SECTION – ‘B’
5/19/2014
SUSTAINABLE INNOVATIONS
Figure 1 OUR PPROJECT
SUBMITTED TO:-
LEC. ABDUL BASEER
SECTION “B” AutoCAD Project
1 SUSTAINABLE INNOVATIONS
Group Members
Sr. # NAMES REG #
1 ASAD ULLAH MALIK (Leader) 16
2 MUHAMMAD UMER ABBASI 78
3 ZULQARNAIN SHAH 130
4 FAKHAR ABBASS 113
5 FARRUKH AZIZ 25
6 MOHAMMAD WAQAR 83
Acknowledgement
First of all, we would thank Allah Almighty because whatever we are,
whatever we do, whatever we did and whatever has been done by us is solely
due to Him and Him alone and rest all are his creatures which He created to
assist us.
We would like to express our very great appreciation to Lecturer Abdul
Baseer for his valuable and constructive suggestions during the planning and
development of this research work. His willingness to give his time so generously
has been very much appreciated.
It is also our duty to record our thankfulness to the Lab Technicians & Lab
Instructors of the Computer Lab of NUST Institute of Civil Engineering for their
help in offering us the resources in running and installing the program. i.e.
AutoCAD software.
Finally, we wish to thank our parents for their support and
encouragement throughout our study.
SECTION “B” AutoCAD Project
2 SUSTAINABLE INNOVATIONS
INTRODUCTION OF THE PROJECT:
We as civil engineers deal with a field which
is so diverse in its applications. In this project
too we dealt with Environmental,
Transportation, Material and other aspects
of a project.
The continuous search for more sustainable
and economic processed solutions has
been an important investigation topic of a
broad research community worldwide. The
resulting solutions can therefore be adapted by the industry thus leading to a more
sustainable society. The building industry is not immune to this reality and huge efforts have
been done in order to find alternative sustainable building materials and low technology
methods, which result in a more sustainable and affordable construction complemented
with the comfort standards required nowadays. The CO2 emissions to the atmosphere,
energy and water consumptions are some parameters that have significant impact in this
equation. Reusing, opting for green building materials (which must be renewable, local,
and abundant), retrofitting, choosing low technology methods and techniques are some
practices that have given good results in this context.
The concept of sustainability is not limited to
buildings. An example can be seen in Fig. 3.
But we only focused on LEED which was our
leading guide through the process.
As mentioned in the abstract, our LEED Project is
situated in Al-Dilam. Below the pictures perfectly
depicts the outskirts of this town. Figure 3 An example of Sustainable Furniture
Figure 2 Branches of Civil Engineering
Figure 4 Local Atmosphere in Al-Dilam
SECTION “B” AutoCAD Project
3 SUSTAINABLE INNOVATIONS
MINIMUM
PROGRAM
REQUIREMENTS
SECTION “B” AutoCAD Project
4 SUSTAINABLE INNOVATIONS
LEED 2009 Minimum Program Requirements for
New Construction and Major Renovations:
1. Must comply with Environmental Laws. (SATISFIED)
Our building was approved by the Ministry of Higher Education of Saudi Arabia. The wall insulations
and other criteria were already imposed by the ministry as per local building standards and codes.
2. Must be a Complete, Permanent Building or Space. (SATISFIED)
3. Must Use a Reasonable Site Boundary (SATISFIED)
4. Must Comply with Minimum Floor Area Requirements.
Total Area of Ground Floor = 11748.654 m2
Total Area of Openings in Ground Floor = 3921.647 m2
Gross Floor Area of Ground Floor= 11748.654 m2 – 3921.647 m2 = 7827.007 m2
Total Area of First Floor = 11748.654 m2
Total Area of Openings in Second Floor = 3495.957 m2
Gross Floor Area of First Floor= 11748.654 m2 – 3495.957 m2= 8252.697 m2
Total Area of Second Floor = 11748.654 m2
Total Area of Openings in Second Floor = 3495.957 m2
Gross Floor Area of Second Floor= 11748.654 m2 – 3495.957 m2 = 8252.697 m2
Gross Floor Area of The Roof Floor= 8252.697 m2
Total Floor Area = 32585.098 m2 > 93 m2 (SATISFIED)
5. Must Comply with Minimum Occupancy Rates (SATISFIED)
As, our project is a university students will remain in university for daily for about 4-5 hours on
average but they also get summer vacations which lowers their annual average of the time they
spend in the premises of the university. But as LEED only requires only 1 FTE which can be served by
the cleaning and security staff which stays on campus all year round. These low paid staff works and
Figure 5 SNAPSHOT TAKEN WHEN CALCULATING AREA OF OPEN SPACES
SECTION “B” AutoCAD Project
5 SUSTAINABLE INNOVATIONS
lives on campus and spends more than 40 hours a week on the LEED project. But here’s the catch. To
satisfy the LEED code the FTE has to spend his/her stipulated time in the LEED project space/building.
6. Must Commit to Sharing Whole-Building Energy and Water Usage Date
We provided have provided our data where necessary in the following part of the report.
7. Must Comply with a Minimum Building Area to Site Area Ratio:
Total Gross Area = 690000 ft2
2% of Total Gross Area = 138000 ft2
Covered Building area = 88000 ft2
< 138000 ft2
(SATISFIED)
SECTION “B” AutoCAD Project
6 SUSTAINABLE INNOVATIONS
SUSTAINABLE
SITES
SECTION “B” AutoCAD Project
7 SUSTAINABLE INNOVATIONS
SS PREREQUISITE 1 : Construction Activity Pollution Prevention
INTENT
To reduce pollution from construction activities by controlling soil
erosion, waterway sedimentation and airborne dust generation.
WHAT WE DID:
We did temporary seeding ALOND WITH Stockpiling and Silt
Fencing. Although rains aren’t much frequent in this particular area
of Saudi Arabia; still we imposed, on precautionary terms, the
provision of making Sediments Basin in the low lying areas of the
site. Temporary seeding stabilizes disturbed areas with fast
growing annual grasses, small grains, or legumes until permanent
vegetation can be established. Dense, established vegetation
protects the soil from raindrop impact, reduces flow velocities,
increases infiltration, reduces soil loss from the site and is the most
effective erosion control practice available. In addition, temporary
seeding is economical and adds organic matter to the soil
and reduces dust and mud problems that are common on
many construction sites.
Temporary seeding is applicable on any area of the site
that will remain inactive for at least 21 days but less than
1 year. It is often used to prevent erosion between
construction activities and during the winter months if
established early enough. Due to its short-term nature,
temporary seeding may be ineffective on its own and
should be used in conjunction with other management
practices. Most importantly in our case the major
concerned factor was the frequent sand storms as our site
was just adjacent to a sand dune. In fact our site was
reclaimed from encroaching sand dunes. For this too the
temporary seeding would help settle dust and sand.
Figure 6 SILT FENCING
Figure 7 Stockpiling the Soil to prevent erosion in an event of
storm and covering it with Sheets to avoid loss due to natural
factors.
Figure 8 Features of Temporary Seeding
SECTION “B” AutoCAD Project
8 SUSTAINABLE INNOVATIONS
SS Credit 1: Site Selection
1 Point (SATISFIED)
INTENT
To avoid the development of inappropriate sites and reduce the environmental impact from the location of a building
on a site.
Requirements
Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria:
Does over site meet the requirements written on the
left
Prime farmland as defined by the U.S. Department
of Agriculture in the United States Code of Federal
Regulations, Title 7, Volume 6, Parts 400 to 699,
Section 657.5 (citation 7CFR657.5)
NO
Previously undeveloped land whose elevation is
lower than 5 feet above the elevation of the 100-year
flood as defined by the Federal Emergency
Management Agency (FEMA)
NO
Land specifically identified as habitat for any
species on federal or state threatened or
endangered lists
NO
Land within 100 feet of any wetlands as defined by
the U.S. Code of Federal Regulations 40 CFR, Parts
230-233 and Part 22, and isolated wetlands or areas
of special concern identified by state or local rule,
OR within setback distances from wetlands
prescribed in state or local regulations, as defined
by local or state rule or law, whichever is more
stringent
NO
Previously undeveloped land that is within 50 feet of
a water body, defined as seas, lakes, rivers, streams
and tributaries that support or could support fish,
recreation or industrial use, consistent with the
terminology of the Clean Water Act
NO
nLand that prior to acquisition for the project was
public parkland, unless land of equal or greater
value as parkland is accepted in trade by the public
landowner (park authority projects are exempt).
NO
SECTION “B” AutoCAD Project
9 SUSTAINABLE INNOVATIONS
SS Credit 2: Development Density and Community Connectivity
5 Points (SATISFIED)
Intent
To channel development to urban areas with existing infrastructure, protect greenfields, and preserve habitat and
Natural resources.
WHAT WE DID:
We proposed a new location for our project which was near 10 basic facilities. The details of these 10 basic
places will be given in the presentation.
SS Credit 4.1: Alternative Transportation—Public Transportation Access
6 Points (SATISFIED)
Intent
To reduce pollution and land development impacts from automobile use.
WHAT WE DID: We made and designed a 15 sitter bus stop to facilitate the students and the staff.
Figure 9 A BUS STOP ADJACENT TO THE MAIN ENTRANCE OF THE BUILDING
SECTION “B” AutoCAD Project
10 SUSTAINABLE INNOVATIONS
SS Credit 4.2: Alternative Transportation—Bicycle Storage and Changing
Rooms
1 Point (SATISFIED)
Intent
To reduce pollution and land development impacts from automobile use.
WHAT WE DID:
We designed, built and provided bicycles stands just near to the main entrances thus facilitating the students.
Changing rooms were located inside LEED Project Building.
SS Credit 4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient
Vehicles
3 Points
Intent
To reduce pollution and land development impacts from automobile use.
WHAT WE DID
We installed OPTION 3 by imposing pavement markings specifically for the fuel efficient vehicles. We
introduced preferred parking and these changes were incorporated in AutoCAD drawings too. Moreover, as
a functioning university each year academically efficient students will be awarded with fuel efficient cars for
usage during their academic tenure. We proposed two cars 1) Toyota Prius C & 2) MERCEDES-BENZ
SMART ELECTRIC DRIVE CONVERTIBLE/COUPE. Both of them achieved a minimum green score of 40
on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide and in fact
Figure 12 Bike Stands given at the entrances to the LEED
building/ space.
Figure 10 Bike stands at the main entrance of the LEED Project
Boundary
Figure 11 SW-ISOMETRIC VIEW OF THE BIKE STAND
SECTION “B” AutoCAD Project
11 SUSTAINABLE INNOVATIONS
these two topped the list for the Greenest Vehicles of 2014. We also installed boards reserving parking for
green vehicles only on different locations as specified by LEED.
Figure 16 ""LOW EMITTING FUEL EFFICIENT VEHICLES ONLY"" written on the parking
spaces adjacent to the entrance to the LEED Project
Figure 15 TOYOTA PRIUS C
Figure 18 MERCEDES-BENZ SMART ELECTRIC DRIVE
CONVERTIBLE/COUPE
Figure 14 Real Life illustration of our concept which we showed you
on the previous page on AutoCAD
Figure 17 SIGN BOARDS
INSTALLED ADJACENT TO
PREFERED PARKING
Figure 13 Preferred Parking near Gate 2
SECTION “B” AutoCAD Project
12 SUSTAINABLE INNOVATIONS
Figure 19 TABLE SHOWING THE SPECS AND POINTS OF THE GREENEST CARS OF 2014
SECTION “B” AutoCAD Project
13 SUSTAINABLE INNOVATIONS
SS Credit 4.4: Alternative
Transportation—Parking
Capacity
2 Points
Intent
To reduce pollution and land development
impacts from automobile use.
WHAT WE DID:
To satisfy LEED’s Non-Residential
Projects condition we didn’t exceed the
minimum zoning requirements.
Dedicated parking for carpools was provided.
SS Credit 6.1 & 6.2: Storm water Design—Quantity & Quality Control
1 Point + 1 Point
Intent
To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or
eliminating pollution from storm water runoff and eliminating contaminants. / To limit disruption and pollution of natural
water flows by managing storm water runoff.
WHAT WE DID: Pictures are Self-explanatory
Figure 21 Sign Board
Figure 20 "LOW EMITTING FUEL EFFIECIENT VEHICLES AND CARPOOLS ONLY".
Figure 23 Pervious Pavement
Figure 22 Vegetated Roof
SECTION “B” AutoCAD Project
14 SUSTAINABLE INNOVATIONS
REFERENCES:
http://www.aceee.org/press/2009/02/annual-ranking-green-vehicles-shows-progress-despite-tou
http://www.canaansitefurnishings.com/wp-content/uploads/2013/04/bicycle-racks-cah-708_0.jpg
http://en.wikipedia.org/wiki/Phase_I_environmental_site_assessment
http://www.cadblocksfree.com/downloaddetails.php?id=787
http://greenercars.org/highlights.htm
http://upload.wikimedia.org/wikipedia/commons/9/91/2013_Smart_Fortwo_Electric_Drive_--_2012_NYIAS.JPG
http://ecosigndesigns.com/wp-content/themes/greenSignDesigns/img/carpool.png
http://www.mto.gov.on.ca/graphics/english/transit/supportive-guideline/2.5.2.jpg
Cool Roof Q & A (draft), Ronnen Levinson Lawrence Berkeley National Laboratory (July 29, 2009)
Figure 25 Rain water collection tank made underground in the lowest part of
the LEED Project Boundary. This will collect Rain water as all the slope of the
area is towards it, which will later be used in urinal flushing. as shown in FIG.
24A
Figure 24A 50% gray water used again for
urinal flushing
SECTION “B” AutoCAD Project
15 SUSTAINABLE INNOVATIONS
WATER
EFFICIENCY
SECTION “B” AutoCAD Project
16 SUSTAINABLE INNOVATIONS
Water efficiency credits
WE Credit 1: Water Efficient Landscaping: (4 points)
Requirement:
Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the
building.
Path:
No Potable Water Use or Irrigation:
Method:
Install landscaping that does not require permanent irrigation systems. Temporary irrigation systems
used for plant establishment are allowed only if removed within 1 year of installation.
In order to get useful results for species that does not require water you have to perform following steps
1. Soil analysis
2. PLANNING & DESIGN
3. EFFICIENT IRRIGATION
4. PROPER PLANT SELECTION
5. Practical grass area
6. Mulching
7. Proper maintaince
The university is situated in Saudi Arabia which has an arid climate. so we study
different species of that area that we can use for our landscaping in project with least or no water use.In the difficult,
arid climate of Saudi Arabia, distinct advantages are to be gained from incorporating some native, or locally suited,
species into a design because of their ability to flourish under local growing conditions and for their superior tolerance
to the extremes of heat, desert winds, drought or saline conditions that can exist. Native species often show a lower
maintenance requirement than introductions and many possess a minimal irrigation demand when established.
There are some species that can be used for our project.
1) Dohm palm
2) Athel tree
3) Cunvolvulus hystrix
Reference:
Department of Landscape Architecture, School of Environmental Design,
Faculty of Engineering, King Abdulaziz University, Jeddah, Saudi Arabia.
WE Credit 2: Innovative Wastewater Technologies: (2 points)
Intent:
To reduce wastewater generation and potable water demand while increasing the local aquifer recharge
Method:
Treat 50% of wastewater on-site to tertiary standards. Treated water must be infiltrated or used on-site
One of technology that can be used for this purpose is “Biological Nutrient Removal systems”
SECTION “B” AutoCAD Project
17 SUSTAINABLE INNOVATIONS
Description
Biological nutrient removal (BNR) removes total nitrogen (TN) and total phosphorus (TP) from wastewater through the
use of microorganisms under different environmental conditions in the treatment process.
Nitrogen Removal:
Mechanisms Involved in the Removal of Total Nitrogen
Form of Nitrogen Common Removal Mechanism Technology Limit (mg/L)
Ammonia-N Nitrification <0.5
Nitrate-N Denitrification 1 – 2
Particulate organic-N Solids separation <1.0
Soluble organic-N None 0.5 – 1.5
Note that organic nitrogen is not removed biologically; rather only the particulate fraction can be removed through
solids separation via sedimentation or filtration.
Phosphorus Removal:
Mechanisms Involved in the Removal of Total Phosphorus
Form of Phosphorus Common Removal Mechanism Technology Limit (mg/L)
Soluble phosphorus
Microbial uptake Chemical
precipitation
0.1
Particulate phosphorus Solids removal <0.05
BNR Unit Costs for Small Systems (Dollars)
Component 4,000 gpd 10,000 gpd 25,000 gpd 50,000 gpd 100,000 gpd
New Plants
Construction $70.97/gpd $34.66/gpd $19.34/gpd $14.58/gpd $8.50/gpd
O&M $7.86/gpd $3.70/gpd $2.10/gpd $1.43/gpd $0.94/gpd
Features:
Special polypropylene discs provide perfect environment for fixed film growth, No blowers, aeration piping, or
diffusers, Low HP drives, Compact design, Stable process, Wheels controlled with VFD’s and DO probes and
Peripheral mixing paddle
Benefits:
No odors, No noise, Low energy requirement, Small footprint, Improved sludge settling, Minimized operator attention,
Can accommodate seasonal fluctuations in flow rate
Reference:
Water Environment Federation (WEF) and American Society of Civil Engineers
SECTION “B” AutoCAD Project
18 SUSTAINABLE INNOVATIONS
(ASCE)/Environmental and Water Resources Institute (EWRI). 2006. Biological Nutrient Removal (BNR) Operation in
Wastewater Treatment Plants. McGraw Hill: New York.
WE Credit 3: Water Use Reduction: (2 points)
Intent:
To further increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater
systems
Innovation:
30% reduction in water use can be achieve by use of “composting toilet system”. let's go over how a
composting toilet works. The process works the same as the composting pile you may have for your kitchen scraps.
Aerobic bacteria within the waste break it down with the help of air, heat and time. Someone does have to stir material
regularly, and add materials such as sawdust or popcorn to keep those bacteria at work. The result is an earthy
nutrient-filled organic matter known as humus.
There are two kinds of composting toilets: self-contained and central. They don't look that different from your
current commode. Self-contained composting toilets are smaller and are more likely to be found in cottages or
seasonal homes. The self-contained unit shouldn't be used year-round if more than two people are using it. As the
name implies, the toilet and the composter are combined in one unit, so composting is taking place just under your
throne. In a central system, the toilet is connected to a separate composter, which may be in the basement or on the
side of the building. Central composting toilets have a bit more capacity for year-round homes but are more expensive
than self-contained composting toilets.
Both have the same goal, though: to destroy the pathogens and recycle our excrement without using water.
Instead of flushing, the waste drops down a pipe to the composter, which is hidden from view with a trap door or
screen
A company with name “Andexa Composting Toilet” is providing our desirable toilets to fit in university.
Reference:
http://www.biolet.com
SECTION “B” AutoCAD Project
19 SUSTAINABLE INNOVATIONS
ENERGY
&
ATMOSPHERE
SECTION “B” AutoCAD Project
20 SUSTAINABLE INNOVATIONS
Prerequisite 1
Fundamental Commissioning of Building Energy Systems
Intent
To verify that the project’s energy-related systems are installed, and calibrated to perform according to the
owner’s project requirements, basis of design and construction documents.
Benefits of commissioning include reduced energy use, lower operating costs, fewer contractor callbacks,
better building documentation, improved occupant productivity and verification that the systems perform in
accordance with the owner’s project requirements.
PREREQUISITE 2
Minimum Energy Performance
Intent
To establish the minimum level of energy efficiency for the proposed building and systems to reduce
environmental
and economic impacts associated with excessive energy use.
PREREQUISITE 3
Fundamental Refrigerant Management
Intent
To reduce stratospheric ozone depletion.
Requirements
SECTION “B” AutoCAD Project
21 SUSTAINABLE INNOVATIONS
Zero use of chlorofluorocarbon (CFC)-based refrigerants in new base building heating, ventilating, air conditioning and
refrigeration (HVAC&R) systems. When reusing existing base building HVAC equipment, complete a comprehensive
CFC phase-out conversion prior to project completion. Phase-out plans extending beyond the project completion date
will be considered on their merits.
GREEN REFRIGERANTS QUALIFY FOR LEED POINTS
Enhanced Refrigerant Management
CREDIT 4
2 points (HVAC&R)
The refrigerants used in HVAC equipment can earn a point for LEED certification. A LEED pre-requisite is that HVAC
equipment must not use a CFC refrigerant. An additional point can be earned if the refrigerant is not an HCFC (such as
HCFC-22 and HCFC-123). are considered “green” refrigerants and earn the extra LEED point.
HCFC-22
While it is currently the most popular and versatile refrigerant in the world, HCFC-22 cannot be used in new equipment
after 2010. A small amount will be manufactured to service equipment until 2020, when its production will stop
completely. If your equipment runs on HCFC-22, you can continue to operate it for its useful life, even after the phase
out date. Like all “extinct” refrigerants, HCFC-22 is grandfathered in the United States. Once the HVAC systems are in
the field, they can stay in the field. Because HCFC-22 is so popular, there should be enough reclaimed refrigerant for
service and repair. Large cooling systems, including all positive pressure centrifugal and screw chillers, are now being
designed for HFC-134a and HFC-407C. In small systems – those under 100 tons – HFC-410A has become the main
