SlideShare a Scribd company logo
ACKNOWLEDGEMENT
I would like to acknowledge and extend my heartfelt gratitude to our camp Instructor and for
their vital encouragement for their guidance and motivation and support in the completion
of this project report. This survey camp meant a lot to me as it gave me lot of field experience.
I would also like to thank our store keeper Mr. Manoj Khadka for who co-operated with me
in the matter of guidance to providing instruments. Most of all I thank my group members,
who were operative in the completion of this report.
The purpose of this fieldwork was to make the each student independent to carry out the
work in real problem in the field. We think, the purpose is suitable for further work and which
make us to produce the report of the fieldwork in time. We are sincerely indebted to our
collage MAMTS, for providing opportunity to consolidate our theoretical and practical
knowledge in engineering surveying.
Our camp Instructor:
1. Er. Niraj Pudasaini (Vice Principle)
2. Er. Sanjaya Subedi (Instructor)
3. Er. Ashma Pokhrel (Instructor)
4. Er. Nita Khadka (Instructor)
5. Er. Sushanta Subedhi (Instructor)
6. Mr. Manoj Khadka (Store Keeper)
7. Mr. Anish Bomjom (Teaching Aid)
PREFACE
This report presents the surveying data of closed camp of Madan Ashrit Memorial Technical
School (Group B). This report will help readers to knowing about the general and detail
description of Surveying progress like as Linear Measurement, Angular Measurement,
Topographic Detailing, Contour Map, Road curve setting, determining the span of the bridge
distance in suitable zone etc.
I am thankful to Er.Niraj Pudasaini for giving some instructions and preliminary idea in
handling me to completing this report. I am also thankful to Mr. Suman Jyoti for his kind
information to preparing this report.
I hope that the report will be further useful in field work for all site visitor in civil construction
and surveying. Inthis SurveyCamp,Wearesupposed to surveya givenplot in all its aspect and work
on road alignment, topographic map and bridge alignment with proper X-section, L-Section
and its topography fulfilling all technical requirements. ThisReportincludestheentiredescriptionof
thepracticalcarriedoutduringtheSurveyCamp.Italsoincludestheprofileandcross-sectionsatdifferentpoints
oftheRoadAlignmentandBridgeSiteSurvey.
I will be verymuch thankful to the viewers who go through this report for bringing such errors in our notice.
Furthermore we would be very thankful for the examiners or viewers for their suggestions in improving
this report.
Our Surveying Team:
1. Suman Jyoti
2. Bishnu pd. Bhandari
3. Dipesh Jung Shai
4. Dubdorje Tamang
5. Dhurba Thapa
6. Dinesh Moktan
7. Sunita Khatiwada
ABSTRACT
Surveying is the science and art of determining the relative positions of above, on, or beneath
the surface of earth, and is the most important part of Civil Engineering. The results of surveys
are used to map the earth, prepare navigational charts, established property boundaries.
Develop data of land used and natural resource information etc. Further survey maintains
highways, railroads, buildings, bridges, tunnels, canals, dams and many more.
Thus, the objective of survey camp was to make us gain the experience in this field by
performing topographic survey in a large area, learning to propose road alignment and select
suitable site for bridge axis.
The report reflects the methodology, observations, and calculations made by thestudents in the
Camp with the corresponding drawings. The large portion of the course covered with elements
of topographic surveying, and then those of road alignment and bridge site survey f follow it.
The main objective of the Survey Camp organized for us is to take an opportunity to consolidate
and update our practical and theoretical knowledge in engineering surveying in the actual field
condition.
In this survey camp we have to prepare a topographic map of the given area, road and bridge
site survey fulfilling all technical requirements. In this regard, we are required to carry out the
necessary field works in our sub-group so that we will get opportunity to the decision on
planning and execution of field works for the preparation of topographic map, road alignment
and bridge site survey. This survey camp helps us to build in our confidence to conduct
engineering survey on required accuracy.
CONTENTS
S.N TITLE PAGE
1 Introduction
1.1 Background
1.1.1 Location……………………………………..…….1
1.1.2Site……………………………………………........1
1.1.3TopographyandGeology…………………………..2
1.1.4Rainfall,ClimateandVegetation……………………2
1.1.5DescriptionofWork………………………………..3
1.1.6WorksdetailsandSchedule………………………....3
1.2 Introduction
1.2.1Surveying…………………………………………4
1.2.2PrincipleofSurveying………………………...……4
1.2.3Definationofterms…………………………....……5
2 TopographicSurveying
2.1LinearMeasurement……………………………………7
2.2TheodoliteTraversing…………………………………...8
2.3Methodology……………………………………….…...9
2.3.1BalancingtheTraverse…………….…………...…10
2.3.2ClosingError………………………………….…11
2.4Detailing……………………………………………….11
2.5TachometryDetailing…………………………………..12
2.6Levelling………………………………………………14
2.7Contouring……………………………………………..15
2.8TotalStation……………………………………………16
3 BridgeSiteSurvey
3.1Overview………………………………………………49
3.2BriefdescriptionofArea………………………………...50
3.3TechnicalSpecification…………………………………50
3.4Methodology………………………………………...…50
3.4Calculation………………………………………...……53
4 RoadAlignmentSurvey
4.1Introduction………………………………….…………61
4.2Curves…………………………………………………61
4.3EquipmentRequired……………………………………62
4.4Norms…………………………………………………63
4.4Methodology…………………………………………...63
4.4Calculation…………………………………………..…66
 starting of Survey Camp report

