CUPERTINO ELECTRIC
• Designers and Installers have become relaxed in using the terms
emergency and standby.
• Any generator is an emergency generator.
• Any load connected to an alternative source of supply is an emergency
load.
• Relaxed standards for the use of the terms emergency and standby can
lead to confusion, added cost and failing to pass inspection.
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY
CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED
STANDBY 701
OPTIONAL STANDBY
ARTICLE 702
SCOPE Legally required and classified as
emergency by codes or AHJ.
• Egress lighting
• Life safety systems
• Fire alarm & communication
• Fire pumps
• Elevators
• Essential Ventilation
Primarily for artificial illumination in
places of assembly -
• Safe exiting
• Panic control
• Essential for safety of human life
• Reference NFPA 101-1997 and
NFPA 110-1996
Legally required and classified as
legally required standby by codes or
AHJ.
• Permanently installed equipment
• Smoke removal
• Sewage Disposal
• Industrial Processes
• HVAC/Ventilation
• Communication equipment
When stopped, could create hazards
or hamper rescue or fire fighter.
• Reference NFPA 110-1996 & IEEE
446-1995
• Intended to protect public and
private facilities where life
safety does not depend on the
performance of the system.
Only those systems that are
permanently installed
• Data processing
• HVAC
• Industrial Process
APPROVAL Approved for use on emergency
systems.
Equipment approved for intended
use.
Equipment approved for intended
use.
TESTS Witness test of complete system and
periodically afterward.
• Tested on a schedule acceptable to
AHJ.
• Battery Maintenance Program
required.
• Written Record of tests and
maintenance.
• Means to test under load required.
Witness test of complete system.
• Tested on a schedule acceptable
to AHJ.
• Battery Maintenance Program
required.
• Written Record of tests and
maintenance.
• Means to test under load required.
None
Based on 1999 NEC
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY
• Lowest priority if combined
• No mandatory loads
• Allowed to supply legally required
and optional standby loads.
• Second priority if combined.
• Capacity to operate all legally
required standby loads
simultaneously.
• Selective load pickup/load
shedding of optional standby.
• Capacity to operate all emergency
loads simultaneously.
• May be used for peak load shed.
• Portable/temporary required when
generator is out of service for major
maintenance or repair.
• Highest priority if combined.
• Selective load pickup/load shedding
of legally required and optional
standby.
CAPACITY/
RATING
• Suitable for intended use.
• No inadvertent connection of
sources.
• Manual or automatic.
• Automatic transfer identified for
standby use and approved by AHJ.
• No inadvertent connection of
sources.
• Bypass/Isolation allowed.
• Electrically operated, mechanically
held.
• Automatic transfer identified for
emergency use and approved by
AHJ.
• No inadvertent connection of
sources.
• Bypass/Isolation allowed.
• Electrically operated, mechanically
held.
• Supply only emergency loads.
TRANSFER
EQUIPMENT
OPTIONAL STANDBY
ARTICLE 702
LEGALLY REQUIRED
STANDBY 701
EMERGENCY ARTICLE 700CATEGORY
Based on 1999 NEC
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY
• Audible and Visual where
practicable.
• Derangement
• Carrying load
• Audible and Visual where
practicable
• Derangement
• Carrying load
• Not functioning (battery charger)
• Audible and Visual where
practicable
• Derangement (BKR open, low fuel)
• Carrying load
• Not functioning (battery charger fail)
• Ground fault (Alarm not trip) posted
instructions
SIGNALS
• At service entrance indicating
type and location of standby
sources.
• At grounding location if remote
from source.
• At service entrance indicate type
and location of legally required
standby power sources.
• At grounding location if remote
from standby source.
• At service entrance indicate type
and location of onsite emergency
power sources.
• At grounding location if remote from
emergency source.
SIGNS
No special restrictions.Permitted to occupy the same
raceway, cable, box or cabinet as
general wiring.
• Boxes, enclosures, transfer
switches, generators, panels, etc.
permanently marked as emergency.
• Wiring kept independent except in
transfer equipment, at exit/emer-
gency fixtures, at unit equipment.
• Locate circuits to minimize hazards;
flood, fire, ice, vandalism.
• In high rise/life safety or assembly
occupancies over 1000 people:
a. Circuits in fully sprinklered
spaces or 1 hours resistive
circuit construction.
WIRING
OPTIONAL STANDBY
ARTICLE 702
LEGALLY REQUIRED
STANDBY 701
EMERGENCY ARTICLE 700CATEGORY
Based on 1999 NEC
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY
CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED
STANDBY 701
OPTIONAL STANDBY
ARTICLE 702
WIRING b. Listed thermal barrier for electrical
components.
c. Minimum 2” of concrete
d. Listed cable assembly
e. Equipment in sprinklered space or 1
hour rating.
SOURCES OF
POWER
Transfer within 10 seconds Transfer within 60 seconds No transfer time specified.
STORAGE
BATTERY
• 1.5 hours to 87.5 percent of normal
voltage
• Sealed battery OK need not be
transparent.
• Wet cell needs to be transparent
• No automotive batteries
• Automatic charging.
• 1.5 hours to 87.5 percent of
normal voltage
• Sealed battery OK need not be
transparent
• Wet cell needs to be transparent
• No automotive batteries.
• Automatic charging.
Not applicable.
GENERATOR
SET
• Automatic start.
• Time delay retransfer 15 minutes
provided
• Two hour fuel supply (8 hours UBC)
on premise
• Two sources of fuel and cooling if
served from public utility system.
• Automatic fuel source transfer.
• Start battery needs independent
charger.
• Automatic start.
• Time delay retransfer 15 minutes
provided
• Two hour fuel supply on premise.
• Two sources of fuel and cooling
if served from public utility
system.
• Automatic fuel source transfer.
• Start battery needs independent
charger.
Not applicable.
Based on 1999 NEC
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY
Not applicable.• Rechargeable battery and battery
charger.
• Local and/or remote lamps.
• Relay to energize lamps.
• 1.5 hours to 87½ percent battery
output.
• 60% light output for 1.5 hours.
• Permanently fixed in place.
• Flexible cord and plug connection
permitted if not over 3’ long.
• Rechargeable battery and battery
charger.
• Local and/or remote lamps.
• Relay to energize lamps.
• 1.5 hours to 87½ percent battery
output.
• 60% light output for 1.5 hours
• Permanently fixed in place.
• Flexible cord and plug connection
permitted if not over 3’ long.
UNIT EQUIPMENT
• Battery charger and dampers
connected to generator.
• Fuel transfer pumps powered from
generator.
GENERATOR SET
Not Applicable.• If acceptable to AHJ
• Per Article 230
• Widely separate electrically and
physically from normal.
• If acceptable to AHJ
• Per Article 230
• Widely separate electrically and
physically from normal.
SEPARATE
SERVICE
Not applicable.• May be used but refer to batteries
and generator above.
• May be used but refer to batteries
and generator above.
UNINTERRUPTIBLE
POWER SUPPLIES
(Lighting Inverter)
OPTIONAL STANDBY
ARTICLE 702
LEGALLY REQUIRED
STANDBY 701
EMERGENCY ARTICLE 700CATEGORY
Based on 1999 NEC
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC
CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED
STANDBY 701
OPTIONAL STANDBY
ARTICLE 702
UNIT
EQUIPMENT
•Circuit also feeds normal lighting
in space or, if 3 circuits used in
space may be on separate circuit
from same panel and locked on.
• Clearly mark circuit at panel.
•Circuit also feeds normal lighting in
space or, if 3 circuits used in space
may be on separate circuit from
same panel and locked on.
• Clearly mark circuit at panel.
BRANCH
CIRCUIT
LOADS
• No appliances and no other lamps
on emergency lighting circuits.
• Automatic transfer required for
power branch circuits that supply
emergency equipment.
Not applicable. Not applicable.
EMERGENCY
ILLUMINATION
• Emergency illumination includes
required means of egress.
• Single lamp out cannot cause total
darkness.
• HID sources need emergency
lamp on until normal illumination
restored.
• Include all required means of
egress lighting, exit signs, and
other lights necessary.
• No single lamp failure leaves
space requiring illumination in
darkness.
• Operate HID fixtures until normal
restored. (Quartz restrike)
If acceptable to AHJ
• Not tapped within service
disconnecting means.
• Separate physically.
Not applicable.
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC
Permitted to occupy the same
raceway, cable, box or cabinet as
general wiring.
Permitted to occupy the same
raceway, cable, box or cabinet as
general wiring.
Supplied from alternate source when
normal power interrupted.
• Independent supply with means to
automatically transfer.
• Two or more systems with
independent power supply where
only one is required.
• Automatic switching unless both
systems normally in service.
• May be part of general lighting system.
LIGHTING
CIRCUITS
Not applicable.No special restriction.Authorized persons have control.
• When two single throw switches in
parallel, one accessible only to
authorized personnel.
• Additional switches to turn lights on
but not off.
• No 3 way or 4 way.
• No switches in series.
SWITCHING
Not applicable.No special restriction.• Convenient to authorized persons only
• In places of assembly (i.e. theater)
– switch convenient in lobby.
