SlideShare a Scribd company logo
1 of 4
Download to read offline
Curriculum Vitae
1
Andrew Carline
AUCKLAND INFRASTRUCTURE TEAM LEADER
Andrew Carline has more than 25 years’ experience in the engineering
industry specialising mainly in the civil and structural areas. Andrew has
over 12 years of experience in civil design and has worked on a variety of
civil projects ranging from roading, drainage and earthworks design for
healthcare providers, the New Zealand Defence Force, the University of
Auckland and others, primarily using Autodesk Civil 3D software. He has
also been Assistant Project Manager on several projects and has
experience with GIS systems.
Andrew is highly conversant with the Auckland Council’s TP90 Erosion
and Sediment Control and TP10 Stormwater Management guidelines. He
holds a current Site Safe passport.
As AKL Infrastructure Team Leader he manages a team of 23 and is
responsible for weekly utilisation and forward workload planning as well
as project delivery.
Andrew has a record of good communication and has received positive
feedback from both internal and external clients for his ability to respond
quickly and to ensure that work is completed to a high standard to
achieve high levels of client satisfaction.
Relevant Project Experience
Matakana Link BCI (Auckland Transport)
Project Manager for a Business Case for Investigation for the proposed
Matakana Link Road which will need to be constructed prior to the opening of
the Puhoi to Warkworth RoNS. The report covers previous transport option
investigations for the area and recommends areas where further or more
detailed investigation is required in order to provide a detailed business case
for further funding.
Auckland Transport TFUG
Route planning and optioneering for Auckland Transport’s “Transport for
Future Urban Growth” initiative. This involved using Autodesk Infraworks 360
and Civil 3D to establish horizontal and vertical alignment options for a
number of sites including Warkworth, Redhills, Silverdale/Wainui and South
Auckland. Reporting included rough-order quantities as well as working in
with local developers around proposed town centres.
CRL Enabling Works
3D road design and temporary traffic management scheme for the Victoria
Street enabling works for the City Rail Link. The project involved the deep
shaft construction and pipe jacking of a new stormwater line across Albert
Street in preparation for the tunnelling operation of the main CRL works. As a
result of the shaft excavation it was necessary to narrow Victoria Street to
two lanes and create an overlaid road surface to manage surface stormwater
and protect existing in-ground services. Vehicle tracking was also undertaken
for the narrow lanes created by the works. The diversion is currently in
operation and will remain in place until near the end of 2017.
Sunnyheights Residential Development
Roading and earthworks lead designer plus QA for erosion and sediment
control for a proposed 650 lot subdivision for a designated Special Housing
Area in North Auckland. The project has been granted resource consent. The
terrain is particularly steep in this area and finding a balance between
meeting AT road design criteria whilst attempting to achieve a balanced
EDUCATION/QUALIFICATIONS
New Zealand Certificate of
Engineering Stage IV, Auckland
Technical Institute, 1985
AREAS OF EXPERTISE
· Earthworks and roading design
· AutoCAD Civil 3D, ArcGIS,
Autodesk Infraworks 360
· Project management, Client
management, Design
management, Project team
management, Team Leadership
· Stormwater treatment
· Drainage design
· Erosion and sediment control
· Subdivisions
TRAINING
· Comprehensive First Aid, 2016
· AECOM NZ Team Leadership
Development Programme, 2015
· URS Associate Project
Management Certification, 2012
· NZS 3910 Engineer’s
Representative Training, 2011,
update 2014
· NZIHT Geometric Design for
Roads, 2011
· TP10 Stormwater Management
Course, 2010
· TP90 Erosion and Sediment
Control Course, 2008
Curriculum Vitae
2
Andrew Carline
AUCKLAND INFRASTRUCTURE TEAM
LEADER
earthworks model and satisfying urban design and planning criteria had
proven to be extremely challenging for this project.
NCI AMETI Construction Oversight
Andrew was Assistant Project Manager for the construction phase of the NCI
Accommodation Works project. His role included attendance at weekly site
meetings, construction sequencing meetings, site inspections, contractor
liaison and general communications between NCI, Fletcher Construction,
subcontractors and Auckland Transport as well as addressing daily queries
from the contractor regarding operational matters on site.
NCI AMETI Accommodation Works Project
Andrew was Assistant Project Manager and Lead Designer for this $6M
project which involved the design of a new access road, car park and
dangerous goods store for a large packaging facility in Mt Wellington. His
duties included civil and drainage design using Civil 3D software,
communications and overall coordination of a large project team including
planning and consenting, geo-contamination, geotechnical, structural,
electrical and hazardous materials. As assistant PM duties included client,
Iwi and contractor liaison plus financial project management. Andrew also
appeared as Expert Witness for NCI during the AMETI NoR hearing.
