K5.4 Success Story (18th March 2015 to 27th July 2015)
Introduction
The K5.4 well is located in SK302B open block in the western
part of the Central Luconia province, offshore Sarawak. It is
the fifth well that has been drilled after K5.1 (1970), K5.2
(1997), K5.2 RDR (1997) and K5.3 (2006). It is a high
temperature carbonate reservoir (312 deg F) containing 70%
CO2 and 70ppm H2S. The well was budgeted for 75 MM USD
and planned for 139 days with two DST.
Well Objectives
The well objectives were to acquire all the critical data that
can help in reducing the uncertainties of the cap rock
integrity, CO2 injectivity & geochemical properties by
obtaining cap rock core samples, obtain carbonate core
samples for reservoir characterization & de-risking GIIP,
ascertain wax content & contaminants through fluid
sampling. The proposed TD of the well would be at 2475m
TVDSS which would explore 151m into the S1 reservoir.
Challenges
 High temperature carbonate reservoir with 70% CO2 and
70ppm H2S content in reservoir
 Uncertainty of the Top of Carbonate
 Coring in potential total losses zone in carbonate section
 Coring in transition zone with potential total losses
 Pioneer in aquifer injectivity test
 Remote location
 Poor performance of coring service provider during
carbonate coring in previous project (Kuang North-3)
 Changing DD/MWD service provider at the last moment
Initiative Summary
To deal with the above challenges, the team worked on the
following initiatives:
 Run VSP log 70m above Top of Carbonate to minimize
risk of poking carbonate & encountering total losses.
 Reorganized the coring service provider manpower, held
coring workshop, reviewed coring program in detail and
incorporated coring lessons learnt from Kuang North-3.
 Did PMCD PRA to come up with mitigation plans in case
of event of total losses while coring in carbonate
reservoir.
 Did detailed risk assessment for water zone injectivity
test and well testing in high CO2 reservoir (70%).
Implementation
K5.4 plan was successfully implemented because of the
following reasons:
 Active HSE participation from all as seen in the 100%
participation of the HUNS Card, Compliance to PCSB Stop
Work Policy, ZETO Rules and Rig As A Second Home
Campaign.
 Prepared Detailed Drilling Program and Standing
Instructions for Driller (SID).
 Pre Job Planning and Materials Take Off review with all
related service providers & logistics personnel.
 Have contingency back up plan and mitigation in place
based on identified risks for each hole section.
 Working as one team with close coordination with G&G
and Well testing team.
 Using PRTVC communication system efficiently during
daily operation morning meeting.
 Diligently monitoring the drilling operations with using
Real Time Monitoring (RTD & RTO)
 Capturing the after action reviews (AAR)/lessons learnt
from each hole section/job to be applied for next hole
section/project.
 All documents stored for easy access and recordkeeping
in ECM for everyone’s reference.
Results
 Recorded 2,071,682 man-hours with zero LTI and & TRCF
 Achieved all well objectives
 Rated as Best in Class well in DDPTF and DCPF
 8.5 days ahead of NOOP (139days)
 12 million USD lower than AFE (75 mill USD)
 Relatively low NPT 7.8%
 Longest carbonate core in PETRONAS (224m) with 98%
core recovery
 100% core recovery for cap rock shale coring
 First mini frac test in Malaysia
 First aquifer injectivity test in carbonate reservoir
containing high CO2 in PETRONAS
 Successfully flared 70% CO2 for first time in PETRONAS
 Compliance to P2P

More Related Content

What's hot

Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
M.T.H Group
 
cgts_services
cgts_servicescgts_services
Minorca final
Minorca finalMinorca final
Minorca final
Alex Gallagher
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Global CCS Institute
 
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
leann_mays
 
Case Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen LagoonCase Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen Lagoon
LPE Learning Center
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009
Steve Williams
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
Steve Williams
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)
leann_mays
 
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
ijtsrd
 
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Ralph Simon, P.G.
 
