SlideShare a Scribd company logo
Project Title
Shanghai Tower
Presented by:
Amna Amanat
16-Arid-3842
DESCRIPTION:
• High-rise buildings emerged in the late nineteenth century in the United
States of America
• In Asian countries, such as China, Korea, Japan, and Malaysia. The
construction of high-rises is currently a trend in the development of large
urban centers, particularly the so-called megacities, to accommodate the
continued growth of the world population.
• Shanghai located in China, Shanghai is undoubtedly the largest city in
China & largest city in the world.
• Shanghai, which means the "Upon the Sea", Nicknamed the “Oriental
Pearl”
• Shanghai serves as the economic, financial, trade and shipping center of
China
SHANGHAI TOWERS
• Shanghai Tower is the second tallest building in the world after Burj
Khalifa in Dubai
• The Shanghai tower is the tallest building in China. It is also the first
Chinese super high-rise exceeds 600 meters
• It is a 127-story vertical city. By incorporating sustainable best practices
and achieving the highest level of performance, Shanghai Tower is
considered as the most green and sustainable skyscraper of nowadays,
achieved LEED Gold pre-certification certificate in 2010
• The tower’s Green building design label highest score Three-star in 2012.
Incorporate sustainability into a mega tall building is not simple task, but it
is possible.
CONTINUE
• The spiraling form of the tower rotates as it rises,
signifying the emergence of China as a global financial
power
• Shanghai Tower’s growth captures the city’s dynamic
nature and its role as China’s financial hub.
• Shanghai Tower sets the new standard for tall buildings in
major cities
• Represents a new way of inhabiting mega towers with a
dense urban environment.
• Tower is a symbol of China’s emergence as a modern
power.
CONTINUE…
• Shanghai Tower will complete the world’s
“first super-high rise zone”, including Jin Mao
Tower, meaning the Golden Prosperity Building (Past)
& Shanghai World Financial Center (Present).
• It is the most forward-looking of the three towers
symbolizing Shanghai’s past, present, and future.
• This tower is symbolic of a nation whose future is filled
with limitless opportunities
PROJECT INITIATION
Planning
• In 2008, the site was prepared for construction A Ground
breaking ceremony was held on 29 November 2008,
after the tower had passed an environmental impact study
• The main construction contractor for the project was Shanghai
Construction Group a member of the consortium that owns
the tower.
PROJECT FACTS
• Location: Lujiazui Finance and Trade Zone, Pudong district,Shanghai,
• Height: 632 meters
• Stories: 121 occupied
• floors Area: 380,000 square meters above grade
• 141,000 square meters below grade
• Overall Program: Office, luxury hotel, entertainment, retail, and cultural
venues
• Above grade levels: Luxury retail, bank, restaurant, conference, meeting,
and banquet functions.
• Below grade levels: will house retail, 1,800 parking spaces, service, and
MEP functions.
CONTINUE
• Cost : CN¥15.7 billion
• The tower had an estimated construction cost of US$2.4 billion.
• Funding for the tower's construction was obtained from shareholders,
bank loans and Shanghai's municipal government.
• The building incorporates 106 elevators
• Three of those are super high speed models capable of traveling at 18
meters per second
• And the tower has the farthest-traveling single elevator, which travels
up to 578.55 meters tall (SRIBS, 2014).
PROJECT MANAGER AND COMPANIES
INVOLVED IN MEGA PROJECT
• Main
constructor
• Design
architect:
• Owner/
• developer
:
• Project
manager
Shanghai
Jianke
Project
Manageme
nt Co.
Shanghai
Tower
Constructio
n &
Developmen
t Co., Ltd.
Shanghai
Construc
tion
Group
Gensler
CONSTRUCTION SCHEDULE OF PROJECT
• Shanghai Tower´s construction started on November of 2008,
• topped out in 2013
• The exterior was completed in summer 2015,[
• and work was considered complete in September 2015.
• Although the building was originally scheduled to open to the public in
November 2014, the actual public-use date slipped considerably.
• The observation deck was opened to visitors in July 2016; the period
from July through September 2016 was termed a "test run" or
"commissioning" period.
• From April 26, 2017 onwards, the sightseeing deck on the 118th floor is
open to the public.
TIME ANALYSIS OF PROJECT
2006 2008 2010 2013 2014 2016 2017
Sep Nov Sep Aug Dec April Jan
Design Construction The underground The main Civil Part of Starts
Selection Starts structure building Engineering the trial
construction of is work are tower operation
the main building topped off Completed is put
is completed into trial
operation
DESIGN
• Unique design of the double wall function has it’s own identity at
the ground floor
• The tower is divided into nine zones each with 12 – 15 floors
• The tower takes the form of cylindrical building stacked at the
top each other, having total 121 floors, all enclosed by the inner
layer of the glass façade.
• Between that and the outer layer which twists as it rises, nine
indoors zones provide public space for visitors. Each of these
nine areas has its own lobby, providing 360 degree views of the
city.
• The tower is able to accommodates as many as 16,0000
