StudyPlaces: India Strategy

To be the preferred source of information and guidance for Indian
students seeking education.
StudyPlaces.com
Confidential
Agenda
•
•
•
•
•
•
•

Market overview
Understanding the Indian student
StudyPlaces key assets
India-focused strategy
Operations overview
Finance
Appendix – Lead Management System
Confidential
MARKET OVERVIEW

Confidential
Market Needs and Challenges
•
•
•
•

Student demand for education options
Fragmented education institution market
Large media spend on student acquisition
Slow but steady shift to online media spending

Confidential
Education Market Overview
• Pent up demand for postsecondary education from India and
neighboring regions. 112M of postsecondary-age students in
India with below-average postsecondary Gross Enrollment
Ratio of 12% (vs. 22% for China, 17% for Indonesia and 30%
for Brazil)
• Local education is a +$11 billion market, with enrolling
institutions spending an average of 20% of revenue for student
acquisition
• India is the largest supplier of students to the US and is the
second largest supplier of students to the global education
market. In 2008 $200 million was spent recruiting Indian
students; expected to grow to $350 million by 2012
www.StudyPlaces.com

Confidential

5
India Domestic Education Spending
Tuition paid by institution type
(in $MM)

Private Colleges
Vocational Courses
IT Training
Test Prep
TOTAL

2008
$6.27
$1.40
$0.23
$1.70
$9.60

2009
$7.34
$1.71
$0.28
$2.04
$11.37

2010
$8.58
$2.08
$0.35
$2.45
$13.46

2011
$10.04
$2.54
$0.44
$2.94
$15.96

Confidential
Source: CLSA Education Industry Report.

2012 08-12 CAGR
$11.75
17%
$3.10
22%
$0.55
24%
$3.53
20%
$18.93
19%
Education Related Ad Spend in India
•

With a 17% market share in the first half of 2008 Education is the #1 category
in Print Advertising in India
Rank

Category

Rank

Category

1

Education

6

Corporate / Brand Image

2

Services

7

Durables

3

Banking / Finance / Investment

8

Personal Accessories

4

Auto

9

Telecom / Internet Service Providers

5

Retail

10

Media

Source: AdEx India a division of TAM Media Research
Confidential
http://www.tamindia.com/Mailer/print_advertising/2008/H1-Part1/graph/3.jpg
Sample print advertising page

Confidential
THE INDIAN STUDENT

Confidential
The Indian Student
…is seeking
information about
education options…

The Indian Student

Goals

• Maximize career
potential
• Increase short term
income
• Improve academic
test results

…through multiple
sources.

Education Options
India

Abroad

Print

• Historically primary source of
information and advertising
medium

Engineering
Medicine
MBA

• Small portion of education ad
money goes to education

TV

Law
Vocational
Professional cert.

Online

• Students shifting to online for
information about education
options
• Target population already tech
savvy and provided with
access

Test preparation

Studying abroad is one of many education options considered by almost every
Indian student in light of academic performance, financial resources and time
Confidential
constraints
Indian Students Search Online for Education
Information
•
•

India is the #1/2 country for the search terms “MBA”, “Engineering”, “Medicine”, “Study Abroad”, and “Tuitions”
Postsecondary prospective students in India and other target countries are already online, doing research and
seeking information (77% of online users are in age group 19-35)

Confidential
KEY ASSETS

Confidential
StudyPlaces Key Assets
India leading education site with a Google PageRank of 6 and 180,000 pages indexed

•
•
•
•
•
•

Management team
Rich and compelling content library, driving organic qualified traffic to
Studyplaces.com
Growing targeted traffic of Indian and other international students –
approx 400k unique visitors
Impressive client roster of Indian and international institutions advertising
in India: Manipal, NIIT, ICFAI, ETS
Partnership with leading media outlets in India (e.g., Hindustan Times,
LiveMint,NDTV), broadening reach
State-of-the-art lead enrichment process, delivering qualified leads to both
local and international institutions
Confidential
Content Library
• College directory: detailed information on
– 3,245 of the largest institutes in India (out of ~ 21,000 total)
– 103 in Australia, 3,829 in the US, and 748 in the UK –
Targeted list of Institutes that Indian students go to
– UK content and site in Association with Guardian
• Valuable and unique information for prospective to student,
driving traffic via SEO and relationships with institutes
• FAQ/forums –enable online communication amongst students
and indexing for SEO
• Result information
• Free test preparation
Confidential

14
SEO Successes
- First page results on google.co.in for:
•
•
•
•
•

“Study Engineering”
“Study MBA”
“Study Medicine”
“Study Law”
“Study Abroad”

- 10% month to month increase in organic traffic

Confidential

15
Client roster

Confidential

16
Media Partnerships
• Distribution deals which allow StudyPlaces to
provide content and expertise to other media
properties
– Hindustan Times, LiveMint (Wall Street Journal),
NDTV

• Media partners depend on Studyplaces for
their online ad inventory
• Increased traffic flow and branding lead to
better monetization opportunities
Confidential

17
INDIA-FOCUSED STRATEGY

Confidential
India-focused Strategy
1.
2.
3.
4.

