SlideShare a Scribd company logo
1 of 9
Download to read offline
Stephen O’Connor CV 1
Stephen O’Connor
Curriculum Vitae
39 years of experience
within the Planning
Profession.
Professionally qualified in
town planning and
environmental science
with extensive public and
private sector experience.
Registered Planner
Fellow of the Planning
Institute of Australia
Member of the Natural
Resource Advisory Council
2010 -2011
Over 40 appearances as
an Expert in the Land and
Environment Court
Member of the NSW
Planning Assessment
Commission 2015 to
present
Director of the Planning
Institute of Australia 2013
to present
Vice President Planning
Institute of Australia 2015
to present
Career
Summary
Steve O’Connor holds professional qualifications in planning and
environmental science. He has been responsible for undertaking a
wide range of major planning studies and environmental
assessments since he first entered the workforce in 1974 and has
worked as a professional planner and environmental manager at
senior levels in the public and private sectors.
He has been the principal in charge of assessments for major
infrastructure projects including the provision of water pipelines,
railway lines, electricity transmission lines, sewerage schemes, gas
pipelines and major arterial roads. He has also been in charge of
assessments and ongoing monitoring associated with significant
new developments in the fields of mining, extractive industries,
chemical industries, construction, commercial, retail, tourism,
industrial and residential estates, recreational infrastructure and
waste management projects.
Steve was appointed as a member of the Natural Resource Advisory
Council by the NSW Minister for the Environment in 2010. He was
appointed as a member of the NSW Planning Assessment
Commission by the Minister for Planning in 2015. Steve is a
Registered Planner, a Fellow of the Planning Institute of Australia
(PIA), is currently a Director of PIA, Chair of PIA’s Finance, Audit
and Risk Management Committee and a national Vice President of
PIA. He has participated as an Expert in the NSW Land and
Environment Court and the NSW Supreme Court in relation to over
fifty appeals/ disputes.
Summary of Employment
• Grafton City Council 1974 – 1975
• Department of Lands, Northern Territory 1978 - 1980
• Port Stephens Council 1980 - 1995
• Environmental Resources Management 1995 - 2016
• KDC Pty Ltd 2011 - present
Academic Affiliations
• Part time teacher in the School of Civil Engineering, Newcastle
TAFE 1985 –1989
• Occasional Lecturer in the School of Geography, University of
NSW 1987 - 1994
• Member of an Academic Review Board investigating
Environmental Studies Programs, University of Newcastle 1998
Community Positions
• President of Raymond Terrace Preschool 1987 - 1988
• Councillor for NSW Country Children’s Services Association
1988 - 1998
Stephen O’Connor CV 2
Stephen O’Connor
Curriculum Vitae
• President of NSW Country Children’s Services Association 1995
Education and Qualifications
Education
• Bachelor of Town Planning (Hons)
• Masters of Science (Hons)
• Local Government Town Planning Certificate (NSW)
Professional Affiliations, Board Membership and
Registrations
• Fellow of the Planning Institute of Australia
• Registered Planner
• Member of the Northern Territory Divisional Committee PIA
1978 - 1980
• Member of the NSW Divisional Committee PIA 2010 – present
• Member of the Hunter Chapter of the NSW UDIA 2010 - 2015
• Member of the Environmental Studies Board, University of
Newcastle 1986 -1991
• Member of the NSW Natural Resource Advisory Council 2010 –
2011
• Member of the Water Delivery Alliance Leadership Team 2007
– 2010
• Director of the Planning Institute of Australia
• Chair PIA’s Finance, Audit and Risk Management Committee
2014 to present
• Justice of the Peace
Major Projects
Infrastructure Projects
Port Stephens Composting Plant, Bedminster
Preparation of an Environmental Impact Statement for new
technology to compost municipal waste which became the first such
plant constructed in Australia.
Nelson Bay Road Upgrade, Roads and Traffic Authority
Preparation of a Review of Environmental Factors for a seven
kilometre dual carriage way arterial road. The project was highly
controversial and required extensive ecological and archaeological
investigations.
Newcastle Airport Terminal Upgrade, Newcastle Airport
Limited
Preparation of a Statement of Environmental Effects to support the
expansion of the passenger terminal at Newcastle Airport. The
project allowed the expansion of passenger services and associated
Stephen O’Connor CV 3
Stephen O’Connor
Curriculum Vitae
infrastructure and facilitated an increase in passengers capacity at
the airport.
Gunnedah Sewage Effluent Reuse, Gunnedah Council
Environmental Impact Statement for a project which has redirected
effluent which previously discharged into the Gwyder River, so that
it now irrigates recreation and agricultural areas.
Tomago to Tomaree Water Supply Pipeline, Hunter Water
Corporation
Preparation of an Environmental Impact Statement for the
construction of a 40 km pipeline from Tomgao Water Treatment
Works to the Tomaree Peninsula. The major constraints to the
project were the existence of threatened flora and fauna which
required sensitive management. Ongoing Environmental
Management Plans and extensive community consultation in the
construction phase was also undertaken.
Summerhill Recycling Study, Newcastle City Council
Waste reuse and recycling strategy for Newcastle including
masterplan for development of Council’s waste centre to maximise
sustainability.
Strategic Planning
Maitland Settlement Strategy, Maitland City Council
Assessment of physical and social constraints to development and
formulation of Comprehensive Urban Settlement Strategy for the
City of Maitland.
Soldiers Point Project, Port Stephens Council
Masterplan and Environmental Assessment for tourist development
which assisted in securing approvals and permits for a high profile
tourist complex.
Fern Bay Master Plan, Winten Property Group
Preparation of a 950 residential lot masterplan for a sensitive coastal
site at Fern Bay north of Newcastle. The masterplan was approved
by the Minister and laid the foundation for the issue of a Project
Approval.
Construction and Remediation Projects
Water Delivery Alliance, Sydney Water Corporation
As a member and for some time the chair of the Alliance Leadership
Team for the WDA, Steve was involved in key decision making
associated with the delivery of desalinated water from Kurnell to
Erskineville via a pipeline which traversed Botany Bay.
Former Industrial Site Remediation, Confidential Client
Review of Statement of Environmental Effects for the remediation
works proposed to decommission two dams on a site with
contaminated soil. The soil containing asbestos material was
proposed to be buried in the dams and capped to provide a secure
Stephen O’Connor CV 4
Stephen O’Connor
Curriculum Vitae
landfill. The site was located in the Holroyd Local Government Area
(LGA) and Council had a ban on disposal of asbestos on site
throughout the LGA. After an appeal was lodged with the NSW Land
