SlideShare a Scribd company logo
1 of 3
SF 3.3A1: Project execution readiness assessment at PIA Headquarter
The form will be designed and implemented in the ERP system and till then the form given below may be used.
To be validated and reviewed by SRLM/CTSA
S.
No
Description Status (Yes /
No)
Proof Remarks
1 Is there an Organisational
signature in place? Dedicatedly
addressing all the following-
a) MIS & Planning
b) IEC
c) Content Development
d) Operations
e) Placement
f) Call centre for Tracking /
Validation
g) ERP & IT support
h) Quality Assurance
I. Infra & documentation
II. Faculty training
III. SOP training & certification
IV. CCTV monitoring Centre Manager control it.
V. HRM
VI. Fin. & Accts.
2 Are the job descriptions
defined for all key job roles in
the organisation
Offer letter KRA and JD defined to all Staff
3 Are job specifications (hiring
requirements) defined for each
job role?
Offer letter Job role define in Offer letters
4 Have all key personnel been
hired as per the job
specification for each key job
role?
5 Are all the personnel been
hired as per the job
specification for each job role?
6 Have all personnel deployed on
the DDUGKY program
undergone a reasonable
induction/orientation program
explaining the following -
i. Organisation values, goals,
processes etc.
ii. Details of DDUGKY project.
7 Have all personnel, deployed
on the project been trained and
certified on the DDUGKY SOP
All are Certified
8 Is the bilingual training content
and TLM available for all
courses conducted by the PIA
including IT, English and Soft
skills?
TLM available as per Norms
and NCVT & SSC approved
9 Is there evidence of the training
content and TLM being
industry accepted and
regularly updated
10 Does the training content
include different training
aids/methodologies like PPTs,
audio-visual/content, practical
demonstration, mock,
exercises, routine tests etc.
11 Has the training content and
TLM been updated with
contemporary industry
practices and statutory
requirements?
12 Are there Basic Qualification
criteria laid down for each type
of faculty required and are
these criteria consistent with
relevant NCVT/SSC norms
NCVT & SSC Norms
13 Are all hired trainers meeting
the laid down qualification
criteria
As per NCVT & SSC Norms
14 Have all trainers undergone a
formal facilitation skills
program and do they have a
recognised certificate for the
same.
15 Is there are a regular trainer
development program
conducted by the organisation
to keep their skills
contemporary.
16 Is there a functional ERP for
managing the entire life cycle of
a trainees available and
working in the organisation?
17 Is the ERP, or alternate data
collection tool, being regularly
used and updated with live
data everyday
18 Is the ERP generating exception
reports showing important
areas of non-compliance or lag
in project for the senior
management?
19 Are such exception reports
being viewed seriously and
timely action taken by
concerned people
20 Are extraordinary achievement
of the team which help in
program deliverables, being
highlighted by the ERP and
rewarded appropriately by the
management
21 Has regular internal and
external assessment of
students been institutionalised
into the DNA at the
organisation?
22 Are additional efforts being
made to track and upgrade the
skills of weak students
23 Is the CCTV footage with good
audio and video quality
regularly available from
training centres
CCTV Recording and
Footage verify by
District team
24 Is there a system in place to
monitor CCTV for quality of
critical parameters
25 Is CCTV footage being regularly
monitored by a team/master
trainer for evaluation or
training quality
26 Are instances of poor
quality/lapses in infrastructure
/attendance being brought to
the notice of the senior
management
27 Is corrective action being taken
on such reports / lapses
observed through CCTV
monitoring and follow up
review happening to ensure
compliance.
28 Is there a dedicated placement
team headed by a fairly senior
person dedicated to this
activity
29 Is the Placement team regularly
meeting employers to capture
requirements of manpower
including feedback of trained
and previously placed
candidates?
30 Is the feedback from employers
regularly incorporated into the
training regime
31 Are the placement targets
being met- if not what
corrective action is being taken
32 Is the placement team regularly
meeting placed candidates to
identify their pain areas/obtain
their feedback?
33 Is the placement team
providing any post placement
support to ensure better
retention of candidates after
placement
34 Does the PIA have a regular call
centre to monitor placements
and keep track of placed
candidates
35 Are there records/evidence
available of regular placement
validation activity and is the
placed candidate’s data
updated.
36 Is there a formal mechanism
for regular review of the
program at the Head office
level chaired by the CEO?

