Software Defect Prevention Techniques
         ~ Example Project ~



               Zarko Acimovic
             Copyright © 2013 Zarko Acimovic

                    All rights reserved.

                  ISBN-10: 1481113305
                ISBN-13: 978-1481113304
DEDICATION

I dedicate this book to my parents, Ivana and Goran
CONTENTS

1   Introduction

2   Theoretical Foundations for Defect Prevention              1

3   Automatic Tools for Defect Prevention                      24

4   Tools for Defect Prevention in Java Software Development   25

5   Sample Project Software Requirements                       25

6   Source Code with Violations                                26

7   Design Defects Detected by ArgoUML                         192

8   Examples of Design Defects in Sample Project               196

    About the Author
Zarko Acimovic




                                             1 INTRODUCTION

I present 5000 lines of Java source code mostly written by using trial/error code/test technique. The code was written
for prototype project in three months without using defect prevention techniques ( that is, tools such as PMD,
FindBugs, StateOfFlow or ArgoUML) I wrote the code in 2004 and ever since had several business offers to
commercialize it which I resisted due to complexity of the code.

8 years after completing project I run the defect prevention tools against the code and uncovered 1123 code violations
(almost 1 violation per 5 lines of code) and 121 software design violations. All these violations are presented in book
with references to the source code lines where they live. It's worth mentioning that these violations are not defects –
being present at the code, they just make it easier for you to make mistake when maintaining code or implementing
new feature.

I recommend readers to use these tools during development and correct all violations on the fly, or switch to some
other risk-free programming language such as Haskell, Erlang or Lisp.




            2 THEORETICAL FOUNDATIONS FOR DEFECT PREVENTION

Below are the details of E-learning course “Software Engineering” from IIT Bombay India >> NPTEL >> Courses
>> Computer Science and Engineering >> Software Engineering (Video).
My opinion is that this course provides solid theoretical foundation for applying software defect prevention
techniques. The course can be found on following location


http://nptel.iitm.ac.in/video.php?subjectId=106101061

Here is high level overview of the course:


1 - Introduction to Software Engineering (52:21)
2 - Introduction to Software Engineering (52:55)
3 - Overview of Phases (57:22)
4 - Overview of Phases (57:03)
5 - Requirements Engineering / Specification (56:39)
6 - Formal Specification (51:44)
7 - Algebraic Specification Methods (57:34)
8 - Systems Modeling Overview (59:38)
9 - Process Modeling - DFD , Function Decomp (56:28)
10 - Process Modeling - DFD, Function Decomp (53:23)
11 - Data Modeling - ER Diagrams, Mapping (1:00:55)
12 - Data Modeling - ER Diagrams, Mapping (58:08)
13 - Production Quality Software - Introduction (53:04)
14 - Software Design - Primary Consideration (1:04:43)
15 - Design Patterns (56:13)
16 - Class and Component Level Design (54:34)


                                                          iv
Software Defects Prevention Techniques – Example Project


17 - Architectural Design (59:28)
18 - Software Testing - I (55:39)
19 - Software Testing - II (51:18)
20 - Structural Programming and Some implementation (45:05)
21 - Software Metrics and Quality (54:51)
22 - Verification and Validation (52:43)
23 - Case Study (54:55)
24 - Case Study (58:39)
25 - Software Evolution (55:41)
26 - Agile Development (55:33)
27 - Software Reuse (53:43)
28 - Reuse Continued (57:07)
29 - Introduction to Project Management (52:36)
30 - Project Scope Management (1:08:45)
31 - Project Time Management (56:51)
32 - Estimation - I (51:42)
33 - Estimation - II (50:38)
34 - Project Quality Management (58:32)
35 - Quality Management Systems - I (54:43)
36 - Quality Management Systems (54:53)
37 - Project Configuration Management (53:00)
38 - Project Risk Management (56:04)
39 - Other PM Processes (55:41)

Here are the details of the videos:


    1. Introduction to Software Engineering (52:21)
http://nptel.iitm.ac.in/video.php?subjectId=106101061


    2. Introduction to Software Engineering (52:55)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

        •    Waterfall Model for Development
        •    Deliverables in Waterfall Model
        •    Cost/Effort Distribution
        •    Shortcomings of Waterfall Model
        •    Prototyping Model
        •    Prototyping
        •    Limitations of Prototyping
        •    Iterative Development
        •    Spiral Model
        •    Project Management Process
        •    Project Planning
        •    Project Monitoring and Control




                                                                 v
Zarko Acimovic


    3. Overview of Phases in Software Development (57:22)
http://nptel.iitm.ac.in/video.php?subjectId=106101061


    4. Overview of Phases in Software Development (57:03)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

        •   Structured Analysis
        •   Structured Methodology
        •   Requirement Specification Format
        •   System Design
        •   Alternatives
        •   Design goals
        •   System Architecture
        •   Structure Chart
        •   Structure Chart Notation
        •   OO Approach
        •   Design Document Format
        •   Detailed Design
        •   Implementation Phase
        •   Operations & Maintenance
        •   Summary



    5. Requirements Engineering / Specification (56:39)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

        •   Objectives
        •   Requirements engineering
        •   What is a requirement?
        •   Requirements abstraction (Davis)
        •   Types of requirement
        •   Requirements Audience
        •   Functional and non-functional requirements
        •   Functional requirements
        •   The LIBSYS system
        •   Examples of functional requirements
        •   Requirements imprecision
        •   Requirements completeness and consistency
        •   Non-functional requirements
        •   Non-functional classifications
        •   Non-functional requirement types
        •   Non-functional requirements examples
        •   Goals and requirements
        •   Examples
        •   User requirements
        •   Problems with natural language
        •   LIBSYS requirement
        •   Editor grid requirement


                                                          vi
Software Defects Prevention Techniques – Example Project


       •   Requirement problems
       •   Structured presentation
       •   Guidelines for writing requirements
       •   System requirements
       •   Requirements and design
       •   Alternatives to NL specification
       •   Structured language specifications
       •   Form-based specifications
       •   Tabular specification
       •   Graphical models
       •   PDL interface description
       •   The requirements document
       •   IEEE requirements standard


    6. Formal Specification (51:44)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Natural Language Requirement Specification
       •   Problem Statement
       •   The Need for Formal Specification
       •   Formal methods
       •   Acceptance of formal methods
       •   Use of formal methods
       •   Specification in the software process
       •   Specification techniques
       •   Formal specification languages
       •   Use formal specification
       •   Development costs with formal specification
       •   Properties of Formal Specifications
       •   Library Example-Informal Statement
       •   Library Example -- Formalization
       •   Library Example -- Formalization - 2
       •   Library Example -- Prove Correctness
       •   Specification Types
       •   Interface specification
       •   Sub-system interfaces
       •   Behavioral specification
       •   Key points



    7. Algebraic Specification Methods (57:34)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Disadvantages of NL specifications
       •   Another Perspective - Dangers of Physical Representations in Analysis
       •   Towards Abstraction
       •   What does a Abstract Data Type (ADT) consist of?7:29
       •   What about Post Conditions?

                                                         vii
Zarko Acimovic


       •   Algebraic Manipulation using Axioms
       •   Abstract Math to Concrete realizations
       •   ADTs and Information Hiding
       •   Completeness of Specification
       •   Definition: sufficient completeness
       •   ADT Consistency


    8. Systems Modeling Overview (59:38)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Model types
       •   Context models
       •   The context of an ATM system
       •   Process models
       •   Behavioral models
       •   Order processing DFD
       •   Microwave oven model
       •   Microwave oven state description
       •   Microwave oven stimuli
       •   Microwave oven state description
       •   Microwave oven stimuli
       •   Microwave oven operation
       •   Semantic data models
       •   Library semantic model
       •   Data Dictionary Entries
       •   Object models
       •   Inheritance models
       •   Multiple inheritance
       •   Object aggregation
       •   Object behavior modeling
       •   Structured methods


    9. Process Modeling - DFD , Function Decomposition (56:28)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

           •   ER MODEL
           •   ENTITY
           •   ENTITY SET
           •   ATTRIBUTE
           •   DOMAIN
           •   PRIMARY KEYS
           •   EXAMPLE : A COLLEGE
           •   RELATIONSHIP
           •   RELATIONSHIP SET
           •   DEPICTING A RELATIONSHIP
           •   PRIMARY KEY FOR REPATIONSHIPS
           •   RELATIONSHIP CARDINALITY



                                                         viii
Software Defects Prevention Techniques – Example Project



    10. Process Modeling - DFD, Function Decomposition (53:23)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

        •   RELATIONSHIP CARDINALITY
        •   EXISTENCE DEPENDENCE
        •   TERNARY RELATIONSHIPS
        •   WEAK ENTITY
        •   EXTENDED E-R MODEL
        •   Generalization




    11. Data Modeling - ER Diagrams, Mapping (1:00:55)

        •   Generalization
        •   Specialization
        •   Inheritance
        •   Aggregation
        •   Process Model
        •   Function Decomposition
        •   FD Diagrams: Examples


    12. Data Modeling - ER Diagrams, Mapping (58:08)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

            •   Data Flow Diagram (DFD)
            •   DFD Notation
            •   Context Diagram
            •   Process Refinement
            •   Physical DFD
            •   Showing Boundaries
            •   DFD Example 1: Payroll
            •   DFD Example 2: Old Car Mart
            •   DFD Example Old Car Mart
            •   Example 3: Book Supplier
            •   Book Supplier: Exploding Process 2
            •   Book Supplier : homework


    13. Production Quality Software - Introduction (53:04)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

            •   Software construction then and now
            •   Software Crisis (Late 1980s)
            •   More perspective on the Software Crisis
            •   Brian Russell's Laws of Software Relativity
            •   Properties of Failing software
            •   Common Error in Managing the Process

                                                            ix
Zarko Acimovic


            •   Software Maintenance
            •   Quality Factors for Software
            •   Quality Factors
            •   Quality Factors - contd.
            •   Quality Factors
            •   Keys to achieving Structural Quality
            •   What ls Abstraction?
            •   Abstraction
            •   Abstraction Techniques
            •   Encapsulation
            •   Modules
            •   Desirable Characteristics - Weak Coupling
            •   Information Hiding
            •   Protocol Vs Behavior
            •   IH and Abstraction
            •   Factorization and Specialization
            •   Inclusion
            •   Benefits of Inheritance
            •   Uses for inheritance



    14. Software Design - Primary Consideration (1:04:43)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

            •   What's Design?
            •   Example Designs in Real Life
            •   Programs
            •   Example Designs in Real Life
            •   Design in Software Engineering
            •   Examples of Process Design
            •   What is covered in Product Design?
            •   From Analysis to Design
            •   Factors To be considered in Design
            •   Factors to be considered in Design
            •   Process of Complex System Design
            •   Top-down Vs. Bottom-up Approach
            •   Decomposition
            •   Composition/Interconnection
            •   Basic Principles To be applied during design
            •   Abstraction
            •   Example Abstractions
            •   Describing Abstractions
            •   Encapsulation
            •   Refinement
            •   Refinement and Change Process
            •   Communication
            •   Other Kinds of Communication



                                                         x
Software Defects Prevention Techniques – Example Project


    15. Design Patterns (56:13)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Reuse in Software Engineering
       •   Patterns in Software Engineering
       •   Design Patterns
       •   Describing a Design Pattern
       •   Pattern Description Template provided by
       •   Classification of Patterns
       •   Examples of Creational Patterns
       •   Behavioral Patterns
       •   A Problem
       •   The Solution
       •   The Design Pattern: Prototype
       •   Singleton Pattern
       •   Implementing Singleton
       •   Adapter Pattern
       •   Composite Pattern
       •   The Solution
       •   Instance Structure for an Instance of a Composite Class
       •   The Composite Pattern
       •   The Facade Pattern
       •   How to interact with components with a subsystem?
       •   The Facade Pattern
       •   Proxy Pattern: A Mechanic for Communication
       •   Real object and Proxy object are different
       •   The Proxy Pattern
       •   The Decorator Pattern: Object Diagram
       •   Visual Component
       •   The Template Method Pattern
       •   Strategy Pattern


    16. Class and Component Level Design (54:34)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Class
       •   Example Classes
       •   Kinds of Classes
       •   Levels of Abstraction
       •   Beck and Cunningham's CRC Method
       •   CRC: our recommendation
       •   A system decomposed in CRCs
       •   Contributions of CRC
       •   Bertrand Meyer' Design-by-Contract
       •   Design by Contact Method
       •   Contracts
       •   An Example Contact for class Book
       •   A Contact Specification


                                                          xi
Zarko Acimovic


       •   Class Design
       •   Part-Whole Design
       •   Odell's Classification Criteria
       •   Component-Integral Object
       •   Material-Object (made of)
       •   Portion-Object
       •   Place-Area
       •   Member-Bunch
       •   Member-Partnership
       •   Non-aggregation relations
       •   Transitivity in Part-Whole
       •   Two Kinds of Part-whole Relations in UML
       •   Designing New Subclasses From Old: Inheritance
       •   Use of Inheritance in a Subclass
       •   Components
       •   Use of Inheritance in a Subclass
       •   Components
       •   Design of Components
       •   Decisions about component's non-functional properties
       •   Reuse in Component Technologies



    17. Architectural Design (59:28)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Software Architecture
       •   Why Do We need Architecture?
       •   Basic Principles applied by Architects
       •   Several Approaches to Architecture
       •   The Zachman Framework
       •   Open Distributed Processing Reference Model (ODP-RM)
       •   ODP: Enterprise viewpoint
       •   ODP: Information viewpoint
       •   ODP: Computational viewpoint
       •   ODP: Computation viewpoint
       •   ODP: Engineering viewpoint
       •   ODP: Transparencies
       •   ODP: Transparencies Defined
       •   4+1 View Model
       •   Unified Process Model of Architecture
       •   Commonly occurring Architectural Patterns
       •   Layers
       •   Peers
       •   Client-server
       •   Pipelines
       •   Transactional Flows
       •   Filters
       •   Blankboards


                                                        xii
Software Defects Prevention Techniques – Example Project


       •   Facade
       •   Broker
       •   MVC
       •   Microkernel
       •   Framework Architectures
       •   A Framework
       •   References/Readings



    18. Software Testing - I (55:39)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Why Testing?
       •   A Test Case
       •   What criteria to use?
       •   Black Box Testing
       •   White Box Testing
       •   Levels of Testing
       •   Stub Modules
       •   Test Drivers
       •   Test Drivers during Partial Integration
       •   Testing Modules with Top Down Integration
       •   Testing Modules with Bottom Up Integration
       •   Regression Testing
       •   Monitoring Behavior of Programs
       •   Documentation Probes
       •   Standard Error Probes and Exceptions (user defined)
       •   Assertions for defensive programming
       •   Different Types of Assertions
       •   IS the output of a test correct?
       •   Test Objectives
       •   Alpha testing and Beta testing
       •   Debugging
       •   Testing In Software Development



    19. Software Testing - II (51:18)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Black box vs. white box testing
       •   Black Box Testing (External)
       •   White Box Testing (Internal)
       •   Statement Coverage
       •   An Example for Statement Coverage
       •   Observations
       •   An Example for Statement Coverage
       •   Observations
       •   Implicit statements


                                                         xiii
Zarko Acimovic


       •   Basic Path Testing
       •   A Sequential Composition
       •   A Branching Statement
       •   A While Statement
       •   A Repeat Statement
       •   A Switch Case Statement
       •   A Compound Condition
       •   Cyclomatic Complexity
       •   Cyclomatic Complexity Example
       •   Condition Testing
       •   Condition Testing Strategies
       •   Data Flow Testing Strategies
       •   Exercise: Try different strategies on the below program




    20. Structural Programming and Some implementation (45:05)
http://nptel.iitm.ac.in/video.php?subjectId=106101061


    21. Software Metrics and Quality (54:51)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Why Measurement?
       •   Use of Software Measurement
       •   The attributes that can be captured
       •   Which one is a good measure?
       •   What to measure in software?
       •   Measurement Scales
       •   Ordinal Scale
       •   Interval Scale
       •   Ratio Scale
       •   Absolute Scale
       •   Size Metrics
       •   Length
       •   Functionality
       •   Complexity
       •   Measuring Structure
       •   Coupling and cohesion
       •   Object Oriented Metrics: CK and MOOD
       •   Quality Guidelines for Coding and Development
       •   Defensive Programming for Modules, Functions, Procedures, Classes
       •   Preconditions
       •   Invariants
       •   Use of Software Measurement
       •   Separate Compilation
       •   Makefile
       •   Separate Compilation


                                                        xiv
Software Defects Prevention Techniques – Example Project


       •   Makefile
       •   A Sample Makefile
       •   Code organization
       •   Development
       •   Some good practices


    22. Verification and Validation (52:43)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Verification vs validation
       •   The V & V process
       •   V & V goals
       •   V & V confidence
       •   Static and dynamic verification
       •   Program testing
       •   Types of testing
       •   Testing and debugging
       •   The debugging process
       •   V & V planning
       •   V-model of development
       •   The Structure of a software test plan
       •   Software inspections
       •   Inspection success
       •   Inspections testing
       •   Program inspections
       •   Inspection pre-conditions
       •   Inspection procedure
       •   Inspection Roles
       •   Inspection Checklists (2)
       •   Inspection Checklists (3)
       •   Inspection rate
       •   Automated static analysis
       •   Static Analysis Checks
       •   Stages of static analysis
       •   LINT static analysis
       •   Verification and formal methods
       •   Arguments for formal methods


    23. Case Study (54:55)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Case study: library book circulation system
       •   BOOK CIRCULATION
       •   STATEMENT OF PROJECT SCOPE AND OBJECTIVES
       •   THE FEASIBILITY STUDY: CIRCULATION
       •   Financial analysis for alternatives 1 :
       •   Alternatives 2
       •   Plan for alternatives 1

                                                           xv
Zarko Acimovic


       •   Feasibility ...
       •   Requirements Analysis
       •   Circulation System
       •   Draw first level DFD
       •   Requirements Analysis



    24. Case Study (58:39)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Requirements Analysis...
       •   Refinement of issue process
       •   Requirements Analysis...
       •   Requirements Specification...
       •   SRS ...
       •   System Design: CIRCULATION
       •   System Design ...
       •   System Design
       •   E-R DIAGRAM
       •   System Design ...
       •   Table Design
       •   Physical DB Design
       •   Physical DB Design...
       •   Physical DB Design...
       •   System Design ...
       •   Software Architecture
       •   Software Architecture...
       •   Implementation Schedule
       •   Implementation Schedule...
       •   Design documentation
       •   Detailed Design
       •   Data and Module Specification
       •   Module ...
       •   Implementation


    25. Software Evolution (55:41)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Software Change
       •   Software change control
       •   Software change strategies
       •   Program evolution dynamics
       •   Laws of Program Evolution
       •   Applicability of Lehman's laws
       •   Software maintenance
       •   Maintenance is inevitable
       •   Causes of maintenance
       •   Distribution of maintenance effort

                                                        xvi
Software Defects Prevention Techniques – Example Project


       •   Types of Maintenance
       •   Breakup of costs
       •   Spiral maintenance model
       •   Maintenance costs
       •   Maintenance costs factors
       •   Problems facing Maintainers
       •   Approaches to Maintenance
       •   The Change process
       •   Change requests
       •   Change implementation
       •   Maintenance prediction
       •   Change prediction
       •   Complexity metrics
       •   Process metrics


    26. Agile Development (55:33)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Objectives
       •   Requirements
       •   Characteristics of Agile Processes
       •   An iterative development process
       •   Advantages of incremental development
       •   Problems with incremental development
       •   Prototyping
       •   Software prototyping
       •   Benefits of prototyping
       •   Throw -away prototypes
       •   Incremental Development & Prototyping
       •   Conflicting objectives
       •   Agile methods
       •   Principles of Agile Methods
       •   Problems with agile methods
       •   Extreme programming
       •   The Four Core Values of XP
       •   Communication
       •   Feedback
       •   Courage
       •   The XP release cycle
       •   XP Practices
       •   XP Practices - 2
       •   XP and agile principles
       •   Requirements scenarios
       •   Story Card for document downloading
       •   XP Design Guidelines
       •   XP and change
       •   Testing in XP
       •   Task cards for document downloading


                                                         xvii
Zarko Acimovic


       •   Test Case Description
       •   Test- first development
       •   Pair programming
       •   XP Summary




    27. Software Reuse (53:43)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Design with Reuse
       •   Objectives
       •   Software reuse
       •   Benefits of reuse
       •   Requirements for design with reuse
       •   Reuse problems
       •   Generator-based reuse
       •   Types of program generator
       •   Reuse through program generation
       •   Component-based development
       •   Components
       •   Component abstractions
       •   CBSE processes
       •   An opportunistic reuse process
       •   Development with reuse
       •   CBSE problems
       •   Application frameworks
       •   Framework classes
       •   Extending frameworks



    28. Reuse Continued (57:07)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Application frameworks
       •   Framework classes
       •   Extending frameworks
       •   Evaluating Frameworks
       •   Framework evaluation criteria
       •   Evaluating Frameworks
       •   COTS product reuse
       •   Integration Approaches
       •   Examples of COTS muse
       •   COTS system integration problems
       •   Component development for reuse
       •   Reusable components
       •   Re-usability enhancement


                                                        xviii
Software Defects Prevention Techniques – Example Project


       •   Generalization Techniques
       •   Generating good mental Models
       •   Application families
       •   Application family specialization
       •   Inventory management systems
       •   Application family architectures
       •   A library system
       •   Library system
       •   Family member development
       •   Design patterns
       •   The Observer pattern


    29. Introduction to Project Management (52:36)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   What is Project Management ?
       •   Who Executes a Project?
       •   An Effective PM Needs to Do the Following:
       •   Productivity Gains With Standards and Procedures
       •   Software Process is a Part of Organizational Process
       •   Software Project Phases and Activities
       •   Software Development Strategies at a Glance
       •   Project Management Process Groups: Schematic
       •   Illustration: Interaction Within and Across Project
       •   Software Development Methodology: Schematic
       •   PMBOK (2000)
       •   Framework for Project Management
       •   PMI Developed Code Of Ethics (1/2)
       •   Impact of Good Project Management
       •   Software Project Management
       •   Suggested Readings




    30. Project Scope Management (1:08:45)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Scope Management Subprocesses
       •   Illustrative Comparison of Projects
       •   Another Way of Comparing Projects:
       •   PM Must Question ALL Aspects of a Project
       •   Illustration: Stakeholder Analysis


                                                          xix
Zarko Acimovic


       •   Illustration: Objectives of a Hospital IS
       •   Illustration: Project Charter (1/3)
       •   Illustration: Project Charter (2/3)
       •   Illustration: Project Charter (3/3)
       •   Illustration: WBS Organized by phases
       •   Summary: Scope management Subprocesses


    31. Project Time Management (56:51)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Project Time Management Subprocesses
       •   WBS to Precedence Relationship
       •   Precedence Diagramming Method (PDM): Types of Dependencies
       •   Illustration: PDM Network
       •   Illustration: Arrow Diagramming Method (ADM) Network
       •   Precedence Relationship to Schedule
       •   Schedule Development Preferences
       •   Illustration of a Schedule
       •   Software Support for Project Management
       •   Summary: Time Management Process



    32. Estimation - I (51:42)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Estimation is an Ongoing Activity
       •   Stages in Project Estimation
       •   Estimation Approaches
       •   PERT Sizing Approach to Estimation
       •   Estimation: Levels of Application
       •   Function Point Counting Procedure
       •   Components of FP Count
       •   FP for Average Complexity Functions




    33. Estimation - II (50:38)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Marketing MIS: data flow diagram
       •   General Systems Characteristics (GSCs)
       •   Value Adjustment Factor (VAF)
       •   GSC and FPC: Marketing MIS
       •   Marketing MIS: Cost and Price


                                                        xx
Software Defects Prevention Techniques – Example Project


       •   COnstructive COst MOdel (COCOMO): Intd.
       •   Marketing MIS Modules
       •   Marketing MIS: Pert sizing
       •   COCOMO Equations
       •   COCOMO Cost Drivers (1/2)
       •   COCOMO Cost Drivers (2/2)
       •   Cost Driver Effort Multipliers
       •   Effort Multipliers: Marketing MIS
       •   Marketing MIS: COCOMO Calculations
       •   Effort and Schedule Distribution by Phase (%)
       •   Marketing MIS: Phase Effort and Schedule
       •   Network Precedence: Marketing MIS
       •   Effort Distribution by Activity: Marketing MIS
       •   Critical Path marketing MIS
       •   Gantt Chart/Histogram:Marketing MIS


    34. Project Quality Management (58:32)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Definitions of Quality (1/2)
       •   Definitions of Quality (2/2)
       •   Quality Management Gurus
       •   Modern Quality Management Emphasizes on:
       •   Project Quality Management Subprocess
       •   Quality Policy
       •   Strategic Planning for Quality
       •   Quality Characteristics: Illustration
       •   Boehm's Description of Quality
       •   Quality Measurements are Used for:
       •   Illustration: Template for Usability
       •   Quality Benchmarking
       •   Cost of Quality
       •   Quality Planning Process: Outputs
       •   What is Quality Assurance?
       •   Main Goals of Quality Assurance:
       •   Role of QA During Development (1/2)
       •   VV&T Activities in SW Project (1/3)
       •   VV&T Activities in SW Project (2/3)
       •   VV&T Activities in SW Project (3/3)
       •   Opportunity for Improvement (OFI)
       •   Who Identifies OFI?
       •   Improvement in Practice and Documentation
       •   Quality Control Process
       •   QC is Performed...
       •   Pareto Chart: Illustration
       •   Control Chart: Schematic




                                                         xxi
Zarko Acimovic


    35. Quality Management Systems - I (54:43)
http://nptel.iitm.ac.in/video.php?subjectId=106101061


    36. Quality Management Systems (54:53)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Who is a Process?
       •   Process Capability and Maturity
       •   Concept of Maturity Level
       •   Capability Maturity Models (CMM)
       •   Some of the Existing CMMs
       •   Capability Maturity Model Integrated (CMMI)
       •   CMMI ls Tailorable
       •   Staged Model: Maturity Levels
       •   Maturity level Structure
       •   Structure of Staged Representation
       •   PA Level 2
       •   PA Level 3
       •   PA Level 4
       •   PA Level 5
       •   Process Visibility with levels
       •   Process Capability with Levels
       •   Continuous Representation
       •   Structure of Continuous Representation
       •   PAs in Staged Representation
       •   Capability and Maturity levels
       •   Progression in Staged model
       •   Progression in Continuous model
       •   When to chose continuous Representation?
       •   implementation Road Map


    37. Project Configuration Management (53:00)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Change Control System: Schematic
       •   What is Configuration Management(CM)?
       •   CM Functions
       •   Typical Application Specific Cls
       •   Versioning of Cls
       •   Concept of Baseline
       •   Configuration Control
       •   Change Control Procedure (1/2)
       •   Change Control Procedure (2/2)
       •   Configuration Status Accounting
       •   Configuration Audit
       •   Configuration Management Plan
       •



                                                        xxii
Software Defects Prevention Techniques – Example Project


    38. Project Risk Management (56:04)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Project Risk Management Processes
       •   Risk Management Planning Process
       •   Risk Manage. Planning Process: Outputs
       •   Risk identification Process Involves:
       •   Risk Analysis Processes
       •   Qualitative Risk Analysis Process
       •   Illustration: Risk Impact Rating Table
       •   Impact, Frequency, and Risk Exposure
       •   Illustration: Quantitative Risk Analysis
       •   Risk Response Planning Process (2/2)
       •   Lessening the Risks
       •   Contingency Actions
       •   Risk Monitoring and Control Process
       •   Illustration: Tracking The Top 10 Risks



    39. Other PM Processes (55:41)
http://nptel.iitm.ac.in/video.php?subjectId=106101061

       •   Other Project Management Processes
       •   Project Cost Management Processes
       •   Illustration: Cost Budget (1/2)
       •   Illustration: Cost Budget (2/2)
       •   Human Resource Management Processes
       •   Impact of Organization Structure on Projects
       •   Typical Software Project Organization
       •   Software Development Responsibilities Need to be shared by all stakeholders
       •   Illustration: Responsibility Assignment Matrix
       •   Project Communications Management Processes
       •   Illustration: Stakeholder Communications Analysis
       •   Project Reporting and Review: Schematic
       •   Administrative Closure Process Covers:
       •   Administrative Closure Process Outputs
       •   Project Procurement Management Processes
       •   Project Integration Management Involves:
       •   Outputs from Project Plan Process: Uses
       •   Objectives of Overall Change Control Process
       •   Integrated Change Control Involves:
       •   Organizational Learning
       •   Role of PM
       •   Important Skills for Project Manager
       •   Engineers vs. Managers




                                                        xxiii
Zarko Acimovic




                     2 AUTOMATIC TOOLS FOR DEFECT PREVENTION

Prototyping (modeling) defect prevention method has efficiency 52%. Before implementing this method defect
potential per 1 FP (function point) was 5, after, 2.4.
Tool: ArgoUML



Static analysis of source code defect prevention method has efficiency 44%. Defect potential per 1 FP was 5, after
implementing this method is 2.8.
Tool: Coverity



Mathematical test case design defect prevention efficiency was 34%. Defect potential per 1 FP is 5, after is 3.3.
Tool: Bullseye



Bonus: Root cause analysis 1044-1993 - IEEE Standard Classification for Software Anomalies. Efficiency 41% -
Before 5 – After 2.95



Source: Chapter 3. Estimating and Measuring Software Quality. The Economics of Software Quality, ISBN:
9780132564762 , Capers Jones, Olivier Bonsignour

http://www.amazon.com/Economics-Software-Quality-Capers-Jones/dp/0132582201
http://www.informit.com/store/product.aspx?isbn=0132582201


       3 TOOLS FOR DEFECT PREVENTION IN JAVA SOFTWARE PROJECTS

Source: http://codedependents.com/2009/07/01/top-5-static-analysis-plugins-for-eclipse/



Code Coverage tool EclEmma http://www.eclemma.org/

Byte Code Analysis FindBugs http://findbugs.sourceforge.net/

Code Complexity Analysis http://www.stateofflow.com/projects/16/eclipsemetrics

Dependency Analysis JDepend4Eclipse http://andrei.gmxhome.de/jdepend4eclipse/

Source Code Analysis PMD http://pmd.sourceforge.net/




                                                          xxiv
Software Defects Prevention Techniques – Example Project




                                4 SAMPLE PROJECT SPECIFICATION

Project duration 3 months, single developer , 5000 lines of code (including comments), 15 Java 2 Micro Edition
classes



Tools used: Sun J2ME Wireless Toolkit, Eclipse, IBM WebSphere Device Developer 5.5, CVS, Motorola and Nokia
phone emulators and SDKs. Technology: J2ME, MIDP 2.0, CLDC 1.1.


Device-independent Java 2 Micro Edition (J2ME) midlet, executable in any emulator or mobile device, for displaying
map with scale, following moving objects, zoom in-out and pan, selection of location , measuring distance, following
individual or vehicle on map with route presentation, presentation of waypoints on map, presentation of list of
existing waypoints (sorted by name, type, distance) for selecting destination or editing and deletion, creating, editing
and deletion of waypoint – points with coordinates, name, type, icon; coordinates are defined by current position,
selected location on map or inserted in textual form, selection of waypoint as destination and navigation towards that
destination. Some classes implemented: MapBackground, MapObject, Point, SelectorPoint, PVector, MapsMIDlet

Project demo web site: https://sites.google.com/site/j2memaps/


    5 PMD, FINDBUGS AND STATEOFFLOW VIOLATIONS IN SOURCE CODE


Here are the violations detected in CommaHyphenString.java Description/ Line/ Type of tool




                                                            xxv
Zarko Acimovic


 Description                                                                                     Line        Type
 All classes and interfaces must belong to a named package                                               9   PMD Marker
 Unused field: CommaHyphenString.lastIndex                                                              12   FindBugs
 Use explicit scoping instead of the default package private level                                      12   PMD Marker
 Document empty constructor                                                                             13   PMD Marker
 Lines of Code in Method is 27                                                                          16   Metrics Marker
 Number of Statements is 28                                                                             16   Metrics Marker
 Avoid variables with short names like s                                                                19   PMD Marker
 Parameter 's' is not assigned and could be declared final                                              19   PMD Marker
 Use explicit scoping instead of the default package private level                                      19   PMD Marker
 Local variable 'lastIndex' could be declared final                                                     20   PMD Marker
 Avoid variables with short names like ss                                                               22   PMD Marker
 A method should have only one exit point, and that should be the last statement in the method          24   PMD Marker
 Avoid variables with short names like v                                                                27   PMD Marker
 Consider replacing this Vector with the newer java.util.List                                           27   PMD Marker
 Local variable 'v' could be declared final                                                             27   PMD Marker
 Use ArrayList instead of Vector                                                                        27   PMD Marker
 Avoid variables with short names like ss                                                               35   PMD Marker
 Lines of Code in Method is 16                                                                          44   Metrics Marker
 Avoid variables with short names like s                                                                47   PMD Marker
 Parameter 's' is not assigned and could be declared final                                              47   PMD Marker
 Use explicit scoping instead of the default package private level                                      47   PMD Marker
 Avoid using if statements without curly braces                                                         53   PMD Marker
 CommaHyphenString.getStringsOnly(String) concatenates strings using + in a loop                        54   FindBugs
 Prefer StringBuffer over += for concatenating strings                                                  54   PMD Marker
 Parameter 's' is not assigned and could be declared final                                              65   PMD Marker
 Use explicit scoping instead of the default package private level                                      65   PMD Marker



Here is the CommaHyphenString.java source code

        1   /**
        2    *
        3    * CommaHyphenString parses .properties file. It eliminates commas or low
lines
     4   * from .properties file so items in it( such as categories) could be
properly
     5   * showed on screen
     6   */
     7 import java.util.*;
     8
     9 public class CommaHyphenString {
    10
    11          //String s;
    12          int lastIndex;
    13          CommaHyphenString(){}
    14
    15
    16     /** Eliminates commas, returns array of strings with low line


                                                                  xxvi
Software Defects Prevention Techniques – Example Project


17   * @return String[]
18   */
19       String[] getWithLowLine(String s) {
20               int lastIndex = defineLast(s);
21               if(lastIndex==0){
22                        String[] ss = new String[1];
23                        ss[0] = s;
24                        return ss;
25               } else {
26                        int start = -1;
27                        Vector v = new Vector();
28                        int current = s.indexOf(',');
29                        do {
30                                v.addElement(s.substring(start+1,current));
31                                start = current;
32                                current = s.indexOf(',',current+1);
33                        } while (start!=lastIndex);
34
35                           String[] ss = new String[v.size()+1];
36                           for(int i=0; i<v.size(); i++){
37                                   ss[i] = (String)v.elementAt(i);
38                           }
39                           ss[v.size()] = s.substring(lastIndex+1,s.length());
40                           return ss;
41               }
42        }
43
44   /** Eliminates low line
45    * @return String[]
46    */
47    String[] getStringsOnly(String s){
48        String[] temp = this.getWithLowLine(s);
49        for (int i=0; i<temp.length; i++){
50                char[] tempChar = temp[i].toCharArray();
51                String k = "";
52                for (int j=0; j<tempChar.length; j++){
53                        if(tempChar[j]=='_') tempChar[j]=' ';
54                        k+=tempChar[j];
55                }
56                temp[i] = k;
57        }
58        return temp;
59    }
60
61
62   /** Returns categories with low line
63    * @return String[]
64    */
65    String[] getCategoriesHyphen(String s){
66        return this.getWithLowLine(s);
67    }


                                          xxvii
Zarko Acimovic


    68
    69       /** Returns categories
    70        * @return String[]
    71        */
    72        String[] getCategories(String s){
    73            return this.getStringsOnly(s);
    74        }
    75
    76       /** Defines index of last comma in string
    77        * @return integer
    78        */
    79        public int defineLast(String s){
    80            int lastIndex = 0;
    81            char c[] = s.toCharArray();
    82                    for (int i=0; i<c.length; i++){
    83                            if(c[i]==',') lastIndex=i;
    84                    }
    85                    return lastIndex;
    86        }
    87
    88   }




CompassCanvas.java violations




                                          xxviii
Software Defects Prevention Techniques – Example Project


All classes and interfaces must belong to a named package                                      10   PMD Marker
Lack of Cohesion in Methods (Henderson-Sellers) is 75%                                         10   Metrics Marker
Lack of Cohesion in Methods (Total Correlation) is 1,668%                                      10   Metrics Marker
Number of Fields is 23                                                                         10   Metrics Marker
The class 'CompassCanvas' has a Cyclomatic Complexity of 6 (Highest = 17).                     10   PMD Marker
To be compliant to J2EE, a webapp should not use any thread.                                   10   PMD Marker
Too many fields                                                                                10   PMD Marker

Found non-transient, non-static member. Please mark as transient or provide accessors.         11   PMD Marker
Use explicit scoping instead of the default package private level                              11   PMD Marker
Found non-transient, non-static member. Please mark as transient or provide accessors.         12   PMD Marker
Use explicit scoping instead of the default package private level                              12   PMD Marker
Found non-transient, non-static member. Please mark as transient or provide accessors.         13   PMD Marker
Use explicit scoping instead of the default package private level                              13   PMD Marker
Found non-transient, non-static member. Please mark as transient or provide accessors.         14   PMD Marker
Use explicit scoping instead of the default package private level                              14   PMD Marker
Found non-transient, non-static member. Please mark as transient or provide accessors.         15   PMD Marker
Use explicit scoping instead of the default package private level                              15   PMD Marker
Avoid variables with short names like c                                                        18   PMD Marker
Unused field: CompassCanvas.c                                                                  18   FindBugs
Avoid variables with short names like t                                                        20   PMD Marker
To be compliant to J2EE, a webapp should not use any thread.                                   20   PMD Marker
Unread field: CompassCanvas.switchVar                                                          22   FindBugs
Unread field: CompassCanvas.switched                                                           23   FindBugs
It is a good practice to call super() in a constructor                                         38   PMD Marker
Lines of Code in Method is 24                                                                  38   Metrics Marker
Number of Statements is 33                                                                     38   Metrics Marker
Parameter 'mob' is not assigned and could be declared final                                    38   PMD Marker
Avoid empty catch blocks                                                                       53   PMD Marker
Avoid empty catch blocks                                                                       57   PMD Marker
To be compliant to J2EE, a webapp should not use any thread.                                   59   PMD Marker
Avoid really long methods.                                                                     63   PMD Marker
Avoid variables with short names like g                                                        63   PMD Marker
Cyclomatic Complexity is 10                                                                    63   Metrics Marker
Lines of Code in Method is 220                                                                 63   Metrics Marker
Number of Statements is 418                                                                    63   Metrics Marker
Parameter 'g' is not assigned and could be declared final                                      63   PMD Marker
The method 'paint' has a Cyclomatic Complexity of 17.                                          63   PMD Marker
The method paint() has an NCSS count of 144                                                    63   PMD Marker
The method paint() has an NPath complexity of 4375                                             63   PMD Marker
Avoid unnecessary comparisons in boolean expressions                                           68   PMD Marker




                                                               xxix
Zarko Acimovic



CompassCanvas.java violations - continued


 Avoid unused local variables such as 'mediumX'.                   122    PMD Marker
 Dead store to mediumX in CompassCanvas.paint(Graphics)            122    FindBugs
 The local variable mediumX is never read                          122    Java Problem
 Avoid unused local variables such as 'mediumY'.                   123    PMD Marker
 Dead store to mediumY in CompassCanvas.paint(Graphics)            123    FindBugs
 The local variable mediumY is never read                          123    Java Problem
 Avoid unnecessary comparisons in boolean expressions              285    PMD Marker




CompassCanvas.java source code


     1   /**
     2    *
     3    * ComapssCanvas draws compass on screen
     4    */
     5   import javax.microedition.lcdui.*;
     6   //import javax.microedition.midlet.*;
     7
     8
     9
    10   public class CompassCanvas extends Canvas implements Runnable{
    11           long north;
    12           long south;
    13           long east;
    14           long west;
    15           int bigRadius;
    16           int smallRadius;
    17           int smallestRadius;
    18           Coordinates c;
    19           long delta = 0;
    20           Thread t;
    21           boolean end = false;
    22           boolean switchVar = false;
    23           boolean switched = false;
    24           MapObjects mob;
    25
    26             int dummy1    =   0;
    27             int dummy2    =   0;
    28             int dummy3    =   0;
    29             int dummy4    =   0;
    30             Image img;
    31


                                                  xxx
Software Defects Prevention Techniques – Example Project


    32          Image imgDest;
    33          long destUp;
    34          long destDown;
    35          long gama;
    36
    37
    38          CompassCanvas(MapObjects mob){
    39             this.mob = mob;
    40             north = MathFP.toFP("0");
    41             south = MathFP.div(Coordinates.MathFP_2PI,MathFP.toFP("2"));
    42             east = MathFP.mul(Coordinates.MathFP_2PI,MathFP.toFP("0.25"));
    43             west = MathFP.mul(Coordinates.MathFP_2PI,MathFP.toFP("0.75"));
    44
    45             destUp = MathFP.toFP("0");
    46             destDown = MathFP.div(Coordinates.MathFP_2PI,MathFP.toFP("2"));
    47
    48             bigRadius = Math.min(this.getWidth(),this.getHeight());
    49             smallRadius = (int)(0.75*bigRadius);
    50             smallestRadius = (int)(0.37*bigRadius);
    51             try{
    52                     img = Image.createImage("Arrow2.jpg");
    53             }catch(Exception e){}
    54
    55              try{
    56                     imgDest = Image.createImage("Dest.jpg");
    57             }catch(Exception e){}
    58
    59             t = new Thread(this);
    60             t.start();
    61          }
    62
    63          public void paint(Graphics g){
    64                  //System.out.println("delta="+MathFP.toString(delta));
    65                  g.setColor(255,255,255);
    66                  g.fillRect(0,0,this.getWidth(),this.getHeight());
    67                  g.setColor(0,0,0);
    68                  if(end == false){
    69                           g.drawImage(img,75,25,0);
    70
    71
//System.out.println("this.getWidth()="+this.getWidth());
    72
//System.out.println("this.getHeight()="+this.getHeight());
    73                           g.drawArc(8,0,bigRadius,bigRadius,0,360);
    74                           g.drawArc(30,22,smallRadius,smallRadius,0,360);
    75
    76                           String sx =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma
thFP.sub(north,delta)))));




                                                xxxi
Zarko Acimovic


    77                          String sy =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma
thFP.sub(north,delta)))));
    78                          int ix = sx.indexOf('.');
    79                          sx = sx.substring(0,ix);
    80                          int iy = sy.indexOf('.');
    81                          sy = sy.substring(0,iy);
    82
    83                          int x = Integer.parseInt(sx);
    84                          int y = Integer.parseInt(sy);
    85
    86                          String s9 =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.sin(MathFP.sub(north,delta)))));
    87                          ix = s9.indexOf('.');
    88                          s9 = s9.substring(0,ix);
    89                          int NX = Integer.parseInt(s9);
    90                          String s10 =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.cos(MathFP.sub(north,delta)))));
    91                          iy = s10.indexOf('.');
    92                          s10 = s10.substring(0,iy);
    93                          int NY = Integer.parseInt(s10);
    94
    95                          g.drawString("N",x,y,0);
    96
    97                          sx =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma
thFP.sub(south,delta)))));
    98                          sy =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma
thFP.sub(south,delta)))));
    99                          ix = sx.indexOf('.');
   100                          sx = sx.substring(0,ix);
   101                          iy = sy.indexOf('.');
   102                          sy = sy.substring(0,iy);
   103
   104                          x = Integer.parseInt(sx);
   105                          y = Integer.parseInt(sy);
   106
   107                          String s11 =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.sin(MathFP.sub(south,delta)))));
   108                          ix = s11.indexOf('.');
   109                          s11 = s11.substring(0,ix);
   110                          int SX = Integer.parseInt(s11);
   111                          String s12 =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.cos(MathFP.sub(south,delta)))));
   112                          iy = s12.indexOf('.');
   113                          s12 = s12.substring(0,iy);


                                        xxxii
Software Defects Prevention Techniques – Example Project


   114                          int SY = Integer.parseInt(s12);
   115
   116
   117
   118                          g.drawString("S",x,y,0);
   119                          int del = 0;
   120                          g.drawLine(NX-del,NY-del,SX-del,SY-del);
   121
   122                          int mediumX = (int)Math.abs((NX-SX)/2);
   123                          int mediumY = (int)Math.abs((NY-SY)/2);
   124
   125                          String s1 =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(10),MathFP.sin(Ma
thFP.sub(east,delta)))));
   126                          String s2 =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(10),MathFP.cos(Ma
thFP.sub(east,delta)))));
   127
   128                          String s3 =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(10),MathFP.sin(Ma
thFP.sub(west,delta)))));
   129                          String s4 =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(10),MathFP.cos(Ma
thFP.sub(west,delta)))));
   130
   131                          ix = s1.indexOf('.');
   132                          s1 = s1.substring(0,ix);
   133                          dummy1 = Integer.parseInt(s1);
   134
   135                          ix = s2.indexOf('.');
   136                          s2 = s2.substring(0,ix);
   137                          dummy2 = Integer.parseInt(s2);
   138
   139                          ix = s3.indexOf('.');
   140                          s3 = s3.substring(0,ix);
   141                          dummy3 = Integer.parseInt(s3);
   142
   143                          ix = s4.indexOf('.');
   144                          s4 = s4.substring(0,ix);
   145                          dummy4 = Integer.parseInt(s4);
   146
   147                          g.drawLine(NX-del,NY-del,dummy1,dummy2);
   148                          g.drawLine(dummy1,dummy2,SX-del,SY-del);
   149                          g.drawLine(NX-del,NY-del,dummy3,dummy4);
   150                          g.drawLine(dummy3,dummy4,SX-del,SY-del);
   151
   152                          sx =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma
thFP.sub(east,delta)))));




                                                xxxiii
Zarko Acimovic


   153                          sy =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma
thFP.sub(east,delta)))));
   154                          ix = sx.indexOf('.');
   155                          sx = sx.substring(0,ix);
   156                          iy = sy.indexOf('.');
   157                          sy = sy.substring(0,iy);
   158
   159                          x = Integer.parseInt(sx);
   160                          y = Integer.parseInt(sy);
   161
   162                          g.drawString("E",x,y,0);
   163
   164                          sx =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma
thFP.sub(west,delta)))));
   165                          sy =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma
thFP.sub(west,delta)))));
   166                          ix = sx.indexOf('.');
   167                          sx = sx.substring(0,ix);
   168                          iy = sy.indexOf('.');
   169                          sy = sy.substring(0,iy);
   170
   171                          x = Integer.parseInt(sx);
   172                          y = Integer.parseInt(sy);
   173
   174                          g.drawString("W",x,y,0);
   175
   176
   177
   178
   179                          gama = MathFP.sub(delta,gama);
   180                          //gama = MathFP.toFP("314");
   181                          long gamaDegrees =
Coordinates.radiansToDegrees(gama);
   182                          //long gamaDegrees = gama;
   183
//System.out.println("gama="+MathFP.toString(gamaDegrees));
   184                          //gama = Coordinates.degreesToRadians(gama);
   185
   186                          long corrX =
MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),MathFP.sin(MathFP
.sub(destUp,gama))));
   187                          long corrY =
MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),MathFP.cos(MathFP
.sub(destUp,gama))));
   188
   189                          long dx = 0;
   190                          long dy = 0;
   191


                                        xxxiv
Software Defects Prevention Techniques – Example Project


   192                           if(gamaDegrees<=0) {
   193                                   gama =
MathFP.add(gama,Coordinates.MathFP_2PI);
   194                                   gamaDegrees =
MathFP.add(gamaDegrees,MathFP.toFP("360"));
   195                           }
   196
   197                           // Correction of position for imgDest
   198                           if(MathFP.toFP("0")<=gamaDegrees && gamaDegrees
<MathFP.toFP("10")){
   199                                   dx = 0-
MathFP.mul(MathFP.toFP("10"),MathFP.cos(gama));
   200                                   dy = 0-
MathFP.mul(MathFP.toFP("23"),MathFP.cos(gama));
   201                           }
   202
   203
   204                           if(MathFP.toFP("10")<=gamaDegrees && gamaDegrees
<MathFP.toFP("50")){
   205                                   dx = 0-
MathFP.mul(MathFP.toFP("25"),MathFP.cos(gama));
   206                                   dy = 0-
MathFP.mul(MathFP.toFP("23"),MathFP.cos(gama));
   207                           }
   208
   209                           if(MathFP.toFP("50")<=gamaDegrees && gamaDegrees
<MathFP.toFP("67")){
   210                                   dx = 0-
MathFP.mul(MathFP.toFP("40"),MathFP.cos(gama));
   211                                   dy = 0-
MathFP.mul(MathFP.toFP("30"),MathFP.cos(gama));
   212                           }
   213
   214                           if(MathFP.toFP("67")<=gamaDegrees && gamaDegrees
<MathFP.toFP("85")){
   215                                   dx = 0-
MathFP.mul(MathFP.toFP("25"),MathFP.sin(gama));
   216                                   dy = 0-
MathFP.mul(MathFP.toFP("12"),MathFP.sin(gama));
   217                           }
   218
   219                           if(MathFP.toFP("85")<=gamaDegrees &&
gamaDegrees<MathFP.toFP("175")){
   220                                   dx = 0-
MathFP.mul(MathFP.toFP("25"),MathFP.sin(gama));
   221                                   dy = 0-
MathFP.mul(MathFP.toFP("12"),MathFP.sin(gama));
   222                           }
   223
   224



                                                xxxv
Zarko Acimovic


   225                           if(MathFP.toFP("175")<=gamaDegrees   &&
gamaDegrees<MathFP.toFP("275")){
   226                                   dx =
MathFP.mul(MathFP.toFP("7"),MathFP.cos(gama));
   227                                   dy =
MathFP.mul(MathFP.toFP("7"),MathFP.sin(gama));
   228                           }
   229
   230                           if(MathFP.toFP("275")<=gamaDegrees   &&
gamaDegrees<=MathFP.toFP("360")){
   231                                   dx = 0-
MathFP.mul(MathFP.toFP("8"),MathFP.cos(gama));
   232                                   dy = 0-
MathFP.mul(MathFP.toFP("25"),MathFP.cos(gama));
   233
   234                           }
   235
   236
   237
   238
   239                           long prevCorrX=corrX;
   240                           long prevCorrY=corrY;
   241
   242                           corrX = MathFP.add(corrX,dx);
   243                           corrY = MathFP.add(corrY,dy);
   244
   245
   246
   247                           sx = MathFP.toString(corrX);
   248                           sy = MathFP.toString(corrY);
   249                           ix = sx.indexOf('.');
   250                           sx = sx.substring(0,ix);
   251                           iy = sy.indexOf('.');
   252                           sy = sy.substring(0,iy);
   253                           int xbear1 = Integer.parseInt(sx);
   254                           int ybear1 = Integer.parseInt(sy);
   255
   256
   257                           sx = MathFP.toString(prevCorrX);
   258                           sy = MathFP.toString(prevCorrY);
   259                           ix = sx.indexOf('.');
   260                           sx = sx.substring(0,ix);
   261                           iy = sy.indexOf('.');
   262                           sy = sy.substring(0,iy);
   263                           int xbear3 = Integer.parseInt(sx);
   264                           int ybear3 = Integer.parseInt(sy);
   265
   266
   267




                                         xxxvi
Software Defects Prevention Techniques – Example Project


   268                          sx =
MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.sin(MathFP.sub(destDown,gama)))));
   269                          sy =
MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M
athFP.cos(MathFP.sub(destDown,gama)))));
   270
   271
   272                          ix = sx.indexOf('.');
   273                          sx = sx.substring(0,ix);
   274                          iy = sy.indexOf('.');
   275                          sy = sy.substring(0,iy);
   276                          int xbear2 = Integer.parseInt(sx);
   277                          int ybear2 = Integer.parseInt(sy);
   278
   279                          g.drawLine(xbear2,ybear2,xbear3,ybear3);
   280                          g.drawImage(imgDest,xbear1,ybear1,0);
   281                  }
   282          }
   283
   284          public void run(){
   285                  while(end == false){
   286                          delta = mob.getDirection();
   287                          gama = mob.getBearing();
   288                          repaint();
   289                          try{
   290                                   Thread.sleep(100);
   291                          }catch(Exception e){}
   292
   293                  }
   294          }
   295
   296          public void setEnd(){
   297                  end = true;
   298          }
   299
   300 }




                                                xxxvii
Zarko Acimovic


Coordinates.java violations


 All classes and interfaces must belong to a named package                                         9   PMD Marker
 Lack of Cohesion in Methods (Henderson-Sellers) is 100%                                           9   Metrics Marker
 Lack of Cohesion in Methods (Pairwise Field Irrelation) is 100%                                   9   Metrics Marker
 Lack of Cohesion in Methods (Total Correlation) is 100%                                           9   Metrics Marker
 Parameter 'latitude' is not assigned and could be declared final                                 38   PMD Marker
 Parameter 'longitude' is not assigned and could be declared final                                38   PMD Marker
 Parameter 'original' is not assigned and could be declared final                                 47   PMD Marker
 Parameter 'latitude' is not assigned and could be declared final                                 74   PMD Marker
 Parameter 'longitude' is not assigned and could be declared final                                82   PMD Marker
 Avoid variables with short names like to                                                         92   PMD Marker
 Cyclomatic Complexity is 6                                                                       95   Metrics Marker
 Lines of Code in Method is 47                                                                    95   Metrics Marker
 Number of Statements is 47                                                                       95   Metrics Marker
 Local variable 'deltaLat' could be declared final                                               107   PMD Marker
 Avoid using if statements without curly braces                                                  122   PMD Marker
 A method should have only one exit point, and that should be the last statement in the method   123   PMD Marker
 Avoid using if statements without curly braces                                                  125   PMD Marker
 A method should have only one exit point, and that should be the last statement in the method   127   PMD Marker
 Avoid using if...else statements without curly braces                                           127   PMD Marker
 A method should have only one exit point, and that should be the last statement in the method   129   PMD Marker
 Avoid using if...else statements without curly braces                                           129   PMD Marker
 Avoid using if statements without curly braces                                                  139   PMD Marker
 Avoid variables with short names like to                                                        148   PMD Marker




Coordinates.java source code



      1     /**
      2      *
      3      * Coordinates class different performs geographical calculations
      4      */
      5
      6
      7
      8     //import net.jscience.math.MathFP;
      9     public class Coordinates {
     10       /**
     11        * Earth's radius (in meters)
     12        */
     13       public static final long EARTH_RADIUS = MathFP.toFP(6367000);
     14       public static final long EARTH_RADIUS2 = MathFP.toFP(6367000*2);
     15       /**
     16        * the WGS-84 latitude of a location
     17        */


                                                                 xxxviii
Software Defects Prevention Techniques – Example Project


    18    private long latitude;
    19    /**
    20     * the WGS-84 longitude of a location
    21     */
    22    private long longitude;
    23    /**
    24     * The altitude of the location in meters, defined as height above WGS-84
ellipsoid. Float.NaN can be used to indicate that the altitude is not known.
    25     */
    26
    27
    28    /**
    29     * Constructor
    30     * @param     latitude    latitude as WGS-84 system coordinate
    31     * @param     longitude    longitude as WGS-84 system coordinate
    32     * @param     altitude    the altitude in meters, if known, or Float.NaN
    33     * @param     timestamp    the time when information stored in this object
was created, in milliseconds since midnight January 1, 1970 GMT, or -1
    34     * @param     source    the short string describing where data contained
in this object came from, like "GPS", "Network", "Database", etc
    35     * @param     horizontalAccuracy    the horizontal accuracy of coordinates
in meters, or Float.NaN
    36     * @param     verticalAccuracy    vertical accuracy of coordinates in
meters, or Float.NaN
    37     */
    38    public Coordinates(long latitude, long longitude){
    39      this.latitude=latitude;
    40      this.longitude=longitude;
    41    }
    42
    43    /**
    44     * Copy constructor
    45     * @param     original    copied object
    46     */
    47    public Coordinates(Coordinates original){
    48      this.latitude=original.latitude;
    49      this.longitude=original.longitude;
    50    }
    51
    52
    53    /**
    54     * The WGS-84 latitude of a location
    55     * @return WGS-84 latitude
    56     */
    57    public long getLatitude(){
    58      return latitude;
    59    }
    60
    61    /**
    62     * The WGS-84 longitude of a location
    63     * @return WGS-84 longitude


                                                 xxxix
Zarko Acimovic


    64     */
    65    public long getLongitude(){
    66       return longitude;
    67    }
    68
    69
    70    /**
    71     * Set latitude as WGS-84 system coordinate.
    72     * @param latitude latitude as WGS-84 system coordinate
    73     */
    74    public void setLatitude(long latitude){
    75       this.latitude=latitude;
    76    }
    77
    78    /**
    79     * Set longitude as WGS-84 system coordinate.
    80     * @param longitude longitude as WGS-84 system coordinate
    81     */
    82    public void setLongitude(long longitude){
    83       this.longitude=longitude;
    84    }
    85
    86    /**
    87     * Calculate bearing to another location on the surface of the Earth,
using the Great Circle.
    88     * bearing - 1.way of behaving 2.connection 3.direction shown by
compass 4.understanding of one's position
    89     * @param to another point
    90     * @return long representing angle in degrees [0,360) between
corresponding meridian in first point and line on the Great Circle between those
points
    91     */
    92    public long bearing(Coordinates to){
    93       return bearing(getLatitude(), getLongitude(), to.getLatitude(),
to.getLongitude());
    94    }
    95    /**
    96     * Calculate bearing between points (latFrom, lonFrom) and (latTo,lonTo)
on the surface of the Earth, using the Great Circle.
    97     * @param latFrom latitude of the first point
    98     * @param lonFrom longitude of the first point
    99     * @param latTo latitude of the second point
   100     * @param lonTo longitude of the second point
   101     * @return long representing angle in degrees [0,360) between
corresponding meridian in first point and line on the Great Circle between those
points
   102     */
   103    protected static long bearing(long latFrom, long lonFrom, long latTo,
long lonTo){
   104       //BMa: Some numeric with MathFP still happen - but error is mostly
below 16 degrees


                                          xl
Software Defects Prevention Techniques – Example Project


   105      // This should be fixed only if the final target device stays without
not have floats or doubles (e.g. it is not CLDC 1.1)
   106      long bearing;
   107      long deltaLat=latTo-latFrom;
   108      long deltaLon=lonTo-lonFrom;
   109      if (MathFP.abs(deltaLat)<MathFP_1 && MathFP.abs(deltaLon)<MathFP_1) {
   110        // longiude and latitude distance within one deegre, could invent
better condition
   111        //This approximation works better for smaller distances
   112        latFrom = degreesToRadians(latFrom);
   113        deltaLon=MathFP.mul(deltaLon, MathFP.cos(latFrom));
   114        bearing = MathFP.atan2(deltaLat,deltaLon);
   115      }else{
   116        latFrom = degreesToRadians(latFrom);
   117        latTo = degreesToRadians(latTo);
   118        lonFrom = degreesToRadians(lonFrom);
   119        lonTo = degreesToRadians(lonTo);
   120
   121
   122        if (latFrom==latTo && lonFrom==lonTo)
   123           return 0;
   124        //if (MathFP.cos(latFrom) < Double.MIN_VALUE)   // Double.MIN_VALUE a
small number ~ machine precision, so here we check for +/-0
   125        if (MathFP.cos(latFrom) == 0 )   // Double.MIN_VALUE a small number ~
machine precision, so here we check for +/-0
   126           if (latFrom > 0)
   127             return MathFP.PI;       // starting from N pole
   128           else
   129             return MathFP_2PI;        // starting from S pole
   130        //double bearing = radiansToDegrees(Math.atan2(Math.sin(lon2-
lon1)*Math.cos(lat2),Math.cos(lat1)*Math.sin(lat2)-
Math.sin(lat1)*Math.cos(lat2)*Math.cos(lon2-lon1))%(2*Math.PI));
   131
   132        bearing = MathFP.atan2(
   133        MathFP.mul(MathFP.sin(deltaLon),MathFP.cos(latTo)),
   134        MathFP.mul(MathFP.cos(latFrom),MathFP.sin(latTo))-
   135
MathFP.mul(MathFP.mul(MathFP.sin(latFrom),MathFP.cos(latTo)),MathFP.cos(deltaLon)))
;
   136      }
   137      bearing = MathFP.mod(radiansToDegrees(bearing), MathFP_360);
   138
   139      if (bearing<0) bearing = MathFP_360 + bearing;
   140      return bearing;
   141    }
   142
   143    /**
   144     * Calculate distance to another location on the surface of the Earth,
using the Great Circle.
   145     * @param to another point



                                                 xli
Zarko Acimovic


   146     * @return distance to another location in meters, using the line on the
Great Circle
   147     */
   148    public long distance(Coordinates to){
   149       //BMa: Some numeric with MathFP are still possible - errors happen
sometimes
   150       // This should be fixed only if the final target device stays without
not have floats or doubles (e.g. it is not CLDC 1.1)
   151       return calculateDistance(getLatitude(), getLongitude(),
to.getLatitude(), to.getLongitude());
   152    }
   153
   154    /**
   155     * Calculate distance between points (latFrom, lonFrom) and (latTo,lonTo)
on the surface of the Earth, using the Great Circle.
   156     * lat , lon - degrees ([-90, +90]; [-180, +180])
   157     *
   158     * @param latFrom latitude of the first point
   159     * @param lonFrom longitude of the first point
   160     * @param latTo latitude of the second point
   161     * @param lonTo longitude of the second point
   162     * @return distance to another location in meters, using the line on the
Great Circle
   163     */
   164    public static long calculateDistance(long latFrom, long lonFrom, long
latTo, long lonTo){
   165     /*
   166       * d=2*asin(sqrt((sin((latFrom-latTo)/2))^2 +
cos(latFrom)*cos(latTo)*(sin((lonFrom-lonTo)/2))^2))
   167       * or
   168       * d=2*asin(sqrt((sin((latFrom-latTo)/2))^2 +
cos(latFrom)*cos(latTo)*(sin((lonTo-lonFrom)/2))^2))
   169       * distance = R*d
   170       */
   171
   172       latFrom = degreesToRadians(latFrom);
   173       latTo = degreesToRadians(latTo);
   174       lonFrom = degreesToRadians(lonFrom);
   175       lonTo = degreesToRadians(lonTo);
   176       //long distance = R * MathFP.acos(MathFP.sin(latFrom)*MathFP.sin(latTo)
+ MathFP.cos(latFrom)*MathFP.cos(latTo)*MathFP.cos(lonTo-lonFrom));
   177       /*
   178       double distance = R * 2 * Math.asin(
   179                                   Math.sqrt(
   180                                     Math.pow(Math.sin((lat1-lat2)/2), 2)
   181                                     +
   182
Math.cos(lat1)*Math.cos(lat2)*Math.pow(Math.sin((lon2-lon1)/2), 2)
   183                                   )
   184                                 );
   185       */


                                          xlii
Software Defects Prevention Techniques – Example Project


   186
   187 /*
   188      System.out.print("latFrom: "+MathFP.toString(latFrom));
   189      System.out.println(" lonFrom: "+MathFP.toString(lonFrom));
   190      System.out.print("latTo: "+MathFP.toString(latTo));
   191      System.out.println(" lonTo: "+MathFP.toString(lonTo));
   192      */
   193
   194      long p1=MathFP.sin(MathFP.div((latFrom-latTo), MathFP_2));
   195      p1 = MathFP.mul(p1, MathFP.toFP(1000000));
   196      //System.out.println(" p1: "+MathFP.toString(p1));
   197      p1 = MathFP.mul(p1, p1);
   198      //System.out.println(" p1: "+MathFP.toString(p1));
   199
   200      long p2=MathFP.sin(MathFP.div((lonTo-lonFrom), MathFP_2));
   201      p2 = MathFP.mul(p2, MathFP.toFP(1000000));
   202      //System.out.println(" p2: "+MathFP.toString(p2));
   203      p2 = MathFP.mul(p2, p2);
   204      //System.out.println(" p2: "+MathFP.toString(p2));
   205
   206      long sqrtarg=p1
+MathFP.mul(MathFP.mul(MathFP.cos(latFrom),MathFP.cos(latTo)),p2);
   207      //System.out.println(" sqrtarg: "+MathFP.toString(sqrtarg));
   208
   209      sqrtarg=MathFP.sqrt(sqrtarg);
   210      //System.out.println(" sqrtarg: "+MathFP.toString(sqrtarg));
   211
   212      long distance;
   213      if (sqrtarg>MathFP.toFP(19000)) { //toFP("0.019")*1000000 - boundary
for MathFP.asin approximation by X
   214         // calculation is erroneus for small angles
   215         long asinarg=MathFP.div(sqrtarg, MathFP.toFP(1000000));
   216         //System.out.println(" > asinarg: "+MathFP.toString(asinarg));
   217         asinarg=MathFP.asin(asinarg);
   218         //System.out.println(" > asinarg: "+MathFP.toString(asinarg));
   219         distance = MathFP.mul(EARTH_RADIUS2, asinarg);
   220         //System.out.println(" distance asin: "+MathFP.toString(distance));
   221      } else {
   222         //asin(X) is aproximately equall to X,
   223         //This approximation allow us to change the order of multiplication
and division in order to reduce loss of significant digits
   224
   225         distance = MathFP.mul(EARTH_RADIUS2, sqrtarg);
   226         //System.out.println(" > distance: "+MathFP.toString(distance));
   227         distance=MathFP.div(distance, MathFP.toFP(1000000));
   228
   229      }
   230
   231      //System.out.println(" distance: "+MathFP.toString(distance));
   232
   233      //if (Double.isNaN(distance)) //equivalent to (distance=0), but safer


                                                 xliii
Zarko Acimovic


   234      // return 0;
   235      return distance;
   236    }
   237
   238
   239    /**
   240     * Convert degrees to radians
   241     * @return value transformed to radians
   242     * @param    degrees    value to be transformed to radians
   243     */
   244    public static long degreesToRadians(long degrees){
   245      return MathFP.div(degrees,MathFP_180DivPI);
   246    }
   247
   248    /**
   249     * Convert radians to degrees
   250     * @return value transformed to degrees
   251     * @param    radians    value to be transformed to degrees
   252     */
   253    public static long radiansToDegrees(long radians){
   254      return MathFP.mul(radians,MathFP_180DivPI);
   255    }
   256
   257    public static final long MathFP_2 = MathFP.toFP(2);
   258    public static final long MathFP_1 = MathFP.toFP(1);
   259    public static final long MathFP_2PI = MathFP.mul(MathFP_2, MathFP.PI);
   260    public static final long MathFP_1000 = MathFP.toFP(1000);
   261    public static final long MathFP_360 = MathFP.toFP(360);
   262    public static final long MathFP_180DivPI = MathFP.div(MathFP.toFP(180),
MathFP.PI);
   263    public static final long MathFP_0_5 = MathFP.toFP("0.5");
   264
   265
   266 }




                                         xliv
Software Defects Prevention Techniques – Example Project



DelRoute.java violations


 All classes and interfaces must belong to a named package                                       5   PMD Marker
 Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67%                                  5   Metrics Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          6   PMD Marker
 Use explicit scoping instead of the default package private level                               6   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          7   PMD Marker
 Use explicit scoping instead of the default package private level                               7   PMD Marker
 Parameter 'index' is not assigned and could be declared final                                   8   PMD Marker
 Parameter 'routeID' is not assigned and could be declared final                                 8   PMD Marker
 Use explicit scoping instead of the default package private level                              12   PMD Marker




     1 /**
     2   *
     3   * DelRoute is used when deleting route
     4   */
     5 public class DelRoute {
     6          int index;
     7          int routeID;
     8          DelRoute(int index, int routeID){
     9                  this.index = index;
    10                  this.routeID = routeID;
    11          }
    12          int getIndex(){
    13                  return index;
    14          }
    15          int getRouteID(){
    16                  return routeID;
    17          }
    18
    19          public String toString(){
    20                  return "ID Route is "+routeID+"n"+"Index of element to
delet is "+index;
    21          }
    22
    23 }




                                                                xlv
Zarko Acimovic



Friend.java violations


 All classes and interfaces must belong to a named package                                 5   PMD Marker
 Lack of Cohesion in Methods (Henderson-Sellers) is 83%                                    5   Metrics Marker
 Lack of Cohesion in Methods (Pairwise Field Irrelation) is 96%                            5   Metrics Marker
 Lack of Cohesion in Methods (Total Correlation) is 107%                                   5   Metrics Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.    6   PMD Marker
 Use explicit scoping instead of the default package private level                         6   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.    7   PMD Marker
 Use explicit scoping instead of the default package private level                         7   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.    8   PMD Marker
 Use explicit scoping instead of the default package private level                         8   PMD Marker
 Avoid variables with short names like t                                                   9   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.    9   PMD Marker
 Use explicit scoping instead of the default package private level                         9   PMD Marker
 Avoid variables with short names like t                                                  11   PMD Marker
 Parameter 'hashThread' is not assigned and could be declared final                       11   PMD Marker
 Parameter 'name' is not assigned and could be declared final                             11   PMD Marker
 Parameter 'resource' is not assigned and could be declared final                         11   PMD Marker
 Parameter 't' is not assigned and could be declared final                                11   PMD Marker
 Parameter 'hash' is not assigned and could be declared final                             30   PMD Marker
 A getX() method which returns a boolean should be named isX()                            42   PMD Marker




       1   /**
       2    *
       3    * Friend class holds all important data for a friend
       4    */
       5   public class Friend {
       6           String name;
       7           String resource;
       8           int hashThread;
       9           Thread4Friend t;
      10
      11                 Friend(String name, String resource, int hashThread, Thread4Friend
t){
      12                             this.name = name;
      13                             this.resource = resource;
      14                             this.hashThread = hashThread;
      15                             this.t = t;
      16          }
      17
      18          public String getName(){
      19              return name;
      20          }
      21
      22          public String getResource(){



                                                                xlvi
Software Defects Prevention Techniques – Example Project


23           return resource;
24       }
25
26       public int getHash(){
27           return hashThread;
28       }
29
30       public void setID(int hash){
31           hashThread = hash;
32       }
33
34       public String toString(){
35           return "Friend is "+name+"n"+"Hash is "+hashThread;
36       }
37
38       public void setFirst(){
39           t.setFirst();
40       }
41
42       public boolean getThread(){
43           if (t==null){ return false; }
44           else {return true; }
45       }
46
47       public void setThread(Thread4Friend t){
48           this.t = t;
49       }
50   }




                                             xlvii
Zarko Acimovic




HeapSorter.java violations


 All classes and interfaces must belong to a named package                5   PMD Marker
 This class has too many methods, consider refactoring it.                5   PMD Marker
 Document empty constructor                                               7   PMD Marker
 Avoid variables with short names like a                                  9   PMD Marker
 Avoid variables with short names like A                                 10   PMD Marker
 Avoid variables with short names like as                                23   PMD Marker
 Avoid variables with short names like AS                                24   PMD Marker
 Prefer StringBuffer over += for concatenating strings                   30   PMD Marker
 Avoid variables with short names like a                                 37   PMD Marker
 Parameter 'a' is not assigned and could be declared final               37   PMD Marker
 Avoid using for statements without curly braces                         38   PMD Marker
 Parameter 'as' is not assigned and could be declared final              41   PMD Marker
 Avoid using for statements without curly braces                         42   PMD Marker
 Lines of Code in Method is 21                                           45   Metrics Marker
 Parameter 'i' is not assigned and could be declared final               45   PMD Marker
 Local variable 'l' could be declared final                              46   PMD Marker
 Local variable 'r' could be declared final                              47   PMD Marker
 Local variable 'tmp' could be declared final                            62   PMD Marker
 Lines of Code in Method is 21                                           67   Metrics Marker
 Number of Statements is 21                                              67   Metrics Marker
 Parameter 'i' is not assigned and could be declared final               67   PMD Marker
 Local variable 'l' could be declared final                              68   PMD Marker




      1    /**
      2     *
      3     * HeapSorter class sorts points by distance or by name
      4     */
      5    public class HeapSorter{
      6
      7         HeapSorter(){}
      8
      9               public void heapsort(long[] a){
     10                       long[]A = setHeapWithSize(a,a.length);
     11                       buildHeap(A);
     12                       for(int i=0; i<A.length; i++){
     13                               System.out.println(A[i]);
     14                       }
     15                       for(int i=a.length; i>1; i--){
     16                               a[i-1]=A[0]; A[0]=A[i-1];
     17                               A=setHeapWithSize(A,A.length-1);
     18                               heapify(A,1);
     19                       }


                                                     xlviii
Software Defects Prevention Techniques – Example Project


    20           a[0]=A[0];
    21    }
    22
    23    public void heapsort(String[] as){
    24            String[] AS = setHeapWithSize(as,as.length);
    25            buildHeap(AS);
    26            for(int i=0; i<AS.length; i++){
    27                    System.out.println(AS[i]);
    28            }
    29            for(int i=as.length; i>1; i--){
    30                    as[i-1]=AS[0]; AS[0]=AS[i-1];
    31                    AS=setHeapWithSize(AS,AS.length-1);
    32                    heapify(AS,1);
    33            }
    34            as[0]=AS[0];
    35    }
    36
    37    public void buildHeap(long[] a){
    38            for(int i=a.length/2; i>0; i--) heapify(a,i);
    39    }
    40
    41    public void buildHeap(String[] as){
    42            for(int i=as.length/2; i>0; i--) heapify(as,i);
    43    }
    44
    45    public void   heapify(long[]a, int i){
    46            int   l=left(i);
    47            int   r=right(i);
    48            int   largest;
    49
    50           if(l<=heapSize(a) && a[l-1]>a[i-1]){
    51                   largest=l;
    52           }else{
    53                   largest=i;
    54           }
    55
    56           if(r<=heapSize(a) && a[r-1]>a[largest-1]){
    57                   largest=r;
    58           }
    59
    60            if(largest!=i){
    61                    //exchange a[i], a[largest]
    62                    long tmp=a[i-1]; a[i-1]=a[largest-1]; a[largest-
1]=tmp;
    63                       heapify(a,largest);
    64           }
    65    }
    66
    67    public void heapify(String[]as, int i){
    68            int l=left(i);
    69            int r=right(i);


                                           xlix
Zarko Acimovic


    70                   int largest;
    71
    72                   if(l<=heapSize(as) && as[l-1].charAt(0)>as[i-1].charAt(0)){
    73                           largest=l;
    74                   }else{
    75                           largest=i;
    76                   }
    77
    78                   if(r<=heapSize(as) && as[r-1].charAt(0)>as[largest-
1].charAt(0)){
    79                            largest=r;
    80                   }
    81
    82                   if(largest!=i){
    83                           //exchange a[i], a[largest]
    84                           String tmpS=as[i-1]; as[i-1]=as[largest-1];
as[largest-1]=tmpS;
    85                            heapify(as,largest);
    86                   }
    87          }
    88
    89
    90          public   int heapSize(long a[]){
    91                    return a.length;
    92          }
    93
    94          public   int heapSize(String as[]){
    95                    return as.length;
    96          }
    97
    98          public   int parent(int i){
    99                    return(i/2);
   100          }
   101
   102          public   int left(int i){
   103                    return(2*i);
   104          }
   105
   106          public   int right(int i){
   107                    return(2*i+1);
   108          }
   109
   110          public   long[] setHeapWithSize(long[]m , int n){
   111                    long[] k = new long[n];
   112                    for(int i=0; i<n; i++){
   113                            k[i]=m[i];
   114                    }
   115                    return k;
   116          }
   117
   118          public   String[] setHeapWithSize(String[]m , int n){