Focus on select markets
Traffic Acquisition
Expand customer base
Broaden media reach

Confidential
Focus on select markets
Target Market

Focus

Rationale

Private Professional
Colleges

•
•
•
•

• Growing number of new professional colleges seeking students to
fill seats
• Colleges ready to pay high premium to agents for admission

Vocational Institutes

• Service industry job
seekers looking for
qualifications

• Target high-demand occupations such as pharmaceutical research,
animation, hospitality, aviation, financial back office, etc.
• High print advertising spend ready to be converted to online lead
generation

Test Preparation

• Engineering
• Medicine
• MBA

• 1.5 million test takers annually representing a $400 million market
annually
• Students and families willing to spend to improve outcome

Professional
Certification

• Job seekers and
current employees

• Low cost and time commitment to improve career opportunities
• Demand for certificates with proven ROI: e.g., Project Planning,
Java , ERP

Study Abroad Agent
Market

• Candidates
considering
studying abroad

• International universities source a large portion of their foreign
students from India
• Premium pricing for international leads converted into students ($2k
per student)
• Agents receive an advertising budget to acquire students.

Engineering
MBA
Medical
Dental

Confidential
Current traffic acquisition model
Who are we targeting?

Students

Parents

School /College Teachers

Counselors

How do we generate traffic?

Create and promote original
relevant content

Optimize search results

Acquire PPC when appropriate

• Ask Studyplaces 30,000+ Questions
• Listing of professional
colleges
• #6 pagerank
• 180,000 pages indexed
• Keyword Analysis
• Manage 100,000
keywords across
multiple categories

Integrate StudyPlaces with
relevant digital destinations

• Facebook

Partner with leading media
platforms

• NDTV
• Hindustan times, Shine
Campus

Working Professional

Confidential
Content development plan
Traffic goals
• Built professional course vertical channels
• Engineering, Medicine, Law, MBA, etc.
• Opportunities for additional advertising

Position StudyPlaces as trusted
source for education options

• Created fully searchable and indexed directory of
2500 India-based institutes
• By type of program, level, geographic
location, focus, etc.

Attract relevant Indian traffic
• Developed database of vocational certificate and
job training options

Develop content that allows for
segmentation and lead
qualification
Customize content and
experience for the prospective
Indian students

• Created counseling zone regarding vocational
options - moderated forums faqs, expert
answers, etc. - to increase stickiness and attract
organic traffic
• Created free preparation zone for millions of
students testing every for the competitive exams
• Engineering, Medicine
• Provide tips, sample exams, exam dates

Confidential

Google
PageRank 6
180,000 indexed
pages
Vertical Channels
• Targeted vertical channels increases relevance for users and search
engines
• Opportunity to create intent-specific “microsites”, thus increasing quality of
leads

Confidential
Education Directory
• Directory covers 3,245 of the largest 21,000 institutes. Next
steps is partnership with Google to create the directory at
more granular /city level.
• Continued effort to add content to increase usability and
relevancy
Directory Content by Category 1Q09 2Q09 3Q09 4Q09

2010

Engineering
Medicine
Law
Coaching
MBA
Total

2,550
500
190
350
1,450
5,040

1,940
145
15
125
750
2,975

Confidential

2,025
195
20
155
850
3,245

2,110
250
30
190
950
3,530

2,200
300
60
220
1,050
3,830
Comprehensive MBA Listings
• Comprehensive listing allows
for custom searches by
– Degree level,
– Country/cities
– Specialization
– Part-time or full-time
• Additional opportunity for
display advertising

Confidential
Result/Placement and Test Prep Apps

Low-cost app to attract qualified traffic
right when students ready to make an
education decision

Approx 20% of organic traffic generated
through free test prep application

Confidential
Traffic Numbers and Projected Goals
2008

2009

Q2

Q3

Q4

Q1

Unique Visitors

807,074

799,658

921,735

1,003,038

Organic Visits

412,987

438,032

618,019

741,081

Page views

4,043,906

3,359,279

3,603,615

4,070,820

Online marketing
spend (USD)

$84,264

$79,951

$83,471

$50,093

Registered Users
added

80,108

52,834

55,144

47,056

6%

41%

2010

Q2

Q3

Q4

Q1

Q2

Q3

Q4

830,011

929,612

1,041,165

1,166,105

1,306,038

1,462,762

1,638,294

20%

Organic traffic
growth
Registered Users
added

12%
10%

27,421

25,664

22,608

19,579

21,537

23,691

26,060

28,666

31,532

34,685

38,154

Page views per user

5%

5.0

4.2

3.9

4.1

4.3

4.5

4.7

4.9

5.2

5.4

5.7

150,000

225,000

337,500

506,250

759,375

1,139,063

1,708,594

2,562,891

Estimated
partnership traffic
from NDTV, HT, Live
Mint and others

Confidential
SALES STRATEGY

Confidential
Sales Overview
• Current Focus
– Top 100 of institutes in the top verticals: Private College,
Vocational, Test Prep, and Study Abroad categories (see
pipeline)
– Wins already include Manipal, ICFAI, HT, etc.