• No switch in projection booth unless to
only turn lights on.
• Exterior lights may by turned off by
photo cell.
SWITCH
LOCATIONS
OPTIONAL STANDBY
ARTICLE 702
LEGALLY REQUIRED
STANDBY 701
EMERGENCY ARTICLE 700CATEGORY
CUPERTINO ELECTRIC
EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC
CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED
STANDBY 701
OPTIONAL STANDBY
ARTICLE 702
OVERCURRENT
PROTECTION
• Accessible to authorized persons
only.
• Coordinated system (fully rated vs.
integrated).
• Accessible to authorized persons
only.
Same as general building supply
system.
GROUND FAULT
PROTECTION
Tripping not required, indication only. Tripping not required, indication only. Tripping required if more than
150 volts to ground and 1000
AMPS.
CUPERTINO ELECTRIC
TYPICAL TRANSFER SYSTEMS
CUPERTINO ELECTRIC
TYPICAL EQUIPMENT CONFIGURATIONS
CUPERTINO ELECTRIC
TYPICAL SYSTEM WITH
A SINGLE GENERATOR
SERVICE ALL LOADS.
MAY EMPLOY LOAD
SHED.
CUPERTINO ELECTRIC
TYPICAL SYSTEM WITH
OPTIONAL LOADS USING
UNIT EQUIPMENT FOR
EGRESS LIGHTING.
CUPERTINO ELECTRIC
TYPICAL SYSTEM WITH BOTH
EMERGENCY AND OPTIONAL
STANDBY ALTERNATE SOURCES.
CUPERTINO ELECTRIC
TWO TYPES OF
ALTERNATE SOURCES,
FOUR TYPES OF
TRANSFER.
CUPERTINO ELECTRIC
MEDIUM VOLTAGE SYSTEM WITH
LOW VOLTAGE EMERGENCY LOADS.
CUPERTINO ELECTRIC
TYPICAL THREE POLE
TRANSFER SWITCH
CONNECTIONS.
CUPERTINO ELECTRIC
TYPICAL FOUR POLE
TRANSFER SWITCH
CONNECTION.
CUPERTINO ELECTRIC
TYPICAL UNIT
EQUIPMENT CONNECTION.
BATTERY SERVES LOAD
FOR 90 MINUTES WHEN
NORMAL SUPPLY TO
GENERAL ILLUMINATION
FAILS.
CUPERTINO ELECTRIC
SWITCHABLE UNIT
EQUIPMENT. BATTERY
SERVES LOAD FOR 90
MINUTES WHEN NORMAL
SUPPLY TO GENERAL
ILLUMINATION FAILS.
CUPERTINO ELECTRIC
SEPARATE CIRCUIT FOR
EGRESS LIGHTING WHEN
ROOM/AREA SERVED WITH
3 OR MORE CIRCUITS.
CUPERTINO ELECTRIC
GENERATOR SIZING EXAMPLEGENERATOR SIZING EXAMPLE
Notes: (1) Running Load = 150KVA (180A @ 480V 3Phase). See Sheet B for calculation.
(2) Refer to Sheet C for Generator Sizing for Combination Loads.
(3) Refer to Sheet D for Total Load Generator Sizing.
CLASSIFICATION OF LOAD GENERATOR LOAD DURING:
EMERGENCY
LEGALLY
REQUIRED
STANDBY
OPTIONAL
STANDBY
ROUTINE
OUTAGE
OUTAGE
WITH
FA/LSS
OUTAGE
WITH FA &
PUMP
OUTAGE
WITH
EQUIPMENT
IN
OPERATION
Egress Lighting 100 100 100 100 100 100
Fire Alarm/LSS 50 50 50 50 50 50
Smoke Control 200 200 200 200 200
Fire Pump 125 125 855 (1) 855 (1)
Computer Room 400 400 400 400
Elevator 100 100 100 100 100 100
Garage Exhaust 100 100 100 100 100 100
Walk-in
Refrigerator
25 25 25 25
TOTALS 1100 475 300 425 775 550 971 (2) 1100 (3)
DESCRIPTION
LOAD
(KW)
CUPERTINO ELECTRIC
GENERATOR SIZING EXAMPLEGENERATOR SIZING EXAMPLE
FIRE PUMP STARTINGFIRE PUMP STARTINGSHEET B
Fire Pump = 150 Hp, 480V 3Ph, Code G Squirrel Cage Motor Started Across the Line.
TABLE 430 – 150: 150Hp = 180 Amps @ 480V.
TABLE 430 – 7(b): Code G = 5.6 – 6.29 KVA/Hp.
Starting KVA = 6.29 x 150Hp = 9435 KVA = 1135 Amps.
NFPA 20 limits Starting Voltage Drop to 15%.
Approximation of Voltage Drop equals Ratio of Starting Current to Maximum Available Fault Current.
AmpsCircuitShortRequired
AmpsStarting
0.1515% ==
7567Amps
0.15
1135
0.15
AmpsStarting
AmpsCKTShortRequired ===
The Normal Source Impedance for 480V Diesel Generators is between 10% and 17% or 0.1pu and 0.17pu
Normal Source FLA = Short CKT Amps x Source Impedance pu
= 7567 x 0.17
= 1286 Amps
480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732
= 0.18 x 1286 x 0.48 x 1.732
= 855KW
Normal Starting Requirement (Generator KW) is 4 to 6 times Fire Pump Horsepower.
puImpedanceSource
FLASourceNormal
AmpsCircuitShort =
CUPERTINO ELECTRIC
SHEET C
From Sheet B
Fire Pump starting required Short Circuit Amps = 7576
Total of Connected Loads = 675KW.
New Combination Required Short Circuit Amps = 7576 + 1014
= 8590 Amps
Normal Source FLA = Short CKT Amps x Source Impedance pu
= 8590 x 0.17
= 1460 Amps
480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732
= 0.18 x 1460 x 0.48 x 1.732
= 971 KW
GENERATOR SIZING FORGENERATOR SIZING FOR
COMBINATION OF LOADS WITH FIRE PUMPCOMBINATION OF LOADS WITH FIRE PUMP
1014Amps
1.732x0.48x0.8
675
LoadsOtherofAmpsLoadRunning ==
CUPERTINO ELECTRIC
SHEET D
From Sheet B
Fire Pump starting required Short Circuit Amps = 7576
Total of Running Loads = 1100 KW.
New Combination Required Short Circuit Amps = 7576 + 1654
= 9230 Amps
Normal Source FLA = Short CKT Amps x Source Impedance pu
= 9230 x 0.17
= 1569 Amps
480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732
= 0.18 x 1569 x 0.48 x 1.732
= 1043 KW
Minimum Size = Connected Load when Minimum Starting Calculation is less than Connected Load.
= 1100 KW
GENERATOR SIZING FORGENERATOR SIZING FOR
TOTAL OF ALL LOADSTOTAL OF ALL LOADS
Amps1654
1.732x0.48x0.8
1100
LoadsOtherofAmpsLoadRunning ==