More Related Content

What's hot

IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTSIRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
BrahmaV1
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Dhaka University of Engineering & Technology, Gazipur
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
Nasir Ahmad Aryanfar
 
Road construction report
Road construction reportRoad construction report
Road construction report
mohammad danish anwar
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
Noorhazlinda Rahman
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
Bhavik Patel
 
Control surveying
Control surveyingControl surveying
Control surveying
Prakash Kumar Sekar
 
Engineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHUEngineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHU
Sabin Acharya
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
Mir Zafarullah
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCE
Sushrut Gautam
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
riyasood003
 
Lec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curveLec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curve
Ahmed Qasim
 
Reinforced Earth Wall RE wall
Reinforced Earth Wall RE wallReinforced Earth Wall RE wall
Reinforced Earth Wall RE wall
Amir nazir paray
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
AkshathaBhandary
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
SaddoAjmal
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
Riezat Zainal
 
Independant study on Reinforced soil retaining wall
Independant study on Reinforced soil retaining wallIndependant study on Reinforced soil retaining wall
Independant study on Reinforced soil retaining wall
paras6904
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition Survey
Md Tanvir Alam
 
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
Muhammad Irfan
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
Gokul Saud
 

What's hot (20)

IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTSIRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
IRC:75-2015 GUIDELINES FOR THE DESIGN OF HIGH EMBANKMENTS
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
Control surveying
Control surveyingControl surveying
Control surveying
 
Engineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHUEngineering Geology I Report-MALEKHU
Engineering Geology I Report-MALEKHU
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCE
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 
Lec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curveLec. 11 setting out simple circular curve
Lec. 11 setting out simple circular curve
 
Reinforced Earth Wall RE wall
Reinforced Earth Wall RE wallReinforced Earth Wall RE wall
Reinforced Earth Wall RE wall
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
Independant study on Reinforced soil retaining wall
Independant study on Reinforced soil retaining wallIndependant study on Reinforced soil retaining wall
Independant study on Reinforced soil retaining wall
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition Survey
 
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
Geotechnical Engineering-I [Lec #5: Phase Relationships - Problems-2]
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 

Similar to starting of Survey Camp report

Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)
Sudip khadka
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
Natasha Grant
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
SingayWangchuk2
 
Abijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfAbijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdf
SingayWangchuk2
 
Transportation field report
Transportation field reportTransportation field report
Transportation field report
Sushrut Gautam
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Dhaka University of Engineering & Technology, Gazipur
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
Bavik Sing
 
Internship Report
Internship ReportInternship Report
Internship Report
prathagarg
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
TAHIR HUSEN
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
sukdeb samanta
 
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
FLORTATIANAVARGASCUE
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
Ankit Gautam
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...
Khaza Ahmed Palash
 
اطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمياطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمي
Zainab Sattar
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Pronob Ghosh
 
Can you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdfCan you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdf
Amansupan
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
mruemran
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
Nishant Pandey
 
final-file
final-filefinal-file
final-file
Ihsan Ali E.I.T
 
M TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHUREM TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHURE
Siddharth Chaudhary
 

Similar to starting of Survey Camp report (20)

Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
 
Abijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfAbijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdf
 
Transportation field report
Transportation field reportTransportation field report
Transportation field report
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...
 
اطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمياطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمي
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
 
Can you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdfCan you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdf
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
final-file
final-filefinal-file
final-file
 
M TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHUREM TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHURE
 

More from BishnuBhandari12

CE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdfCE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdf
BishnuBhandari12
 
MATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdfMATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdf
BishnuBhandari12
 
MATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdfMATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdf
BishnuBhandari12
 
CE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdfCE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdf
BishnuBhandari12
 
CE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdfCE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdf
BishnuBhandari12
 
CE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdfCE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdf
BishnuBhandari12
 
CE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdfCE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdf
BishnuBhandari12
 
CE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdfCE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdf
BishnuBhandari12
 
CE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdfCE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdf
BishnuBhandari12
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
BishnuBhandari12
 
1. cover page
1. cover page1. cover page
1. cover page
BishnuBhandari12
 
Assignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu BhandariAssignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu Bhandari
BishnuBhandari12
 

More from BishnuBhandari12 (12)

CE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdfCE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdf
 
MATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdfMATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdf
 
MATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdfMATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdf
 
CE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdfCE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdf
 
CE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdfCE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdf
 
CE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdfCE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdf
 
CE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdfCE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdf
 
CE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdfCE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdf
 
CE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdfCE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdf
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
1. cover page
1. cover page1. cover page
1. cover page
 
Assignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu BhandariAssignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu Bhandari
 

Recently uploaded

Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 

Recently uploaded (20)

Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 

starting of Survey Camp report

  • 1. ACKNOWLEDGEMENT I would like to acknowledge and extend my heartfelt gratitude to our camp Instructor and for their vital encouragement for their guidance and motivation and support in the completion of this project report. This survey camp meant a lot to me as it gave me lot of field experience. I would also like to thank our store keeper Mr. Manoj Khadka for who co-operated with me in the matter of guidance to providing instruments. Most of all I thank my group members, who were operative in the completion of this report. The purpose of this fieldwork was to make the each student independent to carry out the work in real problem in the field. We think, the purpose is suitable for further work and which make us to produce the report of the fieldwork in time. We are sincerely indebted to our collage MAMTS, for providing opportunity to consolidate our theoretical and practical knowledge in engineering surveying. Our camp Instructor: 1. Er. Niraj Pudasaini (Vice Principle) 2. Er. Sanjaya Subedi (Instructor) 3. Er. Ashma Pokhrel (Instructor) 4. Er. Nita Khadka (Instructor) 5. Er. Sushanta Subedhi (Instructor) 6. Mr. Manoj Khadka (Store Keeper) 7. Mr. Anish Bomjom (Teaching Aid)
  • 2. PREFACE This report presents the surveying data of closed camp of Madan Ashrit Memorial Technical School (Group B). This report will help readers to knowing about the general and detail description of Surveying progress like as Linear Measurement, Angular Measurement, Topographic Detailing, Contour Map, Road curve setting, determining the span of the bridge distance in suitable zone etc. I am thankful to Er.Niraj Pudasaini for giving some instructions and preliminary idea in handling me to completing this report. I am also thankful to Mr. Suman Jyoti for his kind information to preparing this report. I hope that the report will be further useful in field work for all site visitor in civil construction and surveying. Inthis SurveyCamp,Wearesupposed to surveya givenplot in all its aspect and work on road alignment, topographic map and bridge alignment with proper X-section, L-Section and its topography fulfilling all technical requirements. ThisReportincludestheentiredescriptionof thepracticalcarriedoutduringtheSurveyCamp.Italsoincludestheprofileandcross-sectionsatdifferentpoints oftheRoadAlignmentandBridgeSiteSurvey. I will be verymuch thankful to the viewers who go through this report for bringing such errors in our notice. Furthermore we would be very thankful for the examiners or viewers for their suggestions in improving this report. Our Surveying Team: 1. Suman Jyoti 2. Bishnu pd. Bhandari 3. Dipesh Jung Shai 4. Dubdorje Tamang 5. Dhurba Thapa 6. Dinesh Moktan 7. Sunita Khatiwada
  • 3. ABSTRACT Surveying is the science and art of determining the relative positions of above, on, or beneath the surface of earth, and is the most important part of Civil Engineering. The results of surveys are used to map the earth, prepare navigational charts, established property boundaries. Develop data of land used and natural resource information etc. Further survey maintains highways, railroads, buildings, bridges, tunnels, canals, dams and many more. Thus, the objective of survey camp was to make us gain the experience in this field by performing topographic survey in a large area, learning to propose road alignment and select suitable site for bridge axis. The report reflects the methodology, observations, and calculations made by thestudents in the Camp with the corresponding drawings. The large portion of the course covered with elements of topographic surveying, and then those of road alignment and bridge site survey f follow it. The main objective of the Survey Camp organized for us is to take an opportunity to consolidate and update our practical and theoretical knowledge in engineering surveying in the actual field condition. In this survey camp we have to prepare a topographic map of the given area, road and bridge site survey fulfilling all technical requirements. In this regard, we are required to carry out the necessary field works in our sub-group so that we will get opportunity to the decision on planning and execution of field works for the preparation of topographic map, road alignment and bridge site survey. This survey camp helps us to build in our confidence to conduct engineering survey on required accuracy.
  • 4. CONTENTS S.N TITLE PAGE 1 Introduction 1.1 Background 1.1.1 Location……………………………………..…….1 1.1.2Site……………………………………………........1 1.1.3TopographyandGeology…………………………..2 1.1.4Rainfall,ClimateandVegetation……………………2 1.1.5DescriptionofWork………………………………..3 1.1.6WorksdetailsandSchedule………………………....3 1.2 Introduction 1.2.1Surveying…………………………………………4 1.2.2PrincipleofSurveying………………………...……4 1.2.3Definationofterms…………………………....……5 2 TopographicSurveying 2.1LinearMeasurement……………………………………7 2.2TheodoliteTraversing…………………………………...8 2.3Methodology……………………………………….…...9 2.3.1BalancingtheTraverse…………….…………...…10 2.3.2ClosingError………………………………….…11 2.4Detailing……………………………………………….11 2.5TachometryDetailing…………………………………..12 2.6Levelling………………………………………………14 2.7Contouring……………………………………………..15 2.8TotalStation……………………………………………16 3 BridgeSiteSurvey 3.1Overview………………………………………………49 3.2BriefdescriptionofArea………………………………...50 3.3TechnicalSpecification…………………………………50 3.4Methodology………………………………………...…50 3.4Calculation………………………………………...……53 4 RoadAlignmentSurvey 4.1Introduction………………………………….…………61 4.2Curves…………………………………………………61 4.3EquipmentRequired……………………………………62 4.4Norms…………………………………………………63 4.4Methodology…………………………………………...63 4.4Calculation…………………………………………..…66