replacement for HCFC-22.
SECTION “B” AutoCAD Project
22 SUSTAINABLE INNOVATIONS
LIGHTING AND DAYLIGHTING
Opimize Energy Performance Credit 1
Lighting and day lighting controls are systems that adjust the amount of natural and artificial light in a room,
based on its brightness, occupancy, and sometimes other factors.
Good controls are critical to lighting design that incorporates both daylight and artificial light. They can
improve both visual and thermal comfort while significantly decreasing energy use. For instance, occupancy-
based shutoff alone can save up to 38% of lighting energy for private offices, 50% in conference rooms, and
58% for classrooms.
Successful design of lighting control is measured by testing visual comfort in the room during occupied times,
and measuring the daily or monthly lighting energy use. The less energy required while still achieving
comfort, the better. Controls systems are also measured by their reliability and ease of use for occupants
and operations staff.
 Lighting Controls
 Shading Controls
 Lighting for Thermal Comfort
MEASUREMENT AND VERIFICATION (Credit 5)
Lighting Controls
The simplest way to reduce the amount of energy consumed by lighting systems is to turn lights off whenever
they are not required. Most people simply do not shut off lights when they leave rooms. One solution to
this problem is occupancy sensors, which sense the presence of people in a space using infrared and/or
ultrasonic motion sensors. These switches are appropriate in spaces where people pass in and out often,
such as private offices, restrooms, storage areas, and conference rooms.
Lighting controls can also dim lights when
there is plenty of daylight. Such systems can
save 20-60% of lighting energy1. To respond
appropriately as the distribution of sunlight
in the room changes through the day, these
systems require brightness sensors to be
placed strategically in the room. Different
sensors may actuate different lighting zones.
Occupancy sensors and brightness sensors
can be individual switches for individual lights or inputs to larger control
systems. The most highly-optimized lighting control systems combine multiple
sensors and a logic processor to control lights. These systems can often save 40% of overall lighting energy;
sometimes even far more.
Figure 27 Daylight brightness sensor
Figure 26 Occupancy sensor
with a manual override
switch
SECTION “B” AutoCAD Project
23 SUSTAINABLE INNOVATIONS
Shading Controls
Daylight can be valuable to give spaces good visual comfort using no electricity, but sometimes the sun is
too bright. Building occupants can open and close shades, or adjust blinds, to tune light levels to their
comfort; however, people often don't operate such systems to their optimal effectiveness, particularly in
shared spaces.
Motorized shades and blinds can be controlled by timers, brightness sensors, or other inputs. These can
close shades at sunset on western walls to avoid glare, or tilt Venetian blinds to 60% closed at the brightest
times of day while tilting them to full openness at dimmer times.
A brightness sensor detects excess sunlight, and lowers a shade to avoid glare
The simplest and least expensive control systems are timers; sophisticated ones can be set to actuate shades
at different times of day throughout the year, to compensate for changes in the sun's path from winter to
summer. Systems based on brightness sensors are more expensive, but can also adjust for cloudy days and
shadows from surrounding buildings, trees, or other objects.
As with lighting controls, shading controls can be individual units or can be part of a larger system; the latter
is most effective at maximizing visual comfort while minimizing energy use.
Lighting Controls for Thermal Comfort
Saving lighting energy also saves cooling energy in warm climates, because every watt of electricity used by
lighting systems turns into a watt of heat that must be removed from the room. Part of this is from the
inefficiency of lighting equipment, the rest is from the conversion of light into heat when it is absorbed by
the materials it illuminates. Thus, reducing lighting energy use also improves passive thermal comfort.
SECTION “B” AutoCAD Project
24 SUSTAINABLE INNOVATIONS
Lighting energy becomes heat, both by inefficiency and by absorption
In hot climates, preventing excess solar heat gain during the afternoon can be more important than bringing
in natural light. Even when windows have low solar heat gain coefficients, they do still let in heat from the
sun. Motorized shades can also be used to avoid excess gain and translucent shades may even still allow
sufficient daylight.
In cold climates with bright sunlight, insulated shutters may open during the day to allow the sun's heat in
through high-SHGC windows, but shut at night to avoid heat loss through the same windows.
When thermal comfort is a priority for shades, external shades and shutters are more useful than interior
ones, as they prevent the sun's heat from ever getting inside the room, rather than trying to reflect it back
out once it has come in.
Internal shades block some heat, but much heat is still trapped inside
External shades and shutters block heat more completely than internal ones
The Lumen Method of Lighting Design
SECTION “B” AutoCAD Project
25 SUSTAINABLE INNOVATIONS
The intuition of the architect alone is not sufficient to fully comprehend the interplay of light and predict
with certainty the amounts of illumination in all parts of the room. On the other hand, computational tools
available are also often insufficient in themselves to achieve "beautifully" lit buildings.
The simplest method of calculating the overall illumination level for evenly lit spaces1 is the Lumen
Method. It uses both computation and intuition and is the calculation most used by lighting engineers when
determining the number of luminaires for a given lighting level. The simple formula is as follows:
E = F / A
Where E is the average (or minimum) illumination level at the work plane (in lux), F is the useful lumen
output of all sources (lumens) and A is the total surface area of the working plane (in m²). In terms of
architectural design, solving for F allows the architect or engineer to determine the total amount of light
required in the room. This is given by rearranging the formula as follows:
F = AE
Be aware that the resulting value is not the lamp lumens, because not all of the light produced by each lamp
actually reaches the work plane. Many factors affect the amount of light reaching the work plane:
 The size and proportion of the room.
 The height of the light fixtures above the work plane.
 The reflectance of wall and ceiling surfaces.
 The nature of the light fixture and its distribution of light.
 Light loss due to ageing, dust collection and yellowing.
 Atmospheric particles such as smoke or dust.
Some of the most efficient fixtures in the most effective layout can result in up to 80% of the installed lamp
lumens reaching the work plane, while ineffective fixtures in a dark-colored room can result in only 2%.
Steps of the lumen method:
1. Select Required Illumination
Determine what the minimum required illumination level is for your particular application, using government
standards or green building certification systems.
2. Determine Received Flux
This is simply a matter of calculating the total surface area over which the required illuminance is to be
distributed and multiplying this by the required illumination level using the formula F = AE. This gives the
amount of "useful" light required. From this, the total installed flux can be determined.
3. Select a Light Fixture
A preliminary assessment must be made of the type of lighting required, a decision most often made as a
function of both aesthetics and economics. This fixture may prove unsuitable for the lighting task, however.
The next few steps are used to determine this.
4. Determine Mounting Height
SECTION “B” AutoCAD Project
26 SUSTAINABLE INNOVATIONS
The distance from the source to the working plane is very important, as it is a major determinant of the final
illumination level. This is a function of the inverse square law.
5. Determine Room Index
The room index is a ratio, describing how the room's height compares to its length and width. It is given by:
Where L is the length of the room, W is its width, and Hm is the mounting height above the work plane.
6. Determine Utilization Factor (UF)
The Utilization Factor, or Coefficient of Utilization, brings together all of the variables above (reflectance of
both the walls and ceiling, the room index, and the type of luminaire) into a single value. Use tables available
from manufacturers (all architects' offices will have several) to determine the coefficient of utilization for
different light fixtures.
7. Determine Maintenance Factor (MF)
The maintenance factor is based on how often the lights are cleaned and replaced. It takes into account such
factors as decreased efficiency with age, accumulation of dust within the fitting itself and the depreciation
of reflectance as walls and ceilings age. For convenience, it is usually given as three options:
Good = 0.70
Medium = 0.65
Poor = 0.55
8. Determine Number of Fixtures
First, determine the total installed flux needed, by applying the Utilization Factor and Maintenance Factor
to the received flux. This is achieved using the following formula:
Next, determine the number of fixtures required by simply dividing the installed flux by the total output of
each light source.
9. Check Spacing of Fixtures
Once the number of fixtures is known, they must be distributed uniformly throughout the enclosure. This is
simply a matter of determining a grid based on the total number.
Finally, make sure that the fixture spacing is reasonable (not so far that light falls off, not so close that fixtures
overlap). If the fitting you chose is unsuitable, simply select a new luminaire (based on the experience gained
in this calculation) and perform steps 3-9 again.
Combining Electric Lighting With Daylighting
Generally speaking, artificial lighting systems must be designed to illuminate spaces well with no daylight at
all, because buildings are often used at night. However, they should have the flexibility to combine their
lighting with daylighting, to minimize energy use while maximizing comfort.
SECTION “B” AutoCAD Project
27 SUSTAINABLE INNOVATIONS
To combine electric lighting with daylighting, use lighting control systems to dim or turn off electric lights
based on available daylight. This means not only choosing good fixtures and layouts, but also good sensor
locations and control zones.
It can be used in rooms lit with a uniform array of luminaires, where the room's minimum lighting level
should not be less than 70% of the maximum level.
HEATING AND COOLING
Passive Cooling
Just like passive heating, cooling your building using passive strategies is important for reducing energy usage
in your building. Specifically, utilizing passive cooling strategies like natural ventilation, air cooling, and
shades can reduce your demand for mechanical cooling while maintaining thermal comfort.
Passive Heating
Passive heating uses the energy of the sun to keep occupants comfortable without the use of mechanical
systems. These concepts will help you design for passive heating.
SECTION “B” AutoCAD Project
28 SUSTAINABLE INNOVATIONS
ONSITE RENEWABLE ENERGY
(Credit 2)
HOT WATER SYSTEM
CREDIT 5&6
RENEWABLE ENERGY AND GREEN POWER
Renewable Energy and Green Power Generating renewable energy on-site can provide a source of green power.
Green power is a subset of renewable energy and represents those renewable energy resources and technologies
that provide the highest environmental benefit. Green power is produced from solar, wind, geothermal, biogas,
biomass, and low-impact hydro. Green power sources produce electricity with an environmental profile superior to
SECTION “B” AutoCAD Project
29 SUSTAINABLE INNOVATIONS
conventional power technologies and produce no anthropogenic greenhouse gas emissions. EPA requires that green
power sources must also have been built since the beginning of the voluntary market in order to support “new”
renewable energy development (U.S. EPA, 2007e)
Figure 28 BIOGAS PLANT
Figure 29 biogas-5000-portable-biogas-analyser
SECTION “B” AutoCAD Project
30 SUSTAINABLE INNOVATIONS
EA Credit 4: Enhanced Refrigerant Management
Intent
To reduce ozone depletion and support early compliance with the Montreal Protocol while
minimizing direct contributions to climate change.
Solution
HVAC INVERTERS
The inverter controls the compressor speed so that the system optimizes the load distribution to
deliver the capacity needed to reach and maintain the required temperature. This technology can
lower the energy consumption for any cooling or heating application, save money and make a
contribution to a cleaner environment. These HVAC inverters are used for energy saving and
enhanced refrigeration, heating and ventilation.
Typical inverter applications:
Following are the 3 applications of inverter
1) Fans
 Features:
_ Supply & extract ventilation fans
_ Variable Air Volume (VAV) systems
_ Constant Air Volume (CAV) systems
_ Cooling tower fans
_ Condenser fans
_ Boiler fans
_ Car Park ventilation fans
_ Stairway ventilation
2) Pumps
 Features:
_ Chilling
_ Heating
_ Booster pump
_ Pressuration set
_ Cold and hot water pumps
_ Cooling tower pumps
_ Delta P regulation on heat exchangers
_ Swimming pool pumps
3) Compressors
 Features:
_ Chilling
_ Clean air compressors
_ Gas compressors
_ Heat pumps
SECTION “B” AutoCAD Project
31 SUSTAINABLE INNOVATIONS
Our Equipment Supplier:
HONEYWELL INVERTERS
Company: Honeywell
Region: USA
SmartDrive HVAC
Key Features OF SmartDrive HVAC:
Power consumption of SmartDrive HVAC
- 160 kW in 400V ( 3~)
- 0.55 - 55 kW in 230 V ( 3~)
Power consumption of normal HVAC system is 400
kW
Models
- IP21 and IP54 enclosure classes
Features
- EMC/RFI filters for installation in public electrical
network (e.g. typical buildings) integrated as
standard (EN61800-3 category C2)
- Compliance with THD standard
- EN61000-3-12
- Multilanguage text display as standard
Important Features of SmartDrive HVAC
- Special energy saving mode to provide more savings than a standard inverter in the
market for fan and pump applications
- Built-in real-time clock with battery for time-based control and time-stamped fault
messages
- PID-controller with advanced features built-in: Sleep mode, pressure loss compensation,
pump soft fill etc.
- Additional PID-controller for controlling other devices e.g. Damper actuator
- Pump and fan cascade controller with full auto-change functionality
- High class flying start function to obtain the control of already rotating motor very fast
- Ramp time optimization -automatically avoid the pressure spikes in pipes or air ducts
that are caused by increasing or decreasing speed too rapidly.
- Smart cooling channel design to separate all electrical parts from cooling air
- Varnished boards helping to prevent damage from dirt and dust
- Electrolyte free capacitors increase the lifetime of the product
- Extensive software and hardware protection functions
- Configurable Automatic restart
- Trip-free operation with maintenance/safety switch
- Temperature-controlled fans and high switching frequency to reduce device noise
Figure 30 SmartDrive HVAC
SECTION “B” AutoCAD Project
32 SUSTAINABLE INNOVATIONS
NXL HVAC
Company: Honeywell
Region: USA
Key Features
Power consumption of NXL HVAC
- 30 kW in 400V ( 3~)
- Power consumption of normal HVAC system is 400 kW
Models
o IP21 and IP54 enclosure classes
o IP21 models EN61800-3 category C2
o IP54 models EN61800-3 category C1
Important Features of NXL HVAC
- Special energy saving mode to provide more savings than a standard inverter in the
market for fan and pump applications
- Built-in PID-controller with sleep mode for standalone applications
- Pump and fan cascade controller with full auto-change functionality
- High class flying start functionality to take control of already rotating motor
- Robust design in metal frame with cooling air completely separated from electrical
parts
- Disturbance-free operation with highest level RFI filtering
- Extensive software and hardware protection functions
- Automatic restart for uninterruptable operation in fault situation
- Over temperature ride through to automatically adapt to short time over temperatures
- Power ride through to adapt to changes in input voltage
- Trip-free operation when maintenance/ safety switch is operated between inverter and
motor
- Temperature-controlled fans and high switching frequency to reduce the audible noise
from the device
Figure 31 NXL HVAC
SECTION “B” AutoCAD Project
33 SUSTAINABLE INNOVATIONS
SmartDrive COMPACT
Company: Honeywell
Region: USA
Key Features
- • Integrated RFI-filters
- • Flexible side by side mounting with screws or DIN-rail as standard
- • Compact size
- • Single rating suitable for both pump and fan or machine applications
- • Maximum ambient temperature 50oC; (40oC for COMP230-2P2-20 and COMP400-
5P5-20)
- • Easy to use single software package with high functionality
- • Parameter upload/download even without powering the inverter with COMP-
LOADER accessory
- • Configurable Inputs and Outputs
Power consumption of SmartDrive COMPACT
- 0.37 - 2.2 kW in 230V (1~in, 3~out)
- 0.55 - 5.5 kW in 400V (3~)
- Power consumption of normal HVAC system is 400 Kw
Important Features of SmartDrive COMPACT
- Built-in PI-controller for standalone applications
- PI-controller could also be used to control other equipment e.g., damper actuator
- Flying start functionality to take control of already rotating motor
- Varnished boards to prevent damage from dirt and dust
- Extensive software and hardware protection functions
- Automatic reset for avoiding system stops in fault situations
- Over temperature ride-through for automatic adaption to short-term raises in ambient
temperature
- Power ride through for automatic adaptation to short-term drops in input voltage
Figure 32 SmartDrive COMPACT
SECTION “B” AutoCAD Project
34 SUSTAINABLE INNOVATIONS
MATERIAL
&
RESOURCES
SECTION “B” AutoCAD Project
35 SUSTAINABLE INNOVATIONS
MR Prerequisite 1: Storage and collection of recyclables:
Intent
To facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills.
Requirements in LEED documents for the above intent are:
Provide an easily-accessible dedicated area or areas for the collection and storage of materials for recycling for the
entire building.
Procedure being followed by us is:
As you can see the area we chose for the university is vast and is about 2 km away from the nearest locality. You can
also see there are roads which connect to our university, so our university is easily accessible for the supplier to supply
and trucks to haul the waste away to its destination.
For collection and storage of materials we are going to be make an agreement with are suppliers to fulfil our demands
on the spot which can be made on the spot , so to avoid the cost of storage and also wastage as the construction goes
on we face different problems which leads to change in plans . Thus to avoid wastage of materials we will have on the
spot demands made and then delivery. But still we have storage facilities for materials which cannot be delivered on
the spot made about 0.2 km away from the constructions site. For catering the wastage of such material we will include
in our agreement with the supplier to use them in the manufacturing process again this will reduce the wastage and
cost both. This will also divert the construction and demolition debris from being land filled or incinerated.
MR Credit 2: Construction Waste Management:
Intent
To divert construction and demolition debris from disposal in landfills and incineration facilities. Redirect recyclable
recovered resources back to the manufacturing process and reusable materials to appropriate sites.
Procedure followed by us:
The above procedure mentioned Storage and collection of recyclables in also fulfils our construction waste
management criteria too for construction waste management we are also going to follow the procedure of composting
of organic materials which are not worth being reused instead of land filling the organic products.
MR Credit 3: Materials Reuse:
Intent
To reuse building materials and products to reduce demand for virgin materials and reduce waste, thereby lessening
impacts associated with the extraction and processing of virgin resources
Procedure followed by us:
Thus to avoid wastage of materials we will have on the spot demands made and then delivery. But still we have storage
facilities made 0.2 km away from the construction site for materials which cannot be delivered on the spot. For
SECTION “B” AutoCAD Project
36 SUSTAINABLE INNOVATIONS
catering the wastage of such material we will include in our agreement with the supplier to use them in the
manufacturing process again for us to reuse the wasted material this will reduce the wastage and cost both.
MR Credit 4: Recycled Content:
1–2 Points
Intent
To increase demand for building products that incorporate recycled content materials, thereby reducing impacts
resulting from extraction and processing of virgin materials.
WHAT WE DID:
We used corncob ash as a fine aggregate in light weight concrete for use in non-structural members. i.e. walls
CORNCOB PRODUCTION IN SAUDI ARABIA:
Corn is an important seasonal agriculture crop in the Kingdom and many residents are fond of eating
whole corncobs after heating them on hot coal or boiling them in water.
Corn is widely harvested in Jazan and Hail provinces, which are famous for agricultural products.
The product is also harvested in Sakaka, Jouf and Al-Hasa, but the highest quality corn is known to be
produced only in Jazan and Hail. (http://www.arabnews.com/news/486706)
