SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS LOCATED NEAR MĂNĂŞTUR DAM ON THE SOMEŞUL MIC RIVER IN THE CLUJ NAPOCA CITY (ROMÂNIA)
This document proposes an engineering solution to restore longitudinal connectivity and facilitate fish migration upstream and downstream of two spillways near Manastur Dam on the Somesul Mic River in Romania. The solution involves drilling a sloped concrete canal leading fish from below one spillway, along the riverbank, and releasing them above the other spillway. Rest areas would be included to reduce fish fatigue. This solution supports European Union directives on restoring river continuity for fish and ecological status.
Even today part of a roman aqueduct dating back to the 2nd century bc. supplies the city of Rome with water (our proposal to give it still a long file).
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...Răzvan Voicu
IMPROVEMENT OF LATERAL CONNECTIVITY ON HARTIBACIU RIVER.
More Related Content
Similar to SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS LOCATED NEAR MĂNĂŞTUR DAM ON THE SOMEŞUL MIC RIVER IN THE CLUJ NAPOCA CITY (ROMÂNIA)
Even today part of a roman aqueduct dating back to the 2nd century bc. supplies the city of Rome with water (our proposal to give it still a long file).
General solutions to ensure fish fauna passage upstream – downstream of disch...Răzvan Voicu
General solutions to ensure fish fauna passage upstream – downstream of discharge sills!
Similar to SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS LOCATED NEAR MĂNĂŞTUR DAM ON THE SOMEŞUL MIC RIVER IN THE CLUJ NAPOCA CITY (ROMÂNIA) (20)
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...Răzvan Voicu
The issue of ecological restoration of water courses is a matter of public interest and has emerged as a consequence of human impact caused by the following factors:
industrialization, urbanization, agricultural and livestock activities, exploitation of
riverbeds materials, adjustment and embankment works etc.
The application of measures on restoring ecological status / potential of
deteriorated lotic systems, in accordance with W.F.D. (2000/60/EC) presents a
significant contribution to restoring functions (e.g. provisioning, regulating, supporting,
cultural) and implicitly services generated (ex. water quality) by the ecological systems
of natural capital.
2
The purpose of this paper is to propose solutions to renaturating the banks of the
PeŃa Creek, specifically in the river sector: PeŃa -> confluence to Hidisel creek –
discharging into the Crisul Repede River (L = 12.7 km) wich has been designated as
body of water heavily modified, in Crisuri River Area Management Plan. Considering
that this deteriorated sector has a moderate ecological potential, the objective is
restoring its ecological potential from moderate to good level in accordance with the
requirements of the WFD 2000/60 / EC.
In order to achieve its purpose in this paper, there was a detailed analysis of the
study area (documentation, field trips, analyzing data on biocenosis and water quality
and and data analysis to justify the designation of the body of water heavily modified)
and a river sector was selected in the unincorporated area of Oradea, Sânmartin
Village, Bihor County. This river sector has a length of 100 meters and has undergone
transformation as a result the regularization made in 1978.
Also, as mentioned above, the bio-engineering solutions proposed have local
character, and should be coupled with suitable m
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS LOCATED NEAR MĂNĂŞTUR DAM ON THE SOMEŞUL MIC RIVER IN THE CLUJ NAPOCA CITY (ROMÂNIA)
2. 44
Keywords: fish migration, Someşul Mic River, longitudinal connectivity, spillways, lotic
ecosystem.
1.INTRODUCTION
To ensure the fish migration upstream and downstream the
spillways and to the Mănăstur Dam restore in the local area the longitudinal
connectivity of the of the Somesul Mic river.
“Habitat diversity resulting directly from fluvial dynamics is
increased through a combination of different types of hydrological
connectivity. Three kinds of hydrological connectivity may be distinguished
according to the water origin: (1) river water (permanent connections at
both ends, permanent connection only downstream, and temporary
connection occurring only during high river stages and floods); (2)
groundwater from river infiltration (seepage within the alluvial aquifer);
and (3) groundwater from hillslope aquifers” (Amoros & Bornette 2002).
The issue of ecological restoration of water courses is a matter of
public interest and has emerged as a result of the effects of human impact
caused by the following factors: industrialization, urbanization, agricultural
and zootechnical activities, and hydro-morphological pressures. Rivers
restoration includes a large variety of methods, mainly aimed to restore the
natural functions of rivers altered after anthropic interventions. (Voicu &
Bretcan, 2014).