and Environment Court Council granted conditional consent to the
project allowing it to proceed. These works were a prerequisite for
the sale of the site to a third party.
Oyster Bay Service Station and Surrounding Lands
Remediation, Viva
Provision of advice in relation to future land use complying with an
Accredited Site Auditor’s Statement requiring strict procedures to be
followed when excavation and penetration of the groundwater table
is proposed. The use of Restrictive Covenants was discussed as well
as the proposal to undertake medium density development in a
manner which respects the site contamination issues on site.
Kendall Bay Remediation Project, Jemena
Preparation of a Planning Report seeking an amendment to Canada
Bay Local Environmental Plan to accommodate works associated
with the remediation of Kendall Bay which adjoins the site of a
former gas works. A series of specialist studies were undertaken to
support the rezoning investigating odour, noise and vibration,
traffic, heritage, ecology and the likely social and economic impacts.
Hunter River Remediation Project, Thiess
Undertaking environmental monitoring and occupational health and
hygiene assessments for remediation work on the site of a former
steel works in Newcastle. This work involved the dredging of
contaminated sediments from the adjoining Hunter River and the
treatment of these sediments in specially constructed buildings on
the former steel works site.
Environmental Impact Assessment
Cobbora Open Cut Coal Project, Cobbora Unincorporated
Joint Venture
Preparation of an Environmental Assessment (in draft form) for a
proposed 20 million tonnes per annum run of mine black coal
operation in central New South Wales, together with associated
infrastructure including a rail spur line and two water pipelines.
South Bulga Underground Mine EIS, South Bulga Coal
Preparation of an underground coal mining Environmental Impact
Statement for the expansion of an existing underground mine into
new areas including Commonwealth land used for Defence
purposes.
Wallarah No2 Joint Venture Project, Kores
Assisted in presenting on behalf of Kores before an Independent
Panel established to investigate whether mining should be
permitted on the Central Coast of NSW by the NSW State
Government.
Stephen O’Connor CV 5
Stephen O’Connor
Curriculum Vitae
Albion Park Quarry, CSR
Preparation of Environmental Impact Statement for continued
operation of a major quarry under State Environmental Planning
Policy No. 37. Key issues included transport, blasting, noise, visual,
impact, threatened species and rehabilitation.
Angus Place and Springvale Section 96 Amendments,
Centennial Coal.
Preparation of specialist studies and Section 96 Amendment Report
seeking variations to existing development consents for adjoining
mines in the Blue Mountains Location Government Area.
Rezoning Report for major Urban Release Area at Fern
Bay, Boral
Preparation of a Comprehensive Constraints and Opportunities
Report for a large site at Fern Bay currently used for quarry
purposes. A concept development plan was prepared which
illustrated a combined tourist and residential development and
highlighted the dedication of two thirds of the site for environmental
conservation purposes.
Bulga Open Cut Continued Mining EIS, Bulga Coal.
Comprehensive coal mining Environmental Impact Statement which
was subsequently approved to allow 10 million tonnes of coal to be
extracted annually. Detailed ecological investigations were required
to support the application for expansion lodged with the New South
Wales Department of Planning.
Seaham Quarry Expansion, Boral
Preparation of all necessary Environmental Impact Assessment
documentation for expanded operations at Boral’s Seaham Quarry
north of Newcastle. The expansion involved clearing of native
vegetation which had to be assessed in accordance with State and
Commonwealth legislative requirements. Approval was secured
from Council following a successful rezoning of the site to facilitate
the proposed expansion. This required Ministerial approval and the
support of Council.
Peppertree Quarry Alterations, Marulan, Element
Environment Consultants, Boral
Review of Planning and Environmental Assessments associated with
the alterations to Boral’s Peppertree Quarry in the Southern
Highlands of NSW. The alterations involved clearing of native
vegetation which had to be assessed in accordance with State and
Commonwealth legislative requirements.
Nelson Bay Road Upgrade, Roads and Traffic Authority.
Options evaluation of several possible routes and preparation of a
Review of Environmental Factors for the preferred route for a seven
kilometre dual carriage way arterial road near Nelson Bay at Port
Stephens. The project was highly controversial and required
extensive ecological and archaeological investigations. In addition,
a comprehensive community consultation process was undertaken
Stephen O’Connor CV 6
Stephen O’Connor
Curriculum Vitae
including individual negotiations with all land owners the subject of
possible future acquisition.
Fern Bay Sand Extraction, Boral
Environmental investigations including extensive ecological studies
were undertaken as part of securing the approval for continued
sand extraction from a major source of construction sand located
on Stockton Bight north of Stockton in the Hunter Region.
Rehabilitation processes were an integral part of demonstrating
Boral’s credibility in terms of compensating for biodiversity losses
on site.
Preliminary Environmental Assessment Report on
Expansion of Limestone Mine at Marulan, Element
Environmental Consultants
Review of a preliminary environmental assessment report
discussing the proposed expansion of an existing limestone mine
operated by Boral at Marulan. The report documented the complex
interrelationship of environmental factors at play in an area that has
been the subject of mining and extractive industries for over a
century, adjacent to sensitive conservation areas.
Mayfield Industrial Site Constraints and Opportunities
Review, OneSteel
Environmental and planning investigation of a major landholding in
the Mayfield Industrial Estate comprising 175 hectares. A range of
potential land uses were examined including a coal loading facility
given the proximity of the Port of Newcastle. A review of the
planning considerations for any major development on the site was
presented together with the likelihood of such developments being
granted approval.
Chemical Storage Facility, Crawford Freightlines
A hazardous chemical storage facility at Sandgate adjoining a rail
siding and the New England Highway, was assessed in terms of the
proposed expansion from 2,000 to 12,500 tonnes at any one time.
Environmental constraints including wetlands and flood prone land
were undertaken as well as specialised risk and hazard studies. A
complete set of management plans was also prepared to
demonstrate compliance with agency requirements.
Outdoor Storage Facility at Port Kembla, South Coast
Engineers
Environmental and planning investigations to ascertain the most
appropriate approval path for a proposed outdoor storage facility