More Related Content

Similar to SF 3.3A1 Project Execution Readiness Assessment at PIA Headquarter.docx

Presentation on Training &Development in L&T,Chennai
Presentation  on Training &Development in L&T,ChennaiPresentation  on Training &Development in L&T,Chennai
Presentation on Training &Development in L&T,ChennaiTania Dhar
 
Abelardo Alaan profile
Abelardo Alaan profileAbelardo Alaan profile
Abelardo Alaan profileAbelardo Alaan
 
AN EVALUATIVE STUDY OF HUMAN RESOURCE TRAINING PROGRAMS IN AN ORGANISATION
AN EVALUATIVE STUDY  OF HUMAN RESOURCE  TRAINING PROGRAMS  IN AN ORGANISATIONAN EVALUATIVE STUDY  OF HUMAN RESOURCE  TRAINING PROGRAMS  IN AN ORGANISATION
AN EVALUATIVE STUDY OF HUMAN RESOURCE TRAINING PROGRAMS IN AN ORGANISATIONiicecollege
 
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptx
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptxTRAINING AND COMPETENCY PROGRAM PRESENTATION.pptx
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptxSashaPalo
 
Cabin Host – Present &Future.pptx
Cabin Host – Present &Future.pptxCabin Host – Present &Future.pptx
Cabin Host – Present &Future.pptxVivekRS13
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixRicky Smith CMRP, CMRT
 
Conduct / facilitate user training
Conduct / facilitate user trainingConduct / facilitate user training
Conduct / facilitate user trainingGera Paulos
 
Hpe program rating #3 training
Hpe program rating #3 trainingHpe program rating #3 training
Hpe program rating #3 trainingPMHaas
 
Khulisa Management Services- ECD Site Monitoring Instrument
Khulisa Management Services- ECD Site Monitoring InstrumentKhulisa Management Services- ECD Site Monitoring Instrument
Khulisa Management Services- ECD Site Monitoring Instrumentkaleylemottee
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2Irena Morgan
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2Irena Morgan
 
To Plan, Design, Deliver, and Evaluate an Original Training Prog
To Plan, Design, Deliver, and Evaluate an Original Training ProgTo Plan, Design, Deliver, and Evaluate an Original Training Prog
To Plan, Design, Deliver, and Evaluate an Original Training ProgTakishaPeck109
 
Manoj Sathi Resume
Manoj Sathi ResumeManoj Sathi Resume
Manoj Sathi ResumeManoj Sathi
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops ExcellenceWalter Taraska
 
Final implementation report presentation 14 august 2014
Final implementation report presentation 14 august  2014Final implementation report presentation 14 august  2014
Final implementation report presentation 14 august 2014kaleylemottee
 

Similar to SF 3.3A1 Project Execution Readiness Assessment at PIA Headquarter.docx (20)

Presentation on Training &Development in L&T,Chennai
Presentation  on Training &Development in L&T,ChennaiPresentation  on Training &Development in L&T,Chennai
Presentation on Training &Development in L&T,Chennai
 
TPDDL's Learning & Development At Cenpeid
TPDDL's Learning & Development At CenpeidTPDDL's Learning & Development At Cenpeid
TPDDL's Learning & Development At Cenpeid
 
Top compliance challenges for trainers and assessors
Top compliance challenges for trainers and assessorsTop compliance challenges for trainers and assessors
Top compliance challenges for trainers and assessors
 
Abelardo Alaan profile
Abelardo Alaan profileAbelardo Alaan profile
Abelardo Alaan profile
 
AN EVALUATIVE STUDY OF HUMAN RESOURCE TRAINING PROGRAMS IN AN ORGANISATION
AN EVALUATIVE STUDY  OF HUMAN RESOURCE  TRAINING PROGRAMS  IN AN ORGANISATIONAN EVALUATIVE STUDY  OF HUMAN RESOURCE  TRAINING PROGRAMS  IN AN ORGANISATION
AN EVALUATIVE STUDY OF HUMAN RESOURCE TRAINING PROGRAMS IN AN ORGANISATION
 