2.RESULTS AND DISCUSSIONS
The two spillways sills (fig.1) are located near Mănăştur dam (fig.2)
downstream of the dam within 200 meters of it. Since migratory fish were
found in the area (the barbel and the common nase) (Banarescu, 1964) some
engineering solutions should be proposed to facilitate fish passage over the
two spillway sills (Diaconu, 1999) (fig. 3). We have proposed a solution
(Solution for Fish Migration on the Someşul Mic River upstream –
downstream of in Cluj Napoca (Voicu & Bretcan, 2014) for helping fish
cross over Mănăştur Dam and improving the existing fish scale (fig.1 and
fig. 2).
3. 45
Figure 1 The two spillway sills photo Figure 2 Mănăştur Dam, Cluj Napoca
(ABA Somes – Tisa) (ABA Someş – Tisa)
spillway sill II
spillway sill I
Figure 3 Positioning the two spillway sills in relation to dam Mănăştur Dam
A practical solution must be implemented on the left side, both
within and outside the concrete (fig. 4). A rectangular canal with a slope of
about 3.5 ‰, smaller than the slope of the river, whose slope is over 4.3 ‰,
is drilled three meters upstream from the nearest spillway sill (spillway sill
II) on Mănăştur dam. This canal drilled in the bank may be semicircular or
rectangular and forms a semicircle with a 6 meters diameter (fig.5). The
spillway sill I
spillway sill II
inoperable fish passage
4. 46
water speed downstream of Mănăştur dam is about 1m/s and river slope is
0.43 percent (%). The water flow is of about 5.5 m3
/s.
spillway sill II
concrete left bank
Figure 4 The second spillway sill and concrete left bank
ditch not covered by concrete
bank of the Someşul Mic River
the second spillway sill
concrete slabs
6m
Figure 5 Drilling a canal (ditch) within the left bank– indicative scheme
5. 47
After concreting the canal or the semicircular ditch, another
rectangular canal for helping fish migration is fixed inside the ditch, which
opens from the top. The canal will be made of concrete (high quality
without roughness) and will have the same slope as the ditch forementioned,
that is less than the slope of the river in that area (fig. 6).
left bank of the Someşul Mic River
concrete ditch concrete slabs
the second spillway sill
canal for fish migration
concrete ditch
left bank of the river
bank of the Someşul Mic River
Figure 6 Positioning the concrete canal for fish migration within the concrete
ditch– indicative scheme
The canal for fish migration is 43cm wide and 40cm high. At the
beginning of the canal, above the water level, there is a semicircular metal
bar redirecting the floating elements towards the spillway sill (fig.7). The
canal (module M1) will raise up to approx. 30 cm above the water level. The
canal will turn to the left in a semicircle (fig. 8 Positioning module M1).
6. 48
canal for fish migration
metal bar redirecting the floating elements
resistant glass
canal for fish migration
Figure 7 Positioning the metal bar redirecting the floating elements– indicative
scheme
Thus, the canal for fish migration (module M2) will continue its
journey over the water level up to 3 meters from the first spillway sill,
where it penetrates the bank again. There it will have a different height (one
meter) whereas the width remains the same (40cm). It preserves the same
semicircle form (module M3), has a 6 m diameter, whereas the distance to
the spillway sill is 3 meters (fig. 9).
Because it is two times deeper than the other modules of the canal
(fig. 10) for fish migration, the last M3 semicircular module will raise
directly from the bank into the Somesul Mic River. Filling the last M3
module will be also done by using a pipe that captures water from the
Mănăstur storage lake (fig. 9).
7. 49
left bank of the Someşul Mic River
concrete ditch concrete slabs
the second spillway sill
canal for fish migration
resistant glass
Someşul Mic River
M1
M2
Figure 8 Positioning module M1– indicative scheme
In these circumstances the last module will be completely full and
will discharge water directly into the Someșul Mic River, allowing fish to
migrate upstream of the two spillway sills. In front of the pipe supplying the
module M3 with water from Mănăştur Lake there is a metallic grating
which prevents the fish from penetrating inside, and also dissipates the
waterstream (fig.10). Both M1 and M3 modules are provided with very
8. 50
resistant protection glass on their tops (fig.11). In order to migrate within
the canal, the fish must have light of the same intensity as the natural one.
