SIDDHARTH GANDHI
602, A-Wing, Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com
Borivali – (west), Mumbai – 92. Voice: 91-9892324999
--------------------------------------------------------------------------------------------------------------------------------------------
PROFILE SUMMARY
Mechanical engineer (B.E.) with 8 years of experience in Production & Manufacturing.
SKILLS
• Production & Process management - Planning, Execution, monitoring and control.
• Analytical thinking and problem solving.
• Effective interpersonal and communication skill.
• Machine (MAKINO- HMC , MAZAK - HMC, WIDMA - SPM, AMS - VMC etc. machines) Operation.
• Basic knowledge of CNC programming on FANUC.
• Total productive maintenance, 5s.
• Quality Tools (FMEA, Pareto Charts, Fishbone Diagrams).
EDUCATION
Bachelor of Engineering, Mechanical - First class July ’09
University of Mumbai, Mumbai, India
Diploma in Mechanical Engineering - Distinction June ‘06
Bhagubhai Polytechnic, Mumbai, India
PROFESSIONAL EXPERIENCE
ACG – PAM (Engineering Division). July’ 15 – Present
Asst. Manager (Engineer – Production)
• Production planning and manpower scheduling.
• Rework reduction (in AF25T, AF40T & AF90T machine).
• Drive & Turret manufacturing.
• Maintaining good housekeeping (5S) & discipline on shop floor.
• Making of process sheet.
• BOM correction & Material Requirement planning.
• Inventory planning and control (for AF25T, AF40T & AF90T machine).
• Monthly stock re conciliation and identifying the slow moving inventory on quarterly basis and
correspondingly planning for future.
MAHINDRA & MAHINDRA LTD. Feb’ 11 – July’ 15
Asst. Manager – Differential Case & Gear carrier Machining Cell – Axle PU:
• Production planning and manpower scheduling.
• Improving the equipment and line efficiency (OEE & OLE) by reducing losses in department.
SIDDHARTH GANDHI
602, A-Wing, Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com
Borivali – (west), Mumbai – 92. Voice: 91-9892324999
--------------------------------------------------------------------------------------------------------------------------------------------
• Supervised safety features and process efficiency – Designing new processes and introducing
improvements as required.
• Prepare & Update TS 16949 documents (FMEA,process flow chart,quality plan,control
plan,SOP,PPAP).
• Prepare & Update HIRA & ASPECT, near miss register & identifying the unsafe conditions
through SOT (Safety observation tour).
• Implemented 3 Levels of POKA-YOKE (Detection, Prevention and Elimination).
• Done the line balancing in GCML & DCL
• Ensure Fast & Timely Response to all customer complaint with firm Corrective & Preventive
Action. (CAPA)
• Route cause analysis GCA throwback.
• Consulting with SQA for vendor rejection.
• ABC analysis of tool cost.
• Maintaining good housekeeping & discipline on shop floor.
• Implementing various TPM pillars in department (JH up-gradation of machines).
• Inventory Handling & its Control.
• Empower the operators & technicians through training leads to higher productivity, less
rejection & better quality products.
• Effectively arranged equipment [example –MAZAK & WIDMA machine installation for gear
carrier] in accordance with close analysis of existing process of production.
• Making of process sheet.
• Work on PQCDSM to achieve company goals and target by implementing various kaizen.
Kaizen Implementation
Productivity
 Increase in split differential case pinion mate bore capacity.
 Eliminated the cause of breakdown by providing the interlock for wrong job orientation loading.
 Reduced breakdown hours by modifying coolant filtration unit.
Quality
 Reduction of rejection in differential case machining cell.
 Alignment gauge made for checking pin hole radial distance.
Cost
 Reduced tooling cost by providing inhouse made “tool change holder” for makino S33 machine.
 Tool cost reduced on BFW machine – cost saving of 242000/year.
 Tool cost reduced on LMW turning machine by using the unused cutting edge for differential
case facing operation – cost saving of 40000/year.
 Successfully completed MYB (Mahindra yellow belt) project of tool cost reduction of Gear
carrier CAP seat operation on MAKINO A61 HMC machine - cost saving of 304000/year.
Delivery
 Space created in differential case machining cell for easy movements of trolleys.
Safety
 Eliminated the chance of accident or first aid case on widma machine by providing the two
hand safety interlock.