More Related Content

What's hot

1.8 overhead vs underground system
1.8 overhead vs underground system1.8 overhead vs underground system
1.8 overhead vs underground systemW3Edify
 
UPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutionUPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutioniTQAN Maju Resources
 
Voltage Regulators ppt
Voltage Regulators pptVoltage Regulators ppt
Voltage Regulators pptGurkirat Singh
 
Ppt 2 blue design
Ppt 2 blue designPpt 2 blue design
Ppt 2 blue designabin k raju
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentationAneeque Qaiser
 
Inverters (DC-AC)
Inverters (DC-AC)Inverters (DC-AC)
Inverters (DC-AC)Taimur Ijaz
 
cooling systems of transformers
cooling systems of transformerscooling systems of transformers
cooling systems of transformersMalik Armughan
 
Rectifier and Amplifer instruments
Rectifier and Amplifer instruments Rectifier and Amplifer instruments
Rectifier and Amplifer instruments farhan memon
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)RP6997
 
Inverter design ppt
Inverter design pptInverter design ppt
Inverter design pptsubarna Giri
 
Electrical installation handbook part-1
Electrical installation handbook part-1Electrical installation handbook part-1
Electrical installation handbook part-1Souvik Dutta
 
Transmission and distribution system of electricity
Transmission and distribution system of electricity Transmission and distribution system of electricity
Transmission and distribution system of electricity anjali s
 
Simulation of sinosoidal pulse width modulation
Simulation of sinosoidal pulse width modulationSimulation of sinosoidal pulse width modulation
Simulation of sinosoidal pulse width modulationTanzeel Ahmad
 
Lighting and control
Lighting and controlLighting and control
Lighting and controlStephen Dyson
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in preciseMuthar Hussain
 

What's hot (20)

1.8 overhead vs underground system
1.8 overhead vs underground system1.8 overhead vs underground system
1.8 overhead vs underground system
 
UPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection SolutionUPS (Uninterrupted Power Supply) - Power Protection Solution
UPS (Uninterrupted Power Supply) - Power Protection Solution
 
Ilumination schemes
Ilumination schemes Ilumination schemes
Ilumination schemes
 
Voltage Regulators ppt
Voltage Regulators pptVoltage Regulators ppt
Voltage Regulators ppt
 
Ppt 2 blue design
Ppt 2 blue designPpt 2 blue design
Ppt 2 blue design
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentation
 
Inverters (DC-AC)
Inverters (DC-AC)Inverters (DC-AC)
Inverters (DC-AC)
 
cooling systems of transformers
cooling systems of transformerscooling systems of transformers
cooling systems of transformers
 
ups
upsups
ups
 
fire fighting System
fire fighting Systemfire fighting System
fire fighting System
 
Rectifier and Amplifer instruments
Rectifier and Amplifer instruments Rectifier and Amplifer instruments
Rectifier and Amplifer instruments
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)
 
Electric generator
Electric generatorElectric generator
Electric generator
 
Inverter design ppt
Inverter design pptInverter design ppt
Inverter design ppt
 
Electrical installation handbook part-1
Electrical installation handbook part-1Electrical installation handbook part-1
Electrical installation handbook part-1
 
