Special Economic Zones –  CONCEPT, STRUCTURE, PROCESS , IMPACT, FUTURE International Business Environment -JAY SHUKLA
Origin & History of SEZs Yester years EPZs (Export Processing Zones) are todays SEZs One of the earliest & most famous SEZs were founded by China under Den Xiaoping in the early1980s Today the most prominent SEZs in China are Shenzhen & Pudong, a district of Shanghai However, India’s first EPZ was set up in Kandla (Gujarat) in 1965 followed by Santacruz (Mumbai) in 1973
Historical background Four modernizations – Liberalization of Agriculture; Rural & Town Industrialization through Defence, Urban & Area Export-oriented enterprises through SEZs. Importance of the last in faster economic growth, modernization of Industry & Trade and export growth Policy of preferred regions – unequal growth – open-door policies Hong Kong and East Asian factors  Overriding approach based on Deng’s Observation: “For us to establish SEZs and adopt open-door policies, we must have a clear guiding ideology: that is, “Not to constrain but to release”
Experience with EPZs Starting with Kandla in 1965; SEEPZ in 1972, Based on reviews of working, Cochin, Falta, Madras (Chennai) and NOIDA in 1984 and Vizag in 1989 Very limited impact Less than 40% of approvals fructified, rest cancelled or lapsed Employed only 0.01% of labour force FDI was less than 20% of total investment Accounted for less than 4% of exports.  Net export much lower as imports were over 60% of exports
INTRODUCTION
The concept of SEZ is expected to bring large dividends to the State in terms of economic and industrial development and the generation of new employment opportunities. The SEZs are expected to be engines for economic growth..   Special Economic Zone (SEZ) is defined as "a specifically delineated duty free enclave and shall be deemed to be foreign territory for the purposes of trade operations and duties and tariffs" . Special Economic Zone is one or more areas of a country where the tariffs and quotas are eliminated and bureaucratic requirements are lowered so that more companies are attracted to the area. The companies establishing in the area also get extra incentives for doing business. SEZs are an acknowledgement of the potential of export-led development strategy in accelerating economic growth.  Government of India have notified Special Economic Zones (SEZs) Act 2005 and notified Special Economic Zone Rules 2006 with a view to augmenting infrastructure facilities for export production. Setting up of Special Economic Zones are permitted in the public, private, joint sector or by the State Governments.  What is a SEZ ?
Incentives and facilities offered to the SEZs The incentives and facilities offered to the units in SEZs for attracting investments into the SEZs, including foreign investment include:-  Duty free import/domestic procurement of goods for development, operation and maintenance of SEZ units 100% Income Tax exemption on export income for SEZ units under Section 10AA of the Income Tax Act for first 5 years, 50% for next 5 years thereafter and 50% of the ploughed back export profit for next 5 years. Exemption from minimum alternate tax under section 115JB of the Income Tax Act. External commercial borrowing by SEZ units upto US $ 500 million in a year without any maturity restriction through recognized banking channels. Exemption from Central Sales Tax.  Exemption from Service Tax. Single window clearance for Central and State level approvals.  Exemption from State sales tax and other levies as extended by the respective State Governments.  
SEZ Approval  Consequent upon the SEZ Rules coming into effect w.e.f. 10th February, 2006, Twenty-five meetings of the Board of Approvals have since been held.  During these meetings, formal approval has been granted to  462 SEZ proposals.  There are 135 valid in-principle approvals.   Out of the 462 formal approvals, 222 SEZs have been notified. Benefits derived from SEZs   Benefit derived from SEZs is evident from the investment, employment, exports and infrastructural developments additionally generated.  The benefits derived from multiplier effect of the investments and additional economic activity in the SEZs and the employment generated thus will far outweigh the tax exemptions and the losses on account of land acquisition.  Stability in fiscal concession is absolutely essential to ensure credibility of Government intensions. Exports from the functioning SEZs during the last five years : Year Value (Rs. Crore) Growth Rate ( over previous year ) 2003-2004 13,854 39% 2004-2005 18,314  32% 2005-2006 22 840  25% 2006-2007 34,615 52% 2007-2008 66,638 92%
SEZ Policy of 2000 New Policy in April 2000.  SEZs permitted to be set up in the public, private, joint sector or by the State Governments Minimum size of 1000 hectares (4 sq. miles) Simplified procedures and more incentives Main measures were: Conditions for automatic approval relaxed considerably Customs procedures simplified Units could produce items reserved for SSI units in domestic market 100% FDI investment for manufacturing Profits could be repatriated fully Freedom for sub-contracting 100% I.T. exemption for five years Exemption from Central Excise Duty on capital goods, raw materials, consumable spares from domestic market Reimbursement of CST paid on domestic purchases
Evolution : from EPZs to SEZs Deficiencies in EPZ policy were : Limited power of Zonal authorities Absence of single window facility within the Zone Rigid custom procedure for bondings & bank guarantees Restrictive FDI policy Procedural constraints & severe infrastructural deficiencies During 1991-2000, wide-ranging measures were initiated by the GoI for revamping and restructuring EPZs.  This phase was thus marked by progressive liberalisation of policy provisions and relaxation in the severity of controls and simplification of procedures.
Focus had been on delegating powers to zone authorities, providing additional fiscal incentives, simplifying policy provisions and providing greater facilities. The EXIM Policy (1997-2002) introduced a new scheme from April 1, 2000 for establishment of the Special Economic Zones (SEZs) in different parts of the country. From November 1, 2000 the EPZs at Kandla, Santa Cruz (Mumbai), Cochin and Surat have been converted into SEZs. In 2003, other existing EPZs namely, Noida, Falta, Chennai, Vizag were also converted into SEZs. As on June 2005, 53 SEZs have been approved by the Government of India out of which 11 SEZs are functional and the rest 42 SEZs are under establishment. Contd………. Evolution : from EPZs to SEZs
Functional SEZs at present At present there are eight functional SEZs located at:  SantaCruz (Maharashtra), Cochin (Kerala), Kandla and Surat (Gujarat), Chennai (Tamil Nadu),  Visakhapatnam (Andhra Pradesh), Falta (West Bengal) & Nodia (Uttar Pradesh) in India.  Further a SEZ at Indore (Madhya Pradesh ) is now ready for operation.
In addition 18 approvals have been given for setting up of SEZ at  Positra (Gujarat),  Navi Mumbai and Kopata (Maharashtra),  Nanguneri (Tamil Nadu),  Kulpi and Salt Lake (West Bengal),  Paradeep and Gopalpur (Orissa),  Bhadohi, Kanpur, Moradabad and Greater Noida (U.P),  Vishakhapatnam and Kakinada (Andhra Pradesh),  Vallarpadam/Puthuvypeen (Kerala)  Hassan (Karnataka),  Jaipur and Jodhpur  (Rajasthan)  on the basis of proposals received from the State Governments. Functional SEZs at present Contd……….
