What are the
New Seven Q.C. Tools
Affinity Diagrams
Relations Diagrams
Tree Diagrams
Matrix Diagrams
Arrow Diagrams
Process Decision Program Charts
Matrix Data Analysis
History of the
New Seven Q.C. Tools
Committee of J.U.S.E. - 1972
Aim was to develop more QC
techniques with design approach
Work in conjunction with original Basic
Seven Tools
New set of methods (N7) - 1977
Slide 1 0f 2
History of the
New Seven Q.C. Tools
Developed to organize verbal data
diagrammatically.
Basic 7 tools effective for data analysis,
process control, and quality
improvement (numerical data)
Used together increases TQM
effectiveness
Slide 2 0f 2
What are the
Basic Seven Q.C. Tools?
Flow Charts
Run Charts
Histograms
Pareto Diagrams
Cause and Effect Diagrams
Scatter Diagrams
Control Charts
Relation Between New Seven
Q.C. Tools and Basic Seven
Tools
FACTS
Data
Numerical Data Verbal Data
Organize
The Seven New Tools
Information
The Basic Seven Tools
•Generate Ideas
•Formulate plans
•Analytical approach
Define problem after
collecting numerical data
Define problem before
collecting numerical data
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
Enhanced Capabilities
Generate ideas
Improve planning
Eliminate errors and omissions
Explain problems intelligibly
Secure full cooperation
Persuade powerfully
Benefits of Incorporating
New Seven Q.C. Tools
Organize verbal data
Slide 1 0f 4
Enhanced Keys to Organizational Reform
Clarify the desired situation
Prioritize tasks effectively
Proceed systematically
Anticipate future events
Change proactively
Get things right the first time
Benefits of Incorporating
New Seven Q.C. Tools
Assess situations from various angles
Slide 2 0f 4
Five Objectives of Organizational Reform
which will establish a Culture that:
Gives importance to planning
Stresses the importance of the process
Prioritizes tasks
Encourages everyone to think
systematically
Benefits of Incorporating
New Seven Q.C. Tools
Slide 3 0f 4
Identifies problems
Benefits of Incorporating
New Seven Q.C. Tools
Unstructured Problem [must be put into solvable form]
Problem is mapped
Problem becomes
obvious to all
Problem is in solvable form
Slide 4 0f 4
The Seven New Tools
Thoughts are
easily organized
Things go well
People understand
problem
Cooperation is
obtained
Countermeasures
are on target
Problem becomes
obvious to all
Nub of problem
is identified
Problem can be
clearly articulated
Plans are
easily laid
Nothing is
omitted
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Affinity Diagrams
For Pinpointing the Problem in a Chaotic
Situation and Generating Solution Strategies
Gathers large amounts of intertwined
verbal data (ideas, opinions, issues)
Organizes the data into groups based
on natural relationship
Makes it feasible for further analysis
and to find a solution to the problem.
Slide 1 0f 7
New Seven Q.C. Tools
Affinity Diagrams
Advantages of Affinity Diagrams
Facilitates breakthrough thinking and
stimulate fresh ideas
Permits the problem to be pinned down
accurately
Ensures everyone clearly recognizes the
problem
Incorporates opinions of entire group
Slide 2 0f 7
New Seven Q.C. Tools
Affinity Diagrams
Advantages of Affinity Diagrams (cont.)
Fosters team spirit
Raises everyone’s level of awareness
Spurs to the group into action
Slide 3 0f 7
Topic
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Data Card Data Card
New Seven Q.C. Tools
Affinity Diagrams
Constructing an Affinity Diagram
Group Method Approach
Slide 4 0f 7
Select a topic
Collect verbal data by brainstorming
Discuss info collected until everyone
understands it thoroughly
Write each item on separate data card
Spread out all cards on table
New Seven Q.C. Tools
Affinity Diagrams
Constructing an Affinity Diagram
Group Method Approach (cont.)