accommodating up to 250,000 tonnes of material at any one time.
The range of other approvals and permits required were identified
and a flow chart was provided to demonstrate the various approval
paths relevant to the proposal.
Expert Evidence
Buttai Quarry, Daracon.
Stephen O’Connor CV 7
Stephen O’Connor
Curriculum Vitae
Preparation of an Environmental Impact Statement for the
establishment of a 200 000 tonnes per annum hard rock quarry.
The consent issued by Council was subsequently challenged in the
Land and Environment Court and successfully defended.
Litigation in relation to Transport Infrastructure and Steel
Works, Premiers Department of NSW.
Preparation of evidence in support of the Environmental Impact
Statement prepared for a port and seven kilometre long
infrastructure corridor comprising a road/ conveyor to service a
steel mill with an estimated output of over $1 billion worth of
finished products per annum. The litigation was discontinued prior
to the commencement of hearings.
Vincentia Compulsory Acquisition, Morton and Harris.
Preparation of a series of reports assessing the development
potential of land acquired for community uses by Shoalhaven City
Council. The final judgement substantially favoured Council.
Moonee Collector Road Appeal, Gadens Lawyers.
Preparation of expert evidence including joint expert statements in
relation to the refusal of a development application to construct a
collector road from Moonee commercial area to the Glades Estate.
The Court granted consent subject to a series of conditions ensuring
an acceptable environmental impact.
Toronto Retail Centre, Lake Macquarie City Council
Represent Council as an expert witness in the successful defence of
Council’s refusal of a proposed expansion of a supermarket and
specialty shops.
Salamander Project Litigation, Deacons Lawyers
Provided affidavits in respect of planning approval processes
applicable during the 1980’s and 1990’s in relation to proceedings
involving breach of contract.
Wagga Wagga City Council Litigation, Sparke Helmore
Solicitors
Preparation of expert evidence in relation to a residential subdivision
which had suffered the impacts of subsidence as it had been
developed in a sawmill waste disposal area.
Whitebridge Small Lot Housing Appeal, Peter Rees
Solicitor
Represented Council in the successful defence of its refusal of a
development application for a small lot housing project adjoining an
established residential area.
Jesmond Medium Density Housing Appeal, Newcastle City
Council v Private Developer
Presented evidence as a Court Appointed Expert in relation to a
medium density housing project where the key issues were
Stephen O’Connor CV 8
Stephen O’Connor
Curriculum Vitae
overshadowing, privacy, car parking adequacy and streetscape/
aesthetics.
Wambo Land and Environment Court Appeal, Excel Mining
Preparation of Expert Evidence and participation in joint expert
conferences in relation to a challenge against the Minister’s granting
of consent for the expansion of Wambo coal mine in the Hunter
Valley. The appeal was withdrawn shortly prior to the
commencement of court proceedings, removing the obstacle to
mining proceeding.
Dungog Shopping Centre, Dungog Council v Private
Developer
Presented evidence as a Court Appointed Expert in relation to the
proposed development of a new shopping complex adjoining the
heritage declared town centre. The key issues were aesthetics, car
parking, pedestrian linkages to the established town centre,
adequacy of services and public interest.
Challenge Against Validity of Consent for Medium Density
Development at Nelson Bay, Port Stephens Council
Represented Council as an expert witness in the defence of Council’s
approval of a medium density residential development at Nelson
Bay overlooking Port Stephens.
Drayton Coal Mine, Fitzgerald White and Talbot
Complete review of all planning consents and related permits and
approvals dating back to the commencement of mining as part of
the due diligence exercise Anglo American Coal were undertaking.
Pitt Town Litigation, NSW Supreme Court, Johnson
Property Group
Preparation of evidence on town planning issues in relation to the
dispute between adjoining land owners seeking to jointly develop
an urban release area in the Hawkesbury Local Government Area,
including preparation of a joint report with another expert witness.
Cooranbong Water Treatment Infrastructure, Sparke
Helmore Solicitors
Preparation of an expert report in relation to the proposal to develop
a water treatment plant and associated infrastructure to service the
North Cooranbong Residential Estate in the Lake Macquarie Local
Government Area. The plant was designed to provide recycled
water in a third pipe to service the new residential estate to the
north being developed by the Johnson Property Group.
Compulsory Acquisition of Part of a Parcel of Land for
Road Construction, Ashurst Solicitors
Investigation into the planning issues surrounding the acquisition
by the NSW Roads and Maritime Services (RMS) of land used partly
for quarrying. Consideration of the before and after acquisition
Stephen O’Connor CV 9
Stephen O’Connor
Curriculum Vitae
scenarios from the perspective of continued quarrying on the
subject land.
Publications
The Canberra Syndrome. Published in Canplan, 1980.
An Innovative Approach to Assessing Urban Land
Capability. Paper presented to the World Planning and Housing
Congress, Adelaide, 1986.
Living in a Global Greenhouse - Coastal Planning and
Development. Contribution to Occasional Paper No. 13, Board
of Environmental Studies, University of Newcastle, 1989.
Sea Level and Greenhouse - Planning for Change.
Australian Planner Vol. 29 (1) 1991.
Coastal Land Management. Paper presented to Biennial RAPI
Congress on Planning for Sustainable Development, 1992.
The Koala. Australian Planner Vol. 33 (1) 1996.
The Changing Approach to Seeking Approvals for Coal
Mining. Environmental Planning Law Association Annual
Conference, 1998.
DUAP Discussion Paper and Recent Trends in Mining
Approvals. NSW Mineral’s Council Environmental Workshop,
1999.
Integrated Development. New Planner, No 50, 2002.
Columbia New Town. PIA NSW Division Annual Conference,
2004.
Fern Bay Master Plan. Planning Institute of Australia Biennial
Conference, 2005.
Community Title as a Means of Achieving Environmental
and Social Outcomes. Town Centres and Communities Annual
Conference, 2006.
Coastal Planning. New Planner, No 77, 2008.
Sustainable Housing. New Planner, No 78, 2009.
Sydney’s Desalination Project. New Planner No 82, 2010.
Reform of NSW Planning System Part One Plan Making.
New Planner No 84, 2010.
Reform of NSW Planning System Part Two Development
Assessment. New Planner No 87, 2011.
Fundamental Problems with Integrated Development. New
Planner No 88, 2011.
Coal Seam Gas Debate. New Planner No 94, 2013.
Lessons Learnt from the Warkworth Judgement. New
Planner, No 96, 2013.
Implications of an Ageing Australian Population. New
Planner No 98, 2014.
What’s in a Name? New Planner No 101, 2014.
Infrastructure Funding Reforms. New Planner No 103, 2015.
Resilience is a Recurring Theme. New Planner No 105, 2016.