Although it is grown mainly in wet, hot climates, it has been said to thrive in cold, hot, dry or wet conditions,
meaning that it is an extremely versatile crop. (http://en.wikipedia.org/wiki/Maize)
How We will use it: (Preparation method)
Sample preparation and test equipment
Design of a High Strength (Grade 35Mpa) Concrete Using Corn Cob Ash as fine aggregate.
The specific gravity of the corn cob ash was a requirement to designing a high strength concrete. So the
specific gravity of the corn cob ash was determined by weighing a sample of the dry corn cob ash and
equivalent volume of water sample. The ratio of the weight of the corn cob ash sample to the weight of
equivalent water sample gives the specific gravity of the corn cob ash. American concrete Institute Method
of Mix Design was used to design the grade 35 concrete using corn cob ash as a partial replacement for
cement. The mixes designed are listed as follows:
Batching of designed Grade 35 MPa concrete:
CONTROL : CCA CONCRETE
 Ash Content (kg) 0 : 0.8
 Cement Content (kg) 8 : 7.2
 Fine Aggregate (kg) 18.16 : 16.96
 Coarse Aggregate (kg) 21.04 : 21.04
 Water/Cement Ratio (litres) 0.6 : 0.6
SECTION “B” AutoCAD Project
37 SUSTAINABLE INNOVATIONS
RESULT AND DISCUSSION:
1) Concrete batching by volume of mix 1:2:4
CORN COB ASH CONTENTS:
Physical/Mechanical Properties
It was observed that the specimens were dark colored with increasing percentage of corn cob ash, and
setting time and water absorption took much longer in concretes with the ash content than the ones without
the ash. The results generally revealed that that density increased as curing age increased and decreased
with respect to increasing percentage of corn cob ash replacement in concrete samples. Results revealed an
increase in the characteristic strength of concrete cubes as per curing age and decreased as per ash content.
The results also revealed that at 10% ash, compressive strength at 28days was 20N/mm² which was less than
the control whose value of 24.69 N/mm² falls just below the designed 25 N/mm². However, an important
pozzolan characteristic is the slow development of strength which implies that 10% corn cob ash concrete
might develop the required strength over a longer period of time.
2) Corncob Ash as a High Strength concrete:
The physical properties of the high strength concrete were the same as the ones observed in the previous
specimens except for the reduced workability and the specific gravity of the ash was 1.15. Results showed
varying values of density of the designed grade 35 concrete, unlike the grade 25 concrete that increased with
curing age. Results also revealed an increase in compressive strength with curing age; while the compressive
strength at 28days was 29.11N/mm² which was less than the control whose value of 34.00 N/mm² falls just
below the designed 35 N/mm². However, it is assumed that a reduced water/cementitious material ratio,
will enhance the strength of concrete and as stated earlier, an important pozzolan characteristic is the slow
development of strength which implies that 10% corn cob ash concrete might develop the required strength
over a longer period of time.
Table 1. Chemical composition of corn cob ash (CCA)
Chemical Constituents Composition (%)
Sample 1 Sample 2 Sample 2 Average
SiO2 67.33 65.39 66.41 66.38
Al2O3 7.34 9.14 5.97 7.48
Fe2O3 3.74 5.61 3.97 4.44
CaO 10.29 12.89 11.53 11.57
MgO 1.82 2.33 2.02 2.06
SO3 1.11 1.10 1.01 1.07
Na2O 0.39 0.48 0.36 0.41
K2O 4.20 4.92 5.64 4.92
S1O2 + Al2O3 74.67 74.53 72.38 73.86
SECTION “B” AutoCAD Project
38 SUSTAINABLE INNOVATIONS
REFERENCES:
http://www.arabnews.com/news/486706
“CORN COB LIGHTWEIGHT CONCRETE FOR NON-STRUCTURAL
APPLICATIONS” BY Jorge Pinto, 2012
MR Credit 5: Regional Materials:
1-2 Points
Intent
To increase demand for building materials and products that are extracted and manufactured within the region,
thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from
transportation.
Procedure opted by us:
We are using local materials for our construction their sources are mentioned below:
 The innovation we are using in case of materials is corncob ash as fine aggregate in concrete and its
source is:
Ash from rice husk from
rice fields , saw dust ash
from nearby places and
ash from nearby incerators
Waste Of Corn i.e corncob from
corn fields near the university
will be transported to the
construction site on trucks.
Ash also transported from its
respected source.
Corncob
Ash
Concrete
SECTION “B” AutoCAD Project
39 SUSTAINABLE INNOVATIONS
OUR SOURCE OF CONSTRUCTION MATERIALS:
Batterjee Holding
Meister Construction Materials
Country/Region:
Saudi Arabia(Riyadh)
Main Products:
Construction Chemicals, Structural Steel, Recycled Base Oil, Equipments for special Needs, Juices
No.Of Employees:
Above 1000 People
Annual Sales Vol:
Above US$100 Million
As most of the materials being used are present locally so we are fulfilling are LEED requirement with ease.
MR Credit 6: Rapidly Renewable Materials:
1 Point
Intent
To reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with
rapidly renewable materials.
Procedure we opted is:
As we are using corncob and ash aggregate in our concrete, both the materials are renewable and are considered as
wastage, and also they are rapidly available again as both have short production cycles
MR Credit 7: Certified Wood:
Intent:
To encourage environmentally responsible forest management
Procedure followed by us:
SECTION “B” AutoCAD Project
40 SUSTAINABLE INNOVATIONS
Figure 33 THE LINES COLOURED PURPLE ARE SHOWING THE USE OF
CORNCOB ASH CONCRETE IN NON-STRUCTURAL WALLS
SECTION “B” AutoCAD Project
41 SUSTAINABLE INNOVATIONS
INDOOR
ENVIRONMENT
QUALITY
SECTION “B” AutoCAD Project
42 SUSTAINABLE INNOVATIONS
Prerequisite 1: Minimum Indoor Air Quality Performance
Required
Intent
To establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in buildings, thus contributing
to the comfort and well-being of the occupants.
Requirements: ASHRAE Standard 62.1-2007, Paragraph 5.1
Location and Size of Openings. Naturally ventilated spaces shall be permanently open to and within
8 m (25 ft) of operable wall or roof openings to the outdoors, the openable area of which is a
minimum of 4% of the net occupiable floor area. Where openings are covered with louvers or
otherwise obstructed, openable area shall be based on the free unobstructed area through the
opening. Where interior spaces without direct openings to the outdoors are ventilated through
adjoining rooms, the opening between rooms shall be permanently unobstructed and have a free
area of not less than 8% of the area of the interior room nor less than 25 ft2 (2.3 m2).
5.1.2 Control and Accessibility. The means to open required operable openings shall be readily
accessible to building occupants whenever the space is occupied.
How much CO2 is too much?
Current ventilation guidelines, such as those from the American Society of Heating Refrigerating,
and Air Conditioning Engineers (ASHRAE), recommend that indoor CO2 levels not exceed the local
outdoor concentration by more than about 650 ppm. Good practice indicates that the ASHRAE
Standard 62.1 target CO2 level in indoor air is about 1,030 ppm, as follows:
380 ppm CO2 typically found in OSA
+ 650 ppm CO2 (ASHRAE target maximum level)
–––––––––––––––––––––––
= 1,030 ppm CO2 (ASHRAE maximum recommended indoor level of CO2)
Atlas 4 - 2 Room CO2 Monitor Controller
594 dollar
The Atlas 4 controls and monitors CO2 in (2) two areas from 400 to 5000 parts per million (PPM). It comes with two (2) remote
room sensors and 25 foot cables (included), and has integrated 24 hour data logging feature built-in. Special operating mode to
run two rooms with only one CO2 generator! Easy to operate and fun to use, the Atlas 4 goes the distance!
 Controls and monitors CO2 in (2) two rooms from 400 to 5000 parts per million (PPM).
 Two (2) remote room sensors with 25 foot cables (included).
 Can control both bottled CO2 tanks and CO2 generators!
SECTION “B” AutoCAD Project
43 SUSTAINABLE INNOVATIONS
 Integrated 24 hour data logging feature built-in.
 Special operating mode to run two rooms with only one CO2 generator.
 Easy to use and simple to operate
 Doses each room at different PPM settings, if required
 10 Amps/120 Volts/60 Hz.
 3 year warranty.
Environmental Tobacco Smoke (ETS) Control Prerequisite
Intent
To prevent or minimize exposure of building occupants, indoor surfaces
and ventilation air distribution systems to environmental tobacco smoke
(ETS)
ACTIONS WE IMPOSED:
 Prohibit smoking in all common areas of the building.
 Locate any exterior designated smoking areas, including
balconies where smoking is permitted, at least 25 feet from
entries, outdoor air intakes and operable windows opening to
common areas.
 Prohibit on-property smoking within 25 feet of entries, outdoor
air intakes and operable windows.
 Provide signage to allow smoking in designated areas, prohibit
smoking in designated areas or prohibit smoking on the entire property.
IEQ Credit 1: Outdoor Air Delivery Monitoring
1 Point
Intent
To provide capacity for ventilation system monitoring to help promote occupant comfort and well-
being.
Particulate Matter Removal. Particulate matter filters or air cleaners having a minimum
efficiency reporting value (MERV) of not less than 6 when rated in accordance with
ANSI/ASHRAE Standard 52.215 shall be provided upstream of all cooling coils or other
devices with wetted surfaces through which air is supplied to an occupiable space.
Minimum efficiency reporting value, commonly known as MERV rating, is a measurement scale
designed in 1987 by the American Society of Heating, Refrigerating and Air-Conditioning
Engineers (ASHRAE) to rate the effectiveness of air filters. The scale "represents a quantum leap
in the precision and accuracy of air-cleaner ratings"[1] and allows for improved health, reduced cost
and energy efficiency in heating, ventilation and air conditioning (HVAC) design
The scale is designed to represent the worst case performance of a filter when dealing with particles in the range
of 0.3 to 10 micrometres. The MERV rating is from 1 to 16. Higher MERV ratings correspond to a greater
percentage of particles captured on each pass, with a MERV 16 filter capturing more than 95% of particles over
the full range.
Below is a table grouping MERV ratings by particle size:
SECTION “B” AutoCAD Project
44 SUSTAINABLE INNOVATIONS
MERV Min.
particle
size
Typical controlled contaminant [2]
Typical Application [2]
1–4 > 10.0 μm Pollen, dust mites, cockroach debris, sanding dust,
spray paint dust, textile fibers, carpet fibers
Residential window AC units
5–8[3]
10.0–3.0
μm
Mold, spores, dust mite debris, cat and dog dander,
hair spray, fabric protector, dusting aids, pudding mix
Better residential, general
commercial, industrial
workspaces
9–12 3.0–1.0
μm
Legionella, Humidifier dust, Lead dust, Milled flour,
Auto emission particulates, Nebulizer droplets
Superior residential, better
commercial, hospital
laboratories
13–16 1.0–0.3
μm
Bacteria, droplet nuclei (sneeze), cooking oil, most
smoke and insecticide dust, most face powder, most
paint pigments
hospital & general surgery
F150E1000 16X20 - Price $210.37
F150E1026 16X25 - Price $210.37
F150E1018 20X20 - Price $210.37
F150E1034 20X25 - Price $210.37
The F200 Cartridge Style Media Air Cleaner captures a significant amount of the airborne particles, 0.3 microns
and larger from the air circulated through the unit.
SECTION “B” AutoCAD Project
45 SUSTAINABLE INNOVATIONS
Free Airwatch
Wireless Filter
Change Reminder
Included!
Features
 Includes free wireless, microprocessor based, Airwatch™ filter change reminder.
 Upgradeable to higher efficiency F50 Electronic Air Cleaner due to common size cabinet design.
 Available in 4 common sizes: 16 x 20, 20 x 20, 16 x 25, and 20 x 25.
 5 year limited warranty.
 Applicable to all gas, oil, and electric forced warm air furnaces.
 Mounts in the return air duct.
 Cabinet can support weight of residential furnace and evaporator coil.
 Requires no electrical connections.
 Mounts in any position.
 Requires no maintenance except periodic media filter replacement.
 Media filter is easily replaced by homeowner.
 Later upgrade to F50 or F300 Electronic Air Cleaner is easy.
 Efficiency Ratings: Based on American Society of Heating, Refrigerating and Air-Conditioning Engineers
Standard 52.2-1999.
 Fractional Efficiency: 15% (0.3 micron particles).
 Minimum Efficiency Reporting Valve (MERV): 8 at 492 fpm.
 Enviracaire Elite brand, new look and colours.
 5 year limited warranty.
Construction Indoor Air Quality Management Plan—During
Construction
1 Point
Intent
To reduce indoor air quality (IAQ) problems resulting from construction or renovation and promote the comfort and
well-being of construction workers and building occupants.
SECTION “B” AutoCAD Project
46 SUSTAINABLE INNOVATIONS
What In The World Is “Make-Up Air”?
A lot of our products have “make-up air” in the title and we realize not a lot of people may fully understand what
this means. So, here’s the best way we see to explain it!
To put it simply, make-up air is air we take from outside, heat up and then distribute inside evenly. This “new” or
“made-up” air replaces the air that is exhausted. The new air is fresh and drier, which provides the ability to absorb
any moisture as well as to ventilate the fumes from the construction process. This means cleaner, drier air inside
so the moisture is less likely to build up indoors and is also less likely to create a potential for mold.
When doing construction, a lot of exhaust gases, paint, adhesives, etc. are used throughout the process. This means
that the air inside is going to become pretty contaminated. When air becomes contaminated, the potential for
mold, build-up of moisture and other harmful things become possible. In order to prevent these from happening,
simple solutions like make-up air can help do the trick. These heaters allow controlled amounts of tempered air
from the outside to come in and replace that exhausted air.
That’s it, in a nutshell! Now, we’re out of here to go enjoy some fresh air outside!
make-up air cost calculator
Using this calculator constitutes acceptance of Terms of Use.
Click here for Terms of Use
Enter data in the blue highlighted values only.
CFM of Exhaust/Make-up Air 1500
Hours of Operation per Week 120
Average Winter Temperature 38
Desired Discharge Temperature/Space Temperature 65
Cost per therm 1.35
Efficiency of Existing Heating System 55%
Efficiency of Energy Recovery Module (ERM) 60%
Temperature of Exhaust Air 70
SECTION “B” AutoCAD Project
47 SUSTAINABLE INNOVATIONS
Estimated Annual Cost of Heating Make-up Air with Existing System
$
3,904
Estimated Annual Cost of Heating Make-up Air with Direct Fire and no ERM
$
2,147
Estimated Annual Cost of Heating Make-up Air with Direct-Fire and ERM
$
620
Total Savings of Direct-Fire with ERM vs. Existing System
$
3,283
NOTES:
Roughly 5088 hours or 30 weeks in heating season.
https://www.google.com.pk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=8&cad=rja&uact=8&ved=0CFAQFjA
H&url=http%3A%2F%2Fwww.rapidengineering.com%2Fhvac%2Fenergy_recovery%2F2012-Energy-Recovery-
Calculator.xls&ei=Cgh2U62LD6yd0wWjtIHoDw&usg=AFQjCNF7xzHkEZWsG_DU18-sVK3nfntGTA
Construction Indoor Air Quality Management Plan—Before
Occupancy
1 Point
Intent
To reduce indoor air quality (IAQ) problems resulting from construction or renovation to promote the comfort and well-
being of construction workers and building occupants.
After construction ends, prior to occupancy and with all interior finishes installed, install new filtration media and, perform
a building flush-out by supplying a total air volume of 14,000 cubic feet of outdoor air per square foot of floor area while
maintaining an internal temperature of at least 60° F and relative humidity no higher than 60%.
Building Flush-out
Introduction
Flush-out is a process used to remove indoor air pollutants like volatile organic compounds (emitted from adhesives,
paint carpet, furnishings etc.) from a building by operating the buildings HVAC system at 100 percent outside air for a
specific period of time. Mostly, such a flush-out is required in newly constructed, renovated or remodelled buildings.
Brief Description
A building flush out is an important step in finalizing a project. It typically lasts between 3 to 30 days depending on the
building material and furnishings, allowing the majority of pollutants to be removed from the building prior to occupancy.
The minimum recommended flush-out period is 7 days; it should be completed prior to occupancy and after all finishings
are installed.
Optimally a building flush-out begins as soon as HVAC systems are operational and extends through the end of
construction, furniture installation, and the first few days of occupancy. The HVAC system should be run continuously,
24 hours a day, with 100% outside air (no return air should be re-circulated into the building). Outdoor air is to be
thermally conditioned as needed to maintain normal indoor temperatures. In humid climates, it is important to avoid
introducing significant amounts of moisture during the flush-out period. Temporary construction filters should be installed
in the air handlers during the construction period and through the duration of the flush-out. These filters must be replaced
after the flush-out is completed.
SECTION “B” AutoCAD Project
48 SUSTAINABLE INNOVATIONS
In fact, for LEED projects, a building flush-out can be performed to earn credit for a Construction Indoor Air Quality
(IAQ) Management Plan.
LEED: Building flush-out
Consider a building flush-out period to reduce possible indoor air quality contamination after construction completion and
prior to occupancy. This involves running the mechanical system with tempered 100% outside air for an extended period of
time (two weeks).
After conducting the minimum two-week building flush-out with new Minimum Efficiency Reporting Value (MERV) 13
filtration media at 100% outside air, new MERV 13 filters must be replaced in all locations except those that have been
processing only outside air during the flush-out
Cost
There are costs associated with building flush outs: construction management, electricity use, and lost revenue from delayed
occupancy. That being said, the avoidance of illness within the building can offset these costs. Incorporating the flush out as
part of the overall building schedule can avoid delays and minimize extra costs.it is calculated after completion
IE Q Credit 4.2: Low-Emitting Materials—Paints and Coatings
1 Point
Intent
To reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well-
being of installers and occupants.
Standard comply with Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993.
SECTION “B” AutoCAD Project
49 SUSTAINABLE INNOVATIONS
Al-Jazeera Factory
for Paints Co.
Al-Jazeera Eggshell
http://www.al-jazeerapaints.com/Paint Calculator
Low-Emitting Materials—Flooring Systems
1 Point
Intent
To reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well-
being of installers and occupants.
Standard. Comply with FloorScore2 standard
Affiliates
Lonseal values the business relationships we've forged over the years.
 FloorScore® www.rfci.com
 Greenguard Environmental Institute www.greenguard.org
 USGBC www.usgbc.org
 Vinyl Institute www.vinylinfo.org
 AEC Daily www.aecdaily.com/sponsor/lonseal
 Vinyl News Service www.vinylnewsservice.net
 IIDA www.iida.org
 CHPS www.chps.net
Samples & Pricing:hannah@csgulfcoast.com
http://www.lonseal.com/greenvinyl.cfm
With bold and smooth patterns and colorways that complement the market, Lonseal's range of
high performance sheet vinyl is a great solution in corporate and education environments.
SECTION “B” AutoCAD Project
50 SUSTAINABLE INNOVATIONS
Office and education attributes include:
 Sound absorbing, skid-resistant construction excellent for high traffic
 Applicable to LEED MR 4.1 and 4.2
 CHPS approved
 GreenMedic™ anti-microbial properties
 Available in colorways that encourage development and learning
 Foam-backed products available to reduce injury
 Ease of maintenance
KITCHEN FLOORING:
MATERIAL: LONECO® Topseal
FEATURES: As Lonseal's foremost eco-friendly product,Loneco® is composed of 50%
recycled content and features Lonseal's exclusive GreenAir™ technology that reduces
VOC emissions and contributes to superior indoor air quality. Additionally, Loneco®'s
organic and earthy colors easily conceal scuffing and soil. 50% recycled content; LEED
MR 4.1, 4.2; GreenAir™ formulated.
OUTDOOR FLOORING :
MATERIAL : LONDECK SIERRA
FEATURES: LONDECK SIERRA features a unique crevassed texture and comes in six
earthy tones. It is part of Lonseal's Londeck series of resilient exterior sheet vinyl with
slightly embossed surfaces that withstand high volumes of pedestrian traffic and weather-
wear. Because of its versatility, Londeck has been utilized in spaces such as pools, hotel
and condo decks, and stairways.
BATHROOM FLOORING :
MATERIAL: LONWOOD NATURAL Topseal
FEATURES: Lonwood Natural pairs the timeless aesthetics of wood with the benefits
of high-performance sheet vinyl in colors that range from earthy to quirky. Its soft grain
patterning and smooth surface make Lonwood Natural ideal for those who want the
warmth of wood with easier maintenance. 40% recycled content; LEED MR 4.1, 4.2;
GreenAir™ formulated; Microbial resistance formulation.
INDOOR FLOORING:
MATERIAL: LONWOOD DAKOTA Topseal
FEATURES: Lonwood Dakota is a slightly textured sheet that evokes the open grain of
oak and the nuance of knot-free, quarter-sawn plank. It coordinates beautifully with our
Loneco® and Lonfloor Plain collections. Ideal for corporate, healthcare, retail and
hospitality applications. Up to 40% recycled content; LEED MR 4.1, 4.2; GreenAir"
formulated; Microbial resistance formulation.
Figure 34 SEA
COACHINGS
Figure 36 SUMMER NIGHT
Figure 37 HONEY CAKES
Figure 35 TITANIUM
SECTION “B” AutoCAD Project
51 SUSTAINABLE INNOVATIONS
THE END