Air New Zealand Centra Garage Washdown Project
Andrew was Assistant Project Manager and lead designer for a trade waste
interceptor solution to separate and contain emulsified oils from the heavy
vehicle washdown process at Auckland International Airport. This required
analysis of several different treatment options for the contaminated runoff
and the recommendation of a solution which best fit the requirements of the
client’s usage. The project scope subsequently expanded to include an
optioneering report for three different washdown treatment solutions,
including a fully self-contained system with zero discharge into trade waste.
Lincoln Road Interchange Upgrade Project
This project involved Civil 3D modelling of reticulated stormwater drainage
and earthworks for stormwater treatment wetlands for this $150M NZTA
project which was part of the upgrade of the SH16 Northwestern Motorway.
Unitec Building 183 Extension
Andrew was Assistant Project Manager. This project involved site survey,
earthworks, and drainage design for an addition to an existing multi-storey
classroom as part of Unitec’s wider campus consolidation project.
Tauranga Eastern Link Project
Stormwater culvert Civil 3D modelling, terrain modelling, stormwater runoff
modelling for aquaplaning analysis This $300m NZTA project constituted a
23km long four lane motorway stretching from Mt Maunganui into the
Western Bay of Plenty and incorporating seven bridges. The flat swampy
terrain made this a challenging project in many respects.
Mahurangi College New Science Block
Andrew was Civil Design Manager for a replacement classroom block at
Mahurangi College, Warkworth. Obtaining information on existing services
was challenging on this project.
Long Bay Integrated Transport Improvement Plan
This project involved Optioneering and preliminary geometric road design for
the planned upgrade of East Coast Road and Glenvar Road due to projected
increased demand from the ongoing Long Bay subdivision development.
Goodman Glassworks (Christchurch) Downer EDI Site
This project involved earthworks and roading/car park design for a new
industrial yard in the Glassworks industrial development site. Drainage for
Curriculum Vitae
3
Andrew Carline
AUCKLAND INFRASTRUCTURE TEAM
LEADER
this project was via soakage into large on-site swales.
Southern Landfill Stage 2 Closure Planning Design
This project involved the design of a haul road and stormwater system for an
existing landfill site in Wellington with a view to maximising the future waste
volume prior to closure. Included volume calculations for various fill
scenarios on the site.
Leigh Marine Centre Upgrade
This project involved roading, drainage and earthworks design for a major
upgrade at the University of Auckland’s Leigh Marine Centre at Goat Island,
North Auckland. Treatment of stormwater runoff is particularly critical in this
area due to the sensitive marine environment.
Wiri Oil Depot Wetland Design
Andrew was involved in earthworks design for a new stormwater treatment
pond at the Wiri Oil depot in Manukau, which was required as part of local
government regulations for treating stormwater runoff.
Bulk Storage Terminals Mt Maunganui – Liquid Caustic Soda
Andrew was involved in earthworks and drainage design for the
refurbishment and lining of a bunded storage area for liquid caustic soda.
Strict regulations regarding spills require a compound that is lined with an
impermeable layer, but allows stormwater to be collected and pumped out
under normal conditions.
Northern Strategic Growth Area Hobsonville Road Upgrade
This project involved the concept and preliminary design of road widening
and intersections as part of the proposed Northern Strategic Gateway
developments. Road upgrades include bus priority lanes and cycle lanes,
plus a number of large capacity controlled intersections.
RNZAF Whenuapai Aircraft Rinse Rack Upgrade
This project involved paving and stormwater design for a planned upgrade to
the existing rinse rack facility, which was becoming almost unserviceable due
to flaking pavement and corroding fittings. A requirement was also to
reposition the tail wash nozzles to avoid expensive engine damage that had
been occurring due to water influent.
Waikato Hospital Redevelopment
This project involved roading, drainage and new building platform modelling
for a major redevelopment of the central healthcare facility for the Waikato
region.
Te Arai Point Proposed Development
Andrew was involved in preliminary roading layout and presentation
documents for Resource Consent application for a large proposed
development north of Auckland.
Tauranga Hospital Redevelopment
This project involved new roading and car park modelling and drainage
design for the upgrade of Tauranga Hospital.
Kensington Park, Orewa
This project involved preliminary roading and earthworks design for a large
urban subdivision north of Auckland.
Thames Hospital Redevelopment
This project involved earthworks modelling and drainage design for the new
Clinical Centre at Thames Hospital.
RNZN Auckland Asset Aerial Orthophotography and Survey Project
(GIS)
Curriculum Vitae
4
Andrew Carline
AUCKLAND INFRASTRUCTURE TEAM
LEADER
Watercare Services Asset Risk Assessment Project (GIS)
Vector Underground Project (GIS)
Future Hydro-electric Schemes plan for Mighty River Power (GIS)