SIDDHARTH GANDHI
602, A-Wing, Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com
Borivali – (west), Mumbai – 92. Voice: 91-9892324999
--------------------------------------------------------------------------------------------------------------------------------------------
 Safety curtain provided on pillar drill machine to avoid first aid case.
Morale
 Increased the morale of the operators by providing the various visual controls on the machine.
HITEK Engineering Services Oct’ 10 – Feb’ 11
Project Planning Engineer:
• Making bill of quantities, material requisition for the project
• Making of datasheets and quality assurance plan, bar chart, comparison sheet etc
• Coordinating with Consultant
HEATEX Industries Dec’09 – Sep’ 10
Manufacturing Engineer:
• Successfully finished project for the over hauling of the Air circuit Breaker at TATA power,
Jamshedpur
INTERNSHIP
MAHINDRA & MAHINDRA LTD. Dec ’05 – May
‘06
Trainee (Internship):
• Worked as a supervisor in crank case maintenance department
• Finished the project “ reduction of break down for cylinder borer machine”
LARSEN & TOUBRO LTD. June ’04 – Nov ‘04
Trainee (Internship):
• Worked in quality assurance team
• Performed the auditing of U-POWER ACB
• Finished the project “Design & manufacturing of gadget & fixture to reduce time & fatigue
during inspection”.
ACHIEVEMENTS
ACG – PAM (Engineering Division)
• Got star card award for successful FAT & timely dispatches of AF range of machine thrice in one
year.
MAHINDRA & MAHINDRA LTD.
• Got Four times on the spot awards and two times smiley from PU HEAD for the good kaizens
implemented in department.
• Successfully completed WIDMA boring machine trial in Bangalore.
• Successfully completed MAZAK HMC machine inspection in JAPAN.
ADDITIONAL PROJECTS
SIDDHARTH GANDHI
602, A-Wing, Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com
Borivali – (west), Mumbai – 92. Voice: 91-9892324999
--------------------------------------------------------------------------------------------------------------------------------------------
Automation for TIG welding July ’05 – Dec ’05
• Designed miniature wire straightener and feeder for automation of TIG Welding.

SIDDHARTH CV

  • 1.
    SIDDHARTH GANDHI 602, A-Wing,Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com Borivali – (west), Mumbai – 92. Voice: 91-9892324999 -------------------------------------------------------------------------------------------------------------------------------------------- PROFILE SUMMARY Mechanical engineer (B.E.) with 8 years of experience in Production & Manufacturing. SKILLS • Production & Process management - Planning, Execution, monitoring and control. • Analytical thinking and problem solving. • Effective interpersonal and communication skill. • Machine (MAKINO- HMC , MAZAK - HMC, WIDMA - SPM, AMS - VMC etc. machines) Operation. • Basic knowledge of CNC programming on FANUC. • Total productive maintenance, 5s. • Quality Tools (FMEA, Pareto Charts, Fishbone Diagrams). EDUCATION Bachelor of Engineering, Mechanical - First class July ’09 University of Mumbai, Mumbai, India Diploma in Mechanical Engineering - Distinction June ‘06 Bhagubhai Polytechnic, Mumbai, India PROFESSIONAL EXPERIENCE ACG – PAM (Engineering Division). July’ 15 – Present Asst. Manager (Engineer – Production) • Production planning and manpower scheduling. • Rework reduction (in AF25T, AF40T & AF90T machine). • Drive & Turret manufacturing. • Maintaining good housekeeping (5S) & discipline on shop floor. • Making of process sheet. • BOM correction & Material Requirement planning. • Inventory planning and control (for AF25T, AF40T & AF90T machine). • Monthly stock re conciliation and identifying the slow moving inventory on quarterly basis and correspondingly planning for future. MAHINDRA & MAHINDRA LTD. Feb’ 11 – July’ 15 Asst. Manager – Differential Case & Gear carrier Machining Cell – Axle PU: • Production planning and manpower scheduling. • Improving the equipment and line efficiency (OEE & OLE) by reducing losses in department.
  • 2.