More Related Content

What's hot

Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor PresentationMining On Top
 
Opus Sustainable
Opus SustainableOpus Sustainable
Opus Sustainablewinstonh
 
Building Green in China
Building Green in ChinaBuilding Green in China
Building Green in ChinaJohn Wong
 
Green Building Adoption Index
Green Building Adoption IndexGreen Building Adoption Index
Green Building Adoption Indexnilskok
 
Leed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bLeed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bFathi Nada
 
Green Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaGreen Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaSteve Lojuntin
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...ESD UNU-IAS
 
Civil Engineer for Green Buildings
Civil Engineer for Green BuildingsCivil Engineer for Green Buildings
Civil Engineer for Green BuildingsBC Chew
 
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...Egyptian Engineers Association
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
CAH CCM 10.09.17 Item #8 ppt Judson Nature Trail Building
CAH CCM 10.09.17 Item #8  ppt  Judson Nature Trail BuildingCAH CCM 10.09.17 Item #8  ppt  Judson Nature Trail Building
CAH CCM 10.09.17 Item #8 ppt Judson Nature Trail Buildingahcitycouncil
 
Design Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsDesign Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsIsland Health
 
Green building index
Green building index Green building index
Green building index hott1771
 

What's hot (19)

Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor Presentation
 
Opus Sustainable
Opus SustainableOpus Sustainable
Opus Sustainable
 
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
 
IS_Checklist
IS_ChecklistIS_Checklist
IS_Checklist
 
Building Green in China
Building Green in ChinaBuilding Green in China
Building Green in China
 
Green Building Adoption Index
Green Building Adoption IndexGreen Building Adoption Index
Green Building Adoption Index
 
Leed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9bLeed 2009 rating ci 10-2012_9b
Leed 2009 rating ci 10-2012_9b
 
Green Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaGreen Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in Malaysia
 
G1 Here Comes the Sun
G1 Here Comes the SunG1 Here Comes the Sun
G1 Here Comes the Sun
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
 
Civil Engineer for Green Buildings
Civil Engineer for Green BuildingsCivil Engineer for Green Buildings
Civil Engineer for Green Buildings
 
Missouri
MissouriMissouri
Missouri
 
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...
LEEDم.59-مبادرة#تواصل_تطوير-م.محمد فكرى عبدالغفور-مقدمة عن المباني الخضراء وش...
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
CAH CCM 10.09.17 Item #8 ppt Judson Nature Trail Building
CAH CCM 10.09.17 Item #8  ppt  Judson Nature Trail BuildingCAH CCM 10.09.17 Item #8  ppt  Judson Nature Trail Building
CAH CCM 10.09.17 Item #8 ppt Judson Nature Trail Building
 
Design Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsDesign Guidelines, North Island Hospitals
Design Guidelines, North Island Hospitals
 
Green building index
Green building index Green building index
Green building index
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING
 

Similar to Sustainable Modifications and Innovations using LEED of a Women University in Al-Dilam, K.S.A

Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
Green Building and Technology Unit 2
Green Building and Technology Unit 2Green Building and Technology Unit 2
Green Building and Technology Unit 2Chaitanya Nagare
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRoger Pearson
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on buildingRidzuan Ewan
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED RequirementsScott DeGaro
 
THE GREEN BUILDING
THE GREEN BUILDINGTHE GREEN BUILDING
THE GREEN BUILDINGsangeetkhule
 
PgbcBooklet23March1.pdf
PgbcBooklet23March1.pdfPgbcBooklet23March1.pdf
PgbcBooklet23March1.pdfRemusOcliaso
 
IRJET- Evaluation and Comparison of Energy Savings & Water Savings in Gre...
IRJET-  	  Evaluation and Comparison of Energy Savings & Water Savings in Gre...IRJET-  	  Evaluation and Comparison of Energy Savings & Water Savings in Gre...
IRJET- Evaluation and Comparison of Energy Savings & Water Savings in Gre...IRJET Journal
 
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDC
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDCSTUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDC
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDCIRJET Journal
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATIONAdewunmi Okumodi
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability Farah Abdullah
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building vivatechijri
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer Bilal Mohamed
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11MairaNoor4
 
Document Finished
Document FinishedDocument Finished
Document FinishedGregg Boyd
 

Similar to Sustainable Modifications and Innovations using LEED of a Women University in Al-Dilam, K.S.A (20)

Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
Green Building and Technology Unit 2
Green Building and Technology Unit 2Green Building and Technology Unit 2
Green Building and Technology Unit 2
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Igd booklet
Igd bookletIgd booklet
Igd booklet
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for online
 
Applying sustainable concept on building
Applying sustainable concept on buildingApplying sustainable concept on building
Applying sustainable concept on building
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED Requirements
 
THE GREEN BUILDING
THE GREEN BUILDINGTHE GREEN BUILDING
THE GREEN BUILDING
 
PgbcBooklet23March1.pdf
PgbcBooklet23March1.pdfPgbcBooklet23March1.pdf
PgbcBooklet23March1.pdf
 
Marina Yacht Club at Lusail, Qatar
Marina Yacht Club at Lusail, QatarMarina Yacht Club at Lusail, Qatar
Marina Yacht Club at Lusail, Qatar
 
Kala Bansal.ppt
Kala Bansal.pptKala Bansal.ppt
Kala Bansal.ppt
 
IRJET- Evaluation and Comparison of Energy Savings & Water Savings in Gre...
IRJET-  	  Evaluation and Comparison of Energy Savings & Water Savings in Gre...IRJET-  	  Evaluation and Comparison of Energy Savings & Water Savings in Gre...
IRJET- Evaluation and Comparison of Energy Savings & Water Savings in Gre...
 