Slide 5 0f 7
Move data cards into groups of similar
themes (natural affinity for each other)
Combine statements on data cards to
new Affinity statement
Make new card with Affinity statement
Continue to combine until less than 5
groups
New Seven Q.C. Tools
Affinity Diagrams
Constructing an Affinity Diagram
Group Method Approach (cont.)
Slide 6 0f 7
Lay the groups outs, keeping the affinity
clusters together
Next, complete the diagram
New Seven Q.C. Tools
Affinity Diagrams
Completing an Affinity Diagram
Slide 7 0f 7
Topic
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Affinity Statement
Data Card
Data Card
Data Card
Data Card
Data Card Data Card
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Relations Diagrams
For Finding Solutions Strategies by Clarifying
Relationships with Complex Interrelated Causes
Resolves tangled issues by unraveling
the logical connection
Allows for “Multi-directional” thinking
rather than linear
Also known as Interrelationship
diagrams
Slide 1 0f 7
New Seven Q.C. Tools
Relations Diagrams
Advantages of Relations Diagrams
Useful at planning stage for obtaining
perspective on overall situation
Facilitates consensus among team
Assists to develop and change people’s
thinking
Enables priorities to be identified
accurately
Slide 2 0f 7
New Seven Q.C. Tools
Relations Diagrams
Advantages of Relations Diagrams (cont.)
Makes the problem recognizable by
clarifying the relationships among causes
Slide 3 0f 7
Why doesn’t
X happen?
Primary Cause
Primary Cause
Primary Cause
Primary Cause
Tertiary
Cause
Secondary
Cause
Secondary
Cause
Secondary
Cause
Secondary
Cause
Tertiary
Cause
4th level
Cause
Tertiary
Cause
Tertiary
Cause
4th level
Cause
5th level
Cause
6th level
Cause
Tertiary
Cause
Secondary
Cause
New Seven Q.C. Tools
Relations Diagrams
Constructing a Relations Diagram
Group Method Approach
Slide 4 0f 7
Express the problem in form of “Why
isn’t something happening?”
Each member lists 5 causes affecting
problem
Discuss info collected until everyone
understands it thoroughly
Write each item on a card
New Seven Q.C. Tools
Relations Diagrams
Constructing a Relations Diagram
Group Method Approach (cont.)
Slide 5 0f 7
Move cards into similar groups
Asking why, explore the cause-effect
relationships, and divide the cards into
primary, secondary and tertiary causes
Connect all cards by these relationships
Further discuss until all possible causes
have been identified
New Seven Q.C. Tools
Relations Diagrams
Constructing a Relations Diagram
Group Method Approach (cont.)
Slide 6 0f 7
Connect all related groups
Next, complete the diagram
Review whole diagram looking for
relationships among causes
New Seven Q.C. Tools
Relations Diagrams
Completing a Relations Diagram
Slide 7 0f 7
Why doesn’t
X happen?
Primary Cause
Primary Cause
Primary Cause
Primary Cause
Tertiary
Cause
Secondary
Cause
Secondary
Cause
Secondary
Cause
Secondary
Cause
Tertiary
Cause
4th level
Cause
Tertiary
Cause
Tertiary
Cause
4th level
Cause
5th level
Cause
6th level
Cause
Tertiary
Cause
Secondary
Cause
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Tree Diagrams
For Systematically Pursuing the Best Strategies
for Attaining an Objective
Develops a succession of strategies for
achieving objectives
Reveals methods to achieve the results.
Also known as Systematic diagrams or
Dendrograms
Slide 1 0f 5
New Seven Q.C. Tools
Tree Diagrams
Advantages of Tree Diagrams
Systematic and logical approach is less
likely that items are omitted
Facilitates agreement among team
Are extremely convincing with strategies
Slide 2 0f 5
To
Accomplish
Primary means
Constraints
Secondary means
Secondary means
3rd means
3rd means
3rd means
3rd means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
Discuss means of achieving objective
(primary means, first level strategy)
New Seven Q.C. Tools
Tree Diagrams
Constructing a Tree Diagram
Group Method Approach
Slide 3 0f 5
Write Relations Diagram topic (Objective
card)
Identify constraints on how objective
can be achieved
Take each primary mean, write ob-
jective for achieving it (secondary means)
New Seven Q.C. Tools
Tree Diagrams
Constructing an Tree Diagram
Group Method Approach (cont.)