GeoCSI solving gas migration problems WBPC 2015
GeoCSI solving gas migration problems WBPC 2015GeoCSI solving gas migration problems WBPC 2015
GeoCSI solving gas migration problems WBPC 2015
Chemistry Matters Inc.
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
Lovemore Freddie Mauled (Geologist)
 
07a sevougian safety case sand2016 8480 c
07a sevougian safety case sand2016 8480 c07a sevougian safety case sand2016 8480 c
07a sevougian safety case sand2016 8480 c
leann_mays
 
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
UK Carbon Capture and Storage Research Centre
 
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
UK Carbon Capture and Storage Research Centre
 
Volume calculation
Volume calculationVolume calculation
Volume calculation
Abzal Alpysbayev
 
GE
GEGE
Henri_silalahi_CV2016
Henri_silalahi_CV2016Henri_silalahi_CV2016
Henri_silalahi_CV2016
Henri Silalahi
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
Steve Williams
 

What's hot (20)

Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
cgts_services
cgts_servicescgts_services
cgts_services
 
Minorca final
Minorca finalMinorca final
Minorca final
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
 
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
 
Case Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen LagoonCase Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen Lagoon
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)09 reynolds 7th salt workshop (trr)
09 reynolds 7th salt workshop (trr)
 
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
 
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
 
GeoCSI solving gas migration problems WBPC 2015
GeoCSI solving gas migration problems WBPC 2015GeoCSI solving gas migration problems WBPC 2015
GeoCSI solving gas migration problems WBPC 2015
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
 
07a sevougian safety case sand2016 8480 c
07a sevougian safety case sand2016 8480 c07a sevougian safety case sand2016 8480 c
07a sevougian safety case sand2016 8480 c
 
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
Don Lawton (CMC Research Institutes) - Monitoring Conformance and Containment...
 
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
Don Lawton (CMC) at UKCCSRC-CMC Workshop, 20-21 April 2015
 
Volume calculation
Volume calculationVolume calculation
Volume calculation
 
GE
GEGE
GE
 
Henri_silalahi_CV2016
Henri_silalahi_CV2016Henri_silalahi_CV2016
Henri_silalahi_CV2016
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 

Similar to K5 4 Wells Portal Success Story

CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Global CCS Institute
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
Ahmad Hazwan
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
Demonstration project design, Ed Steadman, EERC
Demonstration project design, Ed Steadman, EERCDemonstration project design, Ed Steadman, EERC
Demonstration project design, Ed Steadman, EERC
Global CCS Institute
 
underground_4-page_12142015_LR
underground_4-page_12142015_LRunderground_4-page_12142015_LR
underground_4-page_12142015_LR
Anne Fellini
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
Society of Petroleum Engineers
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field Trip
Eni
 
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Niels Asjee
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
PRABHASH GOKARN
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
Susan Cassidy
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
atlanticcouncil
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
Chisom Okereke
 
Qatar petroleum presentation
Qatar petroleum presentationQatar petroleum presentation
Qatar petroleum presentation
Global CCS Institute
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
Mahmoud Morsy
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
UK Carbon Capture and Storage Research Centre
 
EIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port TrustEIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port Trust
zubeditufail
 
Meticulous management
Meticulous managementMeticulous management
Meticulous management
Naveed uddin
 
CV Bonnell - March 2015
CV Bonnell - March 2015CV Bonnell - March 2015
CV Bonnell - March 2015
Vaughan Bonnell
 
Short Resume
Short Resume Short Resume
Short Resume
Peter Le Muth
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
Global CCS Institute
 

Similar to K5 4 Wells Portal Success Story (20)

CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
Demonstration project design, Ed Steadman, EERC
Demonstration project design, Ed Steadman, EERCDemonstration project design, Ed Steadman, EERC
Demonstration project design, Ed Steadman, EERC
 
underground_4-page_12142015_LR
underground_4-page_12142015_LRunderground_4-page_12142015_LR
underground_4-page_12142015_LR
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field Trip
 