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptx
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptxTRAINING AND COMPETENCY PROGRAM PRESENTATION.pptx
TRAINING AND COMPETENCY PROGRAM PRESENTATION.pptx
 
Cabin Host – Present &Future.pptx
Cabin Host – Present &Future.pptxCabin Host – Present &Future.pptx
Cabin Host – Present &Future.pptx
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity Matrix
 
TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15
 
Training.pdf
Training.pdfTraining.pdf
Training.pdf
 
Conduct / facilitate user training
Conduct / facilitate user trainingConduct / facilitate user training
Conduct / facilitate user training
 
Hpe program rating #3 training
Hpe program rating #3 trainingHpe program rating #3 training
Hpe program rating #3 training
 
Khulisa Management Services- ECD Site Monitoring Instrument
Khulisa Management Services- ECD Site Monitoring InstrumentKhulisa Management Services- ECD Site Monitoring Instrument
Khulisa Management Services- ECD Site Monitoring Instrument
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2
 
Pre course assessment- validation v2
Pre  course assessment- validation v2Pre  course assessment- validation v2
Pre course assessment- validation v2
 
To Plan, Design, Deliver, and Evaluate an Original Training Prog
To Plan, Design, Deliver, and Evaluate an Original Training ProgTo Plan, Design, Deliver, and Evaluate an Original Training Prog
To Plan, Design, Deliver, and Evaluate an Original Training Prog
 
Manoj Sathi Resume
Manoj Sathi ResumeManoj Sathi Resume
Manoj Sathi Resume
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops Excellence
 
Lisa CV3
Lisa CV3Lisa CV3
Lisa CV3
 
Final implementation report presentation 14 august 2014
Final implementation report presentation 14 august  2014Final implementation report presentation 14 august  2014
Final implementation report presentation 14 august 2014
 

More from Parveen Shakya

SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...
SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...
SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...Parveen Shakya
 
SF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.docSF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.docParveen Shakya
 
SF 3.2A Bank Account Detail For DDUGKY.docx
SF 3.2A Bank Account Detail For DDUGKY.docxSF 3.2A Bank Account Detail For DDUGKY.docx
SF 3.2A Bank Account Detail For DDUGKY.docxParveen Shakya
 
Aclp Electrician Domestic Solutions PSS/Q6001
Aclp Electrician Domestic Solutions PSS/Q6001Aclp Electrician Domestic Solutions PSS/Q6001
Aclp Electrician Domestic Solutions PSS/Q6001Parveen Shakya
 
Content of htc mobile report
Content of htc mobile reportContent of htc mobile report
Content of htc mobile reportParveen Shakya
 

More from Parveen Shakya (10)

SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...
SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...
SF 3.10C Ring Fencing of PIA QTeam from Operations Compliance Report from the...
 
SF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.docSF 3.3A Project Execution Rediness Assessment.doc
SF 3.3A Project Execution Rediness Assessment.doc
 
SF 3.2A Bank Account Detail For DDUGKY.docx
SF 3.2A Bank Account Detail For DDUGKY.docxSF 3.2A Bank Account Detail For DDUGKY.docx
SF 3.2A Bank Account Detail For DDUGKY.docx
 
Aclp Electrician Domestic Solutions PSS/Q6001
Aclp Electrician Domestic Solutions PSS/Q6001Aclp Electrician Domestic Solutions PSS/Q6001
Aclp Electrician Domestic Solutions PSS/Q6001
 
First page HTC Mobile
First page HTC MobileFirst page HTC Mobile
First page HTC Mobile
 
Content of HTC
Content of HTCContent of HTC
Content of HTC
 
Certificate
CertificateCertificate
Certificate
 
first page design
first page designfirst page design
first page design
 
Content of htc mobile report
Content of htc mobile reportContent of htc mobile report
Content of htc mobile report
 
Certificate
Certificate Certificate
Certificate
 

Recently uploaded

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 

Recently uploaded (20)