                                              l
Software Defects Prevention Techniques – Example Project


    119                              String[] k = new String[n];
    120                              for(int i=0; i<n; i++){
    121                                      k[i]=m[i];
    122                              }
    123                              return k;
    124                 }
    125    };

ImageCanvas3.java violations


 All classes and interfaces must belong to a named package                                      10   PMD Marker
 Avoid variables with short names like ol                                                       12   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.         12   PMD Marker
 Use explicit scoping instead of the default package private level                              12   PMD Marker
 Avoid variables with short names like ol                                                       14   PMD Marker
 It is a good practice to call super() in a constructor                                         14   PMD Marker
 Parameter 'ol' is not assigned and could be declared final                                     14   PMD Marker
 Avoid variables with short names like g                                                        19   PMD Marker
 Parameter 'g' is not assigned and could be declared final                                      19   PMD Marker
 Cyclomatic Complexity is 8                                                                     23   Metrics Marker
 Lines of Code in Method is 38                                                                  23   Metrics Marker
 Number of Statements is 25                                                                     23   Metrics Marker
 Parameter 'keyCode' is not assigned and could be declared final                                23   PMD Marker




      1    /**
      2     *
      3     * ImageCanvas3 draws elements on screen and captures events on canvas
      4     */
      5
      6    //import java.io.IOException;
      7    import javax.microedition.lcdui.*;
      8    //import java.util.*;
      9
     10    public class ImageCanvas3 extends Canvas {
     11
     12                 Outlook ol;
     13
     14           ImageCanvas3(Outlook ol){
     15               this.ol =ol;
     16               ol.setCanvasWH(this.getWidth(),this.getHeight());
     17           }
     18
     19                 public void paint(Graphics g) {
     20                         ol.drawOutlook(g);
     21           }


                                                                 li
Zarko Acimovic


22
23       public void keyPressed (int keyCode){
24
25               //keyCode+=disabler;
26
27              if(keyCode==49){
28                      ol.ZoomIn();
29              repaint();
30              }
31
32              if(keyCode==50){
33                      ol.ZoomOut();
34              repaint();
35              }
36
37              if(keyCode==51){
38                      repaint();
39              }
40
41
42               switch (getGameAction(keyCode)) {
43                       case Canvas.UP:
44                               ol.setMap('u');
45                               repaint();
46                               break;
47               case Canvas.DOWN:
48                       ol.setMap('d');
49                       repaint();
50                       break;
51               case Canvas.LEFT:
52                       ol.setMap('l');
53                               repaint();
54                               break;
55               case Canvas.RIGHT:
56                       ol.setMap('r');
57                               repaint();
58                               break;
59       }
60       }
61   }




                                   lii
Software Defects Prevention Techniques – Example Project



MapBackground.java violations


 All classes and interfaces must belong to a named package                                       10   PMD Marker
 Lack of Cohesion in Methods (Chidamber & Kemerer) is 214                                        10   Metrics Marker
 Lack of Cohesion in Methods (Henderson-Sellers) is 92%                                          10   Metrics Marker
 Lack of Cohesion in Methods (Pairwise Field Irrelation) is 82%                                  10   Metrics Marker
 Lack of Cohesion in Methods (Total Correlation) is 1,010%                                       10   Metrics Marker
 Number of Fields is 47                                                                          10   Metrics Marker
 The class 'MapBackground' has a Cyclomatic Complexity of 2 (Highest = 15).                      10   PMD Marker
 Too many fields                                                                                 10   PMD Marker
 Weighted Methods per Class is 64                                                                10   Metrics Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          14   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          18   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          20   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          24   PMD Marker
 Found non-transient, non-static member. Please mark as transient or provide accessors.          28   PMD Marker
 Avoid unused private fields such as 'upDlat'.                                                   65   PMD Marker
 The field MapBackground.upDlat is never read locally                                            65   Java Problem
 Unused field: MapBackground.upDlat                                                              65   FindBugs
 Avoid unused private fields such as 'upMlat'.                                                   69   PMD Marker
 The field MapBackground.upMlat is never read locally                                            69   Java Problem
 Unused field: MapBackground.upMlat                                                              69   FindBugs
 Avoid unused private fields such as 'upSlat'.                                                   73   PMD Marker
 The field MapBackground.upSlat is never read locally                                            73   Java Problem
 Unused field: MapBackground.upSlat                                                              73   FindBugs
 Avoid unused private fields such as 'dwDlat'.                                                   77   PMD Marker
 The field MapBackground.dwDlat is never read locally                                            77   Java Problem
 Unused field: MapBackground.dwDlat                                                              77   FindBugs
 Avoid unused private fields such as 'dwMlat'.                                                   81   PMD Marker
 The field MapBackground.dwMlat is never read locally                                            81   Java Problem
 Unused field: MapBackground.dwMlat                                                              81   FindBugs
 The field MapBackground.dwSlat is never read locally                                            85   Java Problem
 Unused field: MapBackground.dwSlat                                                              85   FindBugs
 The field MapBackground.lfDlon is never read locally                                            90   Java Problem
 Unused field: MapBackground.lfDlon                                                              90   FindBugs
 The field MapBackground.lfMlon is never read locally                                            94   Java Problem
 Unused field: MapBackground.lfMlon                                                              94   FindBugs
 The field MapBackground.lfSlon is never read locally                                            98   Java Problem
 Unused field: MapBackground.lfSlon                                                              98   FindBugs
 The field MapBackground.rtDlon is never read locally                                           102   Java Problem
 Unused field: MapBackground.rtDlon                                                             102   FindBugs
 The field MapBackground.rtMlon is never read locally                                           106   Java Problem




                                                                 liii
Zarko Acimovic



MapBacground.java violations – continued


 Use explicit scoping instead of the default package private level                        137   PMD Marker
 Use explicit scoping instead of the default package private level                        142   PMD Marker
 Use explicit scoping instead of the default package private level                        147   PMD Marker
 Unused field: MapBackground.sidePan                                                      151   FindBugs
 Avoid variables with short names like x                                                  155   PMD Marker
 Avoid variables with short names like y                                                  159   PMD Marker
 Unread field: MapBackground.param                                                        208   FindBugs
 Lines of Code in Method is 44                                                            211   Metrics Marker
 Number of Parameters is 7                                                                211   Metrics Marker
 Number of Statements is 47                                                               211   Metrics Marker
 Parameter 'name0' is not assigned and could be declared final                            211   PMD Marker
 Parameter 'name1' is not assigned and could be declared final                            211   PMD Marker
 Parameter 'name2' is not assigned and could be declared final                            211   PMD Marker
 Parameter 'latStr1' is not assigned and could be declared final                          212   PMD Marker
 Parameter 'lonStr1' is not assigned and could be declared final                          213   PMD Marker
 Avoid empty catch blocks                                                                 239   PMD Marker
 The String literal "3600" appears 4 times in this file; the first occurrence is on 249   249   PMD Marker
 Local variable 'pxy1' could be declared final                                            277   PMD Marker
 Local variable 'pxy2' could be declared final                                            280   PMD Marker
 Local variable 'tt1' could be declared final                                             333   PMD Marker
 Local variable 'tt2' could be declared final                                             334   PMD Marker
 Cyclomatic Complexity is 15                                                              361   Metrics Marker
 Lines of Code in Method is 50                                                            361   Metrics Marker
 Number of Statements is 37                                                               361   Metrics Marker
 The method 'setMap' has a Cyclomatic Complexity of 15.                                   364   PMD Marker
 The method setMap() has an NPath complexity of 672                                       364   PMD Marker
 Avoid unnecessary comparisons in boolean expressions                                     367   PMD Marker
 Avoid using if statements without curly braces                                           369   PMD Marker
 Avoid using if statements without curly braces                                           373   PMD Marker
 Avoid unnecessary comparisons in boolean expressions                                     378   PMD Marker
 These nested if statements could be combined                                             378   PMD Marker
 Avoid using if statements without curly braces                                           382   PMD Marker
 Avoid unnecessary comparisons in boolean expressions                                     388   PMD Marker
 These nested if statements could be combined                                             388   PMD Marker
 Avoid using if statements without curly braces                                           390   PMD Marker
 Avoid using if statements without curly braces                                           393   PMD Marker
 Avoid unnecessary comparisons in boolean expressions                                     399   PMD Marker
 These nested if statements could be combined                                             399   PMD Marker
 Lines of Code in Method is 27                                                            425   Metrics Marker
 Number of Statements is 22                                                               425   Metrics Marker




                                                                        liv
Software Defects Prevention Techniques – Example Project



MapBackground.java violations continued


 Consider replacing this Vector with the newer java.util.List                               478   PMD Marker
 Avoid using implementation types like 'Vector'; use the interface instead                  484   PMD Marker
 Avoid using implementation types like 'Vector'; use the interface instead                  484   PMD Marker
 Avoid variables with short names like v                                                    484   PMD Marker
 Consider replacing this Vector with the newer java.util.List                               484   PMD Marker
 Avoid variables with short names like g                                                    490   PMD Marker
 Local variable 'lx' could be declared final                                                491   PMD Marker
 Cyclomatic Complexity is 11                                                                542   Metrics Marker
 Lines of Code in Method is 67                                                              542   Metrics Marker
 Number of Statements is 69                                                                 542   Metrics Marker




     1 /**
     2   *
     3   * MapBackground transforms map according to user actions, zoom In, zoom
out or pan
     4   */
     5 import java.util.*;
     6 import java.io.*;
     7 import javax.microedition.lcdui.*;
     8
     9
    10 public class MapBackground {
    11
    12     /** Current JPEG Background of map
    13      */
    14          private Image img;
    15
    16     /** Images for Different Zoom Levels;
    17      */
    18      private Image[] zoomImg = new Image[3];
    19
    20      private int zoomLevel = 0;
    21
    22     /** Width of current background image
    23      */
    24          private long sizeX;
    25
    26     /** Height of current background image
    27      */
    28          private long sizeY;
    29
    30
    31     /** Float-point value of upper limit
    32      */



                                                            lv
Zarko Acimovic


33        private long upLat;
34
35   /** Float-point value of lower limit
36    */
37        private long downLat;
38
39   /** Side of upper limit
40    */
41        //private char upNS;
42
43   /** Side of lower limit
44    */
45        //private char downNS;
46
47   /** Float-point value of left limit
48    */
49        private long leftLon;
50
51   /** Float-point value of right limit
52    */
53        private long rightLon;
54
55   /** Side of left limit
56    */
57        //private char leftWE;
58
59   /** Side of right limit
60    */
61        ///private char rightWE;
62
63   /** Integer value of latitude degrees of upper limit
64    */
65        private long upDlat;
66
67   /** Integer value of latitude minutes of upper limit
68    */
69        private long upMlat;
70
71   /** Integer value of latitude seconds of upper limit
72    */
73        private long upSlat;
74
75   /** Integer value of latitude degrees of lower limit
76    */
77        private long dwDlat;
78
79   /** Integer value of latitude minutes of lower limit
80    */
81        private long dwMlat;
82
83   /** Integer value of latitude seconds of upper limit


                                      lvi
Software Defects Prevention Techniques – Example Project


 84   */
 85        private long dwSlat;
 86
 87
 88   /** Integer value of longitude degrees of left limit
 89    */
 90    private long lfDlon;
 91
 92   /** Integer value of longitude minutes of left limit
 93    */
 94        private long lfMlon;
 95
 96   /** Integer value of longitude seconds of left limit
 97    */
 98        private long lfSlon;
 99
100   /** Integer value of longitude degrees of right limit
101    */
102        private long rtDlon;
103
104   /** Integer value of longitude minutes of right limit
105    */
106        private long rtMlon;
107
108   /** Integer value of longitude seconds of right limit
109    */
110        private long rtSlon;
111
112
113   /** Scale of map
114    */
115    private long scale;
116
117   /** Number of lat-seconds per pixel
118    */
119        private long pixLat;
120
121   /** Number of lon-seconds per pixel
122    */
123        private long pixLon;
124
125
126   /** Total number of Latitude seconds for upper limit point
127    */
128    long totLatSec ;
129
130   /** Total number of Longitude seconds for left limit point
131    */
132    long totLonSec ;
133
134   /** new upper left edge due to pan or Zoom;


                                            lvii
Zarko Acimovic


135   * newEdge represents Point of upper left corner of visible screen
136   */
137   Point newEdge;
138
139   /** new upper left edge due to pan or Zoom;
140    * newEdge represents Point of upper left corner of visible screen
141    */
142    Point previousEdge;
143
144
145   /** World coordinates of Down end of Image
146    */
147    Point downEnd;
148
149   /** Character that represents side of Pan
150    */
151    char sidePan;
152
153   /** x-coordinate of begining of image
154    */
155    long x = 0;
156
157   /** y-coordinate of begining of image
158    */
159    long y = 0;
160
161   /** Indicates beginning of pan range verticaly
162    */
163    boolean reachBeginV = true;
164
165   /** Indicates end of pan range verticaly
166    */
167    boolean reachEndV = false;
168
169   /** Indicates beginning of pan range horizontaly
170    */
171    boolean reachBeginH = true;
172
173   /** Indicates end of pan range horizontaly
174    */
175    boolean reachEndH = false;
176
177   /** Step of panning
178    */
179    long step = 30;
180
181   /** Counter of shifts vertically
182    */
183    long movV=0;
184
185   /** Counter of shifts horizontally


                                    lviii
Software Defects Prevention Techniques – Example Project


186   */
187   long movH=0;
188
189   /** Name of smallest image
190    */
191    String[] imgArray = new String[3];
192
193   /** Canvas Height
194    */
195    private long canvasHeight;
196
197   /** Canvas Width
198    */
199    private long canvasWidth;
200
201
202   long previousPixLat;
203   long previousPixLon;
204
205   long minX;
206   long minY;
207
208   boolean param = false;
209
210
211        MapBackground( String name0, String name1, String name2,
212                                                String latStr1,
213                                                String lonStr1,
214                            String latStr2,
215                            String lonStr2 ) {
216        if(MathFP.toFP(latStr1)>MathFP.toFP(latStr2)){
217                this.upLat   = MathFP.toFP(latStr1);
218                this.downLat = MathFP.toFP(latStr2);
219        } else {
220                this.upLat   = MathFP.toFP(latStr2);
221                this.downLat = MathFP.toFP(latStr1);
222        }
223
224        if(MathFP.toFP(lonStr1)>MathFP.toFP(lonStr2)){
225                this.leftLon = MathFP.toFP(lonStr2);
226                this.rightLon = MathFP.toFP(lonStr1);
227        } else {
228                this.leftLon   = MathFP.toFP(lonStr1);
229                this.rightLon = MathFP.toFP(lonStr2);
230        }
231
232
233        imgArray[0] = name0;
234                imgArray[1] = name1;
235                imgArray[2] = name2;
236


                                             lix
Zarko Acimovic


    237                 try {
    238                         zoomImg[0] = Image.createImage(imgArray[0]);
    239                 } catch (IOException e) {}
    240
    241                 img = zoomImg[0];
    242                 sizeX = img.getWidth();
    243                 sizeY = img.getHeight();
    244
    245                 newEdge = new
Point(MathFP.toString(upLat),MathFP.toString(leftLon),"newEdge","","blanco",false);
    246
    247                 downEnd = new
Point(MathFP.toString(downLat),MathFP.toString(rightLon),"downEnd","","blanco",fals
e);
    248
    249                 this.totLatSec =
MathFP.mul(this.upLat,MathFP.toFP("3600"));
    250                 this.totLonSec =
MathFP.mul(this.leftLon,MathFP.toFP("3600"));
    251
    252
    253                 this.setPixels();
    254         }
    255
    256
    257
    258     /** Returns number of longitude seconds per pixel
    259     * @return int
    260     *
    261     */
    262         public long getPixLon(){
    263                 return pixLon;
    264         }
    265
    266    /** Returns number of latitude seconds per pixel
    267     * @return int
    268     */
    269         public long getPixLat(){
    270                 return pixLat;
    271         }
    272
    273    /** Sets pixels as Float-Point when main constructor is called
    274     * and when Zoom In/Out is applied
    275     */
    276     public void setPixels(){
    277         long pxy1 =
MathFP.mul(MathFP.sub(rightLon,leftLon),MathFP.toFP("3600"));
    278             pixLon = MathFP.div(pxy1,MathFP.toFP(sizeX));
    279
    280             long pxy2 =
MathFP.mul(MathFP.sub(upLat,downLat),MathFP.toFP("3600"));


                                          lx
Software Defects Prevention Techniques – Example Project


    281            pixLat = MathFP.div(pxy2,MathFP.toFP(sizeY));
    282   }
    283
    284   /** Returns image to draw
    285   *
    286   * @return Image
    287   */
    288       public Image getImage(){
    289               return img;
    290       }
    291
    292
    293   /** Returns total number of seconds for LEFT LONGITUDE
    294    * @return int
    295    */
    296    public long getLonSec() {
    297        return this.totLonSec;
    298    }
    299
    300   /** Returns total number of seconds for UPPER LATITUDE
    301    * @return int
    302    */
    303    public long getLatSec() {
    304        return this.totLatSec;
    305    }
    306
    307
    308   /** Returns Canvas height
    309    *
    310    * @return int
    311    */
    312    public long getCanvasHeight(){
    313        return canvasHeight;
    314    }
    315
    316   /** Returns Canvas width
    317    *
    318    * @return int
    319    */
    320    public long getCanvasWidth(){
    321        return canvasWidth;
    322    }
    323
    324   /** Sets newEdge; new Edge is created every time when user pans or zooms
map ;
    325   *   newEdge represents Point of upper left corner of visible screen (x=0
and
    326   * y=0 for newEdge)
    327   *
    328   * @return Point
    329   */


                                                lxi
Zarko Acimovic


   330      public void setNewEdge(){
   331          previousEdge = newEdge;
   332
   333          long tt1 =
MathFP.mul(this.getPixLat(),MathFP.toFP(Math.abs(this.getY())));
   334          long tt2 =
MathFP.mul(this.getPixLon(),MathFP.toFP(Math.abs(this.getX())));
   335
   336          newEdge = new Point(MathFP.sub(this.getLatSec(),tt1),
   337
MathFP.add(this.getLonSec(),tt2),"","",false);
   338      }
   339
   340     /** Returns new edge
   341      */
   342      public Point getNewEdge(){
   343          return newEdge;
   344      }
   345
   346     /** Returns down End
   347      */
   348      public Point getDownEnd(){
   349          return downEnd;
   350      }
   351
   352     /** Returns new Edge as String
   353      *
   354      * @return String
   355      */
   356      public String getNEdgeStr(){
   357          return newEdge.toString();
   358      }
   359
   360
   361     /** Sets map due to Pan transformation
   362      *
   363      */
   364      public void setMap(char side){
   365
   366          if (side=='u'){
   367                  if(reachBeginV==false){
   368                          y+=((this.img.getHeight() - canvasHeight)/step);
   369                          if(y>0) y=0;
   370                          movV--;
   371                  }
   372                  reachEndV=false;
   373                  if(movV==0) reachBeginV=true;
   374
   375          }
   376
   377          if (side=='d'){


                                         lxii
Software Defects Prevention Techniques – Example Project


378               if(reachEndV==false){
379                       y-=((this.img.getHeight()-canvasHeight)/step);
380                       movV++;
381                       reachBeginV=false;
382                       if(movV==step) reachEndV=true;
383               }
384
385        }
386
387        if (side=='l'){
388                if(reachBeginH==false){
389                        x+=((this.img.getWidth()-canvasWidth)/step);
390                        if(x>0) x=0;
391                        movH--;
392                        reachEndH=false;
393                        if(movH==0) reachBeginH=true;
394                }
395
396        }
397
398        if (side=='r'){
399                if(reachEndH==false) {
400                        x-=((this.img.getWidth()-canvasWidth)/step);
401                        movH++;
402                        reachBeginH=false;
403                        if(movH==step) reachEndH=true;
404
405               }
406        }
407
408        this.setNewEdge();
409
410   }
411
412
413   /** returns x-coordinate of begining of Image
414    */
415    public long getX(){
416        return x;
417    }
418
419   /** returns y-coordinate of begining of Image
420    */
421    public long getY(){
422        return y;
423    }
424
425   /** Zoom In
426    */
427   public boolean ZoomIn(){
428       boolean zoom = false;


                                            lxiii
Zarko Acimovic


   429          if(zoomLevel<2){
   430                  zoom = true;
   431                  this.setPreviousEdge();
   432
   433                  zoomLevel++;
   434                  if (zoomImg[zoomLevel]==null){
   435                           try{
   436                                   zoomImg[zoomLevel] =
Image.createImage(imgArray[zoomLevel]);
   437                           } catch(Exception e){}
   438                  }
   439                  this.img = zoomImg[zoomLevel];
   440                  this.sizeX = this.img.getWidth();
   441                  this.sizeY = this.img.getHeight();
   442                  this.setPixels();
   443
   444                  x=0-(((this.img.getWidth()-canvasWidth)/step)*movH);
   445                  y=0-(((this.img.getHeight()-canvasHeight)/step)*movV);
   446
   447                  this.setNewEdge();
   448
   449                  }
   450                  return zoom;
   451      }
   452
   453      /** Zoom Out
   454       */
   455      public boolean ZoomOut(){
   456          boolean zoom = false;
   457          if(zoomLevel>0){
   458                  zoom = true;
   459                  this.setPreviousEdge();
   460
   461                  zoomLevel--;
   462                  this.img = zoomImg[zoomLevel];
   463                  this.sizeX = this.img.getWidth();
   464                  this.sizeY = this.img.getHeight();
   465                  this.setPixels();
   466
   467                  x=0-(((this.img.getWidth()-canvasWidth)/step)*movH);
   468                  y=0-(((this.img.getHeight()-canvasHeight)/step)*movV);
   469
   470                  this.setNewEdge();
   471              }
   472              return zoom;
   473      }
   474
   475
   476     /** Increments Pan level
   477      */
   478      public void incPan(Vector v){


                                         lxiv
Software Defects Prevention Techniques – Example Project


479        if (step<10) step++;
480   }
481
482   /** Decrements Pan level
483    */
484    public void decPan(Vector v){
485        if (step>3) step--;
486    }
487
488   /** Draws Layout
489    */
490    public void drawMapBackground(Graphics g){
491        Long lx = new Long(x);
492        Long ly = new Long(y);
493        int xx = Integer.parseInt(lx.toString());
494        int yy = Integer.parseInt(ly.toString());
495
496        g.drawImage(img,xx,yy,0);
497   }
498
499   /** Set Canvas width and height
500    */
501    public void setCanvasWH(int canvasWidth, int canvasHeight){
502        this.canvasWidth = (long)canvasWidth;
503        this.canvasHeight = (long)canvasHeight;
504    }
505
506   public Point getPreviousEdge(){
507       return previousEdge;
508   }
509
510   public void setPreviousEdge(){
511       previousEdge = newEdge;
512       previousPixLat = pixLat;
513       previousPixLon = pixLon;
514   }
515
516   public long getPreviousPixLat(){
517       return previousPixLat;
518   }
519
520   public long getPreviousPixLon(){
521       return previousPixLon;
522   }
523
524   public long getZoomLevel(){
525       return zoomLevel;
526   }
527
528   public long imageHeight(){
529       return (long)img.getHeight();


                                            lxv
Zarko Acimovic


   530      }
   531
   532      public long imageWidth(){
   533          return (long)img.getWidth();
   534      }
   535
   536      public long getStep(){
   537          return step;
   538      }
   539
   540
   541
   542     /** Sets Background for selected Point
   543      * Used in SelectorPoint.selectWP
   544      */
   545      public void setBackground(Point ww){
   546
   547          long imgWidth = (long) this.img.getWidth();
   548          long imgHeight= (long) this.img.getHeight();
   549          minX = -Math.abs(imgWidth-canvasWidth);
   550          minY = -Math.abs(imgHeight-canvasHeight);
   551
   552          long difLat = MathFP.div(Math.abs(ww.getLatSec()-
this.getLatSec()),pixLat); //x pixel of ww
   553          long difLon = MathFP.div(Math.abs(ww.getLonSec()-
this.getLonSec()),pixLon); //y pixel of ww
   554          long p1 = MathFP.div(difLat,MathFP.div((this.img.getHeight()-
canvasHeight),step));
   555          long p2 = MathFP.div(difLon,MathFP.div((this.img.getWidth()-
canvasWidth),step));
   556
   557          p1 = MathFP.toLong(p1);
   558          p2 = MathFP.toLong(p2);
   559          p1--;
   560          p2--;
   561
   562
   563
   564          p1*=((this.img.getHeight()-canvasHeight)/step);
   565          p2*=((this.img.getWidth()-canvasWidth)/step);
   566
   567          /**
   568          if(param==true) {
   569                  p1 -=((this.img.getHeight()-canvasHeight)/step);
   570                  p2-=((this.img.getWidth()-canvasWidth)/step);
   571
   572                  p1 -=((this.img.getHeight()-canvasHeight)/step);
   573                  p2-=((this.img.getWidth()-canvasWidth)/step);
   574                  p2-=((this.img.getWidth()-canvasWidth)/step);
   575          }*/
   576


                                         lxvi
Software Defects Prevention Techniques – Example Project


577
578             this.x = 0 - p2; // x value of screen begining
579             this.y = 0 - p1; // y value of screen begining
580
581
582
583             movV = p1/((this.img.getHeight()-canvasHeight)/step);
584             movH = p2/((this.img.getWidth()-canvasWidth)/step);
585
586             if(x<minX){
587                     x=minX;
588                     movH=step;
589             }
590             if(y<minY){
591                     y=minY;
592                     movV=step;
593             }
594
595             if(x>0) x=0;
596             if(y>0) y=0;
597             if(movV<0) movV=0;
598             if(movH<0) movH=0;
599
600             if   (movV==step) {reachEndV=true;} else {reachEndV=false;}
601             if   (movV==0) {reachBeginV=true;} else {reachBeginV=false;}
602             if   (movH==step) {reachEndH=true;} else {reachEndH=false;}
603             if   (movH==0) {reachBeginH=true;} else {reachBeginH=false;}
604
605             this.setNewEdge();
606
607
608       }
609
610       /**
611       public void stela(long p1,long p2){
612           p1 -=((this.img.getHeight()-canvasHeight)/step);
613           p2+=((this.img.getWidth()-canvasWidth)/step);
614
615             p1 -=((this.img.getHeight()-canvasHeight)/step);
616             p2+=((this.img.getWidth()-canvasWidth)/step);
617             p2+=((this.img.getWidth()-canvasWidth)/step);
618             p2+=((this.img.getWidth()-canvasWidth)/step);
619       }*/
620
621
622
623
624
625   }
626



                                                  lxvii
Zarko Acimovic




MapBackgroundFactory.java violations



     All classes and interfaces must belong to a named package                                 5   PMD Marker
     Avoid variables with short names like m                                                   7   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    7   PMD Marker
     Use explicit scoping instead of the default package private level                         7   PMD Marker
     Lines of Code in Method is 17                                                             9   Metrics Marker
     Number of Parameters is 7                                                                 9   Metrics Marker
     Parameter 'name0' is not assigned and could be declared final                            21   PMD Marker
     Parameter 'name1' is not assigned and could be declared final                            21   PMD Marker
     Parameter 'name2' is not assigned and could be declared final                            21   PMD Marker




     1 /**
     2   *
     3   * Different map formats could be implemented and dealt with with
MapBackgroundFactory
     4   */
     5 public class MapBackgroundFactory {
     6
     7          MapBackground m;
     8
     9          /**
    10          MapBackgroundFactory(String name0, String name1, String name2,
    11                                                   int dLat1, int mLat1, int
sLat1, char sdNS1,
    12                                                   int dLon1, int mLon1, int
sLon1, char sdWE1,
    13                              int dLat2, int mLat2, int sLat2, char sdNS2,
    14                              int dLon2, int mLon2, int sLon2, char sdWE2,
int scale){
    15
    16                  //m = new MapBackground(name0,name1,name2,
    17
dLat1,mLat1,sLat1,sdNS1,dLon1,mLon1,sLon1,sdWE1,
    18                         dLat2,mLat2,sLat2,sdNS2,dLon2,mLon2,sLon2,sdWE2,
scale);
    19      }*/
    20
    21      MapBackgroundFactory(String name0, String name1, String name2,
    22                                           String lat1, String lon1, String
lat2, String lon2){
    23          m = new MapBackground(name0,name1,name2,
    24                                 lat1,lon1,lat2,lon2);
    25      }



                                                              lxviii
Software Defects Prevention Techniques – Example Project


     26
     27
     28           public MapBackground getMapBackground(){
     29               return m;
     30           }
     31
     32    }




MapObjects.java violations


      All classes and interfaces must belong to a named package                                  9   PMD Marker
      Lack of Cohesion in Methods (Chidamber & Kemerer) is 101                                   9   Metrics Marker
      Lack of Cohesion in Methods (Henderson-Sellers) is 83%                                     9   Metrics Marker
      Lack of Cohesion in Methods (Pairwise Field Irrelation) is 84%                             9   Metrics Marker
      Lack of Cohesion in Methods (Total Correlation) is 359%                                    9   Metrics Marker
      Number of Fields is 12                                                                     9   Metrics Marker
      The class 'MapObjects' has a Cyclomatic Complexity of 3 (Highest = 17).                    9   PMD Marker
      This class has too many methods, consider refactoring it.                                  9   PMD Marker
      Weighted Methods per Class is 72                                                           9   Metrics Marker
      Avoid variables with short names like mb                                                  11   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.    11   PMD Marker
      Use explicit scoping instead of the default package private level                         11   PMD Marker
      Use explicit scoping instead of the default package private level                         12   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.    13   PMD Marker
      Use explicit scoping instead of the default package private level                         13   PMD Marker
      Avoid excessively long variable names like destinationPosition                            14   PMD Marker
      Use explicit scoping instead of the default package private level                         14   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.    15   PMD Marker
      Use explicit scoping instead of the default package private level                         15   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead                 16   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead                 16   PMD Marker
      Consider replacing this Vector with the newer java.util.List                              16   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.    16   PMD Marker
      Unused field: MapObjects.currentRoute                                                     17   FindBugs
      Avoid using implementation types like 'Vector'; use the interface instead                 18   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead                 18   PMD Marker
      Consider replacing this Vector with the newer java.util.List                              18   PMD Marker




                                                                lxix
Zarko Acimovic



MapObjects.java violations – continued



      Avoid variables with short names like mb                                     26   PMD Marker
      Parameter 'mb' is not assigned and could be declared final                   26   PMD Marker
      Use ArrayList instead of Vector                                              32   PMD Marker
      Cyclomatic Complexity is 7                                                   36   Metrics Marker
      Lines of Code in Method is 41                                                36   Metrics Marker
      Number of Statements is 56                                                   36   Metrics Marker
      Consider replacing this Vector with the newer java.util.List                 40   PMD Marker
      Local variable 'temp1' could be declared final                               40   PMD Marker
      Use ArrayList instead of Vector                                              40   PMD Marker
      Consider replacing this Vector with the newer java.util.List                 41   PMD Marker
      Avoid variables with short names like wp                                     56   PMD Marker
      Local variable 'wp' could be declared final                                  56   PMD Marker
      Avoid variables with short names like v                                      64   PMD Marker
      Local variable 'v' could be declared final                                   64   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                         65   PMD Marker
      Avoid variables with short names like wp                                     69   PMD Marker
      Local variable 'wp' could be declared final                                  69   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead    81   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead    81   PMD Marker
      Consider replacing this Vector with the newer java.util.List                 81   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead    86   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead    86   PMD Marker
      Parameter 'wp' is not assigned and could be declared final                   92   PMD Marker
      Parameter 'wp' is not assigned and could be declared final                  117   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead   139   PMD Marker
      Avoid using implementation types like 'Vector'; use the interface instead   139   PMD Marker
      Cyclomatic Complexity is 9                                                  149   Metrics Marker
      Lines of Code in Method is 47                                               149   Metrics Marker
      Number of Levels is 5                                                       149   Metrics Marker
      Number of Locals in Scope is 7                                              149   Metrics Marker
      Number of Statements is 73                                                  149   Metrics Marker
      Parameter 'g' is not assigned and could be declared final                   151   PMD Marker




                                                         lxx
Software Defects Prevention Techniques – Example Project



MapsObjects.java violations

      Avoid unnecessary comparisons in boolean expressions                                          181   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                          184   PMD Marker
      Cyclomatic Complexity is 7                                                                    197   Metrics Marker
      Lines of Code in Method is 23                                                                 197   Metrics Marker
      Number of Statements is 42                                                                    197   Metrics Marker
      Avoid using if statements without curly braces                                                204   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                          206   PMD Marker
      Avoid using if statements without curly braces                                                217   PMD Marker
      Avoid using if statements without curly braces                                                218   PMD Marker
      A method should have only one exit point, and that should be the last statement in the method 259   PMD Marker
      Comparison of String parameter using == or != in MapObjects.removeRoute(String)               281   FindBugs
      Cyclomatic Complexity is 9                                                                    288   Metrics Marker
      Lines of Code in Method is 20                                                                 288   Metrics Marker
      Number of Statements is 36                                                                    288   Metrics Marker
      The method 'getDirection' has a Cyclomatic Complexity of 17.                                  288   PMD Marker
      The method getDirection() has an NPath complexity of 6561                                     288   PMD Marker
      Avoid using if statements without curly braces                                                296   PMD Marker
      Avoid using if statements without curly braces                                                297   PMD Marker
      Cyclomatic Complexity is 9                                                                    309   Metrics Marker
      Lines of Code in Method is 29                                                                 309   Metrics Marker
      Number of Statements is 48                                                                    309   Metrics Marker




                                                             lxxi
Zarko Acimovic



MapObjects.java



     1 /**
     2   *
     3   * MapObjects controls appearance of all map objects on current screen
     4   */
     5 import java.util.*;
     6 //import java.io.*;
     7 import javax.microedition.lcdui.*;
     8
     9 public class MapObjects {
    10
    11      MapBackground mb;
    12      Point currentPosition;
    13      Point previousPosition;
    14      Point destinationPosition;
    15      PVector freeWaypoints;
    16          Vector routes;
    17      PVector currentRoute;
    18      Vector drawablePoints;
    19      Hashtable friends;
    20      boolean drawLine = false;
    21      boolean destSet = false;
    22      boolean currentSet = false;
    23
    24
    25
    26      MapObjects(MapBackground mb){
    27          this.mb = mb;
    28          currentPosition = mb.getNewEdge();
    29          destinationPosition = mb.getNewEdge();
    30          currentPosition.setName("dummy");
    31          destinationPosition.setName("dummy");
    32          routes = new Vector();
    33          friends = new Hashtable();
    34      }
    35
    36     /** Sets drawable Points for current Screen
    37      *
    38      */
    39      public void setDrawablePoints(){
    40          Vector temp1 = new Vector();
    41          Vector temp2;
    42
    43          //check if current and destination are visible
    44          if(this.currentPosition.check(mb.getNewEdge(), mb.getDownEnd())) {
    45
currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());


                                         lxxii
Software Defects Prevention Techniques – Example Project


    46                  temp1.addElement(currentPosition);
    47          }
    48          if(this.destinationPosition.check(mb.getNewEdge(),
mb.getDownEnd())) {
    49
destinationPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    50                  temp1.addElement(destinationPosition);
    51          }
    52
    53          //check which free waypoints are visible
    54          temp2 = freeWaypoints.getPoints(mb.getNewEdge(),mb.getDownEnd());
    55          for (int j=0; j<temp2.size(); j++){
    56                  Point wp = (Point)temp2.elementAt(j);
    57                  wp.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    58                  temp1.addElement(wp);
    59          }
    60
    61
    62          //check which route points are visible
    63          for (int i=0; i<routes.size(); i++){
    64                  PVector v = (PVector)routes.elementAt(i);
    65                  if (v.getVisible()==true){
    66                          temp2 =
v.getPoints(mb.getNewEdge(),mb.getDownEnd());
    67
    68                                  for (int j=0; j<temp2.size(); j++){
    69                                  Point wp = (Point)temp2.elementAt(j);
    70
wp.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    71                                  temp1.addElement(wp);
    72                          }
    73                  }
    74          }
    75          drawablePoints = temp1;
    76      }
    77
    78     /** Returns drawable Points for current Screen
    79      * @return Vector
    80      */
    81      public Vector getDrawablePointsOld(){
    82
    83          return drawablePoints;
    84      }
    85
    86       public Vector getDrawablePoints(){
    87          this.setDrawablePoints();
    88          return drawablePoints;
    89      }
    90
    91
    92      public void setCurrentPosition(Point wp){


                                                lxxiii
Zarko Acimovic


    93          previousPosition = currentPosition;
    94          currentPosition = wp;
    95
currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    96          currentSet = true;
    97      }
    98
    99     /** Reset current position
   100      */
   101      public void resetCurrentPosition(){
   102          currentPosition = mb.getNewEdge();
   103          drawLine = false;
   104          currentSet = false;
   105      }
   106
   107     /** Returns current position
   108      * @return Point
   109      */
   110      public Point getCurrentPosition(){
   111          return currentPosition;
   112      }
   113
   114
   115      /** Set destination position
   116      */
   117      public void setDestinationPosition(Point wp){
   118          destinationPosition = wp;
   119          destSet = true;
   120      }
   121
   122     /** Reset destination position
   123      */
   124      public void resetDestinationPosition(){
   125          destinationPosition = mb.getNewEdge();
   126          drawLine = false;
   127          destSet = false;
   128      }
   129
   130     /** Returns destination position
   131      * @return Point
   132      */
   133      public Point getDestinationPosition(){
   134          return destinationPosition;
   135      }
   136
   137     /** Returns all routes
   138      */
   139      public Vector getRoutes(){
   140          return routes;
   141      }
   142


                                        lxxiv
Software Defects Prevention Techniques – Example Project


   143     /** Returns free Vector of free Points
   144      */
   145      public PVector getFreeWaypoints(){
   146          return freeWaypoints;
   147      }
   148
   149     /** Draws MapObjects --- OBSOLETED!!!
   150      */
   151      public void drawMOBold(Graphics g, boolean route){
   152          long zl = mb.getZoomLevel()+1;
   153          Long zzl = new Long(zl);
   154          int zoomL = Integer.parseInt(zzl.toString());
   155          this.setDrawablePoints();
   156
   157          // Drawing of line beetwen destination and current position
   158          if(drawLine==true){
   159
currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   160
destinationPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   161
g.drawLine(currentPosition.getXX(),currentPosition.getYY(),destinationPosition.getX
X(),destinationPosition.getYY());
   162          }
   163
   164          // Drawing of free Points, current position and destination
position
   165          for(int i=0; i<drawablePoints.size(); i++){
   166                           Point wp = (Point)drawablePoints.elementAt(i);
   167                           if(wp.getImage().equals("blanco")){
   168                           g.fillRect(wp.getXX(),wp.getYY(),5*zoomL,5*zoomL);
   169                           g.drawString(wp.getName(),wp.getXX()+5,wp.getYY()
+5,0);
   170                           } else {
   171                                    Image img = null;
   172                                    try{
   173                                            img =
Image.createImage(wp.getImage());
   174                                    }catch(Exception e){}
   175                                    g.drawImage(img,wp.getXX(),wp.getYY(),0);
   176                           }
   177
   178          }
   179
   180          // Drawing of route
   181          if(route==true){
   182                  for(int i=0; i<routes.size(); i++){
   183                           PVector wpv = (PVector)routes.elementAt(i);
   184                           if(wpv.getVisible()==true){
   185                                    for(int j=0; j<wpv.size()-1; j++){



                                                lxxv
Zarko Acimovic


    186                                                  Point wp1 = (Point)
wpv.elementAt(j);
    187                                                  Point wp2 = (Point)
wpv.elementAt(j+1);
    188
wp1.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    189
wp2.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    190
g.drawLine(wp1.getXX(),wp1.getYY(),wp2.getXX(),wp2.getYY());
    191                                  }
    192                          }
    193                 }
    194         }
    195     }
    196
    197    /** Draws MapObjects
    198     */
    199     public void drawMOB(Graphics g, boolean route){
    200         g.setColor(0,0,0);
    201
    202
freeWaypoints.drawVector(g,false,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(),mb.g
etZoomLevel());
    203
    204         if(friends.size()!=0)
this.getFriends().drawVector(g,false,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(),
0);
    205
    206         if(route==true){
    207                 for (int i =0; i<routes.size(); i++){
    208                          PVector wpv = (PVector)routes.elementAt(i);
    209
wpv.drawVector(g,route,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(),mb.getZoomLeve
l());
    210                 }
    211         }
    212
    213         if(currentSet) {
    214
currentPosition.drawPoint(g,mb.getNewEdge(),mb.getPixLat(),mb.getPixLon(),mb.getZoo
mLevel());
    215
    216         }
    217         if(destSet)
destinationPosition.drawPoint(g,mb.getNewEdge(),mb.getPixLat(),mb.getPixLon(),mb.ge
tZoomLevel());
    218                 if(currentSet && destSet)
g.drawLine(currentPosition.getXX(),currentPosition.getYY(),destinationPosition.getX
X(),destinationPosition.getYY());
    219         }


                                        lxxvi
Software Defects Prevention Techniques – Example Project


220
221
222
223
224   /** Adds free Point
225    */
226    public void addFreeWaypoint(Point wp){
227        this.freeWaypoints.addElement(wp);
228    }
229
230   /** Adds new route
231    */
232    public void addRoute(PVector v){
233        this.routes.addElement(v);
234    }
235
236   /** Adds new Point to route with routeID on position pos
237    */
238    public void addWP2Route(Point wp, int routeID, int pos) {
239        PVector route;
240        for (int i=0; i<routes.size(); i++){
241                route = (PVector)routes.elementAt(i);
242                if(route.getID()==routeID){
243                        route.insertElementAt(wp,pos);
244                        i=1000;
245                }
246        }
247    }
248
249   /** Sets free waypoints vector
250    */
251    public void setFreeWaypointsV(PVector wpv){
252        this.freeWaypoints = wpv;
253    }
254
255   /** Measure distance
256    */
257    public long measureDistance(Point wp){
258        if (currentPosition.equals(mb.getNewEdge())) {
259                return -1;
260        } else {
261                return currentPosition.measureDistance(wp);
262        }
263    }
264
265   public boolean currentSet(){
266       return currentSet;
267   }
268
269   public boolean destSet(){
270       return destSet;


                                           lxxvii
Zarko Acimovic


271   }
272
273
274   public void removeRoute(PVector wr){
275       routes.removeElement(wr);
276   }
277
278   public void removeRoute(String s){
279       for(int i=0; i<routes.size(); i++){
280               PVector rt = (PVector)routes.elementAt(i);
281               if (rt.getName()==s) {
282                       routes.removeElementAt(i);
283                       i=1000;
284               }
285       }
286   }
287
288   public long getDirection(){
289
290       long   direction = 0;
291       long   latP = previousPosition.getLat();
292       long   lonP = previousPosition.getLon();
293       long   latC = currentPosition.getLat();
294       long   lonC = currentPosition.getLon();
295
296       if(latC>latP && lonP==lonC) direction = MathFP.toFP("0");
297       if(latC>latP && lonC>lonP) direction = MathFP.toFP("45");
298       if(latP==latC && lonC>lonP) direction = MathFP.toFP("90");
299       if(latC<latP && lonC>lonP) direction = MathFP.toFP("135");
300       if(latC<latP && lonP==lonC) direction = MathFP.toFP("180");
301       if(latC<latP && lonC<lonP) direction = MathFP.toFP("225");
302       if(latP==latC && lonC<lonP) direction = MathFP.toFP("270");
303       if(latC>latP && lonC<lonP) direction = MathFP.toFP("315");
304
305       direction = Coordinates.degreesToRadians(direction);
306       return direction;
307   }
308
309   /** This is not working well
310    */
311   public long getBearing(){
312
313       long   bearing = 0;
314       long   latP = previousPosition.getLat();
315       long   lonP = previousPosition.getLon();
316       long   latD = destinationPosition.getLat();
317       long   lonD = destinationPosition.getLon();
318
319
320       //if(latD>latP && lonD==lonP) bearing = MathFP.toFP("0");



                                    lxxviii
Software Defects Prevention Techniques – Example Project


   321          if( latD>latP && MathFP.abs(MathFP.sub(lonD,lonP))<MathFP.toFP("5")
) bearing = MathFP.toFP("0");
   322          if(latD>latP && lonD>lonP) bearing = MathFP.toFP("45");
   323          //if(latD==latP && lonD>lonP) bearing = MathFP.toFP("90");
   324          if(MathFP.abs(MathFP.sub(latD,latP))<MathFP.toFP("5") && lonD>lonP)
bearing = MathFP.toFP("90");
   325          if(latD<latP && lonD>lonP) bearing = MathFP.toFP("135");
   326          //if(latD<latP && lonP==lonD) bearing = MathFP.toFP("180");
   327          if(latD<latP &&
MathFP.abs(MathFP.sub(lonD,lonP))<MathFP.toFP("5") ) bearing = MathFP.toFP("180");
   328          if(latD<latP && lonD<lonP) bearing = MathFP.toFP("225");
   329          //if(latP==latD && lonD<lonP) bearing = MathFP.toFP("270");
   330          if(MathFP.abs(MathFP.sub(latD,latP))<MathFP.toFP("5") && lonD<lonP)
bearing = MathFP.toFP("270");
   331          if(latD>latP && lonD<lonP) bearing = MathFP.toFP("315");
   332
   333
   334          bearing = Coordinates.degreesToRadians(bearing);
   335          return bearing;
   336
   337      }
   338
   339
   340      public void addNewFriend(int friendID){
   341          Point dummy = new Point(currentPosition,false);
   342          Integer frID = new Integer(friendID);
   343          friends.put(frID,dummy);
   344      }
   345
   346      public void updateFriend(Integer friendID,Point p){
   347          friends.put(friendID,p);
   348      }
   349
   350      public void deleteFriend(int friendID){
   351          Integer frID = new Integer(friendID);
   352          friends.remove(frID);
   353          System.out.println(friends);
   354      }
   355
   356      public void deleteAllFriends(){
   357          //System.out.println("YIPI YAAA YEEEEE");
   358          friends.clear();
   359          //System.out.println(friends);
   360      }
   361
   362
   363     /** Conversion of hashtable into vector
   364      */
   365      public PVector getFriends(){
   366          Vector v = new Vector();
   367          Enumeration e = friends.elements();


                                                lxxix
Zarko Acimovic


368           while(e.hasMoreElements()){
369                   v.addElement((Point)e.nextElement());
370           }
371
372           PVector PFriends = new PVector(v,false);
373           return PFriends;
374       }
375
376
377
378   }




                                       lxxx
Software Defects Prevention Techniques – Example Project


MapsMIDlet.java


     All classes and interfaces must belong to a named package                                  17   PMD Marker
     Avoid really long classes.                                                                 17   PMD Marker
     Efferent Couplings is 36                                                                   17   Metrics Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 90%                                     17   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 7,735%                                  17   Metrics Marker
     Number of Fields is 121                                                                    17   Metrics Marker
     The class 'MapsMIDlet' has a Cyclomatic Complexity of 22 (Highest = 202).                  17   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                               17   PMD Marker
     Too many fields                                                                            17   PMD Marker
     Weighted Methods per Class is 150                                                          17   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     20   PMD Marker
     Use explicit scoping instead of the default package private level                          20   PMD Marker
     Avoid variables with short names like mb                                                   24   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     24   PMD Marker
     Use explicit scoping instead of the default package private level                          24   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     25   PMD Marker
     Use explicit scoping instead of the default package private level                          25   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     26   PMD Marker
     Use explicit scoping instead of the default package private level                          26   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     27   PMD Marker
     Use explicit scoping instead of the default package private level                          27   PMD Marker
     Avoid variables with short names like ic                                                   30   PMD Marker
     Avoid variables with short names like cc                                                   31   PMD Marker
     The field name indicates a constant but its modifiers do not                               75   PMD Marker
     The field name indicates a constant but its modifiers do not                               76   PMD Marker
     The field name indicates a constant but its modifiers do not                               77   PMD Marker
     Avoid variables with short names like d                                                    79   PMD Marker
     Avoid variables with short names like t1                                                  100   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                              100   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                              101   PMD Marker
     Unused field: MapsMIDlet.t2                                                               101   FindBugs
     Unread field: MapsMIDlet.first                                                            106   FindBugs
     Unread field: MapsMIDlet.gpsHash                                                          112   FindBugs
     Unread field: MapsMIDlet.gpsThr                                                           114   FindBugs
     Unread field: MapsMIDlet.frndThr                                                          115   FindBugs




                                                              lxxxi
Zarko Acimovic


MapsMIDlet.java


     Avoid using implementation types like 'Vector'; use the interface instead                      129   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                      129   PMD Marker
     Consider replacing this Vector with the newer java.util.List                                   129   PMD Marker
     Avoid excessively long variable names like synchronizationDone                                 134   PMD Marker
     Unread field: MapsMIDlet.synchronizationDone                                                   134   FindBugs
     Unused field: MapsMIDlet.setLine                                                               142   FindBugs
     Unused field: MapsMIDlet.resetLine                                                             143   FindBugs
     The field name indicates a constant but its modifiers do not                                   158   PMD Marker
     The field name indicates a constant but its modifiers do not                                   159   PMD Marker
     Unused field: MapsMIDlet.routeList                                                             186   FindBugs
     Unused field: MapsMIDlet.allRoutes                                                             188   FindBugs
     Unused field: MapsMIDlet.hideRoutes                                                            189   FindBugs
     Unused field: MapsMIDlet.delRouteList                                                          191   FindBugs
     Unused field: MapsMIDlet.delAllRoutes                                                          192   FindBugs
     Unused field: MapsMIDlet.categories                                                            197   FindBugs
     Lines of Code in Method is 165                                                                 201   Metrics Marker
     Number of Statements is 121                                                                    201   Metrics Marker
     Avoid really long methods.                                                                     204   PMD Marker
     The method startApp() has an NCSS count of 113                                                 204   PMD Marker
     The String literal "Categories" appears 8 times in this file; the first occurrence is on 332   332   PMD Marker
     Use ArrayList instead of Vector                                                                362   PMD Marker
     Avoid really long methods.                                                                     368   PMD Marker
     Cyclomatic Complexity is 121                                                                   368   Metrics Marker
     Lines of Code in Method is 819                                                                 368   Metrics Marker
     Number of Levels is 6                                                                          368   Metrics Marker
     Number of Locals in Scope is 30                                                                368   Metrics Marker
     Number of Statements is 716                                                                    368   Metrics Marker
     Parameter 'c' is not assigned and could be declared final                                      368   PMD Marker
     Parameter 's' is not assigned and could be declared final                                      368   PMD Marker
     The method 'commandAction' has a Cyclomatic Complexity of 202.                                 368   PMD Marker
     The method commandAction() has an NCSS count of 539                                            368   PMD Marker
     Avoid using if statements without curly braces                                                 370   PMD Marker
     Use equals() to compare object references.                                                     370   PMD Marker
     Use equals() to compare object references.                                                     371   PMD Marker
     Use equals() to compare object references.                                                     371   PMD Marker
     Use equals() to compare object references.                                                     374   PMD Marker
     Use equals() to compare object references.                                                     374   PMD Marker
     Avoid empty catch blocks                                                                       399   PMD Marker
     MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception                399   FindBugs
     Avoid unnecessary comparisons in boolean expressions                                           413   PMD Marker




                                                                    lxxxii
Software Defects Prevention Techniques – Example Project


MapsMIDLet.java


     Avoid unnecessary comparisons in boolean expressions                                      422    PMD Marker
     Avoid using if statements without curly braces                                            422    PMD Marker
     Local variable 'wp' could be declared final                                               428    PMD Marker
     Local variable 'wp' could be declared final                                               434    PMD Marker
     Local variable 'name' could be declared final                                             450    PMD Marker
     Local variable 'sel' could be declared final                                              451    PMD Marker
     Local variable 'category' could be declared final                                         456    PMD Marker
     The local variable category is never read                                                 456    Java Problem
     Do not add empty strings                                                                  468    PMD Marker
     Do not add empty strings                                                                  468    PMD Marker
     Avoid empty catch blocks                                                                  479    PMD Marker
     MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception           479    FindBugs
     The local variable category is never read                                                 551    Java Problem
     Do not add empty strings                                                                  563    PMD Marker
     Do not add empty strings                                                                  563    PMD Marker
     Avoid empty catch blocks                                                                  574    PMD Marker
     MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception           574    FindBugs
     Deeply nested if..then statements are hard to read                                        599    PMD Marker
     Avoid using if statements without curly braces                                            643    PMD Marker
     Avoid using if statements without curly braces                                            644    PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                      670    PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                      695    PMD Marker
     Avoid instantiating new objects inside loops                                              700    PMD Marker
     Avoid instantiating new objects inside loops                                              735    PMD Marker
     Consider replacing this Vector with the newer java.util.List                              766    PMD Marker
     Avoid instantiating new objects inside loops                                              775    PMD Marker
     Avoid instantiating new objects inside loops                                              786    PMD Marker
     Avoid instantiating new objects inside loops                                              828    PMD Marker
     Consider replacing this Vector with the newer java.util.List                              881    PMD Marker
     Consider replacing this Vector with the newer java.util.List                              881    PMD Marker
     Write to static field MapsMIDlet.resource from instance method
     MapsMIDlet.commandAction(Command, Displayable)                                            1023   FindBugs
     To be compliant to J2EE, a webapp should not use any thread.                              1028   PMD Marker
     Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty()                  1049   PMD Marker
     Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty()                  1105   PMD Marker
     Cyclomatic Complexity is 11                                                               1190   Metrics Marker
     Lines of Code in Method is 87                                                             1190   Metrics Marker
     Number of Levels is 7                                                                     1190   Metrics Marker
     Number of Locals in Scope is 16                                                           1190   Metrics Marker
     Number of Statements is 73                                                                1190   Metrics Marker
     The method 'run' has a Cyclomatic Complexity of 17.                                       1190   PMD Marker




                                                               lxxxiii
Zarko Acimovic


MapsMIDlet.java


     Parameter 'flag' is not assigned and could be declared final            1287   PMD Marker
     Lines of Code in Method is 16                                           1291   Metrics Marker
     Parameter 's' is not assigned and could be declared final               1296   PMD Marker
     Avoid unused local variables such as 'k'.                               1297   PMD Marker
     Dead store to k in MapsMIDlet.compact(String)                           1297   FindBugs
     The local variable k is never read                                      1297   Java Problem
     MapsMIDlet.compact(String) concatenates strings using + in a loop       1302   FindBugs
     Prefer StringBuffer over += for concatenating strings                   1302   PMD Marker
     Avoid unused local variables such as 'kk'.                              1304   PMD Marker
     Dead store to kk in MapsMIDlet.compact(String)                          1304   FindBugs
     The local variable kk is never read                                     1304   Java Problem
     Parameter 's' is not assigned and could be declared final               1308   PMD Marker
     Avoid unused local variables such as 'k'.                               1309   PMD Marker
     Dead store to k in MapsMIDlet.compactFine(String)                       1309   FindBugs
     The local variable k is never read                                      1309   Java Problem
     MapsMIDlet.compactFine(String) concatenates strings using + in a loop   1314   FindBugs
     Prefer StringBuffer over += for concatenating strings                   1314   PMD Marker
     Avoid unused local variables such as 'kk'.                              1316   PMD Marker
     Dead store to kk in MapsMIDlet.compactFine(String)                      1316   FindBugs
     The local variable kk is never read                                     1316   Java Problem
     Cyclomatic Complexity is 6                                              1320   Metrics Marker
     Lines of Code in Method is 31                                           1320   Metrics Marker
     Number of Statements is 26                                              1320   Metrics Marker
     Avoid empty catch blocks                                                1335   PMD Marker



     1   /**
     2    *
     3    * MapsMIDlet creates control menus due to user's actions and handles GPS
issues
     4    *
     5    */
     6   import javax.microedition.lcdui.*;
     7
     8   import javax.microedition.midlet.*;
     9
    10   import java.util.*;
    11   import java.io.*;
    12
    13
    14
    15
    16
    17   public class MapsMIDlet extends MIDlet implements CommandListener,Runnable
{
    18
    19


                                                    lxxxiv
Software Defects Prevention Techniques – Example Project


    20           MapBackgroundFactory mbf = new MapBackgroundFactory("/Mali2.png",
"/Srednji.png","/Veliki.png",
    21                             "44.83049905", "20.44570857", "44.79241639",
"20.48713523");
    22
    23
    24           MapBackground mb;
    25           MapObjects mob;
    26           SelectorPoint selP;
    27           Outlook oul;
    28
    29           PVector vwpF = new PVector("free",false);
    30           ImageCanvas3 ic;
    31           CompassCanvas cc;
    32
    33           //Point wp3 = new
Point("44.81916183","20.45417165","Klub'Akademija'","j","/Cultural_or_Tourist/Event
.png",true);
    34           Point wp2 = new Point("44.82990854","20.45661377","25.
maj","j","/Sport/Swimming.png",true);
    35           Point wp1 = new Point("44.81573706","20.45998215","Sp. Knezu
Mihailu","j","/Cultural_or_Tourist/Monument.png",true);
    36
    37           Point wp4 = new Point("44.8178034","20.45177167","Saborna
crkva","j","/Cultural_or_Tourist/Church.png",true);
    38           Point wp5 = new Point("44.82577520","20.45459270","Zooloski
vrt","j","/Cultural_or_Tourist/Zoo.png",true);
    39
    40           Point wp6 = new Point("44.81293225","20.46132951","Grinet
kafe","j","/Service_or_Utility/Cafe.png",true);
    41           Point wp7 = new Point("44.81426084","20.45943480","Trzni centar
'Sremska'","j","/Service_or_Utility/Shop.png",true);
    42           Point wp8 = new Point("44.81248939","20.46006637","Bioskop
20.oktobar","j","/Service_or_Utility/Cinema.png",true);
    43       Point wp9 = new
Point("44.81293225","20.46743470","Policija","j","/Service_or_Utility/Police.png",t
rue);
    44           Point wp10 = new Point("44.81854182","20.45711898","Filoloski
fakultet","j","/Service_or_Utility/School.png",true);
    45       Point wp11 = new Point("44.82518476","20.45737165","Bioskop
REX","j","/Service_or_Utility/Cinema.png",true);
    46       Point wp12 = new Point("44.80496078","20.47652941","Elektrotehnicki
fakultet","j","/Service_or_Utility/School.png",true);
    47       Point wp13 = new
Point("44.80466556","20.47337150","RCUB","j","/Service_or_Utility/School.png",true)
;
    48       Point wp14 = new
Point("44.80865126","20.46368736","Apoteka","j","/Service_or_Utility/Pharmacy.png",
true);
    49       Point wp15 = new Point("44.80067980","20.45737165","Urgentni
centar","j","/Service_or_Utility/Redcross.png",true);


                                                lxxxv
Zarko Acimovic


    50
    51
    52
    53
    54 /**      Point wp3 = new Point(45,2 , 1,'N',22,20, 5,'E',"c1","j");
    55          Point wp4 = new Point(45,13, 2,'N',21,58, 5,'E',"d1","j");
    56          Point wp5 = new Point(46,45, 1,'N',21,20, 5,'E',"e1","j");
    57          Point wp6 = new Point(46,48,23,'N',21,23, 9,'E',"f1","j");
    58          Point wp7 = new Point(46,30,50,'N',22,25,50,'E',"g1","j");
    59          Point wp8 = new Point(46,48,59,'N',20,27,17,'E',"a","j");
    60          Point wp9 = new Point(46,45, 0,'N',20,26,15,'E',"b","j");
    61          Point wp10 = new Point(46,42, 0,'N',20,29,15,'E',"c","j");
    62          Point wp11 = new Point(46,39, 0,'N',20,29,15,'E',"d","j");
    63          Point wp12 = new Point(46,10,23,'N',20,30, 9,'E',"e","j");
    64          Point wp13 = new Point(45,50,23,'N',20,33, 9,'E',"f","j");
    65          Point wp14 = new Point(46,30,23,'N',20,52, 9,'E',"g","j");
    66          Point wp15 = new Point(46,25,23,'N',20,54, 0,'E',"h","j");
    67          Point wp16 = new Point(46,20,23,'N',20,46, 0,'E',"i","j");
    68          Point wp17 = new Point(46,10,23,'N',20,48, 0,'E',"j","j");
    69          Point wp18 = new Point(45,50,23,'N',20,35, 0,'E',"k","j"); */
    70
    71          Point selectedWP;
    72
    73
    74
///////////////////////COMMANDS,MENUS,BUTTONS
    75          Command DUMMY;
    76          Command DELIM;
    77          Command MAP_CMD;
    78
    79          Display d = Display.getDisplay(this);
    80
    81          List modes;
    82          Command selectCmd;
    83          Command mapviewCmd;
    84          Command compassCmd;
    85
    86
    87
    88          Command opt;
    89          Command mod;
    90
    91          List MVList;
    92          Command Points;
    93          Command routes;
    94          Command gps;
    95          Command friends;
    96          Command ZoomIn;
    97          Command ZoomOut;
    98          Command exitCmd;
    99          SimpleTextForm gpsTf;


                                        lxxxvi
Software Defects Prevention Techniques – Example Project


100   Thread t1;
101   Thread t2;
102
103   static String resource="";
104   boolean gpsON = false;
105   static String show = "";
106   boolean first = false;
107   List friendList;
108   Command addNewFriend ;
109   Command onGPSc;
110   Command offGPSc;
111   List gpsList;
112   int gpsHash = 0;
113
114   int gpsThr = 0;
115   int frndThr = 0;
116   int currentlyShowed = 0;
117   Hashtable thrHash = new Hashtable();
118   Vector listOfFriends = new Vector();
119   SimpleTextForm friendForm;
120   Command stopFollow;
121   Command deleteFriends;
122   boolean followFriends = false;
123
124   List oneFriend;
125   Command stopFollowOne;
126   Command deleteFriend;
127
128   Thread4Friend tff;
129   Vector whiteList;
130   String friend;
131
132   boolean syncFollow = false;
133   long globalTimeStamp = 0;
134   boolean synchronizationDone = false;
135
136   List WPselected;
137   Command setAsCurrent;
138   Command setDest1;
139   Command edit;
140   Command delete;
141   Command measDist;
142   Command setLine;
143   Command resetLine;
144
145
146   List WPnotSel;
147   Command setCurrent;
148   Command setDest2;
149   Command addWP;
150


                                     lxxxvii
Zarko Acimovic


   151          CommaHyphenString chs = new CommaHyphenString();
   152          TextForm tf1; // form for adding new Point on selected spot
   153          TextForm tf2; // form for editing of selected Point
   154          TextForm tf33; // form for adding waypoint with user entered data
for (lat,lon)
   155          TextForm previous;
   156          TextFormImage tf11; //form for adding new Point with images for
selected categories
   157          TextFormImage tf22;
   158          Command SAVE_CMD;
   159          Command CONT_CMD;
   160          Command BACK_CMD;
   161          Alert a = new Alert("Warning","Please Select
Point!",null,AlertType.INFO);
   162
   163          List WPList; //List of Points
   164          Command addNewWP;
   165          Command sortWP;
   166          Command sortNameWP;
   167          boolean showID = false;
   168          Command showIDcom;
   169          List previousList;
   170
   171
   172          TextForm tfAdd; //form for adding Point with complete info about
coordinates
   173
   174          List sorted;
   175
   176
   177          List routeMain;
   178          Command createNewRoute;
   179          Command showRoutes;
   180          Command delRoute;
   181
   182          List routeNew;
   183          Command addPoint;
   184          Command routeFin;
   185
   186          List routeList;
   187          List routeOptions;
   188          Command allRoutes;
   189          Command hideRoutes;
   190
   191          List delRouteList;
   192          Command delAllRoutes;
   193          String nameR = "";
   194
   195          PVector newRouteVector;
   196          SimpleTextForm tf3; ///form for defining name of route
   197          String[] categories;


                                       lxxxviii
Software Defects Prevention Techniques – Example Project


   198          boolean routeSetting = false;
   199
   200          String[] pathToImage;
   201          /**
   202           * @see MIDlet#startApp()
   203           */
   204          protected void startApp() throws MIDletStateChangeException {
   205
   206                   mb = mbf.getMapBackground();
   207                   mob = new MapObjects(mb);
   208
   209                   vwpF.addElement(wp1);
   210                   vwpF.addElement(wp2);
   211              //vwpF.addElement(wp3);
   212               vwpF.addElement(wp4);
   213              vwpF.addElement(wp5);
   214                   vwpF.addElement(wp6);
   215                   vwpF.addElement(wp7);
   216                   vwpF.addElement(wp8);
   217                   vwpF.addElement(wp9);
   218                   vwpF.addElement(wp10);
   219                   vwpF.addElement(wp11);
   220                   vwpF.addElement(wp12);
   221                   vwpF.addElement(wp13);
   222                   vwpF.addElement(wp14);
   223                   vwpF.addElement(wp15);
   224
   225
   226
   227                   mob.setFreeWaypointsV(vwpF);
   228
   229                   selP = new SelectorPoint(mb,mob);
   230
   231                   oul = new Outlook(mb,mob,selP);
   232
   233                   ic = new ImageCanvas3(oul);
   234
   235
   236
//////////////////////////COMMANDS,MENUS,BUTTONS
   237
   238                   DUMMY = new Command("      ",Command.SCREEN,1);
   239                   DELIM = new Command("------------------",Command.SCREEN,1);
   240                   MAP_CMD = new Command("View on Map",Command.BACK,1);
   241                   BACK_CMD = new Command("Back to Previous
Screen",Command.BACK,1);
   242
   243                   mod = new Command("Mode",Command.SCREEN,1);
   244                   modes = new List("",List.IMPLICIT);
   245                   selectCmd = new Command("Selection",Command.SCREEN,1);
   246                   mapviewCmd = new Command("Mapview",Command.SCREEN,1);


                                                 lxxxix
Zarko Acimovic


   247                  compassCmd = new Command("Compass",Command.SCREEN,1);
   248                  exitCmd = new Command("Exit",Command.SCREEN,1);
   249                  modes.append("PLEASE SELECT NEW MODE FROM MENU...",null);
   250                  modes.addCommand(DUMMY);
   251                  modes.addCommand(mapviewCmd);
   252                  modes.addCommand(selectCmd);
   253                  modes.addCommand(compassCmd);
   254                  modes.addCommand(exitCmd);
   255                  modes.setCommandListener(this);
   256
   257                  opt = new Command("Option",Command.SCREEN,1);
   258
   259
   260
   261                  // Map View options
   262                  MVList = new List("",List.IMPLICIT);
   263                  Points = new Command("Waypoints",Command.SCREEN,1);
   264                  routes     = new Command("Routes",Command.SCREEN,1);
   265                  gps        = new Command("GPS",Command.SCREEN,1);
   266
   267                  friends    = new Command("Friends",Command.SCREEN,1);
   268                  ZoomIn     = new Command("Zoom In",Command.SCREEN,1);
   269                  ZoomOut    = new Command("Zoom Out",Command.SCREEN,1);
   270                  //Exit       = new Command("Exit",Command.EXIT,1);
   271
   272                  MVList.addCommand(DUMMY);
   273                  MVList.addCommand(Points);
   274                  MVList.addCommand(routes);
   275                  MVList.addCommand(gps);
   276                  MVList.addCommand(friends);
   277                  MVList.addCommand(ZoomIn);
   278                  MVList.addCommand(ZoomOut);
   279                  MVList.addCommand(BACK_CMD);
   280                  MVList.setCommandListener(this);
   281
   282                  CONT_CMD = new Command("Continue",Command.SCREEN,1);
   283                  gpsTf = new SimpleTextForm(false);
   284                  gpsTf.addCommand(CONT_CMD);
   285                  gpsTf.setCommandListener(this);
   286
   287
   288
   289
   290                  // If Point is selected
   291                  WPselected   = new List("",List.IMPLICIT);
   292                  setAsCurrent = new Command("Set as
Current",Command.SCREEN,1);
   293                  setDest1      = new Command("Set as
Destination",Command.SCREEN,1);
   294                  edit         = new Command("Edit",Command.SCREEN,1);
   295                  delete       = new Command("Delete",Command.SCREEN,1);


                                          xc
Software Defects Prevention Techniques – Example Project


   296                  measDist     = new Command("Measure
Distance",Command.SCREEN,1);
   297
   298
   299                  WPselected.addCommand(DUMMY);
   300                  WPselected.addCommand(MAP_CMD);
   301                  WPselected.addCommand(setAsCurrent);
   302                  WPselected.addCommand(setDest1);
   303                  WPselected.addCommand(edit);
   304                  WPselected.addCommand(delete);
   305                  WPselected.addCommand(measDist);
   306                  WPselected.addCommand(BACK_CMD);
   307                  WPselected.setCommandListener(this);
   308
   309
   310
   311                  // If Point is not selected
   312                  WPnotSel   = new List("",List.IMPLICIT);
   313                  setCurrent = new Command("Set Current",Command.SCREEN,1);
   314                  setDest2    = new Command("Set
Destination",Command.SCREEN,1);
   315                  addWP      = new Command("Add Waypoint",Command.SCREEN,1);
   316
   317                  WPnotSel.addCommand(DUMMY);
   318                  WPnotSel.addCommand(setCurrent);
   319                  WPnotSel.addCommand(setDest2);
   320                  WPnotSel.addCommand(addWP);
   321                  WPnotSel.addCommand(measDist);
   322                  //WPnotSel.addCommand(MAP_CMD);
   323                  WPnotSel.addCommand(BACK_CMD);
   324                  WPnotSel.setCommandListener(this);
   325
   326                  WPList = new List("",List.IMPLICIT);
   327                  addNewWP = new Command("Add Waypoint",Command.SCREEN,1);
   328                  sortWP   = new Command("Sort Waypoints by
Distance",Command.SCREEN,1);
   329                  sortNameWP   = new Command("Sort Waypoints by
Name",Command.SCREEN,1);
   330                  showIDcom = new Command("Show/Hide ID",Command.SCREEN,1);
   331
   332                  tfAdd = new
TextForm(chs.getCategories(this.getAppProperty("Categories")),false);
   333
   334                  tfAdd.addCommand(CONT_CMD);
   335                  tfAdd.setCommandListener(this);
   336
   337                  sorted = new List("",List.IMPLICIT);
   338                  sorted.setCommandListener(this);
   339
   340
   341                  ic.addCommand(opt);


                                                 xci
Zarko Acimovic


   342                  ic.addCommand(mod);
   343                  ic.setCommandListener(this);
   344
   345
   346                  tf1 = new
TextForm(chs.getCategories(this.getAppProperty("Categories")),false);///form for
adding new Point on selected spot
   347                  tf2 = new
TextForm(chs.getCategories(this.getAppProperty("Categories")),false);/// form for
editing of selected Point
   348                  tf33 = new
TextForm(chs.getCategories(this.getAppProperty("Categories")),true);/// form for
editing of selected Point
   349
   350                  SAVE_CMD = new Command("Save",Command.SCREEN,1);
   351
   352                  tf1.addCommand(CONT_CMD);
   353                  tf1.addCommand(BACK_CMD);
   354                  tf1.setCommandListener(this);
   355                  tf2.addCommand(CONT_CMD);
   356                  tf2.addCommand(BACK_CMD);
   357                  tf2.setCommandListener(this);
   358                  tf33.addCommand(CONT_CMD);
   359                  tf33.addCommand(BACK_CMD);
   360                  tf33.setCommandListener(this);
   361
   362                  whiteList = new Vector();
   363
   364                  d.setCurrent(ic);
   365          }
   366
   367
   368          public void commandAction(Command c, Displayable s){
   369
   370                  if (c==MAP_CMD) d.setCurrent(ic);
   371                  if (s==ic && c==mod){
   372                          d.setCurrent(modes);
   373                  }
   374                  if (s==modes && c==selectCmd){
   375                          oul.setSelect();
   376                          ic.repaint();
   377                          d.setCurrent(ic);
   378                          selP.resetBig();
   379                          selP.resetColor();
   380                  }
   381                  if (s==modes && c==mapviewCmd){
   382                          selP.resetColor();
   383                          selP.resetBig();
   384                          oul.resetSelect();
   385                          d.setCurrent(ic);
   386                  }


                                         xcii
Software Defects Prevention Techniques – Example Project


   387
   388                    if (s==modes && c==compassCmd){
   389                            oul.resetSelect();
   390                            cc = new CompassCanvas(mob);
   391                            cc.addCommand(MAP_CMD);
   392                            cc.setCommandListener(this);
   393                            d.setCurrent(cc);
   394                    }
   395
   396                    if (s==modes && c==exitCmd){
   397                            try{
   398                                    destroyApp(false);
   399                            }catch(Exception e){}
   400                            notifyDestroyed();
   401                            return;
   402                    }
   403
   404                    if(s==cc && c==MAP_CMD){
   405                            cc.setEnd();
   406                            ic = new ImageCanvas3(oul);
   407                            ic.addCommand(opt);
   408                            ic.addCommand(mod);
   409                            ic.setCommandListener(this);
   410                            d.setCurrent(ic);
   411                    }
   412
   413                    if (s==ic && c==opt && routeSetting==false){
   414                            if(oul.getSelect()==true) {
   415                                    selectedWP = selP.getSelectedWP();
   416                                    if(selectedWP.getName()=="selector")
d.setCurrent(WPnotSel);
   417                                             if(selectedWP.getName()!="selector") {
   418                                                     d.setCurrent(WPselected);
   419                                                     previousList=null;
   420                                             }
   421                                }
   422                                if(oul.getSelect()==false) d.setCurrent(MVList);
   423                    }
   424
   425
   426                    // IF Point NOT SELECTED
   427                    if(s==WPnotSel && c==setCurrent){
   428                            Point wp = selP.getSelector();
   429                            wp.setName("current");
   430                            mob.setCurrentPosition(wp);
   431                            d.setCurrent(ic);
   432                    }
   433                    if(s==WPnotSel && c==setDest2){
   434                            Point wp = selP.getSelector();
   435                            wp.setName("dest");
   436                            mob.setDestinationPosition(wp);


                                                   xciii
Zarko Acimovic


   437                          d.setCurrent(ic);
   438                  }
   439
   440                  // ADD Point ON SELECTED SPOT
   441                  if(s==WPnotSel && c==addWP){
   442                          tf1.setName("default"); //form for adding new
Point on selected spot
   443                          //tf1.setType("Type will be set according to
category");
   444                          tf1.setLat(selP.getSelector().getLat());
   445                          tf1.setLon(selP.getSelector().getLon());
   446                          d.setCurrent(tf1);
   447                  }
   448
   449                  if (s.equals(tf1) && c == CONT_CMD){
   450                          String name = tf1.getName();
   451                          int sel = tf1.getSelected();
   452
   453                          // chs is instance of CommaHypenString class
   454                          // which helps us process hyphens and commas in
   455                          //.properties file
   456                          String[] category =
chs.getCategories(this.getAppProperty("Categories"));
   457                          String[] categoryHyphen =
chs.getCategoriesHyphen(this.getAppProperty("Categories"));
   458
   459                          // elements of a selected category: as simle
strings and as hyphen-strings
   460                          String catMatches =
this.getAppProperty(categoryHyphen[sel]);
   461                          String[] arCatMatches =
chs.getStringsOnly(catMatches);
   462                          String[] arCatHyphMatches =
chs.getWithLowLine(catMatches);
   463
   464                          // images that correspond to category elements
   465                          String[] imageStr = new
String[arCatMatches.length];
   466                          Image[] img = new Image[arCatMatches.length];
   467                          for(int i=0; i<arCatMatches.length; i++){
   468                                  imageStr[i] =
this.getAppProperty(""+arCatHyphMatches[i]+"");
   469                                  imageStr[i] = this.compact(imageStr[i]);
   470                          }
   471
   472                          pathToImage = new String[arCatMatches.length];
   473                          for (int i=0; i<arCatMatches.length; i++){
   474                                  try{
   475                                          String str = categoryHyphen[sel]
+"/"+imageStr[i];



