• Sri Lanka has prioritized the implementation of
renewable energy projects in Sri Lanka.
• Policy initiatives has put in place a minimum target
of 20% of total power generation to be sourced from
renewable sources by the year 2020.
• However, the lack of a smart grid and the delays in
grid modernization has limited the amount of nondispatchable power allowed onto on-grid power
generation systems .
• Currently, 20 MW of licenses are available in two
licenses of 10 MW each. These two licenses fulfill the
solar power limit allowed onto the main grid in Sri
Lanka.

• These licenses will be the only and last licenses that
will allow solar power generation for on-grid
application without the requirement of battery
storage for supply smoothening and peak load
demand balancing.
Project Location
Project Location
PROJECT DETAILS
Name of Project

Project number 1
Iris Buruthakanda solar project

Project number 2
Anorchi Lanka Buruthakanda solar Project

Name of owning Iris Eco Power Lanka (Pvt) Ltd
company

Anorchi Lanka (Pvt) Ltd

Location of
project
Acquisition
Price
Seller’s
undertakings

Buruthakanda, Hambantota

Buruthakanda, Hambantota

USD 4.0 Million

USD 4.0 Million

Project will be delivered to investor on “Plug-and-Play”
basis. All necessary and required approvals, permits and
licences including land will be completed on delivery of
project
Investor is required to place the entire sum of the
acquisition price in Escrow with an International bank in
Colombo. Currently we operate Escrow accounts with
Deutsche Bank AG.
Escrow property will be released to the seller and
consultant respectively only upon the fulfilment of all
the escrow rules. (i.e. the delivery of project with all
required approvals, permits and licences including land)
The escrow account shall be an interest earning account
so that in the unlikely event that the seller/consultant is
unable to deliver all requirements, the investor will have
the benefit of accrued interest together with the return
of the capital sum.
Acquire 100% of the shares in the project owning
company

Project will be delivered to investor on “Plug-and-Play”
basis. All necessary and required approvals, permits and
licences including land will be completed on delivery of
project
Investor is required to place the entire sum of the
acquisition price in Escrow with an International bank in
Colombo. Currently we operate Escrow accounts with
Deutsche Bank AG.
Escrow property will be released to the seller and
consultant respectively only upon the fulfilment of all
the escrow rules. (i.e. the delivery of project with all
required approvals, permits and licences including land)
The escrow account shall be an interest earning account
so that in the unlikely event that the seller/consultant is
unable to deliver all requirements, the investor will have
the benefit of accrued interest together with the return
of the capital sum.
Acquire 100% of the shares in the project owning
company

Payment Terms

Method of
Acquisition of
project
2 PV Solar Power Projects
10MW each
45 Acres each allocated for the projects

Can be purchased with all approvals

Two Solar Power Projects
available for investment

• The

2 projects are the last two available licenses for solar in Sri Lanka

• Both Licenses are for solar generation without battery backup. This
type of license will never be issued in Sri Lanka in the future

More Related Content

Similar to Solar Power

Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop program
Jay Ranvir
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
Ranbir Ghosh
 
Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar
Ruchir Punjabi
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013
Ritesh Pothan
 
IM2 Company Presentation
IM2 Company Presentation IM2 Company Presentation
IM2 Company Presentation
IM2ENERGIASOLAR
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Gensol Engineering Limited
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
hunter111
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)
Sam Lipman
 
Presentation on Exclusive Reality Investment Opportunity
Presentation on Exclusive Reality Investment Opportunity Presentation on Exclusive Reality Investment Opportunity
Presentation on Exclusive Reality Investment Opportunity
Amit Goon
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptx
MayurHiwarkar4
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
OECD Environment
 
MARG-OPENACCESS
MARG-OPENACCESSMARG-OPENACCESS
MARG-OPENACCESS
Ranbir Ghosh
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Pratap Malempati
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHP
RAJ BAIRWA
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
Gensol Engineering Limited
 
The Project Brief
The Project BriefThe Project Brief
The Project Brief
Anshika Hari Dass
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
antastoya
 
Greenhouse Project Report - Feasibility Report
Greenhouse Project Report - Feasibility ReportGreenhouse Project Report - Feasibility Report
Greenhouse Project Report - Feasibility Report
Venture Advisors
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptx
ParamJothi
 
March 5 solar energy investment opportunities in the philippines ruth p bri...
March 5   solar energy investment opportunities in the philippines ruth p bri...March 5   solar energy investment opportunities in the philippines ruth p bri...
March 5 solar energy investment opportunities in the philippines ruth p bri...
Greenergy Solutions Inc.
 

