Solutions to ichthyofauna migration upstream – downstream of the discharge sill in 
the neighborhood of Dacia Bridge, the city of Oradea 
Ph.d Răzvan Voicu 
getiiliberi@gmail.com, rzvnvoicu@yahoo.com, 
Solution I 
There are lots of discharge sills in the town of Oradea, namely: Centre Hall, CFR 
bridge, Dacia Bridge etc., that inhibit migration of ichthyofauna. Through this study, I 
propose two solutions to ichthyofauna migration upstream – downstream of the discharge 
sill in the neighborhood of Dacia Bridge (fig.1). 
first buttress second buttress left bank abutment 
discharge sill first sluiceway second sluiceway 
the Crisul Repede River 
Figure 1 Discharge sill in the neighborhood of Dacia Bridge 
The first solution to ichthyofauna migration upstream – downstream of the Crisul 
Repede River is to build a parallelepiped rectangular metallic basin provided with a side 
canal(fig. 2).
side canal 
mobile basin 
Figure 2 Positioning rectangular parallelepiped provided with a side canal-indicative 
scheme 
The dimensions of the basin that captures ichthyofauna downstream of the 
discharge sill are calculated based on the water level downstream of the discharge sill. 
Apart from the horizontal surface on a higher plane (metal grid), all other surfaces that 
form the rectangular parallelepiped are compact surfaces (fig.3). 
basin for ichthyofauna migration 
Figure 3 Positioning the basin for ichthyofauna migration- indicative scheme 
The basin for ichthyofauna migration is provided with a loophole in the vertical 
surface and than a rectangular canal (fig. 4).
canal 
Figure 4 Loophole in the vertical surface- indicative scheme 
Three areas of the basin are equipped with automatic opening and closing 
windows allowing the ichthyofauna entering this basin (fig.5). 
windows allowing the ichthyofauna entering this basin 
Figure 5 Position of the window for ichthyofauna entering the basin- indicative scheme 
On the outside, the mobile basin is equipped with two telescopic hydraulic 
cylinders so that the basin can be lifted above the discharge sill (fig.6).
ichthyofauna basin 
the Crisul Repede River 
discharge sill 
telescopic hydraulic cylinders 
Figure 6 Position of the telescopic hydraulic cylinders - indicative scheme 
In order for the ichthyofauna in the mobile basin to migrate above the discharge 
sill in the neighborhood of Dacia Bridge, a rectangular channel for ichthyofauna 
migration must be fixed to the discharge sill using metal hinges (fig.7).
the Crisul Repede River metal hinges 
rectangular canal 
discharge sill 
telescopic hydraulic cylinder 
the Crisul Repede River 
Figure 7 Fixing the rectangular canal for ichthyofauna migration using metal hinges-indicative 
scheme 
At the end of the rectangular canal where no metal hinges are provided, a bearing 
and a telescopic hydraulic cylinder are fixed by two metal bars (fig. 8).
bearing 
rectangular canal 
bearing 
metal bar 
discharge sill telescopic hydraulic cylinder 
Figure 8 Fixing telescopic hydraulic cylinder- indicative scheme 
The rectangular canal reaches the Crisul Repede River downstream of the 
discharge sill, being able to undertake the ichthyofauna coming down. But this channel is 
designed specifically to undertake the ichthyofauna in the rectangular basin (fig.9). One 
of telescopic hydraulic cylinders has a higher lifting degree than the other so that the 
mobile basin will slide to the loophole built into one of the vertical surfaces of the mobile 
basin. In the top of the other telescopic hydraulic cylinder is an metal spiral arc for the 
movement of the ichthyofauna basin. The loophole is provided with a window that opens 
automatically when the second telescopic hydraulic cylinder reaches the maximum point. 
All ichthyofauna will be taken by the rectangular canal provided with metal hinges.
ichthyofauna basin 
the Crisul Repede River 
discharge sill 
The Crisul Repede River 
the Crisul Repede River 
telescopic hydraulic cylinders 
metal hinges 
Figure 9 The general scheme of the ichthyofauna migration system- indicative scheme 
According to the (fig.9), the connection between the canal of the mobile basin for 
ichthyofauna migration and the rectangular canal fixed on the discharge sill is perfect due 
to mobility of the two canals. The slope between the two channels is required by the 
migratory fish species but, is generally the local slope of the Crisul Repede River. The 
solution can be successfully applied anywhere in the world.
Solution II 
Another possibility for the migratory ichthyofauna in the Crisul Repede River to 
cross the discharge sill upstream – downstream is to create a sliding winch system. Two 
cables are passed over the winchs supporting two basing on both sides of the discharge 
sill in the neighborhood of Dacia Bridge (fig.1). 
basin B2 for ichthyofauna 
metal cable winchs 
basin B1 for ichthyofauna 
semicircular tubes supporting 
the basin B1 for ichthyofauna 
the Crisul Repede River 
discharge sill 
metal bar supporting the basin B1 for ichthyofauna 
metal bar supporting the basin B2 for ichthyofauna 
Figure 1 Supporting the basins on both sides of the discharge sill- indicative scheme 
The basins B1 and B2 are attached to the bars by means of some semicircular 
tubes sliding on these bars(fig.2).
metal bar supporting the basin B1 for ichthyofauna 
semicircular tube welding 
metal bar 
Figure 2 System fixing the metal bar supporting the basin B1for ichthyofauna to the 
discharge sill- indicative scheme 
The basin B1 is fixed to the two support bars by the means of two other metal 
