30 SEPT 2011
Summary Of Contract

Name of Project   : Alternative Water Supply to KLIA,
                  Design and Build Water Treatment Plant and
                  Associated Works at Sg.Labu,Selangor
Contract No.      : PAAB/B002-D&B/W/B/K/01/10
Employer          : Pengurusan Aset Air Berhad (PAAB)


Supervising Consultant        : SMHB Sdn. Bhd
Design & Build Contractor     : Salcon Engineering Berhad
Design & Build Consultant     : GHD Perunding Sdn. Bhd

                                                               2
Summary Of Contract

Commencement Date         : 16 June 2010
Completion Date           : 15 December 2011
Contract Period           : 12 Mth - Stage 1 (52.5 MLD)
                          : 12 + 6 Mth - Stage 2 (105 MLD)
Defect Liability Period   : 24 Months
Contract Value            : RM 84,213,297.00




                                                          3
Brief Description of Project Scope

To design, procure, construct, install, commissioning, operate,
maintain, handover and training as follows:
• A new raw water gravity main of about 400 m length from off-
river storage to the water treatment plant
• A new water treatment plant located at Sg.Labu, Selangor
which will be designed for nominal output of 105MLD
• The treated water pumping main of about 3.5 km length from
the water treatment plant to the services reservoir at KLIA



                                                                  4
PROCESS SCHEMATIC



                    5
6
WTP LOCATION



               7
LOCATION PLAN




                8
LOCATION MAP

Sg. Labu




           ORSR




                        WTP




       MAB Reservoirs


                              9
PROPOSED WTP LAYOUT



                      10
Entrance




                           Store/w.shop




                                          CW Tank
                                                                          Detention Pond

              Residual Treatment Building

                                                    Residual Lagoon


Waste Washwater Tank
Emergency Residual Lagoon = 65m x 52m
Effective vol. = 10,053m3




          Detention Pond = 147m x 98m
          Effective vol. = 89,586m3



                                        12
Thank You


            13

More Related Content

What's hot

CH-2.pptx
CH-2.pptxCH-2.pptx
Environmental engineering PPT
Environmental engineering PPTEnvironmental engineering PPT
Environmental engineering PPT
Kavin Raval
 
Water resource engineering
Water resource engineeringWater resource engineering
Water resource engineering
gidc engineering college
 
MAITHON DAM
MAITHON DAMMAITHON DAM
MAITHON DAM
karthik badugu
 
Dams and their role in environment.
Dams and their role in environment.Dams and their role in environment.
Dams and their role in environment.
Navjot Singh Saini
 
Flow through nozzel_AMIT
Flow through nozzel_AMITFlow through nozzel_AMIT
Flow through nozzel_AMITAmit Sharma
 
Manning equation limitation
Manning equation limitationManning equation limitation
Manning equation limitation
RAMYAR SALIH
 
Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesMohammed Salahat
 
Embankment
EmbankmentEmbankment
Embankment
WRE Forum
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2
Vidhi Khokhani
 
Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment
Bakr Younis /Al-Azhar University – Gaza
 
Managing Water and Agriculture for Sustainable Food Security
Managing Water and Agriculture for Sustainable Food SecurityManaging Water and Agriculture for Sustainable Food Security
Managing Water and Agriculture for Sustainable Food Security
International Food Policy Research Institute (IFPRI)
 
Sedimentation
SedimentationSedimentation
Sedimentation
Rajdip Bhdaraka
 
Bio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosionBio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosion
Santosh pathak
 
Water Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation SlidesWater Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation Slides
SlideTeam
 
Global Water Distribution & Sources of Water.ppt
Global Water Distribution & Sources of Water.pptGlobal Water Distribution & Sources of Water.ppt
Global Water Distribution & Sources of Water.ppt
AmosMutua3
 
The Decision Support System for IWRM in the Citarum River Basin
The Decision Support System for IWRM in the Citarum River BasinThe Decision Support System for IWRM in the Citarum River Basin
The Decision Support System for IWRM in the Citarum River Basin
Oswar Mungkasa
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
Wah Engineering College(University of Wah)
 

What's hot (20)

CH-2.pptx
CH-2.pptxCH-2.pptx
CH-2.pptx
 
Environmental engineering PPT
Environmental engineering PPTEnvironmental engineering PPT
Environmental engineering PPT
 
Water resource engineering
Water resource engineeringWater resource engineering
Water resource engineering
 
MAITHON DAM
MAITHON DAMMAITHON DAM
MAITHON DAM
 
Dams and their role in environment.
Dams and their role in environment.Dams and their role in environment.
Dams and their role in environment.
 