• Forward Focus
– Broader reach of institutes in the same verticals
– Geographic expansion: sales presence in South, West, and
East
– Aggressively target other big media spenders
Confidential
Sales Processes
1. Pipeline and revenue forecast management using
salesforce.com
2. Weekly team meetings with status updates and review of key
metrics
3. Prospecting of potential leads through online and offline
media
4. Stringent management of collections vs. invoicing
• India has a higher bad debt percentage so we collect 50%
upfront for all unproven customers
5. Monthly/Quarterly review of quotas vs actuals

Confidential
Sales Methodology
1.
Market Research

•
•

Pipeline Creation

2.
Field Sales & Telesales

Market Research

3.

Pipeline Creation: Pipeline generated with Location,
Tier, and Category of prospect
Pipeline Distribution:
•

Qualified
Inquiries

•
Customers

4.

Review all Edu ads placed in newspapers across top
10 metros
Interns collecting data from offline/online sources

Pipeline distributed to Field Sales where there is a
sales presence (Delhi NCR, started in Mumbai &
Hyderabad).
Telesales distribution (details next slide)

Prospects called for closure

Weekly review of metrics: call rates, appointment rates, close rates, etc.
Confidential
Current Status (India)
• Current customer count: 54 (excluding Hindustan
Times partnership)
•

Repeat (47), New (7)

•
•
•
•
•

Professional Private College (9)
Study Abroad (32)
Test Prep (3)
Vocational (8)
Other (2)

• Average Revenue per Customer: Rs. 26,435
(US$550)
Confidential
Hindustan Times Overview
• #1 newspaper in North India, #2 nationally
• Deal terms:
• Hindustan Times sales team reselling
StudyPlaces
• HT sales team to incudle StudyPlaces as a
strategic component of media sales targeted in
the Education Vertical
• 50% revenue share
• Marketing spend pre paid at start of campaign
Confidential
Hindustan Times Overview

Relevant
Content for
students

Leads,
Applications
for
Admissions

Helping in
student
placements

Counseling
services –
online/ offline
Confidential
Hindustan Times Results
• 14 live deals in 1st month:
•
•
•
•
•
•
•

WCTM
Ameer Engineering
Ameer Medical
Aureole
Career Access
EYK Consultancy
ILADA

•
•
•
•
•
•
•

IRS
Picasso Animation
R V CORRESPONDENCE
RIMS
Stencil
Study Abroad
YES

• Total deal value at Rs. 8 Lacs (USD $16,000)
• Average deal value at $1,150

Confidential
Sales Growth Plan (India)
Org Structure (Highlighted already hired)
Head India
Sales

Regional
Head, Delhi

Regional
Head,
Chennai

Regional
Head,
Kolkata

Regional
Head,
Mumbai

Sales
Managers

Sales
Managers

Sales
Managers

Sales
Managers

Confidential
Sales Growth Plan (India)
Cumulative headcount at end of each period:
2009

2010

2011

Q1 Q2 Q3 Q4 CY Q1 Q2 Q3 Q4 CY Q1 Q2 Q3 Q4 CY

6

6

9 12 12 15 18 21 24 24 27 30 33 36 36

Confidential
OPERATIONS

Confidential
Business Operations
• 20,000 students visit portal daily
• Every day, 2,000 unique students fill up their information to enquire about a
specific course/ country/ vocational institute/ college etc.
• All these enquires reside in our database
• These enquires/user data are sold as
•

Verified Exclusive Lead

•

Verified Shared Lead

•

Counseled Lead

•

Complimentary Enquires (for advertisement buyers)

•

E-mail Campaign Product

Confidential
Lead Management System (LMS)
• Order Entry in LMS triggers campaign planning and
lead inventory for starting the delivery
• Campaign once deployed create leads, in parallel
delivery starts with the matched leads in inventory (reverified)
• LMS gives a powerful basic and exact matching
functionality based on order parameters and several
business rules
• LMS workflow handles the delivery of leads right from
the order entry
Confidential
LMS – Workflow
Lead Verification

Order
Entry

Basic
Match

Exact
Match

Lead
Database

Leads created

LMS
Lead
requirement &
Campaign
planning

Campaign
deployment

Student fills in
aspiration

Confidential

Delivery
Organizational Structure
Amitabh Nagpal
CEO

Executive

In San Francisco
Sr. Sales ops Team

Pankaj Bengani
VP, Business
Development &
Sales

Naini Singh
Director Sales,
India

5

Deepti Chitkara
Sr. Manager
Counseling Ops

3

Unless exception noted, all
employees in New Delhi,
India

Pankaj Batra
Architect

Virender Bisht
Director
Engineering

Harpreet Singh
Sr. Manager,
Business Ops
&Finance Control

10

Confidential

14

Saurabh Shakya
Sr. Manager, Prod
& Mkt

4

Mayank Kumar,
Sr. Manager
Content Ops

3

Support Functions
HR & Admin

7
PLAN AND FINANCE

Confidential
Additional initiatives
1. Sales: Expand sales team in India
2. Product & engineering: Expand product offering to
enable to service students better
3. Partnerships: Invest in partnerships with MSN,
Yahoo for traffic acquisitions
4. School Counseling: Expand reach in to schools for
counseling sessions to High schools students
5. Content Acquisition: Increase content depth in each
stream – Engineering, Medicine, Law, Medicine
Vocational courses
Confidential
Operating Plan
Traffic