Similar to Solar Power (20)

Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop program
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
 
Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013
 
IM2 Company Presentation
IM2 Company Presentation IM2 Company Presentation
IM2 Company Presentation
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)
 
Presentation on Exclusive Reality Investment Opportunity
Presentation on Exclusive Reality Investment Opportunity Presentation on Exclusive Reality Investment Opportunity
Presentation on Exclusive Reality Investment Opportunity
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptx
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
 
MARG-OPENACCESS
MARG-OPENACCESSMARG-OPENACCESS
MARG-OPENACCESS
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHP
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
The Project Brief
The Project BriefThe Project Brief
The Project Brief
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Greenhouse Project Report - Feasibility Report
Greenhouse Project Report - Feasibility ReportGreenhouse Project Report - Feasibility Report
Greenhouse Project Report - Feasibility Report
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptx
 
March 5 solar energy investment opportunities in the philippines ruth p bri...
March 5   solar energy investment opportunities in the philippines ruth p bri...March 5   solar energy investment opportunities in the philippines ruth p bri...
March 5 solar energy investment opportunities in the philippines ruth p bri...
 

More from RusLanka Council

Fish processing plant Sri Lanka
Fish processing plant Sri LankaFish processing plant Sri Lanka
Fish processing plant Sri Lanka
RusLanka Council
 
Презентация Sunbird Ceylon (Pvt) Ltd
Презентация Sunbird Ceylon (Pvt) LtdПрезентация Sunbird Ceylon (Pvt) Ltd
Презентация Sunbird Ceylon (Pvt) Ltd
RusLanka Council
 
Презентация Ceylon Tea MAQAM
Презентация Ceylon Tea MAQAMПрезентация Ceylon Tea MAQAM
Презентация Ceylon Tea MAQAM
RusLanka Council
 
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYAPROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
RusLanka Council
 
SUNBRID CEYLON (PVT) LTD
SUNBRID CEYLON (PVT) LTDSUNBRID CEYLON (PVT) LTD
SUNBRID CEYLON (PVT) LTD
RusLanka Council
 
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDERFULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
RusLanka Council
 
MOT New Presentation
MOT New PresentationMOT New Presentation
MOT New Presentation
RusLanka Council
 
Mount Lavinia Property
Mount Lavinia PropertyMount Lavinia Property
Mount Lavinia Property
RusLanka Council
 
Changing the Landscape of Sri Lanka
Changing the Landscape of Sri LankaChanging the Landscape of Sri Lanka
Changing the Landscape of Sri Lanka
RusLanka Council
 
Golf Course
Golf CourseGolf Course
Golf Course
RusLanka Council
 
Furniture Manufacturing
Furniture ManufacturingFurniture Manufacturing
Furniture Manufacturing
RusLanka Council
 
Elephant Coridor
Elephant CoridorElephant Coridor
Elephant Coridor
RusLanka Council
 
Beira Morgan Road
Beira Morgan RoadBeira Morgan Road
Beira Morgan Road
RusLanka Council
 
Trincomalee Heavvy Industrial Zone
Trincomalee Heavvy Industrial ZoneTrincomalee Heavvy Industrial Zone
Trincomalee Heavvy Industrial Zone
RusLanka Council
 
OIL EXPLORATION IN SRI LANKA
OIL EXPLORATION IN SRI LANKAOIL EXPLORATION IN SRI LANKA
OIL EXPLORATION IN SRI LANKA
RusLanka Council
 
Keppetipola Mawatha Housing Project
Keppetipola Mawatha Housing ProjectKeppetipola Mawatha Housing Project
Keppetipola Mawatha Housing Project
RusLanka Council
 
Karadiyana WtE Project
Karadiyana WtE ProjectKaradiyana WtE Project
Karadiyana WtE Project
RusLanka Council
 
Kalpitiya - Eco System Blending with Water
Kalpitiya - Eco System Blending with WaterKalpitiya - Eco System Blending with Water
Kalpitiya - Eco System Blending with Water
RusLanka Council
 
LICENSED SPECIALIZED BANK In Sri Lanka
LICENSED SPECIALIZED BANK In Sri LankaLICENSED SPECIALIZED BANK In Sri Lanka
LICENSED SPECIALIZED BANK In Sri Lanka
RusLanka Council
 
Hambantota port
Hambantota portHambantota port
Hambantota port
RusLanka Council
 

More from RusLanka Council (20)

Fish processing plant Sri Lanka
Fish processing plant Sri LankaFish processing plant Sri Lanka
Fish processing plant Sri Lanka
 
Презентация Sunbird Ceylon (Pvt) Ltd
Презентация Sunbird Ceylon (Pvt) LtdПрезентация Sunbird Ceylon (Pvt) Ltd
Презентация Sunbird Ceylon (Pvt) Ltd
 
Презентация Ceylon Tea MAQAM
Презентация Ceylon Tea MAQAMПрезентация Ceylon Tea MAQAM
Презентация Ceylon Tea MAQAM
 
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYAPROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
PROJECT PROFILE – INTEGRATED TOURISM RESORT PROJECT IN KALPITIYA
 
SUNBRID CEYLON (PVT) LTD
SUNBRID CEYLON (PVT) LTDSUNBRID CEYLON (PVT) LTD
SUNBRID CEYLON (PVT) LTD
 
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDERFULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
FULLY INTEGRATED TELECOMUNICATIONS SERVICE PROVIDER
 