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDC
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDCSTUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDC
STUDY OF GREEN INDUSTRIAL BUILDING IN CHAKAN MIDC
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11
 
Document Finished
Document FinishedDocument Finished
Document Finished
 

More from Asadullah Malik

A review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesA review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesAsadullah Malik
 
Urban Transportation Planning for the Region of Waterloo
Urban Transportation Planning for the Region of WaterlooUrban Transportation Planning for the Region of Waterloo
Urban Transportation Planning for the Region of WaterlooAsadullah Malik
 
Building Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuestBuilding Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuestAsadullah Malik
 
House Energy Audit Report
House Energy Audit ReportHouse Energy Audit Report
House Energy Audit ReportAsadullah Malik
 
Ways of Determining the Moisture of Soil
Ways of Determining the Moisture of SoilWays of Determining the Moisture of Soil
Ways of Determining the Moisture of SoilAsadullah Malik
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareAsadullah Malik
 
Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design ReportAsadullah Malik
 
The Struve Geodetic arc & its future possibilities of being the one (Semester...
The Struve Geodetic arc & its future possibilities of being the one (Semester...The Struve Geodetic arc & its future possibilities of being the one (Semester...
The Struve Geodetic arc & its future possibilities of being the one (Semester...Asadullah Malik
 
The Struve Geodetic arc & its future possibilities of being the one
The Struve Geodetic arc & its future possibilities of being the oneThe Struve Geodetic arc & its future possibilities of being the one
The Struve Geodetic arc & its future possibilities of being the oneAsadullah Malik
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareAsadullah Malik
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareAsadullah Malik
 
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...Asadullah Malik
 
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...Asadullah Malik
 

More from Asadullah Malik (14)

A review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesA review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniques
 
Urban Transportation Planning for the Region of Waterloo
Urban Transportation Planning for the Region of WaterlooUrban Transportation Planning for the Region of Waterloo
Urban Transportation Planning for the Region of Waterloo
 
Building Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuestBuilding Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuest
 
House Energy Audit Report
House Energy Audit ReportHouse Energy Audit Report
House Energy Audit Report
 
UN Habitat Report
UN Habitat ReportUN Habitat Report
UN Habitat Report
 
Ways of Determining the Moisture of Soil
Ways of Determining the Moisture of SoilWays of Determining the Moisture of Soil
Ways of Determining the Moisture of Soil
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
 
Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design Report
 
The Struve Geodetic arc & its future possibilities of being the one (Semester...
The Struve Geodetic arc & its future possibilities of being the one (Semester...The Struve Geodetic arc & its future possibilities of being the one (Semester...
The Struve Geodetic arc & its future possibilities of being the one (Semester...
 
The Struve Geodetic arc & its future possibilities of being the one
The Struve Geodetic arc & its future possibilities of being the oneThe Struve Geodetic arc & its future possibilities of being the one
The Struve Geodetic arc & its future possibilities of being the one
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
 
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...
Detailed Case Study of Pind Dadan Khan, Punjab, Pakistan with special emphasi...
 
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...
Final Year Project Presentation (June 2015) : INVESTIGATION OF SHEAR BEHAVIOU...
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Sustainable Modifications and Innovations using LEED of a Women University in Al-Dilam, K.S.A