Customers

Operations

3Q09

• Partner with media companies
• SEO- Improve keyword density
on targeted pages for 100
keywords that drive traffic

• Focus on HT
• Strengthen Delhi Team (hire
regional head)

• Add few more engineers
(SysAdmin and Infrastructure)

4Q09

• Partner with coaching institutes
• Offer Scholarship
• SEO – measure the previous
keywords and add another set of
keywords

• Create 1 new key channel
relationship
• Continue supporting HT
• Build out Chennai & south India
territory
• Recruitment on MBA vertical

• Build out 5 more headcount in
televerification team
• Expand content team by 3 to
focus on content collection and
service Google partnership

1Q10

• Partner with coaching institutes
• Create additional channels in
Retail and Pilot Training

• Hire regional head Mumbai &
Kolkata
• Formalize direct sales presence in
all 4 regions
• Recruitment on MBA vertical

• Add management level finance
and marketing operations staff
• Expand Counseling staff

2Q10

• Partner with other publishers
• Create more channels to attract
students in other verticals

• Recruit customers in other
vocational programs

• New office space needed either
Q2 or Q3
• Expand televerifcation staff as
needed

Confidential
Financial Summary
StudyPlaces

CY 09
Q1

Q2

Domestic Leads

65,133

International Leads

CY 10

Q3

Q4

83,201

148,400

239,000

83,079

88,900

108,850

148,211

172,101

84,185

Total COGS

Gross Profit /(Loss)

CY 09

CY 11

Q1

Q2

Q3

Q4

CY 10

Q1

Q2

535,733

300,800

394,400

500,200

606,000

1,801,400

715,800

825,600

162,900

443,729

208,350

246,600

269,802

284,193

1,008,945

299,919

257,250

401,900

979,463

509,150

641,000

770,002

890,193

2,810,345

14,079

102,900

157,892

359,055

196,549

242,623

285,050

321,834

84,185

14,079

102,900

157,892

359,055

196,549

242,623

285,050

64,027

158,023

154,350

244,008

620,407

312,601

398,377

Total Sales Costs

50,876

45,932

56,024

63,804

216,636

56,353

81,195

Q3

Q4

CY 11

935,400

1,045,200

3,522,000

317,103

335,881

356,399

1,309,302

1,015,719

1,142,703

1,271,281

1,401,599

4,831,302

1,046,057

358,464

393,670

427,598

460,397

1,640,129

321,834

1,046,057

358,464

393,670

427,598

460,397

1,640,129

484,952

568,359

1,764,288

657,255

749,034

843,683

941,202

3,191,174

100,804

121,192

359,543

136,518

144,362

165,101

185,841

631,821

Revenues
Lead Revenues

Total Revenues

Cost of Goods
Lead Acquisition
Online Marketing

SG&A

Total Operations Costs

30,779

30,680

34,331

35,631

131,420

37,631

44,090

47,467

47,944

177,132

54,980

61,457

66,293

72,070

254,800

Total Technology Costs

55,500

42,548

47,159

63,159

208,365

77,159

83,159

83,159

83,159

326,634

83,159

83,159

83,159

83,159

332,634

Total Marketing Costs

17,246

26,303

33,750

35,750

113,049

36,750

36,750

38,250

38,250

150,000

45,750

45,750

47,250

47,250

186,000

216,026

157,323

219,536

225,777

818,662

235,182

243,971

247,337

248,907

975,397

257,342

254,821

255,075

255,328

1,022,566

370,426

302,786

390,800

424,120

1,488,133

443,075

489,164

517,016

539,452

1,988,706

577,748

589,548

616,877

643,647

2,427,821

(306,400)

(144,764)

(236,450)

(180,112)

(867,725)

(130,474)

(90,787)

(32,065)

28,907

(224,418)

79,507

159,485

226,806

297,555

763,353

Total Admin and Operations Costs

Total SG&A

Operating Profit (Loss)

Confidential

46
APPENDIX
LEAD MANAGEMENT SYSTEM
Confidential
Order Entry

Confidential
Order Search

Confidential
A Typical Order Entry

Confidential
Corresponding Sub-order

Confidential
Basic Match Operation

Confidential
Basic Match

Confidential
Tele-Verification

Confidential
Elements for Verification
• Intent Verification

• Data Correctness
– Mandatory parameters

• Contact Details (email, phone)
• Category and Course
• Destination Country (for Study
Abroad)
• Target State/City
• Education Level
• Mode of course (part time, full time,
distance learning)

– Premium parameters
• Work Experience
• Subjects in last education
Confidential

– Expected Year and Month of
joining
• Intakes (e.g. for US Fall and
Spring are marked with intent
Yes)
Verification Calls
• Intent Yes

• Intent No

Confidential
Exact Match and Lead Delivery

Confidential
Distribution (LMS)
• Shared
– Can be contacted by multiple partners through
StudyPlaces (4 partners)