Agriculture: Its function in Indian economy Agriculture (a term which encompasses farming) is the process of producing food, feed, fiber and other goods by the systematic raising of plants and animals. India has a labour force of 509.3 million. 60% of which is employed in agriculture and related industries.  agricultural crops include rice, wheat, oilseed, cotton, jute, tea, sugarcane, and potatoes. The agricultural sector accounts for 28% of GDP. Service and industrial sectors make up 54% and 18% respectively.  Agriculture accounts for 8.56 % of India’s exports. About 43 % of India's geographical area is used for agricultural activity. Agriculture is still the largest economic sector and plays a significant role in the overall socio-economic development of India
SEZ: Independent force to boost Indian Economy  SEZ is a better proposition .  SEZ policy is nowhere in conflict with agriculture sector. In fact it’s a lucrative proposition. India will have to gear-up with its modernization and reformation of agriculture sector to make it competent and profitable globally. Wal-Mart’s role in Indian agriculture would be one such step to make the farmers use modern technology to make them eligible for profit sharing partnership proposal. That depends on the efforts that government of India and its population put in. The SEZ conflict with agriculture as of now seems more like a political war fought with the help of pawns for immediate political mileage.
Positive Impacts To Nation World class business environment Increased FDI Higher economic growth Infrastructural development Export growth Employment Opportunities Exposure to technology and global markets
Positive Impacts TO Business houses Hassle free operating environment Single window clearance Simplified procedure for setting up business, compliance proc with with self certification Duty free import Tax exemption- VAT, CST, ST, other levies External commercial borrowings 100% profit reptriation from export earnings
Positive Impacts To People Employement opportunities Impact on lifestyle and standard of living Business infrastructure combined with social facilities Better work culture , good education, leadership vision
Hurdles To Nation Loss of revenue
Hurdles To Business Land acquisition Single window actually is not No strategic planning for electicity, water
Hurdles To People Grabbing of fertile land Water scarcity- Threat to access Food scarcity Exploitation of labour Landless farmers
Hurdles To Environment Mangrove destruction Destruction of ground water recharge system Pollution
 
Definitions in  Special Economic Zones Act,2005   " Unit"  means a Unit set up by an entrepreneur in a Special Economic Zone and includes an existing Unit, an Offshore Banking Unit and a Unit in an International Financial Services Centre, whether established before or established after  commencement of this Act (Section 2(zc) of Special Economic Zones Act ,2005) “ Offshore Banking Unit”  means a branch of a bank located in a Special Economic Zone and which has obtained the permission under clause ( a ) of sub-section ( 1 ) of section 23 of the Banking Regulation Act, 1949  (Section 2(u) of Special Economic Zones Act ,2005)
DEFINITIONS  contd.. “ International Financial Services Centre”  means an International Financial Services Centre which has been approved by the Central Government under sub-section ( 1 ) of section 18 (Section 2(q) of Special Economic Zones Act ,2005) “ entrepreneur”  means a person who has been granted a letter of approval by the Development Commissioner under sub-section ( 9 ) of section 15 (Section 2(j) of Special Economic Zones Act ,2005) “ existing Unit”  means every Unit which has been set up on or before the commencement of this Act (Section 2(l) of Special Economic Zones Act ,2005)
New and Existing Unit New Unit  Any person, who intends to set up a Unit for carrying on the authorised operations in a Special Economic Zone, may submit a proposal to the Development Commissioner concerned  Existing Unit  An existing Unit shall be deemed to have been set up in accordance with the provisions of SEZ Act,2005 and such Units shall not require approval under the SEZ Act, 2005 . (Section 15(1) of SEZ Act,2005)
Procedure for establishment of Unit  ( if proposal not related to Foreign collaboration and FDI ) Application  to Development Commissioner with a copy to developer  Development Commissioner shall scrutinise proposal and place before approval committee  Approval Committee approve the proposal  Development Commissioner will issue a letter of approval in Form G for setting up the unit
Procedure for establishment of Unit  ( if proposal  relates to Foreign collaboration and FDI ) Application  to Development Commissioner with a copy to developer  Development Commissioner shall scrutinise proposal and place before Board  Board shall approve the proposal  Development Commissioner will issue a letter of approval in Form G for setting up the unit
Letter of Approval to a Unit-Rule 19(2) and (3) What is a Letter Validity of a Letter The Letter of Approval shall be valid for one year within which period the Unit shall commence production or service or trading or Free Trade and Warehousing activity .(Rule 19(4) of SEZ Rules ,2006)
Foreign Companies in SEZ- Rule 19(7) Foreign companies can also set up manufacturing units as their branch operations in the Special Economic Zones in accordance with the provisions of Foreign Exchange Management (Foreign exchange derivatives contracts) Regulations, 2000.
Some Contents of Project Report   Overview of the entire project Details of Activities proposed  Direct and indirect employment likely to be generated  Project cost and means of finance Financial/Technical, etc. tie ups  Details of Backward and Forward integrations Details of Past experience  Infrastructure:  About the Land, Factory premises, Equipment, Office premises  Risks associated with Project Implementation schedule
Matters that can be included in application- Rule 17(1) (a) Setting up of unit in a SEZ (b) Annual permission for sub-contracting (c) Allotment of Importer-Exporter Code number (d) Allotment of land/industrial sheds in the SEZ (e) Water connection (f) Registration-cum-Membership Certificate (g) Small Scale Industries Registration
Matters that can be included in application Rule 17(1)  contd.. (h) Registration with Central Pollution Control Board (i) Power connection (j) Building approval plan (k) Sales tax registration (l) Approval from inspectorate of factories (m) Pollution control clearance, wherever required; (n) Any other approval as may be required from the State Government
Guidelines for Central Government  for notifying special Economic Zone  –sec 5   a) generation of additional economic activity b) promotion of exports of goods and services; c) promotion of investment from domestic and foreign sources; d) creation of employment opportunities; e) development of infrastructure facilities; and f) maintenance of sovereignty and integrity of India, the security of the State and friendly relations with foreign States.  
Specific requirements for SEZ-Rule 5(5) Before recommending any proposal for setting up of a SEZ, the State Government  endeavor that following are made available in the State to the proposed SEZ and Developer exemption from the State and local taxes, levies and duties exemption from electricity duty or taxes on sale, of self generated or purchased electric power  allow generation, transmission and distribution of power within a SEZ
Specific requirements for SEZ – Rule 5(5)  …. providing water, electricity and such other services,  Delegation of power to the Development Commissioner under the Industrial Disputes Act, 1947  and other related Acts in relation to the Unit   Declaration of the Special Economic Zone as a Public Utility Service under the Industrial Disputes Act, 1947   Providing single point clearance system to the Developer and unit under the State Acts and rules
Forms used  A Application for setting up SEZ B Format for letter of approval for SEZ developers C Format for Letter of approval for providing Infrastructure facilities in SEZ D Bond-cum Legal Undertaking for developers E Format for Quarterly and half-yearly report for SEZ developer/co-developer  to be furnished to Development commissioner
Forms used  Contd.. F Consolidated Application Form G Format for letter of approval for Unit H Bond-cum Legal Undertaking for SEZ unit I Annual Performance report for units J Form for Appeal K Permanent Identity Card
Check list for the proposals to be taken up by BOA Name of the Developer. Proposed area of the location of the SEZ. Status of recommendation of the proposal by the State Government (if available).  Whether proposal is for formal or in-principle approval? (In case land is in possession of the promoter, it is considered for formal approval) Is it a multi-product SEZ? If it is a sector specific SEZ, the sector is. Whether it meets the area requirements. Area of the SEZ (in hectares)
Check list for the proposals to be taken up by BOA … Whether Form- A has been filed? Whether undertaking and affidavit has been submitted? Whether project report has been submitted? Whether land is owned/leased and is in possession of the Developer? Does the proposal meet the area requirements of the Rules? Whether the land has existing structures or is vacant? Whether the land is contiguous? Projected investment in the project.