                                         xciv
Software Defects Prevention Techniques – Example Project


   476                                                  str = compact(str); //getting rid
off blanco spots
   477                                              pathToImage[i] = str;
   478                                              img[i] = Image.createImage(str);
   479                                      } catch(Exception e){}
   480                         }
   481
   482                         tf11 = new TextFormImage("",arCatMatches,img);
   483                         tf11.setNameCHGR("Please select type");
   484                         tf11.setName(name);
   485                         //tf11.setType("Please select type");
   486                         tf11.addCommand(BACK_CMD);
   487                         tf11.addCommand(SAVE_CMD);
   488                         tf11.setCommandListener(this);
   489                         d.setCurrent(tf11);
   490             }
   491
   492             if(s==tf1 && c==BACK_CMD){
   493                     d.setCurrent(WPnotSel);
   494             }
   495
   496             if(s==tf11 && c==BACK_CMD){
   497                     d.setCurrent(tf1);
   498             }
   499
   500             if(s==tf11 && c==SAVE_CMD){
   501                     Point wp = selP.getSelector();
   502                     wp.setName(tf11.getName());
   503                     int sel = tf11.getSelected();
   504                     String cmpct = compact(pathToImage[sel]);
   505                     wp.setImage(cmpct);
   506                     mob.addFreeWaypoint(wp);
   507                     d.setCurrent(ic);
   508             }
   509
   510             if(s==WPselected && c==setAsCurrent){
   511                     mob.setCurrentPosition(selectedWP);
   512                     d.setCurrent(ic);
   513             }
   514
   515             if(s==WPselected && c==setDest1){
   516                     mob.setDestinationPosition(selectedWP);
   517                     d.setCurrent(ic);
   518             }
   519
   520             //Edit of Point
   521             if(s==WPselected && c==edit){
   522                     tf2.setName(selectedWP.getName());
   523                     tf2.setType(selectedWP.getType());
   524                     tf2.setLat(selectedWP.getLat());
   525                     tf2.setLon(selectedWP.getLon());


                                             xcv
Zarko Acimovic


   526                          d.setCurrent(tf2);
   527                  }
   528
   529
   530                  //Editing of waypoint OR inserting waypoint from text form
   531                  if ( (s.equals(tf2)||s.equals(tf33)) && c == CONT_CMD){
   532                          String name ="";
   533                          int sel = 0;
   534
   535                          if(s.equals(tf2)){
   536                                  name = tf2.getName();
   537                                  sel = tf2.getSelected();
   538                                  previous = tf2;
   539                          }
   540
   541                          if(s.equals(tf33)){
   542                                  name = tf33.getName();
   543                                  sel = tf33.getSelected();
   544                                  previous = tf33;
   545                          }
   546
   547
   548                          // chs is instance of CommaHypenString class
   549                          // which helps us process hyphens and commas in
   550                          //.properties file
   551                          String[] category =
chs.getCategories(this.getAppProperty("Categories"));
   552                          String[] categoryHyphen =
chs.getCategoriesHyphen(this.getAppProperty("Categories"));
   553
   554                          // elements of a selected category: as simle
strings and as hyphen-strings
   555                          String catMatches =
this.getAppProperty(categoryHyphen[sel]);
   556                          String[] arCatMatches =
chs.getStringsOnly(catMatches);
   557                          String[] arCatHyphMatches =
chs.getWithLowLine(catMatches);
   558
   559                          // images that correspond to category elements
   560                          String[] imageStr = new
String[arCatMatches.length];
   561                          Image[] img = new Image[arCatMatches.length];
   562                          for(int i=0; i<arCatMatches.length; i++){
   563                                  imageStr[i] =
this.getAppProperty(""+arCatHyphMatches[i]+"");
   564                                  imageStr[i] = this.compact(imageStr[i]);
   565                          }
   566
   567                          pathToImage = new String[arCatMatches.length];
   568                          for (int i=0; i<arCatMatches.length; i++){


                                         xcvi
Software Defects Prevention Techniques – Example Project


   569                                  try{
   570                                          String str = categoryHyphen[sel]
+"/"+imageStr[i];
   571                                          str = compact(str); //getting rid
off blanco spots
   572                                          pathToImage[i] = str;
   573                                          img[i] = Image.createImage(str);
   574                                  } catch(Exception e){}
   575                          }
   576
   577                          tf22 = new TextFormImage("",arCatMatches,img);
   578                          tf22.setNameCHGR("Please select type");
   579                          tf22.setName(name);
   580                          tf22.addCommand(BACK_CMD);
   581                          tf22.addCommand(SAVE_CMD);
   582                          tf22.setCommandListener(this);
   583                          d.setCurrent(tf22);
   584                  }
   585
   586                  if(s==tf2 && c==BACK_CMD){
   587                          d.setCurrent(WPselected);
   588                  }
   589
   590                  if(s==tf22 && c==BACK_CMD){
   591                          d.setCurrent(previous);
   592                  }
   593
   594                  if(s==tf22 && c==SAVE_CMD){
   595
   596                          //Editing of waypoint
   597                          if(previous == tf2){
   598                                  Point wp = selP.getSelectedWP();
   599                                  if(wp.getLat()==0){
   600                                          wp = new
Point(tf2.getLat(),tf2.getLon(),tf22.getName(),"","blanco",false);
   601                                  }
   602                                  wp.setName(tf22.getName());
   603                                  int sel = tf22.getSelected();
   604                                  String cmpct = compact(pathToImage[sel]);
   605                                  wp.setImage(cmpct);
   606                                  wp.setLat(tf2.getLat());
   607                                  wp.setLon(tf2.getLon());
   608                                  selP.deleteWP();
   609                                  mob.addFreeWaypoint(wp);
   610                                  selP.setColor();
   611                                  d.setCurrent(ic);
   612                          }
   613
   614                          // New waypoint from text form
   615                          if(previous==tf33){



                                                xcvii
Zarko Acimovic


   616                                   Point wp = new
Point(tf33.getLat(),tf33.getLon(),tf22.getName(),"","blanco",false);
   617                                   wp.setName(tf22.getName());
   618                                   int sel = tf22.getSelected();
   619                                   String cmpct = compact(pathToImage[sel]);
   620                                   wp.setImage(cmpct);
   621                                   wp.setLat(tf33.getLat());
   622                                   wp.setLon(tf33.getLon());
   623                                   mob.addFreeWaypoint(wp);
   624                                   d.setCurrent(ic);
   625                          }
   626                  }
   627
   628
   629                  // Delete Point
   630                  if(s==WPselected && c==delete){
   631                          int k = selP.deleteWP();
   632                          if(k==-1){
   633                                   a.setTimeout(3000);
   634                                   a.setString("More than one Point
selected");
   635                                   d.setCurrent(a);
   636                          } else {
   637                                   selP.resetBig();
   638                                   d.setCurrent(ic);
   639                          }
   640                  }
   641
   642                  if(s==WPselected && c==BACK_CMD){
   643                          if(previousList==null) d.setCurrent(ic);
   644                          if(previousList!=null) d.setCurrent(previousList);
   645                  }
   646
   647
   648                  // Measuring distance between current position and selected
WAYPOINT
   649                  if(s==WPselected && c==measDist){
   650
if(mob.getCurrentPosition().getName().equals("dummy")){
   651                                   a.setTimeout(3000);
   652                                   a.setString("Current position is not set");
   653                                   d.setCurrent(a);
   654
   655                          } else {
   656                                   a.setTimeout(3000);
   657                                   selectedWP = selP.getSelectedWP();
   658                                   long k = mob.measureDistance(selectedWP);
   659                                   a.setString("Distance is "+k+" m");
   660                                   d.setCurrent(a);
   661                          }
   662


                                         xcviii
Software Defects Prevention Techniques – Example Project


   663                  }
   664
   665
   666                  // Measuring distance between current position and selected
LOCATION
   667                  if(s==WPnotSel && c==measDist){
   668                          selectedWP = selP.getSelector();
   669                          long k = mob.measureDistance(selectedWP);
   670                          if(mob.currentSet()==false){
   671                                   a.setTimeout(3000);
   672                                   a.setString("Current position is not set");
   673                                   d.setCurrent(a);
   674
   675                          } else {
   676                                   a.setTimeout(3000);
   677                                   a.setString("Distance is "+k+" m");
   678                                   d.setCurrent(a);
   679                          }
   680                  }
   681
   682                  if(s==WPnotSel && c==BACK_CMD) d.setCurrent(ic);
   683
   684
   685
   686
   687
   688                  // -----------------Showing up all Points and some
operations---------------
   689                  if(s==MVList && c==Points){
   690                          setWPList();
   691
   692                          for(int i=0; i<mob.freeWaypoints.size(); i++){
   693                                   Point wp =
(Point)mob.freeWaypoints.elementAt(i);
   694                                   String name = "";
   695                                   if(showID==true){
   696                                            name = wp.getName()
+"_"+wp.getID();
   697                                   } else {
   698                                           name = wp.getName();
   699                                   }
   700                                   Command cc = new
Command(name,Command.SCREEN,1);
   701                                   WPList.addCommand(cc);
   702                          }
   703                          d.setCurrent(WPList);
   704                  }
   705
   706                  if(s==MVList && c==BACK_CMD){
   707                          d.setCurrent(ic);
   708                  }


                                                  xcix
Zarko Acimovic


   709
   710                  if(s==MVList && c==ZoomIn){
   711                          oul.ZoomIn();
   712                          d.setCurrent(ic);
   713                  }
   714
   715                  if(s==MVList && c==ZoomOut){
   716                          oul.ZoomOut();
   717                          d.setCurrent(ic);
   718                  }
   719
   720
   721                  // displaying of IDs of icons
   722                  if(s==WPList && c==showIDcom){
   723                          if(showID==true) {showID=false; } else
{showID=true;}
   724
   725                          setWPList();
   726
   727                          for(int i=0; i<mob.freeWaypoints.size(); i++){
   728                                  Point wp =
(Point)mob.freeWaypoints.elementAt(i);
   729                                  String name = "";
   730                                  if(showID==true){
   731                                            name = wp.getName()
+"_"+wp.getID();
   732                                  } else {
   733                                          name = wp.getName();
   734                                  }
   735                                  Command cc = new
Command(name,Command.SCREEN,1);
   736                                  WPList.addCommand(cc);
   737                          }
   738                          d.setCurrent(WPList);
   739                  }
   740
   741
   742                  // Adding new Point with all attributes such as
   743                  // LATITUDE and LONGITUDE
   744                  // We deal with tf33 same as with tf2 (tf2 is used for
   745                  // inserting new data for selected location
   746                  // Here default values for coordinates are those of center
of the map
   747
   748                  if(s==WPList && c==addNewWP){
   749                          tf33.setName("Center of
Map");//44.80345511,20.42949821
   750                          tf33.setType("");
   751                          tf33.setLat("44.80345511");
   752                          tf33.setLon("20.42949821");
   753                          d.setCurrent(tf33);


                                          c
Software Defects Prevention Techniques – Example Project


   754                  }
   755
   756
   757
   758                  if(s==tf33 && c==BACK_CMD){
   759                          d.setCurrent(WPList);
   760                  }
   761
   762                  //sorting waypoints by distance
   763                  if(s==WPList && c==sortWP){
   764                          setWPList();
   765
   766                          Vector sor =
mob.freeWaypoints.sortAscending(mob.getCurrentPosition());
   767                          for(int i=0; i<sor.size(); i++){
   768                                  Point wp = (Point)sor.elementAt(i);
   769                                  String name = "";
   770                                  if(showID==true){
   771                                          name = wp.getName()+" "+wp.getID();
   772                                  } else {
   773                                          name = wp.getName();
   774                                  }
   775                                  Command cc = new
Command(name,Command.SCREEN,1);
   776                                  WPList.addCommand(cc);
   777                          }
   778                          d.setCurrent(WPList);
   779                  }
   780
   781                  //sorting waypoints by name
   782                  if(s==WPList && c==sortNameWP){
   783                          setWPList();
   784                          String[] sor = mob.freeWaypoints.sortByName();
   785                          for(int i=0; i<sor.length; i++){
   786                                  Command cc = new
Command(sor[i],Command.SCREEN,1);
   787                                  WPList.addCommand(cc);
   788                          }
   789                          d.setCurrent(WPList);
   790                  }
   791
   792
   793                  if(s==WPList && c==MAP_CMD){
   794                          d.setCurrent(ic);
   795                  }
   796
   797                  if(s==WPList && c==BACK_CMD){
   798                          d.setCurrent(MVList);
   799                  }
   800
   801                  //Displaying selected waypoint


                                                  ci
Zarko Acimovic


   802                  if(s==WPList && c!=sortWP && c!=addNewWP && c!=MAP_CMD &&
c!=sortNameWP && c!=DUMMY && c!=BACK_CMD){
   803                          String name = c.getLabel();
   804                          mb.param=true;
   805                          selP.selectWP(name);
   806                          oul.setSelect();
   807                          oul.setWPselection();
   808                          d.setCurrent(WPselected);
   809                          previousList = WPList;
   810                  }
   811
   812
   813
   814                  // -------------- ROUTES --------------------------------
   815
   816                  // Main Menu for Routes
   817                  if(s==MVList && c==routes){
   818                          routeMain = new List("",List.IMPLICIT);
   819                          createNewRoute = new Command("New
Route",Command.SCREEN,1);
   820                          routeMain.addCommand(DUMMY);
   821                          routeMain.addCommand(createNewRoute);
   822                          routeMain.addCommand(BACK_CMD);
   823                          routeMain.addCommand(DELIM);
   824                          routeMain.setCommandListener(this);
   825                          for(int i=0; i<mob.getRoutes().size(); i++){
   826                                  PVector route =
(PVector)mob.getRoutes().elementAt(i);
   827                                  String name = route.getName();
   828                                  Command cr = new
Command(name,Command.SCREEN,1);
   829                                  routeMain.addCommand(cr);
   830                          }
   831                          d.setCurrent(routeMain);
   832                  }
   833
   834                  if(s==routeMain && c==BACK_CMD){
   835                          d.setCurrent(MVList);
   836                  }
   837
   838                  //Creating a New Route
   839                  if(s==routeMain && c==createNewRoute){
   840                          tf3 = new SimpleTextForm(false);
   841                          tf3.addCommand(SAVE_CMD);
   842                          tf3.setCommandListener(this);
   843                          d.setCurrent(tf3);
   844                  }
   845
   846
   847                  if(s==tf3 && c==SAVE_CMD){
   848                          newRouteVector = new PVector("",true);


                                         cii
Software Defects Prevention Techniques – Example Project


   849                          newRouteVector.setName(tf3.getName());
   850                          newRouteVector.setVisible();
   851                          mob.addRoute(newRouteVector);
   852
   853                          routeNew = new List("",List.IMPLICIT);
   854                          addPoint = new Command("Add
Waypoint",Command.SCREEN,1);
   855                          routeFin = new Command("Route
Finished",Command.SCREEN,1);
   856                          routeNew.addCommand(addPoint);
   857                          routeNew.addCommand(routeFin);
   858                          routeNew.setCommandListener(this);
   859
   860                          d.setCurrent(routeNew);
   861                  }
   862
   863
   864                  // Selection of specific route
   865                  if(s==routeMain && c!=createNewRoute && c!=DUMMY && c!
=BACK_CMD && c!=DELIM){
   866                          nameR = c.getLabel();
   867                          routeOptions = new List("",List.IMPLICIT);
   868                          showRoutes = new Command("Show/Hide
Route",Command.SCREEN,1);
   869                          delRoute = new Command("Delete
Route",Command.SCREEN,1);
   870                          routeOptions.addCommand(DUMMY);
   871                          routeOptions.addCommand(MAP_CMD);
   872                          routeOptions.addCommand(showRoutes);
   873                          routeOptions.addCommand(delRoute);
   874                          routeOptions.addCommand(BACK_CMD);
   875                          routeOptions.setCommandListener(this);
   876                          d.setCurrent(routeOptions);
   877                  }
   878
   879                  //Viewing selected route
   880                  if(s==routeOptions && c==showRoutes){
   881                          Vector allR = (Vector) mob.getRoutes();
   882                          for(int i=0; i<allR.size(); i++){
   883                                  PVector rt = (PVector)allR.elementAt(i);
   884                                  if(rt.getName()==nameR) {
   885                                           if(rt.size()!=0){
   886                                                   if(rt.getVisible()==true){
   887                                                           rt.resetVisible();
   888                                                           d.setCurrent(ic);
   889                                                   }else{
   890                                                           rt.setVisible();
   891                                                           Point wp = (Point)
rt.elementAt(0);
   892                                                           String name =
wp.getName();


                                                  ciii
Zarko Acimovic


   893
selP.selectWP(name);
   894                                                             oul.setSelect();
   895                                                             selP.resetColor();
   896                                                             selP.resetBig();
   897                                                             d.setCurrent(ic);
   898                                                      }
   899                                              }
   900                                              if(rt.size()==0){
   901                                                      a.setTitle("Warning");
   902                                                      a.setString("Route has no
points to show");
   903                                                      a.setTimeout(5000);
   904                                                      d.setCurrent(a);
   905                                              }
   906
   907                                 }
   908                                 if(rt.getName()!=nameR) rt.resetVisible();
   909                         }
   910                 }
   911
   912
   913                 //Deletion of selected route
   914                 if(s==routeOptions && c==delRoute){
   915                         Vector v = mob.getRoutes();
   916                         for(int i=0; i<v.size(); i++){
   917                                 PVector wpv = (PVector)v.elementAt(i);
   918                                 if(wpv.getName()==nameR){
   919                                         mob.removeRoute(nameR);
   920                                         i=1000;
   921                                 }
   922                         }
   923                         d.setCurrent(ic);
   924                 }
   925
   926
   927                 //Mapview
   928                 if(s==routeOptions && c==MAP_CMD){
   929                         Vector v = mob.getRoutes();
   930                         for(int i=0; i<v.size(); i++){
   931                                 PVector wpv = (PVector)v.elementAt(i);
   932                                 if(wpv.getName()==nameR){
   933                                         Point p = (Point) wpv.elementAt(0);
   934                                         selP.selectWP(p.getName());
   935                                         oul.setSelect();
   936                                         oul.setWPselection();
   937                                         i=1000;
   938                                 }
   939                         }
   940                         d.setCurrent(ic);
   941                 }


                                        civ
Software Defects Prevention Techniques – Example Project


   942
   943                  //Back on routeMain
   944                  if(s==routeOptions && c==BACK_CMD){
   945                          d.setCurrent(routeMain);
   946                  }
   947
   948
   949
   950
   951
   952                  //Adding new point in current route
   953                  if(s==routeNew && c==addPoint){
   954                          if(oul.getSelect()==true){
   955                                  mob.removeRoute(newRouteVector);
   956                                  Point wp = selP.getSelector();
   957                                  wp.setTypeID(newRouteVector.getID());
   958                                  wp.setName(newRouteVector.getName());
   959                                  wp.setImage("route");
   960                                  newRouteVector.addElement(wp);
   961                                  mob.addRoute(newRouteVector);
   962                                  d.setCurrent(ic);
   963                          }
   964
   965                          if(oul.getSelect()==false){
   966                                  oul.setSelect();
   967                                  oul.setRoute();
   968                                  routeSetting = true;
   969                                  d.setCurrent(ic);
   970                          }
   971
   972                  }
   973
   974                  if(s==ic && routeSetting==true && c==opt){
   975                          d.setCurrent(routeNew);
   976                  }
   977
   978                  if(s==routeNew && c==routeFin){
   979                          oul.resetSelect();
   980                          routeSetting = false;
   981                          d.setCurrent(ic);
   982                  }
   983
   984
   985
   986
   987
   988
   989                  //--------------------------------GPS
ON/OFF------------------------------
   990
   991                  if(s==MVList && c==gps){


                                                 cv
Zarko Acimovic


   992                          gpsList = new List("",List.IMPLICIT);
   993                          onGPSc    = new Command("On",Command.SCREEN,1);
   994                          offGPSc = new Command("Off",Command.SCREEN,1);
   995                          gpsList.addCommand(onGPSc);
   996                  gpsList.addCommand(offGPSc);
   997                  gpsList.setCommandListener(this);
   998                  d.setCurrent(gpsList);
   999                  }
  1000
  1001                  if(s==gpsList && c==onGPSc){
  1002                          if(gpsON==false){
  1003                                   gpsON=true;
  1004                                   followFriends = false;
  1005                                   //Specifying GPS coordinates resource
  1006                                   gpsTf.setLabel("Please select source of GPS
coordinates, usually it's GPS.txt");
  1007                                   gpsTf.setName("GPS.txt");
  1008                                   gpsTf.setType("GPS.txt");
  1009                                   d.setCurrent(gpsTf); //GPS textform
  1010                          } else {
  1011                                   d.setCurrent(ic);
  1012                          }
  1013                  }
  1014
  1015                  if(s==gpsList && c==offGPSc){
  1016                          gpsON=false;
  1017                          d.setCurrent(ic);
  1018                  }
  1019
  1020
  1021
  1022                  if(s==gpsTf && c==CONT_CMD){
  1023                          resource = gpsTf.getName();
  1024
  1025                          syncFollow = true;
  1026                          synchronizationDone=false;
  1027
  1028                          t1=new Thread(this);
  1029                          currentlyShowed = t1.hashCode();
  1030                          gpsHash = t1.hashCode();
  1031                          t1.start();
  1032                          d.setCurrent(ic);
  1033
  1034                  }
  1035
  1036                  // --------------------------- HANDLING FRIENDS' ISSUES
-------------------
  1037
  1038                  if(s==MVList && c==friends){
  1039                          friendList = new List("",List.IMPLICIT);



                                          cvi
Software Defects Prevention Techniques – Example Project


  1040                          addNewFriend = new Command("Add New Friend",
Command.SCREEN,1);
  1041                          stopFollow = new Command("Stop Follow Friends",
Command.SCREEN,1);
  1042                          deleteFriends = new Command("Delete Friends",
Command.SCREEN,1);
  1043                          friendList.addCommand(DUMMY);
  1044                          friendList.addCommand(addNewFriend);
  1045                          friendList.addCommand(stopFollow);
  1046                          friendList.addCommand(deleteFriends);
  1047                          friendList.addCommand(BACK_CMD);
  1048                          friendList.addCommand(DELIM);
  1049                          if(listOfFriends.size()>0){
  1050                                  for (int i=0; i<listOfFriends.size(); i++){
  1051                                          Friend f =
(Friend)listOfFriends.elementAt(i);
  1052                                          Command cc = new
Command(f.getName(),Command.SCREEN,1);
  1053                                          friendList.addCommand(cc);
  1054                                  }
  1055                          }
  1056                          friendList.setCommandListener(this);
  1057                          d.setCurrent(friendList);
  1058                  }
  1059
  1060                  if(s==friendList && c==addNewFriend){
  1061                          friendForm = new SimpleTextForm(false);
  1062                          friendForm.setLabel("Friend");
  1063                          friendForm.setLabel2("Source of coordinates");
  1064                          friendForm.setName("Mika");
  1065                          friendForm.setType("Mika.txt");
  1066
  1067                          friendForm.addCommand(CONT_CMD);
  1068                          friendForm.setCommandListener(this);
  1069
  1070                          d.setCurrent(friendForm);
  1071                  }
  1072
  1073                  if(s==friendForm && c==CONT_CMD){
  1074                          tff = new
Thread4Friend(whiteList,friendForm.getName(),mob,ic,mb,oul);
  1075                          Integer hID = new Integer(tff.getID());
  1076                          whiteList.addElement(hID);
  1077
  1078                          tff.start();
  1079                          Friend f = new
Friend(friendForm.getName(),friendForm.getType(),tff.getID(),tff);
  1080                          listOfFriends.addElement(f);
  1081                          d.setCurrent(ic);
  1082                  }
  1083


                                                 cvii
Zarko Acimovic


  1084                  if(s==friendList && c==stopFollow){
  1085                          whiteList.removeAllElements();
  1086                          mob.deleteAllFriends();
  1087                          ic.repaint();
  1088                          d.setCurrent(ic);
  1089                  }
  1090
  1091                  if(s==friendList && c==deleteFriends){
  1092                          mob.deleteAllFriends();
  1093                          listOfFriends.removeAllElements();
  1094                          friendList = new List("",List.IMPLICIT);
  1095                          addNewFriend = new Command("Add New Friend",
Command.SCREEN,1);
  1096                          stopFollow = new Command("Stop Follow Friends",
Command.SCREEN,1);
  1097                          deleteFriends = new Command("Delete Friends",
Command.SCREEN,1);
  1098                          friendList.addCommand(DUMMY);
  1099                          friendList.addCommand(addNewFriend);
  1100                          friendList.addCommand(stopFollow);
  1101                          friendList.addCommand(deleteFriends);
  1102                          //friendList.addCommand(MAP_CMD);
  1103                          friendList.addCommand(BACK_CMD);
  1104                          friendList.addCommand(DELIM);
  1105                          if(listOfFriends.size()>0){
  1106                                  for (int i=0; i<listOfFriends.size(); i++){
  1107                                          Friend f =
(Friend)listOfFriends.elementAt(i);
  1108                                          Command cc = new
Command(f.getName(),Command.SCREEN,1);
  1109                                          friendList.addCommand(cc);
  1110                                  }
  1111                          }
  1112                          friendList.setCommandListener(this);
  1113                          d.setCurrent(friendList);
  1114                          d.setCurrent(friendList);
  1115                  }
  1116
  1117                  if(s==friendList && c!=addNewFriend && c!=stopFollow && c!
=deleteFriends && c!=MAP_CMD && c!=BACK_CMD && c!=DELIM){
  1118                          friend = c.getLabel();
  1119                          friend = compact(friend);
  1120                          oneFriend = new List("",List.IMPLICIT);
  1121                          stopFollowOne = new Command("Stop Follow",
Command.SCREEN,1);
  1122                          deleteFriend = new Command("Delete",
Command.SCREEN,1);
  1123                          oneFriend.addCommand(DUMMY);
  1124                          oneFriend.addCommand(MAP_CMD);
  1125                          oneFriend.addCommand(stopFollowOne);
  1126                          oneFriend.addCommand(deleteFriend);


                                         cviii
Software Defects Prevention Techniques – Example Project


  1127                          oneFriend.addCommand(BACK_CMD);
  1128                          oneFriend.setCommandListener(this);
  1129
  1130                          d.setCurrent(oneFriend);
  1131                  }
  1132
  1133                  if(s==friendList && c==BACK_CMD){
  1134                          d.setCurrent(MVList);
  1135                  }
  1136
  1137                  if(s==oneFriend && c==MAP_CMD){
  1138                          for(int i=0; i<listOfFriends.size(); i++){
  1139                                  Friend f =
(Friend)listOfFriends.elementAt(i);
  1140                                  if(f.getName().equals(friend)) {
  1141
  1142                                          if(f.getThread()==false){
  1143                                                   tff = new
Thread4Friend(whiteList,f.getName(),mob,ic,mb,oul);
  1144                                                   Integer hID = new
Integer(tff.getID());
  1145                                                   whiteList.addElement(hID);
  1146                                                   f.setID(tff.getID());
  1147                                                   f.setThread(tff);
  1148                                                   tff.setFirst();
  1149                                                   tff.start();
  1150                                          } else {
  1151                                                   f.setFirst();
  1152                                          }
  1153                                  }
  1154                          }
  1155                          d.setCurrent(ic);
  1156                  }
  1157
  1158                  if(s==oneFriend && c==BACK_CMD){
  1159                          d.setCurrent(friendList);
  1160                  }
  1161
  1162                  if(s==oneFriend && c==stopFollowOne){
  1163                          for(int i=0; i<listOfFriends.size(); i++){
  1164                                  Friend f =
(Friend)listOfFriends.elementAt(i);
  1165                                  if(f.getName().equals(friend)) {
  1166                                          whiteList.removeElement(new
Integer(f.getHash()));
  1167                                          mob.deleteFriend(f.getHash());
  1168                                          f.setThread(null);
  1169                                  }
  1170                          }
  1171                          d.setCurrent(ic);
  1172                  }


                                                  cix
Zarko Acimovic


  1173
  1174                   if(s==oneFriend && c==deleteFriend){
  1175                           for(int i=0; i<listOfFriends.size(); i++){
  1176                                   Friend f =
(Friend)listOfFriends.elementAt(i);
  1177                                   if(f.getName().equals(friend)) {
  1178                                            whiteList.removeElement(new
Integer(f.getHash()));
  1179                                            mob.deleteFriend(f.getHash());
  1180                                            listOfFriends.removeElementAt(i);
  1181                                   }
  1182                           }
  1183                           d.setCurrent(ic);
  1184                  }
  1185
  1186          }
  1187
  1188
  1189          //----------------------This part of code deals with
GPS---------------------
  1190          public void run(){
  1191                   while(followFriends==true || gpsON==true){
  1192                           String s = this.getResourceAsString(resource);
  1193                           int nextIndex = 6;
  1194                           int index = s.indexOf('n');
  1195
  1196                           nextIndex = s.indexOf('n',index+1);
  1197
  1198                           int lastIndex = s.lastIndexOf('n');
  1199
  1200                           int begin = -2;
  1201                           int end = index;
  1202
  1203                           String c1 = "";
  1204                           String c2 = "";
  1205                           String timeStamp = "";
  1206                           long currentTS = 0;
  1207
  1208                           while(index<lastIndex && gpsON==true){
  1209                                   Thread t = Thread.currentThread();
  1210                                   if(t.hashCode()==currentlyShowed){
  1211                                            /**
  1212                                            if(synchronizationDone==false &&
syncFollow==true){
  1213                                                    do{ //Synchronization
  1214                                                            String temp =
s.substring(begin+2,end);
  1215                                                            temp =
compact(temp);
  1216                                                            int comma =
temp.indexOf(',');


                                           cx
Software Defects Prevention Techniques – Example Project


  1217                                                                            c1 =
temp.substring(0,comma);
  1218                                                                            int nextComma =
temp.indexOf(',',comma+1);
  1219                                                                            c2 =
temp.substring(comma+1,nextComma);
  1220                                                                            timeStamp =
temp.substring(nextComma+1,temp.length());
  1221                                                                            currentTS =
Long.parseLong(timeStamp);
  1222                                                                            begin = index-1;
  1223                                                                            end = nextIndex;
  1224                                                                            index = nextIndex;
  1225                                                                            nextIndex =
s.indexOf('n',nextIndex+1);
  1226                                                                   }
while(currentTS<this.getTimeStamp());
  1227                                                                   synchronizationDone = true;
  1228                                                      }*/
  1229
  1230                                                      Point wp = null;
  1231                                                      if(!c1.equals("")){
  1232                                                              wp = new
Point(c2,c1,resource,"","blanco",true);
  1233                                                      }
  1234                                                      if(syncFollow==true)           {
  1235
this.setTimeStamp(currentTS);
  1236                                                      }
  1237
  1238                                                      String temp =
s.substring(begin+2,end);
  1239                                                      temp = compact(temp);
  1240                                                      if(temp.equals("")){ //na kraju ce
temp da bude prazno
  1241                                                              index = lastIndex+1;
  1242                                                      } else {
  1243                                                              temp = compact(temp);
  1244                                                              int comma =
temp.indexOf(',');
  1245                                                                   c1 =
temp.substring(0,comma);
  1246                                                                   int nextComma =
temp.indexOf(',',comma+1);
  1247                                                                   c2 =
temp.substring(comma+1,nextComma);
  1248                                                                   timeStamp =
temp.substring(nextComma+1,temp.length());
  1249                                                                   currentTS =
Long.parseLong(timeStamp);
  1250


                                                 cxi
Zarko Acimovic


  1251                                                  begin = index-1;
  1252                                                  end = nextIndex;
  1253                                                  index = nextIndex;
  1254                                                  nextIndex =
s.indexOf('n',nextIndex+1);
  1255                                          }
  1256
  1257                                          try{
  1258                                                  Thread.sleep(1000);
  1259                                          }catch(Exception e){}
  1260
  1261                                          if(wp!=null){
  1262                                                  mob.setDrawablePoints();
  1263                                                  if(gpsON==true){
  1264
mob.setCurrentPosition(wp);
  1265
if((mob.getCurrentPosition().getX()>170 || mob.getCurrentPosition().getY()>160 ||
  1266
mob.getCurrentPosition().getX()<10 || mob.getCurrentPosition().getY()<10) &&
oul.getSelect()==false )
  1267
mb.setBackground(wp);
  1268
ic.repaint();
  1269
  1270                                                  }
  1271                                          }
  1272                                  }
  1273                          }
  1274                  }
  1275
  1276          }
  1277
  1278          /**
  1279           * @see MIDlet#pauseApp()
  1280           */
  1281          protected void pauseApp() {
  1282          }
  1283
  1284          /**
  1285           * @see MIDlet#destroyApp(boolean)
  1286           */
  1287          protected void destroyApp(boolean flag) throws
MIDletStateChangeException {
  1288          }
  1289
  1290
  1291     /** Blanco characters are possible to occur in names of pictures;
  1292      * Integer representations of blanko characters are 9 and 32
  1293      * Also, characters with integer representation between 0 and 33


                                         cxii
Software Defects Prevention Techniques – Example Project


1294   * can not be printed out in WSDD console, so I excluded them too
1295   */
1296      public String compact(String s){
1297              int k = s.length();
1298              char[] d = s.toCharArray();
1299              String ret = "";
1300              for(int i=0; i<d.length; i++){
1301                      int temp = (int)d[i];
1302                      if(temp>32) ret+=d[i];
1303              }
1304              int kk = ret.length();
1305              return ret;
1306      }
1307
1308      public String compactFine(String s){
1309              int k = s.length();
1310              char[] d = s.toCharArray();
1311              String ret = "";
1312              for(int i=0; i<d.length; i++){
1313                      int temp = (int)d[i];
1314                      if(temp!=32 && temp!=9) ret+=d[i];
1315              }
1316              int kk = ret.length();
1317              return ret;
1318      }
1319
1320      public String getResourceAsString(String resource){
1321              InputStream is = null;
1322              try{
1323                      is = this.getClass().getResourceAsStream(resource);
1324              }catch(Exception e) {
1325                      a.setString("There is no such resource");
1326                      d.setCurrent(a);
1327              }
1328
1329              //conversion of resource into string
1330              String s = "";
1331              char m =' ';
1332
1333              try{
1334                      m = (char)is.read();
1335              }catch(Exception e){}
1336
1337              while(m!=65535){
1338                      s+=m;
1339                      try{
1340                              m = (char)is.read();
1341                      }catch(Exception e){}
1342              }
1343              try{
1344                      is.close();


                                           cxiii
Zarko Acimovic


1345              }catch(Exception e){}
1346
1347
1348              s=compactFine(s);
1349              return s;
1350       }
1351
1352       public long getTimeStamp(){
1353               return globalTimeStamp;
1354       }
1355
1356       public void setTimeStamp(long tms){
1357               globalTimeStamp = tms;
1358       }
1359
1360       public void setWPList(){
1361               WPList = new List("",List.IMPLICIT);
1362               WPList.addCommand(DUMMY);
1363               WPList.addCommand(addNewWP);
1364               WPList.addCommand(sortWP);
1365               WPList.addCommand(sortNameWP);
1366               WPList.addCommand(showIDcom);
1367               WPList.addCommand(BACK_CMD);
1368               WPList.addCommand(DELIM);
1369               WPList.setCommandListener(this);
1370
1371       }
1372   }
1373
1374
1375




                                    cxiv
Software Defects Prevention Techniques – Example Project


MathFP.java


     All classes and interfaces must belong to a named package                                          11 PMD Marker
     All methods are static. Consider using Singleton instead. Alternatively, you could add a private
     constructor or make the class abstract to silence this warning.                                     11   PMD Marker
     The class 'MathFP' has a Cyclomatic Complexity of 3 (Highest = 12).                                 11   PMD Marker
     This class has too many methods, consider refactoring it.                                           11   PMD Marker
     Weighted Methods per Class is 105                                                                   11   Metrics Marker
     Avoid variables with short names like by                                                            16   PMD Marker
     Parameter 'by' is not assigned and could be declared final                                          16   PMD Marker
     Parameter 'num' is not assigned and could be declared final                                         16   PMD Marker
     Avoid variables with short names like l                                                             35   PMD Marker
     Parameter 'l' is not assigned and could be declared final                                           35   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method       37   PMD Marker
     Avoid using if...else statements without curly braces                                               37   PMD Marker
     Avoid using if...else statements without curly braces                                               39   PMD Marker
     Avoid variables with short names like l                                                             47   PMD Marker
     Parameter 'l' is not assigned and could be declared final                                           47   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method       49   PMD Marker
     Avoid using if...else statements without curly braces                                               49   PMD Marker
     Avoid using if...else statements without curly braces                                               51   PMD Marker
     Avoid variables with short names like e                                                             62   PMD Marker
     Avoid variables with short names like PI                                                            63   PMD Marker
     The field name indicates a constant but its modifiers do not                                        63   PMD Marker
     The field name indicates a constant but its modifiers do not                                        64   PMD Marker
     Lines of Code in Method is 19                                                                       68   Metrics Marker
     Parameter 'i' is not assigned and could be declared final                                           68   PMD Marker
     Avoid using if statements without curly braces                                                      69   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method       70   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method       94   PMD Marker
     Avoid using if...else statements without curly braces                                               94   PMD Marker
     Local variable 'l1' could be declared final                                                        112   PMD Marker
     Avoid using if statements without curly braces                                                     113   PMD Marker
     Cyclomatic Complexity is 7                                                                         121   Metrics Marker
     Lines of Code in Method is 22                                                                      121   Metrics Marker
     Number of Statements is 31                                                                         121   Metrics Marker
     Avoid using if statements without curly braces                                                     123   PMD Marker
     Avoid using for statements without curly braces                                                    128   PMD Marker
     MathFP.toFP(String) concatenates strings using + in a loop                                         128   FindBugs
     Prefer StringBuffer over += for concatenating strings                                              128   PMD Marker
     Avoid using if statements without curly braces                                                     129   PMD Marker
     Avoid using if statements without curly braces                                                     135   PMD Marker
     Local variable 'l1' could be declared final                                                        137   PMD Marker




                                                                  cxv
Zarko Acimovic


MathFP.java


     Cyclomatic Complexity is 9                                                                      199   Metrics Marker
     Lines of Code in Method is 29                                                                   199   Metrics Marker
     Number of Statements is 26                                                                      199   Metrics Marker
     The method 'mul' has a Cyclomatic Complexity of 12.                                             199   PMD Marker
     The method mul() has an NPath complexity of 320                                                 199   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method   204   PMD Marker
     Cyclomatic Complexity is 8                                                                      229   Metrics Marker
     Lines of Code in Method is 21                                                                   229   Metrics Marker
     The method 'div' has a Cyclomatic Complexity of 11.                                             229   PMD Marker
     Cyclomatic Complexity is 5                                                                      266   Metrics Marker
     The String literal "Bad Input" appears 4 times in this file; the first occurrence is on 268     268   PMD Marker
     Avoid using for statements without curly braces                                                 272   PMD Marker
     Lines of Code in Method is 16                                                                   286   Metrics Marker
     Number of Statements is 29                                                                      286   Metrics Marker
     Consider simply returning the value vs storing it in local variable 'l5'                        300   PMD Marker
     Cyclomatic Complexity is 8                                                                      336   Metrics Marker
     Lines of Code in Method is 31                                                                   336   Metrics Marker
     Number of Statements is 33                                                                      336   Metrics Marker
     The method 'exp' has a Cyclomatic Complexity of 10.                                             336   PMD Marker
     Avoid using for statements without curly braces                                                 343   PMD Marker
     Cyclomatic Complexity is 8                                                                      368   Metrics Marker
     Lines of Code in Method is 28                                                                   368   Metrics Marker
     Number of Statements is 28                                                                      368   Metrics Marker
     Avoid unused local variables such as 'l2'.                                                      372   PMD Marker
     The local variable l2 is never read                                                             372   Java Problem
     Avoid if (x != y) ..; else ..;                                                                  390   PMD Marker
     Cyclomatic Complexity is 5                                                                      397   Metrics Marker
     Lines of Code in Method is 18                                                                   397   Metrics Marker




     1     /**
     2      * MathFP implements fix point as a replacement for floating point
     3      */
     4
     5
     6
     7     // Processed by NMI's Java Code Viewer 4.8.1 © 1997-2000 B. Lemaire
     8     // Website: http://njcv.htmlplanet.com E-mail: info@njcv.htmlplanet.com
     9     // Copy registered to Evaluation Copy
    10
    11     public class MathFP {
    12
    13        /** Modulo (% operator) implementaition missing in MathFP 2.0.6
    14         * @author BMa
    15         */



                                                                     cxvi
Software Defects Prevention Techniques – Example Project


    16    public static long mod(long num, long by) {
    17      //System.out.println("mod: "+MathFP.toString(num)+" by:
"+MathFP.toString(by));
    18      long frac = MathFP.div(num, by);
    19      //System.out.println("MathFP.div(num, by):
"+MathFP.toString(MathFP.div(num, by)));
    20      //long frac = MathFP.round(frac, 0); does not work properly???
    21      //System.out.println("MathFP.round(MathFP.div(num, by), 0):
"+MathFP.toString(MathFP.round(MathFP.div(num, by), 0)));
    22      frac = MathFP.toFP(MathFP.toLong(frac));
    23      //System.out.println("MathFP.better(MathFP.div(num, by), 0):
"+MathFP.toString(frac));
    24      //System.out.println("MathFP.mul(by, frac):
"+MathFP.toString(MathFP.mul(by, frac)));
    25      //System.out.println("MathFP.mod: "+MathFP.toString(num -
MathFP.mul(by, frac)));
    26      return num - MathFP.mul(by, frac);
    27    }
    28
    29
    30    //private static long sinLimit=toFP("0.0055");
    31
    32    /** Fix of bad sin() in MathFP 2.0.6 - X is closer to real sin(X) than
calculated value for small X
    33     * @author BMa
    34     */
    35    public static long sin(long l) {
    36      if (abs(l) > toFP("0.0055"))
    37        return sinBad(l);
    38      else
    39        return l;
    40    }
    41
    42    //private static long asinLimit=toFP("0.019");
    43
    44    /** Fix of bad asin() in MathFP 2.0.6 - X is closer to real asin(X) than
calculated value for small X
    45     * @author BMa
    46     */
    47    public static long asin(long l) {
    48      if (abs(l) > toFP("0.019"))
    49        return asinBad(l);
    50      else
    51        return l;
    52    }
    53
    54
    55    private static int _fbits = 24;
    56    private static int _digits = 8;
    57    private static long _one;
    58    private static long _fmask = 0xffffffL;


                                                cxvii
Zarko Acimovic


 59   private static long _dmul = 0x5f5e100L;
 60   private static long _flt = 0L;
 61   private static long _pi;
 62   private static long e[];
 63   public static long PI;
 64   public static long E;
 65   public static final long MAX_VALUE = 0x7fffffffffffffffL;
 66   public static final long MIN_VALUE = 0x8000000000000001L;
 67
 68   public static int setPrecision(int i) {
 69     if(i > 24 || i < 0)
 70       return _digits;
 71     _fbits = i;
 72     _one = 1L << i;
 73     _flt = 24 - i;
 74     _digits = 0;
 75     _dmul = 1L;
 76     _fmask = _one - 1L;
 77     PI = _pi >> (int)_flt;
 78     E = e[1] >> (int)_flt;
 79     for(long l = _one; l != 0L;) {
 80       l /= 10L;
 81       _digits++;
 82       _dmul *= 10L;
 83     }
 84
 85       return _digits;
 86   }
 87
 88   public static int getPrecision() {
 89     return _fbits;
 90   }
 91
 92   public static long toLong(long l) {
 93     if(l < 0L)
 94       return -(round(-l, 0) >> _fbits);
 95     else
 96       return round(l, 0) >> _fbits;
 97   }
 98
 99   public static long toLongZare(long i) {
100     if(i >= 0)
101              i += 2048;
102         else
103              i -= 2048;
104         return i >> 12;
105   }
106
107   public static long toFP(long l) {
108     return l << _fbits;
109   }


                                    cxviii
Software Defects Prevention Techniques – Example Project


   110
   111    public static long convert(long l, int i) {
   112      long l1 = l >= 0L ? 1L : -1L;
   113      if(abs(i) < 25L)
   114        if(_fbits < i)
   115          l = l + l1 * (1L << (i - _fbits >> 1)) >> i - _fbits;
   116        else
   117          l <<= _fbits - i;
   118      return l;
   119    }
   120
   121    public static long toFP(String s) {
   122      int i = 0;
   123      if(s.charAt(0) == '-')
   124        i = 1;
   125      String s1 = "-1";
   126      int j = s.indexOf(46);
   127      if(j >= 0) {
   128        for(s1 = s.substring(j + 1, s.length()); s1.length() < _digits; s1 =
s1 + "0");
   129        if(s1.length() > _digits)
   130          s1 = s1.substring(0, _digits);
   131      } else {
   132        j = s.length();
   133      }
   134      long l = 0L;
   135      if(i != j)
   136        l = Long.parseLong(s.substring(i, j));
   137      long l1 = Long.parseLong(s1) + 1L;
   138      long l2 = (l << _fbits) + (l1 << _fbits) / _dmul;
   139      if(i == 1)
   140        l2 = -l2;
   141      return l2;
   142    }
   143
   144    public static String toString(long l) {
   145      boolean flag = false;
   146      if(l < 0L) {
   147        flag = true;
   148        l = -l;
   149      }
   150      long l1 = l >> _fbits;
   151      long l2 = _dmul * (l & _fmask) >> _fbits;
   152      String s;
   153      for(s = Long.toString(l2); s.length() < _digits; s = "0" + s);
   154      return (flag ? "-" : "") + Long.toString(l1) + "." + s;
   155    }
   156
   157    public static String toString(long l, int i) {
   158      if(i > _digits)
   159        i = _digits;


                                                 cxix
Zarko Acimovic


160       String s = toString(round(l, i));
161       return s.substring(0, (s.length() - _digits) + i);
162   }
163
164   public static long getWholePart(String s){
165
166           int end = s.indexOf('.');
167           s = s.substring(0,end);
168           long wh = toFP(s);
169           return wh;
170   }
171   /**
172   public static long getWholePart(long l){
173         String s = toString(l);
174         int end = s.indexOf('.');
175         s = s.substring(0,end);
176         long wh = toFP(s);
177         return wh;
178   }*/
179
180   public static long max(long l, long l1) {
181     return l >= l1 ? l : l1;
182   }
183
184   public static long min(long l, long l1) {
185     return l1 >= l ? l : l1;
186   }
187
188   public static long round(long l, int i) {
189     long l1 = 10L;
190     for(int j = 0; j < i; j++)
191       l1 *= 10L;
192
193       l1 = div(toFP(5L), toFP(l1));
194       if(l < 0L)
195         l1 = -l1;
196       return l + l1;
197   }
198
199   public static long mul(long l, long l1) {
200     boolean flag = false;
201     int i = _fbits;
202     long l2 = _fmask;
203     if((l & l2) == 0L)
204       return (l >> i) * l1;
205     if((l1 & l2) == 0L)
206       return l * (l1 >> i);
207     if(l < 0L && l1 > 0L || l > 0L && l1 < 0L)
208       flag = true;
209     if(l < 0L)
210       l = -l;


                                       cxx
Software Defects Prevention Techniques – Example Project


211       if(l1 < 0L)
212         l1 = -l1;
213       for(; max(l, l1) >= 1L << 63 - i; i--) {
214         l >>= 1;
215         l1 >>= 1;
216         l2 >>= 1;
217       }
218
219       long l3 = (l >> i) * (l1 >> i) << i;
220       long l4 = (l & l2) * (l1 & l2) >> i;
221       l4 += (l & ~l2) * (l1 & l2) >> i;
222       l3 = l3 + l4 + ((l & l2) * (l1 & ~l2) >> i) << _fbits - i;
223       if(l3 < 0L)
224         throw new ArithmeticException("Overflow");
225       else
226         return flag ? -l3 : l3;
227   }
228
229   public static long div(long l, long l1) {
230     boolean flag = false;
231     int i = _fbits;
232     if(l1 == _one)
233       return l;
234     if((l1 & _fmask) == 0L)
235       return l / (l1 >> i);
236     if(l < 0L && l1 > 0L || l > 0L && l1 < 0L)
237       flag = true;
238     if(l < 0L)
239       l = -l;
240     if(l1 < 0L)
241       l1 = -l1;
242     for(; max(l, l1) >= 1L << 63 - i; i--) {
243       l >>= 1;
244       l1 >>= 1;
245     }
246
247       long l2 = (l << i) / l1 << _fbits - i;
248       return flag ? -l2 : l2;
249   }
250
251   public static long add(long l, long l1) {
252     return l + l1;
253   }
254
255   public static long sub(long l, long l1) {
256     return l - l1;
257   }
258
259   public static long abs(long l) {
260     if(l < 0L)
261       return -l;


                                               cxxi
Zarko Acimovic


   262      else
   263        return l;
   264    }
   265
   266    public static long sqrt(long l, int i) {
   267      if(l < 0L)
   268        throw new ArithmeticException("Bad Input");
   269      if(l == 0L)
   270        return 0L;
   271      long l1 = l + _one >> 1;
   272      for(int j = 0; j < i; j++)
   273        l1 = l1 + div(l, l1) >> 1;
   274
   275      if(l1 < 0L)
   276        throw new ArithmeticException("Overflow");
   277      else
   278        return l1;
   279    }
   280
   281    public static long sqrt(long l) {
   282      return sqrt(l, 24);
   283    }
   284
   285    //public static long sin(long l) {
   286    private static long sinBad(long l) {
   287      long l1 = mul(l, div(toFP(180L), PI));
   288      l1 %= toFP(360L);
   289      if(l1 < 0L)
   290        l1 = toFP(360L) + l1;
   291      long l2 = l1;
   292      if(l1 >= toFP(90L) && l1 < toFP(270L))
   293        l2 = toFP(180L) - l1;
   294      else
   295        if(l1 >= toFP(270L) && l1 < toFP(360L))
   296           l2 = -(toFP(360L) - l1);
   297      long l3 = l2 / 90L;
   298      long l4 = mul(l3, l3);
   299      long l5 = mul(mul(mul(mul(0xfffffffffffee21aL >> (int)_flt, l4) +
(0x14594dL >> (int)_flt), l4) - (0xa55b13L >> (int)_flt), l4) + (long)(0x1921f9c >>
(int)_flt), l3);
   300      return l5;
   301    }
   302
   303    //public static long asin(long l) {
   304    private static long asinBad(long l) {
   305      if(abs(l) > _one) {
   306        throw new ArithmeticException("Bad Input");
   307      } else {
   308        boolean flag = l < 0L;
   309        l = abs(l);



                                        cxxii
Software Defects Prevention Techniques – Example Project


   310        long l1 = mul(mul(mul(mul(0x236cf >> (int)_flt, l) - (long)(0x92748
>> (int)_flt), l) + (long)(0x15acb4 >> (int)_flt), l) - (long)(0x36d0dd >>
(int)_flt), l) + (long)(0x1921f27 >> (int)_flt);
   311        long l2 = PI / 2L - mul(sqrt(_one - l), l1);
   312        return flag ? -l2 : l2;
   313      }
   314    }
   315
   316    public static long cos(long l) {
   317      return sin(PI / 2L - l);
   318    }
   319
   320    public static long acos(long l) {
   321      return PI / 2L - asin(l);
   322    }
   323
   324    public static long tan(long l) {
   325      return div(sin(l), cos(l));
   326    }
   327
   328    public static long cot(long l) {
   329      return div(cos(l), sin(l));
   330    }
   331
   332    public static long atan(long l) {
   333      return asin(div(l, sqrt(_one + mul(l, l))));
   334    }
   335
   336    public static long exp(long l) {
   337      if(l == 0L)
   338        return _one;
   339      boolean flag = l < 0L;
   340      l = abs(l);
   341      int i = (int)(l >> _fbits);
   342      long l1 = _one;
   343      for(int j = 0; j < i / 4; j++)
   344        l1 = mul(l1, e[4] >> (int)_flt);
   345
   346      if(i % 4 > 0)
   347        l1 = mul(l1, e[i % 4] >> (int)_flt);
   348      l &= _fmask;
   349      if(l > 0L) {
   350        long l2 = _one;
   351        long l3 = 0L;
   352        long l4 = 1L;
   353        for(int k = 0; k < 16; k++) {
   354          l3 += l2 / l4;
   355          l2 = mul(l2, l);
   356          l4 *= k + 1;
   357          if(l4 > l2 || l2 <= 0L || l4 <= 0L)
   358            break;


                                                cxxiii
Zarko Acimovic


359         }
360
361         l1 = mul(l1, l3);
362       }
363       if(flag)
364         l1 = div(_one, l1);
365       return l1;
366   }
367
368   public static long log(long l) {
369     if(l <= 0L)
370       throw new ArithmeticException("Bad Input");
371     long l1 = 0L;
372     long l2 = 0L;
373     int i;
374     for(i = 0; l >= _one << 1; i++)
375       l >>= 1;
376
377       long l4 = (long)i * (long)(0xb17218 >> (int)_flt);
378       long l5 = 0L;
379       if(l < _one)
380         return -log(div(_one, l));
381       l -= _one;
382       for(int j = 1; j < 20; j++) {
383         long l3;
384         if(l1 == 0L)
385           l3 = l;
386         else
387           l3 = mul(l1, l);
388         if(l3 == 0L)
389           break;
390         l5 += ((j % 2 != 0 ? 1L : -1L) * l3) / (long)j;
391         l1 = l3;
392       }
393
394       return l4 + l5;
395   }
396
397   public static long pow(long l, long l1) {
398     boolean flag = l1 < 0L;
399     long l2 = _one;
400     l1 = abs(l1);
401     for(int i = (int)l1 >> _fbits; i-- > 0;)
402       l2 = mul(l2, l);
403
404       if(l2 < 0L)
405         throw new ArithmeticException("Overflow");
406       if(l != 0L)
407         l2 = mul(l2, exp(mul(log(l), l1 & _fmask)));
408       else
409         l2 = 0L;


                                      cxxiv
Software Defects Prevention Techniques – Example Project


410           if(flag)
411             return div(_one, l2);
412           else
413             return l2;
414       }
415
416       public static long atan2(long l, long l1) {
417         long l2 = 0L;
418         if(l1 > 0L)
419           l2 = atan(div(l, l1));
420         else
421           if(l1 < 0L) {
422              l2 = (l1 >= 0L ? PI : -PI) - atan(abs(div(l, l1)));
423           } else {
424              if(l1 == 0L && l == 0L)
425                throw new ArithmeticException("Bad Input");
426              l2 = (l >= 0L ? PI : -PI) / 2L;
427           }
428         return l2;
429       }
430
431       static {
432         _one = 0x1000000L;
433         _pi = 0x3243f6aL;
434         e = (new long[] {
435           _one, 0x2b7e151L, 0x763992eL, 0x1415e5bfL, 0x3699205cL
436         });
437         PI = _pi;
438         E = e[1];
439       }
440   }




                                                  cxxv
Zarko Acimovic



Outlook.java


     All classes and interfaces must belong to a named package                                10   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 82%                                   10   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 66%                           10   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 353%                                  10   Metrics Marker
     The class 'Outlook' has a Cyclomatic Complexity of 2 (Highest = 10).                     10   PMD Marker
     Avoid variables with short names like mb                                                 11   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.   11   PMD Marker
     Use explicit scoping instead of the default package private level                        11   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.   12   PMD Marker
     Use explicit scoping instead of the default package private level                        12   PMD Marker
     Unused field: Outlook.mbf                                                                13   FindBugs
     Use explicit scoping instead of the default package private level                        13   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.   14   PMD Marker
     Use explicit scoping instead of the default package private level                        14   PMD Marker
     Use explicit scoping instead of the default package private level                        15   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.   16   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.   17   PMD Marker
     Avoid variables with short names like mb                                                 22   PMD Marker
     Avoid variables with short names like sp                                                 22   PMD Marker
     Parameter 'mb' is not assigned and could be declared final                               22   PMD Marker
     Parameter 'mob' is not assigned and could be declared final                              22   PMD Marker
     Parameter 'sp' is not assigned and could be declared final                               22   PMD Marker
     Avoid variables with short names like g                                                  29   PMD Marker
     Cyclomatic Complexity is 6                                                               29   Metrics Marker
     Lines of Code in Method is 33                                                            29   Metrics Marker
     Number of Statements is 21                                                               29   Metrics Marker
     Parameter 'g' is not assigned and could be declared final                                29   PMD Marker
     The method 'drawOutlook' has a Cyclomatic Complexity of 10.                              29   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                     30   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                     37   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                     37   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                     37   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                     42   PMD Marker
     Avoid using if statements without curly braces                                           57   PMD Marker
     Avoid using if statements without curly braces                                           59   PMD Marker
     Local variable 'zoom' could be declared final                                            64   PMD Marker
     The method name Outlook.ZoomIn() doesn't start with a lower case letter                  64   FindBugs
     Avoid using if statements without curly braces                                           65   PMD Marker
     Local variable 'zoom' could be declared final                                            69   PMD Marker




                                                              cxxvi
Software Defects Prevention Techniques – Example Project



     1 /**
     2   *
     3   * Outlook coordinates work MapBackground, MapObjects and SelectorPoint
     4   *
     5   */
     6 //import java.util.*;
     7 //import java.io.*;
     8 import javax.microedition.lcdui.*;
     9
    10 public class Outlook {
    11          MapBackground mb;
    12          MapObjects mob;
    13          MapBackgroundFactory mbf;
    14          SelectorPoint selP;
    15          boolean select = false;
    16          boolean route = false;
    17          boolean startup = false;
    18          boolean first = false;
    19          Point center = new Point("44.83168","20.445","","","blanco",false);
    20          boolean WPselection = false;
    21
    22          Outlook(MapBackground mb, MapObjects mob, SelectorPoint sp) {
    23
    24          this.mb = mb;
    25          this.mob = mob;
    26          this.selP = sp;
    27      }
    28
    29          public void drawOutlook(Graphics g){
    30                  if(startup==false) {
    31                          mb.setBackground(center);
    32                          startup = true;
    33                  }
    34
    35                  mb.drawMapBackground(g);
    36
    37                  if(first==true && mob.currentSet()==false &&
WPselection==false){
    38                          selP.selP = new Point(mb.getNewEdge(),false);
    39                          first=false;
    40                  }
    41
    42                  if(first==true && mob.currentSet()==true &&
WPselection==false){
    43                          selP.selectWP(mob.getCurrentPosition().getName());
    44                          mb.drawMapBackground(g);
    45                          first=false;
    46                  }
    47
    48                  /**


                                                cxxvii
Zarko Acimovic


49               if(route==false){
50                       mob.drawMOB(g,route);
51                       if(select==true) selP.drawSelP(g);
52               } else {
53                       if(select==true) selP.drawSelP(g);
54                       mob.drawMOB(g,route);
55               }*/
56
57               if(select==true) selP.drawSelP(g);
58               mob.drawMOB(g,route);
59               if(select==true) selP.drawCaption(g);
60
61        }
62
63        public void ZoomIn(){
64                boolean zoom = mb.ZoomIn();
65                if(zoom==true) selP.Zoom();
66        }
67
68        public void ZoomOut(){
69                boolean zoom = mb.ZoomOut();
70                if(zoom==true) selP.Zoom();
71        }
72
73   /** Sets map due to Pan transformation
74        */
75        public void setMap(char side){
76                if(select == false) mb.setMap(side);
77                if(select == true) selP.setSelectorScreen(side);
78        }
79
80        public void setCanvasWH(int cW,int cH){
81                mb.setCanvasWH(cW,cH);
82        }
83
84        public void setSelect(){
85                select = true;
86                first = true;
87                //selP.resetBig();
88        }
89
90        public void setWPselection(){
91                WPselection = true;
92        }
93
94        public void resetSelect(){
95                select = false;
96                WPselection = false;
97        }
98
99        public boolean getSelect(){


                                  cxxviii
Software Defects Prevention Techniques – Example Project


100               return select;
101       }
102
103       public void setRoute(){
104               route = true;
105       }
106
107       public void resetRoute(){
108               route = false;
109       }
110
111
112   }




                                          cxxix
Zarko Acimovic



Point.java


      All classes and interfaces must belong to a named package                                                10   PMD Marker
      Lack of Cohesion in Methods (Chidamber & Kemerer) is 309                                                 10   Metrics Marker
      Lack of Cohesion in Methods (Henderson-Sellers) is 91%                                                   10   Metrics Marker
      Lack of Cohesion in Methods (Pairwise Field Irrelation) is 80%                                           10   Metrics Marker
      Lack of Cohesion in Methods (Total Correlation) is 474%                                                  10   Metrics Marker
      Number of Fields is 21                                                                                   10   Metrics Marker
      The class 'Point' has a Cyclomatic Complexity of 2 (Highest = 13).                                       10   PMD Marker
      Too many fields                                                                                          10   PMD Marker
      Weighted Methods per Class is 60                                                                         10   Metrics Marker
      Avoid variables with short names like ID                                                                 25   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.                   25   PMD Marker
      The field name indicates a constant but its modifiers do not                                             25   PMD Marker
      Possible unsafe assignment to a non-final static field in a constructor.                                 30   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.                   44   PMD Marker
      Private field 'degLat' could be made final; it is only initialized in the declaration or constructor.    44   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.                   48   PMD Marker
      Private field 'minLat' could be made final; it is only initialized in the declaration or constructor.    48   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.                   52   PMD Marker
      Private field 'secLat' could be made final; it is only initialized in the declaration or constructor.    52   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.                   63   PMD Marker
      Private field 'degLon' could be made final; it is only initialized in the declaration or constructor.    63   PMD Marker
      Private field 'minLon' could be made final; it is only initialized in the declaration or constructor.    67   PMD Marker
      Use explicit scoping instead of the default package private level                                        79   PMD Marker
      Use explicit scoping instead of the default package private level                                        83   PMD Marker
      Use explicit scoping instead of the default package private level                                        87   PMD Marker
      Use explicit scoping instead of the default package private level                                        91   PMD Marker
      Avoid variables with short names like x                                                                  99   PMD Marker
      Avoid variables with short names like y                                                                 103   PMD Marker
      Unread field: Point.dm1                                                                                 108   FindBugs
      Use explicit scoping instead of the default package private level                                       108   PMD Marker
      Unread field: Point.dm2                                                                                 112   FindBugs
      Avoid variables with short names like rr                                                                116   PMD Marker
      Unread field: Point.rr                                                                                  116   FindBugs
      Lines of Code in Method is 36                                                                           123   Metrics Marker
      Number of Parameters is 9                                                                               123   Metrics Marker
      Number of Statements is 36                                                                              123   Metrics Marker
      Parameter 'dlat' is not assigned and could be declared final                                            126   PMD Marker
      Parameter 'mlat' is not assigned and could be declared final                                            126   PMD Marker
      Parameter 'slat' is not assigned and could be declared final                                            126   PMD Marker
      Parameter 'dlon' is not assigned and could be declared final                                            127   PMD Marker
      Parameter 'mlon' is not assigned and could be declared final                                            127   PMD Marker




                                                                        cxxx
Software Defects Prevention Techniques – Example Project



Point.java


      Number of Parameters is 5                                                                                162   Metrics Marker
      Number of Statements is 58                                                                               162   Metrics Marker
      Local variable 'latS' could be declared final                                                            174   PMD Marker
      Local variable 'lonS' could be declared final                                                            175   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                                     200   PMD Marker
      Write to static field Point.cnt from instance method new Point(long, long, String, String, boolean)      202   FindBugs
      Lines of Code in Method is 29                                                                            211   Metrics Marker
      Avoid unnecessary comparisons in boolean expressions                                                     232   PMD Marker
      Write to static field Point.cnt from instance method new Point(Point, boolean)                           234   FindBugs
      Lines of Code in Method is 45                                                                            241   Metrics Marker
      Number of Parameters is 6                                                                                241   Metrics Marker
      Number of Statements is 57                                                                               241   Metrics Marker
      Avoid unnecessary comparisons in boolean expressions                                                     277   PMD Marker
      Write to static field Point.cnt from instance method new Point(String, String, String, String, String,
      boolean)                                                                                                 279   FindBugs
      Local variable 'c1' could be declared final                                                              334   PMD Marker
      Local variable 'c2' could be declared final                                                              335   PMD Marker
      Lines of Code in Method is 21                                                                            474   Metrics Marker
      Lines of Code in Method is 41                                                                            496   Metrics Marker
      Number of Statements is 29                                                                               496   Metrics Marker
      Avoid unnecessary if..then..else statements when returning a boolean                                     529   PMD Marker
      A method should have only one exit point, and that should be the last statement in the method            531   PMD Marker
      Consider simply returning the value vs storing it in local variable 'xx'                                 559   PMD Marker
      Consider simply returning the value vs storing it in local variable 'yy'                                 565   PMD Marker
      Cyclomatic Complexity is 12                                                                              660   Metrics Marker
      Lines of Code in Method is 39                                                                            660   Metrics Marker
      Number of Parameters is 5                                                                                660   Metrics Marker
      Number of Statements is 76                                                                               660   Metrics Marker
      The method 'drawPoint' has a Cyclomatic Complexity of 13.                                                660   PMD Marker
      The method drawPoint() has an NPath complexity of 1032                                                   660   PMD Marker
      Avoid using if statements without curly braces                                                           668   PMD Marker
      Avoid using if statements without curly braces                                                           671   PMD Marker



      1      /**
      2       * Class Point represents geographical object
      3       */
      4
      5
      6      //import java.util.*;
      7      //import java.io.*;
      8      import javax.microedition.lcdui.*;
      9
     10      public class Point {
     11
     12


                                                                     cxxxi
Zarko Acimovic


13   /** type of Waypoint
14    * -2 - destination Point
15    * -1 - current Point
16    * 0 - free Point
17    * n - route Point
18    */
19        private int typeID = 0;
20
21
22   /** Point ID
23    *
24    */
25        private int ID = 0;
26
27
28   /** Counter
29    */
30    private static int cnt = 0;
31
32
33   /** Float-point representation of latitude
34        */
35        private long lat;
36
37   /** Float-point representation of longitude
38        */
39        private long lon;
40
41
42   /** Degrees of latitude in Integer
43        */
44    private long degLat;
45
46   /** Minutes of latitude in Integer
47        */
48        private long minLat;
49
50   /** Seconds of latitude in Integer
51        */
52        private long secLat;
53
54   /** Side of the world, South or North
55        */
56        //private char sideNS;
57
58
59
60
61   /** Degrees of longitude in Integer
62        */
63    private long degLon;


                                    cxxxii
Software Defects Prevention Techniques – Example Project


 64
 65   /** Minutes of longitude in Integer
 66        */
 67        private long minLon;
 68
 69   /** Seconds of longitude in Integer
 70        */
 71        private long secLon;
 72
 73   /** Side of the world, West or East
 74        */
 75        //private char sideWE;
 76
 77   /** Total number of latitude seconds
 78    */
 79    long totLatSec;
 80
 81   /** Total number of longitude seconds
 82    */
 83    long totLonSec;
 84
 85   /** Name of the Point
 86    */
 87        String name = "default";
 88
 89   /** Type of the Point
 90    */
 91        String type = "default";
 92
 93   /** Distance between this point and point which asks sorting
 94    */
 95        private long distance;
 96
 97   /** x coordinate of Point on Canvas
 98    */
 99        private long x = 5;
100
101   /** y coordinate of Point on Canvas
102    */
103        private long y = 5;
104
105
106   /** Help variable
107        */
108        long dm1=0;
109
110   /** Help variable
111        */
112        long dm2=0;
113
114   /** Help variable


                                          cxxxiii
Zarko Acimovic


   115          */
   116          long rr=1000;
   117
   118     /** String that describes image
   119      */
   120      String imgString = "blanco";
   121
   122
   123     /** Regular constructor
   124      * @author Zarko Acimovic
   125      */
   126          Point(long dlat, long mlat, long slat, //char side1,
   127                        long dlon, long mlon, long slon, //char side2,
   128                            String n, String t,boolean setNewID){
   129
   130                  degLat=MathFP.toFP(dlat);
   131                  minLat=MathFP.toFP(mlat);
   132                  secLat=MathFP.toFP(slat);
   133                  //sideNS=side1;
   134
   135
   136                  degLon=MathFP.toFP(dlon);
   137                  minLon=MathFP.toFP(mlon);
   138                  secLon=MathFP.toFP(slon);
   139                  //sideWE=side2;
   140
   141                  name=n;
   142                  type=t;
   143
   144                  long sixty=MathFP.toFP("60");
   145
   146                  lat =
MathFP.add(degLat,MathFP.div(MathFP.add(minLat,MathFP.div(secLat,sixty)),sixty));
   147                  lon =
MathFP.add(degLon,MathFP.div(MathFP.add(minLon,MathFP.div(secLon,sixty)),sixty));
   148
   149                  totLatSec = MathFP.mul(lat,MathFP.toFP("3600"));
   150                  totLonSec =      MathFP.mul(lon,MathFP.toFP("3600"));
   151
   152                  if(setNewID==true){
   153                           ID = cnt;
   154                           cnt++;
   155                  }
   156                  typeID = 0; //default type
   157                  //System.out.println("cnt="+cnt);
   158          }
   159
   160
   161
   162          Point(long totLatSec,
   163                    //char s1,


                                        cxxxiv
Software Defects Prevention Techniques – Example Project


164            long totLonSec,
165            //char s2,
166            String ss1, String ss2, boolean setNewID){
167          lat = MathFP.div(totLatSec, MathFP.toFP("3600"));
168          lon = MathFP.div(totLonSec, MathFP.toFP("3600"));
169          this.name = ss1;
170          this.type = ss2;
171          //this.sideNS = s1;
172          //this.sideWE = s2;
173
174          String latS = MathFP.toString(lat);
175          String lonS = MathFP.toString(lon);
176
177          this.degLat = MathFP.getWholePart(latS);
178          long temp = MathFP.sub(this.lat,this.degLat);
179          temp = MathFP.mul(temp,MathFP.toFP("60"));
180          this.minLat = MathFP.getWholePart(MathFP.toString(temp));
181
182          temp = MathFP.sub(this.lat,this.degLat);
183          temp = MathFP.mul(temp,MathFP.toFP("60"));
184          temp = MathFP.sub(temp,minLat);
185          this.secLat = MathFP.mul(temp,MathFP.toFP("60"));
186
187          this.degLon = MathFP.getWholePart(lonS);
188          temp = MathFP.sub(this.lon,this.degLon);
189          temp = MathFP.mul(temp,MathFP.toFP("60"));
190          this.minLon = MathFP.getWholePart(MathFP.toString(temp));
191
192          temp = MathFP.sub(this.lon,this.degLon);
193          temp = MathFP.mul(temp,MathFP.toFP("60"));
194          temp = MathFP.sub(temp,minLon);
195          this.secLon = MathFP.mul(temp,MathFP.toFP("60"));
196
197          this.totLatSec = totLatSec;
198          this.totLonSec = totLonSec;
199
200          if(setNewID==true){
201                  ID = cnt;
202                  cnt++;
203          }
204          typeID = 0; //default type
205          //System.out.println("cnt="+cnt);
206
207   }
208
209
210
211   Point(Point wp, boolean setNewID) {
212           degLat=wp.degLat;
213           minLat=wp.minLat;
214           secLat=wp.secLat;


                                      cxxxv
Zarko Acimovic


215          //sideNS=wp.sideNS;
216
217
218          degLon=wp.degLon;
219          minLon=wp.minLon;
220          secLon=wp.secLon;
221          //sideWE=wp.sideWE;
222
223          name=wp.name;
224          type=wp.type;
225
226          this.lat = wp.lat;
227          this.lon = wp.lon;
228          this.totLatSec = wp.totLatSec;
229          this.totLonSec = wp.totLonSec;
230
231
232          if (setNewID==true){
233                  ID = cnt;
234                  cnt++;
235          }
236          typeID = 0; //default type
237          //System.out.println("cnt="+cnt);
238          imgString = wp.getImage();
239   }
240
241   Point (String lat,
242              //char sideNS,
243              String lon,
244              //char sideWE,
245              String name, String type, String img, boolean setNewID){
246           //this.sideNS = sideNS;
247           //this.sideWE = sideWE;
248           this.name = name;
249           this.type = type;
250           this.lat = MathFP.toFP(lat);
251           this.lon = MathFP.toFP(lon);
252
253          this.degLat = MathFP.getWholePart(lat);
254          long temp = MathFP.sub(this.lat,this.degLat);
255          temp = MathFP.mul(temp,MathFP.toFP("60"));
256          this.minLat = MathFP.getWholePart(MathFP.toString(temp));
257
258          temp = MathFP.sub(this.lat,this.degLat);
259          temp = MathFP.mul(temp,MathFP.toFP("60"));
260          temp = MathFP.sub(temp,minLat);
261          this.secLat = MathFP.mul(temp,MathFP.toFP("60"));
262
263          this.degLon = MathFP.getWholePart(lon);
264          temp = MathFP.sub(this.lon,this.degLon);
265          temp = MathFP.mul(temp,MathFP.toFP("60"));


                              cxxxvi
Software Defects Prevention Techniques – Example Project


   266                  this.minLon = MathFP.getWholePart(MathFP.toString(temp));
   267
   268                  temp = MathFP.sub(this.lon,this.degLon);
   269                  temp = MathFP.mul(temp,MathFP.toFP("60"));
   270                  temp = MathFP.sub(temp,minLon);
   271                  this.secLon = MathFP.mul(temp,MathFP.toFP("60"));
   272
   273                  this.totLatSec = MathFP.mul(this.lat,MathFP.toFP("3600"));
   274                  this.totLonSec = MathFP.mul(this.lon,MathFP.toFP("3600"));
   275
   276
   277                  if (setNewID==true) {
   278                          ID = cnt;
   279                          cnt++;
   280                  }
   281                  typeID = 0; //default type
   282                  //System.out.println("cnt="+cnt);
   283                  imgString = img;
   284
   285          }
   286
   287
   288
   289          /**
   290          Point(String lat, String lon, String name, String type, String
image, boolean setNewID){
   291                  this.name = name;
   292                  this.type = type;
   293                  this.lat = MathFP.toFP(lat);
   294                  this.lon = MathFP.toFP(lon);
   295
   296                  this.degLat = MathFP.getWholePart(lat);
   297                  long temp = MathFP.sub(this.lat,this.degLat);
   298                  temp = MathFP.mul(temp,MathFP.toFP("60"));
   299                  this.minLat = MathFP.getWholePart(MathFP.toString(temp));
   300
   301                  temp = MathFP.sub(this.lat,this.degLat);
   302                  temp = MathFP.mul(temp,MathFP.toFP("60"));
   303                  temp = MathFP.sub(temp,minLat);
   304                  this.secLat = MathFP.mul(temp,MathFP.toFP("60"));
   305
   306                  this.degLon = MathFP.getWholePart(lon);
   307                  temp = MathFP.sub(this.lon,this.degLon);
   308                  temp = MathFP.mul(temp,MathFP.toFP("60"));
   309                  this.minLon = MathFP.getWholePart(MathFP.toString(temp));
   310
   311                  temp = MathFP.sub(this.lon,this.degLon);
   312                  temp = MathFP.mul(temp,MathFP.toFP("60"));
   313                  temp = MathFP.sub(temp,minLon);
   314                  this.secLon = MathFP.mul(temp,MathFP.toFP("60"));
   315