• Exclusive
– One student-one partner

Confidential
Exact Processed Match

Confidential
Partner Testimonials
I have a long and steady relationship with StudyPlaces. The lead quality is great and so is the
customer service…
Mr. Suneet, Director – Fateh
Education
StudyPlaces has delivered what it promised. The concept was new but it is here to stay.
Target Consultancy
We are very happy with studyplaces.com leads quality. In fact last year we got 12 students from
study places leads and we have already converted two students from this year leads. We
used to invest lot of money in newspaper advertisement but we never got such a good
response. Studyplaces.com is a very cost effective medium. We are getting students in such
a low cost in comparison of other media. Best thing about studyplaces.com is that we are
paying for per response only as other media never take guarantee of response.
Studies in Russia
We have been using services offered by StudyPlaces for last 6 months. The branding and quality
of leads provided by StudyPlaces remain unparalleled. All the best, StudyPlaces.
Mr. Atul Goel, Director – OGIS

Confidential

Study places india strategy 17jul09 vfinal

  • 1.
    StudyPlaces: India Strategy Tobe the preferred source of information and guidance for Indian students seeking education. StudyPlaces.com Confidential
  • 2.
    Agenda • • • • • • • Market overview Understanding theIndian student StudyPlaces key assets India-focused strategy Operations overview Finance Appendix – Lead Management System Confidential
  • 3.
  • 4.
    Market Needs andChallenges • • • • Student demand for education options Fragmented education institution market Large media spend on student acquisition Slow but steady shift to online media spending Confidential
  • 5.
    Education Market Overview •Pent up demand for postsecondary education from India and neighboring regions. 112M of postsecondary-age students in India with below-average postsecondary Gross Enrollment Ratio of 12% (vs. 22% for China, 17% for Indonesia and 30% for Brazil) • Local education is a +$11 billion market, with enrolling institutions spending an average of 20% of revenue for student acquisition • India is the largest supplier of students to the US and is the second largest supplier of students to the global education market. In 2008 $200 million was spent recruiting Indian students; expected to grow to $350 million by 2012 www.StudyPlaces.com Confidential 5
  • 6.
    India Domestic EducationSpending Tuition paid by institution type (in $MM) Private Colleges Vocational Courses IT Training Test Prep TOTAL 2008 $6.27 $1.40 $0.23 $1.70 $9.60 2009 $7.34 $1.71 $0.28 $2.04 $11.37 2010 $8.58 $2.08 $0.35 $2.45 $13.46 2011 $10.04 $2.54 $0.44 $2.94 $15.96 Confidential Source: CLSA Education Industry Report. 2012 08-12 CAGR $11.75 17% $3.10 22% $0.55 24% $3.53 20% $18.93 19%
  • 7.
    Education Related AdSpend in India • With a 17% market share in the first half of 2008 Education is the #1 category in Print Advertising in India Rank Category Rank Category 1 Education 6 Corporate / Brand Image 2 Services 7 Durables 3 Banking / Finance / Investment 8 Personal Accessories 4 Auto 9 Telecom / Internet Service Providers 5 Retail 10 Media Source: AdEx India a division of TAM Media Research Confidential http://www.tamindia.com/Mailer/print_advertising/2008/H1-Part1/graph/3.jpg
  • 8.
    Sample print advertisingpage Confidential
  • 9.
  • 10.
    The Indian Student …isseeking information about education options… The Indian Student Goals • Maximize career potential • Increase short term income • Improve academic test results …through multiple sources. Education Options India Abroad Print • Historically primary source of information and advertising medium Engineering Medicine MBA • Small portion of education ad money goes to education TV Law Vocational Professional cert. Online • Students shifting to online for information about education options • Target population already tech savvy and provided with access Test preparation Studying abroad is one of many education options considered by almost every Indian student in light of academic performance, financial resources and time Confidential constraints
  • 11.
    Indian Students SearchOnline for Education Information • • India is the #1/2 country for the search terms “MBA”, “Engineering”, “Medicine”, “Study Abroad”, and “Tuitions” Postsecondary prospective students in India and other target countries are already online, doing research and seeking information (77% of online users are in age group 19-35) Confidential
  • 12.
  • 13.
    StudyPlaces Key Assets Indialeading education site with a Google PageRank of 6 and 180,000 pages indexed • • • • • • Management team Rich and compelling content library, driving organic qualified traffic to Studyplaces.com Growing targeted traffic of Indian and other international students – approx 400k unique visitors Impressive client roster of Indian and international institutions advertising in India: Manipal, NIIT, ICFAI, ETS Partnership with leading media outlets in India (e.g., Hindustan Times, LiveMint,NDTV), broadening reach State-of-the-art lead enrichment process, delivering qualified leads to both local and international institutions Confidential
  • 14.