More Related Content

What's hot

Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Sam Stribling
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
Group 03 Development Presentation
Group 03 Development PresentationGroup 03 Development Presentation
Group 03 Development PresentationGP Design PS
 
Toledo Harbor Dredging Summit 2009
Toledo Harbor Dredging Summit 2009Toledo Harbor Dredging Summit 2009
Toledo Harbor Dredging Summit 2009HKemler
 
Devens Annual Report 2008
Devens Annual Report 2008Devens Annual Report 2008
Devens Annual Report 2008MassDevelopment
 
Env. Experience 10132015
Env. Experience 10132015Env. Experience 10132015
Env. Experience 10132015Waseem Khan, PG
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshLokesh Saini
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochurechrisberryman
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationCUNY Sustainable Cities
 
George Leahy Resume
George Leahy  ResumeGeorge Leahy  Resume
George Leahy ResumeGeorge Leahy
 
1658 acepd comments to usepa re interim stormwater design workplan 6 14-2010
1658 acepd comments to usepa re interim stormwater design workplan 6 14-20101658 acepd comments to usepa re interim stormwater design workplan 6 14-2010
1658 acepd comments to usepa re interim stormwater design workplan 6 14-2010Protect Gainesville's Citizens
 

What's hot (20)

Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
Engineering with Nature
Engineering with NatureEngineering with Nature
Engineering with Nature
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
Group 03 Development Presentation
Group 03 Development PresentationGroup 03 Development Presentation
Group 03 Development Presentation
 
Blair Dunderdale 2015
Blair Dunderdale 2015Blair Dunderdale 2015
Blair Dunderdale 2015
 
N Armitage CV
N Armitage CVN Armitage CV
N Armitage CV
 
Toledo Harbor Dredging Summit 2009
Toledo Harbor Dredging Summit 2009Toledo Harbor Dredging Summit 2009
Toledo Harbor Dredging Summit 2009
 
Devens Annual Report 2008
Devens Annual Report 2008Devens Annual Report 2008
Devens Annual Report 2008
 
Uic Nepa
Uic NepaUic Nepa
Uic Nepa
 
Resume
ResumeResume
Resume
 
Env. Experience 10132015
Env. Experience 10132015Env. Experience 10132015
Env. Experience 10132015
 
Missouri
MissouriMissouri
Missouri
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochure
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
 