Slide 4 0f 5
Continue to expand to the fourth level
Review each system of means in both
directions (from objective to means and means to
objective)
Add more cards if needed
Connect all levels
Next, complete the diagram
New Seven Q.C. Tools
Tree Diagrams
Completing a Tree Diagram
Slide 5 0f 5
To
Accomplish
3rd means
3rd means
Primary means
3rd means
3rd means
Constraints
Primary means
Secondary means
Secondary means
Secondary means
Secondary means
3rd means
3rd means
3rd means
3rd means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
4th means
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Matrix Diagrams
For Clarifying Problems by “Thinking
Multidimensionally”
Consists of a two-dimensional array to
determine location and nature of
problem
Discovers key ideas by relationships
represented by the cells in matrix.
Slide 1 0f 7
New Seven Q.C. Tools
Matrix Diagrams
Advantages of Matrix Diagrams
Enable data on ideas based on extensive
experience
Clarifies relationships among different
elements
Makes overall structure of problem
immediately obvious
Combined from two to four types of
diagrams, location of problem is clearer.
Slide 2 0f 7
New Seven Q.C. Tools
Matrix Diagrams
Advantages of Matrix Diagrams (cont.)
5 types: L-shaped, T-shaped, Y-shaped, X-
shaped, and C-shaped
Slide 3 0f 7
O O =1 O =4 Principal
O =2 O X =5 O Subsidiary
=3 X =6
Efficacy
Practicability
Rank
Site
QC
circle
Section/Plant
QC
circle
supporter
Section/Plant
Manager
Leader
Member
4th lev
el means
from Tree diagram O O 1 O
4th lev
el means
from Tree diagram O O 1 O Hold 4 times/month
4th lev
el means
from Tree diagram O 3 O At ev
ery meeting
4th lev
el means
from Tree diagram O 2 O
4th lev
el means
from Tree diagram O X 5 O At least 3 times/year/person
4th lev
el means
from Tree diagram O O 1 O O
4th lev
el means
from Tree diagram 4 O
Evaluation Responsibilities
Remarks
New Seven Q.C. Tools
Matrix Diagrams
Constructing a Matrix Diagram
Slide 4 0f 7
Write final-level means from Tree
diagram forming vertical axis
Write in Evaluation categories (efficacy,
practicability, and rank) on horizontal axis.
Write names along horizontal axis
Examine final-level means to identify
whom will implement them
New Seven Q.C. Tools
Matrix Diagrams
Constructing a Matrix Diagram (cont.)
Slide 5 0f 7
Label group of columns as “Responsibilities”
Label right-hand end of horizontal axis
as “Remarks”
Examine each cell and insert the
appropriate symbol:
Efficacy: O=good, =satisfactory, X=none
Practicability: O=good,=satisfactory, X=none
New Seven Q.C. Tools
Matrix Diagrams
Constructing a Matrix Diagram (cont.)