Check list for the proposals to be taken up by BOA…. Projected exports from the project. Projected employment from the project. Share capital and Reserves of the Developer Company. Source of funds for the project.  Audited Accounts of the Developer for last 3 years (for all the constituents in case the Developer is a SPV). Extent of FDI  Source of FDI  Whether provisions contained in the Press Note No. 5 (2005 Series), issued by the Ministry of Commerce and Industry have been followed in respect of Telecom/IT SEZ development?
Processing and Non Processing area The areas falling within the Special Economic Zones may be demarcated by the Central Government as- (a) the processing area for setting up Units for activities, being the manufacture of goods, or rendering services; or (b) the area exclusively for trading or warehousing purposes; or (c) the non-processing areas for activities other than those specified under clause (a) or clause (b) ( Section 6 of SEZ Act,2005) The processing area and Free Trade and Warehousing Zone shall be fully secured by boundary wall with specified entry and exit points. – Rule 11(2) of SEZ Rules ,2006)
Usage of Land in SEZ-Rule 11 The developer holding land on lease basis shall assign lease hold right to the entrepreneur holding valid Letter of Approval.(Rule 11(6)) The lease period shall be co-terminus with the validity of the Letter of Approval.(Rule 11(5)) Developer may grant on lease land or built up space, for creating facilities such as canteen, public telephone booths, first aid centres, creche and such other facilities as may be required for the exclusive use of the Unit. .( Proviso to Rule 11(5))
Usage of Land in SEZ-Rule 11 The Developer may allot land in the processing area on lease basis to a person desiring to create infrastructure facilities for use by the prospective Units. (Rule 11(8)) The Developer shall not sell the land in a Special Economic Zone. (Rule 11(9))
New Rule11(10) No vacant land in the non-processing area shall be leased for business and social purposes such as educational institutions, hospitals, hotels, recreation and entertainment facilities, residential and business complexes, to any person except a co-developer approved by the Board : Provided  that the developer or co-developer may lease the completed infrastructure along with the vacant land appurtenant thereto for such purposes  Provided further  that infrastructure for business or social purposes in the Special Economic Zone, as may be approved by the Board, shall be eligible for exemptions, concessions and drawback.”.
Procedure for setting up SEZ -Sec 15 Any person, who intends to set up a Special Economic Zone, may, after identifying the area make a proposal in Form A to either of the following    a)State Government concerned    b) Board of Approval  25 Copies of Form A are to be given along with Project report outlining the economic and commercial viability of the project No application fees
Suo moto set up of SEZ  Central Government may:- (a) after consulting the State Government  concerned; (b) without referring the proposal for setting up the Special Economic Zone to the Board; and (c) after identifying the area; suo moto  set up and notify the Special Economic Zone (Proviso to sub section 4 of section 3 of SEZ Act ,2005)
Flow Chart for Setting up SEZ SEZ can be formed in two ways  By Applying  to SG By applying to Board of Approval SG forward the  Proposal to BOA  Obtain the  concurrence of SG BOA approves the  proposal   SG=Sate  Government
Flow Chart for Setting up SEZ contd .. Central Government shall  issue letter of Approval to developer  Developer shall furnish to  Central Government information about area  Central Government will notify the area as SEZ
Contents of Form A Location of SEZ Distance from the nearest Sea Port/Air Port/Rail or Road Details of Lease of Land Proposed investment details Means of financing  Equity holdings Details of areas (Processing areas and non-processing area) used for various purposes in SEZ Activities Proposed in Processing and non-processing area Details of employment likely to be generated
Kinds of SEZ  Kinds of SEZ  SEZ for multi-product SEZ for specific sector  SEZ in a port or airport
Minimum Contiguous Area  Requirement  Type Area for specific states/UT Min.Processing Area Multi-product 1000  hectares 200 hectares 25 % (old) 35% (new) ( may be relaxed to 25% by CG on Board recommendation) Multi -services 100  hectares 100 hectares 25% Sector specific 100 hectares 50 hectares 50% Electronic Hardware and software 10 hectares( and min. built up area of 1 lakh sq.mtrs) 10 hectares and min. built up area of 1 lakh sq.mtrs) 50%
Minimum Contiguous Area  Requirement  Type Area for specific states/UT Min.Processing Area Bio- technology/ Non- conventional energy 10 hectares (old) 10 hectares( with a min. built up area of 40000 sq.m) (new) 10 hectares (old) 10 hectares( with a min. built up area of 40000 sq.m) (new) 50 % Gems and jewellery sector 10  hectares (old)  10 hectares( with a min. built up area of 50000 sq.m) (new)  10 hectares (old) 10 hectares ( with a min. built up area of 50000 sq.m) (new)  50 %
Minimum Contiguous Area  Requirement  Type Area for specific states/UT Min.Processing Area Free Trade and Warehousing Zone -  Stand alone 40 hectares (with 1 Lac square meter built up area)  40 hectares (with 1 Lac square meter built up area) 50 %(new) Free Trade and Warehousing Zone - SEZ for a specific sector No minimum area requirement but subject to max area not exceeding 20% of the processing area No minimum area requirement but subject to max area not exceeding 20% of the processing area
Minimum Contiguous Area Requirement  SEZ Amendment Rules,2006 ( came into force on 10.08.2006)  1.   Minimum processing area for multi- product shall be  at least thirty-five per cent of the area which may be relaxed up to twenty-five per cent by the Central Government on recommendations of the Board for the reasons to be recorded in writing
SEZ Amendment Rules,2006… SPECIAL SECTOR 1.  the area shall be ten hectares or more with a minimum built-up area as under :             ( i )  forty thousand square meters in case of a Special Economic Zone proposed to be set up exclusively for bio-technology and non-conventional energy sectors including solar energy equipments/cells but excluding a Special Economic Zone set up for non-conventional energy production and manufacturing;
SEZ Amendment Rules,2006… (ii) fifty thousand square meters in case of a Special Economic Zone proposed to be set up exclusively for the gems and jewellery sector.”
SEZ Amendment Rules,2006… FREE TRADE AND WAREHOUSING ZONES In  a stand alone Free Trade and Warehousing Zone at least fifty per cent of the area shall be earmarked for developing processing area : “ Provided further  that a Free Trade and Warehousing Zone may also be set up as part of a Special Economic Zone for multi-product;”
SEZ Amendment Rules,2006… Rule 5A .  Infrastructure requirements relating to information technology   In case of a Special Economic Zone relating to information technology, the following facilities shall be ensured, namely :—            ( a )  twenty-four hours uninterrupted power    supply at stable frequency in the    zone;            ( b )  reliable connectivity for uninterrupted and    secure data transmission;            ( c )  provision for central air-conditioning    system and        ( d )  a ready to use, furnished plug and pay facility  for end users.”.