peoples on a daily basis.
CONTINUE
• From base to top, the tower makes a rotation that is optimal for minimizing
wind loads.
• 30kW natural gas-fired cogeneration system on the site will provide electricity
and heat energy for the low zone areas
• Three important strategies were adopted for the design:
 Tower’s asymmetrical form
 Is tapering profile
 Its rounded corners
• The tower features a unique “dual-skin” exterior, With the double skin , the
building will function like a thermos bottle. This allows it to use daylight, reduce
artificial lighting to a minimum,
• The dual-skin feature of the structure is important not only artistically but also
environmentally and financially.
ACCOMMODATION
• Tower is divided into zones. Each Zone is dedicated to a
primary use, but is enriched by complementary features and
services.
• The upper floors will house hotels, cultural venues, and an
observation deck with sweeping views of the Shanghai skyline
and the landscape of the city.
• Central floors will house office space. A six-story retail platform
concentrates shopping and dining near the base.
• Ground floor will serve as an “urban market,” connecting people
to each other, to nearby services, and to Shanghai’s Metro.
STRUCTURE OF TOWER
• The building has been divided into 9 separate zones along its height which are
separated by 8 strengthening floors in between.
• Thornton Tomasetti, structural engineer, has designed
• a simple and safe
• Cost-effective structural system that permitted the creation of an innovative
architectural form.
• Shanghai Tower is literally wrapped in public spaces. Both interior and exterior
skins are transparent, establishing a visual connection between the tower’s interior
spaces and Shanghai’s urban stuff. At night the building’s glowing shining form
further joins city and tower.
• Mechanical equipment is spaced strategically in each zone of the building to
provide optimal flexibility, reduce operating costs, and conserve energy.
CHALLENGES AND RISK FACTOR
• There was a problem to lift people from street level to the top of
the structure quickly and efficiently without making them feel
that they are on a fairground ride.
• Keeping air cool and fresh within the building and pumping
water around each floor were also challenges for the designers
and architects.
• There were problems of spreading the weight of the 80,000
tons of steel and concrete that will stretch up into the sky.
• Each upper floor bears down the shear weight of the building.
To compress the load, contractors needed to find out new
techniques and materials to ease their task.
SUSTAINABLE GOALS
New regional
benchmark
integrated water &
waste management
sustainable materials
Bioclimatic design
low energy & low
carbon
integrated landscape
Shanghai Tower incorporates the latest sustainable technologies,
including wind turbines and solar panels as renewable energy
sources to achieve a low carbon footprint.
GREEN STRATEGY EFFICIENCIES
• Daylighting: the glass sin admits maximum daylight, reducing the need
for electrical lighting.
• Landscaping: one-third of the site is green space, with extensive
landscaping that cools the site.
• Wind turbines: exterior lighting for the tower will be powered by 270
wind driven generators.
• Structural efficiency: the simplifies mega-frame structure is an
economical approach. Counteracting sway: a tunes mass damper near
the top of the tower improves the occupant's comfort.
BENEFITS
• Shanghai, posing immense challenges for developing building,
infrastructure and social services for new citizens.
• High-rises are likely the first choice to minimize the impact on land use
in city centers
• Shanghai Tower is built based on the Green Building concept.
• Although buildings provided countless benefits to society. its capture
rainwater harvesting and Blackwater treatment facility
• The tower employs 43 green and energy-saving technologies to
reduce energy usage by 21% and water consumption by 40%
• 34,000 metric tons per year reduced carbon footprint
• The building will recycle 2,35,000 m³ (62.1 million gal) of water per
year
FINDINGS
• In order to preserve nature resources and lower the negative
influences of construction on the surrounding environment, the
sustainable construction management was implemented to Shanghai
Tower
• The construction monitoring and management data shows that the
measures to control dust, noise and light pollution are effective and
meet the requirements of Chinese Green Building Label standard.
• Locally sourced materials are sustainable because these products
reduce transportation related environmental impacts and boosts local
economies.
• environment friendly materials, high performance materials,
embedded waste materials and recycling the construction solid waste
were also requested in the construction process of Shanghai Tower
• construction workers and engineers provided by the safety equipment
on the construction site of Shanghai Tower.
PROJECT TERMINATION
The main structure and exterior walls
completed by Dec 31, 2014. the tower
was finished in 2015
The inauguration ceremony took place
on April 2016 at front of the entrance of
Shanghai Tower, with more than 40
famous personalities are invited as a
guests.