More Related Content

What's hot (20)

CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Clough Booth Welsh Brochure
Clough Booth Welsh BrochureClough Booth Welsh Brochure
Clough Booth Welsh Brochure
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
Clough Corporate Brochure
Clough Corporate BrochureClough Corporate Brochure
Clough Corporate Brochure
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
ATB PE Portfolio2016
ATB PE Portfolio2016ATB PE Portfolio2016
ATB PE Portfolio2016
 
CV PMG
CV PMGCV PMG
CV PMG
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07
 
Major Project Implementation in Nigeria - The Challenges
Major Project Implementation in Nigeria - The ChallengesMajor Project Implementation in Nigeria - The Challenges
Major Project Implementation in Nigeria - The Challenges
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 

Viewers also liked

4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redessStradaRvc
 
Deber de-computacion
Deber de-computacionDeber de-computacion
Deber de-computacionalba alcivar
 
5 gfpi f-019-formato_guia_de_aprendizaje-programacion
5 gfpi f-019-formato_guia_de_aprendizaje-programacion5 gfpi f-019-formato_guia_de_aprendizaje-programacion
5 gfpi f-019-formato_guia_de_aprendizaje-programacionStradaRvc
 
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimientoStradaRvc
 
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento16 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1StradaRvc
 
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redessStradaRvc
 
3 gfpi f-019-formato_guia_de_aprendizaje-access
3 gfpi f-019-formato_guia_de_aprendizaje-access3 gfpi f-019-formato_guia_de_aprendizaje-access
3 gfpi f-019-formato_guia_de_aprendizaje-accessStradaRvc
 
1 gfpi f-019-formato_guia_de_aprendizaje-word
1 gfpi f-019-formato_guia_de_aprendizaje-word1 gfpi f-019-formato_guia_de_aprendizaje-word
1 gfpi f-019-formato_guia_de_aprendizaje-wordStradaRvc
 
4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics
4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics
4 gfpi f-019-formato_guia_de_aprendizaje-internet-ticsStradaRvc
 
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)StradaRvc
 
2 gfpi f-019-formato_guia_de_aprendizajeexcel
2 gfpi f-019-formato_guia_de_aprendizajeexcel2 gfpi f-019-formato_guia_de_aprendizajeexcel
2 gfpi f-019-formato_guia_de_aprendizajeexcelStradaRvc
 
