution
Sulphuric acid plant case solutionSulphuric acid plant case solution
Sulphuric acid plant case solution
 
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
Dynamic operator training simulators for sulphuric acid, phosphoric acid, and...
 
King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4King of acids -Sulphuric Acid H2SO4
King of acids -Sulphuric Acid H2SO4
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
 

Similar to Sulphuric Acid Plant Converter Replacement Projects - Chemetics - COBRAS 2015

Lifting Solution For Compressor House
Lifting Solution For Compressor HouseLifting Solution For Compressor House
Lifting Solution For Compressor HouseSamuel Farley
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15Antonio Biasiolo
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...DOE Office of River Protection
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project ReportPaul Warrington
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumJohn Glenning
 
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DGlobal CCS Institute
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfDaniel Donatelli
 
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsUsing Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsProcess Ecology Inc
 
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilVelocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilJohn Glenning
 
Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav
 
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonBaf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonKen Thomson
 
Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21Sentient Science
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnercare Inc.
 
Portable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny CraftPortable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny CraftIndiaMART InterMESH Limited
 

Similar to Sulphuric Acid Plant Converter Replacement Projects - Chemetics - COBRAS 2015 (20)

Lifting Solution For Compressor House
Lifting Solution For Compressor HouseLifting Solution For Compressor House
Lifting Solution For Compressor House
 
projects
projectsprojects
projects
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
 
Lyes boudiaf
Lyes boudiafLyes boudiaf
Lyes boudiaf
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
 
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFTPart 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
 
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering SystemsUsing Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
Using Aspen HYSYS Upstream for Sizing and Scheduling of Gathering Systems
 
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilVelocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_Council
 
Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav -May-2015
Gana Khaidav -May-2015
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Baf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomsonBaf 2013 abc of jv3_ken thomson
Baf 2013 abc of jv3_ken thomson
 
Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21Extend gearbox life with new components and methods 2015.04.21
Extend gearbox life with new components and methods 2015.04.21
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
 
Portable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny CraftPortable Cabins & Allied Structures By Tinny Craft
Portable Cabins & Allied Structures By Tinny Craft
 
cv_overview 2016
cv_overview 2016cv_overview 2016
cv_overview 2016
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Sulphuric Acid Plant Converter Replacement Projects - Chemetics - COBRAS 2015