George Leahy Resume
George Leahy  ResumeGeorge Leahy  Resume
George Leahy Resume
 
Henri_silalahi_CV2016
Henri_silalahi_CV2016Henri_silalahi_CV2016
Henri_silalahi_CV2016
 
1658 acepd comments to usepa re interim stormwater design workplan 6 14-2010
1658 acepd comments to usepa re interim stormwater design workplan 6 14-20101658 acepd comments to usepa re interim stormwater design workplan 6 14-2010
1658 acepd comments to usepa re interim stormwater design workplan 6 14-2010
 
NYWEA 2012
NYWEA 2012NYWEA 2012
NYWEA 2012
 

Similar to Stephen O'Connor - Curriculum Vitae - July 2016

Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Phil Styles
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie ScottGeorgia Scott
 
Paul Thomas 2015
Paul Thomas 2015Paul Thomas 2015
Paul Thomas 2015Paul Thomas
 
Terry Schaffer Resume Final 11 June 15
Terry Schaffer Resume Final 11 June 15Terry Schaffer Resume Final 11 June 15
Terry Schaffer Resume Final 11 June 15Terry Schaffer
 
CV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLICCV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLICJohn Fisher
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
CV-HSE - Craig Thamm - 2017-02
CV-HSE - Craig Thamm - 2017-02CV-HSE - Craig Thamm - 2017-02
CV-HSE - Craig Thamm - 2017-02Craig Thamm
 
20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_AndrewAndrew Carline
 
AtoP Pipeline fro linked in
AtoP Pipeline fro linked inAtoP Pipeline fro linked in
AtoP Pipeline fro linked inHelen Simpson
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman
 

Similar to Stephen O'Connor - Curriculum Vitae - July 2016 (20)

Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222
 
KvZ_RES2013a3kol4
KvZ_RES2013a3kol4KvZ_RES2013a3kol4
KvZ_RES2013a3kol4
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie Scott
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Paul Thomas 2015
Paul Thomas 2015Paul Thomas 2015
Paul Thomas 2015
 
Resume 2013
Resume 2013Resume 2013
Resume 2013
 
Well integrity lifecycle Santos
Well integrity lifecycle SantosWell integrity lifecycle Santos
Well integrity lifecycle Santos
 
Terry Schaffer Resume Final 11 June 15
Terry Schaffer Resume Final 11 June 15Terry Schaffer Resume Final 11 June 15
Terry Schaffer Resume Final 11 June 15
 
Richard Parkinson CV
Richard Parkinson CVRichard Parkinson CV
Richard Parkinson CV
 
Orion WB 2016
Orion WB 2016Orion WB 2016
Orion WB 2016
 
CV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLICCV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLIC
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
CV-HSE - Craig Thamm - 2017-02
CV-HSE - Craig Thamm - 2017-02CV-HSE - Craig Thamm - 2017-02
CV-HSE - Craig Thamm - 2017-02
 
20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_Andrew
 
Stewart Edwardes_0915
Stewart Edwardes_0915Stewart Edwardes_0915
Stewart Edwardes_0915
 
AtoP Pipeline fro linked in
AtoP Pipeline fro linked inAtoP Pipeline fro linked in
AtoP Pipeline fro linked in
 
Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017
 

Stephen O'Connor - Curriculum Vitae - July 2016

  • 1. Stephen O’Connor CV 1 Stephen O’Connor Curriculum Vitae 39 years of experience within the Planning Profession. Professionally qualified in town planning and environmental science with extensive public and private sector experience. Registered Planner Fellow of the Planning Institute of Australia Member of the Natural Resource Advisory Council 2010 -2011 Over 40 appearances as an Expert in the Land and Environment Court Member of the NSW Planning Assessment Commission 2015 to present Director of the Planning Institute of Australia 2013 to present Vice President Planning Institute of Australia 2015 to present Career Summary Steve O’Connor holds professional qualifications in planning and environmental science. He has been responsible for undertaking a wide range of major planning studies and environmental assessments since he first entered the workforce in 1974 and has worked as a professional planner and environmental manager at senior levels in the public and private sectors. He has been the principal in charge of assessments for major infrastructure projects including the provision of water pipelines, railway lines, electricity transmission lines, sewerage schemes, gas pipelines and major arterial roads. He has also been in charge of assessments and ongoing monitoring associated with significant new developments in the fields of mining, extractive industries, chemical industries, construction, commercial, retail, tourism, industrial and residential estates, recreational infrastructure and waste management projects. Steve was appointed as a member of the Natural Resource Advisory Council by the NSW Minister for the Environment in 2010. He was appointed as a member of the NSW Planning Assessment Commission by the Minister for Planning in 2015. Steve is a Registered Planner, a Fellow of the Planning Institute of Australia (PIA), is currently a Director of PIA, Chair of PIA’s Finance, Audit and Risk Management Committee and a national Vice President of PIA. He has participated as an Expert in the NSW Land and Environment Court and the NSW Supreme Court in relation to over fifty appeals/ disputes. Summary of Employment • Grafton City Council 1974 – 1975 • Department of Lands, Northern Territory 1978 - 1980 • Port Stephens Council 1980 - 1995 • Environmental Resources Management 1995 - 2016 • KDC Pty Ltd 2011 - present Academic Affiliations • Part time teacher in the School of Civil Engineering, Newcastle TAFE 1985 –1989 • Occasional Lecturer in the School of Geography, University of NSW 1987 - 1994 • Member of an Academic Review Board investigating Environmental Studies Programs, University of Newcastle 1998 Community Positions • President of Raymond Terrace Preschool 1987 - 1988 • Councillor for NSW Country Children’s Services Association 1988 - 1998
  • 2. Stephen O’Connor CV 2 Stephen O’Connor Curriculum Vitae • President of NSW Country Children’s Services Association 1995 Education and Qualifications Education • Bachelor of Town Planning (Hons) • Masters of Science (Hons) • Local Government Town Planning Certificate (NSW) Professional Affiliations, Board Membership and Registrations • Fellow of the Planning Institute of Australia • Registered Planner • Member of the Northern Territory Divisional Committee PIA 1978 - 1980 • Member of the NSW Divisional Committee PIA 2010 – present • Member of the Hunter Chapter of the NSW UDIA 2010 - 2015 • Member of the Environmental Studies Board, University of Newcastle 1986 -1991 • Member of the NSW Natural Resource Advisory Council 2010 – 2011 • Member of the Water Delivery Alliance Leadership Team 2007 – 2010 • Director of the Planning Institute of Australia • Chair PIA’s Finance, Audit and Risk Management Committee 2014 to present • Justice of the Peace Major Projects Infrastructure Projects Port Stephens Composting Plant, Bedminster Preparation of an Environmental Impact Statement for new technology to compost municipal waste which became the first such plant constructed in Australia. Nelson Bay Road Upgrade, Roads and Traffic Authority Preparation of a Review of Environmental Factors for a seven kilometre dual carriage way arterial road. The project was highly controversial and required extensive ecological and archaeological investigations. Newcastle Airport Terminal Upgrade, Newcastle Airport Limited Preparation of a Statement of Environmental Effects to support the expansion of the passenger terminal at Newcastle Airport. The project allowed the expansion of passenger services and associated
  • 3. Stephen O’Connor CV 3 Stephen O’Connor Curriculum Vitae infrastructure and facilitated an increase in passengers capacity at the airport. Gunnedah Sewage Effluent Reuse, Gunnedah Council Environmental Impact Statement for a project which has redirected effluent which previously discharged into the Gwyder River, so that it now irrigates recreation and agricultural areas. Tomago to Tomaree Water Supply Pipeline, Hunter Water Corporation Preparation of an Environmental Impact Statement for the construction of a 40 km pipeline from Tomgao Water Treatment Works to the Tomaree Peninsula. The major constraints to the project were the existence of threatened flora and fauna which required sensitive management. Ongoing Environmental Management Plans and extensive community consultation in the construction phase was also undertaken. Summerhill Recycling Study, Newcastle City Council Waste reuse and recycling strategy for Newcastle including masterplan for development of Council’s waste centre to maximise sustainability. Strategic Planning Maitland Settlement Strategy, Maitland City Council Assessment of physical and social constraints to development and formulation of Comprehensive Urban Settlement Strategy for the City of Maitland. Soldiers Point Project, Port Stephens Council Masterplan and Environmental Assessment for tourist development which assisted in securing approvals and permits for a high profile tourist complex. Fern Bay Master Plan, Winten Property Group Preparation of a 950 residential lot masterplan for a sensitive coastal site at Fern Bay north of Newcastle. The masterplan was approved by the Minister and laid the foundation for the issue of a Project Approval. Construction and Remediation Projects Water Delivery Alliance, Sydney Water Corporation As a member and for some time the chair of the Alliance Leadership Team for the WDA, Steve was involved in key decision making associated with the delivery of desalinated water from Kurnell to Erskineville via a pipeline which traversed Botany Bay. Former Industrial Site Remediation, Confidential Client Review of Statement of Environmental Effects for the remediation works proposed to decommission two dams on a site with contaminated soil. The soil containing asbestos material was proposed to be buried in the dams and capped to provide a secure