MOT New Presentation
MOT New PresentationMOT New Presentation
MOT New Presentation
 
Mount Lavinia Property
Mount Lavinia PropertyMount Lavinia Property
Mount Lavinia Property
 
Changing the Landscape of Sri Lanka
Changing the Landscape of Sri LankaChanging the Landscape of Sri Lanka
Changing the Landscape of Sri Lanka
 
Golf Course
Golf CourseGolf Course
Golf Course
 
Furniture Manufacturing
Furniture ManufacturingFurniture Manufacturing
Furniture Manufacturing
 
Elephant Coridor
Elephant CoridorElephant Coridor
Elephant Coridor
 
Beira Morgan Road
Beira Morgan RoadBeira Morgan Road
Beira Morgan Road
 
Trincomalee Heavvy Industrial Zone
Trincomalee Heavvy Industrial ZoneTrincomalee Heavvy Industrial Zone
Trincomalee Heavvy Industrial Zone
 
OIL EXPLORATION IN SRI LANKA
OIL EXPLORATION IN SRI LANKAOIL EXPLORATION IN SRI LANKA
OIL EXPLORATION IN SRI LANKA
 
Keppetipola Mawatha Housing Project
Keppetipola Mawatha Housing ProjectKeppetipola Mawatha Housing Project
Keppetipola Mawatha Housing Project
 
Karadiyana WtE Project
Karadiyana WtE ProjectKaradiyana WtE Project
Karadiyana WtE Project
 
Kalpitiya - Eco System Blending with Water
Kalpitiya - Eco System Blending with WaterKalpitiya - Eco System Blending with Water
Kalpitiya - Eco System Blending with Water
 
LICENSED SPECIALIZED BANK In Sri Lanka
LICENSED SPECIALIZED BANK In Sri LankaLICENSED SPECIALIZED BANK In Sri Lanka
LICENSED SPECIALIZED BANK In Sri Lanka
 
Hambantota port
Hambantota portHambantota port
Hambantota port
 

Recently uploaded

Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
LHelferty
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 

Recently uploaded (14)

Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 

Solar Power

  • 1. • Sri Lanka has prioritized the implementation of renewable energy projects in Sri Lanka. • Policy initiatives has put in place a minimum target of 20% of total power generation to be sourced from renewable sources by the year 2020. • However, the lack of a smart grid and the delays in grid modernization has limited the amount of nondispatchable power allowed onto on-grid power generation systems . • Currently, 20 MW of licenses are available in two licenses of 10 MW each. These two licenses fulfill the solar power limit allowed onto the main grid in Sri Lanka. • These licenses will be the only and last licenses that will allow solar power generation for on-grid application without the requirement of battery storage for supply smoothening and peak load demand balancing.
  • 2.
  • 5. PROJECT DETAILS Name of Project Project number 1 Iris Buruthakanda solar project Project number 2 Anorchi Lanka Buruthakanda solar Project Name of owning Iris Eco Power Lanka (Pvt) Ltd company Anorchi Lanka (Pvt) Ltd Location of project Acquisition Price Seller’s undertakings Buruthakanda, Hambantota Buruthakanda, Hambantota USD 4.0 Million USD 4.0 Million Project will be delivered to investor on “Plug-and-Play” basis. All necessary and required approvals, permits and licences including land will be completed on delivery of project Investor is required to place the entire sum of the acquisition price in Escrow with an International bank in Colombo. Currently we operate Escrow accounts with Deutsche Bank AG. Escrow property will be released to the seller and consultant respectively only upon the fulfilment of all the escrow rules. (i.e. the delivery of project with all required approvals, permits and licences including land) The escrow account shall be an interest earning account so that in the unlikely event that the seller/consultant is unable to deliver all requirements, the investor will have the benefit of accrued interest together with the return of the capital sum. Acquire 100% of the shares in the project owning company Project will be delivered to investor on “Plug-and-Play” basis. All necessary and required approvals, permits and licences including land will be completed on delivery of project Investor is required to place the entire sum of the acquisition price in Escrow with an International bank in Colombo. Currently we operate Escrow accounts with Deutsche Bank AG. Escrow property will be released to the seller and consultant respectively only upon the fulfilment of all the escrow rules. (i.e. the delivery of project with all required approvals, permits and licences including land) The escrow account shall be an interest earning account so that in the unlikely event that the seller/consultant is unable to deliver all requirements, the investor will have the benefit of accrued interest together with the return of the capital sum. Acquire 100% of the shares in the project owning company Payment Terms Method of Acquisition of project
  • 6. 2 PV Solar Power Projects 10MW each 45 Acres each allocated for the projects Can be purchased with all approvals Two Solar Power Projects available for investment • The 2 projects are the last two available licenses for solar in Sri Lanka • Both Licenses are for solar generation without battery backup. This type of license will never be issued in Sri Lanka in the future