bars welded to four semicircular tubes (fig 3). 
basin B1 for ichthyofauna migration 
semicircular tube 
metal bars supporting the basin B1 
system fixing the ichthyofauna basin B1 to the metal bar 
Figure 3 System fixing the ichthyofauna basin B1 to the metal bars by the means of 
some semicircular tubes - indicative scheme
The same fixing system is used for basin B2 except that the fixing system 
connecting the metal bar to the basin B2 is made of two horizontal bars (fig. 4). 
metal bars supporting the basin B2 
the basin B2 
semicircular tube 
fixing system connecting the metal bar to the basin B2 for ichthyofauna 
Figure 4 Fixing system connecting the basin B2 to the metal bars by the means of the 
semicircular tubes- indicative scheme 
The basin B2 is also fixed to two telescopic hydraulic cylinders designed to lift 
the basin B2 above the discharge sill in the neighborhood of Dacia Bridge (fig.5).
semicircular tube the basin B2 
discharge sill 
telescopic hydraulic cylinder 
telescopic hydraulic cylinders 
Figure 5 Fixing the basin B2 to the telescopic hydraulic cylinders- indicative scheme 
A metal pile provided with hinges at the bottom is attached to the surface near the 
discharge sill on the basin B2 (fig.6).
basin B2 
metal pile 
metal hinges 
electric motor 
the Crisul Repede River 
discharge sill the Crisul Repede River 
telescopic hydraulic cylinder 
Figure 6 Position the metal pile and electric motor positioning- indicative scheme 
When the basin reaches the maximum level, an electric motor attached to a 
surface of the basin B2 opens the pile that reaches the Crisul Repede River. When the 
metal pile has been folded completely and being parallel to the discharge sill, then the 
window for ichthyofauna access can be folded vertically (fig.7). Thus all the 
ichthyofauna in the basin B2 goes downstream of the discharge sill. The access window
for ichthyofauna is situated between the two pulleys. During this time, the basin B1 sinks 
into the Crisul Repede River because the two basins are connected by some metal wires. 
basin B2 
window for ichthyofauna discharge 
the Crisul Repede River 
electric motor 
metal hinges 
discharge sill the Crisul Repede River 
telescopic hydraulic cylinder 
Figure 7 Water discharge system from the basin B2- indicative scheme 
Thus all the ichthyofauna in the basin B2 goes downstream of the discharge sill. 
The access window for ichthyofauna is situated between the two winchs. During this
time, the basin B1 sinks into the Crisul Repede River because the two basins are 
connected by some metal wires.In order to help ichthyofauna go upstream the discharge 
sill we use the mobile basin B1. Being fixed to the basin B2 by metal cables, the basin B1 
will slide on the metal bars when the basin B2 sinks totally into the Crisul Repede River 
(fig.8). Due to the electric motor attached to the first buttress, the telescopic hydraulic 
cylinders fold until they reach the minimum level (fig. 8). When the telescopic hydraulic 
cylinders reach the minimum level, the basin B1 reaches the maximum level. 
winchs 
basin B1 
access window for ichthyofauna 
basin B2 
the Crisul Repede River 
discharge sill the Crisul Repede River 
telescopic hydraulic cylinder 
Figure 8 The maximum level of the basin B1- indicative scheme
windows for ichthyofauna access 
basin B1 
window for ichthyofauna discharge 
electric motor 
the Crisul Repede River 
discharge sill the Crisul Repede River 
Figure 9 Positioning the electric motor- indicative scheme 
On similar terms, the basin B1 is provided with a metal pile redirecting the 
ichthyofauna and also with a window for ichthyofauna discharge. Both are driven by an 
electric motor attached to the basin B1 (fig.9). Both B1 and B2 mobile basins are 
provided with some windows for ichthyofauna access, other than for ichthyofauna 
discharge. Ichthyofauna is guided towards both basins B1 and B2 by the means of some 
electromagnetic field generators set in the ground or on floating systems (fig. 10). 
These generators will operate separately depending on the period of ichthyofauna 
migration. When the basin B1 automatically moves, the generators of the basin B2 switch
off, and when the basin B2 automatically moves, the generators for the basin B1 switch 
off. When there is no migration, the two basins will remain steady into the Crisul Repede 
River. If there is no more ithtiofauna left, the whole system can be disassembled and 
reassembled, then and can be also used for other discharge sills successfully. 
.
window for ichthyofauna discharge 
electromagnetic field generators 
windows for ichthyofauna access 
metal grid 
B2 
windows for ichthyofauna access 
window for ichthyofauna discharge 
electromagnetic field generators 
metal grid 
discharge sill 
the Crisul Repede River 
Figure 10 Positioning the electromagnetic field generators- indicative scheme
A generator using the energy provided from the Crisul Repede River can be 
arranged on the discharge sill so that if operating a system for ithtiofauna migration less 
power from other sources to be consumed. In order to stop the migratory species crossing 
the discharge sill without reaching the basin B2, a metal grid shall be fixed on the edge of 
the discharge sill (upstream) (fig.10). When migrating, the fish will gather in front of the 
metal grid and, therefore, the basin B2 will catch as many fish as possible so that the 
migration process can be carried out normally. The solution can be successfully applied 
anywhere in the world.