Slide 6 0f 7
Fill out remarks column and record
meanings of symbol
Next, complete the diagram
Examine cells under Responsibility
Columns, insert double-circle for
Principal and single-circle for Subsidiary
Determine score for each combination
of symbols, record in rank column
New Seven Q.C. Tools
Matrix Diagrams
Completing a Matrix Diagram
Slide 7 0f 7
O O =1 O =4 Principal
O =2 O X =5 O Subsidiary
=3 X =6
Efficacy
Practicability
Rank
Site
QC
circle
Section/Plant
QC
circle
supporter
Section/Plant
Manager
Leader
Member
4th lev
el means
from Tree diagram O O 1 O
4th lev
el means
from Tree diagram O O 1 O Hold 4 times/month
4th lev
el means
from Tree diagram O 3 O At ev
ery meeting
4th lev
el means
from Tree diagram O 2 O
4th lev
el means
from Tree diagram O X 5 O At least 3 times/year/person
4th lev
el means
from Tree diagram O O 1 O O
4th lev
el means
from Tree diagram 4 O
4th lev
el means
from Tree diagram O 2 O
4th lev
el means
from Tree diagram O O 1 O
4th lev
el means
from Tree diagram O O 1 O
Evaluation Responsibilities
Remarks
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Arrow Diagrams
For Working Out Optimal Schedules and
Controlling Them Effectively
Shows relationships among tasks
needed to implement a plan
Network technique using nodes for
events and arrows for activities
Used in PERT (Program Evaluation and Review
Technique) and CPM (Critical Path Method)
Slide 1 0f 7
New Seven Q.C. Tools
Arrow Diagrams
Advantages of Arrow Diagrams
Allows overall task to viewed and potential
snags to be identified before work starts
Leads to discovery of possible
improvements
Makes it easy to monitor progress of work
Deals promptly with changes to plan
Improves communication among team
Slide 2 0f 7
New Seven Q.C. Tools
Arrow Diagrams
Advantages of Arrow Diagrams (cont.)
Promotes understanding and agreement
among group
Slide 3 0f 7
Strategy
1
Constraints
Activity
2
4
3 5 9
6 8
7
10 13
12
11
New Seven Q.C. Tools
Arrow Diagrams
Constructing an Arrow Diagram
Slide 4 0f 7
From strategies on Tree diagram, select
one (Objective of Arrow Diagram)
Identify constraints to Objective
Write all essential activities on separate
cards
List all activities necessary to achieving
Objective
New Seven Q.C. Tools
Arrow Diagrams
Constructing an Arrow Diagram (cont.)
Slide 5 0f 7
Organize cards in sequential order of
activities
Remove any duplicate activities
Review order of activities, find
sequence with greatest amount of
activities
Arrange parallel activities
New Seven Q.C. Tools
Arrow Diagrams
Constructing an Arrow Diagram (cont.)
Slide 6 0f 7
Record names and other necessary
information
Next, complete the diagram
Examine path, number nodes in
sequence from left to right
New Seven Q.C. Tools
Arrow Diagrams
Completing an Arrow Diagram
Slide 7 0f 7
Strategy
1
Constraints
Activity
2
4
3 5 9
6 8
7
10 13
12
11
Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Process Decisions Program
Charts
For Producing the Desired Result from Many
Possible Outcomes
Used to plan various contingencies
Used for getting activities back on track
Steers events in required direction if
unanticipated problems occur
Finds feasible counter measures to
overcome problems
Slide 1 0f 7
Advantages of Process Decisions Program
Charts (PDPC’s)
Facilitates forecasting
Uses past to anticipate contingencies
Enables problems to pinpointed
Illustrates how events will be directed to
successful conclusion
Enables those involved to understand
decision-makers intentions
Slide 2 0f 7
New Seven Q.C. Tools
Process Decisions Program
Charts
Advantages of PDPC’s (cont.)
Fosters cooperation and communication in
group
Easily modified and easily understood
Slide 3 0f 7
New Seven Q.C. Tools
Process Decisions Program
Charts
Start
GOAL
YES
YES
NO
NO
NO
NO
NO
YES
NO
NO
Constructing a PDPC
Slide 4 0f 7
Select a highly effective, but difficult
strategy from the Tree diagram
Decide on a goal (most desirable outcome)
Identify constraints of objective
Identify existing situation (Starting point)
New Seven Q.C. Tools
Process Decisions Program
Charts
List activities to reach goal and potential
problems with each activity
Constructing an PDPC (cont.)