                                               cxxxvii
Zarko Acimovic


316                this.totLatSec = MathFP.mul(this.lat,MathFP.toFP("3600"));
317                this.totLonSec = MathFP.mul(this.lon,MathFP.toFP("3600"));
318
319
320                if (setNewID==true) {
321                        ID = cnt;
322                        cnt++;
323                }
324                typeID = 0; //default type
325
326        }*/
327
328   /** Calculates distance between two Points;
329    *
330        * @version advanced
331        * @return long
332        */
333    public long measureDistance(Point wp){
334        Coordinates c1 = new Coordinates(this.lat,this.lon);
335        Coordinates c2 = new Coordinates(wp.lat, wp.lon);
336        return MathFP.toLong(c1.distance(c2));
337    }
338
339   /** Sets distance
340        */
341        public void setDistance (long dist){
342                distance = dist;
343        }
344
345   /** Gets distance
346    * @return long
347        */
348        public long getDistance (){
349                return distance;
350        }
351
352   /** Returns type of Point
353        * @return String
354        */
355        public String getType() { return type; }
356
357   /** Sets type of Point
358        * @return String
359        */
360        public void setType(String type) { this.type = type; }
361
362   /** Returns name of Point
363        * @return String
364        */
365        public String getName() { return name; }
366


                                  cxxxviii
Software Defects Prevention Techniques – Example Project


367   /** Sets type of Point
368        * @return String
369        */
370        public void setName(String name) { this.name = name; }
371
372   /** Returns side of the world as String
373        * @return String
374        *
375        */
376        //public char getNS(){
377        //      return sideNS;
378        //}
379
380   /** Returns side of the world as String
381    * @return String
382        *
383        */
384        //public char getWE(){
385        //      return sideWE;
386        //}
387
388   /** Returns degrees of latitiude
389    *
390        * @author Zarko Acimovic
391        * @version initial
392        */
393        public long getDLat(){
394                return degLat;
395        }
396
397   /** Returns minutes of latitiude
398    *
399        * @author Zarko Acimovic
400        * @version initial
401        */
402        public long getMLat(){
403                return minLat;
404        }
405
406   /** Returns seconds of latitiude
407    *
408        * @author Zarko Acimovic
409        * @version initial
410        */
411        public long getSLat(){
412                return secLat;
413        }
414
415   /** Returns degrees of longitude
416    *
417        * @author Zarko Acimovic


                                          cxxxix
Zarko Acimovic


418        * @version initial
419        */
420        public long getDLon(){
421                return degLon;
422        }
423
424   /** Returns minutes of longitude
425    *
426        * @author Zarko Acimovic
427        * @version initial
428        */
429        public long getMLon(){
430                return minLon;
431        }
432
433   /** Returns seconds of longitude
434    *
435        * @author Zarko Acimovic
436        * @version initial
437        * @return int
438        */
439        public long getSLon(){
440                return secLon;
441        }
442
443   /** Returns latitude as floating point
444    *
445        * @author Zarko Acimovic
446        * @version initial
447        * @return Float-Point
448        */
449        public long getLat(){
450                return lat;
451        }
452
453   /** Returns longitude as floating point
454    *
455        * @author Zarko Acimovic
456        * @version initial
457        * @return Float-Point
458        */
459        public long getLon(){
460                return lon;
461        }
462
463   /** Prints Point
464    * @author Zarko Acimovic
465    * @version initial
466        * @return String
467        */
468        public String toString(){


                                    cxl
Software Defects Prevention Techniques – Example Project


   469                   return "ID="+getID()+"n"+"Longitude:
"+MathFP.toString(this.lon)+" "+MathFP.toString(this.degLon)
+","+MathFP.toString(this.minLon)+","+MathFP.toString(this.secLon)+","+"
x="+this.getX()+
   470                           "nLatitude: "+MathFP.toString(this.lat)+"
"+MathFP.toString(this.degLat)+","+MathFP.toString(this.minLat)
+","+MathFP.toString(this.secLat)+","+" y="+this.getY()+" "+this.getName()+"n"
   471                           +this.getImage();
   472           }
   473
   474     /** Sets x and y coordinates on Canvas relative to wp
   475      * Usually wp is newEdge
   476      * @author Zarko Acimovic
   477      * @version initial
   478      */
   479           public void setXY (Point wp, long pixLon, long pixLat){
   480                   //System.out.println("----this------------------"+this);
   481                   //System.out.println("-------newEdge---------------"+wp);
   482
///System.out.println("this.getLat()="+MathFP.toString(this.getLat()));
   483
//System.out.println("this.getLon()="+MathFP.toString(this.getLon()));
   484
///System.out.println("wp.getLat()="+MathFP.toString(wp.getLat()));
   485
///System.out.println("wp.getLon()="+MathFP.toString(wp.getLon()));
   486                   //System.out.println("pixLat="+MathFP.toString(pixLat));
   487                   ///System.out.println("pixLon="+MathFP.toString(pixLon));
   488
   489                   y =
MathFP.div(MathFP.mul(MathFP.sub(wp.getLat(),this.getLat()),MathFP.toFP("3600")),pi
xLat);
   490                   y = MathFP.toLong(y);
   491
   492                   x =
MathFP.div(MathFP.mul(MathFP.sub(this.getLon(),wp.getLon()),MathFP.toFP("3600")),pi
xLon);
   493                   x = MathFP.toLong(x);
   494           }
   495
   496     /** Checks if this Point is beetwen wp1 and wp2
   497           *
   498           * @version initial
   499           * @return boolean
   500           */
   501           public boolean check(Point wp1, Point wp2){
   502
   503                   long lim1Lat = wp1.getLat();
   504                   long lim1Lon = wp1.getLon();
   505                   long lim2Lat = wp2.getLat();
   506                   long lim2Lon = wp2.getLon();


                                                 cxli
Zarko Acimovic


507
508                long   bigLat;
509                long   miniLat;
510                long   bigLon;
511                long   miniLon;
512
513               if (lim1Lat>lim2Lat){
514                        bigLat=lim1Lat;
515                        miniLat=lim2Lat;
516               } else {
517                        bigLat=lim2Lat;
518                        miniLat=lim1Lat;
519               }
520
521               if (lim1Lon>lim2Lon){
522                        bigLon=lim1Lon;
523                        miniLon=lim2Lon;
524               } else {
525                        bigLon=lim2Lon;
526                        miniLon=lim1Lon;
527               }
528
529               if (miniLat<this.getLat() && this.getLat()<bigLat &&
530                        miniLon<this.getLon() && this.getLon()<bigLon){
531                                        return true;
532               } else {
533                        return false;
534               }
535
536        }
537
538
539
540   /** Returns x-position of Point on Canvas
541    *
542    * @author Zarko Acimovic
543    * @version initial
544    * @return long
545    */
546        public long getX() {return x; }
547
548   /** Returns y-position of Point on Canvas
549    *
550    * @author Zarko Acimovic
551    * @version initial
552    * @return long
553    */
554        public long getY() {return y; }
555
556        public int getXX() {
557                Long l = new Long(x);


                                      cxlii
Software Defects Prevention Techniques – Example Project


558                int xx = Integer.parseInt(l.toString());
559                return xx;
560        }
561
562        public int getYY() {
563                Long l = new Long(y);
564                int yy = Integer.parseInt(l.toString());
565                return yy;
566        }
567
568   /** Adds inc on x
569        */
570        public void addX(long inc ){
571                this.x+=inc;
572        }
573
574   /** Substracts dec from x
575        */
576        public void subX(long dec){
577                this.x-=dec;
578        }
579
580   /** Adds inc on y
581        */
582        public void addY(long inc){
583                this.y+=inc;
584        }
585
586   /** Substracts dec from y
587        */
588        public void subY(long dec){
589                this.y-=dec;
590        }
591
592
593   /** Returns total number of lat-seconds for Point
594    *
595    * @author Zarko Acimovic
596    * @version initial
597    * @return long
598    */
599    public long getLatSec() {
600        return totLatSec;
601    }
602
603   /** Returns total number of lon-seconds for Point
604    *
605    * @author Zarko Acimovic
606    * @version initial
607    * @return long
608    */


                                           cxliii
Zarko Acimovic


609   public long getLonSec() {
610       return totLonSec;
611   }
612
613   /** Sets x-position of Point on screen
614    */
615    public void setX(long x){
616        this.x=x;
617    }
618
619   /** Sets y-position of Point on screen
620    */
621    public void setY(long y){
622        this.y=y;
623    }
624
625   /** Sets ID of Point
626    * 0 - simple Point
627    * 1 - current Point
628    * 2 - destination Point
629    */
630    public void setTypeID(int i){
631        typeID = i;
632    }
633
634   /** Returns ID of Point
635    * 0 - simple Point
636    * 1 - current Point
637    * 2 - destination Point
638    */
639    public int getTypeID(){
640        return typeID;
641    }
642
643   public int getID(){
644       return ID;
645   }
646
647
648   /** String that represents image
649    */
650    public void setImage(String s){
651        imgString = s;
652    }
653
654   /** Returns name of the image
655    */
656    public String getImage(){
657        return imgString;
658    }
659


                                      cxliv
Software Defects Prevention Techniques – Example Project


   660      public void drawPoint(Graphics g, Point newEdge, long pixLat, long
pixLon, long zoomLv){
   661
   662          this.setXY(newEdge,pixLon,pixLat);
   663          if(this.getImage().equals("route")){
   664                  g.fillRect(this.getXX()-3,this.getYY()-3,6,6);
   665          }
   666          if(this.getImage().equals("blanco")){
   667                  g.fillRect(this.getXX()-3,this.getYY()-3,6,6);
   668                  if (this.getName().equals("current"))
   669                  g.drawString(this.getName(),this.getXX()-25,this.getYY()
+5,0);
   670
   671                  if (this.getName().equals("dest"))
   672                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   673
   674                  if (this.getName().equals("GPS.txt"))
   675                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   676
   677                  if (this.getName().equals("Mika.txt"))
   678                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   679
   680                  if (this.getName().equals("GPS"))
   681                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   682
   683                  if (this.getName().equals("Mika"))
   684                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   685
   686                  if (this.getName().equals("Str8"))
   687                  g.drawString(this.getName(),this.getXX()-18,this.getYY()
+11,0);
   688          }
   689
   690                  if(!this.getImage().equals("blanco") && !
this.getImage().equals("route")){
   691                          Image img = null;
   692                          try{
   693                                  img = Image.createImage(this.getImage());
   694                          }catch(Exception e){}
   695                          g.drawImage(img,this.getXX()-3,this.getYY()-3,0);
   696                          //g.drawString(this.getName(),this.getXX()-
15,this.getYY()+11,0);
   697                  }
   698      }
   699
   700      public void setLat(String s){


                                                 cxlv
Zarko Acimovic


701           lat = MathFP.toFP(s);
702       }
703
704       public void setLon(String s){
705           lon = MathFP.toFP(s);
706       }
707
708   }




                                      cxlvi
Software Defects Prevention Techniques – Example Project



PVector.java


     All classes and interfaces must belong to a named package                                  11   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 75%                                     11   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 100%                            11   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 114%                                    11   Metrics Marker
     Weighted Methods per Class is 45                                                           11   Metrics Marker
     Avoid variables with short names like ID                                                   17   PMD Marker
     The field name indicates a constant but its modifiers do not                               17   PMD Marker
     Possible unsafe assignment to a non-final static field in a constructor.                   18   PMD Marker
     Use explicit scoping instead of the default package private level                          22   PMD Marker
     Parameter 'name' is not assigned and could be declared final                               26   PMD Marker
     Parameter 'route' is not assigned and could be declared final                              26   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                       29   PMD Marker
     Write to static field PVector.cnt from instance method new PVector(String, boolean)        31   FindBugs
     Avoid using implementation types like 'Vector'; use the interface instead                  37   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                  37   PMD Marker
     Avoid variables with short names like v                                                    37   PMD Marker
     Consider replacing this Vector with the newer java.util.List                               37   PMD Marker
     Parameter 'route' is not assigned and could be declared final                              37   PMD Marker
     Parameter 'v' is not assigned and could be declared final                                  37   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                       40   PMD Marker
     Write to static field PVector.cnt from instance method new PVector(Vector, boolean)        42   FindBugs
     Lines of Code in Method is 25                                                              53   Metrics Marker
     Number of Statements is 23                                                                 53   Metrics Marker
     Avoid using implementation types like 'Vector'; use the interface instead                  60   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                  60   PMD Marker
     Avoid variables with short names like wp                                                   60   PMD Marker
     Consider replacing this Vector with the newer java.util.List                               60   PMD Marker
     Parameter 'wp' is not assigned and could be declared final                                 60   PMD Marker
     Local variable 'size' could be declared final                                              61   PMD Marker
     Local variable 'whs' could be declared final                                               64   PMD Marker
     Avoid variables with short names like ht                                                   68   PMD Marker
     Consider replacing this Hashtable with the newer java.util.Map                             68   PMD Marker
     Local variable 'ht' could be declared final                                                68   PMD Marker
     Avoid instantiating new objects inside loops                                               70   PMD Marker
     Avoid variables with short names like hp                                                   72   PMD Marker
     Local variable 'hp' could be declared final                                                72   PMD Marker
     Consider replacing this Vector with the newer java.util.List                               74   PMD Marker
     Local variable 'sorted' could be declared final                                            74   PMD Marker
     Use ArrayList instead of Vector                                                            74   PMD Marker
     Avoid instantiating new objects inside loops                                               75   PMD Marker




                                                                cxlvii
Zarko Acimovic



PVector.java



     Dead store to temp1 in PVector.sortDescending(Point)                                            107   FindBugs
     The local variable temp1 is never read                                                          107   Java Problem
     Use ArrayList instead of Vector                                                                 107   PMD Marker
     Use ArrayList instead of Vector                                                                 108   PMD Marker
     Dead store to temp1 in PVector.sortDescending(Point)                                            109   FindBugs
     Avoid using for statements without curly braces                                                 110   PMD Marker
     Cyclomatic Complexity is 5                                                                      114   Metrics Marker
     Lines of Code in Method is 26                                                                   114   Metrics Marker
     Number of Statements is 26                                                                      114   Metrics Marker
     Avoid using implementation types like 'Vector'; use the interface instead                       120   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                       120   PMD Marker
     Consider replacing this Hashtable with the newer java.util.Map                                  127   PMD Marker
     Avoid instantiating new objects inside loops                                                    129   PMD Marker
     Use ArrayList instead of Vector                                                                 133   PMD Marker
     Avoid instantiating new objects inside loops                                                    135   PMD Marker
     Avoid using if statements without curly braces                                                  136   PMD Marker
     Prefer StringBuffer over += for concatenating strings                                           150   PMD Marker
     PVector.toString() concatenates strings using + in a loop                                       150   FindBugs
     Cyclomatic Complexity is 5                                                                      155   Metrics Marker
     Lines of Code in Method is 46                                                                   155   Metrics Marker
     Number of Statements is 35                                                                      155   Metrics Marker
     Avoid using implementation types like 'Vector'; use the interface instead                       162   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                       162   PMD Marker
     Use ArrayList instead of Vector                                                                 163   PMD Marker
     Lines of Code in Method is 30                                                                   212   Metrics Marker
     Number of Statements is 28                                                                      212   Metrics Marker
     Avoid instantiating new objects inside loops                                                    228   PMD Marker
     Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty()                        232   PMD Marker
     A method should have only one exit point, and that should be the last statement in the method   233   PMD Marker
     Document empty method                                                                           248   PMD Marker
     A getX() method which returns a boolean should be named isX()                                   289   PMD Marker
     Cyclomatic Complexity is 6                                                                      293   Metrics Marker
     Lines of Code in Method is 28                                                                   293   Metrics Marker
     Number of Levels is 5                                                                           293   Metrics Marker




                                                               cxlviii
Software Defects Prevention Techniques – Example Project



 1   /**
 2    *
 3    * PVector enables drawing and sorting of points by name and distance
 4    */
 5
 6
 7   import java.util.*;
 8   //import java.io.*;
 9   import javax.microedition.lcdui.*;
10
11   public class PVector extends Vector {
12
13      /** ID of WP Vector
14       * 0 - simple Vector
15       * 1 - route
16       */
17       private int ID = 0;
18       private static int cnt = 0;
19
20       private String name ="";
21
22       boolean visible = false;
23
24
25
26           PVector(String name,boolean route){
27                   super();
28
29                  if (route==true) {
30                           this.name = name;
31                           cnt++;
32                           ID = cnt;
33                  } else {
34                           ID = 0;
35                  }
36          }
37          PVector(Vector v, boolean route){
38                  super();
39
40                  if (route==true) {
41                           ID = cnt;
42                           cnt++;
43                  } else {
44                           ID = 0;
45                  }
46
47                  for (int i=0; i<v.size(); i++){
48                          this.addElement(v.elementAt(i));
49                  }
50          }


                                             cxlix
Zarko Acimovic


    51
    52
    53     /** Returns vector of Points sorted by distance
    54      * from Point wp in ascending order
    55          *
    56          * @version initial
    57          * @return Vector
    58          */
    59
    60          public Vector sortAscending(Point wp){
    61                  int size = this.size();
    62                  long[] distances = new long [size];
    63                  for (int i=0; i<size; i++) {
    64                          Point whs = (Point)this.elementAt(i); //from
warehouse
    65                          distances[i]=whs.measureDistance(wp);
    66                          whs.setDistance(distances[i]);
    67                  }
    68                  Hashtable ht = new Hashtable();
    69                  for (int i=0; i<size; i++){
    70                          ht.put(new Long(distances[i]),this.elementAt(i));
    71                  }
    72                  HeapSorter hp = new HeapSorter();
    73                  hp.heapsort(distances);
    74                  Vector sorted = new Vector();
    75                  for (int i=0;i<size;i++) sorted.addElement(ht.get(new
Long(distances[i])));
    76                  return sorted;
    77          }
    78
    79          public String[] sortByName(){
    80                  //System.out.println("wwwwww");
    81                  //int size = this.size();
    82                  //long[] firstChars = new long[size];
    83                  //Hashtable ht = new Hashtable();
    84                  String names[] = new String[this.size()];
    85                  for(int i=0; i<this.size(); i++){
    86                          Point whs = (Point) this.elementAt(i);
    87                          //firstChars[i] = (long) whs.getName().charAt(0);
    88                          //ht.put(new
Long(firstChars[i]),this.elementAt(i));
    89                          names[i]=whs.getName();
    90                  }
    91                  HeapSorter hp = new HeapSorter();
    92                  hp.heapsort(names);
    93                  //Vector sorted = new Vector();
    94                  //for (int i=0;i<size;i++) sorted.addElement(ht.get(new
Long(firstChars[i])));
    95                  //System.out.println("wwwwwwn"+sorted);
    96                  return names;
    97          }


                                          cl
Software Defects Prevention Techniques – Example Project


    98
    99     /** Returns vector of Points sorted by distance
   100      * from WayPint wp in descending order
   101          *
   102          * @version initial
   103          * @return Vector
   104          */
   105          public Vector sortDescending(Point wp){
   106                   int size = this.size();
   107                   Vector temp1 = new Vector();
   108                   Vector temp2 = new Vector();
   109                   temp1 = this.sortAscending(wp);
   110                   for (int i=0; i<size;i++ )
temp2.addElement(temp2.elementAt(size-i));
   111                   return temp2;
   112          }
   113
   114     /** Return vector of specific Points of type 'type'
   115          * sorted by distance in ascending order from Point wp
   116          *
   117          * @version initial
   118          * @return Vector
   119          */
   120          public Vector sortAscending (Point wp, String type){
   121                   int size = this.size();
   122                   long[] distances = new long [size];
   123                   for (int i=0; i<size; i++){
   124                           Point whs = (Point)this.elementAt(i); //from
warehouse
   125                           distances[i]=wp.measureDistance(whs);
   126                   }
   127                   Hashtable ht = new Hashtable();
   128                   for (int i=0; i<size; i++){
   129                           ht.put(new Long(distances[i]),this.elementAt(i));
   130                   }
   131                   HeapSorter hp = new HeapSorter();
   132                   hp.heapsort(distances);
   133                   Vector sorted = new Vector();
   134                   for (int i=0;i<size;i++) {
   135                           Point wpnt = (Point)ht.get(new Long(distances[i]));
   136                           if (wp.getType().equals(type))
sorted.addElement(wpnt);
   137                   }
   138                   return sorted;
   139          }
   140
   141     /** Prints array of Points
   142      * @version initial
   143          * @return String
   144          */
   145          public String toString(){


                                                  cli
Zarko Acimovic


146               String str="";
147               int size = this.size();
148               for (int i=0; i<size; i++){
149                       Point wp =(Point)this.elementAt(i);
150                       str += wp.toString();
151               }
152               return str;
153        }
154
155   /**Returns all Points in rectangle
156        * defined by wp1 and wp2 as points
157        * of diagonal
158        *
159        * @version initial
160        * @return Vector
161        */
162        public Vector getPoints(Point wp1, Point wp2){
163                Vector v = new Vector();
164
165                long   lim1Lat    =   wp1.getLat();
166                long   lim1Lon    =   wp1.getLon();
167                long   lim2Lat    =   wp2.getLat();
168                long   lim2Lon    =   wp2.getLon();
169
170                long   bigLat;
171                long   miniLat;
172                long   bigLon;
173                long   miniLon;
174
175               if (lim1Lat>lim2Lat){
176                        bigLat=lim1Lat;
177                        miniLat=lim2Lat;
178               } else {
179                        bigLat=lim2Lat;
180                        miniLat=lim1Lat;
181               }
182
183               if (lim1Lon>lim2Lon){
184                        bigLon=lim1Lon;
185                        miniLon=lim2Lon;
186               } else {
187                        bigLon=lim2Lon;
188                        miniLon=lim1Lon;
189               }
190
191                for (int i=0; i<this.size();i++){
192                        Point wp = (Point)this.elementAt(i);
193                        if (miniLat<wp.getLat() && wp.getLat()<bigLat &&
194                                miniLon<wp.getLon() && wp.getLon()<bigLon){
195                                        v.addElement(wp);
196                        }


                                          clii
Software Defects Prevention Techniques – Example Project


   197                  }
   198                  //System.out.println("Vektor jen"+v);
   199                  return v;
   200          }
   201
   202     /** Merges two vectors
   203      *
   204          * @version initial
   205          */
   206          public void mergeWith(Vector v){
   207                  for (int i=0; i<v.size(); i++ ){
   208                          this.addElement(v.elementAt(i));
   209                  }
   210          }
   211
   212          /** Deletes Point
   213      *
   214          * @author Zarko Acimovic
   215          * @version initial
   216          */
   217          public int deleteWP1(Point wp, int pixLat, int pixLon){
   218                  //System.out.println("Unutar DELETE");
   219                  //System.out.println(this.size());
   220                  Vector toDelete = new Vector();
   221                  long pixLat1 = MathFP.toLong(pixLat);
   222                  long pixLon1 = MathFP.toLong(pixLon);
   223
   224                  for (int i=0; i<this.size(); i++){
   225                          Point wp2 = (Point)this.elementAt(i);
   226                          if ( Math.abs(wp2.getLatSec()-
wp.getLatSec())<5*pixLat1 &&
   227                          Math.abs(wp2.getLonSec()-
wp.getLonSec())<5*pixLon1 ){
   228                                   toDelete.addElement(new Integer(i));
   229                          }
   230                  }
   231
   232                  if(toDelete.size()>1 || toDelete.size()==0) {
   233                          return -1;
   234                  }
   235                  else {
   236                          Integer k = (Integer)toDelete.elementAt(0);
   237                          int c = k.intValue();
   238                          this.removeElementAt(c);
   239                          return c;
   240                  }
   241          }
   242
   243     /** Edits Point
   244      *
   245          * @author Zarko Acimovic


                                                  cliii
Zarko Acimovic


   246          * @version not yet implemented
   247          */
   248          public void editWP(Point wp){
   249          }
   250
   251
   252     /** Sets ID of WPVector
   253      * 0 - simple WPVector
   254      * n - route
   255      *
   256      */
   257      public void setID(int i){
   258          ID = i;
   259      }
   260
   261     /** Returns ID of WPVector
   262      * 0 - simple WPVector
   263      * 1 - route
   264      */
   265      public int getID(){
   266          return ID;
   267      }
   268
   269     /** Returns name WPVector
   270      */
   271      public String getName(){
   272          return name;
   273      }
   274
   275      /** Returns name WPVector
   276      */
   277      public void setName(String s){
   278          name = s;
   279      }
   280
   281      public void setVisible(){
   282          visible = true;
   283      }
   284
   285      public void resetVisible(){
   286          visible = false;
   287      }
   288
   289      public boolean getVisible(){
   290          return visible;
   291      }
   292
   293      public void drawVector(Graphics g, boolean route, Point newEdge, long
pixLon, long pixLat, long zoomL){
   294          /////System.out.println("route="+route);
   295          /////System.out.println("routeVisible="+this.getVisible());


                                         cliv
Software Defects Prevention Techniques – Example Project


   296          if(route==true){
   297                  if(this.getVisible()==true){
   298                           if(this.size()==1){
   299                                    Point wp1 = (Point) this.elementAt(0);
   300
wp1.drawPoint(g,newEdge,pixLat,pixLon,zoomL);
   301                           } else {
   302                                    for(int j=0; j<this.size()-1; j++){
   303                                            Point wp1 = (Point)
this.elementAt(j);
   304                                            Point wp2 = (Point)
this.elementAt(j+1);
   305                                            //wp1.setXY(newEdge,pixLon,pixLat);
   306                                            //wp2.setXY(newEdge,pixLon,pixLat);
   307
wp1.drawPoint(g,newEdge,pixLat,pixLon,zoomL);
   308
wp2.drawPoint(g,newEdge,pixLat,pixLon,zoomL);
   309
g.drawLine(wp1.getXX(),wp1.getYY(),wp2.getXX(),wp2.getYY());
   310                                    }
   311                           }
   312                  }
   313          } else {
   314                  for(int i=0; i<this.size(); i++){
   315                           Point wp = (Point) this.elementAt(i);
   316                           wp.drawPoint(g,newEdge,pixLat,pixLon,zoomL);
   317                  }
   318          }
   319
   320      }
   321
   322
   323 };




                                                  clv
Zarko Acimovic



SelectorPoint.java


      All classes and interfaces must belong to a named package                                     8   PMD Marker
      Lack of Cohesion in Methods (Henderson-Sellers) is 75%                                        8   Metrics Marker
      Lack of Cohesion in Methods (Pairwise Field Irrelation) is 78%                                8   Metrics Marker
      Lack of Cohesion in Methods (Total Correlation) is 333%                                       8   Metrics Marker
      The class 'SelectorPoint' has a Cyclomatic Complexity of 4 (Highest = 19).                    8   PMD Marker
      Weighted Methods per Class is 72                                                              8   Metrics Marker
      Avoid variables with short names like mb                                                      9   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.        9   PMD Marker
      Use explicit scoping instead of the default package private level                             9   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.       10   PMD Marker
      Use explicit scoping instead of the default package private level                            10   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.       11   PMD Marker
      Use explicit scoping instead of the default package private level                            11   PMD Marker
      Avoid variables with short names like m                                                      12   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.       12   PMD Marker
      Use explicit scoping instead of the default package private level                            12   PMD Marker
      Avoid variables with short names like n                                                      13   PMD Marker
      Found non-transient, non-static member. Please mark as transient or provide accessors.       13   PMD Marker
      Use explicit scoping instead of the default package private level                            13   PMD Marker
      Avoid variables with short names like s                                                      14   PMD Marker
      Avoid variables with short names like mb                                                     18   PMD Marker
      Parameter 'mb' is not assigned and could be declared final                                   18   PMD Marker
      Parameter 'mob' is not assigned and could be declared final                                  18   PMD Marker
      Cyclomatic Complexity is 15                                                                  25   Metrics Marker
      Lines of Code in Method is 75                                                                25   Metrics Marker
      Number of Statements is 82                                                                   25   Metrics Marker
      Parameter 's' is not assigned and could be declared final                                    27   PMD Marker
      The method 'setSelectorScreen' has a Cyclomatic Complexity of 19.                            27   PMD Marker
      The method setSelectorScreen() has an NPath complexity of 11025                              27   PMD Marker
      Avoid using if statements without curly braces                                               31   PMD Marker
      Avoid using if statements without curly braces                                               49   PMD Marker
      Avoid using if statements without curly braces                                               61   PMD Marker
      Avoid using if statements without curly braces                                               74   PMD Marker
      Local variable 'WP' could be declared final                                                  87   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                         89   PMD Marker
      The String literal "selector" appears 4 times in this file; the first occurrence is on 89    89   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                         93   PMD Marker
      Feature Envy is 5                                                                           103   Metrics Marker
      Lines of Code in Method is 22                                                               103   Metrics Marker
      Parameter 'edge' is not assigned and could be declared final                                108   PMD Marker




                                                                       clvi
Software Defects Prevention Techniques – Example Project



SelectorPoint.java


      Cyclomatic Complexity is 15                                                          169   Metrics Marker
      Lines of Code in Method is 73                                                        169   Metrics Marker
      Number of Levels is 5                                                                169   Metrics Marker
      Number of Statements is 89                                                           169   Metrics Marker
      The method 'selectWP' has a Cyclomatic Complexity of 18.                             172   PMD Marker
      The method selectWP() has an NPath complexity of 7290                                172   PMD Marker
      Avoid unused local variables such as 'idS'.                                          177   PMD Marker
      The local variable idS is never read                                                 177   Java Problem
      Avoid using if statements without curly braces                                       183   PMD Marker
      Consider replacing this Vector with the newer java.util.List                         214   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                 237   PMD Marker
      Avoid unnecessary comparisons in boolean expressions                                 238   PMD Marker
      Cyclomatic Complexity is 13                                                          243   Metrics Marker
      Lines of Code in Method is 73                                                        243   Metrics Marker
      Number of Statements is 99                                                           243   Metrics Marker
      The method 'deleteWP' has a Cyclomatic Complexity of 17.                             251   PMD Marker
      The method deleteWP() has an NPath complexity of 5760                                251   PMD Marker
      Consider replacing this Vector with the newer java.util.List                         256   PMD Marker
      Use ArrayList instead of Vector                                                      256   PMD Marker
      Avoid instantiating new objects inside loops                                         261   PMD Marker
      Consider replacing this Vector with the newer java.util.List                         265   PMD Marker
      Use ArrayList instead of Vector                                                      265   PMD Marker
      Consider replacing this Vector with the newer java.util.List                         266   PMD Marker
      Avoid instantiating new objects inside loops                                         272   PMD Marker
      Avoid unused local variables such as 'drt'.                                          277   PMD Marker
      The local variable drt is never read                                                 277   Java Problem
      Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty()             278   PMD Marker
      Cyclomatic Complexity is 5                                                           318   Metrics Marker
      Feature Envy is 6                                                                    318   Metrics Marker
      Lines of Code in Method is 26                                                        318   Metrics Marker
      Number of Statements is 54                                                           318   Metrics Marker
      The method name SelectorPoint.Zoom() doesn't start with a lower case letter          321   FindBugs
      Lines of Code in Method is 95                                                        346   Metrics Marker
      Number of Statements is 22                                                           346   Metrics Marker
      Avoid unused local variables such as 'length'.                                       414   PMD Marker
      The local variable length is never read                                              414   Java Problem




                                                         clvii
Zarko Acimovic



     1 /**
     2   * SelectorPoint controls selection and identification of geographical
object
     3   */
     4 import java.util.*;
     5 //import java.io.*;
     6 import javax.microedition.lcdui.*;
     7
     8 public class SelectorPoint{
     9          MapBackground mb;
    10          MapObjects mob;
    11          Point selP;
    12          int m = 255;
    13          int n = 200;
    14          int s = 0;
    15          boolean colorSet=false;
    16          boolean big = false;
    17
    18          SelectorPoint(MapBackground mb, MapObjects mob){
    19
    20                   this.selP = mob.getCurrentPosition();
    21                   this.mb = mb;
    22                   this.mob = mob;
    23          }
    24
    25     /** Sets selector point on Screen due to user's left/right , up/down
commands
    26      */
    27      public void setSelectorScreen(char s){
    28
    29
    30          if(s=='r'){
    31                   if (selP.getX()>0 && selP.getX()<mb.getCanvasWidth())
selP.addX(5);
    32                   if (selP.getX()>mb.getCanvasWidth()-5) {
    33                           // calculation of (deg,min,sec) for Selector before
panning
    34                           //dakle ja pre panovanja izracunam svetske
koordinate selektora,
    35                           //da bi znao gde je on stvarno, pa kad panujem mapu
(a samim
    36                           //tim i promenim njen newEdge onda odredjujem i
relativni polozaj
    37                           //selektorske tacke u odnosu na taj newEdge (jasno
je da pri panovanju mape
    38                           //nije doslo do promene svetskih koordinata
selektora)
    39                           this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
    40                           //Paning


                                         clviii
Software Defects Prevention Techniques – Example Project


      41                           mb.setMap(s);
      42                           mob.setDrawablePoints();
      43                           //calculation of new Selector position on panned
map
    44
selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    45
    46                  }
    47          }
    48          if(s=='l'){
    49                  if (selP.getX()>6) selP.subX(5);
    50                  if (selP.getX()<=6) {
    51                          // calculation of (deg,min,sec) for Selector before
panning
    52                          this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
    53                          //Paning
    54                          mb.setMap(s);
    55                          mob.setDrawablePoints();
    56                          //calculation of new Selector position on panned
map
    57
selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    58                  }
    59          }
    60          if(s=='d'){
    61                  if (selP.getY()>0 && selP.getY()<mb.getCanvasHeight()-5)
selP.addY(5);
    62                  if (selP.getY()>=(mb.getCanvasHeight()-5)) {
    63                          //calculation of (deg,min,sec) for Selector before
panning
    64                          this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
    65                          //Paning
    66                          mb.setMap(s);
    67                          mob.setDrawablePoints();
    68                          //calculation of new Selector position on panned
map
    69
selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    70
    71                  }
    72          }
    73          if(s=='u'){
    74                  if (selP.getY()>6) selP.subY(5);
    75                  if (selP.getY()<=6) {
    76                          //calculation of (deg,min,sec) for Selector before
panning
    77                          this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
    78                          //Paning


                                                 clix
Zarko Acimovic


      79                       mb.setMap(s);
      80                       mob.setDrawablePoints();
      81                       //calculation of new Selector position on panned
map
    82
selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
    83
    84                  }
    85          }
    86
    87          Point WP = this.getSelectedWP();
    88
    89          if (!WP.getName().equals("selector") && colorSet==false) {
    90                  setColor();
    91                  setBig();
    92          }
    93          if (WP.getName().equals("selector") && colorSet==true) {
    94                  resetColor();
    95                  resetBig();
    96          }
    97          //if (!WP.getImage().equals("blanco") && !
WP.getImage().equals("route") && big==false) setBig();
    98          //if ((WP.getImage().equals("blanco")||
WP.getImage().equals("route")) && big==true) resetBig();
    99          }
   100
   101
   102
   103     /** When selector is moved we only update its (x,y) 'descriptors',
   104      * so when map has to be panned we need to find out (lat,lon) pair
   105      * for selector on old screen and adjust its position (x',y') on new
screen
   106      * in a way that (lat,lon) is unchanged
   107      */
   108      public void setSelectorWorld(Point edge, long pixLon, long pixLat){
   109
   110          // pamtim trenutno x i y
   111          long tx = selP.getX();
   112          long ty = selP.getY();
   113
   114          // azuriram svetske kordinate
   115          long dLatSec = MathFP.mul(pixLat,MathFP.toFP(selP.getY()));
   116          long dLonSec = MathFP.mul(pixLon,MathFP.toFP(selP.getX()));
   117
   118          selP = new Point(MathFP.sub(edge.getLatSec(),dLatSec),
   119
MathFP.add(edge.getLonSec(),dLonSec),"","",false);
   120
   121                  // vracam trenutno x i y
   122                  selP.setX(tx);
   123                  selP.setY(ty);


                                         clx
Software Defects Prevention Techniques – Example Project


   124          }
   125
   126     /** Returns copy of SELECTOR Point
   127      * @return Point
   128      */
   129      public Point getSelector(){
   130
this.setSelectorWorld(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   131          Point copy = new Point(selP,true);
   132
   133          copy.setName("");
   134          return copy;
   135      }
   136
   137     /** Returns x-coordinate of selector
   138      * @return long
   139      */
   140      long getSelX(){
   141          return selP.getX();
   142      }
   143
   144     /** Returns y-coordinate of selector
   145      * @return long
   146      */
   147      long getSelY(){
   148          return selP.getY();
   149      }
   150
   151     /** Returns user selected Point
   152      * @return Point
   153      */
   154      public Point getSelectedWP(){
   155          Vector v = mob.getDrawablePoints();
   156          Point ret = new Point(0,0,"selector","s",false);
   157          for(int i=0; i<v.size(); i++){
   158                  Point fWhs = (Point) v.elementAt(i);
   159                  if( Math.abs(fWhs.getX()-selP.getX())<5 &&
   160                      Math.abs(fWhs.getY()-selP.getY())<5 ) {
   161                           ret=fWhs;
   162                           i=1000;
   163                  }
   164          }
   165          return ret;
   166      }
   167
   168
   169     /** Returns user selected Point with name s
   170      * @return Point
   171      */
   172      public void selectWP(String s) {
   173


                                                 clxi
Zarko Acimovic


   174          int len = s.length();
   175          int blanco = s.indexOf('_');
   176          if(blanco!=-1){
   177                  String idS = s.substring(blanco+1,len);
   178                  s = s.substring(0,blanco);
   179                  s = compact(s);
   180          }
   181
   182          int blank = s.indexOf(' ');
   183          if(blank!=-1 && s.substring(blank+1,s.length()).equals("current"))
s = s.substring(0,blank);
   184
   185          Point look4 = null;
   186          PVector freeWPV = mob.getFreeWaypoints();
   187
   188          int k=-2;
   189          for(int i=0; i<freeWPV.size(); i++){
   190                  Point wp = (Point) freeWPV.elementAt(i);
   191                  if(s.equals(wp.getName())){
   192                          k=i;
   193                          look4 = (Point) freeWPV.elementAt(k);
   194                          i=1000;
   195                  }
   196          }
   197
   198          if(k==-2){
   199                  Point cP = mob.getCurrentPosition();
   200                  if(s.equals(cP.getName())) {
   201                          look4=cP;
   202                          k=-3;
   203                  }
   204          }
   205          if(k==-2){
   206                  Point dP = mob.getDestinationPosition();
   207                  if(s.equals(dP.getName())) {
   208                          look4=dP;
   209                          k=-4;
   210                  }
   211          }
   212
   213          if(k==-2){
   214                  Vector routes = mob.getRoutes();
   215                  for(int i=0; i<routes.size(); i++){
   216                          PVector rt = (PVector) routes.elementAt(i);
   217                          for(int j=0; j<rt.size(); j++){
   218                                  Point wp = (Point)rt.elementAt(j);
   219                                  System.out.println(wp);
   220                                  if(wp.getName().equals(s)){
   221                                          k=j;
   222                                          look4=(Point)rt.elementAt(j);
   223                                          i=1000;


                                         clxii
Software Defects Prevention Techniques – Example Project


   224                                           j=1000;
   225                                   }
   226                           }
   227                  }
   228          }
   229
   230          this.selP = new Point(look4,false);
   231
   232          mb.setBackground(look4);
   233
   234          mob.setDrawablePoints();
   235          selP.setXY(mb.getNewEdge(),mb.getPixLon(), mb.getPixLat());
   236
   237          if (!selP.getImage().equals("blanco") && big==false) setBig();
   238          if (selP.getImage().equals("blanco") && big==true) resetBig();
   239
   240          this.setColor();
   241      }
   242
   243     /** Deletes selected Point
   244      * Returns -4 if current Point is deleted
   245      * Returns -3 if destination Point is deleted
   246      * Returns -2 if free Point deleted
   247      * Returns -1 if more then one Point is selected
   248      * Returns 0 if none Point is selected
   249      * Returns n if n-th Point in route deleted
   250      */
   251      public int deleteWP(){
   252          int ret = 0;
   253
   254          this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
   255
   256          Vector temp1 = new Vector();
   257          PVector fWP = mob.getFreeWaypoints();
   258          for (int i=0; i<fWP.size(); i++){
   259                  Point fwp = (Point)fWP.elementAt(i);
   260                  if( Math.abs(selP.getX()-fwp.getX())<5 &&
Math.abs(selP.getY()-fwp.getY())<5 ){
   261                           temp1.addElement(new Integer(i));
   262              }
   263          }
   264
   265          Vector temp2 = new Vector();
   266          Vector Routes = mob.getRoutes();
   267          for (int j=0; j<Routes.size(); j++){
   268                           PVector vR = (PVector) Routes.elementAt(j);
   269                           for (int k=0; k<vR.size(); k++){
   270                           Point wpR = (Point)vR.elementAt(k);
   271                           if( Math.abs(selP.getX()-wpR.getX())<5 &&
Math.abs(selP.getY()-wpR.getY())<5 ) {


                                                clxiii
Zarko Acimovic


   272                                          temp2.addElement(new
DelRoute(k,wpR.getTypeID()));
   273                  }
   274                          }
   275          }
   276
   277          DelRoute drt = null;
   278          if(temp2.size()>0){
   279                  drt = (DelRoute) temp2.elementAt(0);
   280          }
   281
   282          if ( (temp1.size()+temp2.size())> 1 ) ret=-1;
   283          if ( (temp1.size()+temp2.size())==0 ) ret=0;
   284          if ( temp1.size()==1 ) {
   285                  Integer k = (Integer) temp1.elementAt(0);
   286                  int d = k.intValue();
   287                  fWP.removeElementAt(d);
   288                  ret=-2;
   289          }
   290          if( temp2.size()==1 ){
   291                  DelRoute dr = (DelRoute) temp2.elementAt(0);
   292                  PVector vR = (PVector) Routes.elementAt(dr.getRouteID()-1);
   293                  vR.removeElementAt(dr.getIndex());
   294                  ret=dr.getIndex();
   295          }
   296
   297          Point cp = mob.getCurrentPosition();
   298          if( Math.abs(selP.getX()-cp.getX())<5 &&
   299              Math.abs(selP.getY()-cp.getY())<5 ) {
   300                    mob.resetCurrentPosition();
   301                    ret= -4;
   302          }
   303
   304          Point dp = mob.getDestinationPosition();
   305
   306          if( Math.abs(selP.getX()-dp.getX())<5 &&
   307              Math.abs(selP.getY()-dp.getY())<5 ) {
   308                    mob.resetDestinationPosition();
   309                    ret= -3;
   310          }
   311
   312          resetColor();
   313
   314          return ret;
   315      }
   316
   317
   318     /** Action that must be taken with Selector when Zoom In/Out
   319      */
   320      public void Zoom(){



                                        clxiv
Software Defects Prevention Techniques – Example Project


   321          this.setSelectorWorld(mb.getPreviousEdge(),
mb.getPreviousPixLon(),mb.getPreviousPixLat());
   322          selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   323          while (selP.getX()>mb.getCanvasWidth()) {
   324                  this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
   325                  mb.setMap('r');
   326                  selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   327          }
   328          while (selP.getY()>mb.getCanvasHeight()) {
   329                  this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
   330                  mb.setMap('d');
   331                  selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   332          }
   333          while (selP.getX()<0){
   334                   this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
   335                   mb.setMap('l');
   336                   selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   337          }
   338          while (selP.getY()<0) {
   339                  this.setSelectorWorld(mb.getNewEdge(),
mb.getPixLon(),mb.getPixLat());
   340                  mb.setMap('u');
   341                  selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat());
   342          }
   343      }
   344
   345
   346     /** Draws selector point
   347      *
   348      public void drawSelPOld(Graphics g){
   349          long zl = mb.getZoomLevel()+1;
   350          Long zzl = new Long(zl);
   351          int zoomL = Integer.parseInt(zzl.toString());
   352          g.setColor(0,0,0);
   353          g.drawRect(selP.getXX()-6,selP.getYY()-3,12,6);
   354          g.setColor(m,n,s);
   355          g.fillRect(selP.getXX()-3,selP.getYY()-6,6,12);
   356          g.setColor(0,0,0);
   357      }
   358
   359      /** Draws selector point
   360      *
   361      public void drawSelPOld1(Graphics g){
   362          long zl = mb.getZoomLevel()+1;
   363          Long zzl = new Long(zl);
   364          int zoomL = Integer.parseInt(zzl.toString());
   365          g.setColor(m,n,s);
   366          g.fillRect(selP.getXX()-8,selP.getYY()-4,16,8);


                                                 clxv
Zarko Acimovic


   367          g.fillRect(selP.getXX()-4,selP.getYY()-8,8,16);
   368          g.setColor(0,0,0);
   369          g.drawRect(selP.getXX()-8,selP.getYY()-4,16,8);
   370          g.drawRect(selP.getXX()-4,selP.getYY()-8,8,16);
   371          g.setColor(m,n,s);
   372          g.fillRect(selP.getXX()-7,selP.getYY()-3,15,7);
   373          g.fillRect(selP.getXX()-3,selP.getYY()-7,7,15);
   374
   375          g.setColor(0,0,0);
   376
   377
   378      }
   379
   380      /** Draws selector point
   381      *
   382      public void drawSelPobsolete(Graphics g){
   383          //long zl = mb.getZoomLevel()+1;
   384          //Long zzl = new Long(zl);
   385          //int zoomL = Integer.parseInt(zzl.toString());
   386          if(big==false){
   387                  g.setColor(m,n,s);
   388                  g.fillRect(selP.getXX()-8,selP.getYY()-4,15,7);
   389                  g.fillRect(selP.getXX()-4,selP.getYY()-8,7,5);
   390                  g.setColor(0,0,0);
   391                  g.drawRect(selP.getXX()-8,selP.getYY()-4,15,7);
   392                  g.drawRect(selP.getXX()-4,selP.getYY()-8,7,15);
   393                  g.setColor(m,n,s);
   394                  g.fillRect(selP.getXX()-7,selP.getYY()-3,14,6);
   395                  g.fillRect(selP.getXX()-3,selP.getYY()-7,6,14);
   396          } else {
   397                  g.setColor(m,n,s);
   398                  g.fillRect(selP.getXX()-13,selP.getYY()-5,33,16);
   399                  g.fillRect(selP.getXX()-5,selP.getYY()-13,16,22);///umesto
16,32 sad je 16,25
   400                  g.setColor(0,0,0);
   401                  g.drawRect(selP.getXX()-13,selP.getYY()-5,33,16);
   402                  g.drawRect(selP.getXX()-5,selP.getYY()-13,16,22);///umesto
16,32 sad je 16,25
   403                  g.setColor(m,n,s);
   404                  g.fillRect(selP.getXX()-12,selP.getYY()-4,32,15);
   405                  g.fillRect(selP.getXX()-4,selP.getYY()-12,15,22);
   406
   407                  //g.drawString(selP.getName(),selP.getXX()-15,selP.getYY()
+11,0);
   408          }
   409          g.setColor(0,0,0);
   410          if (!this.getSelectedWP().getName().equals("selector"))
g.drawString(this.getSelectedWP().getName(),this.getSelectedWP().getXX()-
15,this.getSelectedWP().getYY()+11,0);
   411      }*/
   412


                                        clxvi
Software Defects Prevention Techniques – Example Project


   413      public void drawSelP(Graphics g){
   414          int length=0;
   415
   416                  //g.setColor(m,n,s);
   417                  g.setColor(255,180,0);
   418                  g.fillRect(selP.getXX()-8,selP.getYY()-4,15,7);
   419                  g.fillRect(selP.getXX()-4,selP.getYY()-8,7,5);
   420                  g.setColor(0,0,0);
   421                  g.drawRect(selP.getXX()-8,selP.getYY()-4,15,7);
   422                  g.drawRect(selP.getXX()-4,selP.getYY()-8,7,15);
   423                  //g.setColor(m,n,s);
   424                  g.setColor(255,180,0);
   425                  g.fillRect(selP.getXX()-7,selP.getYY()-3,14,6);
   426                  g.fillRect(selP.getXX()-3,selP.getYY()-7,6,14);
   427          /**
   428          if(big==true){
   429                  g.setColor(m,n,s);
   430                  //g.drawRect(selP.getXX()-4,selP.getYY()-4,15,15);
   431                  //g.drawRect(selP.getXX()-5,selP.getYY()-5,17,17);
   432                  //g.drawRect(selP.getXX()-6,selP.getYY()-6,19,19);
   433                  String name = this.getSelectedWP().getName();
   434                  length = name.length();
   435                  g.fillRect(selP.getXX()-4*length-2,selP.getYY()
+12,8*length+2,14);
   436          }
   437          g.setColor(0,0,0);
   438                  if (!this.getSelectedWP().getName().equals("selector"))
g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY()
+13,0);
   439          */
   440      }
   441
   442      public void drawCaption(Graphics g){
   443          int length=0;
   444          if(big==true){
   445                  g.setColor(m,n,s);
   446                  //g.drawRect(selP.getXX()-4,selP.getYY()-4,15,15);
   447                  //g.drawRect(selP.getXX()-5,selP.getYY()-5,17,17);
   448                  //g.drawRect(selP.getXX()-6,selP.getYY()-6,19,19);
   449                  String name = this.getSelectedWP().getName();
   450                  length = name.length();
   451                  g.fillRect(selP.getXX()-4*length-2,selP.getYY()
+12,8*length+2,14);
   452                  //if (!this.getSelectedWP().getName().equals("selector"))
g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY()
+13,0);
   453                  g.setColor(0,0,0);
   454                  if (!this.getSelectedWP().getName().equals("selector"))
g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY()
+13,0);
   455          }


                                                clxvii
Zarko Acimovic


456
457        }
458
459
460
461   /** Sets current position
462    */
463    public void setCurrent(MapObjects mob){
464        Point wp = this.getSelectedWP();
465        mob.setCurrentPosition(wp);
466    }
467
468   /** Sets destination position
469    */
470   public void setDest(MapObjects mob){
471        Point wp = this.getSelectedWP();
472        mob.setDestinationPosition(wp);
473    }
474
475   public void setColorOld(){
476          s = 0;
477          colorSet=true;
478   }
479
480    public void setColor(){
481          m=255;
482          n=255;
483          s=0;
484      colorSet=true;
485   }
486
487   public void resetColorOld(){
488          s = 255;
489          colorSet=false;
490   }
491
492   public void resetColor(){
493          m=255;
494          n=180;
495          s=0;
496          colorSet=false;
497   }
498
499   public void setBig(){
500          big=true;
501   }
502
503   public void resetBig(){
504          big=false;
505   }
506


                                      clxviii
Software Defects Prevention Techniques – Example Project


   507         /**   Blanco characters are possible to occur in names of pictures;
   508          *    Integer representations of blanko characters are 9 and 32
   509          *    Also, characters with integer representation between 0 and 33
   510          *    can not be printed out in WSDD console, so I excluded them too
   511          */
   512                 public String compact(String s){
   513                         int k = s.length();
   514                         char[] d = s.toCharArray();
   515                         String ret = "";
   516                         for(int i=0; i<d.length; i++){
   517                                 int temp = (int)d[i];
   518                                 if(temp>32) ret+=d[i];
   519                         }
   520                         int kk = ret.length();
   521                         if (kk!=k) System.out.println("Bugger is: "+s);
   522                         return ret;
   523                 }
   524
   525
   526
   527    }

SimpleTextForm.java

     All classes and interfaces must belong to a named package                                 15   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 75%                                    15   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 74%                            15   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 154%                                   15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    19   PMD Marker
     Use explicit scoping instead of the default package private level                         19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    23   PMD Marker
     Use explicit scoping instead of the default package private level                         23   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    25   PMD Marker
     Use explicit scoping instead of the default package private level                         25   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    27   PMD Marker
     Use explicit scoping instead of the default package private level                         27   PMD Marker
     Parameter 'createChgr' is not assigned and could be declared final                        33   PMD Marker
     Avoid unnecessary comparisons in boolean expressions                                      39   PMD Marker
     Avoid variables with short names like s                                                   63   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 63   PMD Marker
     Avoid variables with short names like s                                                   67   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 67   PMD Marker
     Avoid variables with short names like s                                                   71   PMD Marker




                                                              clxix
Zarko Acimovic




 1   /**
 2    * Simple text form
 3    */
 4
 5
 6   import javax.microedition.lcdui.*;
 7
 8   //import javax.microedition.midlet.*;
 9
10
11   //import java.io.*;
12   //import java.util.*;
13
14
15   public class SimpleTextForm extends Form{
16
17     /** Name of waypoint
18      */
19          TextField nameWP;
20
21     /** Type of waypoint
22      */
23          TextField typeWP;
24
25           String[] str = new String[2];
26
27           ChoiceGroup chgr;
28
29
30
31     /** Creates new form
32      */
33          SimpleTextForm(boolean createChgr){
34                  super("Data Input");
35                  nameWP = new TextField("Name","",8,0);
36                  typeWP = new TextField("Type","",8,0);
37                  this.append(nameWP);
38                  this.append(typeWP);
39                  if(createChgr==true){
40                          str[0] = "Sysnchronized Following";
41                          str[1] = "Out of Sync";
42                          chgr = new ChoiceGroup("",1,str,null);
43                          this.append(chgr);
44                  }
45          }
46
47     /** Returns the name of waypoint
48      * @return String
49      */


                                      clxx
Software Defects Prevention Techniques – Example Project


50            public String getName(){
51                    return nameWP.getString();
52            }
53
54       /** Returns the type of waypoint
55        * @return String
56        */
57            public String getType(){
58                    return typeWP.getString();
59            }
60
61       /** Sets the name of waypoint
62        */
63            public void setName(String s){
64                    nameWP.setString(s);
65            }
66
67            public void setLabel(String s){
68                    nameWP.setLabel(s);
69            }
70
71            public void setLabel2(String s){
72                    typeWP.setLabel(s);
73            }
74
75       /** Sets the type of waypoint
76        */
77            public void setType(String s){
78                    typeWP.setString(s);
79            }
80
81            public int getSelected(){
82                    return chgr.getSelectedIndex();
83            }
84   }




                                              clxxi
Zarko Acimovic




TextForm.java


     All classes and interfaces must belong to a named package                                   15   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 80%                                      15   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 81%                              15   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 165%                                     15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.      19   PMD Marker
     Use explicit scoping instead of the default package private level                           19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.      23   PMD Marker
     Use explicit scoping instead of the default package private level                           23   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.      27   PMD Marker
     Use explicit scoping instead of the default package private level                           27   PMD Marker
     Use explicit scoping instead of the default package private level                           29   PMD Marker
     Use explicit scoping instead of the default package private level                           30   PMD Marker
     Lines of Code in Method is 30                                                               33   Metrics Marker
     Avoid unused constructor parameters such as 'first'.                                        35   PMD Marker
     Avoid variables with short names like s                                                     35   PMD Marker
     Parameter 's' is not assigned and could be declared final                                   35   PMD Marker
     The user-supplied array 's' is stored directly.                                             35   PMD Marker
     The user-supplied array 's' is stored directly.                                             35   PMD Marker
     Avoid assignments in operands                                                               41   PMD Marker
     Dead store to first in new TextForm(String[], boolean)                                      41   FindBugs
     new TextForm(String[], boolean) assigns boolean literal in boolean expression               41   FindBugs
     The parameter first to new TextForm(String[], boolean) is dead upon entry but overwritten   41   FindBugs
     Avoid variables    with short names like s                                                  80   PMD Marker
     Parameter 's' is   not assigned and could be declared final                                 80   PMD Marker
     Avoid variables    with short names like s                                                  86   PMD Marker
     Parameter 's' is   not assigned and could be declared final                                 86   PMD Marker
     Avoid variables    with short names like s                                                  94   PMD Marker
     Parameter 's' is   not assigned and could be declared final                                 94   PMD Marker
     Avoid variables    with short names like s                                                  98   PMD Marker
     Parameter 's' is   not assigned and could be declared final                                 98   PMD Marker




                                                                clxxii
Software Defects Prevention Techniques – Example Project


 1   /**
 2    * Text form
 3    */
 4
 5
 6   import javax.microedition.lcdui.*;
 7
 8   //import javax.microedition.midlet.*;
 9
10
11   //import java.io.*;
12   //import java.util.*;
13
14
15   public class TextForm extends Form{
16
17     /** Name of waypoint
18      */
19          TextField nameWP;
20
21     /** Type of waypoint
22      */
23          TextField typeWP;
24
25     /** ChoiceGroup of categories
26      */
27      ChoiceGroup chgr;
28
29      TextField lat;
30      TextField lon;
31
32
33     /** Creates new form
34      */
35          TextForm(String[] s, boolean first){
36                  super("Data Input");
37                  nameWP = new TextField("Name","",50,0);
38                  typeWP = new TextField("Type","",50,0);
39                  this.append(nameWP);
40
41                   if(first = false){
42                           //this.append(typeWP);
43                           this.append("");
44                           chgr = new ChoiceGroup("Category",1,s,null);
45                           this.append(chgr);
46
47                              lat = new TextField("Latitude","",50,0);
48                              lon = new TextField("Longitude","",50,0);
49                              this.append(lat);
50                              this.append(lon);
51                   }else{


                                             clxxiii
Zarko Acimovic


 52                        lat = new TextField("Latitude","",50,0);
 53                        lon = new TextField("Longitude","",50,0);
 54                        this.append(lat);
 55                        this.append(lon);
 56
 57                        this.append("");
 58                        chgr = new ChoiceGroup("Category:",1,s,null);
 59                        this.append(chgr);
 60                }
 61
 62        }
 63
 64   /** Returns the name of waypoint
 65    * @return String
 66    */
 67        public String getName(){
 68                return nameWP.getString();
 69        }
 70
 71   /** Returns the type of waypoint
 72    * @return String
 73    */
 74        public String getType(){
 75                return typeWP.getString();
 76        }
 77
 78   /** Sets the name of waypoint
 79    */
 80        public void setName(String s){
 81                nameWP.setString(s);
 82        }
 83
 84   /** Sets the type of waypoint
 85    */
 86        public void setType(String s){
 87                typeWP.setString(s);
 88        }
 89
 90        public int getSelected(){
 91                return chgr.getSelectedIndex();
 92        }
 93
 94        public void setLat(long s){
 95                lat.setString(MathFP.toString(s));
 96        }
 97
 98        public void setLon(long s){
 99                lon.setString(MathFP.toString(s));
100        }
101
102        public void setLat(String s){


                                   clxxiv
Software Defects Prevention Techniques – Example Project


   103                              lat.setString(s);
   104                 }
   105
   106                 public void setLon(String s){
   107                         lon.setString(s);
   108                 }
   109
   110                 public String getLat(){
   111                         return lat.getString();
   112                 }
   113
   114                 public String getLon(){
   115                         return lon.getString();
   116                 }
   117    }



TextFromFriend.java


     All classes and interfaces must belong to a named package                                 15   PMD Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 83%                            15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    19   PMD Marker
     Use explicit scoping instead of the default package private level                         19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    23   PMD Marker
     Use explicit scoping instead of the default package private level                         23   PMD Marker
     Avoid variables with short names like s                                                   53   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 53   PMD Marker
     Avoid variables with short names like s                                                   57   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 57   PMD Marker
     Avoid variables with short names like s                                                   63   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 63   PMD Marker




                                                              clxxv
Zarko Acimovic


 1   /**
 2    * Text form
 3    */
 4
 5
 6   import javax.microedition.lcdui.*;
 7
 8   //import javax.microedition.midlet.*;
 9
10
11   //import java.io.*;
12   //import java.util.*;
13
14
15   public class TextFormFriend extends Form{
16
17     /** Name of waypoint
18      */
19          TextField nameWP;
20
21     /** Type of waypoint
22      */
23          TextField typeWP;
24
25
26
27     /** Creates new form
28      */
29          TextFormFriend(){
30                  super("Data Input");
31                  nameWP = new TextField("Name","",8,0);
32                  typeWP = new TextField("Type","",8,0);
33                  this.append(nameWP);
34                  this.append(typeWP);
35          }
36
37     /** Returns the name of waypoint
38      * @return String
39      */
40          public String getName(){
41                  return nameWP.getString();
42          }
43
44     /** Returns the type of waypoint
45      * @return String
46      */
47          public String getType(){
48                  return typeWP.getString();
49          }
50
51     /** Sets the name of waypoint


                                       clxxvi
Software Defects Prevention Techniques – Example Project


    52           */
    53                 public void setName(String s){
    54                         nameWP.setString(s);
    55                 }
    56
    57                 public void setLabel(String s){
    58                         nameWP.setLabel(s);
    59                 }
    60
    61         /** Sets the type of waypoint
    62          */
    63              public void setType(String s){
    64                      typeWP.setString(s);
    65              }
    66    }

TextFormImage.java


     All classes and interfaces must belong to a named package                                 15   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 72%                                    15   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 93%                            15   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 88%                                    15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    19   PMD Marker
     Use explicit scoping instead of the default package private level                         19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    27   PMD Marker
     Use explicit scoping instead of the default package private level                         27   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    34   PMD Marker
     Use explicit scoping instead of the default package private level                         34   PMD Marker
     Avoid variables with short names like s                                                   39   PMD Marker
     Parameter 'img' is not assigned and could be declared final                               39   PMD Marker
     Parameter 'nameChg' is not assigned and could be declared final                           39   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 39   PMD Marker
     Read of unwritten field typeWP in TextFormImage.getType()                                 59   FindBugs
     Unwritten field: TextFormImage.typeWP                                                     59   FindBugs
     Avoid variables with short names like s                                                   64   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 64   PMD Marker
     Avoid variables with short names like s                                                   70   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 70   PMD Marker
     Read of unwritten field typeWP in TextFormImage.setType(String)                           71   FindBugs
     Avoid variables with short names like s                                                   78   PMD Marker
     Avoid variables with short names like s                                                   82   PMD Marker




                                                             clxxvii
Zarko Acimovic


 1   /**
 2    * Text form for ChoicGroup with images
 3    */
 4
 5
 6   import javax.microedition.lcdui.*;
 7
 8   //import javax.microedition.midlet.*;
 9
10
11   //import java.io.*;
12   //import java.util.*;
13
14
15   public class TextFormImage extends Form{
16
17     /** Name of waypoint
18      */
19          TextField nameWP;
20
21     /** Category of waypoit
22      */
23     // TextField catWP;
24
25     /** Type of waypoint
26      */
27          TextField typeWP;
28
29     /** ChoiceGroup of categories
30      */
31
32     // TextField lat;
33     // TextField lon;
34      ChoiceGroup chgr;
35
36
37     /** Creates new form
38      */
39          TextFormImage(String nameChg, String[] s, Image[] img){
40                  super("Data Input");
41                  nameWP = new TextField("Name","",50,0);
42                  this.append(nameWP);
43                  this.append("");
44                  chgr = new ChoiceGroup(nameChg,1,s,img);
45                  this.append(chgr);
46          }
47
48     /** Returns the name of waypoint
49      * @return String
50      */
51          public String getName(){


                                    clxxviii
Software Defects Prevention Techniques – Example Project


52                    return nameWP.getString();
53            }
54
55       /** Returns the type of waypoint
56        * @return String
57        */
58            public String getType(){
59                    return typeWP.getString();
60            }
61
62       /** Sets the name of waypoint
63        */
64            public void setName(String s){
65                    nameWP.setString(s);
66            }
67
68       /** Sets the type of waypoint
69        */
70            public void setType(String s){
71                    typeWP.setString(s);
72            }
73
74            public int getSelected(){
75                    return chgr.getSelectedIndex();
76            }
77
78            public void setNameCHGR(String s){
79                    chgr.setLabel(s);
80            }
81
82            public void setLat(long s){
83                    //lat.setString(MathFP.toString(s));
84            }
85
86            public void setLon(long s){
87                    //lon.setString(MathFP.toString(s));
88            }
89   }




                                              clxxix
Zarko Acimovic


TextFormWP.java

     All classes and interfaces must belong to a named package                                 15   PMD Marker
     Lack of Cohesion in Methods (Chidamber & Kemerer) is 50                                   15   Metrics Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 91%                                    15   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67%                            15   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 351%                                   15   Metrics Marker
     Number of Fields is 11                                                                    15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    19   PMD Marker
     Use explicit scoping instead of the default package private level                         19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    23   PMD Marker
     Use explicit scoping instead of the default package private level                         23   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    27   PMD Marker
     Use explicit scoping instead of the default package private level                         27   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    31   PMD Marker
     Use explicit scoping instead of the default package private level                         31   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    35   PMD Marker
     Use explicit scoping instead of the default package private level                         35   PMD Marker
     Lines of Code in Method is 39                                                             64   Metrics Marker
     Number of Statements is 23                                                                64   Metrics Marker
     Avoid variables with short names like s                                                   66   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 66   PMD Marker
     The user-supplied array 's' is stored directly.                                           66   PMD Marker
     Avoid variables with short names like s                                                  120   PMD Marker
     Parameter 's' is not assigned and could be declared final                                120   PMD Marker
     Avoid variables with short names like s                                                  126   PMD Marker
     Parameter 's' is not assigned and could be declared final                                126   PMD Marker
     Avoid variables with short names like r                                                  133   PMD Marker
     Local variable 'r' could be declared final                                               133   PMD Marker
     Consider simply returning the value vs storing it in local variable 'r'                  134   PMD Marker
     Avoid variables with short names like r                                                  140   PMD Marker
     Local variable 'r' could be declared final                                               140   PMD Marker
     Consider simply returning the value vs storing it in local variable 'r'                  141   PMD Marker
     Local variable 'r' could be declared final                                               147   PMD Marker
     Consider simply returning the value vs storing it in local variable 'r'                  148   PMD Marker
     Local variable 's' could be declared final                                               154   PMD Marker
     Local variable 'c' could be declared final                                               155   PMD Marker
     Consider simply returning the value vs storing it in local variable 'k'                  157   PMD Marker
     Consider simply returning the value vs storing it in local variable 'r'                  164   PMD Marker



     1    /**
     2     * Text form for insertion of waypoint
     3     */
     4
     5
     6    import javax.microedition.lcdui.*;
     7
     8    //import javax.microedition.midlet.*;
     9
    10
    11    //import java.io.*;
    12    //import java.util.*;
    13
    14


                                                              clxxx
Software Defects Prevention Techniques – Example Project


15   public class TextFormWP extends Form{
16
17     /** Name of waypoint
18      */
19          TextField nameWP;
20
21     /** Type of waypoint
22      */
23          TextField typeWP;
24
25     /** Degrees of latitude
26      */
27      TextField degLat;
28
29     /** Minutes of latitude
30      */
31      TextField minLat;
32
33     /** Seconds of latitude
34      */
35      TextField secLat;
36
37     /** Side NORTH / SOUTH
38      */
39      TextField sideNS;
40
41
42     /** Degrees of longitude
43      */
44      TextField degLon;
45
46     /** Minutes of longitude
47      */
48      TextField minLon;
49
50     /** Seconds of longitude
51      */
52      TextField secLon;
53
54     /** Side WEST / EAST
55      */
56      TextField sideWE;
57
58     /** ChoiceGroup of categories
59      */
60      ChoiceGroup chgr;
61
62
63
64     /** Creates new form
65      */


                                             clxxxi
Zarko Acimovic


 66        TextFormWP(String[] s){
 67                super("Data Input");
 68                nameWP = new TextField("Name","",12,0);
 69                this.append(nameWP);
 70                typeWP = new TextField("Type","",12,0);
 71                this.append(typeWP);
 72
 73
 74               degLat = new TextField("Degrees of Latitude","",8,0);
 75               this.append(degLat);
 76
 77               minLat = new TextField("Minutes of Latitude","",8,0);
 78               this.append(minLat);
 79
 80               secLat = new TextField("Seconds of Latitude","",8,0);
 81               this.append(secLat);
 82
 83               sideNS = new TextField("Side, North or South?","",8,0);
 84               this.append(sideNS);
 85
 86
 87               degLon = new TextField("Degrees of Longitude","",8,0);
 88               this.append(degLon);
 89
 90               minLon = new TextField("Minutes of Longitude","",8,0);
 91               this.append(minLon);
 92
 93               secLon = new TextField("Seconds of Longitude","",8,0);
 94               this.append(secLon);
 95
 96               sideWE = new TextField("Side, West or East?","",8,0);
 97               this.append(sideWE);
 98
 99               chgr = new ChoiceGroup("Categories",1,s,null);
100               this.append(chgr);
101
102        }
103
104   /** Returns the name of waypoint
105    * @return String
106    */
107        public String getName(){
108                return nameWP.getString();
109        }
110
111   /** Returns the type of waypoint
112    * @return String
113    */
114        public String getType(){
115                return typeWP.getString();
116        }


                                   clxxxii
Software Defects Prevention Techniques – Example Project


117
118   /** Sets the name of waypoint
119    */
120        public void setName(String s){
121                nameWP.setString(s);
122        }
123
124   /** Sets the type of waypoint
125    */
126        public void setType(String s){
127                typeWP.setString(s);
128        }
129
130   /** Returns degrees of latitude
131    */
132    public int getDegLat(){
133        int r = Integer.parseInt(degLat.getString());
134        return r;
135    }
136
137   /** Returns minutes of latitude
138    */
139    public int getMinLat(){
140        int r = Integer.parseInt(minLat.getString());
141        return r;
142    }
143
144   /** Returns seconds of latitude
145    */
146    public int getSecLat(){
147        int r = Integer.parseInt(secLat.getString());
148        return r;
149    }
150
151   /** Returns side, North or South
152    */
153    public char getSideNS(){
154        String s = sideNS.getString();
155        char[] c = s.toCharArray();
156        char k = c[0];
157        return k;
158    }
159
160   /** Returns degrees of longitude
161    */
162    public int getDegLon(){
163        int r = Integer.parseInt(degLon.getString());
164        return r;
165    }
166
167   /** Returns minutes of longitude


                                          clxxxiii
Zarko Acimovic


168       */
169       public int getMinLon(){
170           int r = Integer.parseInt(minLon.getString());
171           return r;
172       }
173
174       /** Returns seconds of longitude
175        */
176        public int getSecLon(){
177            int r = Integer.parseInt(secLon.getString());
178            return r;
179        }
180
181       /** Returns side, West or East
182        */
183        public char getSideWE(){
184            String s = sideWE.getString();
185            char[] c = s.toCharArray();
186            char k = c[0];
187            return k;
188        }
189   }




                                      clxxxiv
Software Defects Prevention Techniques – Example Project


Thread4Friend.java


     All classes and interfaces must belong to a named package                                  15   PMD Marker
     Lack of Cohesion in Methods (Chidamber & Kemerer) is 50                                    15   Metrics Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 91%                                     15   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67%                             15   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 351%                                    15   Metrics Marker
     Number of Fields is 11                                                                     15   Metrics Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     19   PMD Marker
     Use explicit scoping instead of the default package private level                          19   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     23   PMD Marker
     Use explicit scoping instead of the default package private level                          23   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     27   PMD Marker
     Use explicit scoping instead of the default package private level                          27   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     31   PMD Marker
     Use explicit scoping instead of the default package private level                          31   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     35   PMD Marker
     Use explicit scoping instead of the default package private level                          35   PMD Marker
     Lines of Code in Method is 39                                                              64   Metrics Marker
     Number of Statements is 23                                                                 64   Metrics Marker
     Avoid variables with short names like s                                                    66   PMD Marker
     Parameter 's' is not assigned and could be declared final                                  66   PMD Marker
     The user-supplied array 's' is stored directly.                                            66   PMD Marker
     Avoid variables with short names like s                                                   120   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 120   PMD Marker
     Avoid variables with short names like s                                                   126   PMD Marker
     Parameter 's' is not assigned and could be declared final                                 126   PMD Marker
     Avoid variables with short names like r                                                   133   PMD Marker
     Local variable 'r' could be declared final                                                133   PMD Marker
     Consider simply returning the value vs storing it in local variable 'r'                   134   PMD Marker
     Avoid variables with short names like r                                                   140   PMD Marker
     All classes and interfaces must belong to a named package                                  13   PMD Marker
     Lack of Cohesion in Methods (Henderson-Sellers) is 91%                                     13   Metrics Marker
     Lack of Cohesion in Methods (Pairwise Field Irrelation) is 54%                             13   Metrics Marker
     Lack of Cohesion in Methods (Total Correlation) is 420%                                    13   Metrics Marker
     The class 'Thread4Friend' has a Cyclomatic Complexity of 4 (Highest = 10).                 13   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                               13   PMD Marker
     Avoid variables with short names like t                                                    14   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     14   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                               14   PMD Marker
     Use explicit scoping instead of the default package private level                          14   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                  15   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                  15   PMD Marker
     Consider replacing this Vector with the newer java.util.List                               15   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     15   PMD Marker
     Use explicit scoping instead of the default package private level                          15   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     16   PMD Marker
     Use explicit scoping instead of the default package private level                          16   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.     17   PMD Marker




                                                             clxxxv
Zarko Acimovic


Thread4Friend.java


     Use explicit scoping instead of the default package private level                         17   PMD Marker
     Avoid variables with short names like ic                                                  18   PMD Marker
     Found non-transient, non-static member. Please mark as transient or provide accessors.    18   PMD Marker
     Use explicit scoping instead of the default package private level                         18   PMD Marker
     Avoid variables with short names like mb                                                  19   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                 24   PMD Marker
     Avoid using implementation types like 'Vector'; use the interface instead                 24   PMD Marker
     Avoid variables with short names like ic                                                  24   PMD Marker
     Avoid variables with short names like mb                                                  24   PMD Marker
     Consider replacing this Vector with the newer java.util.List                              24   PMD Marker
     Number of Parameters is 6                                                                 24   Metrics Marker
     Parameter 'ic' is not assigned and could be declared final                                24   PMD Marker
     Parameter 'mb' is not assigned and could be declared final                                24   PMD Marker
     Parameter 'mob' is not assigned and could be declared final                               24   PMD Marker
     Parameter 'oul' is not assigned and could be declared final                               24   PMD Marker
     Parameter 'resource' is not assigned and could be declared final                          24   PMD Marker
     Unread field: Thread4Friend.oul                                                           25   FindBugs
     To be compliant to J2EE, a webapp should not use any thread.                              31   PMD Marker
     Cyclomatic Complexity is 8                                                                45   Metrics Marker
     Lines of Code in Method is 66                                                             45   Metrics Marker
     Number of Levels is 5                                                                     45   Metrics Marker
     Number of Locals in Scope is 17                                                           45   Metrics Marker
     Number of Statements is 75                                                                45   Metrics Marker
     The method 'run' has a Cyclomatic Complexity of 10.                                       45   PMD Marker
     To be compliant to J2EE, a webapp should not use any thread.                              47   PMD Marker
     Avoid instantiating new objects inside loops                                              52   PMD Marker
     Local variable 's' could be declared final                                                53   PMD Marker
     Local variable 'lastIndex' could be declared final                                        59   PMD Marker
     Avoid unused local variables such as 'currentTS'.                                         67   PMD Marker
     The local variable currentTS is never read                                                67   Java Problem
     Avoid instantiating new objects inside loops                                              71   PMD Marker
     Position literals first in String comparisons                                             75   PMD Marker
     Local variable 'comma' could be declared final                                            79   PMD Marker
     Local variable 'nextComma' could be declared final                                        81   PMD Marker
     Assigning an Object to null is a code smell. Consider refactoring.                        90   PMD Marker
     Position literals first in String comparisons                                             91   PMD Marker
     Avoid instantiating new objects inside loops                                              92   PMD Marker
     Avoid empty catch blocks                                                                  98   PMD Marker
     Thread4Friend.run() might ignore java.lang.Exception                                      98   FindBugs
     Avoid unnecessary comparisons in boolean expressions                                     102   PMD Marker
     Lines of Code in Method is 19                                                            114   Metrics Marker
     Avoid unused local variables such as 'k'.                                                120   PMD Marker
     Dead store to k in Thread4Friend.compact(String)                                         120   FindBugs
     Local variable 'k' could be declared final                                               120   PMD Marker
     The local variable k is never read                                                       120   Java Problem
     Avoid using if statements without curly braces                                           126   PMD Marker
     Prefer StringBuffer over += for concatenating strings                                    126   PMD Marker