  • 1. 2014 Asad Ullah Malik SECTION – ‘B’ 5/19/2014 SUSTAINABLE INNOVATIONS Figure 1 OUR PPROJECT SUBMITTED TO:- LEC. ABDUL BASEER
  • 2. SECTION “B” AutoCAD Project 1 SUSTAINABLE INNOVATIONS Group Members Sr. # NAMES REG # 1 ASAD ULLAH MALIK (Leader) 16 2 MUHAMMAD UMER ABBASI 78 3 ZULQARNAIN SHAH 130 4 FAKHAR ABBASS 113 5 FARRUKH AZIZ 25 6 MOHAMMAD WAQAR 83 Acknowledgement First of all, we would thank Allah Almighty because whatever we are, whatever we do, whatever we did and whatever has been done by us is solely due to Him and Him alone and rest all are his creatures which He created to assist us. We would like to express our very great appreciation to Lecturer Abdul Baseer for his valuable and constructive suggestions during the planning and development of this research work. His willingness to give his time so generously has been very much appreciated. It is also our duty to record our thankfulness to the Lab Technicians & Lab Instructors of the Computer Lab of NUST Institute of Civil Engineering for their help in offering us the resources in running and installing the program. i.e. AutoCAD software. Finally, we wish to thank our parents for their support and encouragement throughout our study.
  • 3. SECTION “B” AutoCAD Project 2 SUSTAINABLE INNOVATIONS INTRODUCTION OF THE PROJECT: We as civil engineers deal with a field which is so diverse in its applications. In this project too we dealt with Environmental, Transportation, Material and other aspects of a project. The continuous search for more sustainable and economic processed solutions has been an important investigation topic of a broad research community worldwide. The resulting solutions can therefore be adapted by the industry thus leading to a more sustainable society. The building industry is not immune to this reality and huge efforts have been done in order to find alternative sustainable building materials and low technology methods, which result in a more sustainable and affordable construction complemented with the comfort standards required nowadays. The CO2 emissions to the atmosphere, energy and water consumptions are some parameters that have significant impact in this equation. Reusing, opting for green building materials (which must be renewable, local, and abundant), retrofitting, choosing low technology methods and techniques are some practices that have given good results in this context. The concept of sustainability is not limited to buildings. An example can be seen in Fig. 3. But we only focused on LEED which was our leading guide through the process. As mentioned in the abstract, our LEED Project is situated in Al-Dilam. Below the pictures perfectly depicts the outskirts of this town. Figure 3 An example of Sustainable Furniture Figure 2 Branches of Civil Engineering Figure 4 Local Atmosphere in Al-Dilam
  • 4. SECTION “B” AutoCAD Project 3 SUSTAINABLE INNOVATIONS MINIMUM PROGRAM REQUIREMENTS
  • 5. SECTION “B” AutoCAD Project 4 SUSTAINABLE INNOVATIONS LEED 2009 Minimum Program Requirements for New Construction and Major Renovations: 1. Must comply with Environmental Laws. (SATISFIED) Our building was approved by the Ministry of Higher Education of Saudi Arabia. The wall insulations and other criteria were already imposed by the ministry as per local building standards and codes. 2. Must be a Complete, Permanent Building or Space. (SATISFIED) 3. Must Use a Reasonable Site Boundary (SATISFIED) 4. Must Comply with Minimum Floor Area Requirements. Total Area of Ground Floor = 11748.654 m2 Total Area of Openings in Ground Floor = 3921.647 m2 Gross Floor Area of Ground Floor= 11748.654 m2 – 3921.647 m2 = 7827.007 m2 Total Area of First Floor = 11748.654 m2 Total Area of Openings in Second Floor = 3495.957 m2 Gross Floor Area of First Floor= 11748.654 m2 – 3495.957 m2= 8252.697 m2 Total Area of Second Floor = 11748.654 m2 Total Area of Openings in Second Floor = 3495.957 m2 Gross Floor Area of Second Floor= 11748.654 m2 – 3495.957 m2 = 8252.697 m2 Gross Floor Area of The Roof Floor= 8252.697 m2 Total Floor Area = 32585.098 m2 > 93 m2 (SATISFIED) 5. Must Comply with Minimum Occupancy Rates (SATISFIED) As, our project is a university students will remain in university for daily for about 4-5 hours on average but they also get summer vacations which lowers their annual average of the time they spend in the premises of the university. But as LEED only requires only 1 FTE which can be served by the cleaning and security staff which stays on campus all year round. These low paid staff works and Figure 5 SNAPSHOT TAKEN WHEN CALCULATING AREA OF OPEN SPACES
  • 6. SECTION “B” AutoCAD Project 5 SUSTAINABLE INNOVATIONS lives on campus and spends more than 40 hours a week on the LEED project. But here’s the catch. To satisfy the LEED code the FTE has to spend his/her stipulated time in the LEED project space/building. 6. Must Commit to Sharing Whole-Building Energy and Water Usage Date We provided have provided our data where necessary in the following part of the report. 7. Must Comply with a Minimum Building Area to Site Area Ratio: Total Gross Area = 690000 ft2 2% of Total Gross Area = 138000 ft2 Covered Building area = 88000 ft2 < 138000 ft2 (SATISFIED)
  • 7. SECTION “B” AutoCAD Project 6 SUSTAINABLE INNOVATIONS SUSTAINABLE SITES
  • 8. SECTION “B” AutoCAD Project 7 SUSTAINABLE INNOVATIONS SS PREREQUISITE 1 : Construction Activity Pollution Prevention INTENT To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation and airborne dust generation. WHAT WE DID: We did temporary seeding ALOND WITH Stockpiling and Silt Fencing. Although rains aren’t much frequent in this particular area of Saudi Arabia; still we imposed, on precautionary terms, the provision of making Sediments Basin in the low lying areas of the site. Temporary seeding stabilizes disturbed areas with fast growing annual grasses, small grains, or legumes until permanent vegetation can be established. Dense, established vegetation protects the soil from raindrop impact, reduces flow velocities, increases infiltration, reduces soil loss from the site and is the most effective erosion control practice available. In addition, temporary seeding is economical and adds organic matter to the soil and reduces dust and mud problems that are common on many construction sites. Temporary seeding is applicable on any area of the site that will remain inactive for at least 21 days but less than 1 year. It is often used to prevent erosion between construction activities and during the winter months if established early enough. Due to its short-term nature, temporary seeding may be ineffective on its own and should be used in conjunction with other management practices. Most importantly in our case the major concerned factor was the frequent sand storms as our site was just adjacent to a sand dune. In fact our site was reclaimed from encroaching sand dunes. For this too the temporary seeding would help settle dust and sand. Figure 6 SILT FENCING Figure 7 Stockpiling the Soil to prevent erosion in an event of storm and covering it with Sheets to avoid loss due to natural factors. Figure 8 Features of Temporary Seeding
  • 9. SECTION “B” AutoCAD Project 8 SUSTAINABLE INNOVATIONS SS Credit 1: Site Selection 1 Point (SATISFIED) INTENT To avoid the development of inappropriate sites and reduce the environmental impact from the location of a building on a site. Requirements Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria: Does over site meet the requirements written on the left Prime farmland as defined by the U.S. Department of Agriculture in the United States Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5 (citation 7CFR657.5) NO Previously undeveloped land whose elevation is lower than 5 feet above the elevation of the 100-year flood as defined by the Federal Emergency Management Agency (FEMA) NO Land specifically identified as habitat for any species on federal or state threatened or endangered lists NO Land within 100 feet of any wetlands as defined by the U.S. Code of Federal Regulations 40 CFR, Parts 230-233 and Part 22, and isolated wetlands or areas of special concern identified by state or local rule, OR within setback distances from wetlands prescribed in state or local regulations, as defined by local or state rule or law, whichever is more stringent NO Previously undeveloped land that is within 50 feet of a water body, defined as seas, lakes, rivers, streams and tributaries that support or could support fish, recreation or industrial use, consistent with the terminology of the Clean Water Act NO nLand that prior to acquisition for the project was public parkland, unless land of equal or greater value as parkland is accepted in trade by the public landowner (park authority projects are exempt). NO
  • 10. SECTION “B” AutoCAD Project 9 SUSTAINABLE INNOVATIONS SS Credit 2: Development Density and Community Connectivity 5 Points (SATISFIED) Intent To channel development to urban areas with existing infrastructure, protect greenfields, and preserve habitat and Natural resources. WHAT WE DID: We proposed a new location for our project which was near 10 basic facilities. The details of these 10 basic places will be given in the presentation. SS Credit 4.1: Alternative Transportation—Public Transportation Access 6 Points (SATISFIED) Intent To reduce pollution and land development impacts from automobile use. WHAT WE DID: We made and designed a 15 sitter bus stop to facilitate the students and the staff. Figure 9 A BUS STOP ADJACENT TO THE MAIN ENTRANCE OF THE BUILDING
  • 11. SECTION “B” AutoCAD Project 10 SUSTAINABLE INNOVATIONS SS Credit 4.2: Alternative Transportation—Bicycle Storage and Changing Rooms 1 Point (SATISFIED) Intent To reduce pollution and land development impacts from automobile use. WHAT WE DID: We designed, built and provided bicycles stands just near to the main entrances thus facilitating the students. Changing rooms were located inside LEED Project Building. SS Credit 4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 Points Intent To reduce pollution and land development impacts from automobile use. WHAT WE DID We installed OPTION 3 by imposing pavement markings specifically for the fuel efficient vehicles. We introduced preferred parking and these changes were incorporated in AutoCAD drawings too. Moreover, as a functioning university each year academically efficient students will be awarded with fuel efficient cars for usage during their academic tenure. We proposed two cars 1) Toyota Prius C & 2) MERCEDES-BENZ SMART ELECTRIC DRIVE CONVERTIBLE/COUPE. Both of them achieved a minimum green score of 40 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide and in fact Figure 12 Bike Stands given at the entrances to the LEED building/ space. Figure 10 Bike stands at the main entrance of the LEED Project Boundary Figure 11 SW-ISOMETRIC VIEW OF THE BIKE STAND
  • 12. SECTION “B” AutoCAD Project 11 SUSTAINABLE INNOVATIONS these two topped the list for the Greenest Vehicles of 2014. We also installed boards reserving parking for green vehicles only on different locations as specified by LEED. Figure 16 ""LOW EMITTING FUEL EFFICIENT VEHICLES ONLY"" written on the parking spaces adjacent to the entrance to the LEED Project Figure 15 TOYOTA PRIUS C Figure 18 MERCEDES-BENZ SMART ELECTRIC DRIVE CONVERTIBLE/COUPE Figure 14 Real Life illustration of our concept which we showed you on the previous page on AutoCAD Figure 17 SIGN BOARDS INSTALLED ADJACENT TO PREFERED PARKING Figure 13 Preferred Parking near Gate 2
  • 13. SECTION “B” AutoCAD Project 12 SUSTAINABLE INNOVATIONS Figure 19 TABLE SHOWING THE SPECS AND POINTS OF THE GREENEST CARS OF 2014
  • 14. SECTION “B” AutoCAD Project 13 SUSTAINABLE INNOVATIONS SS Credit 4.4: Alternative Transportation—Parking Capacity 2 Points Intent To reduce pollution and land development impacts from automobile use. WHAT WE DID: To satisfy LEED’s Non-Residential Projects condition we didn’t exceed the minimum zoning requirements. Dedicated parking for carpools was provided. SS Credit 6.1 & 6.2: Storm water Design—Quantity & Quality Control 1 Point + 1 Point Intent To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or eliminating pollution from storm water runoff and eliminating contaminants. / To limit disruption and pollution of natural water flows by managing storm water runoff. WHAT WE DID: Pictures are Self-explanatory Figure 21 Sign Board Figure 20 "LOW EMITTING FUEL EFFIECIENT VEHICLES AND CARPOOLS ONLY". Figure 23 Pervious Pavement Figure 22 Vegetated Roof
  • 15. SECTION “B” AutoCAD Project 14 SUSTAINABLE INNOVATIONS REFERENCES: http://www.aceee.org/press/2009/02/annual-ranking-green-vehicles-shows-progress-despite-tou http://www.canaansitefurnishings.com/wp-content/uploads/2013/04/bicycle-racks-cah-708_0.jpg http://en.wikipedia.org/wiki/Phase_I_environmental_site_assessment http://www.cadblocksfree.com/downloaddetails.php?id=787 http://greenercars.org/highlights.htm http://upload.wikimedia.org/wikipedia/commons/9/91/2013_Smart_Fortwo_Electric_Drive_--_2012_NYIAS.JPG http://ecosigndesigns.com/wp-content/themes/greenSignDesigns/img/carpool.png http://www.mto.gov.on.ca/graphics/english/transit/supportive-guideline/2.5.2.jpg Cool Roof Q & A (draft), Ronnen Levinson Lawrence Berkeley National Laboratory (July 29, 2009) Figure 25 Rain water collection tank made underground in the lowest part of the LEED Project Boundary. This will collect Rain water as all the slope of the area is towards it, which will later be used in urinal flushing. as shown in FIG. 24A Figure 24A 50% gray water used again for urinal flushing
  • 16. SECTION “B” AutoCAD Project 15 SUSTAINABLE INNOVATIONS WATER EFFICIENCY
  • 17. SECTION “B” AutoCAD Project 16 SUSTAINABLE INNOVATIONS Water efficiency credits WE Credit 1: Water Efficient Landscaping: (4 points) Requirement: Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building. Path: No Potable Water Use or Irrigation: Method: Install landscaping that does not require permanent irrigation systems. Temporary irrigation systems used for plant establishment are allowed only if removed within 1 year of installation. In order to get useful results for species that does not require water you have to perform following steps 1. Soil analysis 2. PLANNING & DESIGN 3. EFFICIENT IRRIGATION 4. PROPER PLANT SELECTION 5. Practical grass area 6. Mulching 7. Proper maintaince The university is situated in Saudi Arabia which has an arid climate. so we study different species of that area that we can use for our landscaping in project with least or no water use.In the difficult, arid climate of Saudi Arabia, distinct advantages are to be gained from incorporating some native, or locally suited, species into a design because of their ability to flourish under local growing conditions and for their superior tolerance to the extremes of heat, desert winds, drought or saline conditions that can exist. Native species often show a lower maintenance requirement than introductions and many possess a minimal irrigation demand when established. There are some species that can be used for our project. 1) Dohm palm 2) Athel tree 3) Cunvolvulus hystrix Reference: Department of Landscape Architecture, School of Environmental Design, Faculty of Engineering, King Abdulaziz University, Jeddah, Saudi Arabia. WE Credit 2: Innovative Wastewater Technologies: (2 points) Intent: To reduce wastewater generation and potable water demand while increasing the local aquifer recharge Method: Treat 50% of wastewater on-site to tertiary standards. Treated water must be infiltrated or used on-site One of technology that can be used for this purpose is “Biological Nutrient Removal systems”
  • 18. SECTION “B” AutoCAD Project 17 SUSTAINABLE INNOVATIONS Description Biological nutrient removal (BNR) removes total nitrogen (TN) and total phosphorus (TP) from wastewater through the use of microorganisms under different environmental conditions in the treatment process. Nitrogen Removal: Mechanisms Involved in the Removal of Total Nitrogen Form of Nitrogen Common Removal Mechanism Technology Limit (mg/L) Ammonia-N Nitrification <0.5 Nitrate-N Denitrification 1 – 2 Particulate organic-N Solids separation <1.0 Soluble organic-N None 0.5 – 1.5 Note that organic nitrogen is not removed biologically; rather only the particulate fraction can be removed through solids separation via sedimentation or filtration. Phosphorus Removal: Mechanisms Involved in the Removal of Total Phosphorus Form of Phosphorus Common Removal Mechanism Technology Limit (mg/L) Soluble phosphorus Microbial uptake Chemical precipitation 0.1 Particulate phosphorus Solids removal <0.05 BNR Unit Costs for Small Systems (Dollars) Component 4,000 gpd 10,000 gpd 25,000 gpd 50,000 gpd 100,000 gpd New Plants Construction $70.97/gpd $34.66/gpd $19.34/gpd $14.58/gpd $8.50/gpd O&M $7.86/gpd $3.70/gpd $2.10/gpd $1.43/gpd $0.94/gpd Features: Special polypropylene discs provide perfect environment for fixed film growth, No blowers, aeration piping, or diffusers, Low HP drives, Compact design, Stable process, Wheels controlled with VFD’s and DO probes and Peripheral mixing paddle Benefits: No odors, No noise, Low energy requirement, Small footprint, Improved sludge settling, Minimized operator attention, Can accommodate seasonal fluctuations in flow rate Reference: Water Environment Federation (WEF) and American Society of Civil Engineers
  • 19. SECTION “B” AutoCAD Project 18 SUSTAINABLE INNOVATIONS (ASCE)/Environmental and Water Resources Institute (EWRI). 2006. Biological Nutrient Removal (BNR) Operation in Wastewater Treatment Plants. McGraw Hill: New York. WE Credit 3: Water Use Reduction: (2 points) Intent: To further increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems Innovation: 30% reduction in water use can be achieve by use of “composting toilet system”. let's go over how a composting toilet works. The process works the same as the composting pile you may have for your kitchen scraps. Aerobic bacteria within the waste break it down with the help of air, heat and time. Someone does have to stir material regularly, and add materials such as sawdust or popcorn to keep those bacteria at work. The result is an earthy nutrient-filled organic matter known as humus. There are two kinds of composting toilets: self-contained and central. They don't look that different from your current commode. Self-contained composting toilets are smaller and are more likely to be found in cottages or seasonal homes. The self-contained unit shouldn't be used year-round if more than two people are using it. As the name implies, the toilet and the composter are combined in one unit, so composting is taking place just under your throne. In a central system, the toilet is connected to a separate composter, which may be in the basement or on the side of the building. Central composting toilets have a bit more capacity for year-round homes but are more expensive than self-contained composting toilets. Both have the same goal, though: to destroy the pathogens and recycle our excrement without using water. Instead of flushing, the waste drops down a pipe to the composter, which is hidden from view with a trap door or screen A company with name “Andexa Composting Toilet” is providing our desirable toilets to fit in university. Reference: http://www.biolet.com
  • 20. SECTION “B” AutoCAD Project 19 SUSTAINABLE INNOVATIONS ENERGY & ATMOSPHERE
  • 21. SECTION “B” AutoCAD Project 20 SUSTAINABLE INNOVATIONS Prerequisite 1 Fundamental Commissioning of Building Energy Systems Intent To verify that the project’s energy-related systems are installed, and calibrated to perform according to the owner’s project requirements, basis of design and construction documents. Benefits of commissioning include reduced energy use, lower operating costs, fewer contractor callbacks, better building documentation, improved occupant productivity and verification that the systems perform in accordance with the owner’s project requirements. PREREQUISITE 2 Minimum Energy Performance Intent To establish the minimum level of energy efficiency for the proposed building and systems to reduce environmental and economic impacts associated with excessive energy use. PREREQUISITE 3 Fundamental Refrigerant Management Intent To reduce stratospheric ozone depletion. Requirements
  • 22. SECTION “B” AutoCAD Project 21 SUSTAINABLE INNOVATIONS Zero use of chlorofluorocarbon (CFC)-based refrigerants in new base building heating, ventilating, air conditioning and refrigeration (HVAC&R) systems. When reusing existing base building HVAC equipment, complete a comprehensive CFC phase-out conversion prior to project completion. Phase-out plans extending beyond the project completion date will be considered on their merits. GREEN REFRIGERANTS QUALIFY FOR LEED POINTS Enhanced Refrigerant Management CREDIT 4 2 points (HVAC&R) The refrigerants used in HVAC equipment can earn a point for LEED certification. A LEED pre-requisite is that HVAC equipment must not use a CFC refrigerant. An additional point can be earned if the refrigerant is not an HCFC (such as HCFC-22 and HCFC-123). are considered “green” refrigerants and earn the extra LEED point. HCFC-22 While it is currently the most popular and versatile refrigerant in the world, HCFC-22 cannot be used in new equipment after 2010. A small amount will be manufactured to service equipment until 2020, when its production will stop completely. If your equipment runs on HCFC-22, you can continue to operate it for its useful life, even after the phase out date. Like all “extinct” refrigerants, HCFC-22 is grandfathered in the United States. Once the HVAC systems are in the field, they can stay in the field. Because HCFC-22 is so popular, there should be enough reclaimed refrigerant for service and repair. Large cooling systems, including all positive pressure centrifugal and screw chillers, are now being designed for HFC-134a and HFC-407C. In small systems – those under 100 tons – HFC-410A has become the main replacement for HCFC-22.