More Related Content

What's hot

High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
Shabarinath R
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
Akarshan Chauhan
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
Prasad Thanthratey
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
Kaiserin Tania
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
Anurag Mathur
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
Palak Khandelwal
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
Chittagong University Of Engineering & Technology
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011
Vinay Srivastava
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
Sheetal Pimparwar
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
VISHAKA BOTHRA
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
Simi Sayed
 
high rise case study
high rise case studyhigh rise case study
high rise case study
ParthPatel1739
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Dimple Poddar
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
Himani Khairiya
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
misschand
 
Architect Renzo Piano
Architect Renzo Piano Architect Renzo Piano
Architect Renzo Piano
Onela Fernando
 
Shard tower
Shard towerShard tower
432 Park Avenue, New York City
432 Park Avenue, New York City 432 Park Avenue, New York City
432 Park Avenue, New York City
Madhura Dhamdhere
 

What's hot (20)

High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
Architect Renzo Piano
Architect Renzo Piano Architect Renzo Piano
Architect Renzo Piano
 
Shard tower
Shard towerShard tower
Shard tower
 
432 Park Avenue, New York City
432 Park Avenue, New York City 432 Park Avenue, New York City
432 Park Avenue, New York City
 

Similar to Shanghai tower

architectural concept
architectural conceptarchitectural concept
architectural concept
HezhaHaydar
 
Three Innovative Structures
Three Innovative StructuresThree Innovative Structures
Three Innovative StructuresKevin Sonico
 
Norman foster
Norman fosterNorman foster
Norman foster
Aishwary Kaushal
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
Vishakha Thole
 
Shanghai Tower.pdf
Shanghai Tower.pdfShanghai Tower.pdf
Shanghai Tower.pdf
SanskritiJindal4
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
Mayur Waghulde
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
AlasAlthaher
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
Self employed
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
Prasad Thanthratey
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
VISHAKA BOTHRA
 
High Rise Makka Clock Tower
High Rise Makka Clock TowerHigh Rise Makka Clock Tower
High Rise Makka Clock Tower
RishabhJain572815
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
vishakhapatewar
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
Chiranjita Jibhkate
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
Neha Rampuria
 
Late modernism
Late modernismLate modernism
Late modernism
Anant Nautiyal
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
RaiyyanKhalak
 
HIGH RISE BUILDINGS (1).pptx
HIGH RISE BUILDINGS (1).pptxHIGH RISE BUILDINGS (1).pptx
HIGH RISE BUILDINGS (1).pptx
18CV086Rajanekanth
 
Ar. Norman Foster.pptx
Ar. Norman Foster.pptxAr. Norman Foster.pptx
Ar. Norman Foster.pptx
VaishnaviKapatkar
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
ravindransandhya
 

Similar to Shanghai tower (20)

architectural concept
architectural conceptarchitectural concept
architectural concept
 
Three Innovative Structures
Three Innovative StructuresThree Innovative Structures
Three Innovative Structures
 
Norman foster
Norman fosterNorman foster
Norman foster
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Shanghai Tower.pdf
Shanghai Tower.pdfShanghai Tower.pdf
Shanghai Tower.pdf
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
IFC
IFCIFC
IFC
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
High Rise Makka Clock Tower
High Rise Makka Clock TowerHigh Rise Makka Clock Tower
High Rise Makka Clock Tower
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Late modernism
Late modernismLate modernism
Late modernism
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
 
HIGH RISE BUILDINGS (1).pptx
HIGH RISE BUILDINGS (1).pptxHIGH RISE BUILDINGS (1).pptx
HIGH RISE BUILDINGS (1).pptx
 
Ar. Norman Foster.pptx
Ar. Norman Foster.pptxAr. Norman Foster.pptx
Ar. Norman Foster.pptx
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
 

Recently uploaded

Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 

Recently uploaded (20)

Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 

Shanghai tower

  • 1. Project Title Shanghai Tower Presented by: Amna Amanat 16-Arid-3842
  • 2. DESCRIPTION: • High-rise buildings emerged in the late nineteenth century in the United States of America • In Asian countries, such as China, Korea, Japan, and Malaysia. The construction of high-rises is currently a trend in the development of large urban centers, particularly the so-called megacities, to accommodate the continued growth of the world population. • Shanghai located in China, Shanghai is undoubtedly the largest city in China & largest city in the world. • Shanghai, which means the "Upon the Sea", Nicknamed the “Oriental Pearl” • Shanghai serves as the economic, financial, trade and shipping center of China
  • 3. SHANGHAI TOWERS • Shanghai Tower is the second tallest building in the world after Burj Khalifa in Dubai • The Shanghai tower is the tallest building in China. It is also the first Chinese super high-rise exceeds 600 meters • It is a 127-story vertical city. By incorporating sustainable best practices and achieving the highest level of performance, Shanghai Tower is considered as the most green and sustainable skyscraper of nowadays, achieved LEED Gold pre-certification certificate in 2010 • The tower’s Green building design label highest score Three-star in 2012. Incorporate sustainability into a mega tall building is not simple task, but it is possible.
  • 4. CONTINUE • The spiraling form of the tower rotates as it rises, signifying the emergence of China as a global financial power • Shanghai Tower’s growth captures the city’s dynamic nature and its role as China’s financial hub. • Shanghai Tower sets the new standard for tall buildings in major cities • Represents a new way of inhabiting mega towers with a dense urban environment. • Tower is a symbol of China’s emergence as a modern power.
  • 5. CONTINUE… • Shanghai Tower will complete the world’s “first super-high rise zone”, including Jin Mao Tower, meaning the Golden Prosperity Building (Past) & Shanghai World Financial Center (Present). • It is the most forward-looking of the three towers symbolizing Shanghai’s past, present, and future. • This tower is symbolic of a nation whose future is filled with limitless opportunities
  • 6. PROJECT INITIATION Planning • In 2008, the site was prepared for construction A Ground breaking ceremony was held on 29 November 2008, after the tower had passed an environmental impact study • The main construction contractor for the project was Shanghai Construction Group a member of the consortium that owns the tower.
  • 7. PROJECT FACTS • Location: Lujiazui Finance and Trade Zone, Pudong district,Shanghai, • Height: 632 meters • Stories: 121 occupied • floors Area: 380,000 square meters above grade • 141,000 square meters below grade • Overall Program: Office, luxury hotel, entertainment, retail, and cultural venues • Above grade levels: Luxury retail, bank, restaurant, conference, meeting, and banquet functions. • Below grade levels: will house retail, 1,800 parking spaces, service, and MEP functions.
  • 8. CONTINUE • Cost : CN¥15.7 billion • The tower had an estimated construction cost of US$2.4 billion. • Funding for the tower's construction was obtained from shareholders, bank loans and Shanghai's municipal government. • The building incorporates 106 elevators • Three of those are super high speed models capable of traveling at 18 meters per second • And the tower has the farthest-traveling single elevator, which travels up to 578.55 meters tall (SRIBS, 2014).
  • 9. PROJECT MANAGER AND COMPANIES INVOLVED IN MEGA PROJECT • Main constructor • Design architect: • Owner/ • developer : • Project manager Shanghai Jianke Project Manageme nt Co. Shanghai Tower Constructio n & Developmen t Co., Ltd. Shanghai Construc tion Group Gensler
  • 10. CONSTRUCTION SCHEDULE OF PROJECT • Shanghai Tower´s construction started on November of 2008, • topped out in 2013 • The exterior was completed in summer 2015,[ • and work was considered complete in September 2015. • Although the building was originally scheduled to open to the public in November 2014, the actual public-use date slipped considerably. • The observation deck was opened to visitors in July 2016; the period from July through September 2016 was termed a "test run" or "commissioning" period. • From April 26, 2017 onwards, the sightseeing deck on the 118th floor is open to the public.
  • 11. TIME ANALYSIS OF PROJECT 2006 2008 2010 2013 2014 2016 2017 Sep Nov Sep Aug Dec April Jan Design Construction The underground The main Civil Part of Starts Selection Starts structure building Engineering the trial construction of is work are tower operation the main building topped off Completed is put is completed into trial operation
  • 12. DESIGN • Unique design of the double wall function has it’s own identity at the ground floor • The tower is divided into nine zones each with 12 – 15 floors • The tower takes the form of cylindrical building stacked at the top each other, having total 121 floors, all enclosed by the inner layer of the glass façade. • Between that and the outer layer which twists as it rises, nine indoors zones provide public space for visitors. Each of these nine areas has its own lobby, providing 360 degree views of the city. • The tower is able to accommodates as many as 16,0000 peoples on a daily basis.