Slide 5 0f 7
Review list. Add extra activities or
problems not thought of previously
Prepare contingency plan for each step
and review what action is needed if
step is not achieved
Examine carefully to check for
inconsistencies and all important factors
are included
New Seven Q.C. Tools
Process Decisions Program
Charts
Constructing an PDPC (cont.)
Slide 6 0f 7
Next, complete the diagram
Examine to make sure all contingency
plans are adequate
New Seven Q.C. Tools
Process Decisions Program
Charts
Completing a PDPC
Slide 7 0f 7
New Seven Q.C. Tools
Process Decisions Program
Charts
Start
GOAL
YES
YES
NO
NO
NO
NO
NO
YES
NO
NO
Source: Nayatani,Y., The SevenNewQC Tools (Tokyo, Japan, 3A Corporation, 1984)
New Seven Q.C. Tools
Matrix Data Analysis
Principal Component Analysis
Technique quantifies and arranges data
presented in Matrix
Based solely on numerical data
Finds indicators that differentiate and
attempt to clarify large amount of
information
Slide 1 0f 6
New Seven Q.C. Tools
Matrix Data Analysis
Advantages of Principal Component Analysis
Can be used in various fields (market surveys,
new product planning, process analysis)
Can be when used when Matrix diagram
does not give sufficient information
Useful as Prioritization Grid
Slide 2 0f 6
New Seven Q.C. Tools
Matrix Data Analysis
Constructing a Prioritization Grid
Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
Slide 3 0f 6
Determine your goal, your alternatives,
and criteria for decision
Place selection in order of importance
Sum individual ratings to establish
overall ranking (Divide by number of options
for average ranking)
Apply percentage weight to each option
(all weights should add up to 1)
New Seven Q.C. Tools
Matrix Data Analysis
Constructing a Prioritization Grid (cont.)
Slide 4 0f 6
Rank order each option with respect to
criterion (Average the rankings and apply a
completed ranking)
Multiply weight by associated rank in
Matrix (in example, 4 is best, 1 is worst)
Result is Importance Score
Add up Importance Scores for each
option
New Seven Q.C. Tools
Matrix Data Analysis
Constructing a Prioritization Grid (cont.)
Slide 5 0f 6
See completed the diagram
Rank order the alternatives according to
importance
Completing a Prioritization Grid
Slide 6 0f 6
New Seven Q.C. Tools
Matrix Data Analysis
Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
Cost Reliability
Options
Design A
.30 .20
3 3
.90 .60 3.2 1 (tie)
Design B
.40 .10
4 1
1.6 .10 3.0 2
Design C
.25 .25
2 4
.50 1 2.5 3
Design D
.10 .20
1 3
.10 .60 3.2 1 (tie)
1.05 .75
.26 .19
2 4
Importance
Sum Score
Option
Ranking
(least important)
Strength
Importance score
Rank
Percentage weight
Percentage weight
Rank
Importance score
Percentage weight
Rank
Importance score
Percentage weight
Rank
Importance score
Sum of weights
Average weight
Criterion Ranking
Customer Acceptance
(most important)
.40
4
1.6
.30
3
.90
.25
1
.25
0.3
3
.90
1.25
2
.40
.25
.75
.10
1
.10
.20
.95
.24
3
Criteria
.40
4
3
1.6
.31
1
Review
New Seven Q.C. Tools
Affinity Diagrams
Relations Diagrams
Tree Diagrams
Matrix Diagrams
Arrow Diagrams
Process Decision Program Charts
Matrix Data Analysis
Mental Attitudes
- Keen awareness to the actual problem
- Eagerness to solve problem
- Be highly motivated for the challenge
Keys to Successfully Using the
New Seven Q.C. Tools
Slide 1 0f 5
Four Specific Keys
Understand the problem
Select the right tool for the job
Obtain appropriate verbal data
Interpret analytical results
Keys to Successfully Using the
New Seven Q.C. Tools
Slide 2 0f 5
Understand the problem
Stage 1 - problem is unclear and not obvious
what exact issue should be addressed
Stage 2 - problem is obvious, but causes unknown
explore causes and single out valid ones
Stage 3 - problem and causes are known
required action is unknown
strategies and plan must be developed
4 Specific Keys
Keys to Successfully Using the
New Seven Q.C. Tools
Slide 3 0f 5
Selecting Right tool for the Job
Stage 1 - Collect verbal information on events
(Affinity Diagram)
Stage 2 - Choose tool to identify causes
(Relations Diagram / Matrix Diagram)
Stage 3 - List strategies and activities
(Tree Diagram / Relations Diagram)
Plan actual activities
(Arrow Diagram / PDPC Chart)