  • 23. SECTION “B” AutoCAD Project 22 SUSTAINABLE INNOVATIONS LIGHTING AND DAYLIGHTING Opimize Energy Performance Credit 1 Lighting and day lighting controls are systems that adjust the amount of natural and artificial light in a room, based on its brightness, occupancy, and sometimes other factors. Good controls are critical to lighting design that incorporates both daylight and artificial light. They can improve both visual and thermal comfort while significantly decreasing energy use. For instance, occupancy- based shutoff alone can save up to 38% of lighting energy for private offices, 50% in conference rooms, and 58% for classrooms. Successful design of lighting control is measured by testing visual comfort in the room during occupied times, and measuring the daily or monthly lighting energy use. The less energy required while still achieving comfort, the better. Controls systems are also measured by their reliability and ease of use for occupants and operations staff.  Lighting Controls  Shading Controls  Lighting for Thermal Comfort MEASUREMENT AND VERIFICATION (Credit 5) Lighting Controls The simplest way to reduce the amount of energy consumed by lighting systems is to turn lights off whenever they are not required. Most people simply do not shut off lights when they leave rooms. One solution to this problem is occupancy sensors, which sense the presence of people in a space using infrared and/or ultrasonic motion sensors. These switches are appropriate in spaces where people pass in and out often, such as private offices, restrooms, storage areas, and conference rooms. Lighting controls can also dim lights when there is plenty of daylight. Such systems can save 20-60% of lighting energy1. To respond appropriately as the distribution of sunlight in the room changes through the day, these systems require brightness sensors to be placed strategically in the room. Different sensors may actuate different lighting zones. Occupancy sensors and brightness sensors can be individual switches for individual lights or inputs to larger control systems. The most highly-optimized lighting control systems combine multiple sensors and a logic processor to control lights. These systems can often save 40% of overall lighting energy; sometimes even far more. Figure 27 Daylight brightness sensor Figure 26 Occupancy sensor with a manual override switch
  • 24. SECTION “B” AutoCAD Project 23 SUSTAINABLE INNOVATIONS Shading Controls Daylight can be valuable to give spaces good visual comfort using no electricity, but sometimes the sun is too bright. Building occupants can open and close shades, or adjust blinds, to tune light levels to their comfort; however, people often don't operate such systems to their optimal effectiveness, particularly in shared spaces. Motorized shades and blinds can be controlled by timers, brightness sensors, or other inputs. These can close shades at sunset on western walls to avoid glare, or tilt Venetian blinds to 60% closed at the brightest times of day while tilting them to full openness at dimmer times. A brightness sensor detects excess sunlight, and lowers a shade to avoid glare The simplest and least expensive control systems are timers; sophisticated ones can be set to actuate shades at different times of day throughout the year, to compensate for changes in the sun's path from winter to summer. Systems based on brightness sensors are more expensive, but can also adjust for cloudy days and shadows from surrounding buildings, trees, or other objects. As with lighting controls, shading controls can be individual units or can be part of a larger system; the latter is most effective at maximizing visual comfort while minimizing energy use. Lighting Controls for Thermal Comfort Saving lighting energy also saves cooling energy in warm climates, because every watt of electricity used by lighting systems turns into a watt of heat that must be removed from the room. Part of this is from the inefficiency of lighting equipment, the rest is from the conversion of light into heat when it is absorbed by the materials it illuminates. Thus, reducing lighting energy use also improves passive thermal comfort.
  • 25. SECTION “B” AutoCAD Project 24 SUSTAINABLE INNOVATIONS Lighting energy becomes heat, both by inefficiency and by absorption In hot climates, preventing excess solar heat gain during the afternoon can be more important than bringing in natural light. Even when windows have low solar heat gain coefficients, they do still let in heat from the sun. Motorized shades can also be used to avoid excess gain and translucent shades may even still allow sufficient daylight. In cold climates with bright sunlight, insulated shutters may open during the day to allow the sun's heat in through high-SHGC windows, but shut at night to avoid heat loss through the same windows. When thermal comfort is a priority for shades, external shades and shutters are more useful than interior ones, as they prevent the sun's heat from ever getting inside the room, rather than trying to reflect it back out once it has come in. Internal shades block some heat, but much heat is still trapped inside External shades and shutters block heat more completely than internal ones The Lumen Method of Lighting Design
  • 26. SECTION “B” AutoCAD Project 25 SUSTAINABLE INNOVATIONS The intuition of the architect alone is not sufficient to fully comprehend the interplay of light and predict with certainty the amounts of illumination in all parts of the room. On the other hand, computational tools available are also often insufficient in themselves to achieve "beautifully" lit buildings. The simplest method of calculating the overall illumination level for evenly lit spaces1 is the Lumen Method. It uses both computation and intuition and is the calculation most used by lighting engineers when determining the number of luminaires for a given lighting level. The simple formula is as follows: E = F / A Where E is the average (or minimum) illumination level at the work plane (in lux), F is the useful lumen output of all sources (lumens) and A is the total surface area of the working plane (in m²). In terms of architectural design, solving for F allows the architect or engineer to determine the total amount of light required in the room. This is given by rearranging the formula as follows: F = AE Be aware that the resulting value is not the lamp lumens, because not all of the light produced by each lamp actually reaches the work plane. Many factors affect the amount of light reaching the work plane:  The size and proportion of the room.  The height of the light fixtures above the work plane.  The reflectance of wall and ceiling surfaces.  The nature of the light fixture and its distribution of light.  Light loss due to ageing, dust collection and yellowing.  Atmospheric particles such as smoke or dust. Some of the most efficient fixtures in the most effective layout can result in up to 80% of the installed lamp lumens reaching the work plane, while ineffective fixtures in a dark-colored room can result in only 2%. Steps of the lumen method: 1. Select Required Illumination Determine what the minimum required illumination level is for your particular application, using government standards or green building certification systems. 2. Determine Received Flux This is simply a matter of calculating the total surface area over which the required illuminance is to be distributed and multiplying this by the required illumination level using the formula F = AE. This gives the amount of "useful" light required. From this, the total installed flux can be determined. 3. Select a Light Fixture A preliminary assessment must be made of the type of lighting required, a decision most often made as a function of both aesthetics and economics. This fixture may prove unsuitable for the lighting task, however. The next few steps are used to determine this. 4. Determine Mounting Height
  • 27. SECTION “B” AutoCAD Project 26 SUSTAINABLE INNOVATIONS The distance from the source to the working plane is very important, as it is a major determinant of the final illumination level. This is a function of the inverse square law. 5. Determine Room Index The room index is a ratio, describing how the room's height compares to its length and width. It is given by: Where L is the length of the room, W is its width, and Hm is the mounting height above the work plane. 6. Determine Utilization Factor (UF) The Utilization Factor, or Coefficient of Utilization, brings together all of the variables above (reflectance of both the walls and ceiling, the room index, and the type of luminaire) into a single value. Use tables available from manufacturers (all architects' offices will have several) to determine the coefficient of utilization for different light fixtures. 7. Determine Maintenance Factor (MF) The maintenance factor is based on how often the lights are cleaned and replaced. It takes into account such factors as decreased efficiency with age, accumulation of dust within the fitting itself and the depreciation of reflectance as walls and ceilings age. For convenience, it is usually given as three options: Good = 0.70 Medium = 0.65 Poor = 0.55 8. Determine Number of Fixtures First, determine the total installed flux needed, by applying the Utilization Factor and Maintenance Factor to the received flux. This is achieved using the following formula: Next, determine the number of fixtures required by simply dividing the installed flux by the total output of each light source. 9. Check Spacing of Fixtures Once the number of fixtures is known, they must be distributed uniformly throughout the enclosure. This is simply a matter of determining a grid based on the total number. Finally, make sure that the fixture spacing is reasonable (not so far that light falls off, not so close that fixtures overlap). If the fitting you chose is unsuitable, simply select a new luminaire (based on the experience gained in this calculation) and perform steps 3-9 again. Combining Electric Lighting With Daylighting Generally speaking, artificial lighting systems must be designed to illuminate spaces well with no daylight at all, because buildings are often used at night. However, they should have the flexibility to combine their lighting with daylighting, to minimize energy use while maximizing comfort.
  • 28. SECTION “B” AutoCAD Project 27 SUSTAINABLE INNOVATIONS To combine electric lighting with daylighting, use lighting control systems to dim or turn off electric lights based on available daylight. This means not only choosing good fixtures and layouts, but also good sensor locations and control zones. It can be used in rooms lit with a uniform array of luminaires, where the room's minimum lighting level should not be less than 70% of the maximum level. HEATING AND COOLING Passive Cooling Just like passive heating, cooling your building using passive strategies is important for reducing energy usage in your building. Specifically, utilizing passive cooling strategies like natural ventilation, air cooling, and shades can reduce your demand for mechanical cooling while maintaining thermal comfort. Passive Heating Passive heating uses the energy of the sun to keep occupants comfortable without the use of mechanical systems. These concepts will help you design for passive heating.
  • 29. SECTION “B” AutoCAD Project 28 SUSTAINABLE INNOVATIONS ONSITE RENEWABLE ENERGY (Credit 2) HOT WATER SYSTEM CREDIT 5&6 RENEWABLE ENERGY AND GREEN POWER Renewable Energy and Green Power Generating renewable energy on-site can provide a source of green power. Green power is a subset of renewable energy and represents those renewable energy resources and technologies that provide the highest environmental benefit. Green power is produced from solar, wind, geothermal, biogas, biomass, and low-impact hydro. Green power sources produce electricity with an environmental profile superior to
  • 30. SECTION “B” AutoCAD Project 29 SUSTAINABLE INNOVATIONS conventional power technologies and produce no anthropogenic greenhouse gas emissions. EPA requires that green power sources must also have been built since the beginning of the voluntary market in order to support “new” renewable energy development (U.S. EPA, 2007e) Figure 28 BIOGAS PLANT Figure 29 biogas-5000-portable-biogas-analyser
  • 31. SECTION “B” AutoCAD Project 30 SUSTAINABLE INNOVATIONS EA Credit 4: Enhanced Refrigerant Management Intent To reduce ozone depletion and support early compliance with the Montreal Protocol while minimizing direct contributions to climate change. Solution HVAC INVERTERS The inverter controls the compressor speed so that the system optimizes the load distribution to deliver the capacity needed to reach and maintain the required temperature. This technology can lower the energy consumption for any cooling or heating application, save money and make a contribution to a cleaner environment. These HVAC inverters are used for energy saving and enhanced refrigeration, heating and ventilation. Typical inverter applications: Following are the 3 applications of inverter 1) Fans  Features: _ Supply & extract ventilation fans _ Variable Air Volume (VAV) systems _ Constant Air Volume (CAV) systems _ Cooling tower fans _ Condenser fans _ Boiler fans _ Car Park ventilation fans _ Stairway ventilation 2) Pumps  Features: _ Chilling _ Heating _ Booster pump _ Pressuration set _ Cold and hot water pumps _ Cooling tower pumps _ Delta P regulation on heat exchangers _ Swimming pool pumps 3) Compressors  Features: _ Chilling _ Clean air compressors _ Gas compressors _ Heat pumps
  • 32. SECTION “B” AutoCAD Project 31 SUSTAINABLE INNOVATIONS Our Equipment Supplier: HONEYWELL INVERTERS Company: Honeywell Region: USA SmartDrive HVAC Key Features OF SmartDrive HVAC: Power consumption of SmartDrive HVAC - 160 kW in 400V ( 3~) - 0.55 - 55 kW in 230 V ( 3~) Power consumption of normal HVAC system is 400 kW Models - IP21 and IP54 enclosure classes Features - EMC/RFI filters for installation in public electrical network (e.g. typical buildings) integrated as standard (EN61800-3 category C2) - Compliance with THD standard - EN61000-3-12 - Multilanguage text display as standard Important Features of SmartDrive HVAC - Special energy saving mode to provide more savings than a standard inverter in the market for fan and pump applications - Built-in real-time clock with battery for time-based control and time-stamped fault messages - PID-controller with advanced features built-in: Sleep mode, pressure loss compensation, pump soft fill etc. - Additional PID-controller for controlling other devices e.g. Damper actuator - Pump and fan cascade controller with full auto-change functionality - High class flying start function to obtain the control of already rotating motor very fast - Ramp time optimization -automatically avoid the pressure spikes in pipes or air ducts that are caused by increasing or decreasing speed too rapidly. - Smart cooling channel design to separate all electrical parts from cooling air - Varnished boards helping to prevent damage from dirt and dust - Electrolyte free capacitors increase the lifetime of the product - Extensive software and hardware protection functions - Configurable Automatic restart - Trip-free operation with maintenance/safety switch - Temperature-controlled fans and high switching frequency to reduce device noise Figure 30 SmartDrive HVAC
  • 33. SECTION “B” AutoCAD Project 32 SUSTAINABLE INNOVATIONS NXL HVAC Company: Honeywell Region: USA Key Features Power consumption of NXL HVAC - 30 kW in 400V ( 3~) - Power consumption of normal HVAC system is 400 kW Models o IP21 and IP54 enclosure classes o IP21 models EN61800-3 category C2 o IP54 models EN61800-3 category C1 Important Features of NXL HVAC - Special energy saving mode to provide more savings than a standard inverter in the market for fan and pump applications - Built-in PID-controller with sleep mode for standalone applications - Pump and fan cascade controller with full auto-change functionality - High class flying start functionality to take control of already rotating motor - Robust design in metal frame with cooling air completely separated from electrical parts - Disturbance-free operation with highest level RFI filtering - Extensive software and hardware protection functions - Automatic restart for uninterruptable operation in fault situation - Over temperature ride through to automatically adapt to short time over temperatures - Power ride through to adapt to changes in input voltage - Trip-free operation when maintenance/ safety switch is operated between inverter and motor - Temperature-controlled fans and high switching frequency to reduce the audible noise from the device Figure 31 NXL HVAC
  • 34. SECTION “B” AutoCAD Project 33 SUSTAINABLE INNOVATIONS SmartDrive COMPACT Company: Honeywell Region: USA Key Features - • Integrated RFI-filters - • Flexible side by side mounting with screws or DIN-rail as standard - • Compact size - • Single rating suitable for both pump and fan or machine applications - • Maximum ambient temperature 50oC; (40oC for COMP230-2P2-20 and COMP400- 5P5-20) - • Easy to use single software package with high functionality - • Parameter upload/download even without powering the inverter with COMP- LOADER accessory - • Configurable Inputs and Outputs Power consumption of SmartDrive COMPACT - 0.37 - 2.2 kW in 230V (1~in, 3~out) - 0.55 - 5.5 kW in 400V (3~) - Power consumption of normal HVAC system is 400 Kw Important Features of SmartDrive COMPACT - Built-in PI-controller for standalone applications - PI-controller could also be used to control other equipment e.g., damper actuator - Flying start functionality to take control of already rotating motor - Varnished boards to prevent damage from dirt and dust - Extensive software and hardware protection functions - Automatic reset for avoiding system stops in fault situations - Over temperature ride-through for automatic adaption to short-term raises in ambient temperature - Power ride through for automatic adaptation to short-term drops in input voltage Figure 32 SmartDrive COMPACT
  • 35. SECTION “B” AutoCAD Project 34 SUSTAINABLE INNOVATIONS MATERIAL & RESOURCES
  • 36. SECTION “B” AutoCAD Project 35 SUSTAINABLE INNOVATIONS MR Prerequisite 1: Storage and collection of recyclables: Intent To facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills. Requirements in LEED documents for the above intent are: Provide an easily-accessible dedicated area or areas for the collection and storage of materials for recycling for the entire building. Procedure being followed by us is: As you can see the area we chose for the university is vast and is about 2 km away from the nearest locality. You can also see there are roads which connect to our university, so our university is easily accessible for the supplier to supply and trucks to haul the waste away to its destination. For collection and storage of materials we are going to be make an agreement with are suppliers to fulfil our demands on the spot which can be made on the spot , so to avoid the cost of storage and also wastage as the construction goes on we face different problems which leads to change in plans . Thus to avoid wastage of materials we will have on the spot demands made and then delivery. But still we have storage facilities for materials which cannot be delivered on the spot made about 0.2 km away from the constructions site. For catering the wastage of such material we will include in our agreement with the supplier to use them in the manufacturing process again this will reduce the wastage and cost both. This will also divert the construction and demolition debris from being land filled or incinerated. MR Credit 2: Construction Waste Management: Intent To divert construction and demolition debris from disposal in landfills and incineration facilities. Redirect recyclable recovered resources back to the manufacturing process and reusable materials to appropriate sites. Procedure followed by us: The above procedure mentioned Storage and collection of recyclables in also fulfils our construction waste management criteria too for construction waste management we are also going to follow the procedure of composting of organic materials which are not worth being reused instead of land filling the organic products. MR Credit 3: Materials Reuse: Intent To reuse building materials and products to reduce demand for virgin materials and reduce waste, thereby lessening impacts associated with the extraction and processing of virgin resources Procedure followed by us: Thus to avoid wastage of materials we will have on the spot demands made and then delivery. But still we have storage facilities made 0.2 km away from the construction site for materials which cannot be delivered on the spot. For