                                                             clxxxvi
Software Defects Prevention Techniques – Example Project


Thread4Friend.java


     Thread4Friend.compact(String) concatenates strings using + in a loop                       126   FindBugs
     Avoid unused local variables such as 'kk'.                                                 129   PMD Marker
     Dead store to kk in Thread4Friend.compact(String)                                          129   FindBugs
     The local variable kk is never read                                                        129   Java Problem
     Avoid unused local variables such as 'k'.                                                  135   PMD Marker
     Dead store to k in Thread4Friend.compactFine(String)                                       135   FindBugs
     The local variable k is never read                                                         135   Java Problem
     Avoid using if statements without curly braces                                             141   PMD Marker
     Prefer StringBuffer over += for concatenating strings                                      141   PMD Marker
     Thread4Friend.compactFine(String) concatenates strings using + in a loop                   141   FindBugs
     Avoid unused local variables such as 'kk'.                                                 144   PMD Marker
     Dead store to kk in Thread4Friend.compactFine(String)                                      144   FindBugs
     The local variable kk is never read                                                        144   Java Problem
     Cyclomatic Complexity is 6                                                                 149   Metrics Marker
     Lines of Code in Method is 31                                                              149   Metrics Marker
     Number of Statements is 24                                                                 149   Metrics Marker

     Avoid empty catch blocks                                                                   153 PMD Marker

     Avoid empty catch blocks                                                                   164 PMD Marker
     Prefer StringBuffer over += for concatenating strings                                      167 PMD Marker
     Thread4Friend.getResourceAsString(String) concatenates strings using + in a loop           167 FindBugs

     Avoid empty catch blocks                                                                   170 PMD Marker
     Possible null pointer dereference of is in Thread4Friend.getResourceAsString(String) on
     exception path                                                                             173 FindBugs
     Avoid empty catch blocks                                                                   174 PMD Marker




                                                              clxxxvii
Zarko Acimovic




     1 /**
     2   *
     3   * Thread4Friend controls apperance of friend's position on screen
     4   */
     5 //import javax.microedition.lcdui.*;
     6
     7 //import javax.microedition.midlet.*;
     8
     9 import java.util.*;
    10 import java.io.*;
    11
    12
    13 public class Thread4Friend implements Runnable{
    14          Thread t;
    15          Vector whiteList;
    16          String resource;
    17          MapObjects mob;
    18          ImageCanvas3 ic;
    19          MapBackground mb;
    20          Outlook oul;
    21          int hashID;
    22          boolean first = false;
    23
    24          Thread4Friend(Vector whiteList, String resource, MapObjects mob,
ImageCanvas3 ic, MapBackground mb, Outlook oul){
    25                  this.oul = oul;
    26                  this.mob = mob;
    27                  this.mb = mb;
    28                  this.ic = ic;
    29                  this.resource = resource;
    30                  this.whiteList = whiteList;
    31                  t = new Thread(this);
    32                  //t.start();
    33                  hashID = t.hashCode();
    34          }
    35
    36          public void start(){
    37
    38                  t.start();
    39          }
    40
    41          public int getID(){
    42                  return hashID;
    43          }
    44
    45          public void run(){
    46
    47                  Thread current = Thread.currentThread();
    48                  //System.out.println*


                                       clxxxviii
Software Defects Prevention Techniques – Example Project


    49                  Integer friendID = new Integer(current.hashCode());
    50                  while(whiteList.contains(friendID)){
    51                          current = Thread.currentThread();
    52                          friendID = new Integer(current.hashCode());
    53                          String s = this.getResourceAsString(resource);
    54                          int nextIndex = 6;
    55                          int index = s.indexOf('n');
    56
    57                          nextIndex = s.indexOf('n',index+1);
    58
    59                          int lastIndex = s.lastIndexOf('n');
    60
    61                          int begin = -2;
    62                          int end = index;
    63
    64                          String c1 = "";
    65                          String c2 = "";
    66                          String timeStamp = "";
    67                          long currentTS = 0;
    68
    69                          while(index<lastIndex &&
whiteList.contains(friendID)){
    70                                  current = Thread.currentThread();
    71                                  friendID = new Integer(current.hashCode());
    72                                  Point wp = null;
    73                                  String temp = s.substring(begin+2,end);
    74                                  temp = compact(temp);
    75                                  if(temp.equals("")){ //na kraju ce temp da
bude prazno
    76                                                   index = lastIndex+1;
    77                                  } else {
    78                                           temp = compact(temp);
    79                                           int comma = temp.indexOf(',');
    80                                           c1 = temp.substring(0,comma);
    81                                           int nextComma =
temp.indexOf(',',comma+1);
    82                                           c2 =
temp.substring(comma+1,nextComma);
    83                                           timeStamp =
temp.substring(nextComma+1,temp.length());
    84                                           currentTS =
Long.parseLong(timeStamp);
    85                                           begin = index-1;
    86                                           end = nextIndex;
    87                                           index = nextIndex;
    88                                           nextIndex =
s.indexOf('n',nextIndex+1);
    89
    90                                           wp = null;
    91                                           if(!c1.equals("")){



                                               clxxxix
Zarko Acimovic


    92                                                   wp = new
Point(c2,c1,resource,"","",true);
    93                                                   wp.setImage("blanco");
    94                                           }
    95                                  }
    96                                  try{
    97                                           Thread.sleep(1000);
    98                                  }catch(Exception e){}
    99                                  if(wp!=null &&
whiteList.contains(friendID)){
   100                                           mob.setDrawablePoints();
   101                                           mob.updateFriend(friendID,wp);
   102                                       if(first==false) {
   103                                           mb.setBackground(wp);
   104                                                   first=true;
   105                                       }
   106                                       ic.repaint();
   107                                  }
   108                          }
   109                  }
   110          }
   111
   112
   113
   114          /** Blanco characters are possible to occur in names of pictures;
   115      * Integer representations of blanko characters are 9 and 32
   116      * Also, characters with integer representation between 0 and 33
   117      * can not be printed out in WSDD console, so I excluded them too
   118      */
   119          public String compact(String s){
   120                  int k = s.length();
   121                  //System.out.println("Length of s is "+s.length());
   122                  char[] d = s.toCharArray();
   123                  String ret = "";
   124                  for(int i=0; i<d.length; i++){
   125                          int temp = (int)d[i];
   126                          if(temp>32) ret+=d[i];
   127                  }
   128                  //System.out.println("Length of ret is "+ret.length());
   129                  int kk = ret.length();
   130                  //if (kk!=k) System.out.println("Bugger is: "+s);
   131                  return ret;
   132          }
   133
   134          public String compactFine(String s){
   135                  int k = s.length();
   136                  //System.out.println("Length of s is "+s.length());
   137                  char[] d = s.toCharArray();
   138                  String ret = "";
   139                  for(int i=0; i<d.length; i++){
   140                          int temp = (int)d[i];


                                         cxc
Software Defects Prevention Techniques – Example Project


141                      if(temp!=32 && temp!=9) ret+=d[i];
142              }
143              //System.out.println("Length of ret is "+ret.length());
144              int kk = ret.length();
145              //if (kk!=k) System.out.println("Bugger is: "+s);
146              return ret;
147       }
148
149       public String getResourceAsString(String resource){
150               InputStream is = null;
151               try{
152                       is = this.getClass().getResourceAsStream(resource);
153               }catch(Exception e) {
154                       //a.setString("There is no such resource");
155                       //d.setCurrent(a);
156               }
157
158               //conversion of resource into string
159               String s = "";
160               char m =' ';
161
162               try{
163                      m = (char)is.read();
164              }catch(Exception e){}
165
166              while(m!=65535){
167                      s+=m;
168                      try{
169                              m = (char)is.read();
170                      }catch(Exception e){}
171              }
172              try{
173                      is.close();
174              }catch(Exception e){}
175
176
177              s=compactFine(s);
178              return s;
179       }
180
181       public void setFirst(){
182               first = false;
183       }
184
185   }




                                           cxci
Zarko Acimovic




                        6 DESIGN DEFECTS DETECTED BY ARGOUML



15.3. Class Selection

     15.3.1. Wrap DataType

     15.3.2. Reduce Classes in namespace <namespace>

     15.3.3. Clean Up Diagram

15.4. Naming

     15.4.1. Resolve Association Name Conflict

     15.4.2. Revise Attribute Names to Avoid Conflict

     15.4.3. Change Names or Signatures in a model element

     15.4.4. Duplicate End (Role) Names for an Association

     15.4.5. Role name conflicts with member

     15.4.6. Choose a Name (Classes and Interfaces)

     15.4.7. Name conflict in a namespace

     15.4.8. Choose a Unique Name for a model element (Classes and Interfaces)

     15.4.9. Choose a Name (Attributes)

     15.4.10. Choose a Name (Operations)

     15.4.11. Choose a Name (States)

     15.4.12. Choose a Unique Name for a (State related) model element

     15.4.13. Revise Name to Avoid Confusion

     15.4.14. Choose a Legal Name

     15.4.15. Change a model element to a Non-Reserved Word

     15.4.16. Choose a Better Operation Name

     15.4.17. Choose a Better Attribute Name

     15.4.18. Capitalize Class Name


                                                        cxcii
Software Defects Prevention Techniques – Example Project



     15.4.19. Revise Package Name

15.5. Storage

     15.5.1. Revise Attribute Names to Avoid Conflict

     15.5.2. Add Instance Variables to a Class

     15.5.3. Add a Constructor to a Class

     15.5.4. Reduce Attributes on a Class

15.6. Planned Extensions

     15.6.1. Operations in Interfaces must be public

     15.6.2. Interfaces may only have operations

     15.6.3. Remove Reference to Specific Subclass

15.7. State Machines

     15.7.1. Reduce Transitions on <state>

     15.7.2. Reduce States in machine <machine>

     15.7.3. Add Transitions to <state>

     15.7.4. Add Incoming Transitions to <model element>

     15.7.5. Add Outgoing Transitions from <model element>

     15.7.6. Remove Extra Initial States

     15.7.7. Place an Initial State

     15.7.8. Add Trigger or Guard to Transition

     15.7.9. Change Join Transitions

     15.7.10. Change Fork Transitions

     15.7.11. Add Choice/Junction Transitions

     15.7.12. Add Guard to Transition

     15.7.13. Clean Up Diagram

     15.7.14. Make Edge More Visible

     15.7.15. Composite Association End with Multiplicity >1

15.8. Design Patterns


                                                               cxciii
Zarko Acimovic


          15.8.1. Consider using Singleton Pattern for <class>

          15.8.2. Singleton Stereotype Violated in <class>

          15.8.3. Nodes normally have no enclosers

          15.8.4. NodeInstances normally have no enclosers

          15.8.5. Components normally are inside nodes

          15.8.6. ComponentInstances normally are inside nodes

          15.8.7. Classes normally are inside components

          15.8.8. Interfaces normally are inside components

          15.8.9. Objects normally are inside components

          15.8.10. LinkEnds have not the same locations

          15.8.11. Set classifier (Deployment Diagram)

          15.8.12. Missing return-actions

          15.8.13. Missing call(send)-action

          15.8.14. No Stimuli on these links

          15.8.15. Set Classifier (Sequence Diagram)

          15.8.16. Wrong position of these stimuli

15.9. Relationships

     15.9.1. Circular Association

     15.9.2. Make <association> Navigable

     15.9.3. Remove Navigation from Interface via <association>

     15.9.4. Add Associations to <model element>

     15.9.5. Remove Reference to Specific Subclass

     15.9.6. Reduce Associations on <model element>

     15.9.7. Make Edge More Visible

     15.10. Instantiation

     15.11. Modularity

     15.11.1. Classifier not in Namespace of its Association

     15.11.2. Add Elements to Package <package>

                                                           cxciv
Software Defects Prevention Techniques – Example Project



    15.12. Expected Usage

    15.12.1. Clean Up Diagram

15.13. Methods

    15.13.1. Change Names or Signatures in <model element>

    15.13.2. Class Must be Abstract

    15.13.3. Add Operations to <class>

    15.13.4. Reduce Operations on <model element>

    15.14. Code Generation

    15.14.1. Change Multiple Inheritance to interfaces

    15.15. Stereotypes

    15.16. Inheritance

    15.16.1. Revise Attribute Names to Avoid Conflict

    15.16.2. Remove <class>'s Circular Inheritance

    15.16.3. Class Must be Abstract

    15.16.4. Remove final keyword or remove subclasses

    15.16.5. Illegal Generalization

    15.16.6. Remove Unneeded Realizes from <class>

    15.16.7. Define Concrete (Sub)Class

    15.16.8. Define Class to Implement <interface>

    15.16.9. Change Multiple Inheritance to interfaces

    15.16.10. Make Edge More Visible

15.17. Containment

    15.17.1. Remove Circular Composition

    15.17.2. Duplicate Parameter Name

    15.17.3. Two Aggregate Ends (Roles) in Binary Association

    15.17.4. Aggregate End (Role) in 3-way (or More) Association

    15.17.5. Wrap DataType


                                                           cxcv
Zarko Acimovic




9 EXAMPLES OF DESIGN DEFECTS IN ARGOUML




                   cxcvi
Software Defects Prevention Techniques – Example Project




                         cxcvii
Zarko Acimovic




    cxcviii
Software Defects Prevention Techniques – Example Project




                                        ABOUT THE AUTHOR

Zarko Acimovic was born in 1977 in Belgrade, SERBIA. He obtained his BSc in Computer Science at University of
Belgrade, School of Electrical Engineering. Zarko Acimovic maintains Facebook page for promoting automated
testing of software architecture and software design http://www.facebook.com/AutomatedTesting