Transmission and distribution system of electricity
Transmission and distribution system of electricity Transmission and distribution system of electricity
Transmission and distribution system of electricity
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
Simulation of sinosoidal pulse width modulation
Simulation of sinosoidal pulse width modulationSimulation of sinosoidal pulse width modulation
Simulation of sinosoidal pulse width modulation
 
Lighting and control
Lighting and controlLighting and control
Lighting and control
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in precise
 

Similar to Cupertino Electric: Emergency, Legally Required and Optional Standby Systems

Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systemsmichaeljmack
 
Legend Power - Effects of Voltage Optimziation
Legend Power - Effects of Voltage OptimziationLegend Power - Effects of Voltage Optimziation
Legend Power - Effects of Voltage OptimziationDave Orton
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfGautamChattopadhyay4
 
MINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxMINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxshamlaK
 
Instructinon manual Mega
Instructinon manual  MegaInstructinon manual  Mega
Instructinon manual MegaToàn Huỳnh
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsLisaKnapp23
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.pptThien Phan Bản
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxLoitaFredy
 
foor step power generation ppt
foor step power generation pptfoor step power generation ppt
foor step power generation pptRajendra Prasad
 

Similar to Cupertino Electric: Emergency, Legally Required and Optional Standby Systems (20)

Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Legend Power - Effects of Voltage Optimziation
Legend Power - Effects of Voltage OptimziationLegend Power - Effects of Voltage Optimziation
Legend Power - Effects of Voltage Optimziation
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdf
 
16950
1695016950
16950
 
Power quality 2
Power quality 2Power quality 2
Power quality 2
 
MINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxMINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptx
 
Instructinon manual Mega
Instructinon manual  MegaInstructinon manual  Mega
Instructinon manual Mega
 
His 4
His 4His 4
His 4
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 
Power backups
Power backupsPower backups
Power backups
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving Systems
 
Time current curves
Time current curvesTime current curves
Time current curves
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
HOTEL LOAD
HOTEL LOADHOTEL LOAD
HOTEL LOAD
 
Load banks
Load banksLoad banks
Load banks
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptx
 
foor step power generation ppt
foor step power generation pptfoor step power generation ppt
foor step power generation ppt
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 

More from michaeljmack

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993michaeljmack
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbookmichaeljmack
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbookmichaeljmack
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systemsmichaeljmack
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flashmichaeljmack
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgearmichaeljmack
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrushmichaeljmack
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingmichaeljmack
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protectionmichaeljmack
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spacesmichaeljmack
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708michaeljmack
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distributionmichaeljmack
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performancemichaeljmack
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulatormichaeljmack
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plantsmichaeljmack
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Storiesmichaeljmack
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Sheddingmichaeljmack
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentalsmichaeljmack
 

More from michaeljmack (20)

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbook
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbook
 
Surge Protection
Surge ProtectionSurge Protection
Surge Protection
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systems
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrush
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protection
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spaces
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distribution
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performance
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulator
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plants
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Shedding
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentals
 
Arc Flash
Arc FlashArc Flash
Arc Flash
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Cupertino Electric: Emergency, Legally Required and Optional Standby Systems