    Content Library • Collegedirectory: detailed information on – 3,245 of the largest institutes in India (out of ~ 21,000 total) – 103 in Australia, 3,829 in the US, and 748 in the UK – Targeted list of Institutes that Indian students go to – UK content and site in Association with Guardian • Valuable and unique information for prospective to student, driving traffic via SEO and relationships with institutes • FAQ/forums –enable online communication amongst students and indexing for SEO • Result information • Free test preparation Confidential 14
  • 15.
    SEO Successes - Firstpage results on google.co.in for: • • • • • “Study Engineering” “Study MBA” “Study Medicine” “Study Law” “Study Abroad” - 10% month to month increase in organic traffic Confidential 15
  • 16.
  • 17.
    Media Partnerships • Distributiondeals which allow StudyPlaces to provide content and expertise to other media properties – Hindustan Times, LiveMint (Wall Street Journal), NDTV • Media partners depend on Studyplaces for their online ad inventory • Increased traffic flow and branding lead to better monetization opportunities Confidential 17
  • 18.
  • 19.
    India-focused Strategy 1. 2. 3. 4. Focus onselect markets Traffic Acquisition Expand customer base Broaden media reach Confidential
  • 20.
    Focus on selectmarkets Target Market Focus Rationale Private Professional Colleges • • • • • Growing number of new professional colleges seeking students to fill seats • Colleges ready to pay high premium to agents for admission Vocational Institutes • Service industry job seekers looking for qualifications • Target high-demand occupations such as pharmaceutical research, animation, hospitality, aviation, financial back office, etc. • High print advertising spend ready to be converted to online lead generation Test Preparation • Engineering • Medicine • MBA • 1.5 million test takers annually representing a $400 million market annually • Students and families willing to spend to improve outcome Professional Certification • Job seekers and current employees • Low cost and time commitment to improve career opportunities • Demand for certificates with proven ROI: e.g., Project Planning, Java , ERP Study Abroad Agent Market • Candidates considering studying abroad • International universities source a large portion of their foreign students from India • Premium pricing for international leads converted into students ($2k per student) • Agents receive an advertising budget to acquire students. Engineering MBA Medical Dental Confidential
  • 21.
    Current traffic acquisitionmodel Who are we targeting? Students Parents School /College Teachers Counselors How do we generate traffic? Create and promote original relevant content Optimize search results Acquire PPC when appropriate • Ask Studyplaces 30,000+ Questions • Listing of professional colleges • #6 pagerank • 180,000 pages indexed • Keyword Analysis • Manage 100,000 keywords across multiple categories Integrate StudyPlaces with relevant digital destinations • Facebook Partner with leading media platforms • NDTV • Hindustan times, Shine Campus Working Professional Confidential
  • 22.
    Content development plan Trafficgoals • Built professional course vertical channels • Engineering, Medicine, Law, MBA, etc. • Opportunities for additional advertising Position StudyPlaces as trusted source for education options • Created fully searchable and indexed directory of 2500 India-based institutes • By type of program, level, geographic location, focus, etc. Attract relevant Indian traffic • Developed database of vocational certificate and job training options Develop content that allows for segmentation and lead qualification Customize content and experience for the prospective Indian students • Created counseling zone regarding vocational options - moderated forums faqs, expert answers, etc. - to increase stickiness and attract organic traffic • Created free preparation zone for millions of students testing every for the competitive exams • Engineering, Medicine • Provide tips, sample exams, exam dates Confidential Google PageRank 6 180,000 indexed pages
  • 23.
    Vertical Channels • Targetedvertical channels increases relevance for users and search engines • Opportunity to create intent-specific “microsites”, thus increasing quality of leads Confidential
  • 24.
    Education Directory • Directorycovers 3,245 of the largest 21,000 institutes. Next steps is partnership with Google to create the directory at more granular /city level. • Continued effort to add content to increase usability and relevancy Directory Content by Category 1Q09 2Q09 3Q09 4Q09 2010 Engineering Medicine Law Coaching MBA Total 2,550 500 190 350 1,450 5,040 1,940 145 15 125 750 2,975 Confidential 2,025 195 20 155 850 3,245 2,110 250 30 190 950 3,530 2,200 300 60 220 1,050 3,830
  • 25.
    Comprehensive MBA Listings •Comprehensive listing allows for custom searches by – Degree level, – Country/cities – Specialization – Part-time or full-time • Additional opportunity for display advertising Confidential
  • 26.
    Result/Placement and TestPrep Apps Low-cost app to attract qualified traffic right when students ready to make an education decision Approx 20% of organic traffic generated through free test prep application Confidential
  • 27.