Rule 18(4) (g) No proposal shall be considered for:  “  the use of any plant or machinery previously used for any purpose in Domestic Tariff Area.”
Area conversion factors  1 Acre  = 0.404686 Hectare 1 Hectare = 2.47109 Acres 1 Sq. Km. = 0.38610 Sq. Mile 1 Sq. Km. = 100 Hectares 1 Sq. Mile  =  2.58999  Sq. Kms
 
What is corporate Farming Corporate farming  is a term that describes the business of  agriculture. Specifically, what is seen by some as the practices of would-be mega corporations involved in food production on a very large scale. It is a modern food industry issue, and encompasses not only the farm itself, but also the entire chain of agriculture-related business, including seed supply, agrichemicals, food processing, machinery, storage, transport, distribution, marketing, advertising, and retail sales.
Flow of Corporate farming Critics argue that the ultimate goal of corporate farming is to vertically integrate the entire process of food production, from the development of proprietary strains of DNA through to the distribution and sale of food to consumers.  Some corporations are considered to be well on the way to achieving this objective, and have become very large in the process, such as Archer Daniels Midland and the privately held Cargill, with 2004 revenues of $62.9 billion. citation  needed ] "Corporate farming" is a fairly broad term that deals with the general practices and effects of a small number of large, global corporations that dominate the food industry. It does not refer simply to any incorporated agribusiness enterprise, although most agricultural businesses today are in some way economically connected to the dominant food industry players. As such, it may be thought of as a movement, which is at times also referred to as "anti-corporate farming".
Benefits of Corporate Farming  The core argument for the methods criticized as corporate farming is essentially: "This is the way to keep up with population growth, and to make inroads into feeding billions of people to developed nation standards— this is the only way to feed the world ." Indeed, rapid technological development and large-scale global production management are responsible for an unprecedented abundance of inexpensive, widely available, attractive, "safe" food. By lowering the cost of raw food inputs, creating sophisticated long-distance distribution networks, producing processed convenience foods, and making food available year-round in vastly stocked  supermarkets , corporate farming has presented consumers in the wealthiest regions of the world with an immense variety of food, at relatively low cost. Today, in  North America , only about 10% of average income is spent on food. By this measure, provided these methods are  sustainable , corporate farming would appear to be a tremendous success
Corporate farming in India "Corporate farming" is a fairly broad term that deals with the general practices and effects of a small number of large, global corporations that dominate the food industry. It does not refer simply to any incorporated agribusiness enterprise, although most agricultural businesses today are in some way economically connected to the dominant food industry players. As such, it may be thought of as a movement, which is at times also referred to as "anti-corporate farming".
India to promote corporate contract farming Commodity Online  NEW DELHI: Worried over the slow growth in agricultural sector, the government is planning for expansion in corporate contract farming.  Minister of State for Food Processing Subodh Kant Sahai said the government is open to corporate contract farming.  While domestic corporate bigwigs such as Reliance and Bharti have already taken up the contract farming route to feed their retail chains, global majors Wal-Mart, Tesco and Carrefour are also eyeing foray into India retail.
Corporate contract farming has taken off in states like Punjab, Haryana, Maharashtra and Gujarat. Providing the private sector a more level playing field would help raise the country’s overall farm goods’ processing level, the minister said.  So far, 17 states have made a provision for contract farming in their respective Agricultural Produce Marketing Committee Act to provide legal framework.  In seven more states, there exist no regulatory laws preventing such an arrangement.
India’s is world’s second largest producer of fruit and vegetables. Its annual post harvest loss on fresh fruit and vegetables on lack of processing facilities has been pegged at Rs 40,000 crore.  The minister prescribed market-oriented farming to minimise post-harvest loss. Large-scale corporate farming will also lift the food processing sector.  During the 11th Five Year Plan (2007-12), the growth target for the food processing sector is 7 per cent, while agriculture sector is seen growing only at 4 per cent.
Every bit of farm produce should be viewed as processing raw material, Sahai said. India aims at raising the level of food processing in farm products to 20 per cent by 2015 from the current 6 per cent.  Underscoring the critical role of states in raising the country’s overall food processing level, the minister said that states should adopt a fresh look at their agricultural policy.  The ministry has written to all chief ministers to accord high priority to food processing in a bid to raise rural income.
SEZs IN CHINA Development over the years Started soon after beginning of reforms in 1978. Four SEZs started in 1979 – three in Guangdong adjacent to Hong Kong and one at Xiamen in Fujian  Heavy government investment in infrastructure.  Each zone could introduce its own Regulation to grow investment, approvals and tax concessions. Based on the success, in 1984, the SEZ benefits were extended to 14 coastal open cities. Economic & Technology Development Zones (ETDZ) and High Tech and New Technology Industry Development Zones encouraged in coastal open cities. In 1985, three development triangles – Pearl River Delta (PRD), the Yangtze River Delta (around Shanghai) and Minum Delta (around Xiamen) were designated as coastal open areas. Hainan Island was declared as  fifth  SEZ in 1988
REASONS FOR SUCCESS Unique locations – of the five SEZs, Shenshen, Shantou and Zhuhai are in Guangdong Province adjoining Hong Kong.  Fourth, Xiamen, is in Fujian Province and nearer Taiwan. Large size with government and local authorities providing improved infrastructure with foreign collaboration Attractive incentive packages for foreign investment. Liberal customs procedures. Flexible Labor Laws providing for contract appointments for specified periods. Powers to Provinces and local authorities to frame additional guidelines and in administering the Zones.
SEZs IN INDIA SEZs in India Experience with EPZs Starting with Kandla in 1965; SEEPZ in 1972, based on reviews of working, Cochin, Falta, Madras (Chennai) and NOIDA in 1984 and Vizag in 1989 Very limited impact Less than 40% of approvals fructified Rest cancelled or lapsed Employed only 0.01% of labour force FDI was less than 20% of total investment Accounted for less than 4% of exports.  Net export much lower as imports were over 60% of exports
REASONS FOR FAILURE SEZs in India Inadequate infrastructure Restrictive policies Lengthy procedures – No Single Window Locational disadvantages Stringent labour laws - In the 1990s, as a part of reforms, powers delegated to zone authorities, additional fiscal incentives were given, policy provisions were simplified and greater facilities were provided leading to some, not very significant, improvements.
SMALL SIZE OF EPZs Location Size (Sq.miles) Kandla (Gujarat) 1.17 SEEPZ (Mumbai) 0.15 Cochin (Kerala) 0.16 NOIDA (UP) 0.48 Chennai (TN) 0.41 Vizag (AP) 0.56 Falta (WB) 0.44
CURRENT SEZs IN INDIA.

Sez

  • 1.
    Special Economic Zones– CONCEPT, STRUCTURE, PROCESS , IMPACT, FUTURE International Business Environment -JAY SHUKLA
  • 2.
    Origin & Historyof SEZs Yester years EPZs (Export Processing Zones) are todays SEZs One of the earliest & most famous SEZs were founded by China under Den Xiaoping in the early1980s Today the most prominent SEZs in China are Shenzhen & Pudong, a district of Shanghai However, India’s first EPZ was set up in Kandla (Gujarat) in 1965 followed by Santacruz (Mumbai) in 1973
  • 3.