  • 1. CUPERTINO ELECTRIC INTERNATIONAL ASSOCIATIONINTERNATIONAL ASSOCIATION OFOF ELECTRICAL INSPECTORSELECTRICAL INSPECTORS 2002 SOUTHWESTERN SECTION2002 SOUTHWESTERN SECTION ANNUAL MEETINGANNUAL MEETING EMERGENCY, LEGALLY REQUIREDEMERGENCY, LEGALLY REQUIRED ANDAND OPTIONAL STANDBY SYSTEMSOPTIONAL STANDBY SYSTEMS Rudy Bergthold, P.E. CUPERTINO ELECTRIC, INC. San Jose, California
  • 2. CUPERTINO ELECTRIC • Designers and Installers have become relaxed in using the terms emergency and standby. • Any generator is an emergency generator. • Any load connected to an alternative source of supply is an emergency load. • Relaxed standards for the use of the terms emergency and standby can lead to confusion, added cost and failing to pass inspection.
  • 3. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED STANDBY 701 OPTIONAL STANDBY ARTICLE 702 SCOPE Legally required and classified as emergency by codes or AHJ. • Egress lighting • Life safety systems • Fire alarm & communication • Fire pumps • Elevators • Essential Ventilation Primarily for artificial illumination in places of assembly - • Safe exiting • Panic control • Essential for safety of human life • Reference NFPA 101-1997 and NFPA 110-1996 Legally required and classified as legally required standby by codes or AHJ. • Permanently installed equipment • Smoke removal • Sewage Disposal • Industrial Processes • HVAC/Ventilation • Communication equipment When stopped, could create hazards or hamper rescue or fire fighter. • Reference NFPA 110-1996 & IEEE 446-1995 • Intended to protect public and private facilities where life safety does not depend on the performance of the system. Only those systems that are permanently installed • Data processing • HVAC • Industrial Process APPROVAL Approved for use on emergency systems. Equipment approved for intended use. Equipment approved for intended use. TESTS Witness test of complete system and periodically afterward. • Tested on a schedule acceptable to AHJ. • Battery Maintenance Program required. • Written Record of tests and maintenance. • Means to test under load required. Witness test of complete system. • Tested on a schedule acceptable to AHJ. • Battery Maintenance Program required. • Written Record of tests and maintenance. • Means to test under load required. None Based on 1999 NEC
  • 4. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY • Lowest priority if combined • No mandatory loads • Allowed to supply legally required and optional standby loads. • Second priority if combined. • Capacity to operate all legally required standby loads simultaneously. • Selective load pickup/load shedding of optional standby. • Capacity to operate all emergency loads simultaneously. • May be used for peak load shed. • Portable/temporary required when generator is out of service for major maintenance or repair. • Highest priority if combined. • Selective load pickup/load shedding of legally required and optional standby. CAPACITY/ RATING • Suitable for intended use. • No inadvertent connection of sources. • Manual or automatic. • Automatic transfer identified for standby use and approved by AHJ. • No inadvertent connection of sources. • Bypass/Isolation allowed. • Electrically operated, mechanically held. • Automatic transfer identified for emergency use and approved by AHJ. • No inadvertent connection of sources. • Bypass/Isolation allowed. • Electrically operated, mechanically held. • Supply only emergency loads. TRANSFER EQUIPMENT OPTIONAL STANDBY ARTICLE 702 LEGALLY REQUIRED STANDBY 701 EMERGENCY ARTICLE 700CATEGORY Based on 1999 NEC
  • 5. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY • Audible and Visual where practicable. • Derangement • Carrying load • Audible and Visual where practicable • Derangement • Carrying load • Not functioning (battery charger) • Audible and Visual where practicable • Derangement (BKR open, low fuel) • Carrying load • Not functioning (battery charger fail) • Ground fault (Alarm not trip) posted instructions SIGNALS • At service entrance indicating type and location of standby sources. • At grounding location if remote from source. • At service entrance indicate type and location of legally required standby power sources. • At grounding location if remote from standby source. • At service entrance indicate type and location of onsite emergency power sources. • At grounding location if remote from emergency source. SIGNS No special restrictions.Permitted to occupy the same raceway, cable, box or cabinet as general wiring. • Boxes, enclosures, transfer switches, generators, panels, etc. permanently marked as emergency. • Wiring kept independent except in transfer equipment, at exit/emer- gency fixtures, at unit equipment. • Locate circuits to minimize hazards; flood, fire, ice, vandalism. • In high rise/life safety or assembly occupancies over 1000 people: a. Circuits in fully sprinklered spaces or 1 hours resistive circuit construction. WIRING OPTIONAL STANDBY ARTICLE 702 LEGALLY REQUIRED STANDBY 701 EMERGENCY ARTICLE 700CATEGORY Based on 1999 NEC