  • 13. CONTINUE • From base to top, the tower makes a rotation that is optimal for minimizing wind loads. • 30kW natural gas-fired cogeneration system on the site will provide electricity and heat energy for the low zone areas • Three important strategies were adopted for the design:  Tower’s asymmetrical form  Is tapering profile  Its rounded corners • The tower features a unique “dual-skin” exterior, With the double skin , the building will function like a thermos bottle. This allows it to use daylight, reduce artificial lighting to a minimum, • The dual-skin feature of the structure is important not only artistically but also environmentally and financially.
  • 14. ACCOMMODATION • Tower is divided into zones. Each Zone is dedicated to a primary use, but is enriched by complementary features and services. • The upper floors will house hotels, cultural venues, and an observation deck with sweeping views of the Shanghai skyline and the landscape of the city. • Central floors will house office space. A six-story retail platform concentrates shopping and dining near the base. • Ground floor will serve as an “urban market,” connecting people to each other, to nearby services, and to Shanghai’s Metro.
  • 15. STRUCTURE OF TOWER • The building has been divided into 9 separate zones along its height which are separated by 8 strengthening floors in between. • Thornton Tomasetti, structural engineer, has designed • a simple and safe • Cost-effective structural system that permitted the creation of an innovative architectural form. • Shanghai Tower is literally wrapped in public spaces. Both interior and exterior skins are transparent, establishing a visual connection between the tower’s interior spaces and Shanghai’s urban stuff. At night the building’s glowing shining form further joins city and tower. • Mechanical equipment is spaced strategically in each zone of the building to provide optimal flexibility, reduce operating costs, and conserve energy.
  • 16. CHALLENGES AND RISK FACTOR • There was a problem to lift people from street level to the top of the structure quickly and efficiently without making them feel that they are on a fairground ride. • Keeping air cool and fresh within the building and pumping water around each floor were also challenges for the designers and architects. • There were problems of spreading the weight of the 80,000 tons of steel and concrete that will stretch up into the sky. • Each upper floor bears down the shear weight of the building. To compress the load, contractors needed to find out new techniques and materials to ease their task.
  • 17. SUSTAINABLE GOALS New regional benchmark integrated water & waste management sustainable materials Bioclimatic design low energy & low carbon integrated landscape Shanghai Tower incorporates the latest sustainable technologies, including wind turbines and solar panels as renewable energy sources to achieve a low carbon footprint.
  • 18. GREEN STRATEGY EFFICIENCIES • Daylighting: the glass sin admits maximum daylight, reducing the need for electrical lighting. • Landscaping: one-third of the site is green space, with extensive landscaping that cools the site. • Wind turbines: exterior lighting for the tower will be powered by 270 wind driven generators. • Structural efficiency: the simplifies mega-frame structure is an economical approach. Counteracting sway: a tunes mass damper near the top of the tower improves the occupant's comfort.
  • 19. BENEFITS • Shanghai, posing immense challenges for developing building, infrastructure and social services for new citizens. • High-rises are likely the first choice to minimize the impact on land use in city centers • Shanghai Tower is built based on the Green Building concept. • Although buildings provided countless benefits to society. its capture rainwater harvesting and Blackwater treatment facility • The tower employs 43 green and energy-saving technologies to reduce energy usage by 21% and water consumption by 40% • 34,000 metric tons per year reduced carbon footprint • The building will recycle 2,35,000 m³ (62.1 million gal) of water per year
  • 20. FINDINGS • In order to preserve nature resources and lower the negative influences of construction on the surrounding environment, the sustainable construction management was implemented to Shanghai Tower • The construction monitoring and management data shows that the measures to control dust, noise and light pollution are effective and meet the requirements of Chinese Green Building Label standard. • Locally sourced materials are sustainable because these products reduce transportation related environmental impacts and boosts local economies. • environment friendly materials, high performance materials, embedded waste materials and recycling the construction solid waste were also requested in the construction process of Shanghai Tower • construction workers and engineers provided by the safety equipment on the construction site of Shanghai Tower.
  • 21. PROJECT TERMINATION The main structure and exterior walls completed by Dec 31, 2014. the tower was finished in 2015 The inauguration ceremony took place on April 2016 at front of the entrance of Shanghai Tower, with more than 40 famous personalities are invited as a guests.