    Historical background Fourmodernizations – Liberalization of Agriculture; Rural & Town Industrialization through Defence, Urban & Area Export-oriented enterprises through SEZs. Importance of the last in faster economic growth, modernization of Industry & Trade and export growth Policy of preferred regions – unequal growth – open-door policies Hong Kong and East Asian factors Overriding approach based on Deng’s Observation: “For us to establish SEZs and adopt open-door policies, we must have a clear guiding ideology: that is, “Not to constrain but to release”
  • 4.
    Experience with EPZsStarting with Kandla in 1965; SEEPZ in 1972, Based on reviews of working, Cochin, Falta, Madras (Chennai) and NOIDA in 1984 and Vizag in 1989 Very limited impact Less than 40% of approvals fructified, rest cancelled or lapsed Employed only 0.01% of labour force FDI was less than 20% of total investment Accounted for less than 4% of exports. Net export much lower as imports were over 60% of exports
  • 5.
  • 6.
    The concept ofSEZ is expected to bring large dividends to the State in terms of economic and industrial development and the generation of new employment opportunities. The SEZs are expected to be engines for economic growth.. Special Economic Zone (SEZ) is defined as "a specifically delineated duty free enclave and shall be deemed to be foreign territory for the purposes of trade operations and duties and tariffs" . Special Economic Zone is one or more areas of a country where the tariffs and quotas are eliminated and bureaucratic requirements are lowered so that more companies are attracted to the area. The companies establishing in the area also get extra incentives for doing business. SEZs are an acknowledgement of the potential of export-led development strategy in accelerating economic growth. Government of India have notified Special Economic Zones (SEZs) Act 2005 and notified Special Economic Zone Rules 2006 with a view to augmenting infrastructure facilities for export production. Setting up of Special Economic Zones are permitted in the public, private, joint sector or by the State Governments. What is a SEZ ?
  • 7.
    Incentives and facilitiesoffered to the SEZs The incentives and facilities offered to the units in SEZs for attracting investments into the SEZs, including foreign investment include:- Duty free import/domestic procurement of goods for development, operation and maintenance of SEZ units 100% Income Tax exemption on export income for SEZ units under Section 10AA of the Income Tax Act for first 5 years, 50% for next 5 years thereafter and 50% of the ploughed back export profit for next 5 years. Exemption from minimum alternate tax under section 115JB of the Income Tax Act. External commercial borrowing by SEZ units upto US $ 500 million in a year without any maturity restriction through recognized banking channels. Exemption from Central Sales Tax. Exemption from Service Tax. Single window clearance for Central and State level approvals. Exemption from State sales tax and other levies as extended by the respective State Governments.  
  • 8.
    SEZ Approval Consequent upon the SEZ Rules coming into effect w.e.f. 10th February, 2006, Twenty-five meetings of the Board of Approvals have since been held.  During these meetings, formal approval has been granted to  462 SEZ proposals.  There are 135 valid in-principle approvals.   Out of the 462 formal approvals, 222 SEZs have been notified. Benefits derived from SEZs Benefit derived from SEZs is evident from the investment, employment, exports and infrastructural developments additionally generated.  The benefits derived from multiplier effect of the investments and additional economic activity in the SEZs and the employment generated thus will far outweigh the tax exemptions and the losses on account of land acquisition.  Stability in fiscal concession is absolutely essential to ensure credibility of Government intensions. Exports from the functioning SEZs during the last five years : Year Value (Rs. Crore) Growth Rate ( over previous year ) 2003-2004 13,854 39% 2004-2005 18,314 32% 2005-2006 22 840 25% 2006-2007 34,615 52% 2007-2008 66,638 92%
  • 9.
    SEZ Policy of2000 New Policy in April 2000. SEZs permitted to be set up in the public, private, joint sector or by the State Governments Minimum size of 1000 hectares (4 sq. miles) Simplified procedures and more incentives Main measures were: Conditions for automatic approval relaxed considerably Customs procedures simplified Units could produce items reserved for SSI units in domestic market 100% FDI investment for manufacturing Profits could be repatriated fully Freedom for sub-contracting 100% I.T. exemption for five years Exemption from Central Excise Duty on capital goods, raw materials, consumable spares from domestic market Reimbursement of CST paid on domestic purchases
  • 10.
    Evolution : fromEPZs to SEZs Deficiencies in EPZ policy were : Limited power of Zonal authorities Absence of single window facility within the Zone Rigid custom procedure for bondings & bank guarantees Restrictive FDI policy Procedural constraints & severe infrastructural deficiencies During 1991-2000, wide-ranging measures were initiated by the GoI for revamping and restructuring EPZs. This phase was thus marked by progressive liberalisation of policy provisions and relaxation in the severity of controls and simplification of procedures.
  • 11.
    Focus had beenon delegating powers to zone authorities, providing additional fiscal incentives, simplifying policy provisions and providing greater facilities. The EXIM Policy (1997-2002) introduced a new scheme from April 1, 2000 for establishment of the Special Economic Zones (SEZs) in different parts of the country. From November 1, 2000 the EPZs at Kandla, Santa Cruz (Mumbai), Cochin and Surat have been converted into SEZs. In 2003, other existing EPZs namely, Noida, Falta, Chennai, Vizag were also converted into SEZs. As on June 2005, 53 SEZs have been approved by the Government of India out of which 11 SEZs are functional and the rest 42 SEZs are under establishment. Contd………. Evolution : from EPZs to SEZs
  • 12.
    Functional SEZs atpresent At present there are eight functional SEZs located at: SantaCruz (Maharashtra), Cochin (Kerala), Kandla and Surat (Gujarat), Chennai (Tamil Nadu), Visakhapatnam (Andhra Pradesh), Falta (West Bengal) & Nodia (Uttar Pradesh) in India. Further a SEZ at Indore (Madhya Pradesh ) is now ready for operation.
  • 13.
    In addition 18approvals have been given for setting up of SEZ at Positra (Gujarat), Navi Mumbai and Kopata (Maharashtra), Nanguneri (Tamil Nadu), Kulpi and Salt Lake (West Bengal), Paradeep and Gopalpur (Orissa), Bhadohi, Kanpur, Moradabad and Greater Noida (U.P), Vishakhapatnam and Kakinada (Andhra Pradesh), Vallarpadam/Puthuvypeen (Kerala) Hassan (Karnataka), Jaipur and Jodhpur (Rajasthan) on the basis of proposals received from the State Governments. Functional SEZs at present Contd……….
  • 14.
    Agriculture: Its functionin Indian economy Agriculture (a term which encompasses farming) is the process of producing food, feed, fiber and other goods by the systematic raising of plants and animals. India has a labour force of 509.3 million. 60% of which is employed in agriculture and related industries. agricultural crops include rice, wheat, oilseed, cotton, jute, tea, sugarcane, and potatoes. The agricultural sector accounts for 28% of GDP. Service and industrial sectors make up 54% and 18% respectively. Agriculture accounts for 8.56 % of India’s exports. About 43 % of India's geographical area is used for agricultural activity. Agriculture is still the largest economic sector and plays a significant role in the overall socio-economic development of India
  • 15.