4 Specific Keys (cont.)
Keys to Successfully Using the
New Seven Q.C. Tools
Slide 4 0f 5
Obtaining appropriate verbal data
Three types of verbal data:
- Facts; factual observations expressed in words
- Opinions; factual information colored by opinion
- Ideas; New concepts created by analyzing facts
.Group Discussions:
- Ensures common understanding
- All data should be without bias or distortion
- Data should fit objective of the analysis
4 Specific Keys (cont.)
Keys to Successfully Using the
New Seven Q.C. Tools
Slide 5 0f 5
Interpreting Analytical Results
Information must be obtained for accomplishing
objectives from:
- Completed diagrams; or
- Process of completing diagrams
Analyze actual information obtained:
- Prepare summarized report with findings,
conclusions, and processes used
- Check if necessary data has been obtained, if not
- Discover the cause and take appropriate action
4 Specific Keys (cont.)
Practical Application of
New Seven Q.C. Tools
Slide 1 0f 5
Complete the following Relations Diagram
- Review notes for clarity
- Get in groups of 4-5 per table (work as a team!)
- Topic - “Using the New Seven QC Tools skillfully”
- “Cause cards”- will be provided (not categorized)
- Arrange cards to complete diagram
(some hints have been provided)
Example; Relations Diagram
”Abilities Required for Applying New Seven QC Tools”
Practical Application of
New Seven Q.C. Tools
Slide 2 0f 5
”Abilities Required for Applying New Seven QC Tools”
Use N7
Skillfully
Primary
Cause
Primary
Cause
Primary
Cause
Primary
Cause
Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
Practical Application of
New Seven Q.C. Tools
Slide 3 0f 5
”Abilities Required for Applying New Seven QC Tools”
Cause Statements (hints are in yellow)
A Interpret data clearly N Understand seriousness of problem
B Select appropriate tool O Think flexibly from various standpoints
C Think systematically P Obtain appropriate verbal data
D Give opinions Q Expose core of problem
E Know what the problem is R Communicate well
F Extract necessary information S Accurately understand real problem
G Collect reliable verbal data T Have excellent intuition
H Think multidimensionally U See to heart of problem
I Obtain facts V Select appropriate type of verbal data
J Interpret analytical results W Think in terms of word-based diagram
K Generate ideas X Express genuine thoughts
L Know that distorted data is useless Y Hear and respect other's opinions
M Grasp overall pictured Z Generate highly accurate verbal data
Practical Application of
New Seven Q.C. Tools
Slide 4 0f 5
”Abilities Required for Applying New Seven QC Tools”
Use N7
Skillfully
Primary
Cause
Primary
Cause
Primary
Cause
B
T
R
Y
F
I
L
Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
Practical Application of
New Seven Q.C. Tools
Slide 5 0f 5
Solution for ”Abilities Required for Applying New Seven QC Tools”
Use N7
Skillfully
E
W J
P
B
T
H R
C
Z
Y
O
A
M
F S U
N
V
K
D
I Q
L
X
G
Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
Summary
New Seven Q.C. Tools
1- Provide Training in Thinking
2- Raise People’s Problem Solving Confidence
3- Increase People’s Ability to Predict Future Events
Benefits of New Seven Q.C. Tools
1- Express verbal data diagrammatically
2- Make information visible
3- Organize information intelligibly
4- Clarify overall picture and fine details
5- Get more people involved
Roles of New Seven Q.C. Tools
Bibliography
Foster, Thomas. Managing Quality. An Integrative Approach.