More Related Content

What's hot

Suggested fine-tuning of bridge and park designs to best activate the Provide...
Suggested fine-tuning of bridge and park designs to best activate the Provide...Suggested fine-tuning of bridge and park designs to best activate the Provide...
Suggested fine-tuning of bridge and park designs to best activate the Provide...Barnaby Evans
 
Railwaypcyby K R Thanki
Railwaypcyby K R ThankiRailwaypcyby K R Thanki
Railwaypcyby K R ThankiKrunal Thanki
 
Canal outlets
Canal outletsCanal outlets
Canal outletssaibabu48
 
Drainsandsewers unit7 By K R Thanki
Drainsandsewers unit7 By K R Thanki Drainsandsewers unit7 By K R Thanki
Drainsandsewers unit7 By K R Thanki Krunal Thanki
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects City of Corona
 
water surveys and designs
water surveys and designswater surveys and designs
water surveys and designsStephen Musimba
 
Undergraduate Portfolio
Undergraduate PortfolioUndergraduate Portfolio
Undergraduate PortfolioCourynn Waryn
 

What's hot (8)

Suggested fine-tuning of bridge and park designs to best activate the Provide...
Suggested fine-tuning of bridge and park designs to best activate the Provide...Suggested fine-tuning of bridge and park designs to best activate the Provide...
Suggested fine-tuning of bridge and park designs to best activate the Provide...
 
