STANDARDISED WORK
-LEAN MANUFACTURING TOOL
SUBMITTED BY- PRAKHAR JAIN
SUBMITTEDTO- MS. PRATIBHA
ER NO.- A2481216003
COURSE- BDES. FT
Presented on- 30th sep 2019
• Standardized work is one of the most powerful but least
used lean tools. By documenting the current best
practice, standardized work forms the baseline for
kaizen or continuous improvement.As the standard is
improved, the new standard becomes the baseline for
further improvements, and so on. Improving
standardized work is a never-ending process.
• Basically, standardized work consists of three elements:
• Takt time, which is the rate at which products must be
made in a process to meet customer demand.
• The precise work sequence in which an operator
performs tasks within takt time.
• The standard inventory, including units in machines,
required to keep the process operating smoothly.
TAKT TIME
• Takt time is the time in which one part needs to be
produced based on available time and customer
requirements.
• If there are 25,000 production seconds available per shift
(8 hours less lunch and breaks) and the customer
requires 1000 parts each shift, the takt time would be 25
seconds.This means that a part needs to be produced
every 25 seconds in order to keep up with customer
demand without working any overtime (the ideal
situation). Once takt time is determined, the work
sequence and line balancing can be calculated.
LINE BALANCING
• Line balancing is the next step in standardized work.
This will involve time studies of all the different jobs
within the process.The concept is that all jobs
within an area or line will require the same amount
of time to complete (cycle time).The more detail in
the time study, the easier it will be to balance work
load between operators.
EXAMPLE
• As an example, there are 5 workers on a production line.The cycle
times for each operation are as follows; operator 1 – 20 seconds,
operator 2 – 30 seconds, operator 3 – 25 seconds, operator 4 – 23
seconds and operator 5 – 27 seconds. Using the takt time of 25
seconds from our example above, the goal would be to have no job
more than 25 seconds and have enough operators in this area so
each one would have 25 seconds of work.
• In this example, moving 5 seconds of work from operator 2 to 1,
and 2 seconds of work from operator 5 to 4 would balance out the
work load on this line. Of course, rarely do the times work out like
this in real life, however the two basic concepts are to ensure no
operator has a cycle time greater than the takt time and have
every operation as close in cycle time as possible.
A Case Study on Ethiopian
Garment Industry
• This study consists of conducting time study of sewing
operations. By doing this, the sewing operations of single
model (militaryT-shirt) were standardized on single
production line.To compute standard allowable minutes
(SAM) of this model: First, the product was broken down the
into nine main operation elements, such as pocket, collar,
flap, epaulet, cuff, sleeve, front body and yoke, final
assembly and trimming operations. Also these each
operation was broken in their sub-operations.
• https://www.ijert.org/research/productivity-improvement-
through-lean-manufacturing-tools-a-case-study-on-
ethiopian-garment-industry-IJERTV3IS090977.pdf
• Total 17% allowance factors for all operations were used viz., personal
allowance=7%, basic fatigue allowance=4%, sitting allowance=1%,
contingency=5%
• Using time study, the standard allowable minute (SAM) of a militaryT-shirt model product was
fixed to 34.16 min./shirt. After line balancing, the number of labors required to produce equal
amount of garment, sewing direct labor cost per production line and per unit and production
target is reduced by 24.65% (average),while production capacity, total labor productivity, sewing
machine productivity was increased by 30.6% (average), and real line efficiency increased from
55.59% to 83.3%.
WORK SEQUENCE
• In order to achieve the best quality results every time, the
process must be set up in such a way that each operator that
performs the job does so in the same manner.The work
sequence should contain as much detail as possible.
Instruction as to which hand an operation should be
performed with may be necessary based on the layout of the
components that make up the finished product. By setting up
the work sequence, it is easy to observe when something is
being done out of order. Be very cautious of sharing a
responsibility between operators. Ensure each part of an
operation is assigned to only one operator. If one operator
performs a process one time and then a different operator
perfroms that same process the next time, you leave yourself
wide open for a process to be missed.
BENEFITS IN GARMENT INDUSTRY
• Best method: With standardisation in mind, we are laying
emphasis on finding out & documenting the best possible method
of performing an operation.This study will help improve a lot of
processes and bring down the SAM value or process time.
• Assists Rhythm: Because the standardised method has been
researched it will assist Rhythm. Rhythm in turn improves the
efficiency & reduces confusion.
• ReducedTraining time: The standardised process is illustrated in a
document clearly which can be used for training,re-training &
multiskilling.
• Attacks Variability: Pin pointing reason for sudden variation in the
result is easier if the work has been standardised. Any deviation
from standard method will lead to deviation in result.For example –
There is a sudden increase in uneven stitch at the collar top stitch.
The quality manager goes to the operation to find out the reason. He
observes that the machine is fit with normal pressure foot as opposed
to compensated pressure foot mentioned in the standard work
document.
• Cross FunctionalTeams: In an office if a person repeats the
work sequentially the person sitting next to him will
automatically learn about his job thus enabling cross
functional teams. Also if a work is documented anyone can
be asked to fill-in in case of absence.This eliminates
dependability of processes on people.
• Helps in Continuous Improvement: Standardised works is
the key to continuous improvement. Further improvement
can only be done to standardised processes. For example: An
industrial engineers studied the placement of pins on profile for
collar run stitch and mentioned the findings in the standard
work document.With time the method was adopted and
supervisors had their attention on pins.Later they found out
that out of the three one pin can be removed without affecting
the quality.Thus saving time in pinning & improving the process
further.
• Aesthetically pleasing workplace:And Finally Standardised
workplace looks better aesthetically than non-standardised
workplace.
Standardised work for garment industry- Prakhar Jain