                                                        cxcix

Software defect prevention example project

  • 1.
    Software Defect PreventionTechniques ~ Example Project ~ Zarko Acimovic Copyright © 2013 Zarko Acimovic All rights reserved. ISBN-10: 1481113305 ISBN-13: 978-1481113304
  • 2.
    DEDICATION I dedicate thisbook to my parents, Ivana and Goran
  • 3.
    CONTENTS 1 Introduction 2 Theoretical Foundations for Defect Prevention 1 3 Automatic Tools for Defect Prevention 24 4 Tools for Defect Prevention in Java Software Development 25 5 Sample Project Software Requirements 25 6 Source Code with Violations 26 7 Design Defects Detected by ArgoUML 192 8 Examples of Design Defects in Sample Project 196 About the Author
  • 4.
    Zarko Acimovic 1 INTRODUCTION I present 5000 lines of Java source code mostly written by using trial/error code/test technique. The code was written for prototype project in three months without using defect prevention techniques ( that is, tools such as PMD, FindBugs, StateOfFlow or ArgoUML) I wrote the code in 2004 and ever since had several business offers to commercialize it which I resisted due to complexity of the code. 8 years after completing project I run the defect prevention tools against the code and uncovered 1123 code violations (almost 1 violation per 5 lines of code) and 121 software design violations. All these violations are presented in book with references to the source code lines where they live. It's worth mentioning that these violations are not defects – being present at the code, they just make it easier for you to make mistake when maintaining code or implementing new feature. I recommend readers to use these tools during development and correct all violations on the fly, or switch to some other risk-free programming language such as Haskell, Erlang or Lisp. 2 THEORETICAL FOUNDATIONS FOR DEFECT PREVENTION Below are the details of E-learning course “Software Engineering” from IIT Bombay India >> NPTEL >> Courses >> Computer Science and Engineering >> Software Engineering (Video). My opinion is that this course provides solid theoretical foundation for applying software defect prevention techniques. The course can be found on following location http://nptel.iitm.ac.in/video.php?subjectId=106101061 Here is high level overview of the course: 1 - Introduction to Software Engineering (52:21) 2 - Introduction to Software Engineering (52:55) 3 - Overview of Phases (57:22) 4 - Overview of Phases (57:03) 5 - Requirements Engineering / Specification (56:39) 6 - Formal Specification (51:44) 7 - Algebraic Specification Methods (57:34) 8 - Systems Modeling Overview (59:38) 9 - Process Modeling - DFD , Function Decomp (56:28) 10 - Process Modeling - DFD, Function Decomp (53:23) 11 - Data Modeling - ER Diagrams, Mapping (1:00:55) 12 - Data Modeling - ER Diagrams, Mapping (58:08) 13 - Production Quality Software - Introduction (53:04) 14 - Software Design - Primary Consideration (1:04:43) 15 - Design Patterns (56:13) 16 - Class and Component Level Design (54:34) iv
  • 5.
    Software Defects PreventionTechniques – Example Project 17 - Architectural Design (59:28) 18 - Software Testing - I (55:39) 19 - Software Testing - II (51:18) 20 - Structural Programming and Some implementation (45:05) 21 - Software Metrics and Quality (54:51) 22 - Verification and Validation (52:43) 23 - Case Study (54:55) 24 - Case Study (58:39) 25 - Software Evolution (55:41) 26 - Agile Development (55:33) 27 - Software Reuse (53:43) 28 - Reuse Continued (57:07) 29 - Introduction to Project Management (52:36) 30 - Project Scope Management (1:08:45) 31 - Project Time Management (56:51) 32 - Estimation - I (51:42) 33 - Estimation - II (50:38) 34 - Project Quality Management (58:32) 35 - Quality Management Systems - I (54:43) 36 - Quality Management Systems (54:53) 37 - Project Configuration Management (53:00) 38 - Project Risk Management (56:04) 39 - Other PM Processes (55:41) Here are the details of the videos: 1. Introduction to Software Engineering (52:21) http://nptel.iitm.ac.in/video.php?subjectId=106101061 2. Introduction to Software Engineering (52:55) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Waterfall Model for Development • Deliverables in Waterfall Model • Cost/Effort Distribution • Shortcomings of Waterfall Model • Prototyping Model • Prototyping • Limitations of Prototyping • Iterative Development • Spiral Model • Project Management Process • Project Planning • Project Monitoring and Control v
  • 6.
    Zarko Acimovic 3. Overview of Phases in Software Development (57:22) http://nptel.iitm.ac.in/video.php?subjectId=106101061 4. Overview of Phases in Software Development (57:03) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Structured Analysis • Structured Methodology • Requirement Specification Format • System Design • Alternatives • Design goals • System Architecture • Structure Chart • Structure Chart Notation • OO Approach • Design Document Format • Detailed Design • Implementation Phase • Operations & Maintenance • Summary 5. Requirements Engineering / Specification (56:39) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Objectives • Requirements engineering • What is a requirement? • Requirements abstraction (Davis) • Types of requirement • Requirements Audience • Functional and non-functional requirements • Functional requirements • The LIBSYS system • Examples of functional requirements • Requirements imprecision • Requirements completeness and consistency • Non-functional requirements • Non-functional classifications • Non-functional requirement types • Non-functional requirements examples • Goals and requirements • Examples • User requirements • Problems with natural language • LIBSYS requirement • Editor grid requirement vi
  • 7.
    Software Defects PreventionTechniques – Example Project • Requirement problems • Structured presentation • Guidelines for writing requirements • System requirements • Requirements and design • Alternatives to NL specification • Structured language specifications • Form-based specifications • Tabular specification • Graphical models • PDL interface description • The requirements document • IEEE requirements standard 6. Formal Specification (51:44) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Natural Language Requirement Specification • Problem Statement • The Need for Formal Specification • Formal methods • Acceptance of formal methods • Use of formal methods • Specification in the software process • Specification techniques • Formal specification languages • Use formal specification • Development costs with formal specification • Properties of Formal Specifications • Library Example-Informal Statement • Library Example -- Formalization • Library Example -- Formalization - 2 • Library Example -- Prove Correctness • Specification Types • Interface specification • Sub-system interfaces • Behavioral specification • Key points 7. Algebraic Specification Methods (57:34) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Disadvantages of NL specifications • Another Perspective - Dangers of Physical Representations in Analysis • Towards Abstraction • What does a Abstract Data Type (ADT) consist of?7:29 • What about Post Conditions? vii
  • 8.
    Zarko Acimovic • Algebraic Manipulation using Axioms • Abstract Math to Concrete realizations • ADTs and Information Hiding • Completeness of Specification • Definition: sufficient completeness • ADT Consistency 8. Systems Modeling Overview (59:38) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Model types • Context models • The context of an ATM system • Process models • Behavioral models • Order processing DFD • Microwave oven model • Microwave oven state description • Microwave oven stimuli • Microwave oven state description • Microwave oven stimuli • Microwave oven operation • Semantic data models • Library semantic model • Data Dictionary Entries • Object models • Inheritance models • Multiple inheritance • Object aggregation • Object behavior modeling • Structured methods 9. Process Modeling - DFD , Function Decomposition (56:28) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • ER MODEL • ENTITY • ENTITY SET • ATTRIBUTE • DOMAIN • PRIMARY KEYS • EXAMPLE : A COLLEGE • RELATIONSHIP • RELATIONSHIP SET • DEPICTING A RELATIONSHIP • PRIMARY KEY FOR REPATIONSHIPS • RELATIONSHIP CARDINALITY viii
  • 9.
    Software Defects PreventionTechniques – Example Project 10. Process Modeling - DFD, Function Decomposition (53:23) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • RELATIONSHIP CARDINALITY • EXISTENCE DEPENDENCE • TERNARY RELATIONSHIPS • WEAK ENTITY • EXTENDED E-R MODEL • Generalization 11. Data Modeling - ER Diagrams, Mapping (1:00:55) • Generalization • Specialization • Inheritance • Aggregation • Process Model • Function Decomposition • FD Diagrams: Examples 12. Data Modeling - ER Diagrams, Mapping (58:08) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Data Flow Diagram (DFD) • DFD Notation • Context Diagram • Process Refinement • Physical DFD • Showing Boundaries • DFD Example 1: Payroll • DFD Example 2: Old Car Mart • DFD Example Old Car Mart • Example 3: Book Supplier • Book Supplier: Exploding Process 2 • Book Supplier : homework 13. Production Quality Software - Introduction (53:04) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Software construction then and now • Software Crisis (Late 1980s) • More perspective on the Software Crisis • Brian Russell's Laws of Software Relativity • Properties of Failing software • Common Error in Managing the Process ix
  • 10.
    Zarko Acimovic • Software Maintenance • Quality Factors for Software • Quality Factors • Quality Factors - contd. • Quality Factors • Keys to achieving Structural Quality • What ls Abstraction? • Abstraction • Abstraction Techniques • Encapsulation • Modules • Desirable Characteristics - Weak Coupling • Information Hiding • Protocol Vs Behavior • IH and Abstraction • Factorization and Specialization • Inclusion • Benefits of Inheritance • Uses for inheritance 14. Software Design - Primary Consideration (1:04:43) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • What's Design? • Example Designs in Real Life • Programs • Example Designs in Real Life • Design in Software Engineering • Examples of Process Design • What is covered in Product Design? • From Analysis to Design • Factors To be considered in Design • Factors to be considered in Design • Process of Complex System Design • Top-down Vs. Bottom-up Approach • Decomposition • Composition/Interconnection • Basic Principles To be applied during design • Abstraction • Example Abstractions • Describing Abstractions • Encapsulation • Refinement • Refinement and Change Process • Communication • Other Kinds of Communication x
  • 11.
    Software Defects PreventionTechniques – Example Project 15. Design Patterns (56:13) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Reuse in Software Engineering • Patterns in Software Engineering • Design Patterns • Describing a Design Pattern • Pattern Description Template provided by • Classification of Patterns • Examples of Creational Patterns • Behavioral Patterns • A Problem • The Solution • The Design Pattern: Prototype • Singleton Pattern • Implementing Singleton • Adapter Pattern • Composite Pattern • The Solution • Instance Structure for an Instance of a Composite Class • The Composite Pattern • The Facade Pattern • How to interact with components with a subsystem? • The Facade Pattern • Proxy Pattern: A Mechanic for Communication • Real object and Proxy object are different • The Proxy Pattern • The Decorator Pattern: Object Diagram • Visual Component • The Template Method Pattern • Strategy Pattern 16. Class and Component Level Design (54:34) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Class • Example Classes • Kinds of Classes • Levels of Abstraction • Beck and Cunningham's CRC Method • CRC: our recommendation • A system decomposed in CRCs • Contributions of CRC • Bertrand Meyer' Design-by-Contract • Design by Contact Method • Contracts • An Example Contact for class Book • A Contact Specification xi
  • 12.
    Zarko Acimovic • Class Design • Part-Whole Design • Odell's Classification Criteria • Component-Integral Object • Material-Object (made of) • Portion-Object • Place-Area • Member-Bunch • Member-Partnership • Non-aggregation relations • Transitivity in Part-Whole • Two Kinds of Part-whole Relations in UML • Designing New Subclasses From Old: Inheritance • Use of Inheritance in a Subclass • Components • Use of Inheritance in a Subclass • Components • Design of Components • Decisions about component's non-functional properties • Reuse in Component Technologies 17. Architectural Design (59:28) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Software Architecture • Why Do We need Architecture? • Basic Principles applied by Architects • Several Approaches to Architecture • The Zachman Framework • Open Distributed Processing Reference Model (ODP-RM) • ODP: Enterprise viewpoint • ODP: Information viewpoint • ODP: Computational viewpoint • ODP: Computation viewpoint • ODP: Engineering viewpoint • ODP: Transparencies • ODP: Transparencies Defined • 4+1 View Model • Unified Process Model of Architecture • Commonly occurring Architectural Patterns • Layers • Peers • Client-server • Pipelines • Transactional Flows • Filters • Blankboards xii
  • 13.
    Software Defects PreventionTechniques – Example Project • Facade • Broker • MVC • Microkernel • Framework Architectures • A Framework • References/Readings 18. Software Testing - I (55:39) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Why Testing? • A Test Case • What criteria to use? • Black Box Testing • White Box Testing • Levels of Testing • Stub Modules • Test Drivers • Test Drivers during Partial Integration • Testing Modules with Top Down Integration • Testing Modules with Bottom Up Integration • Regression Testing • Monitoring Behavior of Programs • Documentation Probes • Standard Error Probes and Exceptions (user defined) • Assertions for defensive programming • Different Types of Assertions • IS the output of a test correct? • Test Objectives • Alpha testing and Beta testing • Debugging • Testing In Software Development 19. Software Testing - II (51:18) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Black box vs. white box testing • Black Box Testing (External) • White Box Testing (Internal) • Statement Coverage • An Example for Statement Coverage • Observations • An Example for Statement Coverage • Observations • Implicit statements xiii
  • 14.
    Zarko Acimovic • Basic Path Testing • A Sequential Composition • A Branching Statement • A While Statement • A Repeat Statement • A Switch Case Statement • A Compound Condition • Cyclomatic Complexity • Cyclomatic Complexity Example • Condition Testing • Condition Testing Strategies • Data Flow Testing Strategies • Exercise: Try different strategies on the below program 20. Structural Programming and Some implementation (45:05) http://nptel.iitm.ac.in/video.php?subjectId=106101061 21. Software Metrics and Quality (54:51) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Why Measurement? • Use of Software Measurement • The attributes that can be captured • Which one is a good measure? • What to measure in software? • Measurement Scales • Ordinal Scale • Interval Scale • Ratio Scale • Absolute Scale • Size Metrics • Length • Functionality • Complexity • Measuring Structure • Coupling and cohesion • Object Oriented Metrics: CK and MOOD • Quality Guidelines for Coding and Development • Defensive Programming for Modules, Functions, Procedures, Classes • Preconditions • Invariants • Use of Software Measurement • Separate Compilation • Makefile • Separate Compilation xiv
  • 15.
    Software Defects PreventionTechniques – Example Project • Makefile • A Sample Makefile • Code organization • Development • Some good practices 22. Verification and Validation (52:43) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Verification vs validation • The V & V process • V & V goals • V & V confidence • Static and dynamic verification • Program testing • Types of testing • Testing and debugging • The debugging process • V & V planning • V-model of development • The Structure of a software test plan • Software inspections • Inspection success • Inspections testing • Program inspections • Inspection pre-conditions • Inspection procedure • Inspection Roles • Inspection Checklists (2) • Inspection Checklists (3) • Inspection rate • Automated static analysis • Static Analysis Checks • Stages of static analysis • LINT static analysis • Verification and formal methods • Arguments for formal methods 23. Case Study (54:55) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Case study: library book circulation system • BOOK CIRCULATION • STATEMENT OF PROJECT SCOPE AND OBJECTIVES • THE FEASIBILITY STUDY: CIRCULATION • Financial analysis for alternatives 1 : • Alternatives 2 • Plan for alternatives 1 xv
  • 16.
    Zarko Acimovic • Feasibility ... • Requirements Analysis • Circulation System • Draw first level DFD • Requirements Analysis 24. Case Study (58:39) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Requirements Analysis... • Refinement of issue process • Requirements Analysis... • Requirements Specification... • SRS ... • System Design: CIRCULATION • System Design ... • System Design • E-R DIAGRAM • System Design ... • Table Design • Physical DB Design • Physical DB Design... • Physical DB Design... • System Design ... • Software Architecture • Software Architecture... • Implementation Schedule • Implementation Schedule... • Design documentation • Detailed Design • Data and Module Specification • Module ... • Implementation 25. Software Evolution (55:41) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Software Change • Software change control • Software change strategies • Program evolution dynamics • Laws of Program Evolution • Applicability of Lehman's laws • Software maintenance • Maintenance is inevitable • Causes of maintenance • Distribution of maintenance effort xvi
  • 17.
    Software Defects PreventionTechniques – Example Project • Types of Maintenance • Breakup of costs • Spiral maintenance model • Maintenance costs • Maintenance costs factors • Problems facing Maintainers • Approaches to Maintenance • The Change process • Change requests • Change implementation • Maintenance prediction • Change prediction • Complexity metrics • Process metrics 26. Agile Development (55:33) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Objectives • Requirements • Characteristics of Agile Processes • An iterative development process • Advantages of incremental development • Problems with incremental development • Prototyping • Software prototyping • Benefits of prototyping • Throw -away prototypes • Incremental Development & Prototyping • Conflicting objectives • Agile methods • Principles of Agile Methods • Problems with agile methods • Extreme programming • The Four Core Values of XP • Communication • Feedback • Courage • The XP release cycle • XP Practices • XP Practices - 2 • XP and agile principles • Requirements scenarios • Story Card for document downloading • XP Design Guidelines • XP and change • Testing in XP • Task cards for document downloading xvii
  • 18.
    Zarko Acimovic • Test Case Description • Test- first development • Pair programming • XP Summary 27. Software Reuse (53:43) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Design with Reuse • Objectives • Software reuse • Benefits of reuse • Requirements for design with reuse • Reuse problems • Generator-based reuse • Types of program generator • Reuse through program generation • Component-based development • Components • Component abstractions • CBSE processes • An opportunistic reuse process • Development with reuse • CBSE problems • Application frameworks • Framework classes • Extending frameworks 28. Reuse Continued (57:07) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Application frameworks • Framework classes • Extending frameworks • Evaluating Frameworks • Framework evaluation criteria • Evaluating Frameworks • COTS product reuse • Integration Approaches • Examples of COTS muse • COTS system integration problems • Component development for reuse • Reusable components • Re-usability enhancement xviii
  • 19.
    Software Defects PreventionTechniques – Example Project • Generalization Techniques • Generating good mental Models • Application families • Application family specialization • Inventory management systems • Application family architectures • A library system • Library system • Family member development • Design patterns • The Observer pattern 29. Introduction to Project Management (52:36) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • What is Project Management ? • Who Executes a Project? • An Effective PM Needs to Do the Following: • Productivity Gains With Standards and Procedures • Software Process is a Part of Organizational Process • Software Project Phases and Activities • Software Development Strategies at a Glance • Project Management Process Groups: Schematic • Illustration: Interaction Within and Across Project • Software Development Methodology: Schematic • PMBOK (2000) • Framework for Project Management • PMI Developed Code Of Ethics (1/2) • Impact of Good Project Management • Software Project Management • Suggested Readings 30. Project Scope Management (1:08:45) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Scope Management Subprocesses • Illustrative Comparison of Projects • Another Way of Comparing Projects: • PM Must Question ALL Aspects of a Project • Illustration: Stakeholder Analysis xix
  • 20.
    Zarko Acimovic • Illustration: Objectives of a Hospital IS • Illustration: Project Charter (1/3) • Illustration: Project Charter (2/3) • Illustration: Project Charter (3/3) • Illustration: WBS Organized by phases • Summary: Scope management Subprocesses 31. Project Time Management (56:51) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Project Time Management Subprocesses • WBS to Precedence Relationship • Precedence Diagramming Method (PDM): Types of Dependencies • Illustration: PDM Network • Illustration: Arrow Diagramming Method (ADM) Network • Precedence Relationship to Schedule • Schedule Development Preferences • Illustration of a Schedule • Software Support for Project Management • Summary: Time Management Process 32. Estimation - I (51:42) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Estimation is an Ongoing Activity • Stages in Project Estimation • Estimation Approaches • PERT Sizing Approach to Estimation • Estimation: Levels of Application • Function Point Counting Procedure • Components of FP Count • FP for Average Complexity Functions 33. Estimation - II (50:38) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Marketing MIS: data flow diagram • General Systems Characteristics (GSCs) • Value Adjustment Factor (VAF) • GSC and FPC: Marketing MIS • Marketing MIS: Cost and Price xx
  • 21.
    Software Defects PreventionTechniques – Example Project • COnstructive COst MOdel (COCOMO): Intd. • Marketing MIS Modules • Marketing MIS: Pert sizing • COCOMO Equations • COCOMO Cost Drivers (1/2) • COCOMO Cost Drivers (2/2) • Cost Driver Effort Multipliers • Effort Multipliers: Marketing MIS • Marketing MIS: COCOMO Calculations • Effort and Schedule Distribution by Phase (%) • Marketing MIS: Phase Effort and Schedule • Network Precedence: Marketing MIS • Effort Distribution by Activity: Marketing MIS • Critical Path marketing MIS • Gantt Chart/Histogram:Marketing MIS 34. Project Quality Management (58:32) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Definitions of Quality (1/2) • Definitions of Quality (2/2) • Quality Management Gurus • Modern Quality Management Emphasizes on: • Project Quality Management Subprocess • Quality Policy • Strategic Planning for Quality • Quality Characteristics: Illustration • Boehm's Description of Quality • Quality Measurements are Used for: • Illustration: Template for Usability • Quality Benchmarking • Cost of Quality • Quality Planning Process: Outputs • What is Quality Assurance? • Main Goals of Quality Assurance: • Role of QA During Development (1/2) • VV&T Activities in SW Project (1/3) • VV&T Activities in SW Project (2/3) • VV&T Activities in SW Project (3/3) • Opportunity for Improvement (OFI) • Who Identifies OFI? • Improvement in Practice and Documentation • Quality Control Process • QC is Performed... • Pareto Chart: Illustration • Control Chart: Schematic xxi
  • 22.
    Zarko Acimovic 35. Quality Management Systems - I (54:43) http://nptel.iitm.ac.in/video.php?subjectId=106101061 36. Quality Management Systems (54:53) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Who is a Process? • Process Capability and Maturity • Concept of Maturity Level • Capability Maturity Models (CMM) • Some of the Existing CMMs • Capability Maturity Model Integrated (CMMI) • CMMI ls Tailorable • Staged Model: Maturity Levels • Maturity level Structure • Structure of Staged Representation • PA Level 2 • PA Level 3 • PA Level 4 • PA Level 5 • Process Visibility with levels • Process Capability with Levels • Continuous Representation • Structure of Continuous Representation • PAs in Staged Representation • Capability and Maturity levels • Progression in Staged model • Progression in Continuous model • When to chose continuous Representation? • implementation Road Map 37. Project Configuration Management (53:00) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Change Control System: Schematic • What is Configuration Management(CM)? • CM Functions • Typical Application Specific Cls • Versioning of Cls • Concept of Baseline • Configuration Control • Change Control Procedure (1/2) • Change Control Procedure (2/2) • Configuration Status Accounting • Configuration Audit • Configuration Management Plan • xxii
  • 23.
    Software Defects PreventionTechniques – Example Project 38. Project Risk Management (56:04) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Project Risk Management Processes • Risk Management Planning Process • Risk Manage. Planning Process: Outputs • Risk identification Process Involves: • Risk Analysis Processes • Qualitative Risk Analysis Process • Illustration: Risk Impact Rating Table • Impact, Frequency, and Risk Exposure • Illustration: Quantitative Risk Analysis • Risk Response Planning Process (2/2) • Lessening the Risks • Contingency Actions • Risk Monitoring and Control Process • Illustration: Tracking The Top 10 Risks 39. Other PM Processes (55:41) http://nptel.iitm.ac.in/video.php?subjectId=106101061 • Other Project Management Processes • Project Cost Management Processes • Illustration: Cost Budget (1/2) • Illustration: Cost Budget (2/2) • Human Resource Management Processes • Impact of Organization Structure on Projects • Typical Software Project Organization • Software Development Responsibilities Need to be shared by all stakeholders • Illustration: Responsibility Assignment Matrix • Project Communications Management Processes • Illustration: Stakeholder Communications Analysis • Project Reporting and Review: Schematic • Administrative Closure Process Covers: • Administrative Closure Process Outputs • Project Procurement Management Processes • Project Integration Management Involves: • Outputs from Project Plan Process: Uses • Objectives of Overall Change Control Process • Integrated Change Control Involves: • Organizational Learning • Role of PM • Important Skills for Project Manager • Engineers vs. Managers xxiii
  • 24.
    Zarko Acimovic 2 AUTOMATIC TOOLS FOR DEFECT PREVENTION Prototyping (modeling) defect prevention method has efficiency 52%. Before implementing this method defect potential per 1 FP (function point) was 5, after, 2.4. Tool: ArgoUML Static analysis of source code defect prevention method has efficiency 44%. Defect potential per 1 FP was 5, after implementing this method is 2.8. Tool: Coverity Mathematical test case design defect prevention efficiency was 34%. Defect potential per 1 FP is 5, after is 3.3. Tool: Bullseye Bonus: Root cause analysis 1044-1993 - IEEE Standard Classification for Software Anomalies. Efficiency 41% - Before 5 – After 2.95 Source: Chapter 3. Estimating and Measuring Software Quality. The Economics of Software Quality, ISBN: 9780132564762 , Capers Jones, Olivier Bonsignour http://www.amazon.com/Economics-Software-Quality-Capers-Jones/dp/0132582201 http://www.informit.com/store/product.aspx?isbn=0132582201 3 TOOLS FOR DEFECT PREVENTION IN JAVA SOFTWARE PROJECTS Source: http://codedependents.com/2009/07/01/top-5-static-analysis-plugins-for-eclipse/ Code Coverage tool EclEmma http://www.eclemma.org/ Byte Code Analysis FindBugs http://findbugs.sourceforge.net/ Code Complexity Analysis http://www.stateofflow.com/projects/16/eclipsemetrics Dependency Analysis JDepend4Eclipse http://andrei.gmxhome.de/jdepend4eclipse/ Source Code Analysis PMD http://pmd.sourceforge.net/ xxiv
  • 25.
    Software Defects PreventionTechniques – Example Project 4 SAMPLE PROJECT SPECIFICATION Project duration 3 months, single developer , 5000 lines of code (including comments), 15 Java 2 Micro Edition classes Tools used: Sun J2ME Wireless Toolkit, Eclipse, IBM WebSphere Device Developer 5.5, CVS, Motorola and Nokia phone emulators and SDKs. Technology: J2ME, MIDP 2.0, CLDC 1.1. Device-independent Java 2 Micro Edition (J2ME) midlet, executable in any emulator or mobile device, for displaying map with scale, following moving objects, zoom in-out and pan, selection of location , measuring distance, following individual or vehicle on map with route presentation, presentation of waypoints on map, presentation of list of existing waypoints (sorted by name, type, distance) for selecting destination or editing and deletion, creating, editing and deletion of waypoint – points with coordinates, name, type, icon; coordinates are defined by current position, selected location on map or inserted in textual form, selection of waypoint as destination and navigation towards that destination. Some classes implemented: MapBackground, MapObject, Point, SelectorPoint, PVector, MapsMIDlet Project demo web site: https://sites.google.com/site/j2memaps/ 5 PMD, FINDBUGS AND STATEOFFLOW VIOLATIONS IN SOURCE CODE Here are the violations detected in CommaHyphenString.java Description/ Line/ Type of tool xxv
  • 26.
    Zarko Acimovic Description Line Type All classes and interfaces must belong to a named package 9 PMD Marker Unused field: CommaHyphenString.lastIndex 12 FindBugs Use explicit scoping instead of the default package private level 12 PMD Marker Document empty constructor 13 PMD Marker Lines of Code in Method is 27 16 Metrics Marker Number of Statements is 28 16 Metrics Marker Avoid variables with short names like s 19 PMD Marker Parameter 's' is not assigned and could be declared final 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Local variable 'lastIndex' could be declared final 20 PMD Marker Avoid variables with short names like ss 22 PMD Marker A method should have only one exit point, and that should be the last statement in the method 24 PMD Marker Avoid variables with short names like v 27 PMD Marker Consider replacing this Vector with the newer java.util.List 27 PMD Marker Local variable 'v' could be declared final 27 PMD Marker Use ArrayList instead of Vector 27 PMD Marker Avoid variables with short names like ss 35 PMD Marker Lines of Code in Method is 16 44 Metrics Marker Avoid variables with short names like s 47 PMD Marker Parameter 's' is not assigned and could be declared final 47 PMD Marker Use explicit scoping instead of the default package private level 47 PMD Marker Avoid using if statements without curly braces 53 PMD Marker CommaHyphenString.getStringsOnly(String) concatenates strings using + in a loop 54 FindBugs Prefer StringBuffer over += for concatenating strings 54 PMD Marker Parameter 's' is not assigned and could be declared final 65 PMD Marker Use explicit scoping instead of the default package private level 65 PMD Marker Here is the CommaHyphenString.java source code 1 /** 2 * 3 * CommaHyphenString parses .properties file. It eliminates commas or low lines 4 * from .properties file so items in it( such as categories) could be properly 5 * showed on screen 6 */ 7 import java.util.*; 8 9 public class CommaHyphenString { 10 11 //String s; 12 int lastIndex; 13 CommaHyphenString(){} 14 15 16 /** Eliminates commas, returns array of strings with low line xxvi
  • 27.
    Software Defects PreventionTechniques – Example Project 17 * @return String[] 18 */ 19 String[] getWithLowLine(String s) { 20 int lastIndex = defineLast(s); 21 if(lastIndex==0){ 22 String[] ss = new String[1]; 23 ss[0] = s; 24 return ss; 25 } else { 26 int start = -1; 27 Vector v = new Vector(); 28 int current = s.indexOf(','); 29 do { 30 v.addElement(s.substring(start+1,current)); 31 start = current; 32 current = s.indexOf(',',current+1); 33 } while (start!=lastIndex); 34 35 String[] ss = new String[v.size()+1]; 36 for(int i=0; i<v.size(); i++){ 37 ss[i] = (String)v.elementAt(i); 38 } 39 ss[v.size()] = s.substring(lastIndex+1,s.length()); 40 return ss; 41 } 42 } 43 44 /** Eliminates low line 45 * @return String[] 46 */ 47 String[] getStringsOnly(String s){ 48 String[] temp = this.getWithLowLine(s); 49 for (int i=0; i<temp.length; i++){ 50 char[] tempChar = temp[i].toCharArray(); 51 String k = ""; 52 for (int j=0; j<tempChar.length; j++){ 53 if(tempChar[j]=='_') tempChar[j]=' '; 54 k+=tempChar[j]; 55 } 56 temp[i] = k; 57 } 58 return temp; 59 } 60 61 62 /** Returns categories with low line 63 * @return String[] 64 */ 65 String[] getCategoriesHyphen(String s){ 66 return this.getWithLowLine(s); 67 } xxvii
  • 28.
    Zarko Acimovic 68 69 /** Returns categories 70 * @return String[] 71 */ 72 String[] getCategories(String s){ 73 return this.getStringsOnly(s); 74 } 75 76 /** Defines index of last comma in string 77 * @return integer 78 */ 79 public int defineLast(String s){ 80 int lastIndex = 0; 81 char c[] = s.toCharArray(); 82 for (int i=0; i<c.length; i++){ 83 if(c[i]==',') lastIndex=i; 84 } 85 return lastIndex; 86 } 87 88 } CompassCanvas.java violations xxviii
  • 29.
    Software Defects PreventionTechniques – Example Project All classes and interfaces must belong to a named package 10 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 75% 10 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 1,668% 10 Metrics Marker Number of Fields is 23 10 Metrics Marker The class 'CompassCanvas' has a Cyclomatic Complexity of 6 (Highest = 17). 10 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 10 PMD Marker Too many fields 10 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 11 PMD Marker Use explicit scoping instead of the default package private level 11 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 12 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 13 PMD Marker Use explicit scoping instead of the default package private level 13 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 14 PMD Marker Use explicit scoping instead of the default package private level 14 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 15 PMD Marker Use explicit scoping instead of the default package private level 15 PMD Marker Avoid variables with short names like c 18 PMD Marker Unused field: CompassCanvas.c 18 FindBugs Avoid variables with short names like t 20 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 20 PMD Marker Unread field: CompassCanvas.switchVar 22 FindBugs Unread field: CompassCanvas.switched 23 FindBugs It is a good practice to call super() in a constructor 38 PMD Marker Lines of Code in Method is 24 38 Metrics Marker Number of Statements is 33 38 Metrics Marker Parameter 'mob' is not assigned and could be declared final 38 PMD Marker Avoid empty catch blocks 53 PMD Marker Avoid empty catch blocks 57 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 59 PMD Marker Avoid really long methods. 63 PMD Marker Avoid variables with short names like g 63 PMD Marker Cyclomatic Complexity is 10 63 Metrics Marker Lines of Code in Method is 220 63 Metrics Marker Number of Statements is 418 63 Metrics Marker Parameter 'g' is not assigned and could be declared final 63 PMD Marker The method 'paint' has a Cyclomatic Complexity of 17. 63 PMD Marker The method paint() has an NCSS count of 144 63 PMD Marker The method paint() has an NPath complexity of 4375 63 PMD Marker Avoid unnecessary comparisons in boolean expressions 68 PMD Marker xxix
  • 30.
    Zarko Acimovic CompassCanvas.java violations- continued Avoid unused local variables such as 'mediumX'. 122 PMD Marker Dead store to mediumX in CompassCanvas.paint(Graphics) 122 FindBugs The local variable mediumX is never read 122 Java Problem Avoid unused local variables such as 'mediumY'. 123 PMD Marker Dead store to mediumY in CompassCanvas.paint(Graphics) 123 FindBugs The local variable mediumY is never read 123 Java Problem Avoid unnecessary comparisons in boolean expressions 285 PMD Marker CompassCanvas.java source code 1 /** 2 * 3 * ComapssCanvas draws compass on screen 4 */ 5 import javax.microedition.lcdui.*; 6 //import javax.microedition.midlet.*; 7 8 9 10 public class CompassCanvas extends Canvas implements Runnable{ 11 long north; 12 long south; 13 long east; 14 long west; 15 int bigRadius; 16 int smallRadius; 17 int smallestRadius; 18 Coordinates c; 19 long delta = 0; 20 Thread t; 21 boolean end = false; 22 boolean switchVar = false; 23 boolean switched = false; 24 MapObjects mob; 25 26 int dummy1 = 0; 27 int dummy2 = 0; 28 int dummy3 = 0; 29 int dummy4 = 0; 30 Image img; 31 xxx
  • 31.
    Software Defects PreventionTechniques – Example Project 32 Image imgDest; 33 long destUp; 34 long destDown; 35 long gama; 36 37 38 CompassCanvas(MapObjects mob){ 39 this.mob = mob; 40 north = MathFP.toFP("0"); 41 south = MathFP.div(Coordinates.MathFP_2PI,MathFP.toFP("2")); 42 east = MathFP.mul(Coordinates.MathFP_2PI,MathFP.toFP("0.25")); 43 west = MathFP.mul(Coordinates.MathFP_2PI,MathFP.toFP("0.75")); 44 45 destUp = MathFP.toFP("0"); 46 destDown = MathFP.div(Coordinates.MathFP_2PI,MathFP.toFP("2")); 47 48 bigRadius = Math.min(this.getWidth(),this.getHeight()); 49 smallRadius = (int)(0.75*bigRadius); 50 smallestRadius = (int)(0.37*bigRadius); 51 try{ 52 img = Image.createImage("Arrow2.jpg"); 53 }catch(Exception e){} 54 55 try{ 56 imgDest = Image.createImage("Dest.jpg"); 57 }catch(Exception e){} 58 59 t = new Thread(this); 60 t.start(); 61 } 62 63 public void paint(Graphics g){ 64 //System.out.println("delta="+MathFP.toString(delta)); 65 g.setColor(255,255,255); 66 g.fillRect(0,0,this.getWidth(),this.getHeight()); 67 g.setColor(0,0,0); 68 if(end == false){ 69 g.drawImage(img,75,25,0); 70 71 //System.out.println("this.getWidth()="+this.getWidth()); 72 //System.out.println("this.getHeight()="+this.getHeight()); 73 g.drawArc(8,0,bigRadius,bigRadius,0,360); 74 g.drawArc(30,22,smallRadius,smallRadius,0,360); 75 76 String sx = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma thFP.sub(north,delta))))); xxxi
  • 32.
    Zarko Acimovic 77 String sy = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma thFP.sub(north,delta))))); 78 int ix = sx.indexOf('.'); 79 sx = sx.substring(0,ix); 80 int iy = sy.indexOf('.'); 81 sy = sy.substring(0,iy); 82 83 int x = Integer.parseInt(sx); 84 int y = Integer.parseInt(sy); 85 86 String s9 = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.sin(MathFP.sub(north,delta))))); 87 ix = s9.indexOf('.'); 88 s9 = s9.substring(0,ix); 89 int NX = Integer.parseInt(s9); 90 String s10 = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.cos(MathFP.sub(north,delta))))); 91 iy = s10.indexOf('.'); 92 s10 = s10.substring(0,iy); 93 int NY = Integer.parseInt(s10); 94 95 g.drawString("N",x,y,0); 96 97 sx = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma thFP.sub(south,delta))))); 98 sy = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma thFP.sub(south,delta))))); 99 ix = sx.indexOf('.'); 100 sx = sx.substring(0,ix); 101 iy = sy.indexOf('.'); 102 sy = sy.substring(0,iy); 103 104 x = Integer.parseInt(sx); 105 y = Integer.parseInt(sy); 106 107 String s11 = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.sin(MathFP.sub(south,delta))))); 108 ix = s11.indexOf('.'); 109 s11 = s11.substring(0,ix); 110 int SX = Integer.parseInt(s11); 111 String s12 = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.cos(MathFP.sub(south,delta))))); 112 iy = s12.indexOf('.'); 113 s12 = s12.substring(0,iy); xxxii
  • 33.
    Software Defects PreventionTechniques – Example Project 114 int SY = Integer.parseInt(s12); 115 116 117 118 g.drawString("S",x,y,0); 119 int del = 0; 120 g.drawLine(NX-del,NY-del,SX-del,SY-del); 121 122 int mediumX = (int)Math.abs((NX-SX)/2); 123 int mediumY = (int)Math.abs((NY-SY)/2); 124 125 String s1 = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(10),MathFP.sin(Ma thFP.sub(east,delta))))); 126 String s2 = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(10),MathFP.cos(Ma thFP.sub(east,delta))))); 127 128 String s3 = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(10),MathFP.sin(Ma thFP.sub(west,delta))))); 129 String s4 = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(10),MathFP.cos(Ma thFP.sub(west,delta))))); 130 131 ix = s1.indexOf('.'); 132 s1 = s1.substring(0,ix); 133 dummy1 = Integer.parseInt(s1); 134 135 ix = s2.indexOf('.'); 136 s2 = s2.substring(0,ix); 137 dummy2 = Integer.parseInt(s2); 138 139 ix = s3.indexOf('.'); 140 s3 = s3.substring(0,ix); 141 dummy3 = Integer.parseInt(s3); 142 143 ix = s4.indexOf('.'); 144 s4 = s4.substring(0,ix); 145 dummy4 = Integer.parseInt(s4); 146 147 g.drawLine(NX-del,NY-del,dummy1,dummy2); 148 g.drawLine(dummy1,dummy2,SX-del,SY-del); 149 g.drawLine(NX-del,NY-del,dummy3,dummy4); 150 g.drawLine(dummy3,dummy4,SX-del,SY-del); 151 152 sx = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma thFP.sub(east,delta))))); xxxiii
  • 34.
    Zarko Acimovic 153 sy = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma thFP.sub(east,delta))))); 154 ix = sx.indexOf('.'); 155 sx = sx.substring(0,ix); 156 iy = sy.indexOf('.'); 157 sy = sy.substring(0,iy); 158 159 x = Integer.parseInt(sx); 160 y = Integer.parseInt(sy); 161 162 g.drawString("E",x,y,0); 163 164 sx = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(75),MathFP.sin(Ma thFP.sub(west,delta))))); 165 sy = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(75),MathFP.cos(Ma thFP.sub(west,delta))))); 166 ix = sx.indexOf('.'); 167 sx = sx.substring(0,ix); 168 iy = sy.indexOf('.'); 169 sy = sy.substring(0,iy); 170 171 x = Integer.parseInt(sx); 172 y = Integer.parseInt(sy); 173 174 g.drawString("W",x,y,0); 175 176 177 178 179 gama = MathFP.sub(delta,gama); 180 //gama = MathFP.toFP("314"); 181 long gamaDegrees = Coordinates.radiansToDegrees(gama); 182 //long gamaDegrees = gama; 183 //System.out.println("gama="+MathFP.toString(gamaDegrees)); 184 //gama = Coordinates.degreesToRadians(gama); 185 186 long corrX = MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),MathFP.sin(MathFP .sub(destUp,gama)))); 187 long corrY = MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),MathFP.cos(MathFP .sub(destUp,gama)))); 188 189 long dx = 0; 190 long dy = 0; 191 xxxiv
  • 35.
    Software Defects PreventionTechniques – Example Project 192 if(gamaDegrees<=0) { 193 gama = MathFP.add(gama,Coordinates.MathFP_2PI); 194 gamaDegrees = MathFP.add(gamaDegrees,MathFP.toFP("360")); 195 } 196 197 // Correction of position for imgDest 198 if(MathFP.toFP("0")<=gamaDegrees && gamaDegrees <MathFP.toFP("10")){ 199 dx = 0- MathFP.mul(MathFP.toFP("10"),MathFP.cos(gama)); 200 dy = 0- MathFP.mul(MathFP.toFP("23"),MathFP.cos(gama)); 201 } 202 203 204 if(MathFP.toFP("10")<=gamaDegrees && gamaDegrees <MathFP.toFP("50")){ 205 dx = 0- MathFP.mul(MathFP.toFP("25"),MathFP.cos(gama)); 206 dy = 0- MathFP.mul(MathFP.toFP("23"),MathFP.cos(gama)); 207 } 208 209 if(MathFP.toFP("50")<=gamaDegrees && gamaDegrees <MathFP.toFP("67")){ 210 dx = 0- MathFP.mul(MathFP.toFP("40"),MathFP.cos(gama)); 211 dy = 0- MathFP.mul(MathFP.toFP("30"),MathFP.cos(gama)); 212 } 213 214 if(MathFP.toFP("67")<=gamaDegrees && gamaDegrees <MathFP.toFP("85")){ 215 dx = 0- MathFP.mul(MathFP.toFP("25"),MathFP.sin(gama)); 216 dy = 0- MathFP.mul(MathFP.toFP("12"),MathFP.sin(gama)); 217 } 218 219 if(MathFP.toFP("85")<=gamaDegrees && gamaDegrees<MathFP.toFP("175")){ 220 dx = 0- MathFP.mul(MathFP.toFP("25"),MathFP.sin(gama)); 221 dy = 0- MathFP.mul(MathFP.toFP("12"),MathFP.sin(gama)); 222 } 223 224 xxxv
  • 36.
    Zarko Acimovic 225 if(MathFP.toFP("175")<=gamaDegrees && gamaDegrees<MathFP.toFP("275")){ 226 dx = MathFP.mul(MathFP.toFP("7"),MathFP.cos(gama)); 227 dy = MathFP.mul(MathFP.toFP("7"),MathFP.sin(gama)); 228 } 229 230 if(MathFP.toFP("275")<=gamaDegrees && gamaDegrees<=MathFP.toFP("360")){ 231 dx = 0- MathFP.mul(MathFP.toFP("8"),MathFP.cos(gama)); 232 dy = 0- MathFP.mul(MathFP.toFP("25"),MathFP.cos(gama)); 233 234 } 235 236 237 238 239 long prevCorrX=corrX; 240 long prevCorrY=corrY; 241 242 corrX = MathFP.add(corrX,dx); 243 corrY = MathFP.add(corrY,dy); 244 245 246 247 sx = MathFP.toString(corrX); 248 sy = MathFP.toString(corrY); 249 ix = sx.indexOf('.'); 250 sx = sx.substring(0,ix); 251 iy = sy.indexOf('.'); 252 sy = sy.substring(0,iy); 253 int xbear1 = Integer.parseInt(sx); 254 int ybear1 = Integer.parseInt(sy); 255 256 257 sx = MathFP.toString(prevCorrX); 258 sy = MathFP.toString(prevCorrY); 259 ix = sx.indexOf('.'); 260 sx = sx.substring(0,ix); 261 iy = sy.indexOf('.'); 262 sy = sy.substring(0,iy); 263 int xbear3 = Integer.parseInt(sx); 264 int ybear3 = Integer.parseInt(sy); 265 266 267 xxxvi
  • 37.
    Software Defects PreventionTechniques – Example Project 268 sx = MathFP.toString(MathFP.add(MathFP.toFP(93),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.sin(MathFP.sub(destDown,gama))))); 269 sy = MathFP.toString(MathFP.sub(MathFP.toFP(85),MathFP.mul(MathFP.toFP(smallestRadius),M athFP.cos(MathFP.sub(destDown,gama))))); 270 271 272 ix = sx.indexOf('.'); 273 sx = sx.substring(0,ix); 274 iy = sy.indexOf('.'); 275 sy = sy.substring(0,iy); 276 int xbear2 = Integer.parseInt(sx); 277 int ybear2 = Integer.parseInt(sy); 278 279 g.drawLine(xbear2,ybear2,xbear3,ybear3); 280 g.drawImage(imgDest,xbear1,ybear1,0); 281 } 282 } 283 284 public void run(){ 285 while(end == false){ 286 delta = mob.getDirection(); 287 gama = mob.getBearing(); 288 repaint(); 289 try{ 290 Thread.sleep(100); 291 }catch(Exception e){} 292 293 } 294 } 295 296 public void setEnd(){ 297 end = true; 298 } 299 300 } xxxvii
  • 38.
    Zarko Acimovic Coordinates.java violations All classes and interfaces must belong to a named package 9 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 100% 9 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 100% 9 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 100% 9 Metrics Marker Parameter 'latitude' is not assigned and could be declared final 38 PMD Marker Parameter 'longitude' is not assigned and could be declared final 38 PMD Marker Parameter 'original' is not assigned and could be declared final 47 PMD Marker Parameter 'latitude' is not assigned and could be declared final 74 PMD Marker Parameter 'longitude' is not assigned and could be declared final 82 PMD Marker Avoid variables with short names like to 92 PMD Marker Cyclomatic Complexity is 6 95 Metrics Marker Lines of Code in Method is 47 95 Metrics Marker Number of Statements is 47 95 Metrics Marker Local variable 'deltaLat' could be declared final 107 PMD Marker Avoid using if statements without curly braces 122 PMD Marker A method should have only one exit point, and that should be the last statement in the method 123 PMD Marker Avoid using if statements without curly braces 125 PMD Marker A method should have only one exit point, and that should be the last statement in the method 127 PMD Marker Avoid using if...else statements without curly braces 127 PMD Marker A method should have only one exit point, and that should be the last statement in the method 129 PMD Marker Avoid using if...else statements without curly braces 129 PMD Marker Avoid using if statements without curly braces 139 PMD Marker Avoid variables with short names like to 148 PMD Marker Coordinates.java source code 1 /** 2 * 3 * Coordinates class different performs geographical calculations 4 */ 5 6 7 8 //import net.jscience.math.MathFP; 9 public class Coordinates { 10 /** 11 * Earth's radius (in meters) 12 */ 13 public static final long EARTH_RADIUS = MathFP.toFP(6367000); 14 public static final long EARTH_RADIUS2 = MathFP.toFP(6367000*2); 15 /** 16 * the WGS-84 latitude of a location 17 */ xxxviii
  • 39.
    Software Defects PreventionTechniques – Example Project 18 private long latitude; 19 /** 20 * the WGS-84 longitude of a location 21 */ 22 private long longitude; 23 /** 24 * The altitude of the location in meters, defined as height above WGS-84 ellipsoid. Float.NaN can be used to indicate that the altitude is not known. 25 */ 26 27 28 /** 29 * Constructor 30 * @param latitude latitude as WGS-84 system coordinate 31 * @param longitude longitude as WGS-84 system coordinate 32 * @param altitude the altitude in meters, if known, or Float.NaN 33 * @param timestamp the time when information stored in this object was created, in milliseconds since midnight January 1, 1970 GMT, or -1 34 * @param source the short string describing where data contained in this object came from, like "GPS", "Network", "Database", etc 35 * @param horizontalAccuracy the horizontal accuracy of coordinates in meters, or Float.NaN 36 * @param verticalAccuracy vertical accuracy of coordinates in meters, or Float.NaN 37 */ 38 public Coordinates(long latitude, long longitude){ 39 this.latitude=latitude; 40 this.longitude=longitude; 41 } 42 43 /** 44 * Copy constructor 45 * @param original copied object 46 */ 47 public Coordinates(Coordinates original){ 48 this.latitude=original.latitude; 49 this.longitude=original.longitude; 50 } 51 52 53 /** 54 * The WGS-84 latitude of a location 55 * @return WGS-84 latitude 56 */ 57 public long getLatitude(){ 58 return latitude; 59 } 60 61 /** 62 * The WGS-84 longitude of a location 63 * @return WGS-84 longitude xxxix
  • 40.
    Zarko Acimovic 64 */ 65 public long getLongitude(){ 66 return longitude; 67 } 68 69 70 /** 71 * Set latitude as WGS-84 system coordinate. 72 * @param latitude latitude as WGS-84 system coordinate 73 */ 74 public void setLatitude(long latitude){ 75 this.latitude=latitude; 76 } 77 78 /** 79 * Set longitude as WGS-84 system coordinate. 80 * @param longitude longitude as WGS-84 system coordinate 81 */ 82 public void setLongitude(long longitude){ 83 this.longitude=longitude; 84 } 85 86 /** 87 * Calculate bearing to another location on the surface of the Earth, using the Great Circle. 88 * bearing - 1.way of behaving 2.connection 3.direction shown by compass 4.understanding of one's position 89 * @param to another point 90 * @return long representing angle in degrees [0,360) between corresponding meridian in first point and line on the Great Circle between those points 91 */ 92 public long bearing(Coordinates to){ 93 return bearing(getLatitude(), getLongitude(), to.getLatitude(), to.getLongitude()); 94 } 95 /** 96 * Calculate bearing between points (latFrom, lonFrom) and (latTo,lonTo) on the surface of the Earth, using the Great Circle. 97 * @param latFrom latitude of the first point 98 * @param lonFrom longitude of the first point 99 * @param latTo latitude of the second point 100 * @param lonTo longitude of the second point 101 * @return long representing angle in degrees [0,360) between corresponding meridian in first point and line on the Great Circle between those points 102 */ 103 protected static long bearing(long latFrom, long lonFrom, long latTo, long lonTo){ 104 //BMa: Some numeric with MathFP still happen - but error is mostly below 16 degrees xl
  • 41.
    Software Defects PreventionTechniques – Example Project 105 // This should be fixed only if the final target device stays without not have floats or doubles (e.g. it is not CLDC 1.1) 106 long bearing; 107 long deltaLat=latTo-latFrom; 108 long deltaLon=lonTo-lonFrom; 109 if (MathFP.abs(deltaLat)<MathFP_1 && MathFP.abs(deltaLon)<MathFP_1) { 110 // longiude and latitude distance within one deegre, could invent better condition 111 //This approximation works better for smaller distances 112 latFrom = degreesToRadians(latFrom); 113 deltaLon=MathFP.mul(deltaLon, MathFP.cos(latFrom)); 114 bearing = MathFP.atan2(deltaLat,deltaLon); 115 }else{ 116 latFrom = degreesToRadians(latFrom); 117 latTo = degreesToRadians(latTo); 118 lonFrom = degreesToRadians(lonFrom); 119 lonTo = degreesToRadians(lonTo); 120 121 122 if (latFrom==latTo && lonFrom==lonTo) 123 return 0; 124 //if (MathFP.cos(latFrom) < Double.MIN_VALUE) // Double.MIN_VALUE a small number ~ machine precision, so here we check for +/-0 125 if (MathFP.cos(latFrom) == 0 ) // Double.MIN_VALUE a small number ~ machine precision, so here we check for +/-0 126 if (latFrom > 0) 127 return MathFP.PI; // starting from N pole 128 else 129 return MathFP_2PI; // starting from S pole 130 //double bearing = radiansToDegrees(Math.atan2(Math.sin(lon2- lon1)*Math.cos(lat2),Math.cos(lat1)*Math.sin(lat2)- Math.sin(lat1)*Math.cos(lat2)*Math.cos(lon2-lon1))%(2*Math.PI)); 131 132 bearing = MathFP.atan2( 133 MathFP.mul(MathFP.sin(deltaLon),MathFP.cos(latTo)), 134 MathFP.mul(MathFP.cos(latFrom),MathFP.sin(latTo))- 135 MathFP.mul(MathFP.mul(MathFP.sin(latFrom),MathFP.cos(latTo)),MathFP.cos(deltaLon))) ; 136 } 137 bearing = MathFP.mod(radiansToDegrees(bearing), MathFP_360); 138 139 if (bearing<0) bearing = MathFP_360 + bearing; 140 return bearing; 141 } 142 143 /** 144 * Calculate distance to another location on the surface of the Earth, using the Great Circle. 145 * @param to another point xli
  • 42.
    Zarko Acimovic 146 * @return distance to another location in meters, using the line on the Great Circle 147 */ 148 public long distance(Coordinates to){ 149 //BMa: Some numeric with MathFP are still possible - errors happen sometimes 150 // This should be fixed only if the final target device stays without not have floats or doubles (e.g. it is not CLDC 1.1) 151 return calculateDistance(getLatitude(), getLongitude(), to.getLatitude(), to.getLongitude()); 152 } 153 154 /** 155 * Calculate distance between points (latFrom, lonFrom) and (latTo,lonTo) on the surface of the Earth, using the Great Circle. 156 * lat , lon - degrees ([-90, +90]; [-180, +180]) 157 * 158 * @param latFrom latitude of the first point 159 * @param lonFrom longitude of the first point 160 * @param latTo latitude of the second point 161 * @param lonTo longitude of the second point 162 * @return distance to another location in meters, using the line on the Great Circle 163 */ 164 public static long calculateDistance(long latFrom, long lonFrom, long latTo, long lonTo){ 165 /* 166 * d=2*asin(sqrt((sin((latFrom-latTo)/2))^2 + cos(latFrom)*cos(latTo)*(sin((lonFrom-lonTo)/2))^2)) 167 * or 168 * d=2*asin(sqrt((sin((latFrom-latTo)/2))^2 + cos(latFrom)*cos(latTo)*(sin((lonTo-lonFrom)/2))^2)) 169 * distance = R*d 170 */ 171 172 latFrom = degreesToRadians(latFrom); 173 latTo = degreesToRadians(latTo); 174 lonFrom = degreesToRadians(lonFrom); 175 lonTo = degreesToRadians(lonTo); 176 //long distance = R * MathFP.acos(MathFP.sin(latFrom)*MathFP.sin(latTo) + MathFP.cos(latFrom)*MathFP.cos(latTo)*MathFP.cos(lonTo-lonFrom)); 177 /* 178 double distance = R * 2 * Math.asin( 179 Math.sqrt( 180 Math.pow(Math.sin((lat1-lat2)/2), 2) 181 + 182 Math.cos(lat1)*Math.cos(lat2)*Math.pow(Math.sin((lon2-lon1)/2), 2) 183 ) 184 ); 185 */ xlii
  • 43.
    Software Defects PreventionTechniques – Example Project 186 187 /* 188 System.out.print("latFrom: "+MathFP.toString(latFrom)); 189 System.out.println(" lonFrom: "+MathFP.toString(lonFrom)); 190 System.out.print("latTo: "+MathFP.toString(latTo)); 191 System.out.println(" lonTo: "+MathFP.toString(lonTo)); 192 */ 193 194 long p1=MathFP.sin(MathFP.div((latFrom-latTo), MathFP_2)); 195 p1 = MathFP.mul(p1, MathFP.toFP(1000000)); 196 //System.out.println(" p1: "+MathFP.toString(p1)); 197 p1 = MathFP.mul(p1, p1); 198 //System.out.println(" p1: "+MathFP.toString(p1)); 199 200 long p2=MathFP.sin(MathFP.div((lonTo-lonFrom), MathFP_2)); 201 p2 = MathFP.mul(p2, MathFP.toFP(1000000)); 202 //System.out.println(" p2: "+MathFP.toString(p2)); 203 p2 = MathFP.mul(p2, p2); 204 //System.out.println(" p2: "+MathFP.toString(p2)); 205 206 long sqrtarg=p1 +MathFP.mul(MathFP.mul(MathFP.cos(latFrom),MathFP.cos(latTo)),p2); 207 //System.out.println(" sqrtarg: "+MathFP.toString(sqrtarg)); 208 209 sqrtarg=MathFP.sqrt(sqrtarg); 210 //System.out.println(" sqrtarg: "+MathFP.toString(sqrtarg)); 211 212 long distance; 213 if (sqrtarg>MathFP.toFP(19000)) { //toFP("0.019")*1000000 - boundary for MathFP.asin approximation by X 214 // calculation is erroneus for small angles 215 long asinarg=MathFP.div(sqrtarg, MathFP.toFP(1000000)); 216 //System.out.println(" > asinarg: "+MathFP.toString(asinarg)); 217 asinarg=MathFP.asin(asinarg); 218 //System.out.println(" > asinarg: "+MathFP.toString(asinarg)); 219 distance = MathFP.mul(EARTH_RADIUS2, asinarg); 220 //System.out.println(" distance asin: "+MathFP.toString(distance)); 221 } else { 222 //asin(X) is aproximately equall to X, 223 //This approximation allow us to change the order of multiplication and division in order to reduce loss of significant digits 224 225 distance = MathFP.mul(EARTH_RADIUS2, sqrtarg); 226 //System.out.println(" > distance: "+MathFP.toString(distance)); 227 distance=MathFP.div(distance, MathFP.toFP(1000000)); 228 229 } 230 231 //System.out.println(" distance: "+MathFP.toString(distance)); 232 233 //if (Double.isNaN(distance)) //equivalent to (distance=0), but safer xliii
  • 44.
    Zarko Acimovic 234 // return 0; 235 return distance; 236 } 237 238 239 /** 240 * Convert degrees to radians 241 * @return value transformed to radians 242 * @param degrees value to be transformed to radians 243 */ 244 public static long degreesToRadians(long degrees){ 245 return MathFP.div(degrees,MathFP_180DivPI); 246 } 247 248 /** 249 * Convert radians to degrees 250 * @return value transformed to degrees 251 * @param radians value to be transformed to degrees 252 */ 253 public static long radiansToDegrees(long radians){ 254 return MathFP.mul(radians,MathFP_180DivPI); 255 } 256 257 public static final long MathFP_2 = MathFP.toFP(2); 258 public static final long MathFP_1 = MathFP.toFP(1); 259 public static final long MathFP_2PI = MathFP.mul(MathFP_2, MathFP.PI); 260 public static final long MathFP_1000 = MathFP.toFP(1000); 261 public static final long MathFP_360 = MathFP.toFP(360); 262 public static final long MathFP_180DivPI = MathFP.div(MathFP.toFP(180), MathFP.PI); 263 public static final long MathFP_0_5 = MathFP.toFP("0.5"); 264 265 266 } xliv
  • 45.
    Software Defects PreventionTechniques – Example Project DelRoute.java violations All classes and interfaces must belong to a named package 5 PMD Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67% 5 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 6 PMD Marker Use explicit scoping instead of the default package private level 6 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 7 PMD Marker Use explicit scoping instead of the default package private level 7 PMD Marker Parameter 'index' is not assigned and could be declared final 8 PMD Marker Parameter 'routeID' is not assigned and could be declared final 8 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker 1 /** 2 * 3 * DelRoute is used when deleting route 4 */ 5 public class DelRoute { 6 int index; 7 int routeID; 8 DelRoute(int index, int routeID){ 9 this.index = index; 10 this.routeID = routeID; 11 } 12 int getIndex(){ 13 return index; 14 } 15 int getRouteID(){ 16 return routeID; 17 } 18 19 public String toString(){ 20 return "ID Route is "+routeID+"n"+"Index of element to delet is "+index; 21 } 22 23 } xlv
  • 46.
    Zarko Acimovic Friend.java violations All classes and interfaces must belong to a named package 5 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 83% 5 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 96% 5 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 107% 5 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 6 PMD Marker Use explicit scoping instead of the default package private level 6 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 7 PMD Marker Use explicit scoping instead of the default package private level 7 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 8 PMD Marker Use explicit scoping instead of the default package private level 8 PMD Marker Avoid variables with short names like t 9 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 9 PMD Marker Use explicit scoping instead of the default package private level 9 PMD Marker Avoid variables with short names like t 11 PMD Marker Parameter 'hashThread' is not assigned and could be declared final 11 PMD Marker Parameter 'name' is not assigned and could be declared final 11 PMD Marker Parameter 'resource' is not assigned and could be declared final 11 PMD Marker Parameter 't' is not assigned and could be declared final 11 PMD Marker Parameter 'hash' is not assigned and could be declared final 30 PMD Marker A getX() method which returns a boolean should be named isX() 42 PMD Marker 1 /** 2 * 3 * Friend class holds all important data for a friend 4 */ 5 public class Friend { 6 String name; 7 String resource; 8 int hashThread; 9 Thread4Friend t; 10 11 Friend(String name, String resource, int hashThread, Thread4Friend t){ 12 this.name = name; 13 this.resource = resource; 14 this.hashThread = hashThread; 15 this.t = t; 16 } 17 18 public String getName(){ 19 return name; 20 } 21 22 public String getResource(){ xlvi
  • 47.
    Software Defects PreventionTechniques – Example Project 23 return resource; 24 } 25 26 public int getHash(){ 27 return hashThread; 28 } 29 30 public void setID(int hash){ 31 hashThread = hash; 32 } 33 34 public String toString(){ 35 return "Friend is "+name+"n"+"Hash is "+hashThread; 36 } 37 38 public void setFirst(){ 39 t.setFirst(); 40 } 41 42 public boolean getThread(){ 43 if (t==null){ return false; } 44 else {return true; } 45 } 46 47 public void setThread(Thread4Friend t){ 48 this.t = t; 49 } 50 } xlvii
  • 48.
    Zarko Acimovic HeapSorter.java violations All classes and interfaces must belong to a named package 5 PMD Marker This class has too many methods, consider refactoring it. 5 PMD Marker Document empty constructor 7 PMD Marker Avoid variables with short names like a 9 PMD Marker Avoid variables with short names like A 10 PMD Marker Avoid variables with short names like as 23 PMD Marker Avoid variables with short names like AS 24 PMD Marker Prefer StringBuffer over += for concatenating strings 30 PMD Marker Avoid variables with short names like a 37 PMD Marker Parameter 'a' is not assigned and could be declared final 37 PMD Marker Avoid using for statements without curly braces 38 PMD Marker Parameter 'as' is not assigned and could be declared final 41 PMD Marker Avoid using for statements without curly braces 42 PMD Marker Lines of Code in Method is 21 45 Metrics Marker Parameter 'i' is not assigned and could be declared final 45 PMD Marker Local variable 'l' could be declared final 46 PMD Marker Local variable 'r' could be declared final 47 PMD Marker Local variable 'tmp' could be declared final 62 PMD Marker Lines of Code in Method is 21 67 Metrics Marker Number of Statements is 21 67 Metrics Marker Parameter 'i' is not assigned and could be declared final 67 PMD Marker Local variable 'l' could be declared final 68 PMD Marker 1 /** 2 * 3 * HeapSorter class sorts points by distance or by name 4 */ 5 public class HeapSorter{ 6 7 HeapSorter(){} 8 9 public void heapsort(long[] a){ 10 long[]A = setHeapWithSize(a,a.length); 11 buildHeap(A); 12 for(int i=0; i<A.length; i++){ 13 System.out.println(A[i]); 14 } 15 for(int i=a.length; i>1; i--){ 16 a[i-1]=A[0]; A[0]=A[i-1]; 17 A=setHeapWithSize(A,A.length-1); 18 heapify(A,1); 19 } xlviii
  • 49.
    Software Defects PreventionTechniques – Example Project 20 a[0]=A[0]; 21 } 22 23 public void heapsort(String[] as){ 24 String[] AS = setHeapWithSize(as,as.length); 25 buildHeap(AS); 26 for(int i=0; i<AS.length; i++){ 27 System.out.println(AS[i]); 28 } 29 for(int i=as.length; i>1; i--){ 30 as[i-1]=AS[0]; AS[0]=AS[i-1]; 31 AS=setHeapWithSize(AS,AS.length-1); 32 heapify(AS,1); 33 } 34 as[0]=AS[0]; 35 } 36 37 public void buildHeap(long[] a){ 38 for(int i=a.length/2; i>0; i--) heapify(a,i); 39 } 40 41 public void buildHeap(String[] as){ 42 for(int i=as.length/2; i>0; i--) heapify(as,i); 43 } 44 45 public void heapify(long[]a, int i){ 46 int l=left(i); 47 int r=right(i); 48 int largest; 49 50 if(l<=heapSize(a) && a[l-1]>a[i-1]){ 51 largest=l; 52 }else{ 53 largest=i; 54 } 55 56 if(r<=heapSize(a) && a[r-1]>a[largest-1]){ 57 largest=r; 58 } 59 60 if(largest!=i){ 61 //exchange a[i], a[largest] 62 long tmp=a[i-1]; a[i-1]=a[largest-1]; a[largest- 1]=tmp; 63 heapify(a,largest); 64 } 65 } 66 67 public void heapify(String[]as, int i){ 68 int l=left(i); 69 int r=right(i); xlix
  • 50.
    Zarko Acimovic 70 int largest; 71 72 if(l<=heapSize(as) && as[l-1].charAt(0)>as[i-1].charAt(0)){ 73 largest=l; 74 }else{ 75 largest=i; 76 } 77 78 if(r<=heapSize(as) && as[r-1].charAt(0)>as[largest- 1].charAt(0)){ 79 largest=r; 80 } 81 82 if(largest!=i){ 83 //exchange a[i], a[largest] 84 String tmpS=as[i-1]; as[i-1]=as[largest-1]; as[largest-1]=tmpS; 85 heapify(as,largest); 86 } 87 } 88 89 90 public int heapSize(long a[]){ 91 return a.length; 92 } 93 94 public int heapSize(String as[]){ 95 return as.length; 96 } 97 98 public int parent(int i){ 99 return(i/2); 100 } 101 102 public int left(int i){ 103 return(2*i); 104 } 105 106 public int right(int i){ 107 return(2*i+1); 108 } 109 110 public long[] setHeapWithSize(long[]m , int n){ 111 long[] k = new long[n]; 112 for(int i=0; i<n; i++){ 113 k[i]=m[i]; 114 } 115 return k; 116 } 117 118 public String[] setHeapWithSize(String[]m , int n){ l
  • 51.
    Software Defects PreventionTechniques – Example Project 119 String[] k = new String[n]; 120 for(int i=0; i<n; i++){ 121 k[i]=m[i]; 122 } 123 return k; 124 } 125 }; ImageCanvas3.java violations All classes and interfaces must belong to a named package 10 PMD Marker Avoid variables with short names like ol 12 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 12 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker Avoid variables with short names like ol 14 PMD Marker It is a good practice to call super() in a constructor 14 PMD Marker Parameter 'ol' is not assigned and could be declared final 14 PMD Marker Avoid variables with short names like g 19 PMD Marker Parameter 'g' is not assigned and could be declared final 19 PMD Marker Cyclomatic Complexity is 8 23 Metrics Marker Lines of Code in Method is 38 23 Metrics Marker Number of Statements is 25 23 Metrics Marker Parameter 'keyCode' is not assigned and could be declared final 23 PMD Marker 1 /** 2 * 3 * ImageCanvas3 draws elements on screen and captures events on canvas 4 */ 5 6 //import java.io.IOException; 7 import javax.microedition.lcdui.*; 8 //import java.util.*; 9 10 public class ImageCanvas3 extends Canvas { 11 12 Outlook ol; 13 14 ImageCanvas3(Outlook ol){ 15 this.ol =ol; 16 ol.setCanvasWH(this.getWidth(),this.getHeight()); 17 } 18 19 public void paint(Graphics g) { 20 ol.drawOutlook(g); 21 } li
  • 52.
    Zarko Acimovic 22 23 public void keyPressed (int keyCode){ 24 25 //keyCode+=disabler; 26 27 if(keyCode==49){ 28 ol.ZoomIn(); 29 repaint(); 30 } 31 32 if(keyCode==50){ 33 ol.ZoomOut(); 34 repaint(); 35 } 36 37 if(keyCode==51){ 38 repaint(); 39 } 40 41 42 switch (getGameAction(keyCode)) { 43 case Canvas.UP: 44 ol.setMap('u'); 45 repaint(); 46 break; 47 case Canvas.DOWN: 48 ol.setMap('d'); 49 repaint(); 50 break; 51 case Canvas.LEFT: 52 ol.setMap('l'); 53 repaint(); 54 break; 55 case Canvas.RIGHT: 56 ol.setMap('r'); 57 repaint(); 58 break; 59 } 60 } 61 } lii
  • 53.
    Software Defects PreventionTechniques – Example Project MapBackground.java violations All classes and interfaces must belong to a named package 10 PMD Marker Lack of Cohesion in Methods (Chidamber & Kemerer) is 214 10 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 92% 10 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 82% 10 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 1,010% 10 Metrics Marker Number of Fields is 47 10 Metrics Marker The class 'MapBackground' has a Cyclomatic Complexity of 2 (Highest = 15). 10 PMD Marker Too many fields 10 PMD Marker Weighted Methods per Class is 64 10 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 14 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 18 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 20 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 24 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 28 PMD Marker Avoid unused private fields such as 'upDlat'. 65 PMD Marker The field MapBackground.upDlat is never read locally 65 Java Problem Unused field: MapBackground.upDlat 65 FindBugs Avoid unused private fields such as 'upMlat'. 69 PMD Marker The field MapBackground.upMlat is never read locally 69 Java Problem Unused field: MapBackground.upMlat 69 FindBugs Avoid unused private fields such as 'upSlat'. 73 PMD Marker The field MapBackground.upSlat is never read locally 73 Java Problem Unused field: MapBackground.upSlat 73 FindBugs Avoid unused private fields such as 'dwDlat'. 77 PMD Marker The field MapBackground.dwDlat is never read locally 77 Java Problem Unused field: MapBackground.dwDlat 77 FindBugs Avoid unused private fields such as 'dwMlat'. 81 PMD Marker The field MapBackground.dwMlat is never read locally 81 Java Problem Unused field: MapBackground.dwMlat 81 FindBugs The field MapBackground.dwSlat is never read locally 85 Java Problem Unused field: MapBackground.dwSlat 85 FindBugs The field MapBackground.lfDlon is never read locally 90 Java Problem Unused field: MapBackground.lfDlon 90 FindBugs The field MapBackground.lfMlon is never read locally 94 Java Problem Unused field: MapBackground.lfMlon 94 FindBugs The field MapBackground.lfSlon is never read locally 98 Java Problem Unused field: MapBackground.lfSlon 98 FindBugs The field MapBackground.rtDlon is never read locally 102 Java Problem Unused field: MapBackground.rtDlon 102 FindBugs The field MapBackground.rtMlon is never read locally 106 Java Problem liii
  • 54.
    Zarko Acimovic MapBacground.java violations– continued Use explicit scoping instead of the default package private level 137 PMD Marker Use explicit scoping instead of the default package private level 142 PMD Marker Use explicit scoping instead of the default package private level 147 PMD Marker Unused field: MapBackground.sidePan 151 FindBugs Avoid variables with short names like x 155 PMD Marker Avoid variables with short names like y 159 PMD Marker Unread field: MapBackground.param 208 FindBugs Lines of Code in Method is 44 211 Metrics Marker Number of Parameters is 7 211 Metrics Marker Number of Statements is 47 211 Metrics Marker Parameter 'name0' is not assigned and could be declared final 211 PMD Marker Parameter 'name1' is not assigned and could be declared final 211 PMD Marker Parameter 'name2' is not assigned and could be declared final 211 PMD Marker Parameter 'latStr1' is not assigned and could be declared final 212 PMD Marker Parameter 'lonStr1' is not assigned and could be declared final 213 PMD Marker Avoid empty catch blocks 239 PMD Marker The String literal "3600" appears 4 times in this file; the first occurrence is on 249 249 PMD Marker Local variable 'pxy1' could be declared final 277 PMD Marker Local variable 'pxy2' could be declared final 280 PMD Marker Local variable 'tt1' could be declared final 333 PMD Marker Local variable 'tt2' could be declared final 334 PMD Marker Cyclomatic Complexity is 15 361 Metrics Marker Lines of Code in Method is 50 361 Metrics Marker Number of Statements is 37 361 Metrics Marker The method 'setMap' has a Cyclomatic Complexity of 15. 364 PMD Marker The method setMap() has an NPath complexity of 672 364 PMD Marker Avoid unnecessary comparisons in boolean expressions 367 PMD Marker Avoid using if statements without curly braces 369 PMD Marker Avoid using if statements without curly braces 373 PMD Marker Avoid unnecessary comparisons in boolean expressions 378 PMD Marker These nested if statements could be combined 378 PMD Marker Avoid using if statements without curly braces 382 PMD Marker Avoid unnecessary comparisons in boolean expressions 388 PMD Marker These nested if statements could be combined 388 PMD Marker Avoid using if statements without curly braces 390 PMD Marker Avoid using if statements without curly braces 393 PMD Marker Avoid unnecessary comparisons in boolean expressions 399 PMD Marker These nested if statements could be combined 399 PMD Marker Lines of Code in Method is 27 425 Metrics Marker Number of Statements is 22 425 Metrics Marker liv
  • 55.
    Software Defects PreventionTechniques – Example Project MapBackground.java violations continued Consider replacing this Vector with the newer java.util.List 478 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 484 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 484 PMD Marker Avoid variables with short names like v 484 PMD Marker Consider replacing this Vector with the newer java.util.List 484 PMD Marker Avoid variables with short names like g 490 PMD Marker Local variable 'lx' could be declared final 491 PMD Marker Cyclomatic Complexity is 11 542 Metrics Marker Lines of Code in Method is 67 542 Metrics Marker Number of Statements is 69 542 Metrics Marker 1 /** 2 * 3 * MapBackground transforms map according to user actions, zoom In, zoom out or pan 4 */ 5 import java.util.*; 6 import java.io.*; 7 import javax.microedition.lcdui.*; 8 9 10 public class MapBackground { 11 12 /** Current JPEG Background of map 13 */ 14 private Image img; 15 16 /** Images for Different Zoom Levels; 17 */ 18 private Image[] zoomImg = new Image[3]; 19 20 private int zoomLevel = 0; 21 22 /** Width of current background image 23 */ 24 private long sizeX; 25 26 /** Height of current background image 27 */ 28 private long sizeY; 29 30 31 /** Float-point value of upper limit 32 */ lv
  • 56.
    Zarko Acimovic 33 private long upLat; 34 35 /** Float-point value of lower limit 36 */ 37 private long downLat; 38 39 /** Side of upper limit 40 */ 41 //private char upNS; 42 43 /** Side of lower limit 44 */ 45 //private char downNS; 46 47 /** Float-point value of left limit 48 */ 49 private long leftLon; 50 51 /** Float-point value of right limit 52 */ 53 private long rightLon; 54 55 /** Side of left limit 56 */ 57 //private char leftWE; 58 59 /** Side of right limit 60 */ 61 ///private char rightWE; 62 63 /** Integer value of latitude degrees of upper limit 64 */ 65 private long upDlat; 66 67 /** Integer value of latitude minutes of upper limit 68 */ 69 private long upMlat; 70 71 /** Integer value of latitude seconds of upper limit 72 */ 73 private long upSlat; 74 75 /** Integer value of latitude degrees of lower limit 76 */ 77 private long dwDlat; 78 79 /** Integer value of latitude minutes of lower limit 80 */ 81 private long dwMlat; 82 83 /** Integer value of latitude seconds of upper limit lvi
  • 57.
    Software Defects PreventionTechniques – Example Project 84 */ 85 private long dwSlat; 86 87 88 /** Integer value of longitude degrees of left limit 89 */ 90 private long lfDlon; 91 92 /** Integer value of longitude minutes of left limit 93 */ 94 private long lfMlon; 95 96 /** Integer value of longitude seconds of left limit 97 */ 98 private long lfSlon; 99 100 /** Integer value of longitude degrees of right limit 101 */ 102 private long rtDlon; 103 104 /** Integer value of longitude minutes of right limit 105 */ 106 private long rtMlon; 107 108 /** Integer value of longitude seconds of right limit 109 */ 110 private long rtSlon; 111 112 113 /** Scale of map 114 */ 115 private long scale; 116 117 /** Number of lat-seconds per pixel 118 */ 119 private long pixLat; 120 121 /** Number of lon-seconds per pixel 122 */ 123 private long pixLon; 124 125 126 /** Total number of Latitude seconds for upper limit point 127 */ 128 long totLatSec ; 129 130 /** Total number of Longitude seconds for left limit point 131 */ 132 long totLonSec ; 133 134 /** new upper left edge due to pan or Zoom; lvii
  • 58.
    Zarko Acimovic 135 * newEdge represents Point of upper left corner of visible screen 136 */ 137 Point newEdge; 138 139 /** new upper left edge due to pan or Zoom; 140 * newEdge represents Point of upper left corner of visible screen 141 */ 142 Point previousEdge; 143 144 145 /** World coordinates of Down end of Image 146 */ 147 Point downEnd; 148 149 /** Character that represents side of Pan 150 */ 151 char sidePan; 152 153 /** x-coordinate of begining of image 154 */ 155 long x = 0; 156 157 /** y-coordinate of begining of image 158 */ 159 long y = 0; 160 161 /** Indicates beginning of pan range verticaly 162 */ 163 boolean reachBeginV = true; 164 165 /** Indicates end of pan range verticaly 166 */ 167 boolean reachEndV = false; 168 169 /** Indicates beginning of pan range horizontaly 170 */ 171 boolean reachBeginH = true; 172 173 /** Indicates end of pan range horizontaly 174 */ 175 boolean reachEndH = false; 176 177 /** Step of panning 178 */ 179 long step = 30; 180 181 /** Counter of shifts vertically 182 */ 183 long movV=0; 184 185 /** Counter of shifts horizontally lviii
  • 59.
    Software Defects PreventionTechniques – Example Project 186 */ 187 long movH=0; 188 189 /** Name of smallest image 190 */ 191 String[] imgArray = new String[3]; 192 193 /** Canvas Height 194 */ 195 private long canvasHeight; 196 197 /** Canvas Width 198 */ 199 private long canvasWidth; 200 201 202 long previousPixLat; 203 long previousPixLon; 204 205 long minX; 206 long minY; 207 208 boolean param = false; 209 210 211 MapBackground( String name0, String name1, String name2, 212 String latStr1, 213 String lonStr1, 214 String latStr2, 215 String lonStr2 ) { 216 if(MathFP.toFP(latStr1)>MathFP.toFP(latStr2)){ 217 this.upLat = MathFP.toFP(latStr1); 218 this.downLat = MathFP.toFP(latStr2); 219 } else { 220 this.upLat = MathFP.toFP(latStr2); 221 this.downLat = MathFP.toFP(latStr1); 222 } 223 224 if(MathFP.toFP(lonStr1)>MathFP.toFP(lonStr2)){ 225 this.leftLon = MathFP.toFP(lonStr2); 226 this.rightLon = MathFP.toFP(lonStr1); 227 } else { 228 this.leftLon = MathFP.toFP(lonStr1); 229 this.rightLon = MathFP.toFP(lonStr2); 230 } 231 232 233 imgArray[0] = name0; 234 imgArray[1] = name1; 235 imgArray[2] = name2; 236 lix
  • 60.
    Zarko Acimovic 237 try { 238 zoomImg[0] = Image.createImage(imgArray[0]); 239 } catch (IOException e) {} 240 241 img = zoomImg[0]; 242 sizeX = img.getWidth(); 243 sizeY = img.getHeight(); 244 245 newEdge = new Point(MathFP.toString(upLat),MathFP.toString(leftLon),"newEdge","","blanco",false); 246 247 downEnd = new Point(MathFP.toString(downLat),MathFP.toString(rightLon),"downEnd","","blanco",fals e); 248 249 this.totLatSec = MathFP.mul(this.upLat,MathFP.toFP("3600")); 250 this.totLonSec = MathFP.mul(this.leftLon,MathFP.toFP("3600")); 251 252 253 this.setPixels(); 254 } 255 256 257 258 /** Returns number of longitude seconds per pixel 259 * @return int 260 * 261 */ 262 public long getPixLon(){ 263 return pixLon; 264 } 265 266 /** Returns number of latitude seconds per pixel 267 * @return int 268 */ 269 public long getPixLat(){ 270 return pixLat; 271 } 272 273 /** Sets pixels as Float-Point when main constructor is called 274 * and when Zoom In/Out is applied 275 */ 276 public void setPixels(){ 277 long pxy1 = MathFP.mul(MathFP.sub(rightLon,leftLon),MathFP.toFP("3600")); 278 pixLon = MathFP.div(pxy1,MathFP.toFP(sizeX)); 279 280 long pxy2 = MathFP.mul(MathFP.sub(upLat,downLat),MathFP.toFP("3600")); lx
  • 61.
    Software Defects PreventionTechniques – Example Project 281 pixLat = MathFP.div(pxy2,MathFP.toFP(sizeY)); 282 } 283 284 /** Returns image to draw 285 * 286 * @return Image 287 */ 288 public Image getImage(){ 289 return img; 290 } 291 292 293 /** Returns total number of seconds for LEFT LONGITUDE 294 * @return int 295 */ 296 public long getLonSec() { 297 return this.totLonSec; 298 } 299 300 /** Returns total number of seconds for UPPER LATITUDE 301 * @return int 302 */ 303 public long getLatSec() { 304 return this.totLatSec; 305 } 306 307 308 /** Returns Canvas height 309 * 310 * @return int 311 */ 312 public long getCanvasHeight(){ 313 return canvasHeight; 314 } 315 316 /** Returns Canvas width 317 * 318 * @return int 319 */ 320 public long getCanvasWidth(){ 321 return canvasWidth; 322 } 323 324 /** Sets newEdge; new Edge is created every time when user pans or zooms map ; 325 * newEdge represents Point of upper left corner of visible screen (x=0 and 326 * y=0 for newEdge) 327 * 328 * @return Point 329 */ lxi
  • 62.
    Zarko Acimovic 330 public void setNewEdge(){ 331 previousEdge = newEdge; 332 333 long tt1 = MathFP.mul(this.getPixLat(),MathFP.toFP(Math.abs(this.getY()))); 334 long tt2 = MathFP.mul(this.getPixLon(),MathFP.toFP(Math.abs(this.getX()))); 335 336 newEdge = new Point(MathFP.sub(this.getLatSec(),tt1), 337 MathFP.add(this.getLonSec(),tt2),"","",false); 338 } 339 340 /** Returns new edge 341 */ 342 public Point getNewEdge(){ 343 return newEdge; 344 } 345 346 /** Returns down End 347 */ 348 public Point getDownEnd(){ 349 return downEnd; 350 } 351 352 /** Returns new Edge as String 353 * 354 * @return String 355 */ 356 public String getNEdgeStr(){ 357 return newEdge.toString(); 358 } 359 360 361 /** Sets map due to Pan transformation 362 * 363 */ 364 public void setMap(char side){ 365 366 if (side=='u'){ 367 if(reachBeginV==false){ 368 y+=((this.img.getHeight() - canvasHeight)/step); 369 if(y>0) y=0; 370 movV--; 371 } 372 reachEndV=false; 373 if(movV==0) reachBeginV=true; 374 375 } 376 377 if (side=='d'){ lxii
  • 63.
    Software Defects PreventionTechniques – Example Project 378 if(reachEndV==false){ 379 y-=((this.img.getHeight()-canvasHeight)/step); 380 movV++; 381 reachBeginV=false; 382 if(movV==step) reachEndV=true; 383 } 384 385 } 386 387 if (side=='l'){ 388 if(reachBeginH==false){ 389 x+=((this.img.getWidth()-canvasWidth)/step); 390 if(x>0) x=0; 391 movH--; 392 reachEndH=false; 393 if(movH==0) reachBeginH=true; 394 } 395 396 } 397 398 if (side=='r'){ 399 if(reachEndH==false) { 400 x-=((this.img.getWidth()-canvasWidth)/step); 401 movH++; 402 reachBeginH=false; 403 if(movH==step) reachEndH=true; 404 405 } 406 } 407 408 this.setNewEdge(); 409 410 } 411 412 413 /** returns x-coordinate of begining of Image 414 */ 415 public long getX(){ 416 return x; 417 } 418 419 /** returns y-coordinate of begining of Image 420 */ 421 public long getY(){ 422 return y; 423 } 424 425 /** Zoom In 426 */ 427 public boolean ZoomIn(){ 428 boolean zoom = false; lxiii
  • 64.
    Zarko Acimovic 429 if(zoomLevel<2){ 430 zoom = true; 431 this.setPreviousEdge(); 432 433 zoomLevel++; 434 if (zoomImg[zoomLevel]==null){ 435 try{ 436 zoomImg[zoomLevel] = Image.createImage(imgArray[zoomLevel]); 437 } catch(Exception e){} 438 } 439 this.img = zoomImg[zoomLevel]; 440 this.sizeX = this.img.getWidth(); 441 this.sizeY = this.img.getHeight(); 442 this.setPixels(); 443 444 x=0-(((this.img.getWidth()-canvasWidth)/step)*movH); 445 y=0-(((this.img.getHeight()-canvasHeight)/step)*movV); 446 447 this.setNewEdge(); 448 449 } 450 return zoom; 451 } 452 453 /** Zoom Out 454 */ 455 public boolean ZoomOut(){ 456 boolean zoom = false; 457 if(zoomLevel>0){ 458 zoom = true; 459 this.setPreviousEdge(); 460 461 zoomLevel--; 462 this.img = zoomImg[zoomLevel]; 463 this.sizeX = this.img.getWidth(); 464 this.sizeY = this.img.getHeight(); 465 this.setPixels(); 466 467 x=0-(((this.img.getWidth()-canvasWidth)/step)*movH); 468 y=0-(((this.img.getHeight()-canvasHeight)/step)*movV); 469 470 this.setNewEdge(); 471 } 472 return zoom; 473 } 474 475 476 /** Increments Pan level 477 */ 478 public void incPan(Vector v){ lxiv
  • 65.
    Software Defects PreventionTechniques – Example Project 479 if (step<10) step++; 480 } 481 482 /** Decrements Pan level 483 */ 484 public void decPan(Vector v){ 485 if (step>3) step--; 486 } 487 488 /** Draws Layout 489 */ 490 public void drawMapBackground(Graphics g){ 491 Long lx = new Long(x); 492 Long ly = new Long(y); 493 int xx = Integer.parseInt(lx.toString()); 494 int yy = Integer.parseInt(ly.toString()); 495 496 g.drawImage(img,xx,yy,0); 497 } 498 499 /** Set Canvas width and height 500 */ 501 public void setCanvasWH(int canvasWidth, int canvasHeight){ 502 this.canvasWidth = (long)canvasWidth; 503 this.canvasHeight = (long)canvasHeight; 504 } 505 506 public Point getPreviousEdge(){ 507 return previousEdge; 508 } 509 510 public void setPreviousEdge(){ 511 previousEdge = newEdge; 512 previousPixLat = pixLat; 513 previousPixLon = pixLon; 514 } 515 516 public long getPreviousPixLat(){ 517 return previousPixLat; 518 } 519 520 public long getPreviousPixLon(){ 521 return previousPixLon; 522 } 523 524 public long getZoomLevel(){ 525 return zoomLevel; 526 } 527 528 public long imageHeight(){ 529 return (long)img.getHeight(); lxv
  • 66.
    Zarko Acimovic 530 } 531 532 public long imageWidth(){ 533 return (long)img.getWidth(); 534 } 535 536 public long getStep(){ 537 return step; 538 } 539 540 541 542 /** Sets Background for selected Point 543 * Used in SelectorPoint.selectWP 544 */ 545 public void setBackground(Point ww){ 546 547 long imgWidth = (long) this.img.getWidth(); 548 long imgHeight= (long) this.img.getHeight(); 549 minX = -Math.abs(imgWidth-canvasWidth); 550 minY = -Math.abs(imgHeight-canvasHeight); 551 552 long difLat = MathFP.div(Math.abs(ww.getLatSec()- this.getLatSec()),pixLat); //x pixel of ww 553 long difLon = MathFP.div(Math.abs(ww.getLonSec()- this.getLonSec()),pixLon); //y pixel of ww 554 long p1 = MathFP.div(difLat,MathFP.div((this.img.getHeight()- canvasHeight),step)); 555 long p2 = MathFP.div(difLon,MathFP.div((this.img.getWidth()- canvasWidth),step)); 556 557 p1 = MathFP.toLong(p1); 558 p2 = MathFP.toLong(p2); 559 p1--; 560 p2--; 561 562 563 564 p1*=((this.img.getHeight()-canvasHeight)/step); 565 p2*=((this.img.getWidth()-canvasWidth)/step); 566 567 /** 568 if(param==true) { 569 p1 -=((this.img.getHeight()-canvasHeight)/step); 570 p2-=((this.img.getWidth()-canvasWidth)/step); 571 572 p1 -=((this.img.getHeight()-canvasHeight)/step); 573 p2-=((this.img.getWidth()-canvasWidth)/step); 574 p2-=((this.img.getWidth()-canvasWidth)/step); 575 }*/ 576 lxvi
  • 67.
    Software Defects PreventionTechniques – Example Project 577 578 this.x = 0 - p2; // x value of screen begining 579 this.y = 0 - p1; // y value of screen begining 580 581 582 583 movV = p1/((this.img.getHeight()-canvasHeight)/step); 584 movH = p2/((this.img.getWidth()-canvasWidth)/step); 585 586 if(x<minX){ 587 x=minX; 588 movH=step; 589 } 590 if(y<minY){ 591 y=minY; 592 movV=step; 593 } 594 595 if(x>0) x=0; 596 if(y>0) y=0; 597 if(movV<0) movV=0; 598 if(movH<0) movH=0; 599 600 if (movV==step) {reachEndV=true;} else {reachEndV=false;} 601 if (movV==0) {reachBeginV=true;} else {reachBeginV=false;} 602 if (movH==step) {reachEndH=true;} else {reachEndH=false;} 603 if (movH==0) {reachBeginH=true;} else {reachBeginH=false;} 604 605 this.setNewEdge(); 606 607 608 } 609 610 /** 611 public void stela(long p1,long p2){ 612 p1 -=((this.img.getHeight()-canvasHeight)/step); 613 p2+=((this.img.getWidth()-canvasWidth)/step); 614 615 p1 -=((this.img.getHeight()-canvasHeight)/step); 616 p2+=((this.img.getWidth()-canvasWidth)/step); 617 p2+=((this.img.getWidth()-canvasWidth)/step); 618 p2+=((this.img.getWidth()-canvasWidth)/step); 619 }*/ 620 621 622 623 624 625 } 626 lxvii
  • 68.