Railwaypcyby K R Thanki
Railwaypcyby K R ThankiRailwaypcyby K R Thanki
Railwaypcyby K R Thanki
 
CE460Final-2
CE460Final-2CE460Final-2
CE460Final-2
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Drainsandsewers unit7 By K R Thanki
Drainsandsewers unit7 By K R Thanki Drainsandsewers unit7 By K R Thanki
Drainsandsewers unit7 By K R Thanki
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
 
water surveys and designs
water surveys and designswater surveys and designs
water surveys and designs
 
Undergraduate Portfolio
Undergraduate PortfolioUndergraduate Portfolio
Undergraduate Portfolio
 

Similar to Solution to ichthyofauna migration razvan voicu-2013

General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...Răzvan Voicu
 
Dambovita river, fish passage solution!
Dambovita river, fish passage solution!Dambovita river, fish passage solution!
Dambovita river, fish passage solution!Răzvan Voicu
 
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!Răzvan Voicu
 
Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!Răzvan Voicu
 
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu
 
Bârlad river restoration!
Bârlad river restoration!Bârlad river restoration!
Bârlad river restoration!Răzvan Voicu
 
Hydraulic Turbines
Hydraulic TurbinesHydraulic Turbines
Hydraulic Turbinesroy159
 
Removing the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRemoving the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRăzvan Voicu
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringLatif Hyder Wadho
 
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...Răzvan Voicu
 
canal drainage works icluding component for canals pdf
canal drainage works icluding component for canals pdfcanal drainage works icluding component for canals pdf
canal drainage works icluding component for canals pdfAyushsharma131736
 
Flow through nozzel_AMIT
Flow through nozzel_AMITFlow through nozzel_AMIT
Flow through nozzel_AMITAmit Sharma
 
Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Răzvan Voicu
 
160120119032 2141906
160120119032 2141906160120119032 2141906
160120119032 2141906Bhavesh Jain
 

Similar to Solution to ichthyofauna migration razvan voicu-2013 (20)

General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...
 
Dambovita river, fish passage solution!
Dambovita river, fish passage solution!Dambovita river, fish passage solution!
Dambovita river, fish passage solution!
 
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!
Ecotechnical method V Isalnita dam! Răzvan Voicu,2012!
 
Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!
 
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
 
Bârlad river restoration!
Bârlad river restoration!Bârlad river restoration!
Bârlad river restoration!
 
MATERIAL #2 IRRIGATION PDF.pdf
MATERIAL #2 IRRIGATION PDF.pdfMATERIAL #2 IRRIGATION PDF.pdf
MATERIAL #2 IRRIGATION PDF.pdf
 
Hydraulic Turbines
Hydraulic TurbinesHydraulic Turbines
Hydraulic Turbines
 
Removing the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRemoving the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi river
 
Hydroelectric power plants (chapter 5)
Hydroelectric power plants   (chapter 5)Hydroelectric power plants   (chapter 5)
Hydroelectric power plants (chapter 5)
 
Asdso
AsdsoAsdso
Asdso
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil Engineering
 
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
 
canal drainage works icluding component for canals pdf
canal drainage works icluding component for canals pdfcanal drainage works icluding component for canals pdf
canal drainage works icluding component for canals pdf
 
Flow through nozzel_AMIT
Flow through nozzel_AMITFlow through nozzel_AMIT
Flow through nozzel_AMIT
 
Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!
 
160120119032 2141906
160120119032 2141906160120119032 2141906
160120119032 2141906
 
Hydrolic Power Plant
Hydrolic Power PlantHydrolic Power Plant
Hydrolic Power Plant
 
201610204
201610204201610204
201610204
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 

More from Răzvan Voicu

FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...Răzvan Voicu
 
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...Răzvan Voicu
 
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...Răzvan Voicu
 
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...Răzvan Voicu
 
Fish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWFish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWRăzvan Voicu
 
Msd10.2478 volume10 issue-2_01paper
Msd10.2478  volume10 issue-2_01paperMsd10.2478  volume10 issue-2_01paper
Msd10.2478 volume10 issue-2_01paperRăzvan Voicu
 
Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Răzvan Voicu
 
Fish passage system!
Fish passage system!Fish passage system!
Fish passage system!Răzvan Voicu
 
Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Răzvan Voicu
 
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...Răzvan Voicu
 
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...Răzvan Voicu
 
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
Razvan voicu  fish passage 2015 - agnita and manastur ii+iiiRazvan voicu  fish passage 2015 - agnita and manastur ii+iii
Razvan voicu fish passage 2015 - agnita and manastur ii+iiiRăzvan Voicu
 
Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Răzvan Voicu
 
Socializarea prin raportul banilor 2.2 - 2011!
Socializarea prin raportul banilor 2.2   - 2011!Socializarea prin raportul banilor 2.2   - 2011!
Socializarea prin raportul banilor 2.2 - 2011!Răzvan Voicu
 
Erosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuErosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuRăzvan Voicu
 
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!Răzvan Voicu
 
Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Răzvan Voicu
 
Hydraulic structures and bioengineering for rivers!1
Hydraulic structures and bioengineering for rivers!1Hydraulic structures and bioengineering for rivers!1
Hydraulic structures and bioengineering for rivers!1Răzvan Voicu
 
Jijia river restoration! Article!
Jijia river restoration! Article!Jijia river restoration! Article!
Jijia river restoration! Article!Răzvan Voicu
 

More from Răzvan Voicu (20)

FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
 
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
 
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
 
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
 
Fish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWFish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOW
 
Msd10.2478 volume10 issue-2_01paper
Msd10.2478  volume10 issue-2_01paperMsd10.2478  volume10 issue-2_01paper
Msd10.2478 volume10 issue-2_01paper
 
Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!
 
Fish passage system!
Fish passage system!Fish passage system!
Fish passage system!
 
Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!
 
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
 
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
 
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
Razvan voicu  fish passage 2015 - agnita and manastur ii+iiiRazvan voicu  fish passage 2015 - agnita and manastur ii+iii
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
 
Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!
 
Ecologie!
Ecologie!Ecologie!
Ecologie!
 
Socializarea prin raportul banilor 2.2 - 2011!
Socializarea prin raportul banilor 2.2   - 2011!Socializarea prin raportul banilor 2.2   - 2011!
Socializarea prin raportul banilor 2.2 - 2011!
 
Erosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuErosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan Voicu
 
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
 
Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2
 
Hydraulic structures and bioengineering for rivers!1
Hydraulic structures and bioengineering for rivers!1Hydraulic structures and bioengineering for rivers!1
Hydraulic structures and bioengineering for rivers!1
 
Jijia river restoration! Article!
Jijia river restoration! Article!Jijia river restoration! Article!
Jijia river restoration! Article!
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