    Traffic Numbers andProjected Goals 2008 2009 Q2 Q3 Q4 Q1 Unique Visitors 807,074 799,658 921,735 1,003,038 Organic Visits 412,987 438,032 618,019 741,081 Page views 4,043,906 3,359,279 3,603,615 4,070,820 Online marketing spend (USD) $84,264 $79,951 $83,471 $50,093 Registered Users added 80,108 52,834 55,144 47,056 6% 41% 2010 Q2 Q3 Q4 Q1 Q2 Q3 Q4 830,011 929,612 1,041,165 1,166,105 1,306,038 1,462,762 1,638,294 20% Organic traffic growth Registered Users added 12% 10% 27,421 25,664 22,608 19,579 21,537 23,691 26,060 28,666 31,532 34,685 38,154 Page views per user 5% 5.0 4.2 3.9 4.1 4.3 4.5 4.7 4.9 5.2 5.4 5.7 150,000 225,000 337,500 506,250 759,375 1,139,063 1,708,594 2,562,891 Estimated partnership traffic from NDTV, HT, Live Mint and others Confidential
  • 28.
  • 29.
    Sales Overview • CurrentFocus – Top 100 of institutes in the top verticals: Private College, Vocational, Test Prep, and Study Abroad categories (see pipeline) – Wins already include Manipal, ICFAI, HT, etc. • Forward Focus – Broader reach of institutes in the same verticals – Geographic expansion: sales presence in South, West, and East – Aggressively target other big media spenders Confidential
  • 30.
    Sales Processes 1. Pipelineand revenue forecast management using salesforce.com 2. Weekly team meetings with status updates and review of key metrics 3. Prospecting of potential leads through online and offline media 4. Stringent management of collections vs. invoicing • India has a higher bad debt percentage so we collect 50% upfront for all unproven customers 5. Monthly/Quarterly review of quotas vs actuals Confidential
  • 31.
    Sales Methodology 1. Market Research • • PipelineCreation 2. Field Sales & Telesales Market Research 3. Pipeline Creation: Pipeline generated with Location, Tier, and Category of prospect Pipeline Distribution: • Qualified Inquiries • Customers 4. Review all Edu ads placed in newspapers across top 10 metros Interns collecting data from offline/online sources Pipeline distributed to Field Sales where there is a sales presence (Delhi NCR, started in Mumbai & Hyderabad). Telesales distribution (details next slide) Prospects called for closure Weekly review of metrics: call rates, appointment rates, close rates, etc. Confidential
  • 32.
    Current Status (India) •Current customer count: 54 (excluding Hindustan Times partnership) • Repeat (47), New (7) • • • • • Professional Private College (9) Study Abroad (32) Test Prep (3) Vocational (8) Other (2) • Average Revenue per Customer: Rs. 26,435 (US$550) Confidential
  • 33.
    Hindustan Times Overview •#1 newspaper in North India, #2 nationally • Deal terms: • Hindustan Times sales team reselling StudyPlaces • HT sales team to incudle StudyPlaces as a strategic component of media sales targeted in the Education Vertical • 50% revenue share • Marketing spend pre paid at start of campaign Confidential
  • 34.
    Hindustan Times Overview Relevant Contentfor students Leads, Applications for Admissions Helping in student placements Counseling services – online/ offline Confidential
  • 35.
    Hindustan Times Results •14 live deals in 1st month: • • • • • • • WCTM Ameer Engineering Ameer Medical Aureole Career Access EYK Consultancy ILADA • • • • • • • IRS Picasso Animation R V CORRESPONDENCE RIMS Stencil Study Abroad YES • Total deal value at Rs. 8 Lacs (USD $16,000) • Average deal value at $1,150 Confidential
  • 36.
    Sales Growth Plan(India) Org Structure (Highlighted already hired) Head India Sales Regional Head, Delhi Regional Head, Chennai Regional Head, Kolkata Regional Head, Mumbai Sales Managers Sales Managers Sales Managers Sales Managers Confidential
  • 37.
    Sales Growth Plan(India) Cumulative headcount at end of each period: 2009 2010 2011 Q1 Q2 Q3 Q4 CY Q1 Q2 Q3 Q4 CY Q1 Q2 Q3 Q4 CY 6 6 9 12 12 15 18 21 24 24 27 30 33 36 36 Confidential
  • 38.
  • 39.
    Business Operations • 20,000students visit portal daily • Every day, 2,000 unique students fill up their information to enquire about a specific course/ country/ vocational institute/ college etc. • All these enquires reside in our database • These enquires/user data are sold as • Verified Exclusive Lead • Verified Shared Lead • Counseled Lead • Complimentary Enquires (for advertisement buyers) • E-mail Campaign Product Confidential
  • 40.
    Lead Management System(LMS) • Order Entry in LMS triggers campaign planning and lead inventory for starting the delivery • Campaign once deployed create leads, in parallel delivery starts with the matched leads in inventory (reverified) • LMS gives a powerful basic and exact matching functionality based on order parameters and several business rules • LMS workflow handles the delivery of leads right from the order entry Confidential
  • 41.
    LMS – Workflow LeadVerification Order Entry Basic Match Exact Match Lead Database Leads created LMS Lead requirement & Campaign planning Campaign deployment Student fills in aspiration Confidential Delivery
  • 42.
    Organizational Structure Amitabh Nagpal CEO Executive InSan Francisco Sr. Sales ops Team Pankaj Bengani VP, Business Development & Sales Naini Singh Director Sales, India 5 Deepti Chitkara Sr. Manager Counseling Ops 3 Unless exception noted, all employees in New Delhi, India Pankaj Batra Architect Virender Bisht Director Engineering Harpreet Singh Sr. Manager, Business Ops &Finance Control 10 Confidential 14 Saurabh Shakya Sr. Manager, Prod & Mkt 4 Mayank Kumar, Sr. Manager Content Ops 3 Support Functions HR & Admin 7
  • 43.
  • 44.