    Zarko Acimovic MapBackgroundFactory.java violations All classes and interfaces must belong to a named package 5 PMD Marker Avoid variables with short names like m 7 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 7 PMD Marker Use explicit scoping instead of the default package private level 7 PMD Marker Lines of Code in Method is 17 9 Metrics Marker Number of Parameters is 7 9 Metrics Marker Parameter 'name0' is not assigned and could be declared final 21 PMD Marker Parameter 'name1' is not assigned and could be declared final 21 PMD Marker Parameter 'name2' is not assigned and could be declared final 21 PMD Marker 1 /** 2 * 3 * Different map formats could be implemented and dealt with with MapBackgroundFactory 4 */ 5 public class MapBackgroundFactory { 6 7 MapBackground m; 8 9 /** 10 MapBackgroundFactory(String name0, String name1, String name2, 11 int dLat1, int mLat1, int sLat1, char sdNS1, 12 int dLon1, int mLon1, int sLon1, char sdWE1, 13 int dLat2, int mLat2, int sLat2, char sdNS2, 14 int dLon2, int mLon2, int sLon2, char sdWE2, int scale){ 15 16 //m = new MapBackground(name0,name1,name2, 17 dLat1,mLat1,sLat1,sdNS1,dLon1,mLon1,sLon1,sdWE1, 18 dLat2,mLat2,sLat2,sdNS2,dLon2,mLon2,sLon2,sdWE2, scale); 19 }*/ 20 21 MapBackgroundFactory(String name0, String name1, String name2, 22 String lat1, String lon1, String lat2, String lon2){ 23 m = new MapBackground(name0,name1,name2, 24 lat1,lon1,lat2,lon2); 25 } lxviii
  • 69.
    Software Defects PreventionTechniques – Example Project 26 27 28 public MapBackground getMapBackground(){ 29 return m; 30 } 31 32 } MapObjects.java violations All classes and interfaces must belong to a named package 9 PMD Marker Lack of Cohesion in Methods (Chidamber & Kemerer) is 101 9 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 83% 9 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 84% 9 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 359% 9 Metrics Marker Number of Fields is 12 9 Metrics Marker The class 'MapObjects' has a Cyclomatic Complexity of 3 (Highest = 17). 9 PMD Marker This class has too many methods, consider refactoring it. 9 PMD Marker Weighted Methods per Class is 72 9 Metrics Marker Avoid variables with short names like mb 11 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 11 PMD Marker Use explicit scoping instead of the default package private level 11 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 13 PMD Marker Use explicit scoping instead of the default package private level 13 PMD Marker Avoid excessively long variable names like destinationPosition 14 PMD Marker Use explicit scoping instead of the default package private level 14 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 15 PMD Marker Use explicit scoping instead of the default package private level 15 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 16 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 16 PMD Marker Consider replacing this Vector with the newer java.util.List 16 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 16 PMD Marker Unused field: MapObjects.currentRoute 17 FindBugs Avoid using implementation types like 'Vector'; use the interface instead 18 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 18 PMD Marker Consider replacing this Vector with the newer java.util.List 18 PMD Marker lxix
  • 70.
    Zarko Acimovic MapObjects.java violations– continued Avoid variables with short names like mb 26 PMD Marker Parameter 'mb' is not assigned and could be declared final 26 PMD Marker Use ArrayList instead of Vector 32 PMD Marker Cyclomatic Complexity is 7 36 Metrics Marker Lines of Code in Method is 41 36 Metrics Marker Number of Statements is 56 36 Metrics Marker Consider replacing this Vector with the newer java.util.List 40 PMD Marker Local variable 'temp1' could be declared final 40 PMD Marker Use ArrayList instead of Vector 40 PMD Marker Consider replacing this Vector with the newer java.util.List 41 PMD Marker Avoid variables with short names like wp 56 PMD Marker Local variable 'wp' could be declared final 56 PMD Marker Avoid variables with short names like v 64 PMD Marker Local variable 'v' could be declared final 64 PMD Marker Avoid unnecessary comparisons in boolean expressions 65 PMD Marker Avoid variables with short names like wp 69 PMD Marker Local variable 'wp' could be declared final 69 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 81 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 81 PMD Marker Consider replacing this Vector with the newer java.util.List 81 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 86 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 86 PMD Marker Parameter 'wp' is not assigned and could be declared final 92 PMD Marker Parameter 'wp' is not assigned and could be declared final 117 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 139 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 139 PMD Marker Cyclomatic Complexity is 9 149 Metrics Marker Lines of Code in Method is 47 149 Metrics Marker Number of Levels is 5 149 Metrics Marker Number of Locals in Scope is 7 149 Metrics Marker Number of Statements is 73 149 Metrics Marker Parameter 'g' is not assigned and could be declared final 151 PMD Marker lxx
  • 71.
    Software Defects PreventionTechniques – Example Project MapsObjects.java violations Avoid unnecessary comparisons in boolean expressions 181 PMD Marker Avoid unnecessary comparisons in boolean expressions 184 PMD Marker Cyclomatic Complexity is 7 197 Metrics Marker Lines of Code in Method is 23 197 Metrics Marker Number of Statements is 42 197 Metrics Marker Avoid using if statements without curly braces 204 PMD Marker Avoid unnecessary comparisons in boolean expressions 206 PMD Marker Avoid using if statements without curly braces 217 PMD Marker Avoid using if statements without curly braces 218 PMD Marker A method should have only one exit point, and that should be the last statement in the method 259 PMD Marker Comparison of String parameter using == or != in MapObjects.removeRoute(String) 281 FindBugs Cyclomatic Complexity is 9 288 Metrics Marker Lines of Code in Method is 20 288 Metrics Marker Number of Statements is 36 288 Metrics Marker The method 'getDirection' has a Cyclomatic Complexity of 17. 288 PMD Marker The method getDirection() has an NPath complexity of 6561 288 PMD Marker Avoid using if statements without curly braces 296 PMD Marker Avoid using if statements without curly braces 297 PMD Marker Cyclomatic Complexity is 9 309 Metrics Marker Lines of Code in Method is 29 309 Metrics Marker Number of Statements is 48 309 Metrics Marker lxxi
  • 72.
    Zarko Acimovic MapObjects.java 1 /** 2 * 3 * MapObjects controls appearance of all map objects on current screen 4 */ 5 import java.util.*; 6 //import java.io.*; 7 import javax.microedition.lcdui.*; 8 9 public class MapObjects { 10 11 MapBackground mb; 12 Point currentPosition; 13 Point previousPosition; 14 Point destinationPosition; 15 PVector freeWaypoints; 16 Vector routes; 17 PVector currentRoute; 18 Vector drawablePoints; 19 Hashtable friends; 20 boolean drawLine = false; 21 boolean destSet = false; 22 boolean currentSet = false; 23 24 25 26 MapObjects(MapBackground mb){ 27 this.mb = mb; 28 currentPosition = mb.getNewEdge(); 29 destinationPosition = mb.getNewEdge(); 30 currentPosition.setName("dummy"); 31 destinationPosition.setName("dummy"); 32 routes = new Vector(); 33 friends = new Hashtable(); 34 } 35 36 /** Sets drawable Points for current Screen 37 * 38 */ 39 public void setDrawablePoints(){ 40 Vector temp1 = new Vector(); 41 Vector temp2; 42 43 //check if current and destination are visible 44 if(this.currentPosition.check(mb.getNewEdge(), mb.getDownEnd())) { 45 currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); lxxii
  • 73.
    Software Defects PreventionTechniques – Example Project 46 temp1.addElement(currentPosition); 47 } 48 if(this.destinationPosition.check(mb.getNewEdge(), mb.getDownEnd())) { 49 destinationPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 50 temp1.addElement(destinationPosition); 51 } 52 53 //check which free waypoints are visible 54 temp2 = freeWaypoints.getPoints(mb.getNewEdge(),mb.getDownEnd()); 55 for (int j=0; j<temp2.size(); j++){ 56 Point wp = (Point)temp2.elementAt(j); 57 wp.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 58 temp1.addElement(wp); 59 } 60 61 62 //check which route points are visible 63 for (int i=0; i<routes.size(); i++){ 64 PVector v = (PVector)routes.elementAt(i); 65 if (v.getVisible()==true){ 66 temp2 = v.getPoints(mb.getNewEdge(),mb.getDownEnd()); 67 68 for (int j=0; j<temp2.size(); j++){ 69 Point wp = (Point)temp2.elementAt(j); 70 wp.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 71 temp1.addElement(wp); 72 } 73 } 74 } 75 drawablePoints = temp1; 76 } 77 78 /** Returns drawable Points for current Screen 79 * @return Vector 80 */ 81 public Vector getDrawablePointsOld(){ 82 83 return drawablePoints; 84 } 85 86 public Vector getDrawablePoints(){ 87 this.setDrawablePoints(); 88 return drawablePoints; 89 } 90 91 92 public void setCurrentPosition(Point wp){ lxxiii
  • 74.
    Zarko Acimovic 93 previousPosition = currentPosition; 94 currentPosition = wp; 95 currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 96 currentSet = true; 97 } 98 99 /** Reset current position 100 */ 101 public void resetCurrentPosition(){ 102 currentPosition = mb.getNewEdge(); 103 drawLine = false; 104 currentSet = false; 105 } 106 107 /** Returns current position 108 * @return Point 109 */ 110 public Point getCurrentPosition(){ 111 return currentPosition; 112 } 113 114 115 /** Set destination position 116 */ 117 public void setDestinationPosition(Point wp){ 118 destinationPosition = wp; 119 destSet = true; 120 } 121 122 /** Reset destination position 123 */ 124 public void resetDestinationPosition(){ 125 destinationPosition = mb.getNewEdge(); 126 drawLine = false; 127 destSet = false; 128 } 129 130 /** Returns destination position 131 * @return Point 132 */ 133 public Point getDestinationPosition(){ 134 return destinationPosition; 135 } 136 137 /** Returns all routes 138 */ 139 public Vector getRoutes(){ 140 return routes; 141 } 142 lxxiv
  • 75.
    Software Defects PreventionTechniques – Example Project 143 /** Returns free Vector of free Points 144 */ 145 public PVector getFreeWaypoints(){ 146 return freeWaypoints; 147 } 148 149 /** Draws MapObjects --- OBSOLETED!!! 150 */ 151 public void drawMOBold(Graphics g, boolean route){ 152 long zl = mb.getZoomLevel()+1; 153 Long zzl = new Long(zl); 154 int zoomL = Integer.parseInt(zzl.toString()); 155 this.setDrawablePoints(); 156 157 // Drawing of line beetwen destination and current position 158 if(drawLine==true){ 159 currentPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 160 destinationPosition.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 161 g.drawLine(currentPosition.getXX(),currentPosition.getYY(),destinationPosition.getX X(),destinationPosition.getYY()); 162 } 163 164 // Drawing of free Points, current position and destination position 165 for(int i=0; i<drawablePoints.size(); i++){ 166 Point wp = (Point)drawablePoints.elementAt(i); 167 if(wp.getImage().equals("blanco")){ 168 g.fillRect(wp.getXX(),wp.getYY(),5*zoomL,5*zoomL); 169 g.drawString(wp.getName(),wp.getXX()+5,wp.getYY() +5,0); 170 } else { 171 Image img = null; 172 try{ 173 img = Image.createImage(wp.getImage()); 174 }catch(Exception e){} 175 g.drawImage(img,wp.getXX(),wp.getYY(),0); 176 } 177 178 } 179 180 // Drawing of route 181 if(route==true){ 182 for(int i=0; i<routes.size(); i++){ 183 PVector wpv = (PVector)routes.elementAt(i); 184 if(wpv.getVisible()==true){ 185 for(int j=0; j<wpv.size()-1; j++){ lxxv
  • 76.
    Zarko Acimovic 186 Point wp1 = (Point) wpv.elementAt(j); 187 Point wp2 = (Point) wpv.elementAt(j+1); 188 wp1.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 189 wp2.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 190 g.drawLine(wp1.getXX(),wp1.getYY(),wp2.getXX(),wp2.getYY()); 191 } 192 } 193 } 194 } 195 } 196 197 /** Draws MapObjects 198 */ 199 public void drawMOB(Graphics g, boolean route){ 200 g.setColor(0,0,0); 201 202 freeWaypoints.drawVector(g,false,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(),mb.g etZoomLevel()); 203 204 if(friends.size()!=0) this.getFriends().drawVector(g,false,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(), 0); 205 206 if(route==true){ 207 for (int i =0; i<routes.size(); i++){ 208 PVector wpv = (PVector)routes.elementAt(i); 209 wpv.drawVector(g,route,mb.getNewEdge(),mb.getPixLon(),mb.getPixLat(),mb.getZoomLeve l()); 210 } 211 } 212 213 if(currentSet) { 214 currentPosition.drawPoint(g,mb.getNewEdge(),mb.getPixLat(),mb.getPixLon(),mb.getZoo mLevel()); 215 216 } 217 if(destSet) destinationPosition.drawPoint(g,mb.getNewEdge(),mb.getPixLat(),mb.getPixLon(),mb.ge tZoomLevel()); 218 if(currentSet && destSet) g.drawLine(currentPosition.getXX(),currentPosition.getYY(),destinationPosition.getX X(),destinationPosition.getYY()); 219 } lxxvi
  • 77.
    Software Defects PreventionTechniques – Example Project 220 221 222 223 224 /** Adds free Point 225 */ 226 public void addFreeWaypoint(Point wp){ 227 this.freeWaypoints.addElement(wp); 228 } 229 230 /** Adds new route 231 */ 232 public void addRoute(PVector v){ 233 this.routes.addElement(v); 234 } 235 236 /** Adds new Point to route with routeID on position pos 237 */ 238 public void addWP2Route(Point wp, int routeID, int pos) { 239 PVector route; 240 for (int i=0; i<routes.size(); i++){ 241 route = (PVector)routes.elementAt(i); 242 if(route.getID()==routeID){ 243 route.insertElementAt(wp,pos); 244 i=1000; 245 } 246 } 247 } 248 249 /** Sets free waypoints vector 250 */ 251 public void setFreeWaypointsV(PVector wpv){ 252 this.freeWaypoints = wpv; 253 } 254 255 /** Measure distance 256 */ 257 public long measureDistance(Point wp){ 258 if (currentPosition.equals(mb.getNewEdge())) { 259 return -1; 260 } else { 261 return currentPosition.measureDistance(wp); 262 } 263 } 264 265 public boolean currentSet(){ 266 return currentSet; 267 } 268 269 public boolean destSet(){ 270 return destSet; lxxvii
  • 78.
    Zarko Acimovic 271 } 272 273 274 public void removeRoute(PVector wr){ 275 routes.removeElement(wr); 276 } 277 278 public void removeRoute(String s){ 279 for(int i=0; i<routes.size(); i++){ 280 PVector rt = (PVector)routes.elementAt(i); 281 if (rt.getName()==s) { 282 routes.removeElementAt(i); 283 i=1000; 284 } 285 } 286 } 287 288 public long getDirection(){ 289 290 long direction = 0; 291 long latP = previousPosition.getLat(); 292 long lonP = previousPosition.getLon(); 293 long latC = currentPosition.getLat(); 294 long lonC = currentPosition.getLon(); 295 296 if(latC>latP && lonP==lonC) direction = MathFP.toFP("0"); 297 if(latC>latP && lonC>lonP) direction = MathFP.toFP("45"); 298 if(latP==latC && lonC>lonP) direction = MathFP.toFP("90"); 299 if(latC<latP && lonC>lonP) direction = MathFP.toFP("135"); 300 if(latC<latP && lonP==lonC) direction = MathFP.toFP("180"); 301 if(latC<latP && lonC<lonP) direction = MathFP.toFP("225"); 302 if(latP==latC && lonC<lonP) direction = MathFP.toFP("270"); 303 if(latC>latP && lonC<lonP) direction = MathFP.toFP("315"); 304 305 direction = Coordinates.degreesToRadians(direction); 306 return direction; 307 } 308 309 /** This is not working well 310 */ 311 public long getBearing(){ 312 313 long bearing = 0; 314 long latP = previousPosition.getLat(); 315 long lonP = previousPosition.getLon(); 316 long latD = destinationPosition.getLat(); 317 long lonD = destinationPosition.getLon(); 318 319 320 //if(latD>latP && lonD==lonP) bearing = MathFP.toFP("0"); lxxviii
  • 79.
    Software Defects PreventionTechniques – Example Project 321 if( latD>latP && MathFP.abs(MathFP.sub(lonD,lonP))<MathFP.toFP("5") ) bearing = MathFP.toFP("0"); 322 if(latD>latP && lonD>lonP) bearing = MathFP.toFP("45"); 323 //if(latD==latP && lonD>lonP) bearing = MathFP.toFP("90"); 324 if(MathFP.abs(MathFP.sub(latD,latP))<MathFP.toFP("5") && lonD>lonP) bearing = MathFP.toFP("90"); 325 if(latD<latP && lonD>lonP) bearing = MathFP.toFP("135"); 326 //if(latD<latP && lonP==lonD) bearing = MathFP.toFP("180"); 327 if(latD<latP && MathFP.abs(MathFP.sub(lonD,lonP))<MathFP.toFP("5") ) bearing = MathFP.toFP("180"); 328 if(latD<latP && lonD<lonP) bearing = MathFP.toFP("225"); 329 //if(latP==latD && lonD<lonP) bearing = MathFP.toFP("270"); 330 if(MathFP.abs(MathFP.sub(latD,latP))<MathFP.toFP("5") && lonD<lonP) bearing = MathFP.toFP("270"); 331 if(latD>latP && lonD<lonP) bearing = MathFP.toFP("315"); 332 333 334 bearing = Coordinates.degreesToRadians(bearing); 335 return bearing; 336 337 } 338 339 340 public void addNewFriend(int friendID){ 341 Point dummy = new Point(currentPosition,false); 342 Integer frID = new Integer(friendID); 343 friends.put(frID,dummy); 344 } 345 346 public void updateFriend(Integer friendID,Point p){ 347 friends.put(friendID,p); 348 } 349 350 public void deleteFriend(int friendID){ 351 Integer frID = new Integer(friendID); 352 friends.remove(frID); 353 System.out.println(friends); 354 } 355 356 public void deleteAllFriends(){ 357 //System.out.println("YIPI YAAA YEEEEE"); 358 friends.clear(); 359 //System.out.println(friends); 360 } 361 362 363 /** Conversion of hashtable into vector 364 */ 365 public PVector getFriends(){ 366 Vector v = new Vector(); 367 Enumeration e = friends.elements(); lxxix
  • 80.
    Zarko Acimovic 368 while(e.hasMoreElements()){ 369 v.addElement((Point)e.nextElement()); 370 } 371 372 PVector PFriends = new PVector(v,false); 373 return PFriends; 374 } 375 376 377 378 } lxxx
  • 81.
    Software Defects PreventionTechniques – Example Project MapsMIDlet.java All classes and interfaces must belong to a named package 17 PMD Marker Avoid really long classes. 17 PMD Marker Efferent Couplings is 36 17 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 90% 17 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 7,735% 17 Metrics Marker Number of Fields is 121 17 Metrics Marker The class 'MapsMIDlet' has a Cyclomatic Complexity of 22 (Highest = 202). 17 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 17 PMD Marker Too many fields 17 PMD Marker Weighted Methods per Class is 150 17 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 20 PMD Marker Use explicit scoping instead of the default package private level 20 PMD Marker Avoid variables with short names like mb 24 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 24 PMD Marker Use explicit scoping instead of the default package private level 24 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 25 PMD Marker Use explicit scoping instead of the default package private level 25 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 26 PMD Marker Use explicit scoping instead of the default package private level 26 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Avoid variables with short names like ic 30 PMD Marker Avoid variables with short names like cc 31 PMD Marker The field name indicates a constant but its modifiers do not 75 PMD Marker The field name indicates a constant but its modifiers do not 76 PMD Marker The field name indicates a constant but its modifiers do not 77 PMD Marker Avoid variables with short names like d 79 PMD Marker Avoid variables with short names like t1 100 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 100 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 101 PMD Marker Unused field: MapsMIDlet.t2 101 FindBugs Unread field: MapsMIDlet.first 106 FindBugs Unread field: MapsMIDlet.gpsHash 112 FindBugs Unread field: MapsMIDlet.gpsThr 114 FindBugs Unread field: MapsMIDlet.frndThr 115 FindBugs lxxxi
  • 82.
    Zarko Acimovic MapsMIDlet.java Avoid using implementation types like 'Vector'; use the interface instead 129 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 129 PMD Marker Consider replacing this Vector with the newer java.util.List 129 PMD Marker Avoid excessively long variable names like synchronizationDone 134 PMD Marker Unread field: MapsMIDlet.synchronizationDone 134 FindBugs Unused field: MapsMIDlet.setLine 142 FindBugs Unused field: MapsMIDlet.resetLine 143 FindBugs The field name indicates a constant but its modifiers do not 158 PMD Marker The field name indicates a constant but its modifiers do not 159 PMD Marker Unused field: MapsMIDlet.routeList 186 FindBugs Unused field: MapsMIDlet.allRoutes 188 FindBugs Unused field: MapsMIDlet.hideRoutes 189 FindBugs Unused field: MapsMIDlet.delRouteList 191 FindBugs Unused field: MapsMIDlet.delAllRoutes 192 FindBugs Unused field: MapsMIDlet.categories 197 FindBugs Lines of Code in Method is 165 201 Metrics Marker Number of Statements is 121 201 Metrics Marker Avoid really long methods. 204 PMD Marker The method startApp() has an NCSS count of 113 204 PMD Marker The String literal "Categories" appears 8 times in this file; the first occurrence is on 332 332 PMD Marker Use ArrayList instead of Vector 362 PMD Marker Avoid really long methods. 368 PMD Marker Cyclomatic Complexity is 121 368 Metrics Marker Lines of Code in Method is 819 368 Metrics Marker Number of Levels is 6 368 Metrics Marker Number of Locals in Scope is 30 368 Metrics Marker Number of Statements is 716 368 Metrics Marker Parameter 'c' is not assigned and could be declared final 368 PMD Marker Parameter 's' is not assigned and could be declared final 368 PMD Marker The method 'commandAction' has a Cyclomatic Complexity of 202. 368 PMD Marker The method commandAction() has an NCSS count of 539 368 PMD Marker Avoid using if statements without curly braces 370 PMD Marker Use equals() to compare object references. 370 PMD Marker Use equals() to compare object references. 371 PMD Marker Use equals() to compare object references. 371 PMD Marker Use equals() to compare object references. 374 PMD Marker Use equals() to compare object references. 374 PMD Marker Avoid empty catch blocks 399 PMD Marker MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception 399 FindBugs Avoid unnecessary comparisons in boolean expressions 413 PMD Marker lxxxii
  • 83.
    Software Defects PreventionTechniques – Example Project MapsMIDLet.java Avoid unnecessary comparisons in boolean expressions 422 PMD Marker Avoid using if statements without curly braces 422 PMD Marker Local variable 'wp' could be declared final 428 PMD Marker Local variable 'wp' could be declared final 434 PMD Marker Local variable 'name' could be declared final 450 PMD Marker Local variable 'sel' could be declared final 451 PMD Marker Local variable 'category' could be declared final 456 PMD Marker The local variable category is never read 456 Java Problem Do not add empty strings 468 PMD Marker Do not add empty strings 468 PMD Marker Avoid empty catch blocks 479 PMD Marker MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception 479 FindBugs The local variable category is never read 551 Java Problem Do not add empty strings 563 PMD Marker Do not add empty strings 563 PMD Marker Avoid empty catch blocks 574 PMD Marker MapsMIDlet.commandAction(Command, Displayable) might ignore java.lang.Exception 574 FindBugs Deeply nested if..then statements are hard to read 599 PMD Marker Avoid using if statements without curly braces 643 PMD Marker Avoid using if statements without curly braces 644 PMD Marker Avoid unnecessary comparisons in boolean expressions 670 PMD Marker Avoid unnecessary comparisons in boolean expressions 695 PMD Marker Avoid instantiating new objects inside loops 700 PMD Marker Avoid instantiating new objects inside loops 735 PMD Marker Consider replacing this Vector with the newer java.util.List 766 PMD Marker Avoid instantiating new objects inside loops 775 PMD Marker Avoid instantiating new objects inside loops 786 PMD Marker Avoid instantiating new objects inside loops 828 PMD Marker Consider replacing this Vector with the newer java.util.List 881 PMD Marker Consider replacing this Vector with the newer java.util.List 881 PMD Marker Write to static field MapsMIDlet.resource from instance method MapsMIDlet.commandAction(Command, Displayable) 1023 FindBugs To be compliant to J2EE, a webapp should not use any thread. 1028 PMD Marker Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty() 1049 PMD Marker Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty() 1105 PMD Marker Cyclomatic Complexity is 11 1190 Metrics Marker Lines of Code in Method is 87 1190 Metrics Marker Number of Levels is 7 1190 Metrics Marker Number of Locals in Scope is 16 1190 Metrics Marker Number of Statements is 73 1190 Metrics Marker The method 'run' has a Cyclomatic Complexity of 17. 1190 PMD Marker lxxxiii
  • 84.
    Zarko Acimovic MapsMIDlet.java Parameter 'flag' is not assigned and could be declared final 1287 PMD Marker Lines of Code in Method is 16 1291 Metrics Marker Parameter 's' is not assigned and could be declared final 1296 PMD Marker Avoid unused local variables such as 'k'. 1297 PMD Marker Dead store to k in MapsMIDlet.compact(String) 1297 FindBugs The local variable k is never read 1297 Java Problem MapsMIDlet.compact(String) concatenates strings using + in a loop 1302 FindBugs Prefer StringBuffer over += for concatenating strings 1302 PMD Marker Avoid unused local variables such as 'kk'. 1304 PMD Marker Dead store to kk in MapsMIDlet.compact(String) 1304 FindBugs The local variable kk is never read 1304 Java Problem Parameter 's' is not assigned and could be declared final 1308 PMD Marker Avoid unused local variables such as 'k'. 1309 PMD Marker Dead store to k in MapsMIDlet.compactFine(String) 1309 FindBugs The local variable k is never read 1309 Java Problem MapsMIDlet.compactFine(String) concatenates strings using + in a loop 1314 FindBugs Prefer StringBuffer over += for concatenating strings 1314 PMD Marker Avoid unused local variables such as 'kk'. 1316 PMD Marker Dead store to kk in MapsMIDlet.compactFine(String) 1316 FindBugs The local variable kk is never read 1316 Java Problem Cyclomatic Complexity is 6 1320 Metrics Marker Lines of Code in Method is 31 1320 Metrics Marker Number of Statements is 26 1320 Metrics Marker Avoid empty catch blocks 1335 PMD Marker 1 /** 2 * 3 * MapsMIDlet creates control menus due to user's actions and handles GPS issues 4 * 5 */ 6 import javax.microedition.lcdui.*; 7 8 import javax.microedition.midlet.*; 9 10 import java.util.*; 11 import java.io.*; 12 13 14 15 16 17 public class MapsMIDlet extends MIDlet implements CommandListener,Runnable { 18 19 lxxxiv
  • 85.
    Software Defects PreventionTechniques – Example Project 20 MapBackgroundFactory mbf = new MapBackgroundFactory("/Mali2.png", "/Srednji.png","/Veliki.png", 21 "44.83049905", "20.44570857", "44.79241639", "20.48713523"); 22 23 24 MapBackground mb; 25 MapObjects mob; 26 SelectorPoint selP; 27 Outlook oul; 28 29 PVector vwpF = new PVector("free",false); 30 ImageCanvas3 ic; 31 CompassCanvas cc; 32 33 //Point wp3 = new Point("44.81916183","20.45417165","Klub'Akademija'","j","/Cultural_or_Tourist/Event .png",true); 34 Point wp2 = new Point("44.82990854","20.45661377","25. maj","j","/Sport/Swimming.png",true); 35 Point wp1 = new Point("44.81573706","20.45998215","Sp. Knezu Mihailu","j","/Cultural_or_Tourist/Monument.png",true); 36 37 Point wp4 = new Point("44.8178034","20.45177167","Saborna crkva","j","/Cultural_or_Tourist/Church.png",true); 38 Point wp5 = new Point("44.82577520","20.45459270","Zooloski vrt","j","/Cultural_or_Tourist/Zoo.png",true); 39 40 Point wp6 = new Point("44.81293225","20.46132951","Grinet kafe","j","/Service_or_Utility/Cafe.png",true); 41 Point wp7 = new Point("44.81426084","20.45943480","Trzni centar 'Sremska'","j","/Service_or_Utility/Shop.png",true); 42 Point wp8 = new Point("44.81248939","20.46006637","Bioskop 20.oktobar","j","/Service_or_Utility/Cinema.png",true); 43 Point wp9 = new Point("44.81293225","20.46743470","Policija","j","/Service_or_Utility/Police.png",t rue); 44 Point wp10 = new Point("44.81854182","20.45711898","Filoloski fakultet","j","/Service_or_Utility/School.png",true); 45 Point wp11 = new Point("44.82518476","20.45737165","Bioskop REX","j","/Service_or_Utility/Cinema.png",true); 46 Point wp12 = new Point("44.80496078","20.47652941","Elektrotehnicki fakultet","j","/Service_or_Utility/School.png",true); 47 Point wp13 = new Point("44.80466556","20.47337150","RCUB","j","/Service_or_Utility/School.png",true) ; 48 Point wp14 = new Point("44.80865126","20.46368736","Apoteka","j","/Service_or_Utility/Pharmacy.png", true); 49 Point wp15 = new Point("44.80067980","20.45737165","Urgentni centar","j","/Service_or_Utility/Redcross.png",true); lxxxv
  • 86.
    Zarko Acimovic 50 51 52 53 54 /** Point wp3 = new Point(45,2 , 1,'N',22,20, 5,'E',"c1","j"); 55 Point wp4 = new Point(45,13, 2,'N',21,58, 5,'E',"d1","j"); 56 Point wp5 = new Point(46,45, 1,'N',21,20, 5,'E',"e1","j"); 57 Point wp6 = new Point(46,48,23,'N',21,23, 9,'E',"f1","j"); 58 Point wp7 = new Point(46,30,50,'N',22,25,50,'E',"g1","j"); 59 Point wp8 = new Point(46,48,59,'N',20,27,17,'E',"a","j"); 60 Point wp9 = new Point(46,45, 0,'N',20,26,15,'E',"b","j"); 61 Point wp10 = new Point(46,42, 0,'N',20,29,15,'E',"c","j"); 62 Point wp11 = new Point(46,39, 0,'N',20,29,15,'E',"d","j"); 63 Point wp12 = new Point(46,10,23,'N',20,30, 9,'E',"e","j"); 64 Point wp13 = new Point(45,50,23,'N',20,33, 9,'E',"f","j"); 65 Point wp14 = new Point(46,30,23,'N',20,52, 9,'E',"g","j"); 66 Point wp15 = new Point(46,25,23,'N',20,54, 0,'E',"h","j"); 67 Point wp16 = new Point(46,20,23,'N',20,46, 0,'E',"i","j"); 68 Point wp17 = new Point(46,10,23,'N',20,48, 0,'E',"j","j"); 69 Point wp18 = new Point(45,50,23,'N',20,35, 0,'E',"k","j"); */ 70 71 Point selectedWP; 72 73 74 ///////////////////////COMMANDS,MENUS,BUTTONS 75 Command DUMMY; 76 Command DELIM; 77 Command MAP_CMD; 78 79 Display d = Display.getDisplay(this); 80 81 List modes; 82 Command selectCmd; 83 Command mapviewCmd; 84 Command compassCmd; 85 86 87 88 Command opt; 89 Command mod; 90 91 List MVList; 92 Command Points; 93 Command routes; 94 Command gps; 95 Command friends; 96 Command ZoomIn; 97 Command ZoomOut; 98 Command exitCmd; 99 SimpleTextForm gpsTf; lxxxvi
  • 87.
    Software Defects PreventionTechniques – Example Project 100 Thread t1; 101 Thread t2; 102 103 static String resource=""; 104 boolean gpsON = false; 105 static String show = ""; 106 boolean first = false; 107 List friendList; 108 Command addNewFriend ; 109 Command onGPSc; 110 Command offGPSc; 111 List gpsList; 112 int gpsHash = 0; 113 114 int gpsThr = 0; 115 int frndThr = 0; 116 int currentlyShowed = 0; 117 Hashtable thrHash = new Hashtable(); 118 Vector listOfFriends = new Vector(); 119 SimpleTextForm friendForm; 120 Command stopFollow; 121 Command deleteFriends; 122 boolean followFriends = false; 123 124 List oneFriend; 125 Command stopFollowOne; 126 Command deleteFriend; 127 128 Thread4Friend tff; 129 Vector whiteList; 130 String friend; 131 132 boolean syncFollow = false; 133 long globalTimeStamp = 0; 134 boolean synchronizationDone = false; 135 136 List WPselected; 137 Command setAsCurrent; 138 Command setDest1; 139 Command edit; 140 Command delete; 141 Command measDist; 142 Command setLine; 143 Command resetLine; 144 145 146 List WPnotSel; 147 Command setCurrent; 148 Command setDest2; 149 Command addWP; 150 lxxxvii
  • 88.
    Zarko Acimovic 151 CommaHyphenString chs = new CommaHyphenString(); 152 TextForm tf1; // form for adding new Point on selected spot 153 TextForm tf2; // form for editing of selected Point 154 TextForm tf33; // form for adding waypoint with user entered data for (lat,lon) 155 TextForm previous; 156 TextFormImage tf11; //form for adding new Point with images for selected categories 157 TextFormImage tf22; 158 Command SAVE_CMD; 159 Command CONT_CMD; 160 Command BACK_CMD; 161 Alert a = new Alert("Warning","Please Select Point!",null,AlertType.INFO); 162 163 List WPList; //List of Points 164 Command addNewWP; 165 Command sortWP; 166 Command sortNameWP; 167 boolean showID = false; 168 Command showIDcom; 169 List previousList; 170 171 172 TextForm tfAdd; //form for adding Point with complete info about coordinates 173 174 List sorted; 175 176 177 List routeMain; 178 Command createNewRoute; 179 Command showRoutes; 180 Command delRoute; 181 182 List routeNew; 183 Command addPoint; 184 Command routeFin; 185 186 List routeList; 187 List routeOptions; 188 Command allRoutes; 189 Command hideRoutes; 190 191 List delRouteList; 192 Command delAllRoutes; 193 String nameR = ""; 194 195 PVector newRouteVector; 196 SimpleTextForm tf3; ///form for defining name of route 197 String[] categories; lxxxviii
  • 89.
    Software Defects PreventionTechniques – Example Project 198 boolean routeSetting = false; 199 200 String[] pathToImage; 201 /** 202 * @see MIDlet#startApp() 203 */ 204 protected void startApp() throws MIDletStateChangeException { 205 206 mb = mbf.getMapBackground(); 207 mob = new MapObjects(mb); 208 209 vwpF.addElement(wp1); 210 vwpF.addElement(wp2); 211 //vwpF.addElement(wp3); 212 vwpF.addElement(wp4); 213 vwpF.addElement(wp5); 214 vwpF.addElement(wp6); 215 vwpF.addElement(wp7); 216 vwpF.addElement(wp8); 217 vwpF.addElement(wp9); 218 vwpF.addElement(wp10); 219 vwpF.addElement(wp11); 220 vwpF.addElement(wp12); 221 vwpF.addElement(wp13); 222 vwpF.addElement(wp14); 223 vwpF.addElement(wp15); 224 225 226 227 mob.setFreeWaypointsV(vwpF); 228 229 selP = new SelectorPoint(mb,mob); 230 231 oul = new Outlook(mb,mob,selP); 232 233 ic = new ImageCanvas3(oul); 234 235 236 //////////////////////////COMMANDS,MENUS,BUTTONS 237 238 DUMMY = new Command(" ",Command.SCREEN,1); 239 DELIM = new Command("------------------",Command.SCREEN,1); 240 MAP_CMD = new Command("View on Map",Command.BACK,1); 241 BACK_CMD = new Command("Back to Previous Screen",Command.BACK,1); 242 243 mod = new Command("Mode",Command.SCREEN,1); 244 modes = new List("",List.IMPLICIT); 245 selectCmd = new Command("Selection",Command.SCREEN,1); 246 mapviewCmd = new Command("Mapview",Command.SCREEN,1); lxxxix
  • 90.
    Zarko Acimovic 247 compassCmd = new Command("Compass",Command.SCREEN,1); 248 exitCmd = new Command("Exit",Command.SCREEN,1); 249 modes.append("PLEASE SELECT NEW MODE FROM MENU...",null); 250 modes.addCommand(DUMMY); 251 modes.addCommand(mapviewCmd); 252 modes.addCommand(selectCmd); 253 modes.addCommand(compassCmd); 254 modes.addCommand(exitCmd); 255 modes.setCommandListener(this); 256 257 opt = new Command("Option",Command.SCREEN,1); 258 259 260 261 // Map View options 262 MVList = new List("",List.IMPLICIT); 263 Points = new Command("Waypoints",Command.SCREEN,1); 264 routes = new Command("Routes",Command.SCREEN,1); 265 gps = new Command("GPS",Command.SCREEN,1); 266 267 friends = new Command("Friends",Command.SCREEN,1); 268 ZoomIn = new Command("Zoom In",Command.SCREEN,1); 269 ZoomOut = new Command("Zoom Out",Command.SCREEN,1); 270 //Exit = new Command("Exit",Command.EXIT,1); 271 272 MVList.addCommand(DUMMY); 273 MVList.addCommand(Points); 274 MVList.addCommand(routes); 275 MVList.addCommand(gps); 276 MVList.addCommand(friends); 277 MVList.addCommand(ZoomIn); 278 MVList.addCommand(ZoomOut); 279 MVList.addCommand(BACK_CMD); 280 MVList.setCommandListener(this); 281 282 CONT_CMD = new Command("Continue",Command.SCREEN,1); 283 gpsTf = new SimpleTextForm(false); 284 gpsTf.addCommand(CONT_CMD); 285 gpsTf.setCommandListener(this); 286 287 288 289 290 // If Point is selected 291 WPselected = new List("",List.IMPLICIT); 292 setAsCurrent = new Command("Set as Current",Command.SCREEN,1); 293 setDest1 = new Command("Set as Destination",Command.SCREEN,1); 294 edit = new Command("Edit",Command.SCREEN,1); 295 delete = new Command("Delete",Command.SCREEN,1); xc
  • 91.
    Software Defects PreventionTechniques – Example Project 296 measDist = new Command("Measure Distance",Command.SCREEN,1); 297 298 299 WPselected.addCommand(DUMMY); 300 WPselected.addCommand(MAP_CMD); 301 WPselected.addCommand(setAsCurrent); 302 WPselected.addCommand(setDest1); 303 WPselected.addCommand(edit); 304 WPselected.addCommand(delete); 305 WPselected.addCommand(measDist); 306 WPselected.addCommand(BACK_CMD); 307 WPselected.setCommandListener(this); 308 309 310 311 // If Point is not selected 312 WPnotSel = new List("",List.IMPLICIT); 313 setCurrent = new Command("Set Current",Command.SCREEN,1); 314 setDest2 = new Command("Set Destination",Command.SCREEN,1); 315 addWP = new Command("Add Waypoint",Command.SCREEN,1); 316 317 WPnotSel.addCommand(DUMMY); 318 WPnotSel.addCommand(setCurrent); 319 WPnotSel.addCommand(setDest2); 320 WPnotSel.addCommand(addWP); 321 WPnotSel.addCommand(measDist); 322 //WPnotSel.addCommand(MAP_CMD); 323 WPnotSel.addCommand(BACK_CMD); 324 WPnotSel.setCommandListener(this); 325 326 WPList = new List("",List.IMPLICIT); 327 addNewWP = new Command("Add Waypoint",Command.SCREEN,1); 328 sortWP = new Command("Sort Waypoints by Distance",Command.SCREEN,1); 329 sortNameWP = new Command("Sort Waypoints by Name",Command.SCREEN,1); 330 showIDcom = new Command("Show/Hide ID",Command.SCREEN,1); 331 332 tfAdd = new TextForm(chs.getCategories(this.getAppProperty("Categories")),false); 333 334 tfAdd.addCommand(CONT_CMD); 335 tfAdd.setCommandListener(this); 336 337 sorted = new List("",List.IMPLICIT); 338 sorted.setCommandListener(this); 339 340 341 ic.addCommand(opt); xci
  • 92.
    Zarko Acimovic 342 ic.addCommand(mod); 343 ic.setCommandListener(this); 344 345 346 tf1 = new TextForm(chs.getCategories(this.getAppProperty("Categories")),false);///form for adding new Point on selected spot 347 tf2 = new TextForm(chs.getCategories(this.getAppProperty("Categories")),false);/// form for editing of selected Point 348 tf33 = new TextForm(chs.getCategories(this.getAppProperty("Categories")),true);/// form for editing of selected Point 349 350 SAVE_CMD = new Command("Save",Command.SCREEN,1); 351 352 tf1.addCommand(CONT_CMD); 353 tf1.addCommand(BACK_CMD); 354 tf1.setCommandListener(this); 355 tf2.addCommand(CONT_CMD); 356 tf2.addCommand(BACK_CMD); 357 tf2.setCommandListener(this); 358 tf33.addCommand(CONT_CMD); 359 tf33.addCommand(BACK_CMD); 360 tf33.setCommandListener(this); 361 362 whiteList = new Vector(); 363 364 d.setCurrent(ic); 365 } 366 367 368 public void commandAction(Command c, Displayable s){ 369 370 if (c==MAP_CMD) d.setCurrent(ic); 371 if (s==ic && c==mod){ 372 d.setCurrent(modes); 373 } 374 if (s==modes && c==selectCmd){ 375 oul.setSelect(); 376 ic.repaint(); 377 d.setCurrent(ic); 378 selP.resetBig(); 379 selP.resetColor(); 380 } 381 if (s==modes && c==mapviewCmd){ 382 selP.resetColor(); 383 selP.resetBig(); 384 oul.resetSelect(); 385 d.setCurrent(ic); 386 } xcii
  • 93.
    Software Defects PreventionTechniques – Example Project 387 388 if (s==modes && c==compassCmd){ 389 oul.resetSelect(); 390 cc = new CompassCanvas(mob); 391 cc.addCommand(MAP_CMD); 392 cc.setCommandListener(this); 393 d.setCurrent(cc); 394 } 395 396 if (s==modes && c==exitCmd){ 397 try{ 398 destroyApp(false); 399 }catch(Exception e){} 400 notifyDestroyed(); 401 return; 402 } 403 404 if(s==cc && c==MAP_CMD){ 405 cc.setEnd(); 406 ic = new ImageCanvas3(oul); 407 ic.addCommand(opt); 408 ic.addCommand(mod); 409 ic.setCommandListener(this); 410 d.setCurrent(ic); 411 } 412 413 if (s==ic && c==opt && routeSetting==false){ 414 if(oul.getSelect()==true) { 415 selectedWP = selP.getSelectedWP(); 416 if(selectedWP.getName()=="selector") d.setCurrent(WPnotSel); 417 if(selectedWP.getName()!="selector") { 418 d.setCurrent(WPselected); 419 previousList=null; 420 } 421 } 422 if(oul.getSelect()==false) d.setCurrent(MVList); 423 } 424 425 426 // IF Point NOT SELECTED 427 if(s==WPnotSel && c==setCurrent){ 428 Point wp = selP.getSelector(); 429 wp.setName("current"); 430 mob.setCurrentPosition(wp); 431 d.setCurrent(ic); 432 } 433 if(s==WPnotSel && c==setDest2){ 434 Point wp = selP.getSelector(); 435 wp.setName("dest"); 436 mob.setDestinationPosition(wp); xciii
  • 94.
    Zarko Acimovic 437 d.setCurrent(ic); 438 } 439 440 // ADD Point ON SELECTED SPOT 441 if(s==WPnotSel && c==addWP){ 442 tf1.setName("default"); //form for adding new Point on selected spot 443 //tf1.setType("Type will be set according to category"); 444 tf1.setLat(selP.getSelector().getLat()); 445 tf1.setLon(selP.getSelector().getLon()); 446 d.setCurrent(tf1); 447 } 448 449 if (s.equals(tf1) && c == CONT_CMD){ 450 String name = tf1.getName(); 451 int sel = tf1.getSelected(); 452 453 // chs is instance of CommaHypenString class 454 // which helps us process hyphens and commas in 455 //.properties file 456 String[] category = chs.getCategories(this.getAppProperty("Categories")); 457 String[] categoryHyphen = chs.getCategoriesHyphen(this.getAppProperty("Categories")); 458 459 // elements of a selected category: as simle strings and as hyphen-strings 460 String catMatches = this.getAppProperty(categoryHyphen[sel]); 461 String[] arCatMatches = chs.getStringsOnly(catMatches); 462 String[] arCatHyphMatches = chs.getWithLowLine(catMatches); 463 464 // images that correspond to category elements 465 String[] imageStr = new String[arCatMatches.length]; 466 Image[] img = new Image[arCatMatches.length]; 467 for(int i=0; i<arCatMatches.length; i++){ 468 imageStr[i] = this.getAppProperty(""+arCatHyphMatches[i]+""); 469 imageStr[i] = this.compact(imageStr[i]); 470 } 471 472 pathToImage = new String[arCatMatches.length]; 473 for (int i=0; i<arCatMatches.length; i++){ 474 try{ 475 String str = categoryHyphen[sel] +"/"+imageStr[i]; xciv
  • 95.
    Software Defects PreventionTechniques – Example Project 476 str = compact(str); //getting rid off blanco spots 477 pathToImage[i] = str; 478 img[i] = Image.createImage(str); 479 } catch(Exception e){} 480 } 481 482 tf11 = new TextFormImage("",arCatMatches,img); 483 tf11.setNameCHGR("Please select type"); 484 tf11.setName(name); 485 //tf11.setType("Please select type"); 486 tf11.addCommand(BACK_CMD); 487 tf11.addCommand(SAVE_CMD); 488 tf11.setCommandListener(this); 489 d.setCurrent(tf11); 490 } 491 492 if(s==tf1 && c==BACK_CMD){ 493 d.setCurrent(WPnotSel); 494 } 495 496 if(s==tf11 && c==BACK_CMD){ 497 d.setCurrent(tf1); 498 } 499 500 if(s==tf11 && c==SAVE_CMD){ 501 Point wp = selP.getSelector(); 502 wp.setName(tf11.getName()); 503 int sel = tf11.getSelected(); 504 String cmpct = compact(pathToImage[sel]); 505 wp.setImage(cmpct); 506 mob.addFreeWaypoint(wp); 507 d.setCurrent(ic); 508 } 509 510 if(s==WPselected && c==setAsCurrent){ 511 mob.setCurrentPosition(selectedWP); 512 d.setCurrent(ic); 513 } 514 515 if(s==WPselected && c==setDest1){ 516 mob.setDestinationPosition(selectedWP); 517 d.setCurrent(ic); 518 } 519 520 //Edit of Point 521 if(s==WPselected && c==edit){ 522 tf2.setName(selectedWP.getName()); 523 tf2.setType(selectedWP.getType()); 524 tf2.setLat(selectedWP.getLat()); 525 tf2.setLon(selectedWP.getLon()); xcv
  • 96.
    Zarko Acimovic 526 d.setCurrent(tf2); 527 } 528 529 530 //Editing of waypoint OR inserting waypoint from text form 531 if ( (s.equals(tf2)||s.equals(tf33)) && c == CONT_CMD){ 532 String name =""; 533 int sel = 0; 534 535 if(s.equals(tf2)){ 536 name = tf2.getName(); 537 sel = tf2.getSelected(); 538 previous = tf2; 539 } 540 541 if(s.equals(tf33)){ 542 name = tf33.getName(); 543 sel = tf33.getSelected(); 544 previous = tf33; 545 } 546 547 548 // chs is instance of CommaHypenString class 549 // which helps us process hyphens and commas in 550 //.properties file 551 String[] category = chs.getCategories(this.getAppProperty("Categories")); 552 String[] categoryHyphen = chs.getCategoriesHyphen(this.getAppProperty("Categories")); 553 554 // elements of a selected category: as simle strings and as hyphen-strings 555 String catMatches = this.getAppProperty(categoryHyphen[sel]); 556 String[] arCatMatches = chs.getStringsOnly(catMatches); 557 String[] arCatHyphMatches = chs.getWithLowLine(catMatches); 558 559 // images that correspond to category elements 560 String[] imageStr = new String[arCatMatches.length]; 561 Image[] img = new Image[arCatMatches.length]; 562 for(int i=0; i<arCatMatches.length; i++){ 563 imageStr[i] = this.getAppProperty(""+arCatHyphMatches[i]+""); 564 imageStr[i] = this.compact(imageStr[i]); 565 } 566 567 pathToImage = new String[arCatMatches.length]; 568 for (int i=0; i<arCatMatches.length; i++){ xcvi
  • 97.
    Software Defects PreventionTechniques – Example Project 569 try{ 570 String str = categoryHyphen[sel] +"/"+imageStr[i]; 571 str = compact(str); //getting rid off blanco spots 572 pathToImage[i] = str; 573 img[i] = Image.createImage(str); 574 } catch(Exception e){} 575 } 576 577 tf22 = new TextFormImage("",arCatMatches,img); 578 tf22.setNameCHGR("Please select type"); 579 tf22.setName(name); 580 tf22.addCommand(BACK_CMD); 581 tf22.addCommand(SAVE_CMD); 582 tf22.setCommandListener(this); 583 d.setCurrent(tf22); 584 } 585 586 if(s==tf2 && c==BACK_CMD){ 587 d.setCurrent(WPselected); 588 } 589 590 if(s==tf22 && c==BACK_CMD){ 591 d.setCurrent(previous); 592 } 593 594 if(s==tf22 && c==SAVE_CMD){ 595 596 //Editing of waypoint 597 if(previous == tf2){ 598 Point wp = selP.getSelectedWP(); 599 if(wp.getLat()==0){ 600 wp = new Point(tf2.getLat(),tf2.getLon(),tf22.getName(),"","blanco",false); 601 } 602 wp.setName(tf22.getName()); 603 int sel = tf22.getSelected(); 604 String cmpct = compact(pathToImage[sel]); 605 wp.setImage(cmpct); 606 wp.setLat(tf2.getLat()); 607 wp.setLon(tf2.getLon()); 608 selP.deleteWP(); 609 mob.addFreeWaypoint(wp); 610 selP.setColor(); 611 d.setCurrent(ic); 612 } 613 614 // New waypoint from text form 615 if(previous==tf33){ xcvii
  • 98.
    Zarko Acimovic 616 Point wp = new Point(tf33.getLat(),tf33.getLon(),tf22.getName(),"","blanco",false); 617 wp.setName(tf22.getName()); 618 int sel = tf22.getSelected(); 619 String cmpct = compact(pathToImage[sel]); 620 wp.setImage(cmpct); 621 wp.setLat(tf33.getLat()); 622 wp.setLon(tf33.getLon()); 623 mob.addFreeWaypoint(wp); 624 d.setCurrent(ic); 625 } 626 } 627 628 629 // Delete Point 630 if(s==WPselected && c==delete){ 631 int k = selP.deleteWP(); 632 if(k==-1){ 633 a.setTimeout(3000); 634 a.setString("More than one Point selected"); 635 d.setCurrent(a); 636 } else { 637 selP.resetBig(); 638 d.setCurrent(ic); 639 } 640 } 641 642 if(s==WPselected && c==BACK_CMD){ 643 if(previousList==null) d.setCurrent(ic); 644 if(previousList!=null) d.setCurrent(previousList); 645 } 646 647 648 // Measuring distance between current position and selected WAYPOINT 649 if(s==WPselected && c==measDist){ 650 if(mob.getCurrentPosition().getName().equals("dummy")){ 651 a.setTimeout(3000); 652 a.setString("Current position is not set"); 653 d.setCurrent(a); 654 655 } else { 656 a.setTimeout(3000); 657 selectedWP = selP.getSelectedWP(); 658 long k = mob.measureDistance(selectedWP); 659 a.setString("Distance is "+k+" m"); 660 d.setCurrent(a); 661 } 662 xcviii
  • 99.
    Software Defects PreventionTechniques – Example Project 663 } 664 665 666 // Measuring distance between current position and selected LOCATION 667 if(s==WPnotSel && c==measDist){ 668 selectedWP = selP.getSelector(); 669 long k = mob.measureDistance(selectedWP); 670 if(mob.currentSet()==false){ 671 a.setTimeout(3000); 672 a.setString("Current position is not set"); 673 d.setCurrent(a); 674 675 } else { 676 a.setTimeout(3000); 677 a.setString("Distance is "+k+" m"); 678 d.setCurrent(a); 679 } 680 } 681 682 if(s==WPnotSel && c==BACK_CMD) d.setCurrent(ic); 683 684 685 686 687 688 // -----------------Showing up all Points and some operations--------------- 689 if(s==MVList && c==Points){ 690 setWPList(); 691 692 for(int i=0; i<mob.freeWaypoints.size(); i++){ 693 Point wp = (Point)mob.freeWaypoints.elementAt(i); 694 String name = ""; 695 if(showID==true){ 696 name = wp.getName() +"_"+wp.getID(); 697 } else { 698 name = wp.getName(); 699 } 700 Command cc = new Command(name,Command.SCREEN,1); 701 WPList.addCommand(cc); 702 } 703 d.setCurrent(WPList); 704 } 705 706 if(s==MVList && c==BACK_CMD){ 707 d.setCurrent(ic); 708 } xcix
  • 100.
    Zarko Acimovic 709 710 if(s==MVList && c==ZoomIn){ 711 oul.ZoomIn(); 712 d.setCurrent(ic); 713 } 714 715 if(s==MVList && c==ZoomOut){ 716 oul.ZoomOut(); 717 d.setCurrent(ic); 718 } 719 720 721 // displaying of IDs of icons 722 if(s==WPList && c==showIDcom){ 723 if(showID==true) {showID=false; } else {showID=true;} 724 725 setWPList(); 726 727 for(int i=0; i<mob.freeWaypoints.size(); i++){ 728 Point wp = (Point)mob.freeWaypoints.elementAt(i); 729 String name = ""; 730 if(showID==true){ 731 name = wp.getName() +"_"+wp.getID(); 732 } else { 733 name = wp.getName(); 734 } 735 Command cc = new Command(name,Command.SCREEN,1); 736 WPList.addCommand(cc); 737 } 738 d.setCurrent(WPList); 739 } 740 741 742 // Adding new Point with all attributes such as 743 // LATITUDE and LONGITUDE 744 // We deal with tf33 same as with tf2 (tf2 is used for 745 // inserting new data for selected location 746 // Here default values for coordinates are those of center of the map 747 748 if(s==WPList && c==addNewWP){ 749 tf33.setName("Center of Map");//44.80345511,20.42949821 750 tf33.setType(""); 751 tf33.setLat("44.80345511"); 752 tf33.setLon("20.42949821"); 753 d.setCurrent(tf33); c
  • 101.
    Software Defects PreventionTechniques – Example Project 754 } 755 756 757 758 if(s==tf33 && c==BACK_CMD){ 759 d.setCurrent(WPList); 760 } 761 762 //sorting waypoints by distance 763 if(s==WPList && c==sortWP){ 764 setWPList(); 765 766 Vector sor = mob.freeWaypoints.sortAscending(mob.getCurrentPosition()); 767 for(int i=0; i<sor.size(); i++){ 768 Point wp = (Point)sor.elementAt(i); 769 String name = ""; 770 if(showID==true){ 771 name = wp.getName()+" "+wp.getID(); 772 } else { 773 name = wp.getName(); 774 } 775 Command cc = new Command(name,Command.SCREEN,1); 776 WPList.addCommand(cc); 777 } 778 d.setCurrent(WPList); 779 } 780 781 //sorting waypoints by name 782 if(s==WPList && c==sortNameWP){ 783 setWPList(); 784 String[] sor = mob.freeWaypoints.sortByName(); 785 for(int i=0; i<sor.length; i++){ 786 Command cc = new Command(sor[i],Command.SCREEN,1); 787 WPList.addCommand(cc); 788 } 789 d.setCurrent(WPList); 790 } 791 792 793 if(s==WPList && c==MAP_CMD){ 794 d.setCurrent(ic); 795 } 796 797 if(s==WPList && c==BACK_CMD){ 798 d.setCurrent(MVList); 799 } 800 801 //Displaying selected waypoint ci
  • 102.
    Zarko Acimovic 802 if(s==WPList && c!=sortWP && c!=addNewWP && c!=MAP_CMD && c!=sortNameWP && c!=DUMMY && c!=BACK_CMD){ 803 String name = c.getLabel(); 804 mb.param=true; 805 selP.selectWP(name); 806 oul.setSelect(); 807 oul.setWPselection(); 808 d.setCurrent(WPselected); 809 previousList = WPList; 810 } 811 812 813 814 // -------------- ROUTES -------------------------------- 815 816 // Main Menu for Routes 817 if(s==MVList && c==routes){ 818 routeMain = new List("",List.IMPLICIT); 819 createNewRoute = new Command("New Route",Command.SCREEN,1); 820 routeMain.addCommand(DUMMY); 821 routeMain.addCommand(createNewRoute); 822 routeMain.addCommand(BACK_CMD); 823 routeMain.addCommand(DELIM); 824 routeMain.setCommandListener(this); 825 for(int i=0; i<mob.getRoutes().size(); i++){ 826 PVector route = (PVector)mob.getRoutes().elementAt(i); 827 String name = route.getName(); 828 Command cr = new Command(name,Command.SCREEN,1); 829 routeMain.addCommand(cr); 830 } 831 d.setCurrent(routeMain); 832 } 833 834 if(s==routeMain && c==BACK_CMD){ 835 d.setCurrent(MVList); 836 } 837 838 //Creating a New Route 839 if(s==routeMain && c==createNewRoute){ 840 tf3 = new SimpleTextForm(false); 841 tf3.addCommand(SAVE_CMD); 842 tf3.setCommandListener(this); 843 d.setCurrent(tf3); 844 } 845 846 847 if(s==tf3 && c==SAVE_CMD){ 848 newRouteVector = new PVector("",true); cii
  • 103.
    Software Defects PreventionTechniques – Example Project 849 newRouteVector.setName(tf3.getName()); 850 newRouteVector.setVisible(); 851 mob.addRoute(newRouteVector); 852 853 routeNew = new List("",List.IMPLICIT); 854 addPoint = new Command("Add Waypoint",Command.SCREEN,1); 855 routeFin = new Command("Route Finished",Command.SCREEN,1); 856 routeNew.addCommand(addPoint); 857 routeNew.addCommand(routeFin); 858 routeNew.setCommandListener(this); 859 860 d.setCurrent(routeNew); 861 } 862 863 864 // Selection of specific route 865 if(s==routeMain && c!=createNewRoute && c!=DUMMY && c! =BACK_CMD && c!=DELIM){ 866 nameR = c.getLabel(); 867 routeOptions = new List("",List.IMPLICIT); 868 showRoutes = new Command("Show/Hide Route",Command.SCREEN,1); 869 delRoute = new Command("Delete Route",Command.SCREEN,1); 870 routeOptions.addCommand(DUMMY); 871 routeOptions.addCommand(MAP_CMD); 872 routeOptions.addCommand(showRoutes); 873 routeOptions.addCommand(delRoute); 874 routeOptions.addCommand(BACK_CMD); 875 routeOptions.setCommandListener(this); 876 d.setCurrent(routeOptions); 877 } 878 879 //Viewing selected route 880 if(s==routeOptions && c==showRoutes){ 881 Vector allR = (Vector) mob.getRoutes(); 882 for(int i=0; i<allR.size(); i++){ 883 PVector rt = (PVector)allR.elementAt(i); 884 if(rt.getName()==nameR) { 885 if(rt.size()!=0){ 886 if(rt.getVisible()==true){ 887 rt.resetVisible(); 888 d.setCurrent(ic); 889 }else{ 890 rt.setVisible(); 891 Point wp = (Point) rt.elementAt(0); 892 String name = wp.getName(); ciii
  • 104.
    Zarko Acimovic 893 selP.selectWP(name); 894 oul.setSelect(); 895 selP.resetColor(); 896 selP.resetBig(); 897 d.setCurrent(ic); 898 } 899 } 900 if(rt.size()==0){ 901 a.setTitle("Warning"); 902 a.setString("Route has no points to show"); 903 a.setTimeout(5000); 904 d.setCurrent(a); 905 } 906 907 } 908 if(rt.getName()!=nameR) rt.resetVisible(); 909 } 910 } 911 912 913 //Deletion of selected route 914 if(s==routeOptions && c==delRoute){ 915 Vector v = mob.getRoutes(); 916 for(int i=0; i<v.size(); i++){ 917 PVector wpv = (PVector)v.elementAt(i); 918 if(wpv.getName()==nameR){ 919 mob.removeRoute(nameR); 920 i=1000; 921 } 922 } 923 d.setCurrent(ic); 924 } 925 926 927 //Mapview 928 if(s==routeOptions && c==MAP_CMD){ 929 Vector v = mob.getRoutes(); 930 for(int i=0; i<v.size(); i++){ 931 PVector wpv = (PVector)v.elementAt(i); 932 if(wpv.getName()==nameR){ 933 Point p = (Point) wpv.elementAt(0); 934 selP.selectWP(p.getName()); 935 oul.setSelect(); 936 oul.setWPselection(); 937 i=1000; 938 } 939 } 940 d.setCurrent(ic); 941 } civ
  • 105.
    Software Defects PreventionTechniques – Example Project 942 943 //Back on routeMain 944 if(s==routeOptions && c==BACK_CMD){ 945 d.setCurrent(routeMain); 946 } 947 948 949 950 951 952 //Adding new point in current route 953 if(s==routeNew && c==addPoint){ 954 if(oul.getSelect()==true){ 955 mob.removeRoute(newRouteVector); 956 Point wp = selP.getSelector(); 957 wp.setTypeID(newRouteVector.getID()); 958 wp.setName(newRouteVector.getName()); 959 wp.setImage("route"); 960 newRouteVector.addElement(wp); 961 mob.addRoute(newRouteVector); 962 d.setCurrent(ic); 963 } 964 965 if(oul.getSelect()==false){ 966 oul.setSelect(); 967 oul.setRoute(); 968 routeSetting = true; 969 d.setCurrent(ic); 970 } 971 972 } 973 974 if(s==ic && routeSetting==true && c==opt){ 975 d.setCurrent(routeNew); 976 } 977 978 if(s==routeNew && c==routeFin){ 979 oul.resetSelect(); 980 routeSetting = false; 981 d.setCurrent(ic); 982 } 983 984 985 986 987 988 989 //--------------------------------GPS ON/OFF------------------------------ 990 991 if(s==MVList && c==gps){ cv
  • 106.
    Zarko Acimovic 992 gpsList = new List("",List.IMPLICIT); 993 onGPSc = new Command("On",Command.SCREEN,1); 994 offGPSc = new Command("Off",Command.SCREEN,1); 995 gpsList.addCommand(onGPSc); 996 gpsList.addCommand(offGPSc); 997 gpsList.setCommandListener(this); 998 d.setCurrent(gpsList); 999 } 1000 1001 if(s==gpsList && c==onGPSc){ 1002 if(gpsON==false){ 1003 gpsON=true; 1004 followFriends = false; 1005 //Specifying GPS coordinates resource 1006 gpsTf.setLabel("Please select source of GPS coordinates, usually it's GPS.txt"); 1007 gpsTf.setName("GPS.txt"); 1008 gpsTf.setType("GPS.txt"); 1009 d.setCurrent(gpsTf); //GPS textform 1010 } else { 1011 d.setCurrent(ic); 1012 } 1013 } 1014 1015 if(s==gpsList && c==offGPSc){ 1016 gpsON=false; 1017 d.setCurrent(ic); 1018 } 1019 1020 1021 1022 if(s==gpsTf && c==CONT_CMD){ 1023 resource = gpsTf.getName(); 1024 1025 syncFollow = true; 1026 synchronizationDone=false; 1027 1028 t1=new Thread(this); 1029 currentlyShowed = t1.hashCode(); 1030 gpsHash = t1.hashCode(); 1031 t1.start(); 1032 d.setCurrent(ic); 1033 1034 } 1035 1036 // --------------------------- HANDLING FRIENDS' ISSUES ------------------- 1037 1038 if(s==MVList && c==friends){ 1039 friendList = new List("",List.IMPLICIT); cvi
  • 107.
    Software Defects PreventionTechniques – Example Project 1040 addNewFriend = new Command("Add New Friend", Command.SCREEN,1); 1041 stopFollow = new Command("Stop Follow Friends", Command.SCREEN,1); 1042 deleteFriends = new Command("Delete Friends", Command.SCREEN,1); 1043 friendList.addCommand(DUMMY); 1044 friendList.addCommand(addNewFriend); 1045 friendList.addCommand(stopFollow); 1046 friendList.addCommand(deleteFriends); 1047 friendList.addCommand(BACK_CMD); 1048 friendList.addCommand(DELIM); 1049 if(listOfFriends.size()>0){ 1050 for (int i=0; i<listOfFriends.size(); i++){ 1051 Friend f = (Friend)listOfFriends.elementAt(i); 1052 Command cc = new Command(f.getName(),Command.SCREEN,1); 1053 friendList.addCommand(cc); 1054 } 1055 } 1056 friendList.setCommandListener(this); 1057 d.setCurrent(friendList); 1058 } 1059 1060 if(s==friendList && c==addNewFriend){ 1061 friendForm = new SimpleTextForm(false); 1062 friendForm.setLabel("Friend"); 1063 friendForm.setLabel2("Source of coordinates"); 1064 friendForm.setName("Mika"); 1065 friendForm.setType("Mika.txt"); 1066 1067 friendForm.addCommand(CONT_CMD); 1068 friendForm.setCommandListener(this); 1069 1070 d.setCurrent(friendForm); 1071 } 1072 1073 if(s==friendForm && c==CONT_CMD){ 1074 tff = new Thread4Friend(whiteList,friendForm.getName(),mob,ic,mb,oul); 1075 Integer hID = new Integer(tff.getID()); 1076 whiteList.addElement(hID); 1077 1078 tff.start(); 1079 Friend f = new Friend(friendForm.getName(),friendForm.getType(),tff.getID(),tff); 1080 listOfFriends.addElement(f); 1081 d.setCurrent(ic); 1082 } 1083 cvii
  • 108.
    Zarko Acimovic 1084 if(s==friendList && c==stopFollow){ 1085 whiteList.removeAllElements(); 1086 mob.deleteAllFriends(); 1087 ic.repaint(); 1088 d.setCurrent(ic); 1089 } 1090 1091 if(s==friendList && c==deleteFriends){ 1092 mob.deleteAllFriends(); 1093 listOfFriends.removeAllElements(); 1094 friendList = new List("",List.IMPLICIT); 1095 addNewFriend = new Command("Add New Friend", Command.SCREEN,1); 1096 stopFollow = new Command("Stop Follow Friends", Command.SCREEN,1); 1097 deleteFriends = new Command("Delete Friends", Command.SCREEN,1); 1098 friendList.addCommand(DUMMY); 1099 friendList.addCommand(addNewFriend); 1100 friendList.addCommand(stopFollow); 1101 friendList.addCommand(deleteFriends); 1102 //friendList.addCommand(MAP_CMD); 1103 friendList.addCommand(BACK_CMD); 1104 friendList.addCommand(DELIM); 1105 if(listOfFriends.size()>0){ 1106 for (int i=0; i<listOfFriends.size(); i++){ 1107 Friend f = (Friend)listOfFriends.elementAt(i); 1108 Command cc = new Command(f.getName(),Command.SCREEN,1); 1109 friendList.addCommand(cc); 1110 } 1111 } 1112 friendList.setCommandListener(this); 1113 d.setCurrent(friendList); 1114 d.setCurrent(friendList); 1115 } 1116 1117 if(s==friendList && c!=addNewFriend && c!=stopFollow && c! =deleteFriends && c!=MAP_CMD && c!=BACK_CMD && c!=DELIM){ 1118 friend = c.getLabel(); 1119 friend = compact(friend); 1120 oneFriend = new List("",List.IMPLICIT); 1121 stopFollowOne = new Command("Stop Follow", Command.SCREEN,1); 1122 deleteFriend = new Command("Delete", Command.SCREEN,1); 1123 oneFriend.addCommand(DUMMY); 1124 oneFriend.addCommand(MAP_CMD); 1125 oneFriend.addCommand(stopFollowOne); 1126 oneFriend.addCommand(deleteFriend); cviii
  • 109.
    Software Defects PreventionTechniques – Example Project 1127 oneFriend.addCommand(BACK_CMD); 1128 oneFriend.setCommandListener(this); 1129 1130 d.setCurrent(oneFriend); 1131 } 1132 1133 if(s==friendList && c==BACK_CMD){ 1134 d.setCurrent(MVList); 1135 } 1136 1137 if(s==oneFriend && c==MAP_CMD){ 1138 for(int i=0; i<listOfFriends.size(); i++){ 1139 Friend f = (Friend)listOfFriends.elementAt(i); 1140 if(f.getName().equals(friend)) { 1141 1142 if(f.getThread()==false){ 1143 tff = new Thread4Friend(whiteList,f.getName(),mob,ic,mb,oul); 1144 Integer hID = new Integer(tff.getID()); 1145 whiteList.addElement(hID); 1146 f.setID(tff.getID()); 1147 f.setThread(tff); 1148 tff.setFirst(); 1149 tff.start(); 1150 } else { 1151 f.setFirst(); 1152 } 1153 } 1154 } 1155 d.setCurrent(ic); 1156 } 1157 1158 if(s==oneFriend && c==BACK_CMD){ 1159 d.setCurrent(friendList); 1160 } 1161 1162 if(s==oneFriend && c==stopFollowOne){ 1163 for(int i=0; i<listOfFriends.size(); i++){ 1164 Friend f = (Friend)listOfFriends.elementAt(i); 1165 if(f.getName().equals(friend)) { 1166 whiteList.removeElement(new Integer(f.getHash())); 1167 mob.deleteFriend(f.getHash()); 1168 f.setThread(null); 1169 } 1170 } 1171 d.setCurrent(ic); 1172 } cix
  • 110.
    Zarko Acimovic 1173 1174 if(s==oneFriend && c==deleteFriend){ 1175 for(int i=0; i<listOfFriends.size(); i++){ 1176 Friend f = (Friend)listOfFriends.elementAt(i); 1177 if(f.getName().equals(friend)) { 1178 whiteList.removeElement(new Integer(f.getHash())); 1179 mob.deleteFriend(f.getHash()); 1180 listOfFriends.removeElementAt(i); 1181 } 1182 } 1183 d.setCurrent(ic); 1184 } 1185 1186 } 1187 1188 1189 //----------------------This part of code deals with GPS--------------------- 1190 public void run(){ 1191 while(followFriends==true || gpsON==true){ 1192 String s = this.getResourceAsString(resource); 1193 int nextIndex = 6; 1194 int index = s.indexOf('n'); 1195 1196 nextIndex = s.indexOf('n',index+1); 1197 1198 int lastIndex = s.lastIndexOf('n'); 1199 1200 int begin = -2; 1201 int end = index; 1202 1203 String c1 = ""; 1204 String c2 = ""; 1205 String timeStamp = ""; 1206 long currentTS = 0; 1207 1208 while(index<lastIndex && gpsON==true){ 1209 Thread t = Thread.currentThread(); 1210 if(t.hashCode()==currentlyShowed){ 1211 /** 1212 if(synchronizationDone==false && syncFollow==true){ 1213 do{ //Synchronization 1214 String temp = s.substring(begin+2,end); 1215 temp = compact(temp); 1216 int comma = temp.indexOf(','); cx
  • 111.
    Software Defects PreventionTechniques – Example Project 1217 c1 = temp.substring(0,comma); 1218 int nextComma = temp.indexOf(',',comma+1); 1219 c2 = temp.substring(comma+1,nextComma); 1220 timeStamp = temp.substring(nextComma+1,temp.length()); 1221 currentTS = Long.parseLong(timeStamp); 1222 begin = index-1; 1223 end = nextIndex; 1224 index = nextIndex; 1225 nextIndex = s.indexOf('n',nextIndex+1); 1226 } while(currentTS<this.getTimeStamp()); 1227 synchronizationDone = true; 1228 }*/ 1229 1230 Point wp = null; 1231 if(!c1.equals("")){ 1232 wp = new Point(c2,c1,resource,"","blanco",true); 1233 } 1234 if(syncFollow==true) { 1235 this.setTimeStamp(currentTS); 1236 } 1237 1238 String temp = s.substring(begin+2,end); 1239 temp = compact(temp); 1240 if(temp.equals("")){ //na kraju ce temp da bude prazno 1241 index = lastIndex+1; 1242 } else { 1243 temp = compact(temp); 1244 int comma = temp.indexOf(','); 1245 c1 = temp.substring(0,comma); 1246 int nextComma = temp.indexOf(',',comma+1); 1247 c2 = temp.substring(comma+1,nextComma); 1248 timeStamp = temp.substring(nextComma+1,temp.length()); 1249 currentTS = Long.parseLong(timeStamp); 1250 cxi
  • 112.
    Zarko Acimovic 1251 begin = index-1; 1252 end = nextIndex; 1253 index = nextIndex; 1254 nextIndex = s.indexOf('n',nextIndex+1); 1255 } 1256 1257 try{ 1258 Thread.sleep(1000); 1259 }catch(Exception e){} 1260 1261 if(wp!=null){ 1262 mob.setDrawablePoints(); 1263 if(gpsON==true){ 1264 mob.setCurrentPosition(wp); 1265 if((mob.getCurrentPosition().getX()>170 || mob.getCurrentPosition().getY()>160 || 1266 mob.getCurrentPosition().getX()<10 || mob.getCurrentPosition().getY()<10) && oul.getSelect()==false ) 1267 mb.setBackground(wp); 1268 ic.repaint(); 1269 1270 } 1271 } 1272 } 1273 } 1274 } 1275 1276 } 1277 1278 /** 1279 * @see MIDlet#pauseApp() 1280 */ 1281 protected void pauseApp() { 1282 } 1283 1284 /** 1285 * @see MIDlet#destroyApp(boolean) 1286 */ 1287 protected void destroyApp(boolean flag) throws MIDletStateChangeException { 1288 } 1289 1290 1291 /** Blanco characters are possible to occur in names of pictures; 1292 * Integer representations of blanko characters are 9 and 32 1293 * Also, characters with integer representation between 0 and 33 cxii
  • 113.
    Software Defects PreventionTechniques – Example Project 1294 * can not be printed out in WSDD console, so I excluded them too 1295 */ 1296 public String compact(String s){ 1297 int k = s.length(); 1298 char[] d = s.toCharArray(); 1299 String ret = ""; 1300 for(int i=0; i<d.length; i++){ 1301 int temp = (int)d[i]; 1302 if(temp>32) ret+=d[i]; 1303 } 1304 int kk = ret.length(); 1305 return ret; 1306 } 1307 1308 public String compactFine(String s){ 1309 int k = s.length(); 1310 char[] d = s.toCharArray(); 1311 String ret = ""; 1312 for(int i=0; i<d.length; i++){ 1313 int temp = (int)d[i]; 1314 if(temp!=32 && temp!=9) ret+=d[i]; 1315 } 1316 int kk = ret.length(); 1317 return ret; 1318 } 1319 1320 public String getResourceAsString(String resource){ 1321 InputStream is = null; 1322 try{ 1323 is = this.getClass().getResourceAsStream(resource); 1324 }catch(Exception e) { 1325 a.setString("There is no such resource"); 1326 d.setCurrent(a); 1327 } 1328 1329 //conversion of resource into string 1330 String s = ""; 1331 char m =' '; 1332 1333 try{ 1334 m = (char)is.read(); 1335 }catch(Exception e){} 1336 1337 while(m!=65535){ 1338 s+=m; 1339 try{ 1340 m = (char)is.read(); 1341 }catch(Exception e){} 1342 } 1343 try{ 1344 is.close(); cxiii
  • 114.
    Zarko Acimovic 1345 }catch(Exception e){} 1346 1347 1348 s=compactFine(s); 1349 return s; 1350 } 1351 1352 public long getTimeStamp(){ 1353 return globalTimeStamp; 1354 } 1355 1356 public void setTimeStamp(long tms){ 1357 globalTimeStamp = tms; 1358 } 1359 1360 public void setWPList(){ 1361 WPList = new List("",List.IMPLICIT); 1362 WPList.addCommand(DUMMY); 1363 WPList.addCommand(addNewWP); 1364 WPList.addCommand(sortWP); 1365 WPList.addCommand(sortNameWP); 1366 WPList.addCommand(showIDcom); 1367 WPList.addCommand(BACK_CMD); 1368 WPList.addCommand(DELIM); 1369 WPList.setCommandListener(this); 1370 1371 } 1372 } 1373 1374 1375 cxiv
  • 115.
    Software Defects PreventionTechniques – Example Project MathFP.java All classes and interfaces must belong to a named package 11 PMD Marker All methods are static. Consider using Singleton instead. Alternatively, you could add a private constructor or make the class abstract to silence this warning. 11 PMD Marker The class 'MathFP' has a Cyclomatic Complexity of 3 (Highest = 12). 11 PMD Marker This class has too many methods, consider refactoring it. 11 PMD Marker Weighted Methods per Class is 105 11 Metrics Marker Avoid variables with short names like by 16 PMD Marker Parameter 'by' is not assigned and could be declared final 16 PMD Marker Parameter 'num' is not assigned and could be declared final 16 PMD Marker Avoid variables with short names like l 35 PMD Marker Parameter 'l' is not assigned and could be declared final 35 PMD Marker A method should have only one exit point, and that should be the last statement in the method 37 PMD Marker Avoid using if...else statements without curly braces 37 PMD Marker Avoid using if...else statements without curly braces 39 PMD Marker Avoid variables with short names like l 47 PMD Marker Parameter 'l' is not assigned and could be declared final 47 PMD Marker A method should have only one exit point, and that should be the last statement in the method 49 PMD Marker Avoid using if...else statements without curly braces 49 PMD Marker Avoid using if...else statements without curly braces 51 PMD Marker Avoid variables with short names like e 62 PMD Marker Avoid variables with short names like PI 63 PMD Marker The field name indicates a constant but its modifiers do not 63 PMD Marker The field name indicates a constant but its modifiers do not 64 PMD Marker Lines of Code in Method is 19 68 Metrics Marker Parameter 'i' is not assigned and could be declared final 68 PMD Marker Avoid using if statements without curly braces 69 PMD Marker A method should have only one exit point, and that should be the last statement in the method 70 PMD Marker A method should have only one exit point, and that should be the last statement in the method 94 PMD Marker Avoid using if...else statements without curly braces 94 PMD Marker Local variable 'l1' could be declared final 112 PMD Marker Avoid using if statements without curly braces 113 PMD Marker Cyclomatic Complexity is 7 121 Metrics Marker Lines of Code in Method is 22 121 Metrics Marker Number of Statements is 31 121 Metrics Marker Avoid using if statements without curly braces 123 PMD Marker Avoid using for statements without curly braces 128 PMD Marker MathFP.toFP(String) concatenates strings using + in a loop 128 FindBugs Prefer StringBuffer over += for concatenating strings 128 PMD Marker Avoid using if statements without curly braces 129 PMD Marker Avoid using if statements without curly braces 135 PMD Marker Local variable 'l1' could be declared final 137 PMD Marker cxv
  • 116.
    Zarko Acimovic MathFP.java Cyclomatic Complexity is 9 199 Metrics Marker Lines of Code in Method is 29 199 Metrics Marker Number of Statements is 26 199 Metrics Marker The method 'mul' has a Cyclomatic Complexity of 12. 199 PMD Marker The method mul() has an NPath complexity of 320 199 PMD Marker A method should have only one exit point, and that should be the last statement in the method 204 PMD Marker Cyclomatic Complexity is 8 229 Metrics Marker Lines of Code in Method is 21 229 Metrics Marker The method 'div' has a Cyclomatic Complexity of 11. 229 PMD Marker Cyclomatic Complexity is 5 266 Metrics Marker The String literal "Bad Input" appears 4 times in this file; the first occurrence is on 268 268 PMD Marker Avoid using for statements without curly braces 272 PMD Marker Lines of Code in Method is 16 286 Metrics Marker Number of Statements is 29 286 Metrics Marker Consider simply returning the value vs storing it in local variable 'l5' 300 PMD Marker Cyclomatic Complexity is 8 336 Metrics Marker Lines of Code in Method is 31 336 Metrics Marker Number of Statements is 33 336 Metrics Marker The method 'exp' has a Cyclomatic Complexity of 10. 336 PMD Marker Avoid using for statements without curly braces 343 PMD Marker Cyclomatic Complexity is 8 368 Metrics Marker Lines of Code in Method is 28 368 Metrics Marker Number of Statements is 28 368 Metrics Marker Avoid unused local variables such as 'l2'. 372 PMD Marker The local variable l2 is never read 372 Java Problem Avoid if (x != y) ..; else ..; 390 PMD Marker Cyclomatic Complexity is 5 397 Metrics Marker Lines of Code in Method is 18 397 Metrics Marker 1 /** 2 * MathFP implements fix point as a replacement for floating point 3 */ 4 5 6 7 // Processed by NMI's Java Code Viewer 4.8.1 © 1997-2000 B. Lemaire 8 // Website: http://njcv.htmlplanet.com E-mail: info@njcv.htmlplanet.com 9 // Copy registered to Evaluation Copy 10 11 public class MathFP { 12 13 /** Modulo (% operator) implementaition missing in MathFP 2.0.6 14 * @author BMa 15 */ cxvi
  • 117.
    Software Defects PreventionTechniques – Example Project 16 public static long mod(long num, long by) { 17 //System.out.println("mod: "+MathFP.toString(num)+" by: "+MathFP.toString(by)); 18 long frac = MathFP.div(num, by); 19 //System.out.println("MathFP.div(num, by): "+MathFP.toString(MathFP.div(num, by))); 20 //long frac = MathFP.round(frac, 0); does not work properly??? 21 //System.out.println("MathFP.round(MathFP.div(num, by), 0): "+MathFP.toString(MathFP.round(MathFP.div(num, by), 0))); 22 frac = MathFP.toFP(MathFP.toLong(frac)); 23 //System.out.println("MathFP.better(MathFP.div(num, by), 0): "+MathFP.toString(frac)); 24 //System.out.println("MathFP.mul(by, frac): "+MathFP.toString(MathFP.mul(by, frac))); 25 //System.out.println("MathFP.mod: "+MathFP.toString(num - MathFP.mul(by, frac))); 26 return num - MathFP.mul(by, frac); 27 } 28 29 30 //private static long sinLimit=toFP("0.0055"); 31 32 /** Fix of bad sin() in MathFP 2.0.6 - X is closer to real sin(X) than calculated value for small X 33 * @author BMa 34 */ 35 public static long sin(long l) { 36 if (abs(l) > toFP("0.0055")) 37 return sinBad(l); 38 else 39 return l; 40 } 41 42 //private static long asinLimit=toFP("0.019"); 43 44 /** Fix of bad asin() in MathFP 2.0.6 - X is closer to real asin(X) than calculated value for small X 45 * @author BMa 46 */ 47 public static long asin(long l) { 48 if (abs(l) > toFP("0.019")) 49 return asinBad(l); 50 else 51 return l; 52 } 53 54 55 private static int _fbits = 24; 56 private static int _digits = 8; 57 private static long _one; 58 private static long _fmask = 0xffffffL; cxvii
  • 118.
    Zarko Acimovic 59 private static long _dmul = 0x5f5e100L; 60 private static long _flt = 0L; 61 private static long _pi; 62 private static long e[]; 63 public static long PI; 64 public static long E; 65 public static final long MAX_VALUE = 0x7fffffffffffffffL; 66 public static final long MIN_VALUE = 0x8000000000000001L; 67 68 public static int setPrecision(int i) { 69 if(i > 24 || i < 0) 70 return _digits; 71 _fbits = i; 72 _one = 1L << i; 73 _flt = 24 - i; 74 _digits = 0; 75 _dmul = 1L; 76 _fmask = _one - 1L; 77 PI = _pi >> (int)_flt; 78 E = e[1] >> (int)_flt; 79 for(long l = _one; l != 0L;) { 80 l /= 10L; 81 _digits++; 82 _dmul *= 10L; 83 } 84 85 return _digits; 86 } 87 88 public static int getPrecision() { 89 return _fbits; 90 } 91 92 public static long toLong(long l) { 93 if(l < 0L) 94 return -(round(-l, 0) >> _fbits); 95 else 96 return round(l, 0) >> _fbits; 97 } 98 99 public static long toLongZare(long i) { 100 if(i >= 0) 101 i += 2048; 102 else 103 i -= 2048; 104 return i >> 12; 105 } 106 107 public static long toFP(long l) { 108 return l << _fbits; 109 } cxviii
  • 119.
    Software Defects PreventionTechniques – Example Project 110 111 public static long convert(long l, int i) { 112 long l1 = l >= 0L ? 1L : -1L; 113 if(abs(i) < 25L) 114 if(_fbits < i) 115 l = l + l1 * (1L << (i - _fbits >> 1)) >> i - _fbits; 116 else 117 l <<= _fbits - i; 118 return l; 119 } 120 121 public static long toFP(String s) { 122 int i = 0; 123 if(s.charAt(0) == '-') 124 i = 1; 125 String s1 = "-1"; 126 int j = s.indexOf(46); 127 if(j >= 0) { 128 for(s1 = s.substring(j + 1, s.length()); s1.length() < _digits; s1 = s1 + "0"); 129 if(s1.length() > _digits) 130 s1 = s1.substring(0, _digits); 131 } else { 132 j = s.length(); 133 } 134 long l = 0L; 135 if(i != j) 136 l = Long.parseLong(s.substring(i, j)); 137 long l1 = Long.parseLong(s1) + 1L; 138 long l2 = (l << _fbits) + (l1 << _fbits) / _dmul; 139 if(i == 1) 140 l2 = -l2; 141 return l2; 142 } 143 144 public static String toString(long l) { 145 boolean flag = false; 146 if(l < 0L) { 147 flag = true; 148 l = -l; 149 } 150 long l1 = l >> _fbits; 151 long l2 = _dmul * (l & _fmask) >> _fbits; 152 String s; 153 for(s = Long.toString(l2); s.length() < _digits; s = "0" + s); 154 return (flag ? "-" : "") + Long.toString(l1) + "." + s; 155 } 156 157 public static String toString(long l, int i) { 158 if(i > _digits) 159 i = _digits; cxix
  • 120.
    Zarko Acimovic 160 String s = toString(round(l, i)); 161 return s.substring(0, (s.length() - _digits) + i); 162 } 163 164 public static long getWholePart(String s){ 165 166 int end = s.indexOf('.'); 167 s = s.substring(0,end); 168 long wh = toFP(s); 169 return wh; 170 } 171 /** 172 public static long getWholePart(long l){ 173 String s = toString(l); 174 int end = s.indexOf('.'); 175 s = s.substring(0,end); 176 long wh = toFP(s); 177 return wh; 178 }*/ 179 180 public static long max(long l, long l1) { 181 return l >= l1 ? l : l1; 182 } 183 184 public static long min(long l, long l1) { 185 return l1 >= l ? l : l1; 186 } 187 188 public static long round(long l, int i) { 189 long l1 = 10L; 190 for(int j = 0; j < i; j++) 191 l1 *= 10L; 192 193 l1 = div(toFP(5L), toFP(l1)); 194 if(l < 0L) 195 l1 = -l1; 196 return l + l1; 197 } 198 199 public static long mul(long l, long l1) { 200 boolean flag = false; 201 int i = _fbits; 202 long l2 = _fmask; 203 if((l & l2) == 0L) 204 return (l >> i) * l1; 205 if((l1 & l2) == 0L) 206 return l * (l1 >> i); 207 if(l < 0L && l1 > 0L || l > 0L && l1 < 0L) 208 flag = true; 209 if(l < 0L) 210 l = -l; cxx
  • 121.
    Software Defects PreventionTechniques – Example Project 211 if(l1 < 0L) 212 l1 = -l1; 213 for(; max(l, l1) >= 1L << 63 - i; i--) { 214 l >>= 1; 215 l1 >>= 1; 216 l2 >>= 1; 217 } 218 219 long l3 = (l >> i) * (l1 >> i) << i; 220 long l4 = (l & l2) * (l1 & l2) >> i; 221 l4 += (l & ~l2) * (l1 & l2) >> i; 222 l3 = l3 + l4 + ((l & l2) * (l1 & ~l2) >> i) << _fbits - i; 223 if(l3 < 0L) 224 throw new ArithmeticException("Overflow"); 225 else 226 return flag ? -l3 : l3; 227 } 228 229 public static long div(long l, long l1) { 230 boolean flag = false; 231 int i = _fbits; 232 if(l1 == _one) 233 return l; 234 if((l1 & _fmask) == 0L) 235 return l / (l1 >> i); 236 if(l < 0L && l1 > 0L || l > 0L && l1 < 0L) 237 flag = true; 238 if(l < 0L) 239 l = -l; 240 if(l1 < 0L) 241 l1 = -l1; 242 for(; max(l, l1) >= 1L << 63 - i; i--) { 243 l >>= 1; 244 l1 >>= 1; 245 } 246 247 long l2 = (l << i) / l1 << _fbits - i; 248 return flag ? -l2 : l2; 249 } 250 251 public static long add(long l, long l1) { 252 return l + l1; 253 } 254 255 public static long sub(long l, long l1) { 256 return l - l1; 257 } 258 259 public static long abs(long l) { 260 if(l < 0L) 261 return -l; cxxi
  • 122.
    Zarko Acimovic 262 else 263 return l; 264 } 265 266 public static long sqrt(long l, int i) { 267 if(l < 0L) 268 throw new ArithmeticException("Bad Input"); 269 if(l == 0L) 270 return 0L; 271 long l1 = l + _one >> 1; 272 for(int j = 0; j < i; j++) 273 l1 = l1 + div(l, l1) >> 1; 274 275 if(l1 < 0L) 276 throw new ArithmeticException("Overflow"); 277 else 278 return l1; 279 } 280 281 public static long sqrt(long l) { 282 return sqrt(l, 24); 283 } 284 285 //public static long sin(long l) { 286 private static long sinBad(long l) { 287 long l1 = mul(l, div(toFP(180L), PI)); 288 l1 %= toFP(360L); 289 if(l1 < 0L) 290 l1 = toFP(360L) + l1; 291 long l2 = l1; 292 if(l1 >= toFP(90L) && l1 < toFP(270L)) 293 l2 = toFP(180L) - l1; 294 else 295 if(l1 >= toFP(270L) && l1 < toFP(360L)) 296 l2 = -(toFP(360L) - l1); 297 long l3 = l2 / 90L; 298 long l4 = mul(l3, l3); 299 long l5 = mul(mul(mul(mul(0xfffffffffffee21aL >> (int)_flt, l4) + (0x14594dL >> (int)_flt), l4) - (0xa55b13L >> (int)_flt), l4) + (long)(0x1921f9c >> (int)_flt), l3); 300 return l5; 301 } 302 303 //public static long asin(long l) { 304 private static long asinBad(long l) { 305 if(abs(l) > _one) { 306 throw new ArithmeticException("Bad Input"); 307 } else { 308 boolean flag = l < 0L; 309 l = abs(l); cxxii
  • 123.
    Software Defects PreventionTechniques – Example Project 310 long l1 = mul(mul(mul(mul(0x236cf >> (int)_flt, l) - (long)(0x92748 >> (int)_flt), l) + (long)(0x15acb4 >> (int)_flt), l) - (long)(0x36d0dd >> (int)_flt), l) + (long)(0x1921f27 >> (int)_flt); 311 long l2 = PI / 2L - mul(sqrt(_one - l), l1); 312 return flag ? -l2 : l2; 313 } 314 } 315 316 public static long cos(long l) { 317 return sin(PI / 2L - l); 318 } 319 320 public static long acos(long l) { 321 return PI / 2L - asin(l); 322 } 323 324 public static long tan(long l) { 325 return div(sin(l), cos(l)); 326 } 327 328 public static long cot(long l) { 329 return div(cos(l), sin(l)); 330 } 331 332 public static long atan(long l) { 333 return asin(div(l, sqrt(_one + mul(l, l)))); 334 } 335 336 public static long exp(long l) { 337 if(l == 0L) 338 return _one; 339 boolean flag = l < 0L; 340 l = abs(l); 341 int i = (int)(l >> _fbits); 342 long l1 = _one; 343 for(int j = 0; j < i / 4; j++) 344 l1 = mul(l1, e[4] >> (int)_flt); 345 346 if(i % 4 > 0) 347 l1 = mul(l1, e[i % 4] >> (int)_flt); 348 l &= _fmask; 349 if(l > 0L) { 350 long l2 = _one; 351 long l3 = 0L; 352 long l4 = 1L; 353 for(int k = 0; k < 16; k++) { 354 l3 += l2 / l4; 355 l2 = mul(l2, l); 356 l4 *= k + 1; 357 if(l4 > l2 || l2 <= 0L || l4 <= 0L) 358 break; cxxiii
  • 124.
    Zarko Acimovic 359 } 360 361 l1 = mul(l1, l3); 362 } 363 if(flag) 364 l1 = div(_one, l1); 365 return l1; 366 } 367 368 public static long log(long l) { 369 if(l <= 0L) 370 throw new ArithmeticException("Bad Input"); 371 long l1 = 0L; 372 long l2 = 0L; 373 int i; 374 for(i = 0; l >= _one << 1; i++) 375 l >>= 1; 376 377 long l4 = (long)i * (long)(0xb17218 >> (int)_flt); 378 long l5 = 0L; 379 if(l < _one) 380 return -log(div(_one, l)); 381 l -= _one; 382 for(int j = 1; j < 20; j++) { 383 long l3; 384 if(l1 == 0L) 385 l3 = l; 386 else 387 l3 = mul(l1, l); 388 if(l3 == 0L) 389 break; 390 l5 += ((j % 2 != 0 ? 1L : -1L) * l3) / (long)j; 391 l1 = l3; 392 } 393 394 return l4 + l5; 395 } 396 397 public static long pow(long l, long l1) { 398 boolean flag = l1 < 0L; 399 long l2 = _one; 400 l1 = abs(l1); 401 for(int i = (int)l1 >> _fbits; i-- > 0;) 402 l2 = mul(l2, l); 403 404 if(l2 < 0L) 405 throw new ArithmeticException("Overflow"); 406 if(l != 0L) 407 l2 = mul(l2, exp(mul(log(l), l1 & _fmask))); 408 else 409 l2 = 0L; cxxiv
  • 125.
    Software Defects PreventionTechniques – Example Project 410 if(flag) 411 return div(_one, l2); 412 else 413 return l2; 414 } 415 416 public static long atan2(long l, long l1) { 417 long l2 = 0L; 418 if(l1 > 0L) 419 l2 = atan(div(l, l1)); 420 else 421 if(l1 < 0L) { 422 l2 = (l1 >= 0L ? PI : -PI) - atan(abs(div(l, l1))); 423 } else { 424 if(l1 == 0L && l == 0L) 425 throw new ArithmeticException("Bad Input"); 426 l2 = (l >= 0L ? PI : -PI) / 2L; 427 } 428 return l2; 429 } 430 431 static { 432 _one = 0x1000000L; 433 _pi = 0x3243f6aL; 434 e = (new long[] { 435 _one, 0x2b7e151L, 0x763992eL, 0x1415e5bfL, 0x3699205cL 436 }); 437 PI = _pi; 438 E = e[1]; 439 } 440 } cxxv
  • 126.
    Zarko Acimovic Outlook.java All classes and interfaces must belong to a named package 10 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 82% 10 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 66% 10 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 353% 10 Metrics Marker The class 'Outlook' has a Cyclomatic Complexity of 2 (Highest = 10). 10 PMD Marker Avoid variables with short names like mb 11 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 11 PMD Marker Use explicit scoping instead of the default package private level 11 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 12 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker Unused field: Outlook.mbf 13 FindBugs Use explicit scoping instead of the default package private level 13 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 14 PMD Marker Use explicit scoping instead of the default package private level 14 PMD Marker Use explicit scoping instead of the default package private level 15 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 16 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 17 PMD Marker Avoid variables with short names like mb 22 PMD Marker Avoid variables with short names like sp 22 PMD Marker Parameter 'mb' is not assigned and could be declared final 22 PMD Marker Parameter 'mob' is not assigned and could be declared final 22 PMD Marker Parameter 'sp' is not assigned and could be declared final 22 PMD Marker Avoid variables with short names like g 29 PMD Marker Cyclomatic Complexity is 6 29 Metrics Marker Lines of Code in Method is 33 29 Metrics Marker Number of Statements is 21 29 Metrics Marker Parameter 'g' is not assigned and could be declared final 29 PMD Marker The method 'drawOutlook' has a Cyclomatic Complexity of 10. 29 PMD Marker Avoid unnecessary comparisons in boolean expressions 30 PMD Marker Avoid unnecessary comparisons in boolean expressions 37 PMD Marker Avoid unnecessary comparisons in boolean expressions 37 PMD Marker Avoid unnecessary comparisons in boolean expressions 37 PMD Marker Avoid unnecessary comparisons in boolean expressions 42 PMD Marker Avoid using if statements without curly braces 57 PMD Marker Avoid using if statements without curly braces 59 PMD Marker Local variable 'zoom' could be declared final 64 PMD Marker The method name Outlook.ZoomIn() doesn't start with a lower case letter 64 FindBugs Avoid using if statements without curly braces 65 PMD Marker Local variable 'zoom' could be declared final 69 PMD Marker cxxvi
  • 127.
    Software Defects PreventionTechniques – Example Project 1 /** 2 * 3 * Outlook coordinates work MapBackground, MapObjects and SelectorPoint 4 * 5 */ 6 //import java.util.*; 7 //import java.io.*; 8 import javax.microedition.lcdui.*; 9 10 public class Outlook { 11 MapBackground mb; 12 MapObjects mob; 13 MapBackgroundFactory mbf; 14 SelectorPoint selP; 15 boolean select = false; 16 boolean route = false; 17 boolean startup = false; 18 boolean first = false; 19 Point center = new Point("44.83168","20.445","","","blanco",false); 20 boolean WPselection = false; 21 22 Outlook(MapBackground mb, MapObjects mob, SelectorPoint sp) { 23 24 this.mb = mb; 25 this.mob = mob; 26 this.selP = sp; 27 } 28 29 public void drawOutlook(Graphics g){ 30 if(startup==false) { 31 mb.setBackground(center); 32 startup = true; 33 } 34 35 mb.drawMapBackground(g); 36 37 if(first==true && mob.currentSet()==false && WPselection==false){ 38 selP.selP = new Point(mb.getNewEdge(),false); 39 first=false; 40 } 41 42 if(first==true && mob.currentSet()==true && WPselection==false){ 43 selP.selectWP(mob.getCurrentPosition().getName()); 44 mb.drawMapBackground(g); 45 first=false; 46 } 47 48 /** cxxvii
  • 128.
    Zarko Acimovic 49 if(route==false){ 50 mob.drawMOB(g,route); 51 if(select==true) selP.drawSelP(g); 52 } else { 53 if(select==true) selP.drawSelP(g); 54 mob.drawMOB(g,route); 55 }*/ 56 57 if(select==true) selP.drawSelP(g); 58 mob.drawMOB(g,route); 59 if(select==true) selP.drawCaption(g); 60 61 } 62 63 public void ZoomIn(){ 64 boolean zoom = mb.ZoomIn(); 65 if(zoom==true) selP.Zoom(); 66 } 67 68 public void ZoomOut(){ 69 boolean zoom = mb.ZoomOut(); 70 if(zoom==true) selP.Zoom(); 71 } 72 73 /** Sets map due to Pan transformation 74 */ 75 public void setMap(char side){ 76 if(select == false) mb.setMap(side); 77 if(select == true) selP.setSelectorScreen(side); 78 } 79 80 public void setCanvasWH(int cW,int cH){ 81 mb.setCanvasWH(cW,cH); 82 } 83 84 public void setSelect(){ 85 select = true; 86 first = true; 87 //selP.resetBig(); 88 } 89 90 public void setWPselection(){ 91 WPselection = true; 92 } 93 94 public void resetSelect(){ 95 select = false; 96 WPselection = false; 97 } 98 99 public boolean getSelect(){ cxxviii
  • 129.
    Software Defects PreventionTechniques – Example Project 100 return select; 101 } 102 103 public void setRoute(){ 104 route = true; 105 } 106 107 public void resetRoute(){ 108 route = false; 109 } 110 111 112 } cxxix
  • 130.