  • 4. Stephen O’Connor CV 4 Stephen O’Connor Curriculum Vitae landfill. The site was located in the Holroyd Local Government Area (LGA) and Council had a ban on disposal of asbestos on site throughout the LGA. After an appeal was lodged with the NSW Land and Environment Court Council granted conditional consent to the project allowing it to proceed. These works were a prerequisite for the sale of the site to a third party. Oyster Bay Service Station and Surrounding Lands Remediation, Viva Provision of advice in relation to future land use complying with an Accredited Site Auditor’s Statement requiring strict procedures to be followed when excavation and penetration of the groundwater table is proposed. The use of Restrictive Covenants was discussed as well as the proposal to undertake medium density development in a manner which respects the site contamination issues on site. Kendall Bay Remediation Project, Jemena Preparation of a Planning Report seeking an amendment to Canada Bay Local Environmental Plan to accommodate works associated with the remediation of Kendall Bay which adjoins the site of a former gas works. A series of specialist studies were undertaken to support the rezoning investigating odour, noise and vibration, traffic, heritage, ecology and the likely social and economic impacts. Hunter River Remediation Project, Thiess Undertaking environmental monitoring and occupational health and hygiene assessments for remediation work on the site of a former steel works in Newcastle. This work involved the dredging of contaminated sediments from the adjoining Hunter River and the treatment of these sediments in specially constructed buildings on the former steel works site. Environmental Impact Assessment Cobbora Open Cut Coal Project, Cobbora Unincorporated Joint Venture Preparation of an Environmental Assessment (in draft form) for a proposed 20 million tonnes per annum run of mine black coal operation in central New South Wales, together with associated infrastructure including a rail spur line and two water pipelines. South Bulga Underground Mine EIS, South Bulga Coal Preparation of an underground coal mining Environmental Impact Statement for the expansion of an existing underground mine into new areas including Commonwealth land used for Defence purposes. Wallarah No2 Joint Venture Project, Kores Assisted in presenting on behalf of Kores before an Independent Panel established to investigate whether mining should be permitted on the Central Coast of NSW by the NSW State Government.
  • 5. Stephen O’Connor CV 5 Stephen O’Connor Curriculum Vitae Albion Park Quarry, CSR Preparation of Environmental Impact Statement for continued operation of a major quarry under State Environmental Planning Policy No. 37. Key issues included transport, blasting, noise, visual, impact, threatened species and rehabilitation. Angus Place and Springvale Section 96 Amendments, Centennial Coal. Preparation of specialist studies and Section 96 Amendment Report seeking variations to existing development consents for adjoining mines in the Blue Mountains Location Government Area. Rezoning Report for major Urban Release Area at Fern Bay, Boral Preparation of a Comprehensive Constraints and Opportunities Report for a large site at Fern Bay currently used for quarry purposes. A concept development plan was prepared which illustrated a combined tourist and residential development and highlighted the dedication of two thirds of the site for environmental conservation purposes. Bulga Open Cut Continued Mining EIS, Bulga Coal. Comprehensive coal mining Environmental Impact Statement which was subsequently approved to allow 10 million tonnes of coal to be extracted annually. Detailed ecological investigations were required to support the application for expansion lodged with the New South Wales Department of Planning. Seaham Quarry Expansion, Boral Preparation of all necessary Environmental Impact Assessment documentation for expanded operations at Boral’s Seaham Quarry north of Newcastle. The expansion involved clearing of native vegetation which had to be assessed in accordance with State and Commonwealth legislative requirements. Approval was secured from Council following a successful rezoning of the site to facilitate the proposed expansion. This required Ministerial approval and the support of Council. Peppertree Quarry Alterations, Marulan, Element Environment Consultants, Boral Review of Planning and Environmental Assessments associated with the alterations to Boral’s Peppertree Quarry in the Southern Highlands of NSW. The alterations involved clearing of native vegetation which had to be assessed in accordance with State and Commonwealth legislative requirements. Nelson Bay Road Upgrade, Roads and Traffic Authority. Options evaluation of several possible routes and preparation of a Review of Environmental Factors for the preferred route for a seven kilometre dual carriage way arterial road near Nelson Bay at Port Stephens. The project was highly controversial and required extensive ecological and archaeological investigations. In addition, a comprehensive community consultation process was undertaken
  • 6. Stephen O’Connor CV 6 Stephen O’Connor Curriculum Vitae including individual negotiations with all land owners the subject of possible future acquisition. Fern Bay Sand Extraction, Boral Environmental investigations including extensive ecological studies were undertaken as part of securing the approval for continued sand extraction from a major source of construction sand located on Stockton Bight north of Stockton in the Hunter Region. Rehabilitation processes were an integral part of demonstrating Boral’s credibility in terms of compensating for biodiversity losses on site. Preliminary Environmental Assessment Report on Expansion of Limestone Mine at Marulan, Element Environmental Consultants Review of a preliminary environmental assessment report discussing the proposed expansion of an existing limestone mine operated by Boral at Marulan. The report documented the complex interrelationship of environmental factors at play in an area that has been the subject of mining and extractive industries for over a century, adjacent to sensitive conservation areas. Mayfield Industrial Site Constraints and Opportunities Review, OneSteel Environmental and planning investigation of a major landholding in the Mayfield Industrial Estate comprising 175 hectares. A range of potential land uses were examined including a coal loading facility given the proximity of the Port of Newcastle. A review of the planning considerations for any major development on the site was presented together with the likelihood of such developments being granted approval. Chemical Storage Facility, Crawford Freightlines A hazardous chemical storage facility at Sandgate adjoining a rail siding and the New England Highway, was assessed in terms of the proposed expansion from 2,000 to 12,500 tonnes at any one time. Environmental constraints including wetlands and flood prone land were undertaken as well as specialised risk and hazard studies. A complete set of management plans was also prepared to demonstrate compliance with agency requirements. Outdoor Storage Facility at Port Kembla, South Coast Engineers Environmental and planning investigations to ascertain the most appropriate approval path for a proposed outdoor storage facility accommodating up to 250,000 tonnes of material at any one time. The range of other approvals and permits required were identified and a flow chart was provided to demonstrate the various approval paths relevant to the proposal. Expert Evidence Buttai Quarry, Daracon.