10 gfpi f-019-formato_guia_de_aprendizaje-redes
10 gfpi f-019-formato_guia_de_aprendizaje-redes10 gfpi f-019-formato_guia_de_aprendizaje-redes
10 gfpi f-019-formato_guia_de_aprendizaje-redesStradaRvc
 

Viewers also liked (15)

4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
 
slideshare
slideshareslideshare
slideshare
 
Slide share
Slide shareSlide share
Slide share
 
slideshare
slideshareslideshare
slideshare
 
Deber de-computacion
Deber de-computacionDeber de-computacion
Deber de-computacion
 
5 gfpi f-019-formato_guia_de_aprendizaje-programacion
5 gfpi f-019-formato_guia_de_aprendizaje-programacion5 gfpi f-019-formato_guia_de_aprendizaje-programacion
5 gfpi f-019-formato_guia_de_aprendizaje-programacion
 
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
 
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento16 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
 
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
4 gfpi f-019-formato_guia_de_aprendizaje-internet-redess
 
3 gfpi f-019-formato_guia_de_aprendizaje-access
3 gfpi f-019-formato_guia_de_aprendizaje-access3 gfpi f-019-formato_guia_de_aprendizaje-access
3 gfpi f-019-formato_guia_de_aprendizaje-access
 
1 gfpi f-019-formato_guia_de_aprendizaje-word
1 gfpi f-019-formato_guia_de_aprendizaje-word1 gfpi f-019-formato_guia_de_aprendizaje-word
1 gfpi f-019-formato_guia_de_aprendizaje-word
 
4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics
4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics
4 gfpi f-019-formato_guia_de_aprendizaje-internet-tics
 
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)
8 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento-registros(1)
 
2 gfpi f-019-formato_guia_de_aprendizajeexcel
2 gfpi f-019-formato_guia_de_aprendizajeexcel2 gfpi f-019-formato_guia_de_aprendizajeexcel
2 gfpi f-019-formato_guia_de_aprendizajeexcel
 
10 gfpi f-019-formato_guia_de_aprendizaje-redes
10 gfpi f-019-formato_guia_de_aprendizaje-redes10 gfpi f-019-formato_guia_de_aprendizaje-redes
10 gfpi f-019-formato_guia_de_aprendizaje-redes
 

Similar to CV: Andrew Carline, Auckland Infrastructure Team Leader

BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016Kim Barry
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin JacobsMartin Jacobs
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Ross Ullman
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon CapabilityDamien Allen
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015Phil Morris
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Craig Marshall
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015aWincy Ho
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 

Similar to CV: Andrew Carline, Auckland Infrastructure Team Leader (20)

BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 
Jamie Resume
Jamie ResumeJamie Resume
Jamie Resume
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Francis' CV
Francis' CVFrancis' CV
Francis' CV
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
Resume 2013
Resume 2013Resume 2013
Resume 2013
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015a
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 