  • 6. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED STANDBY 701 OPTIONAL STANDBY ARTICLE 702 WIRING b. Listed thermal barrier for electrical components. c. Minimum 2” of concrete d. Listed cable assembly e. Equipment in sprinklered space or 1 hour rating. SOURCES OF POWER Transfer within 10 seconds Transfer within 60 seconds No transfer time specified. STORAGE BATTERY • 1.5 hours to 87.5 percent of normal voltage • Sealed battery OK need not be transparent. • Wet cell needs to be transparent • No automotive batteries • Automatic charging. • 1.5 hours to 87.5 percent of normal voltage • Sealed battery OK need not be transparent • Wet cell needs to be transparent • No automotive batteries. • Automatic charging. Not applicable. GENERATOR SET • Automatic start. • Time delay retransfer 15 minutes provided • Two hour fuel supply (8 hours UBC) on premise • Two sources of fuel and cooling if served from public utility system. • Automatic fuel source transfer. • Start battery needs independent charger. • Automatic start. • Time delay retransfer 15 minutes provided • Two hour fuel supply on premise. • Two sources of fuel and cooling if served from public utility system. • Automatic fuel source transfer. • Start battery needs independent charger. Not applicable. Based on 1999 NEC
  • 7. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBY Not applicable.• Rechargeable battery and battery charger. • Local and/or remote lamps. • Relay to energize lamps. • 1.5 hours to 87½ percent battery output. • 60% light output for 1.5 hours. • Permanently fixed in place. • Flexible cord and plug connection permitted if not over 3’ long. • Rechargeable battery and battery charger. • Local and/or remote lamps. • Relay to energize lamps. • 1.5 hours to 87½ percent battery output. • 60% light output for 1.5 hours • Permanently fixed in place. • Flexible cord and plug connection permitted if not over 3’ long. UNIT EQUIPMENT • Battery charger and dampers connected to generator. • Fuel transfer pumps powered from generator. GENERATOR SET Not Applicable.• If acceptable to AHJ • Per Article 230 • Widely separate electrically and physically from normal. • If acceptable to AHJ • Per Article 230 • Widely separate electrically and physically from normal. SEPARATE SERVICE Not applicable.• May be used but refer to batteries and generator above. • May be used but refer to batteries and generator above. UNINTERRUPTIBLE POWER SUPPLIES (Lighting Inverter) OPTIONAL STANDBY ARTICLE 702 LEGALLY REQUIRED STANDBY 701 EMERGENCY ARTICLE 700CATEGORY Based on 1999 NEC
  • 8. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED STANDBY 701 OPTIONAL STANDBY ARTICLE 702 UNIT EQUIPMENT •Circuit also feeds normal lighting in space or, if 3 circuits used in space may be on separate circuit from same panel and locked on. • Clearly mark circuit at panel. •Circuit also feeds normal lighting in space or, if 3 circuits used in space may be on separate circuit from same panel and locked on. • Clearly mark circuit at panel. BRANCH CIRCUIT LOADS • No appliances and no other lamps on emergency lighting circuits. • Automatic transfer required for power branch circuits that supply emergency equipment. Not applicable. Not applicable. EMERGENCY ILLUMINATION • Emergency illumination includes required means of egress. • Single lamp out cannot cause total darkness. • HID sources need emergency lamp on until normal illumination restored. • Include all required means of egress lighting, exit signs, and other lights necessary. • No single lamp failure leaves space requiring illumination in darkness. • Operate HID fixtures until normal restored. (Quartz restrike) If acceptable to AHJ • Not tapped within service disconnecting means. • Separate physically. Not applicable.
  • 9. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC Permitted to occupy the same raceway, cable, box or cabinet as general wiring. Permitted to occupy the same raceway, cable, box or cabinet as general wiring. Supplied from alternate source when normal power interrupted. • Independent supply with means to automatically transfer. • Two or more systems with independent power supply where only one is required. • Automatic switching unless both systems normally in service. • May be part of general lighting system. LIGHTING CIRCUITS Not applicable.No special restriction.Authorized persons have control. • When two single throw switches in parallel, one accessible only to authorized personnel. • Additional switches to turn lights on but not off. • No 3 way or 4 way. • No switches in series. SWITCHING Not applicable.No special restriction.• Convenient to authorized persons only • In places of assembly (i.e. theater) – switch convenient in lobby. • No switch in projection booth unless to only turn lights on. • Exterior lights may by turned off by photo cell. SWITCH LOCATIONS OPTIONAL STANDBY ARTICLE 702 LEGALLY REQUIRED STANDBY 701 EMERGENCY ARTICLE 700CATEGORY