More Related Content

What's hot

Thesis Presentation | Minimization of Sewing Defects through Implementation o...
Thesis Presentation | Minimization of Sewing Defects through Implementation o...Thesis Presentation | Minimization of Sewing Defects through Implementation o...
Thesis Presentation | Minimization of Sewing Defects through Implementation o...
Md Rakibul Hassan
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
Azmir Latif Beg
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
Rajeev Sharan
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
HasanRabbi3
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown
vikram kumar
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
Md.Abdur Rahim Al Bahar
 
Training
TrainingTraining
Training
Muhammad Aamir
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
zaman parvez
 
Sop (textile finishing)
Sop (textile finishing)Sop (textile finishing)
Sop (textile finishing)
Mizan Rahman
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
Azmir Latif Beg
 
Apparel Manufacturing Process
Apparel Manufacturing ProcessApparel Manufacturing Process
Apparel Manufacturing Process
Sunjib Anwar; MBA,SCSS
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
 
Garments & garment defects zubair lahore
Garments & garment defects zubair lahoreGarments & garment defects zubair lahore
Garments & garment defects zubair lahore
zubairtex90
 
7 wastages
7 wastages7 wastages
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
 
Garment defects
Garment defectsGarment defects
Garment defects
2008000400034
 
Work study
Work studyWork study
Work study
Saifur Rahman
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
Abhishek Kumar
 

What's hot (20)

Thesis Presentation | Minimization of Sewing Defects through Implementation o...
Thesis Presentation | Minimization of Sewing Defects through Implementation o...Thesis Presentation | Minimization of Sewing Defects through Implementation o...
Thesis Presentation | Minimization of Sewing Defects through Implementation o...
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 
Training
TrainingTraining
Training
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
Sop (textile finishing)
Sop (textile finishing)Sop (textile finishing)
Sop (textile finishing)
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
 
Apparel Manufacturing Process
Apparel Manufacturing ProcessApparel Manufacturing Process
Apparel Manufacturing Process
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Garments & garment defects zubair lahore
Garments & garment defects zubair lahoreGarments & garment defects zubair lahore
Garments & garment defects zubair lahore
 