  • 1. © Copyright 2015, Chemetics Inc. All rights reserved. Sulphuric Acid Plant Converter Replacement Projects
  • 2. © Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 2 Grigory Lwow 1942 – 2014 In Memory of
  • 3. © Copyright 2015, Chemetics Inc. All rights reserved. Presentation Outline  Main Factors to Consider  Technology change  Fabrication Strategy  3 Case Studies  Project 1 – Canada  Project 2 – USA  Project 3 – Brazil  Conclusions 26/10/2015 Slide 3
  • 4. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects in General…  Largest piece of process equipment in acid plant  Traditional discussions when replacing a Converter  Space constraints  New foundation vs. existing foundation  Technology change  Materials of construction  Internal heat exchangers and/or superheater  Fabrication Strategy – modular Converter approach  Opportunity for capacity increase  Replace aging equipment  Preheater evaluation  New ducting  Catalyst  Shutdown time for tie-in 26/10/2015 Slide 4
  • 5. © Copyright 2015, Chemetics Inc. All rights reserved. Technology Change 26/10/2015 Bed # 1 Bed # 2 Bed # 3 Bed # 4 Carbon Steel bricklined Converter Stainless Steel Converter Stainless Steel Converter with Internal Exchangers Bed # 4 Bed # 3 Bed # 1 Bed # 2 Slide 5
  • 6. © Copyright 2015, Chemetics Inc. All rights reserved. Technology Change Enthusiasts Visionaries Pragmatists Conservatives Skeptics Diffusion of Innovation Principle 26/10/2015 Slide 6
  • 7. © Copyright 2015, Chemetics Inc. All rights reserved. Technology Change Stainless Steel Converters with Internal Exhangers Enthusiasts Visionaries Pragmatists Conservatives Skeptics Diffusion of Innovation Principle 26/10/2015 Slide 7
  • 8. © Copyright 2015, Chemetics Inc. All rights reserved. Fabrication Strategy  Converters rarely can be shipped in 1 piece 3 options:  On site “stick build” fabrication (raw plate supply – 100% on site fabrication)  On site “knock-down” fabrication (cut, rolled, bevelled pieces done in shop and supplied to field – > 75% on site fabrication)  Modularize fabrication (> 80% shop fabrication & < 20% on site fabrication) 26/10/2015 Slide 8
  • 9. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Recent Case Studies  2011 – Project 1 – Canada  2013 – Project 2 – USA  2014 – Project 3 – Brazil 26/10/2015 Slide 9
  • 10. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada  1100 mtpd metallurgical acid plant  Converter Diagnostic  +25 year old carbon steel brick-lined Converter  Equipment reaching end of service life  Structural integrity of Converter compromised – shell thinning  Extended plant shutdowns for major repairs  Project  Technology upgrade to SS Converter on new foundation  Internal exchanger to reduce ducting costs and reduce footprint  Replace cold and inter gas/gas heat exchangers  Construct new Converter next to operating plant  Tie-in during 28 day general maintenance shutdown  Re-use old catalyst and combine with new catalyst 26/10/2015 Slide 10
  • 11. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada – Chemetics® Scope of Work  EPS  Engineering  Complete basic and detailed engineering  All disciplines  Procurement  Modular Converter supply  13.3m diameter Converter (3+1 configuration)  14 months (12 months fabrication w/5 months installation overlap)  Gas/gas exchanger supply  All materials supply  Field Services  Construction advisory services  Mechanical check-out  Commissioning advisory services 26/10/2015 Slide 11
  • 12. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 12
  • 13. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 13
  • 14. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 14
  • 15. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 15
  • 16. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 16
  • 17. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 17
  • 18. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 18
  • 19. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 19
  • 20. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 20
  • 21. © Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 21
  • 22. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 22
  • 23. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 23
  • 24. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 24
  • 25. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Xstrata Nickel 26/10/2015 Slide 25
  • 26. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 26
  • 27. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 27
  • 28. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 1 – Canada 26/10/2015 Slide 28
  • 29. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA  1800 mtpd sulphur burning acid plant  Converter Diagnostic  +30 year old carbon steel brick-lined Converter  Equipment reached end of service life  Frequent gas leaks  Plant shutdowns for repairs  Project  Technology upgrade to SS Converter on new foundation  Internal gas exchangers to reduce ducting costs  Construct new Converter next to operating plant  Supply Converter in modules to reduce construction costs and overall project schedule  Tie-in during 19 day general maintenance shutdown  All new catalyst 26/10/2015 Slide 29
  • 30. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA – Chemetics® Scope of Work  EPS  Engineering  Complete basic and detailed engineering  All disciplines  Procurement  Modular Converter supply  11.7m diameter Converter (3+1 configuration)  Accelerated schedule  14 months (12 months fabrication w/3 months installation)  Site Services  Construction advisory services  Mechanical check-out  Commissioning advisory services 26/10/2015 Slide 30
  • 31. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 31
  • 32. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 32
  • 33. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 33
  • 34. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 34
  • 35. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 35
  • 36. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 36
  • 37. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 37