  • 10. CUPERTINO ELECTRIC EMERGENCY VS. STANDBYEMERGENCY VS. STANDBYBased on 1999 NEC CATEGORY EMERGENCY ARTICLE 700 LEGALLY REQUIRED STANDBY 701 OPTIONAL STANDBY ARTICLE 702 OVERCURRENT PROTECTION • Accessible to authorized persons only. • Coordinated system (fully rated vs. integrated). • Accessible to authorized persons only. Same as general building supply system. GROUND FAULT PROTECTION Tripping not required, indication only. Tripping not required, indication only. Tripping required if more than 150 volts to ground and 1000 AMPS.
  • 13. CUPERTINO ELECTRIC TYPICAL SYSTEM WITH A SINGLE GENERATOR SERVICE ALL LOADS. MAY EMPLOY LOAD SHED.
  • 14. CUPERTINO ELECTRIC TYPICAL SYSTEM WITH OPTIONAL LOADS USING UNIT EQUIPMENT FOR EGRESS LIGHTING.
  • 15. CUPERTINO ELECTRIC TYPICAL SYSTEM WITH BOTH EMERGENCY AND OPTIONAL STANDBY ALTERNATE SOURCES.
  • 16. CUPERTINO ELECTRIC TWO TYPES OF ALTERNATE SOURCES, FOUR TYPES OF TRANSFER.
  • 17. CUPERTINO ELECTRIC MEDIUM VOLTAGE SYSTEM WITH LOW VOLTAGE EMERGENCY LOADS.
  • 18. CUPERTINO ELECTRIC TYPICAL THREE POLE TRANSFER SWITCH CONNECTIONS.
  • 19. CUPERTINO ELECTRIC TYPICAL FOUR POLE TRANSFER SWITCH CONNECTION.
  • 20. CUPERTINO ELECTRIC TYPICAL UNIT EQUIPMENT CONNECTION. BATTERY SERVES LOAD FOR 90 MINUTES WHEN NORMAL SUPPLY TO GENERAL ILLUMINATION FAILS.
  • 21. CUPERTINO ELECTRIC SWITCHABLE UNIT EQUIPMENT. BATTERY SERVES LOAD FOR 90 MINUTES WHEN NORMAL SUPPLY TO GENERAL ILLUMINATION FAILS.
  • 22. CUPERTINO ELECTRIC SEPARATE CIRCUIT FOR EGRESS LIGHTING WHEN ROOM/AREA SERVED WITH 3 OR MORE CIRCUITS.
  • 23. CUPERTINO ELECTRIC GENERATOR SIZING EXAMPLEGENERATOR SIZING EXAMPLE Notes: (1) Running Load = 150KVA (180A @ 480V 3Phase). See Sheet B for calculation. (2) Refer to Sheet C for Generator Sizing for Combination Loads. (3) Refer to Sheet D for Total Load Generator Sizing. CLASSIFICATION OF LOAD GENERATOR LOAD DURING: EMERGENCY LEGALLY REQUIRED STANDBY OPTIONAL STANDBY ROUTINE OUTAGE OUTAGE WITH FA/LSS OUTAGE WITH FA & PUMP OUTAGE WITH EQUIPMENT IN OPERATION Egress Lighting 100 100 100 100 100 100 Fire Alarm/LSS 50 50 50 50 50 50 Smoke Control 200 200 200 200 200 Fire Pump 125 125 855 (1) 855 (1) Computer Room 400 400 400 400 Elevator 100 100 100 100 100 100 Garage Exhaust 100 100 100 100 100 100 Walk-in Refrigerator 25 25 25 25 TOTALS 1100 475 300 425 775 550 971 (2) 1100 (3) DESCRIPTION LOAD (KW)
  • 24. CUPERTINO ELECTRIC GENERATOR SIZING EXAMPLEGENERATOR SIZING EXAMPLE FIRE PUMP STARTINGFIRE PUMP STARTINGSHEET B Fire Pump = 150 Hp, 480V 3Ph, Code G Squirrel Cage Motor Started Across the Line. TABLE 430 – 150: 150Hp = 180 Amps @ 480V. TABLE 430 – 7(b): Code G = 5.6 – 6.29 KVA/Hp. Starting KVA = 6.29 x 150Hp = 9435 KVA = 1135 Amps. NFPA 20 limits Starting Voltage Drop to 15%. Approximation of Voltage Drop equals Ratio of Starting Current to Maximum Available Fault Current. AmpsCircuitShortRequired AmpsStarting 0.1515% == 7567Amps 0.15 1135 0.15 AmpsStarting AmpsCKTShortRequired === The Normal Source Impedance for 480V Diesel Generators is between 10% and 17% or 0.1pu and 0.17pu Normal Source FLA = Short CKT Amps x Source Impedance pu = 7567 x 0.17 = 1286 Amps 480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732 = 0.18 x 1286 x 0.48 x 1.732 = 855KW Normal Starting Requirement (Generator KW) is 4 to 6 times Fire Pump Horsepower. puImpedanceSource FLASourceNormal AmpsCircuitShort =
  • 25. CUPERTINO ELECTRIC SHEET C From Sheet B Fire Pump starting required Short Circuit Amps = 7576 Total of Connected Loads = 675KW. New Combination Required Short Circuit Amps = 7576 + 1014 = 8590 Amps Normal Source FLA = Short CKT Amps x Source Impedance pu = 8590 x 0.17 = 1460 Amps 480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732 = 0.18 x 1460 x 0.48 x 1.732 = 971 KW GENERATOR SIZING FORGENERATOR SIZING FOR COMBINATION OF LOADS WITH FIRE PUMPCOMBINATION OF LOADS WITH FIRE PUMP 1014Amps 1.732x0.48x0.8 675 LoadsOtherofAmpsLoadRunning ==
  • 26. CUPERTINO ELECTRIC SHEET D From Sheet B Fire Pump starting required Short Circuit Amps = 7576 Total of Running Loads = 1100 KW. New Combination Required Short Circuit Amps = 7576 + 1654 = 9230 Amps Normal Source FLA = Short CKT Amps x Source Impedance pu = 9230 x 0.17 = 1569 Amps 480V 3Phase Generator KW = 0.8pf x Normal FLA x 0.48 x 1.732 = 0.18 x 1569 x 0.48 x 1.732 = 1043 KW Minimum Size = Connected Load when Minimum Starting Calculation is less than Connected Load. = 1100 KW GENERATOR SIZING FORGENERATOR SIZING FOR TOTAL OF ALL LOADSTOTAL OF ALL LOADS Amps1654 1.732x0.48x0.8 1100 LoadsOtherofAmpsLoadRunning ==