CV: Andrew Carline, Auckland Infrastructure Team Leader

  • 1. Curriculum Vitae 1 Andrew Carline AUCKLAND INFRASTRUCTURE TEAM LEADER Andrew Carline has more than 25 years’ experience in the engineering industry specialising mainly in the civil and structural areas. Andrew has over 12 years of experience in civil design and has worked on a variety of civil projects ranging from roading, drainage and earthworks design for healthcare providers, the New Zealand Defence Force, the University of Auckland and others, primarily using Autodesk Civil 3D software. He has also been Assistant Project Manager on several projects and has experience with GIS systems. Andrew is highly conversant with the Auckland Council’s TP90 Erosion and Sediment Control and TP10 Stormwater Management guidelines. He holds a current Site Safe passport. As AKL Infrastructure Team Leader he manages a team of 23 and is responsible for weekly utilisation and forward workload planning as well as project delivery. Andrew has a record of good communication and has received positive feedback from both internal and external clients for his ability to respond quickly and to ensure that work is completed to a high standard to achieve high levels of client satisfaction. Relevant Project Experience Matakana Link BCI (Auckland Transport) Project Manager for a Business Case for Investigation for the proposed Matakana Link Road which will need to be constructed prior to the opening of the Puhoi to Warkworth RoNS. The report covers previous transport option investigations for the area and recommends areas where further or more detailed investigation is required in order to provide a detailed business case for further funding. Auckland Transport TFUG Route planning and optioneering for Auckland Transport’s “Transport for Future Urban Growth” initiative. This involved using Autodesk Infraworks 360 and Civil 3D to establish horizontal and vertical alignment options for a number of sites including Warkworth, Redhills, Silverdale/Wainui and South Auckland. Reporting included rough-order quantities as well as working in with local developers around proposed town centres. CRL Enabling Works 3D road design and temporary traffic management scheme for the Victoria Street enabling works for the City Rail Link. The project involved the deep shaft construction and pipe jacking of a new stormwater line across Albert Street in preparation for the tunnelling operation of the main CRL works. As a result of the shaft excavation it was necessary to narrow Victoria Street to two lanes and create an overlaid road surface to manage surface stormwater and protect existing in-ground services. Vehicle tracking was also undertaken for the narrow lanes created by the works. The diversion is currently in operation and will remain in place until near the end of 2017. Sunnyheights Residential Development Roading and earthworks lead designer plus QA for erosion and sediment control for a proposed 650 lot subdivision for a designated Special Housing Area in North Auckland. The project has been granted resource consent. The terrain is particularly steep in this area and finding a balance between meeting AT road design criteria whilst attempting to achieve a balanced EDUCATION/QUALIFICATIONS New Zealand Certificate of Engineering Stage IV, Auckland Technical Institute, 1985 AREAS OF EXPERTISE · Earthworks and roading design · AutoCAD Civil 3D, ArcGIS, Autodesk Infraworks 360 · Project management, Client management, Design management, Project team management, Team Leadership · Stormwater treatment · Drainage design · Erosion and sediment control · Subdivisions TRAINING · Comprehensive First Aid, 2016 · AECOM NZ Team Leadership Development Programme, 2015 · URS Associate Project Management Certification, 2012 · NZS 3910 Engineer’s Representative Training, 2011, update 2014 · NZIHT Geometric Design for Roads, 2011 · TP10 Stormwater Management Course, 2010 · TP90 Erosion and Sediment Control Course, 2008
  • 2. Curriculum Vitae 2 Andrew Carline AUCKLAND INFRASTRUCTURE TEAM LEADER earthworks model and satisfying urban design and planning criteria had proven to be extremely challenging for this project. NCI AMETI Construction Oversight Andrew was Assistant Project Manager for the construction phase of the NCI Accommodation Works project. His role included attendance at weekly site meetings, construction sequencing meetings, site inspections, contractor liaison and general communications between NCI, Fletcher Construction, subcontractors and Auckland Transport as well as addressing daily queries from the contractor regarding operational matters on site. NCI AMETI Accommodation Works Project Andrew was Assistant Project Manager and Lead Designer for this $6M project which involved the design of a new access road, car park and dangerous goods store for a large packaging facility in Mt Wellington. His duties included civil and drainage design using Civil 3D software, communications and overall coordination of a large project team including planning and consenting, geo-contamination, geotechnical, structural, electrical and hazardous materials. As assistant PM duties included client, Iwi and contractor liaison plus financial project management. Andrew also appeared as Expert Witness for NCI during the AMETI NoR hearing. Air New