Waterproof and energy-saving lighting systems are the most common and
used (LED lighting). For M1 and M3 modules, at both the entrance and exit
of the concrete bank, inside the canal for fish migration, there are sensors
that light the bulbs fixed to the concrete walls supporting the horizontal
transparent glass (fig. 11).
metal pipe supplying the M3 module
M2
M1
M3
Someşul Mic River
Figure 9 Positioning M2 module – indicative scheme
9. 51
metal door that allows access to module M3
metal hinges
resistant glass
metal ladder
water pipe for supplying module M3
Somesul Mic River
M2
M3
metal grating
Figure 10 Direct connection between module M3 and the Somesul Mic River –
indicative scheme
resistant glass
river bank river bank
canal for fish migration sensor for ichthyofauna
concrete ditch
metal pipe supplying the M3 module
artificial light
source
metal grating
Figure 11 Positioning the glass in the upper part of the modules M1 and M3–
indicative scheme
10. 52
Module 2 is made of rectangular parallelepiped rest areas (fig. 12) 14
cm depth.
metal door
metal hinges
door locking system
ichtyofauna resting area (refuge)
Figure 12 Positioning the refuge areas in the module M2 – indicative scheme
Given that Module 2 is about 40 meters, (all the computation will be
done after receiving the final acceptance on the project) three ichthyofauna
resting areas are required. Every resting area is about 14 cm deep, 4 m long
and approximately 1m wide. The thickness of the modules and resting
places for fish fauna is 3cm. Module 2 is fixed both in the river bed and the
banks by the means of some metal bars (fig.13).
11. 53
left bank
concrete canal for fish migration (M2)
M2 metal bar
metal bar
Someşul Mic River
Figure 13 Positioning Module 2 for ichthyofauna migration, – indicative
scheme
Above, Module M2 is provided with a metal grille having two
doors, which are fixed on metal hinges for solving various technical
problems (fig. 14). Circular visiting doors provided with protective metal
grille can also be found in the circular ditches. The access to the modules
M1 and M3 is done directly by some vertical concrete ditches equipped with
metal stairs (fig10).
12. 54
ichtyofauna resting area (refuge)
metal grating
metal grating
metal door
metal hinges
door locking system
M2
Figure 14 Positioning the metal door within the Module M2 – indicative
scheme
CONCLUSIONS
The biggest advantage of this solution is that it can adjust (calculate)
the slope of the canal for fish migration as much as needed because the
module M2 is suspended and it can be positioned so that the slope of the
canal to be smaller than that of the Someşul Mic River. The surfaces of the
three modules (M1, M2 and M3) are not ribbed and so, they cannot hurt fish
because they are perfectly smooth. Another advantage of this solution is that
the Module M3 penetrates directly into the river bed, therefore it is not
necessary to create another module to take water flow from the module M3
and thus hinder the fish passage over the two spillway sills. Water
circulation through all three modules and also through the pipe that supplies
the module M3 is performed gravitationally, thus saves energy except from
the sources of indoor lighting. In case of large floods which discharge over
Mănăştur dam large amounts of water, they can only damage, in the worst
case, the module M2 that can be replaced quickly. Both execution and
maintenance costs are average, which gives the advantage to be applied
anywhere in the world.
13. 55
REFERENCE
Amoros C. & Bornette G. 2002, Connectivity and biocomplexity in
waterbodies of riverine floodplains. Freshwater Biology, 47: 763.
Bănărescu, P. 1964, Fauna of P.R.R.. Academy Edition, Bucharest, (in
Romanian).
Diaconu S. 1999, Cursuri de apa. Amenajare, impact, Reabilitare, Editura
*H*G*A, Bucuresti.
Planul national de amenajare a bazinelor hidrografice din Romania,
Sinteza versiune revizuita, Administratia Nationala "Apele Romane",
Februarie 2013.
Voicu R. & Bretcan P. 2014, Solution For Fish Migration On The Someşul
Mic River Upstream – Downstream Of Mănăştur Dam In Cluj Napoca,
Annals of Valahia University of Targoviste. Geographical Series,
14(2): 125-132