7 wastages
7 wastages7 wastages
7 wastages
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Garment defects
Garment defectsGarment defects
Garment defects
 
Work study
Work studyWork study
Work study
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 

Similar to Standardised work for garment industry- Prakhar Jain

Motion and time study
Motion and time studyMotion and time study
Motion and time study
Seta Wicaksana
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
Shubham Singh
 
project-presentation
project-presentationproject-presentation
project-presentation
ronybste
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
SandipanMaji3
 
SMED overview
SMED overviewSMED overview
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Varsha Chauhan
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
sserwaniko
 
Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]
Hariharan Ponnusamy
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
shakil tutul
 
Training on development of supervisor
Training on development of supervisorTraining on development of supervisor
Training on development of supervisor
MdIslamulHasan
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
Saurabh Jain
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
Margi Shah
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
shayanzafar2
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
RDTCPOLYTECHNICMECHD
 
Standard operations
Standard operationsStandard operations
Standard operations
globalsevensteps
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
Md. Mazadul Hasan Shishir
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IJECSJournal
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
Sasidharan Mohanakrishnan
 

Similar to Standardised work for garment industry- Prakhar Jain (20)

Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
project-presentation
project-presentationproject-presentation
project-presentation
 
Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
 
SMED overview
SMED overviewSMED overview
SMED overview
 
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]Production & Operation Management Chapter15[1]
Production & Operation Management Chapter15[1]
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Training on development of supervisor
Training on development of supervisorTraining on development of supervisor
Training on development of supervisor
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
 
Standard operations
Standard operationsStandard operations
Standard operations
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 

Recently uploaded

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani case
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
YourLegal Accounting
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
BBPMedia1
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
Ksquare Energy Pvt. Ltd.
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
RedSeer
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
➑➌➋➑➒➎➑➑➊➍
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Pro Tips for Effortless Contract Management
Pro Tips for Effortless Contract ManagementPro Tips for Effortless Contract Management
Pro Tips for Effortless Contract Management
Eternity Paralegal Services
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
irhcs
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
Freelance
 

Recently uploaded (20)

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
The Role of White Label Bookkeeping Services in Supporting the Growth and Sca...
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Pro Tips for Effortless Contract Management
Pro Tips for Effortless Contract ManagementPro Tips for Effortless Contract Management
Pro Tips for Effortless Contract Management
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
 