  • 38. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 38
  • 39. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 39
  • 40. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 40
  • 41. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 41
  • 42. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 42
  • 43. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 43
  • 44. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 44
  • 45. © Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 45
  • 46. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 46
  • 47. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 2 – USA 26/10/2015 Slide 47
  • 48. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil  1400 mtpd sulphur burning acid plant  Converter Diagnostic  +30 year old carbon steel brick-lined Converter  Equipment reaching end of service life  Frequent ducting gas leaks  Frequent plant shutdowns for repairs  Project  Technology upgrade to SS Converter on new foundation  New Internal exchanger and Superheater to reduce ducting costs  Replace Inter and Final economizers  Replace almost all plant ducting  Size converter for increased plant capacity 1600 mtpd  Construct new (knock down) Converter next to operating plant  Tie-in during general maintenance shutdown  Re-use old catalyst and combine with new catalyst 26/10/2015 Slide 48
  • 49. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil – Chemetics® Scope of Work  E+S  Engineering  Basic engineering – all disciplines  Detailed engineering – proprietary equipment and ducting  Field Services  Construction advisory services  Mechanical check-out  Commissioning advisory services  Project  11.85m diameter Converter (3+1 configuration)  Built on-site – some large pieces shipped to site  12 months (7 months pre-fabrication w/5 months installation) 26/10/2015 Slide 49
  • 50. © Copyright 2015, Chemetics Inc. All rights reserved. Chemetics® Sulphur Burning Acid Plant Converter 26/10/2015 Slide 50 Bed # 4 Bed # 3 Bed # 1 Bed # 2
  • 51. © Copyright 2015, Chemetics Inc. All rights reserved.26/10/2015 Slide 51 Bed # 4 Bed # 3 Bed # 1 Bed # 2 Superheater Inter Reheat Exchanger SO2 from Boiler SO2/SO3 to IAT SO3 to Econ. / FAT SO2 from Cold Reheat Exch. Steam Chemetics® Sulphur Burning Acid Plant Converter Flow Path
  • 52. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 52
  • 53. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 53
  • 54. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 54
  • 55. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil Novo Conversor 3:1 (11.85 m Ø x 21.45 m H) – Super Aquecedor Interno – Tocador “Inter Reheat” Interno Novo Economizador Final Novo Inter Economizador 26/10/2015 Slide 55
  • 56. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 56
  • 57. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 57
  • 58. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 58
  • 59. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 59
  • 60. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 60
  • 61. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 61
  • 62. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 62
  • 63. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 63
  • 64. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 64
  • 65. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 65
  • 66. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 66
  • 67. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 67
  • 68. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Project 3 – Brazil 26/10/2015 Slide 68
  • 69. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Retrofit References – Last 20 years Startup Country Beds SS Converter Internal Heat Exchangers New Foundation Modular 2015 Confidential 4 Yes Yes (2) Yes Yes 2014 Canada 4 Yes Yes (2) Yes Yes 2014 Brazil 4 Yes Yes (2) Yes No 2013 USA 4 Yes Yes (1) Yes Yes 2012 Canada 4 Yes Yes (1) Yes Yes 2010 UK 4 Yes No Yes No 2006 USA 4 Yes Yes (1) Yes No 2006 Canada 4 Yes No Yes No 2000 Sweden 5 Yes Yes (1) Yes No 1999 RSA 4 Yes No No No 1999 Netherlands 1 Yes Yes (1) Yes No 1995 USA 4 Yes Yes No No 26/10/2015 Slide 69
  • 70. © Copyright 2015, Chemetics Inc. All rights reserved. Converter Replacement Projects Conclusions  Most common solutions in Converter replacement projects  New SS converter on new foundation  Internal exchangers for space limitations and ducting costs  Install Converter while plant is operating and then tie-in new ducting during a general maintenance shutdown (<30 days)  Take advantage of overall project to replace other aging equipment  Capacity increase is common, but only if existing equipment can perform increased capacity – project sometimes executed in phases  Modular Converter approach to reduce construction costs (large crane) and increase fabrication quality becoming more common  Emission guarantee with all new catalyst or activity tested existing catalyst 26/10/2015 Slide 70
  • 71. © Copyright 2015, Chemetics Inc. All rights reserved. Thank you for your attention. Questions? 26/10/2015 Slide 71
  • 72. © Copyright 2015, Chemetics Inc. All rights reserved. Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Jacobs and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. 26/10/2015 Slide 72
  • 73. © Copyright 2015, Chemetics Inc. All rights reserved. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Jacobs Engineering Group Inc. (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Jacobs’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Jacobs Engineering Group Inc. believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Jacobs Engineering Group Inc. is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Jacobs Engineering Inc. nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Jacobs consists of many legally independent entities, constituting their own separate identities. Jacobs is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Jacobs”, “we” or “us” when we refer to Jacobs companies in general or where no useful purpose is served by identifying any particular Jacobs company. 26/10/2015 Slide 73