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

SF 3.3A1 Project Execution Readiness Assessment at PIA Headquarter.docx

  • 1. SF 3.3A1: Project execution readiness assessment at PIA Headquarter The form will be designed and implemented in the ERP system and till then the form given below may be used. To be validated and reviewed by SRLM/CTSA S. No Description Status (Yes / No) Proof Remarks 1 Is there an Organisational signature in place? Dedicatedly addressing all the following- a) MIS & Planning b) IEC c) Content Development d) Operations e) Placement f) Call centre for Tracking / Validation g) ERP & IT support h) Quality Assurance I. Infra & documentation II. Faculty training III. SOP training & certification IV. CCTV monitoring Centre Manager control it. V. HRM VI. Fin. & Accts. 2 Are the job descriptions defined for all key job roles in the organisation Offer letter KRA and JD defined to all Staff 3 Are job specifications (hiring requirements) defined for each job role? Offer letter Job role define in Offer letters 4 Have all key personnel been hired as per the job specification for each key job role? 5 Are all the personnel been hired as per the job specification for each job role? 6 Have all personnel deployed on the DDUGKY program undergone a reasonable induction/orientation program explaining the following - i. Organisation values, goals, processes etc. ii. Details of DDUGKY project. 7 Have all personnel, deployed on the project been trained and certified on the DDUGKY SOP All are Certified 8 Is the bilingual training content and TLM available for all courses conducted by the PIA including IT, English and Soft skills? TLM available as per Norms and NCVT & SSC approved 9 Is there evidence of the training content and TLM being industry accepted and regularly updated
  • 2. 10 Does the training content include different training aids/methodologies like PPTs, audio-visual/content, practical demonstration, mock, exercises, routine tests etc. 11 Has the training content and TLM been updated with contemporary industry practices and statutory requirements? 12 Are there Basic Qualification criteria laid down for each type of faculty required and are these criteria consistent with relevant NCVT/SSC norms NCVT & SSC Norms 13 Are all hired trainers meeting the laid down qualification criteria As per NCVT & SSC Norms 14 Have all trainers undergone a formal facilitation skills program and do they have a recognised certificate for the same. 15 Is there are a regular trainer development program conducted by the organisation to keep their skills contemporary. 16 Is there a functional ERP for managing the entire life cycle of a trainees available and working in the organisation? 17 Is the ERP, or alternate data collection tool, being regularly used and updated with live data everyday 18 Is the ERP generating exception reports showing important areas of non-compliance or lag in project for the senior management? 19 Are such exception reports being viewed seriously and timely action taken by concerned people 20 Are extraordinary achievement of the team which help in program deliverables, being highlighted by the ERP and rewarded appropriately by the management 21 Has regular internal and external assessment of students been institutionalised into the DNA at the organisation? 22 Are additional efforts being made to track and upgrade the skills of weak students 23 Is the CCTV footage with good audio and video quality regularly available from training centres CCTV Recording and Footage verify by District team
  • 3. 24 Is there a system in place to monitor CCTV for quality of critical parameters 25 Is CCTV footage being regularly monitored by a team/master trainer for evaluation or training quality 26 Are instances of poor quality/lapses in infrastructure /attendance being brought to the notice of the senior management 27 Is corrective action being taken on such reports / lapses observed through CCTV monitoring and follow up review happening to ensure compliance. 28 Is there a dedicated placement team headed by a fairly senior person dedicated to this activity 29 Is the Placement team regularly meeting employers to capture requirements of manpower including feedback of trained and previously placed candidates? 30 Is the feedback from employers regularly incorporated into the training regime 31 Are the placement targets being met- if not what corrective action is being taken 32 Is the placement team regularly meeting placed candidates to identify their pain areas/obtain their feedback? 33 Is the placement team providing any post placement support to ensure better retention of candidates after placement 34 Does the PIA have a regular call centre to monitor placements and keep track of placed candidates 35 Are there records/evidence available of regular placement validation activity and is the placed candidate’s data updated. 36 Is there a formal mechanism for regular review of the program at the Head office level chaired by the CEO?