    Zarko Acimovic Point.java All classes and interfaces must belong to a named package 10 PMD Marker Lack of Cohesion in Methods (Chidamber & Kemerer) is 309 10 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 91% 10 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 80% 10 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 474% 10 Metrics Marker Number of Fields is 21 10 Metrics Marker The class 'Point' has a Cyclomatic Complexity of 2 (Highest = 13). 10 PMD Marker Too many fields 10 PMD Marker Weighted Methods per Class is 60 10 Metrics Marker Avoid variables with short names like ID 25 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 25 PMD Marker The field name indicates a constant but its modifiers do not 25 PMD Marker Possible unsafe assignment to a non-final static field in a constructor. 30 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 44 PMD Marker Private field 'degLat' could be made final; it is only initialized in the declaration or constructor. 44 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 48 PMD Marker Private field 'minLat' could be made final; it is only initialized in the declaration or constructor. 48 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 52 PMD Marker Private field 'secLat' could be made final; it is only initialized in the declaration or constructor. 52 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 63 PMD Marker Private field 'degLon' could be made final; it is only initialized in the declaration or constructor. 63 PMD Marker Private field 'minLon' could be made final; it is only initialized in the declaration or constructor. 67 PMD Marker Use explicit scoping instead of the default package private level 79 PMD Marker Use explicit scoping instead of the default package private level 83 PMD Marker Use explicit scoping instead of the default package private level 87 PMD Marker Use explicit scoping instead of the default package private level 91 PMD Marker Avoid variables with short names like x 99 PMD Marker Avoid variables with short names like y 103 PMD Marker Unread field: Point.dm1 108 FindBugs Use explicit scoping instead of the default package private level 108 PMD Marker Unread field: Point.dm2 112 FindBugs Avoid variables with short names like rr 116 PMD Marker Unread field: Point.rr 116 FindBugs Lines of Code in Method is 36 123 Metrics Marker Number of Parameters is 9 123 Metrics Marker Number of Statements is 36 123 Metrics Marker Parameter 'dlat' is not assigned and could be declared final 126 PMD Marker Parameter 'mlat' is not assigned and could be declared final 126 PMD Marker Parameter 'slat' is not assigned and could be declared final 126 PMD Marker Parameter 'dlon' is not assigned and could be declared final 127 PMD Marker Parameter 'mlon' is not assigned and could be declared final 127 PMD Marker cxxx
  • 131.
    Software Defects PreventionTechniques – Example Project Point.java Number of Parameters is 5 162 Metrics Marker Number of Statements is 58 162 Metrics Marker Local variable 'latS' could be declared final 174 PMD Marker Local variable 'lonS' could be declared final 175 PMD Marker Avoid unnecessary comparisons in boolean expressions 200 PMD Marker Write to static field Point.cnt from instance method new Point(long, long, String, String, boolean) 202 FindBugs Lines of Code in Method is 29 211 Metrics Marker Avoid unnecessary comparisons in boolean expressions 232 PMD Marker Write to static field Point.cnt from instance method new Point(Point, boolean) 234 FindBugs Lines of Code in Method is 45 241 Metrics Marker Number of Parameters is 6 241 Metrics Marker Number of Statements is 57 241 Metrics Marker Avoid unnecessary comparisons in boolean expressions 277 PMD Marker Write to static field Point.cnt from instance method new Point(String, String, String, String, String, boolean) 279 FindBugs Local variable 'c1' could be declared final 334 PMD Marker Local variable 'c2' could be declared final 335 PMD Marker Lines of Code in Method is 21 474 Metrics Marker Lines of Code in Method is 41 496 Metrics Marker Number of Statements is 29 496 Metrics Marker Avoid unnecessary if..then..else statements when returning a boolean 529 PMD Marker A method should have only one exit point, and that should be the last statement in the method 531 PMD Marker Consider simply returning the value vs storing it in local variable 'xx' 559 PMD Marker Consider simply returning the value vs storing it in local variable 'yy' 565 PMD Marker Cyclomatic Complexity is 12 660 Metrics Marker Lines of Code in Method is 39 660 Metrics Marker Number of Parameters is 5 660 Metrics Marker Number of Statements is 76 660 Metrics Marker The method 'drawPoint' has a Cyclomatic Complexity of 13. 660 PMD Marker The method drawPoint() has an NPath complexity of 1032 660 PMD Marker Avoid using if statements without curly braces 668 PMD Marker Avoid using if statements without curly braces 671 PMD Marker 1 /** 2 * Class Point represents geographical object 3 */ 4 5 6 //import java.util.*; 7 //import java.io.*; 8 import javax.microedition.lcdui.*; 9 10 public class Point { 11 12 cxxxi
  • 132.
    Zarko Acimovic 13 /** type of Waypoint 14 * -2 - destination Point 15 * -1 - current Point 16 * 0 - free Point 17 * n - route Point 18 */ 19 private int typeID = 0; 20 21 22 /** Point ID 23 * 24 */ 25 private int ID = 0; 26 27 28 /** Counter 29 */ 30 private static int cnt = 0; 31 32 33 /** Float-point representation of latitude 34 */ 35 private long lat; 36 37 /** Float-point representation of longitude 38 */ 39 private long lon; 40 41 42 /** Degrees of latitude in Integer 43 */ 44 private long degLat; 45 46 /** Minutes of latitude in Integer 47 */ 48 private long minLat; 49 50 /** Seconds of latitude in Integer 51 */ 52 private long secLat; 53 54 /** Side of the world, South or North 55 */ 56 //private char sideNS; 57 58 59 60 61 /** Degrees of longitude in Integer 62 */ 63 private long degLon; cxxxii
  • 133.
    Software Defects PreventionTechniques – Example Project 64 65 /** Minutes of longitude in Integer 66 */ 67 private long minLon; 68 69 /** Seconds of longitude in Integer 70 */ 71 private long secLon; 72 73 /** Side of the world, West or East 74 */ 75 //private char sideWE; 76 77 /** Total number of latitude seconds 78 */ 79 long totLatSec; 80 81 /** Total number of longitude seconds 82 */ 83 long totLonSec; 84 85 /** Name of the Point 86 */ 87 String name = "default"; 88 89 /** Type of the Point 90 */ 91 String type = "default"; 92 93 /** Distance between this point and point which asks sorting 94 */ 95 private long distance; 96 97 /** x coordinate of Point on Canvas 98 */ 99 private long x = 5; 100 101 /** y coordinate of Point on Canvas 102 */ 103 private long y = 5; 104 105 106 /** Help variable 107 */ 108 long dm1=0; 109 110 /** Help variable 111 */ 112 long dm2=0; 113 114 /** Help variable cxxxiii
  • 134.
    Zarko Acimovic 115 */ 116 long rr=1000; 117 118 /** String that describes image 119 */ 120 String imgString = "blanco"; 121 122 123 /** Regular constructor 124 * @author Zarko Acimovic 125 */ 126 Point(long dlat, long mlat, long slat, //char side1, 127 long dlon, long mlon, long slon, //char side2, 128 String n, String t,boolean setNewID){ 129 130 degLat=MathFP.toFP(dlat); 131 minLat=MathFP.toFP(mlat); 132 secLat=MathFP.toFP(slat); 133 //sideNS=side1; 134 135 136 degLon=MathFP.toFP(dlon); 137 minLon=MathFP.toFP(mlon); 138 secLon=MathFP.toFP(slon); 139 //sideWE=side2; 140 141 name=n; 142 type=t; 143 144 long sixty=MathFP.toFP("60"); 145 146 lat = MathFP.add(degLat,MathFP.div(MathFP.add(minLat,MathFP.div(secLat,sixty)),sixty)); 147 lon = MathFP.add(degLon,MathFP.div(MathFP.add(minLon,MathFP.div(secLon,sixty)),sixty)); 148 149 totLatSec = MathFP.mul(lat,MathFP.toFP("3600")); 150 totLonSec = MathFP.mul(lon,MathFP.toFP("3600")); 151 152 if(setNewID==true){ 153 ID = cnt; 154 cnt++; 155 } 156 typeID = 0; //default type 157 //System.out.println("cnt="+cnt); 158 } 159 160 161 162 Point(long totLatSec, 163 //char s1, cxxxiv
  • 135.
    Software Defects PreventionTechniques – Example Project 164 long totLonSec, 165 //char s2, 166 String ss1, String ss2, boolean setNewID){ 167 lat = MathFP.div(totLatSec, MathFP.toFP("3600")); 168 lon = MathFP.div(totLonSec, MathFP.toFP("3600")); 169 this.name = ss1; 170 this.type = ss2; 171 //this.sideNS = s1; 172 //this.sideWE = s2; 173 174 String latS = MathFP.toString(lat); 175 String lonS = MathFP.toString(lon); 176 177 this.degLat = MathFP.getWholePart(latS); 178 long temp = MathFP.sub(this.lat,this.degLat); 179 temp = MathFP.mul(temp,MathFP.toFP("60")); 180 this.minLat = MathFP.getWholePart(MathFP.toString(temp)); 181 182 temp = MathFP.sub(this.lat,this.degLat); 183 temp = MathFP.mul(temp,MathFP.toFP("60")); 184 temp = MathFP.sub(temp,minLat); 185 this.secLat = MathFP.mul(temp,MathFP.toFP("60")); 186 187 this.degLon = MathFP.getWholePart(lonS); 188 temp = MathFP.sub(this.lon,this.degLon); 189 temp = MathFP.mul(temp,MathFP.toFP("60")); 190 this.minLon = MathFP.getWholePart(MathFP.toString(temp)); 191 192 temp = MathFP.sub(this.lon,this.degLon); 193 temp = MathFP.mul(temp,MathFP.toFP("60")); 194 temp = MathFP.sub(temp,minLon); 195 this.secLon = MathFP.mul(temp,MathFP.toFP("60")); 196 197 this.totLatSec = totLatSec; 198 this.totLonSec = totLonSec; 199 200 if(setNewID==true){ 201 ID = cnt; 202 cnt++; 203 } 204 typeID = 0; //default type 205 //System.out.println("cnt="+cnt); 206 207 } 208 209 210 211 Point(Point wp, boolean setNewID) { 212 degLat=wp.degLat; 213 minLat=wp.minLat; 214 secLat=wp.secLat; cxxxv
  • 136.
    Zarko Acimovic 215 //sideNS=wp.sideNS; 216 217 218 degLon=wp.degLon; 219 minLon=wp.minLon; 220 secLon=wp.secLon; 221 //sideWE=wp.sideWE; 222 223 name=wp.name; 224 type=wp.type; 225 226 this.lat = wp.lat; 227 this.lon = wp.lon; 228 this.totLatSec = wp.totLatSec; 229 this.totLonSec = wp.totLonSec; 230 231 232 if (setNewID==true){ 233 ID = cnt; 234 cnt++; 235 } 236 typeID = 0; //default type 237 //System.out.println("cnt="+cnt); 238 imgString = wp.getImage(); 239 } 240 241 Point (String lat, 242 //char sideNS, 243 String lon, 244 //char sideWE, 245 String name, String type, String img, boolean setNewID){ 246 //this.sideNS = sideNS; 247 //this.sideWE = sideWE; 248 this.name = name; 249 this.type = type; 250 this.lat = MathFP.toFP(lat); 251 this.lon = MathFP.toFP(lon); 252 253 this.degLat = MathFP.getWholePart(lat); 254 long temp = MathFP.sub(this.lat,this.degLat); 255 temp = MathFP.mul(temp,MathFP.toFP("60")); 256 this.minLat = MathFP.getWholePart(MathFP.toString(temp)); 257 258 temp = MathFP.sub(this.lat,this.degLat); 259 temp = MathFP.mul(temp,MathFP.toFP("60")); 260 temp = MathFP.sub(temp,minLat); 261 this.secLat = MathFP.mul(temp,MathFP.toFP("60")); 262 263 this.degLon = MathFP.getWholePart(lon); 264 temp = MathFP.sub(this.lon,this.degLon); 265 temp = MathFP.mul(temp,MathFP.toFP("60")); cxxxvi
  • 137.
    Software Defects PreventionTechniques – Example Project 266 this.minLon = MathFP.getWholePart(MathFP.toString(temp)); 267 268 temp = MathFP.sub(this.lon,this.degLon); 269 temp = MathFP.mul(temp,MathFP.toFP("60")); 270 temp = MathFP.sub(temp,minLon); 271 this.secLon = MathFP.mul(temp,MathFP.toFP("60")); 272 273 this.totLatSec = MathFP.mul(this.lat,MathFP.toFP("3600")); 274 this.totLonSec = MathFP.mul(this.lon,MathFP.toFP("3600")); 275 276 277 if (setNewID==true) { 278 ID = cnt; 279 cnt++; 280 } 281 typeID = 0; //default type 282 //System.out.println("cnt="+cnt); 283 imgString = img; 284 285 } 286 287 288 289 /** 290 Point(String lat, String lon, String name, String type, String image, boolean setNewID){ 291 this.name = name; 292 this.type = type; 293 this.lat = MathFP.toFP(lat); 294 this.lon = MathFP.toFP(lon); 295 296 this.degLat = MathFP.getWholePart(lat); 297 long temp = MathFP.sub(this.lat,this.degLat); 298 temp = MathFP.mul(temp,MathFP.toFP("60")); 299 this.minLat = MathFP.getWholePart(MathFP.toString(temp)); 300 301 temp = MathFP.sub(this.lat,this.degLat); 302 temp = MathFP.mul(temp,MathFP.toFP("60")); 303 temp = MathFP.sub(temp,minLat); 304 this.secLat = MathFP.mul(temp,MathFP.toFP("60")); 305 306 this.degLon = MathFP.getWholePart(lon); 307 temp = MathFP.sub(this.lon,this.degLon); 308 temp = MathFP.mul(temp,MathFP.toFP("60")); 309 this.minLon = MathFP.getWholePart(MathFP.toString(temp)); 310 311 temp = MathFP.sub(this.lon,this.degLon); 312 temp = MathFP.mul(temp,MathFP.toFP("60")); 313 temp = MathFP.sub(temp,minLon); 314 this.secLon = MathFP.mul(temp,MathFP.toFP("60")); 315 cxxxvii
  • 138.
    Zarko Acimovic 316 this.totLatSec = MathFP.mul(this.lat,MathFP.toFP("3600")); 317 this.totLonSec = MathFP.mul(this.lon,MathFP.toFP("3600")); 318 319 320 if (setNewID==true) { 321 ID = cnt; 322 cnt++; 323 } 324 typeID = 0; //default type 325 326 }*/ 327 328 /** Calculates distance between two Points; 329 * 330 * @version advanced 331 * @return long 332 */ 333 public long measureDistance(Point wp){ 334 Coordinates c1 = new Coordinates(this.lat,this.lon); 335 Coordinates c2 = new Coordinates(wp.lat, wp.lon); 336 return MathFP.toLong(c1.distance(c2)); 337 } 338 339 /** Sets distance 340 */ 341 public void setDistance (long dist){ 342 distance = dist; 343 } 344 345 /** Gets distance 346 * @return long 347 */ 348 public long getDistance (){ 349 return distance; 350 } 351 352 /** Returns type of Point 353 * @return String 354 */ 355 public String getType() { return type; } 356 357 /** Sets type of Point 358 * @return String 359 */ 360 public void setType(String type) { this.type = type; } 361 362 /** Returns name of Point 363 * @return String 364 */ 365 public String getName() { return name; } 366 cxxxviii
  • 139.
    Software Defects PreventionTechniques – Example Project 367 /** Sets type of Point 368 * @return String 369 */ 370 public void setName(String name) { this.name = name; } 371 372 /** Returns side of the world as String 373 * @return String 374 * 375 */ 376 //public char getNS(){ 377 // return sideNS; 378 //} 379 380 /** Returns side of the world as String 381 * @return String 382 * 383 */ 384 //public char getWE(){ 385 // return sideWE; 386 //} 387 388 /** Returns degrees of latitiude 389 * 390 * @author Zarko Acimovic 391 * @version initial 392 */ 393 public long getDLat(){ 394 return degLat; 395 } 396 397 /** Returns minutes of latitiude 398 * 399 * @author Zarko Acimovic 400 * @version initial 401 */ 402 public long getMLat(){ 403 return minLat; 404 } 405 406 /** Returns seconds of latitiude 407 * 408 * @author Zarko Acimovic 409 * @version initial 410 */ 411 public long getSLat(){ 412 return secLat; 413 } 414 415 /** Returns degrees of longitude 416 * 417 * @author Zarko Acimovic cxxxix
  • 140.
    Zarko Acimovic 418 * @version initial 419 */ 420 public long getDLon(){ 421 return degLon; 422 } 423 424 /** Returns minutes of longitude 425 * 426 * @author Zarko Acimovic 427 * @version initial 428 */ 429 public long getMLon(){ 430 return minLon; 431 } 432 433 /** Returns seconds of longitude 434 * 435 * @author Zarko Acimovic 436 * @version initial 437 * @return int 438 */ 439 public long getSLon(){ 440 return secLon; 441 } 442 443 /** Returns latitude as floating point 444 * 445 * @author Zarko Acimovic 446 * @version initial 447 * @return Float-Point 448 */ 449 public long getLat(){ 450 return lat; 451 } 452 453 /** Returns longitude as floating point 454 * 455 * @author Zarko Acimovic 456 * @version initial 457 * @return Float-Point 458 */ 459 public long getLon(){ 460 return lon; 461 } 462 463 /** Prints Point 464 * @author Zarko Acimovic 465 * @version initial 466 * @return String 467 */ 468 public String toString(){ cxl
  • 141.
    Software Defects PreventionTechniques – Example Project 469 return "ID="+getID()+"n"+"Longitude: "+MathFP.toString(this.lon)+" "+MathFP.toString(this.degLon) +","+MathFP.toString(this.minLon)+","+MathFP.toString(this.secLon)+","+" x="+this.getX()+ 470 "nLatitude: "+MathFP.toString(this.lat)+" "+MathFP.toString(this.degLat)+","+MathFP.toString(this.minLat) +","+MathFP.toString(this.secLat)+","+" y="+this.getY()+" "+this.getName()+"n" 471 +this.getImage(); 472 } 473 474 /** Sets x and y coordinates on Canvas relative to wp 475 * Usually wp is newEdge 476 * @author Zarko Acimovic 477 * @version initial 478 */ 479 public void setXY (Point wp, long pixLon, long pixLat){ 480 //System.out.println("----this------------------"+this); 481 //System.out.println("-------newEdge---------------"+wp); 482 ///System.out.println("this.getLat()="+MathFP.toString(this.getLat())); 483 //System.out.println("this.getLon()="+MathFP.toString(this.getLon())); 484 ///System.out.println("wp.getLat()="+MathFP.toString(wp.getLat())); 485 ///System.out.println("wp.getLon()="+MathFP.toString(wp.getLon())); 486 //System.out.println("pixLat="+MathFP.toString(pixLat)); 487 ///System.out.println("pixLon="+MathFP.toString(pixLon)); 488 489 y = MathFP.div(MathFP.mul(MathFP.sub(wp.getLat(),this.getLat()),MathFP.toFP("3600")),pi xLat); 490 y = MathFP.toLong(y); 491 492 x = MathFP.div(MathFP.mul(MathFP.sub(this.getLon(),wp.getLon()),MathFP.toFP("3600")),pi xLon); 493 x = MathFP.toLong(x); 494 } 495 496 /** Checks if this Point is beetwen wp1 and wp2 497 * 498 * @version initial 499 * @return boolean 500 */ 501 public boolean check(Point wp1, Point wp2){ 502 503 long lim1Lat = wp1.getLat(); 504 long lim1Lon = wp1.getLon(); 505 long lim2Lat = wp2.getLat(); 506 long lim2Lon = wp2.getLon(); cxli
  • 142.
    Zarko Acimovic 507 508 long bigLat; 509 long miniLat; 510 long bigLon; 511 long miniLon; 512 513 if (lim1Lat>lim2Lat){ 514 bigLat=lim1Lat; 515 miniLat=lim2Lat; 516 } else { 517 bigLat=lim2Lat; 518 miniLat=lim1Lat; 519 } 520 521 if (lim1Lon>lim2Lon){ 522 bigLon=lim1Lon; 523 miniLon=lim2Lon; 524 } else { 525 bigLon=lim2Lon; 526 miniLon=lim1Lon; 527 } 528 529 if (miniLat<this.getLat() && this.getLat()<bigLat && 530 miniLon<this.getLon() && this.getLon()<bigLon){ 531 return true; 532 } else { 533 return false; 534 } 535 536 } 537 538 539 540 /** Returns x-position of Point on Canvas 541 * 542 * @author Zarko Acimovic 543 * @version initial 544 * @return long 545 */ 546 public long getX() {return x; } 547 548 /** Returns y-position of Point on Canvas 549 * 550 * @author Zarko Acimovic 551 * @version initial 552 * @return long 553 */ 554 public long getY() {return y; } 555 556 public int getXX() { 557 Long l = new Long(x); cxlii
  • 143.
    Software Defects PreventionTechniques – Example Project 558 int xx = Integer.parseInt(l.toString()); 559 return xx; 560 } 561 562 public int getYY() { 563 Long l = new Long(y); 564 int yy = Integer.parseInt(l.toString()); 565 return yy; 566 } 567 568 /** Adds inc on x 569 */ 570 public void addX(long inc ){ 571 this.x+=inc; 572 } 573 574 /** Substracts dec from x 575 */ 576 public void subX(long dec){ 577 this.x-=dec; 578 } 579 580 /** Adds inc on y 581 */ 582 public void addY(long inc){ 583 this.y+=inc; 584 } 585 586 /** Substracts dec from y 587 */ 588 public void subY(long dec){ 589 this.y-=dec; 590 } 591 592 593 /** Returns total number of lat-seconds for Point 594 * 595 * @author Zarko Acimovic 596 * @version initial 597 * @return long 598 */ 599 public long getLatSec() { 600 return totLatSec; 601 } 602 603 /** Returns total number of lon-seconds for Point 604 * 605 * @author Zarko Acimovic 606 * @version initial 607 * @return long 608 */ cxliii
  • 144.
    Zarko Acimovic 609 public long getLonSec() { 610 return totLonSec; 611 } 612 613 /** Sets x-position of Point on screen 614 */ 615 public void setX(long x){ 616 this.x=x; 617 } 618 619 /** Sets y-position of Point on screen 620 */ 621 public void setY(long y){ 622 this.y=y; 623 } 624 625 /** Sets ID of Point 626 * 0 - simple Point 627 * 1 - current Point 628 * 2 - destination Point 629 */ 630 public void setTypeID(int i){ 631 typeID = i; 632 } 633 634 /** Returns ID of Point 635 * 0 - simple Point 636 * 1 - current Point 637 * 2 - destination Point 638 */ 639 public int getTypeID(){ 640 return typeID; 641 } 642 643 public int getID(){ 644 return ID; 645 } 646 647 648 /** String that represents image 649 */ 650 public void setImage(String s){ 651 imgString = s; 652 } 653 654 /** Returns name of the image 655 */ 656 public String getImage(){ 657 return imgString; 658 } 659 cxliv
  • 145.
    Software Defects PreventionTechniques – Example Project 660 public void drawPoint(Graphics g, Point newEdge, long pixLat, long pixLon, long zoomLv){ 661 662 this.setXY(newEdge,pixLon,pixLat); 663 if(this.getImage().equals("route")){ 664 g.fillRect(this.getXX()-3,this.getYY()-3,6,6); 665 } 666 if(this.getImage().equals("blanco")){ 667 g.fillRect(this.getXX()-3,this.getYY()-3,6,6); 668 if (this.getName().equals("current")) 669 g.drawString(this.getName(),this.getXX()-25,this.getYY() +5,0); 670 671 if (this.getName().equals("dest")) 672 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 673 674 if (this.getName().equals("GPS.txt")) 675 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 676 677 if (this.getName().equals("Mika.txt")) 678 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 679 680 if (this.getName().equals("GPS")) 681 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 682 683 if (this.getName().equals("Mika")) 684 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 685 686 if (this.getName().equals("Str8")) 687 g.drawString(this.getName(),this.getXX()-18,this.getYY() +11,0); 688 } 689 690 if(!this.getImage().equals("blanco") && ! this.getImage().equals("route")){ 691 Image img = null; 692 try{ 693 img = Image.createImage(this.getImage()); 694 }catch(Exception e){} 695 g.drawImage(img,this.getXX()-3,this.getYY()-3,0); 696 //g.drawString(this.getName(),this.getXX()- 15,this.getYY()+11,0); 697 } 698 } 699 700 public void setLat(String s){ cxlv
  • 146.
    Zarko Acimovic 701 lat = MathFP.toFP(s); 702 } 703 704 public void setLon(String s){ 705 lon = MathFP.toFP(s); 706 } 707 708 } cxlvi
  • 147.
    Software Defects PreventionTechniques – Example Project PVector.java All classes and interfaces must belong to a named package 11 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 75% 11 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 100% 11 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 114% 11 Metrics Marker Weighted Methods per Class is 45 11 Metrics Marker Avoid variables with short names like ID 17 PMD Marker The field name indicates a constant but its modifiers do not 17 PMD Marker Possible unsafe assignment to a non-final static field in a constructor. 18 PMD Marker Use explicit scoping instead of the default package private level 22 PMD Marker Parameter 'name' is not assigned and could be declared final 26 PMD Marker Parameter 'route' is not assigned and could be declared final 26 PMD Marker Avoid unnecessary comparisons in boolean expressions 29 PMD Marker Write to static field PVector.cnt from instance method new PVector(String, boolean) 31 FindBugs Avoid using implementation types like 'Vector'; use the interface instead 37 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 37 PMD Marker Avoid variables with short names like v 37 PMD Marker Consider replacing this Vector with the newer java.util.List 37 PMD Marker Parameter 'route' is not assigned and could be declared final 37 PMD Marker Parameter 'v' is not assigned and could be declared final 37 PMD Marker Avoid unnecessary comparisons in boolean expressions 40 PMD Marker Write to static field PVector.cnt from instance method new PVector(Vector, boolean) 42 FindBugs Lines of Code in Method is 25 53 Metrics Marker Number of Statements is 23 53 Metrics Marker Avoid using implementation types like 'Vector'; use the interface instead 60 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 60 PMD Marker Avoid variables with short names like wp 60 PMD Marker Consider replacing this Vector with the newer java.util.List 60 PMD Marker Parameter 'wp' is not assigned and could be declared final 60 PMD Marker Local variable 'size' could be declared final 61 PMD Marker Local variable 'whs' could be declared final 64 PMD Marker Avoid variables with short names like ht 68 PMD Marker Consider replacing this Hashtable with the newer java.util.Map 68 PMD Marker Local variable 'ht' could be declared final 68 PMD Marker Avoid instantiating new objects inside loops 70 PMD Marker Avoid variables with short names like hp 72 PMD Marker Local variable 'hp' could be declared final 72 PMD Marker Consider replacing this Vector with the newer java.util.List 74 PMD Marker Local variable 'sorted' could be declared final 74 PMD Marker Use ArrayList instead of Vector 74 PMD Marker Avoid instantiating new objects inside loops 75 PMD Marker cxlvii
  • 148.
    Zarko Acimovic PVector.java Dead store to temp1 in PVector.sortDescending(Point) 107 FindBugs The local variable temp1 is never read 107 Java Problem Use ArrayList instead of Vector 107 PMD Marker Use ArrayList instead of Vector 108 PMD Marker Dead store to temp1 in PVector.sortDescending(Point) 109 FindBugs Avoid using for statements without curly braces 110 PMD Marker Cyclomatic Complexity is 5 114 Metrics Marker Lines of Code in Method is 26 114 Metrics Marker Number of Statements is 26 114 Metrics Marker Avoid using implementation types like 'Vector'; use the interface instead 120 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 120 PMD Marker Consider replacing this Hashtable with the newer java.util.Map 127 PMD Marker Avoid instantiating new objects inside loops 129 PMD Marker Use ArrayList instead of Vector 133 PMD Marker Avoid instantiating new objects inside loops 135 PMD Marker Avoid using if statements without curly braces 136 PMD Marker Prefer StringBuffer over += for concatenating strings 150 PMD Marker PVector.toString() concatenates strings using + in a loop 150 FindBugs Cyclomatic Complexity is 5 155 Metrics Marker Lines of Code in Method is 46 155 Metrics Marker Number of Statements is 35 155 Metrics Marker Avoid using implementation types like 'Vector'; use the interface instead 162 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 162 PMD Marker Use ArrayList instead of Vector 163 PMD Marker Lines of Code in Method is 30 212 Metrics Marker Number of Statements is 28 212 Metrics Marker Avoid instantiating new objects inside loops 228 PMD Marker Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty() 232 PMD Marker A method should have only one exit point, and that should be the last statement in the method 233 PMD Marker Document empty method 248 PMD Marker A getX() method which returns a boolean should be named isX() 289 PMD Marker Cyclomatic Complexity is 6 293 Metrics Marker Lines of Code in Method is 28 293 Metrics Marker Number of Levels is 5 293 Metrics Marker cxlviii
  • 149.
    Software Defects PreventionTechniques – Example Project 1 /** 2 * 3 * PVector enables drawing and sorting of points by name and distance 4 */ 5 6 7 import java.util.*; 8 //import java.io.*; 9 import javax.microedition.lcdui.*; 10 11 public class PVector extends Vector { 12 13 /** ID of WP Vector 14 * 0 - simple Vector 15 * 1 - route 16 */ 17 private int ID = 0; 18 private static int cnt = 0; 19 20 private String name =""; 21 22 boolean visible = false; 23 24 25 26 PVector(String name,boolean route){ 27 super(); 28 29 if (route==true) { 30 this.name = name; 31 cnt++; 32 ID = cnt; 33 } else { 34 ID = 0; 35 } 36 } 37 PVector(Vector v, boolean route){ 38 super(); 39 40 if (route==true) { 41 ID = cnt; 42 cnt++; 43 } else { 44 ID = 0; 45 } 46 47 for (int i=0; i<v.size(); i++){ 48 this.addElement(v.elementAt(i)); 49 } 50 } cxlix
  • 150.
    Zarko Acimovic 51 52 53 /** Returns vector of Points sorted by distance 54 * from Point wp in ascending order 55 * 56 * @version initial 57 * @return Vector 58 */ 59 60 public Vector sortAscending(Point wp){ 61 int size = this.size(); 62 long[] distances = new long [size]; 63 for (int i=0; i<size; i++) { 64 Point whs = (Point)this.elementAt(i); //from warehouse 65 distances[i]=whs.measureDistance(wp); 66 whs.setDistance(distances[i]); 67 } 68 Hashtable ht = new Hashtable(); 69 for (int i=0; i<size; i++){ 70 ht.put(new Long(distances[i]),this.elementAt(i)); 71 } 72 HeapSorter hp = new HeapSorter(); 73 hp.heapsort(distances); 74 Vector sorted = new Vector(); 75 for (int i=0;i<size;i++) sorted.addElement(ht.get(new Long(distances[i]))); 76 return sorted; 77 } 78 79 public String[] sortByName(){ 80 //System.out.println("wwwwww"); 81 //int size = this.size(); 82 //long[] firstChars = new long[size]; 83 //Hashtable ht = new Hashtable(); 84 String names[] = new String[this.size()]; 85 for(int i=0; i<this.size(); i++){ 86 Point whs = (Point) this.elementAt(i); 87 //firstChars[i] = (long) whs.getName().charAt(0); 88 //ht.put(new Long(firstChars[i]),this.elementAt(i)); 89 names[i]=whs.getName(); 90 } 91 HeapSorter hp = new HeapSorter(); 92 hp.heapsort(names); 93 //Vector sorted = new Vector(); 94 //for (int i=0;i<size;i++) sorted.addElement(ht.get(new Long(firstChars[i]))); 95 //System.out.println("wwwwwwn"+sorted); 96 return names; 97 } cl
  • 151.
    Software Defects PreventionTechniques – Example Project 98 99 /** Returns vector of Points sorted by distance 100 * from WayPint wp in descending order 101 * 102 * @version initial 103 * @return Vector 104 */ 105 public Vector sortDescending(Point wp){ 106 int size = this.size(); 107 Vector temp1 = new Vector(); 108 Vector temp2 = new Vector(); 109 temp1 = this.sortAscending(wp); 110 for (int i=0; i<size;i++ ) temp2.addElement(temp2.elementAt(size-i)); 111 return temp2; 112 } 113 114 /** Return vector of specific Points of type 'type' 115 * sorted by distance in ascending order from Point wp 116 * 117 * @version initial 118 * @return Vector 119 */ 120 public Vector sortAscending (Point wp, String type){ 121 int size = this.size(); 122 long[] distances = new long [size]; 123 for (int i=0; i<size; i++){ 124 Point whs = (Point)this.elementAt(i); //from warehouse 125 distances[i]=wp.measureDistance(whs); 126 } 127 Hashtable ht = new Hashtable(); 128 for (int i=0; i<size; i++){ 129 ht.put(new Long(distances[i]),this.elementAt(i)); 130 } 131 HeapSorter hp = new HeapSorter(); 132 hp.heapsort(distances); 133 Vector sorted = new Vector(); 134 for (int i=0;i<size;i++) { 135 Point wpnt = (Point)ht.get(new Long(distances[i])); 136 if (wp.getType().equals(type)) sorted.addElement(wpnt); 137 } 138 return sorted; 139 } 140 141 /** Prints array of Points 142 * @version initial 143 * @return String 144 */ 145 public String toString(){ cli
  • 152.
    Zarko Acimovic 146 String str=""; 147 int size = this.size(); 148 for (int i=0; i<size; i++){ 149 Point wp =(Point)this.elementAt(i); 150 str += wp.toString(); 151 } 152 return str; 153 } 154 155 /**Returns all Points in rectangle 156 * defined by wp1 and wp2 as points 157 * of diagonal 158 * 159 * @version initial 160 * @return Vector 161 */ 162 public Vector getPoints(Point wp1, Point wp2){ 163 Vector v = new Vector(); 164 165 long lim1Lat = wp1.getLat(); 166 long lim1Lon = wp1.getLon(); 167 long lim2Lat = wp2.getLat(); 168 long lim2Lon = wp2.getLon(); 169 170 long bigLat; 171 long miniLat; 172 long bigLon; 173 long miniLon; 174 175 if (lim1Lat>lim2Lat){ 176 bigLat=lim1Lat; 177 miniLat=lim2Lat; 178 } else { 179 bigLat=lim2Lat; 180 miniLat=lim1Lat; 181 } 182 183 if (lim1Lon>lim2Lon){ 184 bigLon=lim1Lon; 185 miniLon=lim2Lon; 186 } else { 187 bigLon=lim2Lon; 188 miniLon=lim1Lon; 189 } 190 191 for (int i=0; i<this.size();i++){ 192 Point wp = (Point)this.elementAt(i); 193 if (miniLat<wp.getLat() && wp.getLat()<bigLat && 194 miniLon<wp.getLon() && wp.getLon()<bigLon){ 195 v.addElement(wp); 196 } clii
  • 153.
    Software Defects PreventionTechniques – Example Project 197 } 198 //System.out.println("Vektor jen"+v); 199 return v; 200 } 201 202 /** Merges two vectors 203 * 204 * @version initial 205 */ 206 public void mergeWith(Vector v){ 207 for (int i=0; i<v.size(); i++ ){ 208 this.addElement(v.elementAt(i)); 209 } 210 } 211 212 /** Deletes Point 213 * 214 * @author Zarko Acimovic 215 * @version initial 216 */ 217 public int deleteWP1(Point wp, int pixLat, int pixLon){ 218 //System.out.println("Unutar DELETE"); 219 //System.out.println(this.size()); 220 Vector toDelete = new Vector(); 221 long pixLat1 = MathFP.toLong(pixLat); 222 long pixLon1 = MathFP.toLong(pixLon); 223 224 for (int i=0; i<this.size(); i++){ 225 Point wp2 = (Point)this.elementAt(i); 226 if ( Math.abs(wp2.getLatSec()- wp.getLatSec())<5*pixLat1 && 227 Math.abs(wp2.getLonSec()- wp.getLonSec())<5*pixLon1 ){ 228 toDelete.addElement(new Integer(i)); 229 } 230 } 231 232 if(toDelete.size()>1 || toDelete.size()==0) { 233 return -1; 234 } 235 else { 236 Integer k = (Integer)toDelete.elementAt(0); 237 int c = k.intValue(); 238 this.removeElementAt(c); 239 return c; 240 } 241 } 242 243 /** Edits Point 244 * 245 * @author Zarko Acimovic cliii
  • 154.
    Zarko Acimovic 246 * @version not yet implemented 247 */ 248 public void editWP(Point wp){ 249 } 250 251 252 /** Sets ID of WPVector 253 * 0 - simple WPVector 254 * n - route 255 * 256 */ 257 public void setID(int i){ 258 ID = i; 259 } 260 261 /** Returns ID of WPVector 262 * 0 - simple WPVector 263 * 1 - route 264 */ 265 public int getID(){ 266 return ID; 267 } 268 269 /** Returns name WPVector 270 */ 271 public String getName(){ 272 return name; 273 } 274 275 /** Returns name WPVector 276 */ 277 public void setName(String s){ 278 name = s; 279 } 280 281 public void setVisible(){ 282 visible = true; 283 } 284 285 public void resetVisible(){ 286 visible = false; 287 } 288 289 public boolean getVisible(){ 290 return visible; 291 } 292 293 public void drawVector(Graphics g, boolean route, Point newEdge, long pixLon, long pixLat, long zoomL){ 294 /////System.out.println("route="+route); 295 /////System.out.println("routeVisible="+this.getVisible()); cliv
  • 155.
    Software Defects PreventionTechniques – Example Project 296 if(route==true){ 297 if(this.getVisible()==true){ 298 if(this.size()==1){ 299 Point wp1 = (Point) this.elementAt(0); 300 wp1.drawPoint(g,newEdge,pixLat,pixLon,zoomL); 301 } else { 302 for(int j=0; j<this.size()-1; j++){ 303 Point wp1 = (Point) this.elementAt(j); 304 Point wp2 = (Point) this.elementAt(j+1); 305 //wp1.setXY(newEdge,pixLon,pixLat); 306 //wp2.setXY(newEdge,pixLon,pixLat); 307 wp1.drawPoint(g,newEdge,pixLat,pixLon,zoomL); 308 wp2.drawPoint(g,newEdge,pixLat,pixLon,zoomL); 309 g.drawLine(wp1.getXX(),wp1.getYY(),wp2.getXX(),wp2.getYY()); 310 } 311 } 312 } 313 } else { 314 for(int i=0; i<this.size(); i++){ 315 Point wp = (Point) this.elementAt(i); 316 wp.drawPoint(g,newEdge,pixLat,pixLon,zoomL); 317 } 318 } 319 320 } 321 322 323 }; clv
  • 156.
    Zarko Acimovic SelectorPoint.java All classes and interfaces must belong to a named package 8 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 75% 8 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 78% 8 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 333% 8 Metrics Marker The class 'SelectorPoint' has a Cyclomatic Complexity of 4 (Highest = 19). 8 PMD Marker Weighted Methods per Class is 72 8 Metrics Marker Avoid variables with short names like mb 9 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 9 PMD Marker Use explicit scoping instead of the default package private level 9 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 10 PMD Marker Use explicit scoping instead of the default package private level 10 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 11 PMD Marker Use explicit scoping instead of the default package private level 11 PMD Marker Avoid variables with short names like m 12 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 12 PMD Marker Use explicit scoping instead of the default package private level 12 PMD Marker Avoid variables with short names like n 13 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 13 PMD Marker Use explicit scoping instead of the default package private level 13 PMD Marker Avoid variables with short names like s 14 PMD Marker Avoid variables with short names like mb 18 PMD Marker Parameter 'mb' is not assigned and could be declared final 18 PMD Marker Parameter 'mob' is not assigned and could be declared final 18 PMD Marker Cyclomatic Complexity is 15 25 Metrics Marker Lines of Code in Method is 75 25 Metrics Marker Number of Statements is 82 25 Metrics Marker Parameter 's' is not assigned and could be declared final 27 PMD Marker The method 'setSelectorScreen' has a Cyclomatic Complexity of 19. 27 PMD Marker The method setSelectorScreen() has an NPath complexity of 11025 27 PMD Marker Avoid using if statements without curly braces 31 PMD Marker Avoid using if statements without curly braces 49 PMD Marker Avoid using if statements without curly braces 61 PMD Marker Avoid using if statements without curly braces 74 PMD Marker Local variable 'WP' could be declared final 87 PMD Marker Avoid unnecessary comparisons in boolean expressions 89 PMD Marker The String literal "selector" appears 4 times in this file; the first occurrence is on 89 89 PMD Marker Avoid unnecessary comparisons in boolean expressions 93 PMD Marker Feature Envy is 5 103 Metrics Marker Lines of Code in Method is 22 103 Metrics Marker Parameter 'edge' is not assigned and could be declared final 108 PMD Marker clvi
  • 157.
    Software Defects PreventionTechniques – Example Project SelectorPoint.java Cyclomatic Complexity is 15 169 Metrics Marker Lines of Code in Method is 73 169 Metrics Marker Number of Levels is 5 169 Metrics Marker Number of Statements is 89 169 Metrics Marker The method 'selectWP' has a Cyclomatic Complexity of 18. 172 PMD Marker The method selectWP() has an NPath complexity of 7290 172 PMD Marker Avoid unused local variables such as 'idS'. 177 PMD Marker The local variable idS is never read 177 Java Problem Avoid using if statements without curly braces 183 PMD Marker Consider replacing this Vector with the newer java.util.List 214 PMD Marker Avoid unnecessary comparisons in boolean expressions 237 PMD Marker Avoid unnecessary comparisons in boolean expressions 238 PMD Marker Cyclomatic Complexity is 13 243 Metrics Marker Lines of Code in Method is 73 243 Metrics Marker Number of Statements is 99 243 Metrics Marker The method 'deleteWP' has a Cyclomatic Complexity of 17. 251 PMD Marker The method deleteWP() has an NPath complexity of 5760 251 PMD Marker Consider replacing this Vector with the newer java.util.List 256 PMD Marker Use ArrayList instead of Vector 256 PMD Marker Avoid instantiating new objects inside loops 261 PMD Marker Consider replacing this Vector with the newer java.util.List 265 PMD Marker Use ArrayList instead of Vector 265 PMD Marker Consider replacing this Vector with the newer java.util.List 266 PMD Marker Avoid instantiating new objects inside loops 272 PMD Marker Avoid unused local variables such as 'drt'. 277 PMD Marker The local variable drt is never read 277 Java Problem Substitute calls to size() == 0 (or size() != 0) with calls to isEmpty() 278 PMD Marker Cyclomatic Complexity is 5 318 Metrics Marker Feature Envy is 6 318 Metrics Marker Lines of Code in Method is 26 318 Metrics Marker Number of Statements is 54 318 Metrics Marker The method name SelectorPoint.Zoom() doesn't start with a lower case letter 321 FindBugs Lines of Code in Method is 95 346 Metrics Marker Number of Statements is 22 346 Metrics Marker Avoid unused local variables such as 'length'. 414 PMD Marker The local variable length is never read 414 Java Problem clvii
  • 158.
    Zarko Acimovic 1 /** 2 * SelectorPoint controls selection and identification of geographical object 3 */ 4 import java.util.*; 5 //import java.io.*; 6 import javax.microedition.lcdui.*; 7 8 public class SelectorPoint{ 9 MapBackground mb; 10 MapObjects mob; 11 Point selP; 12 int m = 255; 13 int n = 200; 14 int s = 0; 15 boolean colorSet=false; 16 boolean big = false; 17 18 SelectorPoint(MapBackground mb, MapObjects mob){ 19 20 this.selP = mob.getCurrentPosition(); 21 this.mb = mb; 22 this.mob = mob; 23 } 24 25 /** Sets selector point on Screen due to user's left/right , up/down commands 26 */ 27 public void setSelectorScreen(char s){ 28 29 30 if(s=='r'){ 31 if (selP.getX()>0 && selP.getX()<mb.getCanvasWidth()) selP.addX(5); 32 if (selP.getX()>mb.getCanvasWidth()-5) { 33 // calculation of (deg,min,sec) for Selector before panning 34 //dakle ja pre panovanja izracunam svetske koordinate selektora, 35 //da bi znao gde je on stvarno, pa kad panujem mapu (a samim 36 //tim i promenim njen newEdge onda odredjujem i relativni polozaj 37 //selektorske tacke u odnosu na taj newEdge (jasno je da pri panovanju mape 38 //nije doslo do promene svetskih koordinata selektora) 39 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 40 //Paning clviii
  • 159.
    Software Defects PreventionTechniques – Example Project 41 mb.setMap(s); 42 mob.setDrawablePoints(); 43 //calculation of new Selector position on panned map 44 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 45 46 } 47 } 48 if(s=='l'){ 49 if (selP.getX()>6) selP.subX(5); 50 if (selP.getX()<=6) { 51 // calculation of (deg,min,sec) for Selector before panning 52 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 53 //Paning 54 mb.setMap(s); 55 mob.setDrawablePoints(); 56 //calculation of new Selector position on panned map 57 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 58 } 59 } 60 if(s=='d'){ 61 if (selP.getY()>0 && selP.getY()<mb.getCanvasHeight()-5) selP.addY(5); 62 if (selP.getY()>=(mb.getCanvasHeight()-5)) { 63 //calculation of (deg,min,sec) for Selector before panning 64 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 65 //Paning 66 mb.setMap(s); 67 mob.setDrawablePoints(); 68 //calculation of new Selector position on panned map 69 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 70 71 } 72 } 73 if(s=='u'){ 74 if (selP.getY()>6) selP.subY(5); 75 if (selP.getY()<=6) { 76 //calculation of (deg,min,sec) for Selector before panning 77 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 78 //Paning clix
  • 160.
    Zarko Acimovic 79 mb.setMap(s); 80 mob.setDrawablePoints(); 81 //calculation of new Selector position on panned map 82 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 83 84 } 85 } 86 87 Point WP = this.getSelectedWP(); 88 89 if (!WP.getName().equals("selector") && colorSet==false) { 90 setColor(); 91 setBig(); 92 } 93 if (WP.getName().equals("selector") && colorSet==true) { 94 resetColor(); 95 resetBig(); 96 } 97 //if (!WP.getImage().equals("blanco") && ! WP.getImage().equals("route") && big==false) setBig(); 98 //if ((WP.getImage().equals("blanco")|| WP.getImage().equals("route")) && big==true) resetBig(); 99 } 100 101 102 103 /** When selector is moved we only update its (x,y) 'descriptors', 104 * so when map has to be panned we need to find out (lat,lon) pair 105 * for selector on old screen and adjust its position (x',y') on new screen 106 * in a way that (lat,lon) is unchanged 107 */ 108 public void setSelectorWorld(Point edge, long pixLon, long pixLat){ 109 110 // pamtim trenutno x i y 111 long tx = selP.getX(); 112 long ty = selP.getY(); 113 114 // azuriram svetske kordinate 115 long dLatSec = MathFP.mul(pixLat,MathFP.toFP(selP.getY())); 116 long dLonSec = MathFP.mul(pixLon,MathFP.toFP(selP.getX())); 117 118 selP = new Point(MathFP.sub(edge.getLatSec(),dLatSec), 119 MathFP.add(edge.getLonSec(),dLonSec),"","",false); 120 121 // vracam trenutno x i y 122 selP.setX(tx); 123 selP.setY(ty); clx
  • 161.
    Software Defects PreventionTechniques – Example Project 124 } 125 126 /** Returns copy of SELECTOR Point 127 * @return Point 128 */ 129 public Point getSelector(){ 130 this.setSelectorWorld(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 131 Point copy = new Point(selP,true); 132 133 copy.setName(""); 134 return copy; 135 } 136 137 /** Returns x-coordinate of selector 138 * @return long 139 */ 140 long getSelX(){ 141 return selP.getX(); 142 } 143 144 /** Returns y-coordinate of selector 145 * @return long 146 */ 147 long getSelY(){ 148 return selP.getY(); 149 } 150 151 /** Returns user selected Point 152 * @return Point 153 */ 154 public Point getSelectedWP(){ 155 Vector v = mob.getDrawablePoints(); 156 Point ret = new Point(0,0,"selector","s",false); 157 for(int i=0; i<v.size(); i++){ 158 Point fWhs = (Point) v.elementAt(i); 159 if( Math.abs(fWhs.getX()-selP.getX())<5 && 160 Math.abs(fWhs.getY()-selP.getY())<5 ) { 161 ret=fWhs; 162 i=1000; 163 } 164 } 165 return ret; 166 } 167 168 169 /** Returns user selected Point with name s 170 * @return Point 171 */ 172 public void selectWP(String s) { 173 clxi
  • 162.
    Zarko Acimovic 174 int len = s.length(); 175 int blanco = s.indexOf('_'); 176 if(blanco!=-1){ 177 String idS = s.substring(blanco+1,len); 178 s = s.substring(0,blanco); 179 s = compact(s); 180 } 181 182 int blank = s.indexOf(' '); 183 if(blank!=-1 && s.substring(blank+1,s.length()).equals("current")) s = s.substring(0,blank); 184 185 Point look4 = null; 186 PVector freeWPV = mob.getFreeWaypoints(); 187 188 int k=-2; 189 for(int i=0; i<freeWPV.size(); i++){ 190 Point wp = (Point) freeWPV.elementAt(i); 191 if(s.equals(wp.getName())){ 192 k=i; 193 look4 = (Point) freeWPV.elementAt(k); 194 i=1000; 195 } 196 } 197 198 if(k==-2){ 199 Point cP = mob.getCurrentPosition(); 200 if(s.equals(cP.getName())) { 201 look4=cP; 202 k=-3; 203 } 204 } 205 if(k==-2){ 206 Point dP = mob.getDestinationPosition(); 207 if(s.equals(dP.getName())) { 208 look4=dP; 209 k=-4; 210 } 211 } 212 213 if(k==-2){ 214 Vector routes = mob.getRoutes(); 215 for(int i=0; i<routes.size(); i++){ 216 PVector rt = (PVector) routes.elementAt(i); 217 for(int j=0; j<rt.size(); j++){ 218 Point wp = (Point)rt.elementAt(j); 219 System.out.println(wp); 220 if(wp.getName().equals(s)){ 221 k=j; 222 look4=(Point)rt.elementAt(j); 223 i=1000; clxii
  • 163.
    Software Defects PreventionTechniques – Example Project 224 j=1000; 225 } 226 } 227 } 228 } 229 230 this.selP = new Point(look4,false); 231 232 mb.setBackground(look4); 233 234 mob.setDrawablePoints(); 235 selP.setXY(mb.getNewEdge(),mb.getPixLon(), mb.getPixLat()); 236 237 if (!selP.getImage().equals("blanco") && big==false) setBig(); 238 if (selP.getImage().equals("blanco") && big==true) resetBig(); 239 240 this.setColor(); 241 } 242 243 /** Deletes selected Point 244 * Returns -4 if current Point is deleted 245 * Returns -3 if destination Point is deleted 246 * Returns -2 if free Point deleted 247 * Returns -1 if more then one Point is selected 248 * Returns 0 if none Point is selected 249 * Returns n if n-th Point in route deleted 250 */ 251 public int deleteWP(){ 252 int ret = 0; 253 254 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 255 256 Vector temp1 = new Vector(); 257 PVector fWP = mob.getFreeWaypoints(); 258 for (int i=0; i<fWP.size(); i++){ 259 Point fwp = (Point)fWP.elementAt(i); 260 if( Math.abs(selP.getX()-fwp.getX())<5 && Math.abs(selP.getY()-fwp.getY())<5 ){ 261 temp1.addElement(new Integer(i)); 262 } 263 } 264 265 Vector temp2 = new Vector(); 266 Vector Routes = mob.getRoutes(); 267 for (int j=0; j<Routes.size(); j++){ 268 PVector vR = (PVector) Routes.elementAt(j); 269 for (int k=0; k<vR.size(); k++){ 270 Point wpR = (Point)vR.elementAt(k); 271 if( Math.abs(selP.getX()-wpR.getX())<5 && Math.abs(selP.getY()-wpR.getY())<5 ) { clxiii
  • 164.
    Zarko Acimovic 272 temp2.addElement(new DelRoute(k,wpR.getTypeID())); 273 } 274 } 275 } 276 277 DelRoute drt = null; 278 if(temp2.size()>0){ 279 drt = (DelRoute) temp2.elementAt(0); 280 } 281 282 if ( (temp1.size()+temp2.size())> 1 ) ret=-1; 283 if ( (temp1.size()+temp2.size())==0 ) ret=0; 284 if ( temp1.size()==1 ) { 285 Integer k = (Integer) temp1.elementAt(0); 286 int d = k.intValue(); 287 fWP.removeElementAt(d); 288 ret=-2; 289 } 290 if( temp2.size()==1 ){ 291 DelRoute dr = (DelRoute) temp2.elementAt(0); 292 PVector vR = (PVector) Routes.elementAt(dr.getRouteID()-1); 293 vR.removeElementAt(dr.getIndex()); 294 ret=dr.getIndex(); 295 } 296 297 Point cp = mob.getCurrentPosition(); 298 if( Math.abs(selP.getX()-cp.getX())<5 && 299 Math.abs(selP.getY()-cp.getY())<5 ) { 300 mob.resetCurrentPosition(); 301 ret= -4; 302 } 303 304 Point dp = mob.getDestinationPosition(); 305 306 if( Math.abs(selP.getX()-dp.getX())<5 && 307 Math.abs(selP.getY()-dp.getY())<5 ) { 308 mob.resetDestinationPosition(); 309 ret= -3; 310 } 311 312 resetColor(); 313 314 return ret; 315 } 316 317 318 /** Action that must be taken with Selector when Zoom In/Out 319 */ 320 public void Zoom(){ clxiv
  • 165.
    Software Defects PreventionTechniques – Example Project 321 this.setSelectorWorld(mb.getPreviousEdge(), mb.getPreviousPixLon(),mb.getPreviousPixLat()); 322 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 323 while (selP.getX()>mb.getCanvasWidth()) { 324 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 325 mb.setMap('r'); 326 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 327 } 328 while (selP.getY()>mb.getCanvasHeight()) { 329 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 330 mb.setMap('d'); 331 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 332 } 333 while (selP.getX()<0){ 334 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 335 mb.setMap('l'); 336 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 337 } 338 while (selP.getY()<0) { 339 this.setSelectorWorld(mb.getNewEdge(), mb.getPixLon(),mb.getPixLat()); 340 mb.setMap('u'); 341 selP.setXY(mb.getNewEdge(),mb.getPixLon(),mb.getPixLat()); 342 } 343 } 344 345 346 /** Draws selector point 347 * 348 public void drawSelPOld(Graphics g){ 349 long zl = mb.getZoomLevel()+1; 350 Long zzl = new Long(zl); 351 int zoomL = Integer.parseInt(zzl.toString()); 352 g.setColor(0,0,0); 353 g.drawRect(selP.getXX()-6,selP.getYY()-3,12,6); 354 g.setColor(m,n,s); 355 g.fillRect(selP.getXX()-3,selP.getYY()-6,6,12); 356 g.setColor(0,0,0); 357 } 358 359 /** Draws selector point 360 * 361 public void drawSelPOld1(Graphics g){ 362 long zl = mb.getZoomLevel()+1; 363 Long zzl = new Long(zl); 364 int zoomL = Integer.parseInt(zzl.toString()); 365 g.setColor(m,n,s); 366 g.fillRect(selP.getXX()-8,selP.getYY()-4,16,8); clxv
  • 166.
    Zarko Acimovic 367 g.fillRect(selP.getXX()-4,selP.getYY()-8,8,16); 368 g.setColor(0,0,0); 369 g.drawRect(selP.getXX()-8,selP.getYY()-4,16,8); 370 g.drawRect(selP.getXX()-4,selP.getYY()-8,8,16); 371 g.setColor(m,n,s); 372 g.fillRect(selP.getXX()-7,selP.getYY()-3,15,7); 373 g.fillRect(selP.getXX()-3,selP.getYY()-7,7,15); 374 375 g.setColor(0,0,0); 376 377 378 } 379 380 /** Draws selector point 381 * 382 public void drawSelPobsolete(Graphics g){ 383 //long zl = mb.getZoomLevel()+1; 384 //Long zzl = new Long(zl); 385 //int zoomL = Integer.parseInt(zzl.toString()); 386 if(big==false){ 387 g.setColor(m,n,s); 388 g.fillRect(selP.getXX()-8,selP.getYY()-4,15,7); 389 g.fillRect(selP.getXX()-4,selP.getYY()-8,7,5); 390 g.setColor(0,0,0); 391 g.drawRect(selP.getXX()-8,selP.getYY()-4,15,7); 392 g.drawRect(selP.getXX()-4,selP.getYY()-8,7,15); 393 g.setColor(m,n,s); 394 g.fillRect(selP.getXX()-7,selP.getYY()-3,14,6); 395 g.fillRect(selP.getXX()-3,selP.getYY()-7,6,14); 396 } else { 397 g.setColor(m,n,s); 398 g.fillRect(selP.getXX()-13,selP.getYY()-5,33,16); 399 g.fillRect(selP.getXX()-5,selP.getYY()-13,16,22);///umesto 16,32 sad je 16,25 400 g.setColor(0,0,0); 401 g.drawRect(selP.getXX()-13,selP.getYY()-5,33,16); 402 g.drawRect(selP.getXX()-5,selP.getYY()-13,16,22);///umesto 16,32 sad je 16,25 403 g.setColor(m,n,s); 404 g.fillRect(selP.getXX()-12,selP.getYY()-4,32,15); 405 g.fillRect(selP.getXX()-4,selP.getYY()-12,15,22); 406 407 //g.drawString(selP.getName(),selP.getXX()-15,selP.getYY() +11,0); 408 } 409 g.setColor(0,0,0); 410 if (!this.getSelectedWP().getName().equals("selector")) g.drawString(this.getSelectedWP().getName(),this.getSelectedWP().getXX()- 15,this.getSelectedWP().getYY()+11,0); 411 }*/ 412 clxvi
  • 167.
    Software Defects PreventionTechniques – Example Project 413 public void drawSelP(Graphics g){ 414 int length=0; 415 416 //g.setColor(m,n,s); 417 g.setColor(255,180,0); 418 g.fillRect(selP.getXX()-8,selP.getYY()-4,15,7); 419 g.fillRect(selP.getXX()-4,selP.getYY()-8,7,5); 420 g.setColor(0,0,0); 421 g.drawRect(selP.getXX()-8,selP.getYY()-4,15,7); 422 g.drawRect(selP.getXX()-4,selP.getYY()-8,7,15); 423 //g.setColor(m,n,s); 424 g.setColor(255,180,0); 425 g.fillRect(selP.getXX()-7,selP.getYY()-3,14,6); 426 g.fillRect(selP.getXX()-3,selP.getYY()-7,6,14); 427 /** 428 if(big==true){ 429 g.setColor(m,n,s); 430 //g.drawRect(selP.getXX()-4,selP.getYY()-4,15,15); 431 //g.drawRect(selP.getXX()-5,selP.getYY()-5,17,17); 432 //g.drawRect(selP.getXX()-6,selP.getYY()-6,19,19); 433 String name = this.getSelectedWP().getName(); 434 length = name.length(); 435 g.fillRect(selP.getXX()-4*length-2,selP.getYY() +12,8*length+2,14); 436 } 437 g.setColor(0,0,0); 438 if (!this.getSelectedWP().getName().equals("selector")) g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY() +13,0); 439 */ 440 } 441 442 public void drawCaption(Graphics g){ 443 int length=0; 444 if(big==true){ 445 g.setColor(m,n,s); 446 //g.drawRect(selP.getXX()-4,selP.getYY()-4,15,15); 447 //g.drawRect(selP.getXX()-5,selP.getYY()-5,17,17); 448 //g.drawRect(selP.getXX()-6,selP.getYY()-6,19,19); 449 String name = this.getSelectedWP().getName(); 450 length = name.length(); 451 g.fillRect(selP.getXX()-4*length-2,selP.getYY() +12,8*length+2,14); 452 //if (!this.getSelectedWP().getName().equals("selector")) g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY() +13,0); 453 g.setColor(0,0,0); 454 if (!this.getSelectedWP().getName().equals("selector")) g.drawString(this.getSelectedWP().getName(),selP.getXX()-4*length,selP.getYY() +13,0); 455 } clxvii
  • 168.
    Zarko Acimovic 456 457 } 458 459 460 461 /** Sets current position 462 */ 463 public void setCurrent(MapObjects mob){ 464 Point wp = this.getSelectedWP(); 465 mob.setCurrentPosition(wp); 466 } 467 468 /** Sets destination position 469 */ 470 public void setDest(MapObjects mob){ 471 Point wp = this.getSelectedWP(); 472 mob.setDestinationPosition(wp); 473 } 474 475 public void setColorOld(){ 476 s = 0; 477 colorSet=true; 478 } 479 480 public void setColor(){ 481 m=255; 482 n=255; 483 s=0; 484 colorSet=true; 485 } 486 487 public void resetColorOld(){ 488 s = 255; 489 colorSet=false; 490 } 491 492 public void resetColor(){ 493 m=255; 494 n=180; 495 s=0; 496 colorSet=false; 497 } 498 499 public void setBig(){ 500 big=true; 501 } 502 503 public void resetBig(){ 504 big=false; 505 } 506 clxviii
  • 169.
    Software Defects PreventionTechniques – Example Project 507 /** Blanco characters are possible to occur in names of pictures; 508 * Integer representations of blanko characters are 9 and 32 509 * Also, characters with integer representation between 0 and 33 510 * can not be printed out in WSDD console, so I excluded them too 511 */ 512 public String compact(String s){ 513 int k = s.length(); 514 char[] d = s.toCharArray(); 515 String ret = ""; 516 for(int i=0; i<d.length; i++){ 517 int temp = (int)d[i]; 518 if(temp>32) ret+=d[i]; 519 } 520 int kk = ret.length(); 521 if (kk!=k) System.out.println("Bugger is: "+s); 522 return ret; 523 } 524 525 526 527 } SimpleTextForm.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 75% 15 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 74% 15 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 154% 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 23 PMD Marker Use explicit scoping instead of the default package private level 23 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 25 PMD Marker Use explicit scoping instead of the default package private level 25 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Parameter 'createChgr' is not assigned and could be declared final 33 PMD Marker Avoid unnecessary comparisons in boolean expressions 39 PMD Marker Avoid variables with short names like s 63 PMD Marker Parameter 's' is not assigned and could be declared final 63 PMD Marker Avoid variables with short names like s 67 PMD Marker Parameter 's' is not assigned and could be declared final 67 PMD Marker Avoid variables with short names like s 71 PMD Marker clxix
  • 170.
    Zarko Acimovic 1 /** 2 * Simple text form 3 */ 4 5 6 import javax.microedition.lcdui.*; 7 8 //import javax.microedition.midlet.*; 9 10 11 //import java.io.*; 12 //import java.util.*; 13 14 15 public class SimpleTextForm extends Form{ 16 17 /** Name of waypoint 18 */ 19 TextField nameWP; 20 21 /** Type of waypoint 22 */ 23 TextField typeWP; 24 25 String[] str = new String[2]; 26 27 ChoiceGroup chgr; 28 29 30 31 /** Creates new form 32 */ 33 SimpleTextForm(boolean createChgr){ 34 super("Data Input"); 35 nameWP = new TextField("Name","",8,0); 36 typeWP = new TextField("Type","",8,0); 37 this.append(nameWP); 38 this.append(typeWP); 39 if(createChgr==true){ 40 str[0] = "Sysnchronized Following"; 41 str[1] = "Out of Sync"; 42 chgr = new ChoiceGroup("",1,str,null); 43 this.append(chgr); 44 } 45 } 46 47 /** Returns the name of waypoint 48 * @return String 49 */ clxx
  • 171.
    Software Defects PreventionTechniques – Example Project 50 public String getName(){ 51 return nameWP.getString(); 52 } 53 54 /** Returns the type of waypoint 55 * @return String 56 */ 57 public String getType(){ 58 return typeWP.getString(); 59 } 60 61 /** Sets the name of waypoint 62 */ 63 public void setName(String s){ 64 nameWP.setString(s); 65 } 66 67 public void setLabel(String s){ 68 nameWP.setLabel(s); 69 } 70 71 public void setLabel2(String s){ 72 typeWP.setLabel(s); 73 } 74 75 /** Sets the type of waypoint 76 */ 77 public void setType(String s){ 78 typeWP.setString(s); 79 } 80 81 public int getSelected(){ 82 return chgr.getSelectedIndex(); 83 } 84 } clxxi
  • 172.
    Zarko Acimovic TextForm.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 80% 15 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 81% 15 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 165% 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 23 PMD Marker Use explicit scoping instead of the default package private level 23 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Use explicit scoping instead of the default package private level 29 PMD Marker Use explicit scoping instead of the default package private level 30 PMD Marker Lines of Code in Method is 30 33 Metrics Marker Avoid unused constructor parameters such as 'first'. 35 PMD Marker Avoid variables with short names like s 35 PMD Marker Parameter 's' is not assigned and could be declared final 35 PMD Marker The user-supplied array 's' is stored directly. 35 PMD Marker The user-supplied array 's' is stored directly. 35 PMD Marker Avoid assignments in operands 41 PMD Marker Dead store to first in new TextForm(String[], boolean) 41 FindBugs new TextForm(String[], boolean) assigns boolean literal in boolean expression 41 FindBugs The parameter first to new TextForm(String[], boolean) is dead upon entry but overwritten 41 FindBugs Avoid variables with short names like s 80 PMD Marker Parameter 's' is not assigned and could be declared final 80 PMD Marker Avoid variables with short names like s 86 PMD Marker Parameter 's' is not assigned and could be declared final 86 PMD Marker Avoid variables with short names like s 94 PMD Marker Parameter 's' is not assigned and could be declared final 94 PMD Marker Avoid variables with short names like s 98 PMD Marker Parameter 's' is not assigned and could be declared final 98 PMD Marker clxxii
  • 173.
    Software Defects PreventionTechniques – Example Project 1 /** 2 * Text form 3 */ 4 5 6 import javax.microedition.lcdui.*; 7 8 //import javax.microedition.midlet.*; 9 10 11 //import java.io.*; 12 //import java.util.*; 13 14 15 public class TextForm extends Form{ 16 17 /** Name of waypoint 18 */ 19 TextField nameWP; 20 21 /** Type of waypoint 22 */ 23 TextField typeWP; 24 25 /** ChoiceGroup of categories 26 */ 27 ChoiceGroup chgr; 28 29 TextField lat; 30 TextField lon; 31 32 33 /** Creates new form 34 */ 35 TextForm(String[] s, boolean first){ 36 super("Data Input"); 37 nameWP = new TextField("Name","",50,0); 38 typeWP = new TextField("Type","",50,0); 39 this.append(nameWP); 40 41 if(first = false){ 42 //this.append(typeWP); 43 this.append(""); 44 chgr = new ChoiceGroup("Category",1,s,null); 45 this.append(chgr); 46 47 lat = new TextField("Latitude","",50,0); 48 lon = new TextField("Longitude","",50,0); 49 this.append(lat); 50 this.append(lon); 51 }else{ clxxiii
  • 174.
    Zarko Acimovic 52 lat = new TextField("Latitude","",50,0); 53 lon = new TextField("Longitude","",50,0); 54 this.append(lat); 55 this.append(lon); 56 57 this.append(""); 58 chgr = new ChoiceGroup("Category:",1,s,null); 59 this.append(chgr); 60 } 61 62 } 63 64 /** Returns the name of waypoint 65 * @return String 66 */ 67 public String getName(){ 68 return nameWP.getString(); 69 } 70 71 /** Returns the type of waypoint 72 * @return String 73 */ 74 public String getType(){ 75 return typeWP.getString(); 76 } 77 78 /** Sets the name of waypoint 79 */ 80 public void setName(String s){ 81 nameWP.setString(s); 82 } 83 84 /** Sets the type of waypoint 85 */ 86 public void setType(String s){ 87 typeWP.setString(s); 88 } 89 90 public int getSelected(){ 91 return chgr.getSelectedIndex(); 92 } 93 94 public void setLat(long s){ 95 lat.setString(MathFP.toString(s)); 96 } 97 98 public void setLon(long s){ 99 lon.setString(MathFP.toString(s)); 100 } 101 102 public void setLat(String s){ clxxiv
  • 175.
    Software Defects PreventionTechniques – Example Project 103 lat.setString(s); 104 } 105 106 public void setLon(String s){ 107 lon.setString(s); 108 } 109 110 public String getLat(){ 111 return lat.getString(); 112 } 113 114 public String getLon(){ 115 return lon.getString(); 116 } 117 } TextFromFriend.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 83% 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 23 PMD Marker Use explicit scoping instead of the default package private level 23 PMD Marker Avoid variables with short names like s 53 PMD Marker Parameter 's' is not assigned and could be declared final 53 PMD Marker Avoid variables with short names like s 57 PMD Marker Parameter 's' is not assigned and could be declared final 57 PMD Marker Avoid variables with short names like s 63 PMD Marker Parameter 's' is not assigned and could be declared final 63 PMD Marker clxxv
  • 176.
    Zarko Acimovic 1 /** 2 * Text form 3 */ 4 5 6 import javax.microedition.lcdui.*; 7 8 //import javax.microedition.midlet.*; 9 10 11 //import java.io.*; 12 //import java.util.*; 13 14 15 public class TextFormFriend extends Form{ 16 17 /** Name of waypoint 18 */ 19 TextField nameWP; 20 21 /** Type of waypoint 22 */ 23 TextField typeWP; 24 25 26 27 /** Creates new form 28 */ 29 TextFormFriend(){ 30 super("Data Input"); 31 nameWP = new TextField("Name","",8,0); 32 typeWP = new TextField("Type","",8,0); 33 this.append(nameWP); 34 this.append(typeWP); 35 } 36 37 /** Returns the name of waypoint 38 * @return String 39 */ 40 public String getName(){ 41 return nameWP.getString(); 42 } 43 44 /** Returns the type of waypoint 45 * @return String 46 */ 47 public String getType(){ 48 return typeWP.getString(); 49 } 50 51 /** Sets the name of waypoint clxxvi
  • 177.
    Software Defects PreventionTechniques – Example Project 52 */ 53 public void setName(String s){ 54 nameWP.setString(s); 55 } 56 57 public void setLabel(String s){ 58 nameWP.setLabel(s); 59 } 60 61 /** Sets the type of waypoint 62 */ 63 public void setType(String s){ 64 typeWP.setString(s); 65 } 66 } TextFormImage.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 72% 15 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 93% 15 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 88% 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 34 PMD Marker Use explicit scoping instead of the default package private level 34 PMD Marker Avoid variables with short names like s 39 PMD Marker Parameter 'img' is not assigned and could be declared final 39 PMD Marker Parameter 'nameChg' is not assigned and could be declared final 39 PMD Marker Parameter 's' is not assigned and could be declared final 39 PMD Marker Read of unwritten field typeWP in TextFormImage.getType() 59 FindBugs Unwritten field: TextFormImage.typeWP 59 FindBugs Avoid variables with short names like s 64 PMD Marker Parameter 's' is not assigned and could be declared final 64 PMD Marker Avoid variables with short names like s 70 PMD Marker Parameter 's' is not assigned and could be declared final 70 PMD Marker Read of unwritten field typeWP in TextFormImage.setType(String) 71 FindBugs Avoid variables with short names like s 78 PMD Marker Avoid variables with short names like s 82 PMD Marker clxxvii
  • 178.
    Zarko Acimovic 1 /** 2 * Text form for ChoicGroup with images 3 */ 4 5 6 import javax.microedition.lcdui.*; 7 8 //import javax.microedition.midlet.*; 9 10 11 //import java.io.*; 12 //import java.util.*; 13 14 15 public class TextFormImage extends Form{ 16 17 /** Name of waypoint 18 */ 19 TextField nameWP; 20 21 /** Category of waypoit 22 */ 23 // TextField catWP; 24 25 /** Type of waypoint 26 */ 27 TextField typeWP; 28 29 /** ChoiceGroup of categories 30 */ 31 32 // TextField lat; 33 // TextField lon; 34 ChoiceGroup chgr; 35 36 37 /** Creates new form 38 */ 39 TextFormImage(String nameChg, String[] s, Image[] img){ 40 super("Data Input"); 41 nameWP = new TextField("Name","",50,0); 42 this.append(nameWP); 43 this.append(""); 44 chgr = new ChoiceGroup(nameChg,1,s,img); 45 this.append(chgr); 46 } 47 48 /** Returns the name of waypoint 49 * @return String 50 */ 51 public String getName(){ clxxviii
  • 179.
    Software Defects PreventionTechniques – Example Project 52 return nameWP.getString(); 53 } 54 55 /** Returns the type of waypoint 56 * @return String 57 */ 58 public String getType(){ 59 return typeWP.getString(); 60 } 61 62 /** Sets the name of waypoint 63 */ 64 public void setName(String s){ 65 nameWP.setString(s); 66 } 67 68 /** Sets the type of waypoint 69 */ 70 public void setType(String s){ 71 typeWP.setString(s); 72 } 73 74 public int getSelected(){ 75 return chgr.getSelectedIndex(); 76 } 77 78 public void setNameCHGR(String s){ 79 chgr.setLabel(s); 80 } 81 82 public void setLat(long s){ 83 //lat.setString(MathFP.toString(s)); 84 } 85 86 public void setLon(long s){ 87 //lon.setString(MathFP.toString(s)); 88 } 89 } clxxix
  • 180.
    Zarko Acimovic TextFormWP.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Chidamber & Kemerer) is 50 15 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 91% 15 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67% 15 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 351% 15 Metrics Marker Number of Fields is 11 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 23 PMD Marker Use explicit scoping instead of the default package private level 23 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 31 PMD Marker Use explicit scoping instead of the default package private level 31 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 35 PMD Marker Use explicit scoping instead of the default package private level 35 PMD Marker Lines of Code in Method is 39 64 Metrics Marker Number of Statements is 23 64 Metrics Marker Avoid variables with short names like s 66 PMD Marker Parameter 's' is not assigned and could be declared final 66 PMD Marker The user-supplied array 's' is stored directly. 66 PMD Marker Avoid variables with short names like s 120 PMD Marker Parameter 's' is not assigned and could be declared final 120 PMD Marker Avoid variables with short names like s 126 PMD Marker Parameter 's' is not assigned and could be declared final 126 PMD Marker Avoid variables with short names like r 133 PMD Marker Local variable 'r' could be declared final 133 PMD Marker Consider simply returning the value vs storing it in local variable 'r' 134 PMD Marker Avoid variables with short names like r 140 PMD Marker Local variable 'r' could be declared final 140 PMD Marker Consider simply returning the value vs storing it in local variable 'r' 141 PMD Marker Local variable 'r' could be declared final 147 PMD Marker Consider simply returning the value vs storing it in local variable 'r' 148 PMD Marker Local variable 's' could be declared final 154 PMD Marker Local variable 'c' could be declared final 155 PMD Marker Consider simply returning the value vs storing it in local variable 'k' 157 PMD Marker Consider simply returning the value vs storing it in local variable 'r' 164 PMD Marker 1 /** 2 * Text form for insertion of waypoint 3 */ 4 5 6 import javax.microedition.lcdui.*; 7 8 //import javax.microedition.midlet.*; 9 10 11 //import java.io.*; 12 //import java.util.*; 13 14 clxxx
  • 181.
    Software Defects PreventionTechniques – Example Project 15 public class TextFormWP extends Form{ 16 17 /** Name of waypoint 18 */ 19 TextField nameWP; 20 21 /** Type of waypoint 22 */ 23 TextField typeWP; 24 25 /** Degrees of latitude 26 */ 27 TextField degLat; 28 29 /** Minutes of latitude 30 */ 31 TextField minLat; 32 33 /** Seconds of latitude 34 */ 35 TextField secLat; 36 37 /** Side NORTH / SOUTH 38 */ 39 TextField sideNS; 40 41 42 /** Degrees of longitude 43 */ 44 TextField degLon; 45 46 /** Minutes of longitude 47 */ 48 TextField minLon; 49 50 /** Seconds of longitude 51 */ 52 TextField secLon; 53 54 /** Side WEST / EAST 55 */ 56 TextField sideWE; 57 58 /** ChoiceGroup of categories 59 */ 60 ChoiceGroup chgr; 61 62 63 64 /** Creates new form 65 */ clxxxi
  • 182.
    Zarko Acimovic 66 TextFormWP(String[] s){ 67 super("Data Input"); 68 nameWP = new TextField("Name","",12,0); 69 this.append(nameWP); 70 typeWP = new TextField("Type","",12,0); 71 this.append(typeWP); 72 73 74 degLat = new TextField("Degrees of Latitude","",8,0); 75 this.append(degLat); 76 77 minLat = new TextField("Minutes of Latitude","",8,0); 78 this.append(minLat); 79 80 secLat = new TextField("Seconds of Latitude","",8,0); 81 this.append(secLat); 82 83 sideNS = new TextField("Side, North or South?","",8,0); 84 this.append(sideNS); 85 86 87 degLon = new TextField("Degrees of Longitude","",8,0); 88 this.append(degLon); 89 90 minLon = new TextField("Minutes of Longitude","",8,0); 91 this.append(minLon); 92 93 secLon = new TextField("Seconds of Longitude","",8,0); 94 this.append(secLon); 95 96 sideWE = new TextField("Side, West or East?","",8,0); 97 this.append(sideWE); 98 99 chgr = new ChoiceGroup("Categories",1,s,null); 100 this.append(chgr); 101 102 } 103 104 /** Returns the name of waypoint 105 * @return String 106 */ 107 public String getName(){ 108 return nameWP.getString(); 109 } 110 111 /** Returns the type of waypoint 112 * @return String 113 */ 114 public String getType(){ 115 return typeWP.getString(); 116 } clxxxii
  • 183.
    Software Defects PreventionTechniques – Example Project 117 118 /** Sets the name of waypoint 119 */ 120 public void setName(String s){ 121 nameWP.setString(s); 122 } 123 124 /** Sets the type of waypoint 125 */ 126 public void setType(String s){ 127 typeWP.setString(s); 128 } 129 130 /** Returns degrees of latitude 131 */ 132 public int getDegLat(){ 133 int r = Integer.parseInt(degLat.getString()); 134 return r; 135 } 136 137 /** Returns minutes of latitude 138 */ 139 public int getMinLat(){ 140 int r = Integer.parseInt(minLat.getString()); 141 return r; 142 } 143 144 /** Returns seconds of latitude 145 */ 146 public int getSecLat(){ 147 int r = Integer.parseInt(secLat.getString()); 148 return r; 149 } 150 151 /** Returns side, North or South 152 */ 153 public char getSideNS(){ 154 String s = sideNS.getString(); 155 char[] c = s.toCharArray(); 156 char k = c[0]; 157 return k; 158 } 159 160 /** Returns degrees of longitude 161 */ 162 public int getDegLon(){ 163 int r = Integer.parseInt(degLon.getString()); 164 return r; 165 } 166 167 /** Returns minutes of longitude clxxxiii
  • 184.
    Zarko Acimovic 168 */ 169 public int getMinLon(){ 170 int r = Integer.parseInt(minLon.getString()); 171 return r; 172 } 173 174 /** Returns seconds of longitude 175 */ 176 public int getSecLon(){ 177 int r = Integer.parseInt(secLon.getString()); 178 return r; 179 } 180 181 /** Returns side, West or East 182 */ 183 public char getSideWE(){ 184 String s = sideWE.getString(); 185 char[] c = s.toCharArray(); 186 char k = c[0]; 187 return k; 188 } 189 } clxxxiv
  • 185.
    Software Defects PreventionTechniques – Example Project Thread4Friend.java All classes and interfaces must belong to a named package 15 PMD Marker Lack of Cohesion in Methods (Chidamber & Kemerer) is 50 15 Metrics Marker Lack of Cohesion in Methods (Henderson-Sellers) is 91% 15 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 67% 15 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 351% 15 Metrics Marker Number of Fields is 11 15 Metrics Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 19 PMD Marker Use explicit scoping instead of the default package private level 19 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 23 PMD Marker Use explicit scoping instead of the default package private level 23 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 27 PMD Marker Use explicit scoping instead of the default package private level 27 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 31 PMD Marker Use explicit scoping instead of the default package private level 31 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 35 PMD Marker Use explicit scoping instead of the default package private level 35 PMD Marker Lines of Code in Method is 39 64 Metrics Marker Number of Statements is 23 64 Metrics Marker Avoid variables with short names like s 66 PMD Marker Parameter 's' is not assigned and could be declared final 66 PMD Marker The user-supplied array 's' is stored directly. 66 PMD Marker Avoid variables with short names like s 120 PMD Marker Parameter 's' is not assigned and could be declared final 120 PMD Marker Avoid variables with short names like s 126 PMD Marker Parameter 's' is not assigned and could be declared final 126 PMD Marker Avoid variables with short names like r 133 PMD Marker Local variable 'r' could be declared final 133 PMD Marker Consider simply returning the value vs storing it in local variable 'r' 134 PMD Marker Avoid variables with short names like r 140 PMD Marker All classes and interfaces must belong to a named package 13 PMD Marker Lack of Cohesion in Methods (Henderson-Sellers) is 91% 13 Metrics Marker Lack of Cohesion in Methods (Pairwise Field Irrelation) is 54% 13 Metrics Marker Lack of Cohesion in Methods (Total Correlation) is 420% 13 Metrics Marker The class 'Thread4Friend' has a Cyclomatic Complexity of 4 (Highest = 10). 13 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 13 PMD Marker Avoid variables with short names like t 14 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 14 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 14 PMD Marker Use explicit scoping instead of the default package private level 14 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 15 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 15 PMD Marker Consider replacing this Vector with the newer java.util.List 15 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 15 PMD Marker Use explicit scoping instead of the default package private level 15 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 16 PMD Marker Use explicit scoping instead of the default package private level 16 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 17 PMD Marker clxxxv
  • 186.
    Zarko Acimovic Thread4Friend.java Use explicit scoping instead of the default package private level 17 PMD Marker Avoid variables with short names like ic 18 PMD Marker Found non-transient, non-static member. Please mark as transient or provide accessors. 18 PMD Marker Use explicit scoping instead of the default package private level 18 PMD Marker Avoid variables with short names like mb 19 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 24 PMD Marker Avoid using implementation types like 'Vector'; use the interface instead 24 PMD Marker Avoid variables with short names like ic 24 PMD Marker Avoid variables with short names like mb 24 PMD Marker Consider replacing this Vector with the newer java.util.List 24 PMD Marker Number of Parameters is 6 24 Metrics Marker Parameter 'ic' is not assigned and could be declared final 24 PMD Marker Parameter 'mb' is not assigned and could be declared final 24 PMD Marker Parameter 'mob' is not assigned and could be declared final 24 PMD Marker Parameter 'oul' is not assigned and could be declared final 24 PMD Marker Parameter 'resource' is not assigned and could be declared final 24 PMD Marker Unread field: Thread4Friend.oul 25 FindBugs To be compliant to J2EE, a webapp should not use any thread. 31 PMD Marker Cyclomatic Complexity is 8 45 Metrics Marker Lines of Code in Method is 66 45 Metrics Marker Number of Levels is 5 45 Metrics Marker Number of Locals in Scope is 17 45 Metrics Marker Number of Statements is 75 45 Metrics Marker The method 'run' has a Cyclomatic Complexity of 10. 45 PMD Marker To be compliant to J2EE, a webapp should not use any thread. 47 PMD Marker Avoid instantiating new objects inside loops 52 PMD Marker Local variable 's' could be declared final 53 PMD Marker Local variable 'lastIndex' could be declared final 59 PMD Marker Avoid unused local variables such as 'currentTS'. 67 PMD Marker The local variable currentTS is never read 67 Java Problem Avoid instantiating new objects inside loops 71 PMD Marker Position literals first in String comparisons 75 PMD Marker Local variable 'comma' could be declared final 79 PMD Marker Local variable 'nextComma' could be declared final 81 PMD Marker Assigning an Object to null is a code smell. Consider refactoring. 90 PMD Marker Position literals first in String comparisons 91 PMD Marker Avoid instantiating new objects inside loops 92 PMD Marker Avoid empty catch blocks 98 PMD Marker Thread4Friend.run() might ignore java.lang.Exception 98 FindBugs Avoid unnecessary comparisons in boolean expressions 102 PMD Marker Lines of Code in Method is 19 114 Metrics Marker Avoid unused local variables such as 'k'. 120 PMD Marker Dead store to k in Thread4Friend.compact(String) 120 FindBugs Local variable 'k' could be declared final 120 PMD Marker The local variable k is never read 120 Java Problem Avoid using if statements without curly braces 126 PMD Marker Prefer StringBuffer over += for concatenating strings 126 PMD Marker clxxxvi
  • 187.
    Software Defects PreventionTechniques – Example Project Thread4Friend.java Thread4Friend.compact(String) concatenates strings using + in a loop 126 FindBugs Avoid unused local variables such as 'kk'. 129 PMD Marker Dead store to kk in Thread4Friend.compact(String) 129 FindBugs The local variable kk is never read 129 Java Problem Avoid unused local variables such as 'k'. 135 PMD Marker Dead store to k in Thread4Friend.compactFine(String) 135 FindBugs The local variable k is never read 135 Java Problem Avoid using if statements without curly braces 141 PMD Marker Prefer StringBuffer over += for concatenating strings 141 PMD Marker Thread4Friend.compactFine(String) concatenates strings using + in a loop 141 FindBugs Avoid unused local variables such as 'kk'. 144 PMD Marker Dead store to kk in Thread4Friend.compactFine(String) 144 FindBugs The local variable kk is never read 144 Java Problem Cyclomatic Complexity is 6 149 Metrics Marker Lines of Code in Method is 31 149 Metrics Marker Number of Statements is 24 149 Metrics Marker Avoid empty catch blocks 153 PMD Marker Avoid empty catch blocks 164 PMD Marker Prefer StringBuffer over += for concatenating strings 167 PMD Marker Thread4Friend.getResourceAsString(String) concatenates strings using + in a loop 167 FindBugs Avoid empty catch blocks 170 PMD Marker Possible null pointer dereference of is in Thread4Friend.getResourceAsString(String) on exception path 173 FindBugs Avoid empty catch blocks 174 PMD Marker clxxxvii
  • 188.
    Zarko Acimovic 1 /** 2 * 3 * Thread4Friend controls apperance of friend's position on screen 4 */ 5 //import javax.microedition.lcdui.*; 6 7 //import javax.microedition.midlet.*; 8 9 import java.util.*; 10 import java.io.*; 11 12 13 public class Thread4Friend implements Runnable{ 14 Thread t; 15 Vector whiteList; 16 String resource; 17 MapObjects mob; 18 ImageCanvas3 ic; 19 MapBackground mb; 20 Outlook oul; 21 int hashID; 22 boolean first = false; 23 24 Thread4Friend(Vector whiteList, String resource, MapObjects mob, ImageCanvas3 ic, MapBackground mb, Outlook oul){ 25 this.oul = oul; 26 this.mob = mob; 27 this.mb = mb; 28 this.ic = ic; 29 this.resource = resource; 30 this.whiteList = whiteList; 31 t = new Thread(this); 32 //t.start(); 33 hashID = t.hashCode(); 34 } 35 36 public void start(){ 37 38 t.start(); 39 } 40 41 public int getID(){ 42 return hashID; 43 } 44 45 public void run(){ 46 47 Thread current = Thread.currentThread(); 48 //System.out.println* clxxxviii
  • 189.
    Software Defects PreventionTechniques – Example Project 49 Integer friendID = new Integer(current.hashCode()); 50 while(whiteList.contains(friendID)){ 51 current = Thread.currentThread(); 52 friendID = new Integer(current.hashCode()); 53 String s = this.getResourceAsString(resource); 54 int nextIndex = 6; 55 int index = s.indexOf('n'); 56 57 nextIndex = s.indexOf('n',index+1); 58 59 int lastIndex = s.lastIndexOf('n'); 60 61 int begin = -2; 62 int end = index; 63 64 String c1 = ""; 65 String c2 = ""; 66 String timeStamp = ""; 67 long currentTS = 0; 68 69 while(index<lastIndex && whiteList.contains(friendID)){ 70 current = Thread.currentThread(); 71 friendID = new Integer(current.hashCode()); 72 Point wp = null; 73 String temp = s.substring(begin+2,end); 74 temp = compact(temp); 75 if(temp.equals("")){ //na kraju ce temp da bude prazno 76 index = lastIndex+1; 77 } else { 78 temp = compact(temp); 79 int comma = temp.indexOf(','); 80 c1 = temp.substring(0,comma); 81 int nextComma = temp.indexOf(',',comma+1); 82 c2 = temp.substring(comma+1,nextComma); 83 timeStamp = temp.substring(nextComma+1,temp.length()); 84 currentTS = Long.parseLong(timeStamp); 85 begin = index-1; 86 end = nextIndex; 87 index = nextIndex; 88 nextIndex = s.indexOf('n',nextIndex+1); 89 90 wp = null; 91 if(!c1.equals("")){ clxxxix
  • 190.
    Zarko Acimovic 92 wp = new Point(c2,c1,resource,"","",true); 93 wp.setImage("blanco"); 94 } 95 } 96 try{ 97 Thread.sleep(1000); 98 }catch(Exception e){} 99 if(wp!=null && whiteList.contains(friendID)){ 100 mob.setDrawablePoints(); 101 mob.updateFriend(friendID,wp); 102 if(first==false) { 103 mb.setBackground(wp); 104 first=true; 105 } 106 ic.repaint(); 107 } 108 } 109 } 110 } 111 112 113 114 /** Blanco characters are possible to occur in names of pictures; 115 * Integer representations of blanko characters are 9 and 32 116 * Also, characters with integer representation between 0 and 33 117 * can not be printed out in WSDD console, so I excluded them too 118 */ 119 public String compact(String s){ 120 int k = s.length(); 121 //System.out.println("Length of s is "+s.length()); 122 char[] d = s.toCharArray(); 123 String ret = ""; 124 for(int i=0; i<d.length; i++){ 125 int temp = (int)d[i]; 126 if(temp>32) ret+=d[i]; 127 } 128 //System.out.println("Length of ret is "+ret.length()); 129 int kk = ret.length(); 130 //if (kk!=k) System.out.println("Bugger is: "+s); 131 return ret; 132 } 133 134 public String compactFine(String s){ 135 int k = s.length(); 136 //System.out.println("Length of s is "+s.length()); 137 char[] d = s.toCharArray(); 138 String ret = ""; 139 for(int i=0; i<d.length; i++){ 140 int temp = (int)d[i]; cxc
  • 191.
    Software Defects PreventionTechniques – Example Project 141 if(temp!=32 && temp!=9) ret+=d[i]; 142 } 143 //System.out.println("Length of ret is "+ret.length()); 144 int kk = ret.length(); 145 //if (kk!=k) System.out.println("Bugger is: "+s); 146 return ret; 147 } 148 149 public String getResourceAsString(String resource){ 150 InputStream is = null; 151 try{ 152 is = this.getClass().getResourceAsStream(resource); 153 }catch(Exception e) { 154 //a.setString("There is no such resource"); 155 //d.setCurrent(a); 156 } 157 158 //conversion of resource into string 159 String s = ""; 160 char m =' '; 161 162 try{ 163 m = (char)is.read(); 164 }catch(Exception e){} 165 166 while(m!=65535){ 167 s+=m; 168 try{ 169 m = (char)is.read(); 170 }catch(Exception e){} 171 } 172 try{ 173 is.close(); 174 }catch(Exception e){} 175 176 177 s=compactFine(s); 178 return s; 179 } 180 181 public void setFirst(){ 182 first = false; 183 } 184 185 } cxci
  • 192.
    Zarko Acimovic 6 DESIGN DEFECTS DETECTED BY ARGOUML 15.3. Class Selection 15.3.1. Wrap DataType 15.3.2. Reduce Classes in namespace <namespace> 15.3.3. Clean Up Diagram 15.4. Naming 15.4.1. Resolve Association Name Conflict 15.4.2. Revise Attribute Names to Avoid Conflict 15.4.3. Change Names or Signatures in a model element 15.4.4. Duplicate End (Role) Names for an Association 15.4.5. Role name conflicts with member 15.4.6. Choose a Name (Classes and Interfaces) 15.4.7. Name conflict in a namespace 15.4.8. Choose a Unique Name for a model element (Classes and Interfaces) 15.4.9. Choose a Name (Attributes) 15.4.10. Choose a Name (Operations) 15.4.11. Choose a Name (States) 15.4.12. Choose a Unique Name for a (State related) model element 15.4.13. Revise Name to Avoid Confusion 15.4.14. Choose a Legal Name 15.4.15. Change a model element to a Non-Reserved Word 15.4.16. Choose a Better Operation Name 15.4.17. Choose a Better Attribute Name 15.4.18. Capitalize Class Name cxcii
  • 193.
    Software Defects PreventionTechniques – Example Project 15.4.19. Revise Package Name 15.5. Storage 15.5.1. Revise Attribute Names to Avoid Conflict 15.5.2. Add Instance Variables to a Class 15.5.3. Add a Constructor to a Class 15.5.4. Reduce Attributes on a Class 15.6. Planned Extensions 15.6.1. Operations in Interfaces must be public 15.6.2. Interfaces may only have operations 15.6.3. Remove Reference to Specific Subclass 15.7. State Machines 15.7.1. Reduce Transitions on <state> 15.7.2. Reduce States in machine <machine> 15.7.3. Add Transitions to <state> 15.7.4. Add Incoming Transitions to <model element> 15.7.5. Add Outgoing Transitions from <model element> 15.7.6. Remove Extra Initial States 15.7.7. Place an Initial State 15.7.8. Add Trigger or Guard to Transition 15.7.9. Change Join Transitions 15.7.10. Change Fork Transitions 15.7.11. Add Choice/Junction Transitions 15.7.12. Add Guard to Transition 15.7.13. Clean Up Diagram 15.7.14. Make Edge More Visible 15.7.15. Composite Association End with Multiplicity >1 15.8. Design Patterns cxciii
  • 194.
    Zarko Acimovic 15.8.1. Consider using Singleton Pattern for <class> 15.8.2. Singleton Stereotype Violated in <class> 15.8.3. Nodes normally have no enclosers 15.8.4. NodeInstances normally have no enclosers 15.8.5. Components normally are inside nodes 15.8.6. ComponentInstances normally are inside nodes 15.8.7. Classes normally are inside components 15.8.8. Interfaces normally are inside components 15.8.9. Objects normally are inside components 15.8.10. LinkEnds have not the same locations 15.8.11. Set classifier (Deployment Diagram) 15.8.12. Missing return-actions 15.8.13. Missing call(send)-action 15.8.14. No Stimuli on these links 15.8.15. Set Classifier (Sequence Diagram) 15.8.16. Wrong position of these stimuli 15.9. Relationships 15.9.1. Circular Association 15.9.2. Make <association> Navigable 15.9.3. Remove Navigation from Interface via <association> 15.9.4. Add Associations to <model element> 15.9.5. Remove Reference to Specific Subclass 15.9.6. Reduce Associations on <model element> 15.9.7. Make Edge More Visible 15.10. Instantiation 15.11. Modularity 15.11.1. Classifier not in Namespace of its Association 15.11.2. Add Elements to Package <package> cxciv
  • 195.
    Software Defects PreventionTechniques – Example Project 15.12. Expected Usage 15.12.1. Clean Up Diagram 15.13. Methods 15.13.1. Change Names or Signatures in <model element> 15.13.2. Class Must be Abstract 15.13.3. Add Operations to <class> 15.13.4. Reduce Operations on <model element> 15.14. Code Generation 15.14.1. Change Multiple Inheritance to interfaces 15.15. Stereotypes 15.16. Inheritance 15.16.1. Revise Attribute Names to Avoid Conflict 15.16.2. Remove <class>'s Circular Inheritance 15.16.3. Class Must be Abstract 15.16.4. Remove final keyword or remove subclasses 15.16.5. Illegal Generalization 15.16.6. Remove Unneeded Realizes from <class> 15.16.7. Define Concrete (Sub)Class 15.16.8. Define Class to Implement <interface> 15.16.9. Change Multiple Inheritance to interfaces 15.16.10. Make Edge More Visible 15.17. Containment 15.17.1. Remove Circular Composition 15.17.2. Duplicate Parameter Name 15.17.3. Two Aggregate Ends (Roles) in Binary Association 15.17.4. Aggregate End (Role) in 3-way (or More) Association 15.17.5. Wrap DataType cxcv
  • 196.
    Zarko Acimovic 9 EXAMPLESOF DESIGN DEFECTS IN ARGOUML cxcvi
  • 197.
    Software Defects PreventionTechniques – Example Project cxcvii
  • 198.
  • 199.
    Software Defects PreventionTechniques – Example Project ABOUT THE AUTHOR Zarko Acimovic was born in 1977 in Belgrade, SERBIA. He obtained his BSc in Computer Science at University of Belgrade, School of Electrical Engineering. Zarko Acimovic maintains Facebook page for promoting automated testing of software architecture and software design http://www.facebook.com/AutomatedTesting cxcix