    SEZ: Independent forceto boost Indian Economy  SEZ is a better proposition . SEZ policy is nowhere in conflict with agriculture sector. In fact it’s a lucrative proposition. India will have to gear-up with its modernization and reformation of agriculture sector to make it competent and profitable globally. Wal-Mart’s role in Indian agriculture would be one such step to make the farmers use modern technology to make them eligible for profit sharing partnership proposal. That depends on the efforts that government of India and its population put in. The SEZ conflict with agriculture as of now seems more like a political war fought with the help of pawns for immediate political mileage.
  • 16.
    Positive Impacts ToNation World class business environment Increased FDI Higher economic growth Infrastructural development Export growth Employment Opportunities Exposure to technology and global markets
  • 17.
    Positive Impacts TOBusiness houses Hassle free operating environment Single window clearance Simplified procedure for setting up business, compliance proc with with self certification Duty free import Tax exemption- VAT, CST, ST, other levies External commercial borrowings 100% profit reptriation from export earnings
  • 18.
    Positive Impacts ToPeople Employement opportunities Impact on lifestyle and standard of living Business infrastructure combined with social facilities Better work culture , good education, leadership vision
  • 19.
    Hurdles To NationLoss of revenue
  • 20.
    Hurdles To BusinessLand acquisition Single window actually is not No strategic planning for electicity, water
  • 21.
    Hurdles To PeopleGrabbing of fertile land Water scarcity- Threat to access Food scarcity Exploitation of labour Landless farmers
  • 22.
    Hurdles To EnvironmentMangrove destruction Destruction of ground water recharge system Pollution
  • 23.
  • 24.
    Definitions in Special Economic Zones Act,2005 " Unit" means a Unit set up by an entrepreneur in a Special Economic Zone and includes an existing Unit, an Offshore Banking Unit and a Unit in an International Financial Services Centre, whether established before or established after commencement of this Act (Section 2(zc) of Special Economic Zones Act ,2005) “ Offshore Banking Unit” means a branch of a bank located in a Special Economic Zone and which has obtained the permission under clause ( a ) of sub-section ( 1 ) of section 23 of the Banking Regulation Act, 1949 (Section 2(u) of Special Economic Zones Act ,2005)
  • 25.
    DEFINITIONS contd..“ International Financial Services Centre” means an International Financial Services Centre which has been approved by the Central Government under sub-section ( 1 ) of section 18 (Section 2(q) of Special Economic Zones Act ,2005) “ entrepreneur” means a person who has been granted a letter of approval by the Development Commissioner under sub-section ( 9 ) of section 15 (Section 2(j) of Special Economic Zones Act ,2005) “ existing Unit” means every Unit which has been set up on or before the commencement of this Act (Section 2(l) of Special Economic Zones Act ,2005)
  • 26.
    New and ExistingUnit New Unit Any person, who intends to set up a Unit for carrying on the authorised operations in a Special Economic Zone, may submit a proposal to the Development Commissioner concerned Existing Unit An existing Unit shall be deemed to have been set up in accordance with the provisions of SEZ Act,2005 and such Units shall not require approval under the SEZ Act, 2005 . (Section 15(1) of SEZ Act,2005)
  • 27.
    Procedure for establishmentof Unit ( if proposal not related to Foreign collaboration and FDI ) Application to Development Commissioner with a copy to developer Development Commissioner shall scrutinise proposal and place before approval committee Approval Committee approve the proposal Development Commissioner will issue a letter of approval in Form G for setting up the unit
  • 28.
    Procedure for establishmentof Unit ( if proposal relates to Foreign collaboration and FDI ) Application to Development Commissioner with a copy to developer Development Commissioner shall scrutinise proposal and place before Board Board shall approve the proposal Development Commissioner will issue a letter of approval in Form G for setting up the unit
  • 29.
    Letter of Approvalto a Unit-Rule 19(2) and (3) What is a Letter Validity of a Letter The Letter of Approval shall be valid for one year within which period the Unit shall commence production or service or trading or Free Trade and Warehousing activity .(Rule 19(4) of SEZ Rules ,2006)
  • 30.
    Foreign Companies inSEZ- Rule 19(7) Foreign companies can also set up manufacturing units as their branch operations in the Special Economic Zones in accordance with the provisions of Foreign Exchange Management (Foreign exchange derivatives contracts) Regulations, 2000.
  • 31.
    Some Contents ofProject Report Overview of the entire project Details of Activities proposed Direct and indirect employment likely to be generated Project cost and means of finance Financial/Technical, etc. tie ups Details of Backward and Forward integrations Details of Past experience Infrastructure: About the Land, Factory premises, Equipment, Office premises Risks associated with Project Implementation schedule
  • 32.
    Matters that canbe included in application- Rule 17(1) (a) Setting up of unit in a SEZ (b) Annual permission for sub-contracting (c) Allotment of Importer-Exporter Code number (d) Allotment of land/industrial sheds in the SEZ (e) Water connection (f) Registration-cum-Membership Certificate (g) Small Scale Industries Registration
  • 33.
    Matters that canbe included in application Rule 17(1) contd.. (h) Registration with Central Pollution Control Board (i) Power connection (j) Building approval plan (k) Sales tax registration (l) Approval from inspectorate of factories (m) Pollution control clearance, wherever required; (n) Any other approval as may be required from the State Government
  • 34.
    Guidelines for CentralGovernment for notifying special Economic Zone –sec 5 a) generation of additional economic activity b) promotion of exports of goods and services; c) promotion of investment from domestic and foreign sources; d) creation of employment opportunities; e) development of infrastructure facilities; and f) maintenance of sovereignty and integrity of India, the security of the State and friendly relations with foreign States.  
  • 35.
    Specific requirements forSEZ-Rule 5(5) Before recommending any proposal for setting up of a SEZ, the State Government endeavor that following are made available in the State to the proposed SEZ and Developer exemption from the State and local taxes, levies and duties exemption from electricity duty or taxes on sale, of self generated or purchased electric power allow generation, transmission and distribution of power within a SEZ
  • 36.
    Specific requirements forSEZ – Rule 5(5) …. providing water, electricity and such other services, Delegation of power to the Development Commissioner under the Industrial Disputes Act, 1947 and other related Acts in relation to the Unit Declaration of the Special Economic Zone as a Public Utility Service under the Industrial Disputes Act, 1947 Providing single point clearance system to the Developer and unit under the State Acts and rules
  • 37.
    Forms used A Application for setting up SEZ B Format for letter of approval for SEZ developers C Format for Letter of approval for providing Infrastructure facilities in SEZ D Bond-cum Legal Undertaking for developers E Format for Quarterly and half-yearly report for SEZ developer/co-developer to be furnished to Development commissioner
  • 38.
    Forms used Contd.. F Consolidated Application Form G Format for letter of approval for Unit H Bond-cum Legal Undertaking for SEZ unit I Annual Performance report for units J Form for Appeal K Permanent Identity Card
  • 39.