  • 37. SECTION “B” AutoCAD Project 36 SUSTAINABLE INNOVATIONS catering the wastage of such material we will include in our agreement with the supplier to use them in the manufacturing process again for us to reuse the wasted material this will reduce the wastage and cost both. MR Credit 4: Recycled Content: 1–2 Points Intent To increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. WHAT WE DID: We used corncob ash as a fine aggregate in light weight concrete for use in non-structural members. i.e. walls CORNCOB PRODUCTION IN SAUDI ARABIA: Corn is an important seasonal agriculture crop in the Kingdom and many residents are fond of eating whole corncobs after heating them on hot coal or boiling them in water. Corn is widely harvested in Jazan and Hail provinces, which are famous for agricultural products. The product is also harvested in Sakaka, Jouf and Al-Hasa, but the highest quality corn is known to be produced only in Jazan and Hail. (http://www.arabnews.com/news/486706) Although it is grown mainly in wet, hot climates, it has been said to thrive in cold, hot, dry or wet conditions, meaning that it is an extremely versatile crop. (http://en.wikipedia.org/wiki/Maize) How We will use it: (Preparation method) Sample preparation and test equipment Design of a High Strength (Grade 35Mpa) Concrete Using Corn Cob Ash as fine aggregate. The specific gravity of the corn cob ash was a requirement to designing a high strength concrete. So the specific gravity of the corn cob ash was determined by weighing a sample of the dry corn cob ash and equivalent volume of water sample. The ratio of the weight of the corn cob ash sample to the weight of equivalent water sample gives the specific gravity of the corn cob ash. American concrete Institute Method of Mix Design was used to design the grade 35 concrete using corn cob ash as a partial replacement for cement. The mixes designed are listed as follows: Batching of designed Grade 35 MPa concrete: CONTROL : CCA CONCRETE  Ash Content (kg) 0 : 0.8  Cement Content (kg) 8 : 7.2  Fine Aggregate (kg) 18.16 : 16.96  Coarse Aggregate (kg) 21.04 : 21.04  Water/Cement Ratio (litres) 0.6 : 0.6
  • 38. SECTION “B” AutoCAD Project 37 SUSTAINABLE INNOVATIONS RESULT AND DISCUSSION: 1) Concrete batching by volume of mix 1:2:4 CORN COB ASH CONTENTS: Physical/Mechanical Properties It was observed that the specimens were dark colored with increasing percentage of corn cob ash, and setting time and water absorption took much longer in concretes with the ash content than the ones without the ash. The results generally revealed that that density increased as curing age increased and decreased with respect to increasing percentage of corn cob ash replacement in concrete samples. Results revealed an increase in the characteristic strength of concrete cubes as per curing age and decreased as per ash content. The results also revealed that at 10% ash, compressive strength at 28days was 20N/mm² which was less than the control whose value of 24.69 N/mm² falls just below the designed 25 N/mm². However, an important pozzolan characteristic is the slow development of strength which implies that 10% corn cob ash concrete might develop the required strength over a longer period of time. 2) Corncob Ash as a High Strength concrete: The physical properties of the high strength concrete were the same as the ones observed in the previous specimens except for the reduced workability and the specific gravity of the ash was 1.15. Results showed varying values of density of the designed grade 35 concrete, unlike the grade 25 concrete that increased with curing age. Results also revealed an increase in compressive strength with curing age; while the compressive strength at 28days was 29.11N/mm² which was less than the control whose value of 34.00 N/mm² falls just below the designed 35 N/mm². However, it is assumed that a reduced water/cementitious material ratio, will enhance the strength of concrete and as stated earlier, an important pozzolan characteristic is the slow development of strength which implies that 10% corn cob ash concrete might develop the required strength over a longer period of time. Table 1. Chemical composition of corn cob ash (CCA) Chemical Constituents Composition (%) Sample 1 Sample 2 Sample 2 Average SiO2 67.33 65.39 66.41 66.38 Al2O3 7.34 9.14 5.97 7.48 Fe2O3 3.74 5.61 3.97 4.44 CaO 10.29 12.89 11.53 11.57 MgO 1.82 2.33 2.02 2.06 SO3 1.11 1.10 1.01 1.07 Na2O 0.39 0.48 0.36 0.41 K2O 4.20 4.92 5.64 4.92 S1O2 + Al2O3 74.67 74.53 72.38 73.86
  • 39. SECTION “B” AutoCAD Project 38 SUSTAINABLE INNOVATIONS REFERENCES: http://www.arabnews.com/news/486706 “CORN COB LIGHTWEIGHT CONCRETE FOR NON-STRUCTURAL APPLICATIONS” BY Jorge Pinto, 2012 MR Credit 5: Regional Materials: 1-2 Points Intent To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Procedure opted by us: We are using local materials for our construction their sources are mentioned below:  The innovation we are using in case of materials is corncob ash as fine aggregate in concrete and its source is: Ash from rice husk from rice fields , saw dust ash from nearby places and ash from nearby incerators Waste Of Corn i.e corncob from corn fields near the university will be transported to the construction site on trucks. Ash also transported from its respected source. Corncob Ash Concrete
  • 40. SECTION “B” AutoCAD Project 39 SUSTAINABLE INNOVATIONS OUR SOURCE OF CONSTRUCTION MATERIALS: Batterjee Holding Meister Construction Materials Country/Region: Saudi Arabia(Riyadh) Main Products: Construction Chemicals, Structural Steel, Recycled Base Oil, Equipments for special Needs, Juices No.Of Employees: Above 1000 People Annual Sales Vol: Above US$100 Million As most of the materials being used are present locally so we are fulfilling are LEED requirement with ease. MR Credit 6: Rapidly Renewable Materials: 1 Point Intent To reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with rapidly renewable materials. Procedure we opted is: As we are using corncob and ash aggregate in our concrete, both the materials are renewable and are considered as wastage, and also they are rapidly available again as both have short production cycles MR Credit 7: Certified Wood: Intent: To encourage environmentally responsible forest management Procedure followed by us:
  • 41. SECTION “B” AutoCAD Project 40 SUSTAINABLE INNOVATIONS Figure 33 THE LINES COLOURED PURPLE ARE SHOWING THE USE OF CORNCOB ASH CONCRETE IN NON-STRUCTURAL WALLS
  • 42. SECTION “B” AutoCAD Project 41 SUSTAINABLE INNOVATIONS INDOOR ENVIRONMENT QUALITY
  • 43. SECTION “B” AutoCAD Project 42 SUSTAINABLE INNOVATIONS Prerequisite 1: Minimum Indoor Air Quality Performance Required Intent To establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in buildings, thus contributing to the comfort and well-being of the occupants. Requirements: ASHRAE Standard 62.1-2007, Paragraph 5.1 Location and Size of Openings. Naturally ventilated spaces shall be permanently open to and within 8 m (25 ft) of operable wall or roof openings to the outdoors, the openable area of which is a minimum of 4% of the net occupiable floor area. Where openings are covered with louvers or otherwise obstructed, openable area shall be based on the free unobstructed area through the opening. Where interior spaces without direct openings to the outdoors are ventilated through adjoining rooms, the opening between rooms shall be permanently unobstructed and have a free area of not less than 8% of the area of the interior room nor less than 25 ft2 (2.3 m2). 5.1.2 Control and Accessibility. The means to open required operable openings shall be readily accessible to building occupants whenever the space is occupied. How much CO2 is too much? Current ventilation guidelines, such as those from the American Society of Heating Refrigerating, and Air Conditioning Engineers (ASHRAE), recommend that indoor CO2 levels not exceed the local outdoor concentration by more than about 650 ppm. Good practice indicates that the ASHRAE Standard 62.1 target CO2 level in indoor air is about 1,030 ppm, as follows: 380 ppm CO2 typically found in OSA + 650 ppm CO2 (ASHRAE target maximum level) ––––––––––––––––––––––– = 1,030 ppm CO2 (ASHRAE maximum recommended indoor level of CO2) Atlas 4 - 2 Room CO2 Monitor Controller 594 dollar The Atlas 4 controls and monitors CO2 in (2) two areas from 400 to 5000 parts per million (PPM). It comes with two (2) remote room sensors and 25 foot cables (included), and has integrated 24 hour data logging feature built-in. Special operating mode to run two rooms with only one CO2 generator! Easy to operate and fun to use, the Atlas 4 goes the distance!  Controls and monitors CO2 in (2) two rooms from 400 to 5000 parts per million (PPM).  Two (2) remote room sensors with 25 foot cables (included).  Can control both bottled CO2 tanks and CO2 generators!
  • 44. SECTION “B” AutoCAD Project 43 SUSTAINABLE INNOVATIONS  Integrated 24 hour data logging feature built-in.  Special operating mode to run two rooms with only one CO2 generator.  Easy to use and simple to operate  Doses each room at different PPM settings, if required  10 Amps/120 Volts/60 Hz.  3 year warranty. Environmental Tobacco Smoke (ETS) Control Prerequisite Intent To prevent or minimize exposure of building occupants, indoor surfaces and ventilation air distribution systems to environmental tobacco smoke (ETS) ACTIONS WE IMPOSED:  Prohibit smoking in all common areas of the building.  Locate any exterior designated smoking areas, including balconies where smoking is permitted, at least 25 feet from entries, outdoor air intakes and operable windows opening to common areas.  Prohibit on-property smoking within 25 feet of entries, outdoor air intakes and operable windows.  Provide signage to allow smoking in designated areas, prohibit smoking in designated areas or prohibit smoking on the entire property. IEQ Credit 1: Outdoor Air Delivery Monitoring 1 Point Intent To provide capacity for ventilation system monitoring to help promote occupant comfort and well- being. Particulate Matter Removal. Particulate matter filters or air cleaners having a minimum efficiency reporting value (MERV) of not less than 6 when rated in accordance with ANSI/ASHRAE Standard 52.215 shall be provided upstream of all cooling coils or other devices with wetted surfaces through which air is supplied to an occupiable space. Minimum efficiency reporting value, commonly known as MERV rating, is a measurement scale designed in 1987 by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) to rate the effectiveness of air filters. The scale "represents a quantum leap in the precision and accuracy of air-cleaner ratings"[1] and allows for improved health, reduced cost and energy efficiency in heating, ventilation and air conditioning (HVAC) design The scale is designed to represent the worst case performance of a filter when dealing with particles in the range of 0.3 to 10 micrometres. The MERV rating is from 1 to 16. Higher MERV ratings correspond to a greater percentage of particles captured on each pass, with a MERV 16 filter capturing more than 95% of particles over the full range. Below is a table grouping MERV ratings by particle size:
  • 45. SECTION “B” AutoCAD Project 44 SUSTAINABLE INNOVATIONS MERV Min. particle size Typical controlled contaminant [2] Typical Application [2] 1–4 > 10.0 μm Pollen, dust mites, cockroach debris, sanding dust, spray paint dust, textile fibers, carpet fibers Residential window AC units 5–8[3] 10.0–3.0 μm Mold, spores, dust mite debris, cat and dog dander, hair spray, fabric protector, dusting aids, pudding mix Better residential, general commercial, industrial workspaces 9–12 3.0–1.0 μm Legionella, Humidifier dust, Lead dust, Milled flour, Auto emission particulates, Nebulizer droplets Superior residential, better commercial, hospital laboratories 13–16 1.0–0.3 μm Bacteria, droplet nuclei (sneeze), cooking oil, most smoke and insecticide dust, most face powder, most paint pigments hospital & general surgery F150E1000 16X20 - Price $210.37 F150E1026 16X25 - Price $210.37 F150E1018 20X20 - Price $210.37 F150E1034 20X25 - Price $210.37 The F200 Cartridge Style Media Air Cleaner captures a significant amount of the airborne particles, 0.3 microns and larger from the air circulated through the unit.
  • 46. SECTION “B” AutoCAD Project 45 SUSTAINABLE INNOVATIONS Free Airwatch Wireless Filter Change Reminder Included! Features  Includes free wireless, microprocessor based, Airwatch™ filter change reminder.  Upgradeable to higher efficiency F50 Electronic Air Cleaner due to common size cabinet design.  Available in 4 common sizes: 16 x 20, 20 x 20, 16 x 25, and 20 x 25.  5 year limited warranty.  Applicable to all gas, oil, and electric forced warm air furnaces.  Mounts in the return air duct.  Cabinet can support weight of residential furnace and evaporator coil.  Requires no electrical connections.  Mounts in any position.  Requires no maintenance except periodic media filter replacement.  Media filter is easily replaced by homeowner.  Later upgrade to F50 or F300 Electronic Air Cleaner is easy.  Efficiency Ratings: Based on American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 52.2-1999.  Fractional Efficiency: 15% (0.3 micron particles).  Minimum Efficiency Reporting Valve (MERV): 8 at 492 fpm.  Enviracaire Elite brand, new look and colours.  5 year limited warranty. Construction Indoor Air Quality Management Plan—During Construction 1 Point Intent To reduce indoor air quality (IAQ) problems resulting from construction or renovation and promote the comfort and well-being of construction workers and building occupants.
  • 47. SECTION “B” AutoCAD Project 46 SUSTAINABLE INNOVATIONS What In The World Is “Make-Up Air”? A lot of our products have “make-up air” in the title and we realize not a lot of people may fully understand what this means. So, here’s the best way we see to explain it! To put it simply, make-up air is air we take from outside, heat up and then distribute inside evenly. This “new” or “made-up” air replaces the air that is exhausted. The new air is fresh and drier, which provides the ability to absorb any moisture as well as to ventilate the fumes from the construction process. This means cleaner, drier air inside so the moisture is less likely to build up indoors and is also less likely to create a potential for mold. When doing construction, a lot of exhaust gases, paint, adhesives, etc. are used throughout the process. This means that the air inside is going to become pretty contaminated. When air becomes contaminated, the potential for mold, build-up of moisture and other harmful things become possible. In order to prevent these from happening, simple solutions like make-up air can help do the trick. These heaters allow controlled amounts of tempered air from the outside to come in and replace that exhausted air. That’s it, in a nutshell! Now, we’re out of here to go enjoy some fresh air outside! make-up air cost calculator Using this calculator constitutes acceptance of Terms of Use. Click here for Terms of Use Enter data in the blue highlighted values only. CFM of Exhaust/Make-up Air 1500 Hours of Operation per Week 120 Average Winter Temperature 38 Desired Discharge Temperature/Space Temperature 65 Cost per therm 1.35 Efficiency of Existing Heating System 55% Efficiency of Energy Recovery Module (ERM) 60% Temperature of Exhaust Air 70
  • 48. SECTION “B” AutoCAD Project 47 SUSTAINABLE INNOVATIONS Estimated Annual Cost of Heating Make-up Air with Existing System $ 3,904 Estimated Annual Cost of Heating Make-up Air with Direct Fire and no ERM $ 2,147 Estimated Annual Cost of Heating Make-up Air with Direct-Fire and ERM $ 620 Total Savings of Direct-Fire with ERM vs. Existing System $ 3,283 NOTES: Roughly 5088 hours or 30 weeks in heating season. https://www.google.com.pk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=8&cad=rja&uact=8&ved=0CFAQFjA H&url=http%3A%2F%2Fwww.rapidengineering.com%2Fhvac%2Fenergy_recovery%2F2012-Energy-Recovery- Calculator.xls&ei=Cgh2U62LD6yd0wWjtIHoDw&usg=AFQjCNF7xzHkEZWsG_DU18-sVK3nfntGTA Construction Indoor Air Quality Management Plan—Before Occupancy 1 Point Intent To reduce indoor air quality (IAQ) problems resulting from construction or renovation to promote the comfort and well- being of construction workers and building occupants. After construction ends, prior to occupancy and with all interior finishes installed, install new filtration media and, perform a building flush-out by supplying a total air volume of 14,000 cubic feet of outdoor air per square foot of floor area while maintaining an internal temperature of at least 60° F and relative humidity no higher than 60%. Building Flush-out Introduction Flush-out is a process used to remove indoor air pollutants like volatile organic compounds (emitted from adhesives, paint carpet, furnishings etc.) from a building by operating the buildings HVAC system at 100 percent outside air for a specific period of time. Mostly, such a flush-out is required in newly constructed, renovated or remodelled buildings. Brief Description A building flush out is an important step in finalizing a project. It typically lasts between 3 to 30 days depending on the building material and furnishings, allowing the majority of pollutants to be removed from the building prior to occupancy. The minimum recommended flush-out period is 7 days; it should be completed prior to occupancy and after all finishings are installed. Optimally a building flush-out begins as soon as HVAC systems are operational and extends through the end of construction, furniture installation, and the first few days of occupancy. The HVAC system should be run continuously, 24 hours a day, with 100% outside air (no return air should be re-circulated into the building). Outdoor air is to be thermally conditioned as needed to maintain normal indoor temperatures. In humid climates, it is important to avoid introducing significant amounts of moisture during the flush-out period. Temporary construction filters should be installed in the air handlers during the construction period and through the duration of the flush-out. These filters must be replaced after the flush-out is completed.
  • 49. SECTION “B” AutoCAD Project 48 SUSTAINABLE INNOVATIONS In fact, for LEED projects, a building flush-out can be performed to earn credit for a Construction Indoor Air Quality (IAQ) Management Plan. LEED: Building flush-out Consider a building flush-out period to reduce possible indoor air quality contamination after construction completion and prior to occupancy. This involves running the mechanical system with tempered 100% outside air for an extended period of time (two weeks). After conducting the minimum two-week building flush-out with new Minimum Efficiency Reporting Value (MERV) 13 filtration media at 100% outside air, new MERV 13 filters must be replaced in all locations except those that have been processing only outside air during the flush-out Cost There are costs associated with building flush outs: construction management, electricity use, and lost revenue from delayed occupancy. That being said, the avoidance of illness within the building can offset these costs. Incorporating the flush out as part of the overall building schedule can avoid delays and minimize extra costs.it is calculated after completion IE Q Credit 4.2: Low-Emitting Materials—Paints and Coatings 1 Point Intent To reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well- being of installers and occupants. Standard comply with Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993.
  • 50. SECTION “B” AutoCAD Project 49 SUSTAINABLE INNOVATIONS Al-Jazeera Factory for Paints Co. Al-Jazeera Eggshell http://www.al-jazeerapaints.com/Paint Calculator Low-Emitting Materials—Flooring Systems 1 Point Intent To reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well- being of installers and occupants. Standard. Comply with FloorScore2 standard Affiliates Lonseal values the business relationships we've forged over the years.  FloorScore® www.rfci.com  Greenguard Environmental Institute www.greenguard.org  USGBC www.usgbc.org  Vinyl Institute www.vinylinfo.org  AEC Daily www.aecdaily.com/sponsor/lonseal  Vinyl News Service www.vinylnewsservice.net  IIDA www.iida.org  CHPS www.chps.net Samples & Pricing:hannah@csgulfcoast.com http://www.lonseal.com/greenvinyl.cfm With bold and smooth patterns and colorways that complement the market, Lonseal's range of high performance sheet vinyl is a great solution in corporate and education environments.
  • 51. SECTION “B” AutoCAD Project 50 SUSTAINABLE INNOVATIONS Office and education attributes include:  Sound absorbing, skid-resistant construction excellent for high traffic  Applicable to LEED MR 4.1 and 4.2  CHPS approved  GreenMedic™ anti-microbial properties  Available in colorways that encourage development and learning  Foam-backed products available to reduce injury  Ease of maintenance KITCHEN FLOORING: MATERIAL: LONECO® Topseal FEATURES: As Lonseal's foremost eco-friendly product,Loneco® is composed of 50% recycled content and features Lonseal's exclusive GreenAir™ technology that reduces VOC emissions and contributes to superior indoor air quality. Additionally, Loneco®'s organic and earthy colors easily conceal scuffing and soil. 50% recycled content; LEED MR 4.1, 4.2; GreenAir™ formulated. OUTDOOR FLOORING : MATERIAL : LONDECK SIERRA FEATURES: LONDECK SIERRA features a unique crevassed texture and comes in six earthy tones. It is part of Lonseal's Londeck series of resilient exterior sheet vinyl with slightly embossed surfaces that withstand high volumes of pedestrian traffic and weather- wear. Because of its versatility, Londeck has been utilized in spaces such as pools, hotel and condo decks, and stairways. BATHROOM FLOORING : MATERIAL: LONWOOD NATURAL Topseal FEATURES: Lonwood Natural pairs the timeless aesthetics of wood with the benefits of high-performance sheet vinyl in colors that range from earthy to quirky. Its soft grain patterning and smooth surface make Lonwood Natural ideal for those who want the warmth of wood with easier maintenance. 40% recycled content; LEED MR 4.1, 4.2; GreenAir™ formulated; Microbial resistance formulation. INDOOR FLOORING: MATERIAL: LONWOOD DAKOTA Topseal FEATURES: Lonwood Dakota is a slightly textured sheet that evokes the open grain of oak and the nuance of knot-free, quarter-sawn plank. It coordinates beautifully with our Loneco® and Lonfloor Plain collections. Ideal for corporate, healthcare, retail and hospitality applications. Up to 40% recycled content; LEED MR 4.1, 4.2; GreenAir" formulated; Microbial resistance formulation. Figure 34 SEA COACHINGS Figure 36 SUMMER NIGHT Figure 37 HONEY CAKES Figure 35 TITANIUM
  • 52. SECTION “B” AutoCAD Project 51 SUSTAINABLE INNOVATIONS THE END