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
Qatar petroleum presentation
Qatar petroleum presentationQatar petroleum presentation
Qatar petroleum presentation
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
 
EIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port TrustEIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port Trust
 
Meticulous management
Meticulous managementMeticulous management
Meticulous management
 
CV Bonnell - March 2015
CV Bonnell - March 2015CV Bonnell - March 2015
CV Bonnell - March 2015
 
Short Resume
Short Resume Short Resume
Short Resume
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 

K5 4 Wells Portal Success Story

  • 1. K5.4 Success Story (18th March 2015 to 27th July 2015) Introduction The K5.4 well is located in SK302B open block in the western part of the Central Luconia province, offshore Sarawak. It is the fifth well that has been drilled after K5.1 (1970), K5.2 (1997), K5.2 RDR (1997) and K5.3 (2006). It is a high temperature carbonate reservoir (312 deg F) containing 70% CO2 and 70ppm H2S. The well was budgeted for 75 MM USD and planned for 139 days with two DST. Well Objectives The well objectives were to acquire all the critical data that can help in reducing the uncertainties of the cap rock integrity, CO2 injectivity & geochemical properties by obtaining cap rock core samples, obtain carbonate core samples for reservoir characterization & de-risking GIIP, ascertain wax content & contaminants through fluid sampling. The proposed TD of the well would be at 2475m TVDSS which would explore 151m into the S1 reservoir. Challenges  High temperature carbonate reservoir with 70% CO2 and 70ppm H2S content in reservoir  Uncertainty of the Top of Carbonate  Coring in potential total losses zone in carbonate section  Coring in transition zone with potential total losses  Pioneer in aquifer injectivity test  Remote location  Poor performance of coring service provider during carbonate coring in previous project (Kuang North-3)  Changing DD/MWD service provider at the last moment Initiative Summary To deal with the above challenges, the team worked on the following initiatives:  Run VSP log 70m above Top of Carbonate to minimize risk of poking carbonate & encountering total losses.  Reorganized the coring service provider manpower, held coring workshop, reviewed coring program in detail and incorporated coring lessons learnt from Kuang North-3.  Did PMCD PRA to come up with mitigation plans in case of event of total losses while coring in carbonate reservoir.  Did detailed risk assessment for water zone injectivity test and well testing in high CO2 reservoir (70%). Implementation K5.4 plan was successfully implemented because of the following reasons:  Active HSE participation from all as seen in the 100% participation of the HUNS Card, Compliance to PCSB Stop Work Policy, ZETO Rules and Rig As A Second Home Campaign.  Prepared Detailed Drilling Program and Standing Instructions for Driller (SID).  Pre Job Planning and Materials Take Off review with all related service providers & logistics personnel.  Have contingency back up plan and mitigation in place based on identified risks for each hole section.  Working as one team with close coordination with G&G and Well testing team.  Using PRTVC communication system efficiently during daily operation morning meeting.  Diligently monitoring the drilling operations with using Real Time Monitoring (RTD & RTO)  Capturing the after action reviews (AAR)/lessons learnt from each hole section/job to be applied for next hole section/project.  All documents stored for easy access and recordkeeping in ECM for everyone’s reference. Results  Recorded 2,071,682 man-hours with zero LTI and & TRCF  Achieved all well objectives  Rated as Best in Class well in DDPTF and DCPF  8.5 days ahead of NOOP (139days)  12 million USD lower than AFE (75 mill USD)  Relatively low NPT 7.8%  Longest carbonate core in PETRONAS (224m) with 98% core recovery  100% core recovery for cap rock shale coring  First mini frac test in Malaysia  First aquifer injectivity test in carbonate reservoir containing high CO2 in PETRONAS  Successfully flared 70% CO2 for first time in PETRONAS  Compliance to P2P