    Check list forthe proposals to be taken up by BOA Name of the Developer. Proposed area of the location of the SEZ. Status of recommendation of the proposal by the State Government (if available). Whether proposal is for formal or in-principle approval? (In case land is in possession of the promoter, it is considered for formal approval) Is it a multi-product SEZ? If it is a sector specific SEZ, the sector is. Whether it meets the area requirements. Area of the SEZ (in hectares)
  • 40.
    Check list forthe proposals to be taken up by BOA … Whether Form- A has been filed? Whether undertaking and affidavit has been submitted? Whether project report has been submitted? Whether land is owned/leased and is in possession of the Developer? Does the proposal meet the area requirements of the Rules? Whether the land has existing structures or is vacant? Whether the land is contiguous? Projected investment in the project.
  • 41.
    Check list forthe proposals to be taken up by BOA…. Projected exports from the project. Projected employment from the project. Share capital and Reserves of the Developer Company. Source of funds for the project. Audited Accounts of the Developer for last 3 years (for all the constituents in case the Developer is a SPV). Extent of FDI Source of FDI Whether provisions contained in the Press Note No. 5 (2005 Series), issued by the Ministry of Commerce and Industry have been followed in respect of Telecom/IT SEZ development?
  • 42.
    Processing and NonProcessing area The areas falling within the Special Economic Zones may be demarcated by the Central Government as- (a) the processing area for setting up Units for activities, being the manufacture of goods, or rendering services; or (b) the area exclusively for trading or warehousing purposes; or (c) the non-processing areas for activities other than those specified under clause (a) or clause (b) ( Section 6 of SEZ Act,2005) The processing area and Free Trade and Warehousing Zone shall be fully secured by boundary wall with specified entry and exit points. – Rule 11(2) of SEZ Rules ,2006)
  • 43.
    Usage of Landin SEZ-Rule 11 The developer holding land on lease basis shall assign lease hold right to the entrepreneur holding valid Letter of Approval.(Rule 11(6)) The lease period shall be co-terminus with the validity of the Letter of Approval.(Rule 11(5)) Developer may grant on lease land or built up space, for creating facilities such as canteen, public telephone booths, first aid centres, creche and such other facilities as may be required for the exclusive use of the Unit. .( Proviso to Rule 11(5))
  • 44.
    Usage of Landin SEZ-Rule 11 The Developer may allot land in the processing area on lease basis to a person desiring to create infrastructure facilities for use by the prospective Units. (Rule 11(8)) The Developer shall not sell the land in a Special Economic Zone. (Rule 11(9))
  • 45.
    New Rule11(10) Novacant land in the non-processing area shall be leased for business and social purposes such as educational institutions, hospitals, hotels, recreation and entertainment facilities, residential and business complexes, to any person except a co-developer approved by the Board : Provided that the developer or co-developer may lease the completed infrastructure along with the vacant land appurtenant thereto for such purposes Provided further that infrastructure for business or social purposes in the Special Economic Zone, as may be approved by the Board, shall be eligible for exemptions, concessions and drawback.”.
  • 46.
    Procedure for settingup SEZ -Sec 15 Any person, who intends to set up a Special Economic Zone, may, after identifying the area make a proposal in Form A to either of the following a)State Government concerned b) Board of Approval 25 Copies of Form A are to be given along with Project report outlining the economic and commercial viability of the project No application fees
  • 47.
    Suo moto setup of SEZ Central Government may:- (a) after consulting the State Government concerned; (b) without referring the proposal for setting up the Special Economic Zone to the Board; and (c) after identifying the area; suo moto set up and notify the Special Economic Zone (Proviso to sub section 4 of section 3 of SEZ Act ,2005)
  • 48.
    Flow Chart forSetting up SEZ SEZ can be formed in two ways By Applying to SG By applying to Board of Approval SG forward the Proposal to BOA Obtain the concurrence of SG BOA approves the proposal SG=Sate Government
  • 49.
    Flow Chart forSetting up SEZ contd .. Central Government shall issue letter of Approval to developer Developer shall furnish to Central Government information about area Central Government will notify the area as SEZ
  • 50.
    Contents of FormA Location of SEZ Distance from the nearest Sea Port/Air Port/Rail or Road Details of Lease of Land Proposed investment details Means of financing Equity holdings Details of areas (Processing areas and non-processing area) used for various purposes in SEZ Activities Proposed in Processing and non-processing area Details of employment likely to be generated
  • 51.
    Kinds of SEZ Kinds of SEZ SEZ for multi-product SEZ for specific sector SEZ in a port or airport
  • 52.
    Minimum Contiguous Area Requirement Type Area for specific states/UT Min.Processing Area Multi-product 1000 hectares 200 hectares 25 % (old) 35% (new) ( may be relaxed to 25% by CG on Board recommendation) Multi -services 100 hectares 100 hectares 25% Sector specific 100 hectares 50 hectares 50% Electronic Hardware and software 10 hectares( and min. built up area of 1 lakh sq.mtrs) 10 hectares and min. built up area of 1 lakh sq.mtrs) 50%
  • 53.
    Minimum Contiguous Area Requirement Type Area for specific states/UT Min.Processing Area Bio- technology/ Non- conventional energy 10 hectares (old) 10 hectares( with a min. built up area of 40000 sq.m) (new) 10 hectares (old) 10 hectares( with a min. built up area of 40000 sq.m) (new) 50 % Gems and jewellery sector 10 hectares (old) 10 hectares( with a min. built up area of 50000 sq.m) (new) 10 hectares (old) 10 hectares ( with a min. built up area of 50000 sq.m) (new) 50 %
  • 54.
    Minimum Contiguous Area Requirement Type Area for specific states/UT Min.Processing Area Free Trade and Warehousing Zone - Stand alone 40 hectares (with 1 Lac square meter built up area) 40 hectares (with 1 Lac square meter built up area) 50 %(new) Free Trade and Warehousing Zone - SEZ for a specific sector No minimum area requirement but subject to max area not exceeding 20% of the processing area No minimum area requirement but subject to max area not exceeding 20% of the processing area
  • 55.
    Minimum Contiguous AreaRequirement SEZ Amendment Rules,2006 ( came into force on 10.08.2006) 1. Minimum processing area for multi- product shall be at least thirty-five per cent of the area which may be relaxed up to twenty-five per cent by the Central Government on recommendations of the Board for the reasons to be recorded in writing
  • 56.
    SEZ Amendment Rules,2006…SPECIAL SECTOR 1. the area shall be ten hectares or more with a minimum built-up area as under :            ( i )  forty thousand square meters in case of a Special Economic Zone proposed to be set up exclusively for bio-technology and non-conventional energy sectors including solar energy equipments/cells but excluding a Special Economic Zone set up for non-conventional energy production and manufacturing;
  • 57.
    SEZ Amendment Rules,2006…(ii) fifty thousand square meters in case of a Special Economic Zone proposed to be set up exclusively for the gems and jewellery sector.”
  • 58.
    SEZ Amendment Rules,2006…FREE TRADE AND WAREHOUSING ZONES In a stand alone Free Trade and Warehousing Zone at least fifty per cent of the area shall be earmarked for developing processing area : “ Provided further that a Free Trade and Warehousing Zone may also be set up as part of a Special Economic Zone for multi-product;”
  • 59.