Solution to ichthyofauna migration razvan voicu-2013

  • 1. Solutions to ichthyofauna migration upstream – downstream of the discharge sill in the neighborhood of Dacia Bridge, the city of Oradea Ph.d Răzvan Voicu getiiliberi@gmail.com, rzvnvoicu@yahoo.com, Solution I There are lots of discharge sills in the town of Oradea, namely: Centre Hall, CFR bridge, Dacia Bridge etc., that inhibit migration of ichthyofauna. Through this study, I propose two solutions to ichthyofauna migration upstream – downstream of the discharge sill in the neighborhood of Dacia Bridge (fig.1). first buttress second buttress left bank abutment discharge sill first sluiceway second sluiceway the Crisul Repede River Figure 1 Discharge sill in the neighborhood of Dacia Bridge The first solution to ichthyofauna migration upstream – downstream of the Crisul Repede River is to build a parallelepiped rectangular metallic basin provided with a side canal(fig. 2).
  • 2. side canal mobile basin Figure 2 Positioning rectangular parallelepiped provided with a side canal-indicative scheme The dimensions of the basin that captures ichthyofauna downstream of the discharge sill are calculated based on the water level downstream of the discharge sill. Apart from the horizontal surface on a higher plane (metal grid), all other surfaces that form the rectangular parallelepiped are compact surfaces (fig.3). basin for ichthyofauna migration Figure 3 Positioning the basin for ichthyofauna migration- indicative scheme The basin for ichthyofauna migration is provided with a loophole in the vertical surface and than a rectangular canal (fig. 4).
  • 3. canal Figure 4 Loophole in the vertical surface- indicative scheme Three areas of the basin are equipped with automatic opening and closing windows allowing the ichthyofauna entering this basin (fig.5). windows allowing the ichthyofauna entering this basin Figure 5 Position of the window for ichthyofauna entering the basin- indicative scheme On the outside, the mobile basin is equipped with two telescopic hydraulic cylinders so that the basin can be lifted above the discharge sill (fig.6).
  • 4. ichthyofauna basin the Crisul Repede River discharge sill telescopic hydraulic cylinders Figure 6 Position of the telescopic hydraulic cylinders - indicative scheme In order for the ichthyofauna in the mobile basin to migrate above the discharge sill in the neighborhood of Dacia Bridge, a rectangular channel for ichthyofauna migration must be fixed to the discharge sill using metal hinges (fig.7).
  • 5. the Crisul Repede River metal hinges rectangular canal discharge sill telescopic hydraulic cylinder the Crisul Repede River Figure 7 Fixing the rectangular canal for ichthyofauna migration using metal hinges-indicative scheme At the end of the rectangular canal where no metal hinges are provided, a bearing and a telescopic hydraulic cylinder are fixed by two metal bars (fig. 8).
  • 6. bearing rectangular canal bearing metal bar discharge sill telescopic hydraulic cylinder Figure 8 Fixing telescopic hydraulic cylinder- indicative scheme The rectangular canal reaches the Crisul Repede River downstream of the discharge sill, being able to undertake the ichthyofauna coming down. But this channel is designed specifically to undertake the ichthyofauna in the rectangular basin (fig.9). One of telescopic hydraulic cylinders has a higher lifting degree than the other so that the mobile basin will slide to the loophole built into one of the vertical surfaces of the mobile basin. In the top of the other telescopic hydraulic cylinder is an metal spiral arc for the movement of the ichthyofauna basin. The loophole is provided with a window that opens automatically when the second telescopic hydraulic cylinder reaches the maximum point. All ichthyofauna will be taken by the rectangular canal provided with metal hinges.
  • 7. ichthyofauna basin the Crisul Repede River discharge sill The Crisul Repede River the Crisul Repede River telescopic hydraulic cylinders metal hinges Figure 9 The general scheme of the ichthyofauna migration system- indicative scheme According to the (fig.9), the connection between the canal of the mobile basin for ichthyofauna migration and the rectangular canal fixed on the discharge sill is perfect due to mobility of the two canals. The slope between the two channels is required by the migratory fish species but, is generally the local slope of the Crisul Repede River. The solution can be successfully applied anywhere in the world.
  • 8. Solution II Another possibility for the migratory ichthyofauna in the Crisul Repede River to cross the discharge sill upstream – downstream is to create a sliding winch system. Two cables are passed over the winchs supporting two basing on both sides of the discharge sill in the neighborhood of Dacia Bridge (fig.1). basin B2 for ichthyofauna metal cable winchs basin B1 for ichthyofauna semicircular tubes supporting the basin B1 for ichthyofauna the Crisul Repede River discharge sill metal bar supporting the basin B1 for ichthyofauna metal bar supporting the basin B2 for ichthyofauna Figure 1 Supporting the basins on both sides of the discharge sill- indicative scheme The basins B1 and B2 are attached to the bars by means of some semicircular tubes sliding on these bars(fig.2).