    SIDDHARTH GANDHI 602, A-Wing,Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com Borivali – (west), Mumbai – 92. Voice: 91-9892324999 -------------------------------------------------------------------------------------------------------------------------------------------- • Supervised safety features and process efficiency – Designing new processes and introducing improvements as required. • Prepare & Update TS 16949 documents (FMEA,process flow chart,quality plan,control plan,SOP,PPAP). • Prepare & Update HIRA & ASPECT, near miss register & identifying the unsafe conditions through SOT (Safety observation tour). • Implemented 3 Levels of POKA-YOKE (Detection, Prevention and Elimination). • Done the line balancing in GCML & DCL • Ensure Fast & Timely Response to all customer complaint with firm Corrective & Preventive Action. (CAPA) • Route cause analysis GCA throwback. • Consulting with SQA for vendor rejection. • ABC analysis of tool cost. • Maintaining good housekeeping & discipline on shop floor. • Implementing various TPM pillars in department (JH up-gradation of machines). • Inventory Handling & its Control. • Empower the operators & technicians through training leads to higher productivity, less rejection & better quality products. • Effectively arranged equipment [example –MAZAK & WIDMA machine installation for gear carrier] in accordance with close analysis of existing process of production. • Making of process sheet. • Work on PQCDSM to achieve company goals and target by implementing various kaizen. Kaizen Implementation Productivity  Increase in split differential case pinion mate bore capacity.  Eliminated the cause of breakdown by providing the interlock for wrong job orientation loading.  Reduced breakdown hours by modifying coolant filtration unit. Quality  Reduction of rejection in differential case machining cell.  Alignment gauge made for checking pin hole radial distance. Cost  Reduced tooling cost by providing inhouse made “tool change holder” for makino S33 machine.  Tool cost reduced on BFW machine – cost saving of 242000/year.  Tool cost reduced on LMW turning machine by using the unused cutting edge for differential case facing operation – cost saving of 40000/year.  Successfully completed MYB (Mahindra yellow belt) project of tool cost reduction of Gear carrier CAP seat operation on MAKINO A61 HMC machine - cost saving of 304000/year. Delivery  Space created in differential case machining cell for easy movements of trolleys. Safety  Eliminated the chance of accident or first aid case on widma machine by providing the two hand safety interlock.
  • 3.
    SIDDHARTH GANDHI 602, A-Wing,Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com Borivali – (west), Mumbai – 92. Voice: 91-9892324999 --------------------------------------------------------------------------------------------------------------------------------------------  Safety curtain provided on pillar drill machine to avoid first aid case. Morale  Increased the morale of the operators by providing the various visual controls on the machine. HITEK Engineering Services Oct’ 10 – Feb’ 11 Project Planning Engineer: • Making bill of quantities, material requisition for the project • Making of datasheets and quality assurance plan, bar chart, comparison sheet etc • Coordinating with Consultant HEATEX Industries Dec’09 – Sep’ 10 Manufacturing Engineer: • Successfully finished project for the over hauling of the Air circuit Breaker at TATA power, Jamshedpur INTERNSHIP MAHINDRA & MAHINDRA LTD. Dec ’05 – May ‘06 Trainee (Internship): • Worked as a supervisor in crank case maintenance department • Finished the project “ reduction of break down for cylinder borer machine” LARSEN & TOUBRO LTD. June ’04 – Nov ‘04 Trainee (Internship): • Worked in quality assurance team • Performed the auditing of U-POWER ACB • Finished the project “Design & manufacturing of gadget & fixture to reduce time & fatigue during inspection”. ACHIEVEMENTS ACG – PAM (Engineering Division) • Got star card award for successful FAT & timely dispatches of AF range of machine thrice in one year. MAHINDRA & MAHINDRA LTD. • Got Four times on the spot awards and two times smiley from PU HEAD for the good kaizens implemented in department. • Successfully completed WIDMA boring machine trial in Bangalore. • Successfully completed MAZAK HMC machine inspection in JAPAN. ADDITIONAL PROJECTS
  • 4.
    SIDDHARTH GANDHI 602, A-Wing,Rite Galaxy, Sodawala lane E-mail: sid1424@gmail.com Borivali – (west), Mumbai – 92. Voice: 91-9892324999 -------------------------------------------------------------------------------------------------------------------------------------------- Automation for TIG welding July ’05 – Dec ’05 • Designed miniature wire straightener and feeder for automation of TIG Welding.