    SEZ Amendment Rules,2006…Rule 5A . Infrastructure requirements relating to information technology In case of a Special Economic Zone relating to information technology, the following facilities shall be ensured, namely :—           ( a )  twenty-four hours uninterrupted power supply at stable frequency in the zone;           ( b )  reliable connectivity for uninterrupted and secure data transmission;           ( c )  provision for central air-conditioning system and       ( d )  a ready to use, furnished plug and pay facility for end users.”.
  • 60.
    Rule 18(4) (g)No proposal shall be considered for: “ the use of any plant or machinery previously used for any purpose in Domestic Tariff Area.”
  • 61.
    Area conversion factors 1 Acre = 0.404686 Hectare 1 Hectare = 2.47109 Acres 1 Sq. Km. = 0.38610 Sq. Mile 1 Sq. Km. = 100 Hectares 1 Sq. Mile = 2.58999 Sq. Kms
  • 62.
  • 63.
    What is corporateFarming Corporate farming is a term that describes the business of agriculture. Specifically, what is seen by some as the practices of would-be mega corporations involved in food production on a very large scale. It is a modern food industry issue, and encompasses not only the farm itself, but also the entire chain of agriculture-related business, including seed supply, agrichemicals, food processing, machinery, storage, transport, distribution, marketing, advertising, and retail sales.
  • 64.
    Flow of Corporatefarming Critics argue that the ultimate goal of corporate farming is to vertically integrate the entire process of food production, from the development of proprietary strains of DNA through to the distribution and sale of food to consumers. Some corporations are considered to be well on the way to achieving this objective, and have become very large in the process, such as Archer Daniels Midland and the privately held Cargill, with 2004 revenues of $62.9 billion. citation needed ] "Corporate farming" is a fairly broad term that deals with the general practices and effects of a small number of large, global corporations that dominate the food industry. It does not refer simply to any incorporated agribusiness enterprise, although most agricultural businesses today are in some way economically connected to the dominant food industry players. As such, it may be thought of as a movement, which is at times also referred to as "anti-corporate farming".
  • 65.
    Benefits of CorporateFarming The core argument for the methods criticized as corporate farming is essentially: "This is the way to keep up with population growth, and to make inroads into feeding billions of people to developed nation standards— this is the only way to feed the world ." Indeed, rapid technological development and large-scale global production management are responsible for an unprecedented abundance of inexpensive, widely available, attractive, "safe" food. By lowering the cost of raw food inputs, creating sophisticated long-distance distribution networks, producing processed convenience foods, and making food available year-round in vastly stocked supermarkets , corporate farming has presented consumers in the wealthiest regions of the world with an immense variety of food, at relatively low cost. Today, in North America , only about 10% of average income is spent on food. By this measure, provided these methods are sustainable , corporate farming would appear to be a tremendous success
  • 66.
    Corporate farming inIndia "Corporate farming" is a fairly broad term that deals with the general practices and effects of a small number of large, global corporations that dominate the food industry. It does not refer simply to any incorporated agribusiness enterprise, although most agricultural businesses today are in some way economically connected to the dominant food industry players. As such, it may be thought of as a movement, which is at times also referred to as "anti-corporate farming".
  • 67.
    India to promotecorporate contract farming Commodity Online NEW DELHI: Worried over the slow growth in agricultural sector, the government is planning for expansion in corporate contract farming. Minister of State for Food Processing Subodh Kant Sahai said the government is open to corporate contract farming. While domestic corporate bigwigs such as Reliance and Bharti have already taken up the contract farming route to feed their retail chains, global majors Wal-Mart, Tesco and Carrefour are also eyeing foray into India retail.
  • 68.
    Corporate contract farminghas taken off in states like Punjab, Haryana, Maharashtra and Gujarat. Providing the private sector a more level playing field would help raise the country’s overall farm goods’ processing level, the minister said. So far, 17 states have made a provision for contract farming in their respective Agricultural Produce Marketing Committee Act to provide legal framework. In seven more states, there exist no regulatory laws preventing such an arrangement.
  • 69.
    India’s is world’ssecond largest producer of fruit and vegetables. Its annual post harvest loss on fresh fruit and vegetables on lack of processing facilities has been pegged at Rs 40,000 crore. The minister prescribed market-oriented farming to minimise post-harvest loss. Large-scale corporate farming will also lift the food processing sector. During the 11th Five Year Plan (2007-12), the growth target for the food processing sector is 7 per cent, while agriculture sector is seen growing only at 4 per cent.
  • 70.
    Every bit offarm produce should be viewed as processing raw material, Sahai said. India aims at raising the level of food processing in farm products to 20 per cent by 2015 from the current 6 per cent. Underscoring the critical role of states in raising the country’s overall food processing level, the minister said that states should adopt a fresh look at their agricultural policy. The ministry has written to all chief ministers to accord high priority to food processing in a bid to raise rural income.
  • 71.
    SEZs IN CHINADevelopment over the years Started soon after beginning of reforms in 1978. Four SEZs started in 1979 – three in Guangdong adjacent to Hong Kong and one at Xiamen in Fujian Heavy government investment in infrastructure. Each zone could introduce its own Regulation to grow investment, approvals and tax concessions. Based on the success, in 1984, the SEZ benefits were extended to 14 coastal open cities. Economic & Technology Development Zones (ETDZ) and High Tech and New Technology Industry Development Zones encouraged in coastal open cities. In 1985, three development triangles – Pearl River Delta (PRD), the Yangtze River Delta (around Shanghai) and Minum Delta (around Xiamen) were designated as coastal open areas. Hainan Island was declared as fifth SEZ in 1988
  • 72.
    REASONS FOR SUCCESSUnique locations – of the five SEZs, Shenshen, Shantou and Zhuhai are in Guangdong Province adjoining Hong Kong. Fourth, Xiamen, is in Fujian Province and nearer Taiwan. Large size with government and local authorities providing improved infrastructure with foreign collaboration Attractive incentive packages for foreign investment. Liberal customs procedures. Flexible Labor Laws providing for contract appointments for specified periods. Powers to Provinces and local authorities to frame additional guidelines and in administering the Zones.
  • 73.
    SEZs IN INDIASEZs in India Experience with EPZs Starting with Kandla in 1965; SEEPZ in 1972, based on reviews of working, Cochin, Falta, Madras (Chennai) and NOIDA in 1984 and Vizag in 1989 Very limited impact Less than 40% of approvals fructified Rest cancelled or lapsed Employed only 0.01% of labour force FDI was less than 20% of total investment Accounted for less than 4% of exports. Net export much lower as imports were over 60% of exports
  • 74.
    REASONS FOR FAILURESEZs in India Inadequate infrastructure Restrictive policies Lengthy procedures – No Single Window Locational disadvantages Stringent labour laws - In the 1990s, as a part of reforms, powers delegated to zone authorities, additional fiscal incentives were given, policy provisions were simplified and greater facilities were provided leading to some, not very significant, improvements.
  • 75.
    SMALL SIZE OFEPZs Location Size (Sq.miles) Kandla (Gujarat) 1.17 SEEPZ (Mumbai) 0.15 Cochin (Kerala) 0.16 NOIDA (UP) 0.48 Chennai (TN) 0.41 Vizag (AP) 0.56 Falta (WB) 0.44
  • 76.