  • 9. metal bar supporting the basin B1 for ichthyofauna semicircular tube welding metal bar Figure 2 System fixing the metal bar supporting the basin B1for ichthyofauna to the discharge sill- indicative scheme The basin B1 is fixed to the two support bars by the means of two other metal bars welded to four semicircular tubes (fig 3). basin B1 for ichthyofauna migration semicircular tube metal bars supporting the basin B1 system fixing the ichthyofauna basin B1 to the metal bar Figure 3 System fixing the ichthyofauna basin B1 to the metal bars by the means of some semicircular tubes - indicative scheme
  • 10. The same fixing system is used for basin B2 except that the fixing system connecting the metal bar to the basin B2 is made of two horizontal bars (fig. 4). metal bars supporting the basin B2 the basin B2 semicircular tube fixing system connecting the metal bar to the basin B2 for ichthyofauna Figure 4 Fixing system connecting the basin B2 to the metal bars by the means of the semicircular tubes- indicative scheme The basin B2 is also fixed to two telescopic hydraulic cylinders designed to lift the basin B2 above the discharge sill in the neighborhood of Dacia Bridge (fig.5).
  • 11. semicircular tube the basin B2 discharge sill telescopic hydraulic cylinder telescopic hydraulic cylinders Figure 5 Fixing the basin B2 to the telescopic hydraulic cylinders- indicative scheme A metal pile provided with hinges at the bottom is attached to the surface near the discharge sill on the basin B2 (fig.6).
  • 12. basin B2 metal pile metal hinges electric motor the Crisul Repede River discharge sill the Crisul Repede River telescopic hydraulic cylinder Figure 6 Position the metal pile and electric motor positioning- indicative scheme When the basin reaches the maximum level, an electric motor attached to a surface of the basin B2 opens the pile that reaches the Crisul Repede River. When the metal pile has been folded completely and being parallel to the discharge sill, then the window for ichthyofauna access can be folded vertically (fig.7). Thus all the ichthyofauna in the basin B2 goes downstream of the discharge sill. The access window
  • 13. for ichthyofauna is situated between the two pulleys. During this time, the basin B1 sinks into the Crisul Repede River because the two basins are connected by some metal wires. basin B2 window for ichthyofauna discharge the Crisul Repede River electric motor metal hinges discharge sill the Crisul Repede River telescopic hydraulic cylinder Figure 7 Water discharge system from the basin B2- indicative scheme Thus all the ichthyofauna in the basin B2 goes downstream of the discharge sill. The access window for ichthyofauna is situated between the two winchs. During this
  • 14. time, the basin B1 sinks into the Crisul Repede River because the two basins are connected by some metal wires.In order to help ichthyofauna go upstream the discharge sill we use the mobile basin B1. Being fixed to the basin B2 by metal cables, the basin B1 will slide on the metal bars when the basin B2 sinks totally into the Crisul Repede River (fig.8). Due to the electric motor attached to the first buttress, the telescopic hydraulic cylinders fold until they reach the minimum level (fig. 8). When the telescopic hydraulic cylinders reach the minimum level, the basin B1 reaches the maximum level. winchs basin B1 access window for ichthyofauna basin B2 the Crisul Repede River discharge sill the Crisul Repede River telescopic hydraulic cylinder Figure 8 The maximum level of the basin B1- indicative scheme
  • 15. windows for ichthyofauna access basin B1 window for ichthyofauna discharge electric motor the Crisul Repede River discharge sill the Crisul Repede River Figure 9 Positioning the electric motor- indicative scheme On similar terms, the basin B1 is provided with a metal pile redirecting the ichthyofauna and also with a window for ichthyofauna discharge. Both are driven by an electric motor attached to the basin B1 (fig.9). Both B1 and B2 mobile basins are provided with some windows for ichthyofauna access, other than for ichthyofauna discharge. Ichthyofauna is guided towards both basins B1 and B2 by the means of some electromagnetic field generators set in the ground or on floating systems (fig. 10). These generators will operate separately depending on the period of ichthyofauna migration. When the basin B1 automatically moves, the generators of the basin B2 switch
  • 16. off, and when the basin B2 automatically moves, the generators for the basin B1 switch off. When there is no migration, the two basins will remain steady into the Crisul Repede River. If there is no more ithtiofauna left, the whole system can be disassembled and reassembled, then and can be also used for other discharge sills successfully. .
  • 17. window for ichthyofauna discharge electromagnetic field generators windows for ichthyofauna access metal grid B2 windows for ichthyofauna access window for ichthyofauna discharge electromagnetic field generators metal grid discharge sill the Crisul Repede River Figure 10 Positioning the electromagnetic field generators- indicative scheme
  • 18. A generator using the energy provided from the Crisul Repede River can be arranged on the discharge sill so that if operating a system for ithtiofauna migration less power from other sources to be consumed. In order to stop the migratory species crossing the discharge sill without reaching the basin B2, a metal grid shall be fixed on the edge of the discharge sill (upstream) (fig.10). When migrating, the fish will gather in front of the metal grid and, therefore, the basin B2 will catch as many fish as possible so that the migration process can be carried out normally. The solution can be successfully applied anywhere in the world.