    Additional initiatives 1. Sales:Expand sales team in India 2. Product & engineering: Expand product offering to enable to service students better 3. Partnerships: Invest in partnerships with MSN, Yahoo for traffic acquisitions 4. School Counseling: Expand reach in to schools for counseling sessions to High schools students 5. Content Acquisition: Increase content depth in each stream – Engineering, Medicine, Law, Medicine Vocational courses Confidential
  • 45.
    Operating Plan Traffic Customers Operations 3Q09 • Partnerwith media companies • SEO- Improve keyword density on targeted pages for 100 keywords that drive traffic • Focus on HT • Strengthen Delhi Team (hire regional head) • Add few more engineers (SysAdmin and Infrastructure) 4Q09 • Partner with coaching institutes • Offer Scholarship • SEO – measure the previous keywords and add another set of keywords • Create 1 new key channel relationship • Continue supporting HT • Build out Chennai & south India territory • Recruitment on MBA vertical • Build out 5 more headcount in televerification team • Expand content team by 3 to focus on content collection and service Google partnership 1Q10 • Partner with coaching institutes • Create additional channels in Retail and Pilot Training • Hire regional head Mumbai & Kolkata • Formalize direct sales presence in all 4 regions • Recruitment on MBA vertical • Add management level finance and marketing operations staff • Expand Counseling staff 2Q10 • Partner with other publishers • Create more channels to attract students in other verticals • Recruit customers in other vocational programs • New office space needed either Q2 or Q3 • Expand televerifcation staff as needed Confidential
  • 46.
    Financial Summary StudyPlaces CY 09 Q1 Q2 DomesticLeads 65,133 International Leads CY 10 Q3 Q4 83,201 148,400 239,000 83,079 88,900 108,850 148,211 172,101 84,185 Total COGS Gross Profit /(Loss) CY 09 CY 11 Q1 Q2 Q3 Q4 CY 10 Q1 Q2 535,733 300,800 394,400 500,200 606,000 1,801,400 715,800 825,600 162,900 443,729 208,350 246,600 269,802 284,193 1,008,945 299,919 257,250 401,900 979,463 509,150 641,000 770,002 890,193 2,810,345 14,079 102,900 157,892 359,055 196,549 242,623 285,050 321,834 84,185 14,079 102,900 157,892 359,055 196,549 242,623 285,050 64,027 158,023 154,350 244,008 620,407 312,601 398,377 Total Sales Costs 50,876 45,932 56,024 63,804 216,636 56,353 81,195 Q3 Q4 CY 11 935,400 1,045,200 3,522,000 317,103 335,881 356,399 1,309,302 1,015,719 1,142,703 1,271,281 1,401,599 4,831,302 1,046,057 358,464 393,670 427,598 460,397 1,640,129 321,834 1,046,057 358,464 393,670 427,598 460,397 1,640,129 484,952 568,359 1,764,288 657,255 749,034 843,683 941,202 3,191,174 100,804 121,192 359,543 136,518 144,362 165,101 185,841 631,821 Revenues Lead Revenues Total Revenues Cost of Goods Lead Acquisition Online Marketing SG&A Total Operations Costs 30,779 30,680 34,331 35,631 131,420 37,631 44,090 47,467 47,944 177,132 54,980 61,457 66,293 72,070 254,800 Total Technology Costs 55,500 42,548 47,159 63,159 208,365 77,159 83,159 83,159 83,159 326,634 83,159 83,159 83,159 83,159 332,634 Total Marketing Costs 17,246 26,303 33,750 35,750 113,049 36,750 36,750 38,250 38,250 150,000 45,750 45,750 47,250 47,250 186,000 216,026 157,323 219,536 225,777 818,662 235,182 243,971 247,337 248,907 975,397 257,342 254,821 255,075 255,328 1,022,566 370,426 302,786 390,800 424,120 1,488,133 443,075 489,164 517,016 539,452 1,988,706 577,748 589,548 616,877 643,647 2,427,821 (306,400) (144,764) (236,450) (180,112) (867,725) (130,474) (90,787) (32,065) 28,907 (224,418) 79,507 159,485 226,806 297,555 763,353 Total Admin and Operations Costs Total SG&A Operating Profit (Loss) Confidential 46
  • 47.
  • 48.
  • 49.
  • 50.
    A Typical OrderEntry Confidential
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
    Elements for Verification •Intent Verification • Data Correctness – Mandatory parameters • Contact Details (email, phone) • Category and Course • Destination Country (for Study Abroad) • Target State/City • Education Level • Mode of course (part time, full time, distance learning) – Premium parameters • Work Experience • Subjects in last education Confidential – Expected Year and Month of joining • Intakes (e.g. for US Fall and Spring are marked with intent Yes)
  • 56.
    Verification Calls • IntentYes • Intent No Confidential
  • 57.
    Exact Match andLead Delivery Confidential
  • 58.
    Distribution (LMS) • Shared –Can be contacted by multiple partners through StudyPlaces (4 partners) • Exclusive – One student-one partner Confidential
  • 59.
  • 60.
    Partner Testimonials I havea long and steady relationship with StudyPlaces. The lead quality is great and so is the customer service… Mr. Suneet, Director – Fateh Education StudyPlaces has delivered what it promised. The concept was new but it is here to stay. Target Consultancy We are very happy with studyplaces.com leads quality. In fact last year we got 12 students from study places leads and we have already converted two students from this year leads. We used to invest lot of money in newspaper advertisement but we never got such a good response. Studyplaces.com is a very cost effective medium. We are getting students in such a low cost in comparison of other media. Best thing about studyplaces.com is that we are paying for per response only as other media never take guarantee of response. Studies in Russia We have been using services offered by StudyPlaces for last 6 months. The branding and quality of leads provided by StudyPlaces remain unparalleled. All the best, StudyPlaces. Mr. Atul Goel, Director – OGIS Confidential