Standardised work for garment industry- Prakhar Jain

  • 1. STANDARDISED WORK -LEAN MANUFACTURING TOOL SUBMITTED BY- PRAKHAR JAIN SUBMITTEDTO- MS. PRATIBHA ER NO.- A2481216003 COURSE- BDES. FT Presented on- 30th sep 2019
  • 2. • Standardized work is one of the most powerful but least used lean tools. By documenting the current best practice, standardized work forms the baseline for kaizen or continuous improvement.As the standard is improved, the new standard becomes the baseline for further improvements, and so on. Improving standardized work is a never-ending process. • Basically, standardized work consists of three elements: • Takt time, which is the rate at which products must be made in a process to meet customer demand. • The precise work sequence in which an operator performs tasks within takt time. • The standard inventory, including units in machines, required to keep the process operating smoothly.
  • 3.
  • 4. TAKT TIME • Takt time is the time in which one part needs to be produced based on available time and customer requirements. • If there are 25,000 production seconds available per shift (8 hours less lunch and breaks) and the customer requires 1000 parts each shift, the takt time would be 25 seconds.This means that a part needs to be produced every 25 seconds in order to keep up with customer demand without working any overtime (the ideal situation). Once takt time is determined, the work sequence and line balancing can be calculated.
  • 5. LINE BALANCING • Line balancing is the next step in standardized work. This will involve time studies of all the different jobs within the process.The concept is that all jobs within an area or line will require the same amount of time to complete (cycle time).The more detail in the time study, the easier it will be to balance work load between operators.
  • 6. EXAMPLE • As an example, there are 5 workers on a production line.The cycle times for each operation are as follows; operator 1 – 20 seconds, operator 2 – 30 seconds, operator 3 – 25 seconds, operator 4 – 23 seconds and operator 5 – 27 seconds. Using the takt time of 25 seconds from our example above, the goal would be to have no job more than 25 seconds and have enough operators in this area so each one would have 25 seconds of work. • In this example, moving 5 seconds of work from operator 2 to 1, and 2 seconds of work from operator 5 to 4 would balance out the work load on this line. Of course, rarely do the times work out like this in real life, however the two basic concepts are to ensure no operator has a cycle time greater than the takt time and have every operation as close in cycle time as possible.
  • 7. A Case Study on Ethiopian Garment Industry • This study consists of conducting time study of sewing operations. By doing this, the sewing operations of single model (militaryT-shirt) were standardized on single production line.To compute standard allowable minutes (SAM) of this model: First, the product was broken down the into nine main operation elements, such as pocket, collar, flap, epaulet, cuff, sleeve, front body and yoke, final assembly and trimming operations. Also these each operation was broken in their sub-operations. • https://www.ijert.org/research/productivity-improvement- through-lean-manufacturing-tools-a-case-study-on- ethiopian-garment-industry-IJERTV3IS090977.pdf
  • 8. • Total 17% allowance factors for all operations were used viz., personal allowance=7%, basic fatigue allowance=4%, sitting allowance=1%, contingency=5%
  • 9.
  • 10. • Using time study, the standard allowable minute (SAM) of a militaryT-shirt model product was fixed to 34.16 min./shirt. After line balancing, the number of labors required to produce equal amount of garment, sewing direct labor cost per production line and per unit and production target is reduced by 24.65% (average),while production capacity, total labor productivity, sewing machine productivity was increased by 30.6% (average), and real line efficiency increased from 55.59% to 83.3%.
  • 11. WORK SEQUENCE • In order to achieve the best quality results every time, the process must be set up in such a way that each operator that performs the job does so in the same manner.The work sequence should contain as much detail as possible. Instruction as to which hand an operation should be performed with may be necessary based on the layout of the components that make up the finished product. By setting up the work sequence, it is easy to observe when something is being done out of order. Be very cautious of sharing a responsibility between operators. Ensure each part of an operation is assigned to only one operator. If one operator performs a process one time and then a different operator perfroms that same process the next time, you leave yourself wide open for a process to be missed.
  • 12. BENEFITS IN GARMENT INDUSTRY • Best method: With standardisation in mind, we are laying emphasis on finding out & documenting the best possible method of performing an operation.This study will help improve a lot of processes and bring down the SAM value or process time. • Assists Rhythm: Because the standardised method has been researched it will assist Rhythm. Rhythm in turn improves the efficiency & reduces confusion. • ReducedTraining time: The standardised process is illustrated in a document clearly which can be used for training,re-training & multiskilling. • Attacks Variability: Pin pointing reason for sudden variation in the result is easier if the work has been standardised. Any deviation from standard method will lead to deviation in result.For example – There is a sudden increase in uneven stitch at the collar top stitch. The quality manager goes to the operation to find out the reason. He observes that the machine is fit with normal pressure foot as opposed to compensated pressure foot mentioned in the standard work document.
  • 13. • Cross FunctionalTeams: In an office if a person repeats the work sequentially the person sitting next to him will automatically learn about his job thus enabling cross functional teams. Also if a work is documented anyone can be asked to fill-in in case of absence.This eliminates dependability of processes on people. • Helps in Continuous Improvement: Standardised works is the key to continuous improvement. Further improvement can only be done to standardised processes. For example: An industrial engineers studied the placement of pins on profile for collar run stitch and mentioned the findings in the standard work document.With time the method was adopted and supervisors had their attention on pins.Later they found out that out of the three one pin can be removed without affecting the quality.Thus saving time in pinning & improving the process further. • Aesthetically pleasing workplace:And Finally Standardised workplace looks better aesthetically than non-standardised workplace.