  • 7. Stephen O’Connor CV 7 Stephen O’Connor Curriculum Vitae Preparation of an Environmental Impact Statement for the establishment of a 200 000 tonnes per annum hard rock quarry. The consent issued by Council was subsequently challenged in the Land and Environment Court and successfully defended. Litigation in relation to Transport Infrastructure and Steel Works, Premiers Department of NSW. Preparation of evidence in support of the Environmental Impact Statement prepared for a port and seven kilometre long infrastructure corridor comprising a road/ conveyor to service a steel mill with an estimated output of over $1 billion worth of finished products per annum. The litigation was discontinued prior to the commencement of hearings. Vincentia Compulsory Acquisition, Morton and Harris. Preparation of a series of reports assessing the development potential of land acquired for community uses by Shoalhaven City Council. The final judgement substantially favoured Council. Moonee Collector Road Appeal, Gadens Lawyers. Preparation of expert evidence including joint expert statements in relation to the refusal of a development application to construct a collector road from Moonee commercial area to the Glades Estate. The Court granted consent subject to a series of conditions ensuring an acceptable environmental impact. Toronto Retail Centre, Lake Macquarie City Council Represent Council as an expert witness in the successful defence of Council’s refusal of a proposed expansion of a supermarket and specialty shops. Salamander Project Litigation, Deacons Lawyers Provided affidavits in respect of planning approval processes applicable during the 1980’s and 1990’s in relation to proceedings involving breach of contract. Wagga Wagga City Council Litigation, Sparke Helmore Solicitors Preparation of expert evidence in relation to a residential subdivision which had suffered the impacts of subsidence as it had been developed in a sawmill waste disposal area. Whitebridge Small Lot Housing Appeal, Peter Rees Solicitor Represented Council in the successful defence of its refusal of a development application for a small lot housing project adjoining an established residential area. Jesmond Medium Density Housing Appeal, Newcastle City Council v Private Developer Presented evidence as a Court Appointed Expert in relation to a medium density housing project where the key issues were
  • 8. Stephen O’Connor CV 8 Stephen O’Connor Curriculum Vitae overshadowing, privacy, car parking adequacy and streetscape/ aesthetics. Wambo Land and Environment Court Appeal, Excel Mining Preparation of Expert Evidence and participation in joint expert conferences in relation to a challenge against the Minister’s granting of consent for the expansion of Wambo coal mine in the Hunter Valley. The appeal was withdrawn shortly prior to the commencement of court proceedings, removing the obstacle to mining proceeding. Dungog Shopping Centre, Dungog Council v Private Developer Presented evidence as a Court Appointed Expert in relation to the proposed development of a new shopping complex adjoining the heritage declared town centre. The key issues were aesthetics, car parking, pedestrian linkages to the established town centre, adequacy of services and public interest. Challenge Against Validity of Consent for Medium Density Development at Nelson Bay, Port Stephens Council Represented Council as an expert witness in the defence of Council’s approval of a medium density residential development at Nelson Bay overlooking Port Stephens. Drayton Coal Mine, Fitzgerald White and Talbot Complete review of all planning consents and related permits and approvals dating back to the commencement of mining as part of the due diligence exercise Anglo American Coal were undertaking. Pitt Town Litigation, NSW Supreme Court, Johnson Property Group Preparation of evidence on town planning issues in relation to the dispute between adjoining land owners seeking to jointly develop an urban release area in the Hawkesbury Local Government Area, including preparation of a joint report with another expert witness. Cooranbong Water Treatment Infrastructure, Sparke Helmore Solicitors Preparation of an expert report in relation to the proposal to develop a water treatment plant and associated infrastructure to service the North Cooranbong Residential Estate in the Lake Macquarie Local Government Area. The plant was designed to provide recycled water in a third pipe to service the new residential estate to the north being developed by the Johnson Property Group. Compulsory Acquisition of Part of a Parcel of Land for Road Construction, Ashurst Solicitors Investigation into the planning issues surrounding the acquisition by the NSW Roads and Maritime Services (RMS) of land used partly for quarrying. Consideration of the before and after acquisition
  • 9. Stephen O’Connor CV 9 Stephen O’Connor Curriculum Vitae scenarios from the perspective of continued quarrying on the subject land. Publications The Canberra Syndrome. Published in Canplan, 1980. An Innovative Approach to Assessing Urban Land Capability. Paper presented to the World Planning and Housing Congress, Adelaide, 1986. Living in a Global Greenhouse - Coastal Planning and Development. Contribution to Occasional Paper No. 13, Board of Environmental Studies, University of Newcastle, 1989. Sea Level and Greenhouse - Planning for Change. Australian Planner Vol. 29 (1) 1991. Coastal Land Management. Paper presented to Biennial RAPI Congress on Planning for Sustainable Development, 1992. The Koala. Australian Planner Vol. 33 (1) 1996. The Changing Approach to Seeking Approvals for Coal Mining. Environmental Planning Law Association Annual Conference, 1998. DUAP Discussion Paper and Recent Trends in Mining Approvals. NSW Mineral’s Council Environmental Workshop, 1999. Integrated Development. New Planner, No 50, 2002. Columbia New Town. PIA NSW Division Annual Conference, 2004. Fern Bay Master Plan. Planning Institute of Australia Biennial Conference, 2005. Community Title as a Means of Achieving Environmental and Social Outcomes. Town Centres and Communities Annual Conference, 2006. Coastal Planning. New Planner, No 77, 2008. Sustainable Housing. New Planner, No 78, 2009. Sydney’s Desalination Project. New Planner No 82, 2010. Reform of NSW Planning System Part One Plan Making. New Planner No 84, 2010. Reform of NSW Planning System Part Two Development Assessment. New Planner No 87, 2011. Fundamental Problems with Integrated Development. New Planner No 88, 2011. Coal Seam Gas Debate. New Planner No 94, 2013. Lessons Learnt from the Warkworth Judgement. New Planner, No 96, 2013. Implications of an Ageing Australian Population. New Planner No 98, 2014. What’s in a Name? New Planner No 101, 2014. Infrastructure Funding Reforms. New Planner No 103, 2015. Resilience is a Recurring Theme. New Planner No 105, 2016.