Zealand Centra Garage Washdown Project Andrew was Assistant Project Manager and lead designer for a trade waste interceptor solution to separate and contain emulsified oils from the heavy vehicle washdown process at Auckland International Airport. This required analysis of several different treatment options for the contaminated runoff and the recommendation of a solution which best fit the requirements of the client’s usage. The project scope subsequently expanded to include an optioneering report for three different washdown treatment solutions, including a fully self-contained system with zero discharge into trade waste. Lincoln Road Interchange Upgrade Project This project involved Civil 3D modelling of reticulated stormwater drainage and earthworks for stormwater treatment wetlands for this $150M NZTA project which was part of the upgrade of the SH16 Northwestern Motorway. Unitec Building 183 Extension Andrew was Assistant Project Manager. This project involved site survey, earthworks, and drainage design for an addition to an existing multi-storey classroom as part of Unitec’s wider campus consolidation project. Tauranga Eastern Link Project Stormwater culvert Civil 3D modelling, terrain modelling, stormwater runoff modelling for aquaplaning analysis This $300m NZTA project constituted a 23km long four lane motorway stretching from Mt Maunganui into the Western Bay of Plenty and incorporating seven bridges. The flat swampy terrain made this a challenging project in many respects. Mahurangi College New Science Block Andrew was Civil Design Manager for a replacement classroom block at Mahurangi College, Warkworth. Obtaining information on existing services was challenging on this project. Long Bay Integrated Transport Improvement Plan This project involved Optioneering and preliminary geometric road design for the planned upgrade of East Coast Road and Glenvar Road due to projected increased demand from the ongoing Long Bay subdivision development. Goodman Glassworks (Christchurch) Downer EDI Site This project involved earthworks and roading/car park design for a new industrial yard in the Glassworks industrial development site. Drainage for
  • 3. Curriculum Vitae 3 Andrew Carline AUCKLAND INFRASTRUCTURE TEAM LEADER this project was via soakage into large on-site swales. Southern Landfill Stage 2 Closure Planning Design This project involved the design of a haul road and stormwater system for an existing landfill site in Wellington with a view to maximising the future waste volume prior to closure. Included volume calculations for various fill scenarios on the site. Leigh Marine Centre Upgrade This project involved roading, drainage and earthworks design for a major upgrade at the University of Auckland’s Leigh Marine Centre at Goat Island, North Auckland. Treatment of stormwater runoff is particularly critical in this area due to the sensitive marine environment. Wiri Oil Depot Wetland Design Andrew was involved in earthworks design for a new stormwater treatment pond at the Wiri Oil depot in Manukau, which was required as part of local government regulations for treating stormwater runoff. Bulk Storage Terminals Mt Maunganui – Liquid Caustic Soda Andrew was involved in earthworks and drainage design for the refurbishment and lining of a bunded storage area for liquid caustic soda. Strict regulations regarding spills require a compound that is lined with an impermeable layer, but allows stormwater to be collected and pumped out under normal conditions. Northern Strategic Growth Area Hobsonville Road Upgrade This project involved the concept and preliminary design of road widening and intersections as part of the proposed Northern Strategic Gateway developments. Road upgrades include bus priority lanes and cycle lanes, plus a number of large capacity controlled intersections. RNZAF Whenuapai Aircraft Rinse Rack Upgrade This project involved paving and stormwater design for a planned upgrade to the existing rinse rack facility, which was becoming almost unserviceable due to flaking pavement and corroding fittings. A requirement was also to reposition the tail wash nozzles to avoid expensive engine damage that had been occurring due to water influent. Waikato Hospital Redevelopment This project involved roading, drainage and new building platform modelling for a major redevelopment of the central healthcare facility for the Waikato region. Te Arai Point Proposed Development Andrew was involved in preliminary roading layout and presentation documents for Resource Consent application for a large proposed development north of Auckland. Tauranga Hospital Redevelopment This project involved new roading and car park modelling and drainage design for the upgrade of Tauranga Hospital. Kensington Park, Orewa This project involved preliminary roading and earthworks design for a large urban subdivision north of Auckland. Thames Hospital Redevelopment This project involved earthworks modelling and drainage design for the new Clinical Centre at Thames Hospital. RNZN Auckland Asset Aerial Orthophotography and Survey Project (GIS)
  • 4. Curriculum Vitae 4 Andrew Carline AUCKLAND INFRASTRUCTURE TEAM LEADER Watercare Services Asset Risk Assessment Project (GIS) Vector Underground Project (GIS) Future Hydro-electric Schemes plan for Mighty River Power (GIS)