Flow through nozzel_AMIT
Flow through nozzel_AMITFlow through nozzel_AMIT
Flow through nozzel_AMIT
 
Manning equation limitation
Manning equation limitationManning equation limitation
Manning equation limitation
 
Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resources
 
Embankment
EmbankmentEmbankment
Embankment
 
Dam outlet works lecture 2
Dam outlet works lecture 2Dam outlet works lecture 2
Dam outlet works lecture 2
 
Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment
 
Managing Water and Agriculture for Sustainable Food Security
Managing Water and Agriculture for Sustainable Food SecurityManaging Water and Agriculture for Sustainable Food Security
Managing Water and Agriculture for Sustainable Food Security
 
Sedimentation
SedimentationSedimentation
Sedimentation
 
Weirs
WeirsWeirs
Weirs
 
Bio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosionBio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosion
 
Water Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation SlidesWater Resource Management Powerpoint Presentation Slides
Water Resource Management Powerpoint Presentation Slides
 
HYDRAULIC JUMP
HYDRAULIC JUMPHYDRAULIC JUMP
HYDRAULIC JUMP
 
Global Water Distribution & Sources of Water.ppt
Global Water Distribution & Sources of Water.pptGlobal Water Distribution & Sources of Water.ppt
Global Water Distribution & Sources of Water.ppt
 
The Decision Support System for IWRM in the Citarum River Basin
The Decision Support System for IWRM in the Citarum River BasinThe Decision Support System for IWRM in the Citarum River Basin
The Decision Support System for IWRM in the Citarum River Basin
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 

Similar to Sg.Labu WTP

NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)BCreaven
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
zubeditufail
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
muk7971
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - FletcherJade Keswick
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
Abhinava Tripathi
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
jose notario torres
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVHenk van Dyk
 
CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
AthrvaKumkar
 
Presentation on Water Issues Oct 2012 by Syabas
Presentation on Water Issues Oct 2012 by SyabasPresentation on Water Issues Oct 2012 by Syabas
Presentation on Water Issues Oct 2012 by Syabas
chinesechamber
 
younggeun_Lee.pdf
younggeun_Lee.pdfyounggeun_Lee.pdf
younggeun_Lee.pdf
ssuserea0355
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devicesGurdeep singh Johar
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Ekonnect
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryDaljit Brar
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
PRABHASH GOKARN
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012
ambercourt
 

Similar to Sg.Labu WTP (20)

NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - Fletcher
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CV
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
 
Presentation on Water Issues Oct 2012 by Syabas
Presentation on Water Issues Oct 2012 by SyabasPresentation on Water Issues Oct 2012 by Syabas
Presentation on Water Issues Oct 2012 by Syabas
 
younggeun_Lee.pdf
younggeun_Lee.pdfyounggeun_Lee.pdf
younggeun_Lee.pdf
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devices
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success Story
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012
 

Recently uploaded

Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 

Recently uploaded (20)

Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 

Sg.Labu WTP

  • 2. Summary Of Contract Name of Project : Alternative Water Supply to KLIA, Design and Build Water Treatment Plant and Associated Works at Sg.Labu,Selangor Contract No. : PAAB/B002-D&B/W/B/K/01/10 Employer : Pengurusan Aset Air Berhad (PAAB) Supervising Consultant : SMHB Sdn. Bhd Design & Build Contractor : Salcon Engineering Berhad Design & Build Consultant : GHD Perunding Sdn. Bhd 2
  • 3. Summary Of Contract Commencement Date : 16 June 2010 Completion Date : 15 December 2011 Contract Period : 12 Mth - Stage 1 (52.5 MLD) : 12 + 6 Mth - Stage 2 (105 MLD) Defect Liability Period : 24 Months Contract Value : RM 84,213,297.00 3
  • 4. Brief Description of Project Scope To design, procure, construct, install, commissioning, operate, maintain, handover and training as follows: • A new raw water gravity main of about 400 m length from off- river storage to the water treatment plant • A new water treatment plant located at Sg.Labu, Selangor which will be designed for nominal output of 105MLD • The treated water pumping main of about 3.5 km length from the water treatment plant to the services reservoir at KLIA 4
  • 6. 6
  • 9. LOCATION MAP Sg. Labu ORSR WTP MAB Reservoirs 9
  • 11. Entrance Store/w.shop CW Tank Detention Pond Residual Treatment Building Residual Lagoon Waste Washwater Tank
  • 12. Emergency Residual Lagoon = 65m x 52m Effective vol. = 10,053m3 Detention Pond = 147m x 98m Effective vol. = 89,586m3 12
  • 13. Thank You 13