Upper Saddle River : Prentice Hall, 2001.
Nayatani, Yoshingobu, Eiga, Toru, Futami, Ryoji, Miyagawa,
Hiroyuki, and Loftus, John. The Seven New QC Tools: Practical
Applications for Managers. Tokyo : 3A Corporation, 1994.
“TQM: The 9 TQM Tools.” Internet
http://www.iqd.com/pfttools.htm.

Seven QC Tools New approach.pptx

  • 1.
    What are the NewSeven Q.C. Tools Affinity Diagrams Relations Diagrams Tree Diagrams Matrix Diagrams Arrow Diagrams Process Decision Program Charts Matrix Data Analysis
  • 2.
    History of the NewSeven Q.C. Tools Committee of J.U.S.E. - 1972 Aim was to develop more QC techniques with design approach Work in conjunction with original Basic Seven Tools New set of methods (N7) - 1977 Slide 1 0f 2
  • 3.
    History of the NewSeven Q.C. Tools Developed to organize verbal data diagrammatically. Basic 7 tools effective for data analysis, process control, and quality improvement (numerical data) Used together increases TQM effectiveness Slide 2 0f 2
  • 4.
    What are the BasicSeven Q.C. Tools? Flow Charts Run Charts Histograms Pareto Diagrams Cause and Effect Diagrams Scatter Diagrams Control Charts
  • 5.
    Relation Between NewSeven Q.C. Tools and Basic Seven Tools FACTS Data Numerical Data Verbal Data Organize The Seven New Tools Information The Basic Seven Tools •Generate Ideas •Formulate plans •Analytical approach Define problem after collecting numerical data Define problem before collecting numerical data Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 6.
    Enhanced Capabilities Generate ideas Improveplanning Eliminate errors and omissions Explain problems intelligibly Secure full cooperation Persuade powerfully Benefits of Incorporating New Seven Q.C. Tools Organize verbal data Slide 1 0f 4
  • 7.
    Enhanced Keys toOrganizational Reform Clarify the desired situation Prioritize tasks effectively Proceed systematically Anticipate future events Change proactively Get things right the first time Benefits of Incorporating New Seven Q.C. Tools Assess situations from various angles Slide 2 0f 4
  • 8.
    Five Objectives ofOrganizational Reform which will establish a Culture that: Gives importance to planning Stresses the importance of the process Prioritizes tasks Encourages everyone to think systematically Benefits of Incorporating New Seven Q.C. Tools Slide 3 0f 4 Identifies problems
  • 9.
    Benefits of Incorporating NewSeven Q.C. Tools Unstructured Problem [must be put into solvable form] Problem is mapped Problem becomes obvious to all Problem is in solvable form Slide 4 0f 4 The Seven New Tools Thoughts are easily organized Things go well People understand problem Cooperation is obtained Countermeasures are on target Problem becomes obvious to all Nub of problem is identified Problem can be clearly articulated Plans are easily laid Nothing is omitted Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 10.
    New Seven Q.C.Tools Affinity Diagrams For Pinpointing the Problem in a Chaotic Situation and Generating Solution Strategies Gathers large amounts of intertwined verbal data (ideas, opinions, issues) Organizes the data into groups based on natural relationship Makes it feasible for further analysis and to find a solution to the problem. Slide 1 0f 7
  • 11.
    New Seven Q.C.Tools Affinity Diagrams Advantages of Affinity Diagrams Facilitates breakthrough thinking and stimulate fresh ideas Permits the problem to be pinned down accurately Ensures everyone clearly recognizes the problem Incorporates opinions of entire group Slide 2 0f 7
  • 12.
    New Seven Q.C.Tools Affinity Diagrams Advantages of Affinity Diagrams (cont.) Fosters team spirit Raises everyone’s level of awareness Spurs to the group into action Slide 3 0f 7 Topic Affinity Statement Data Card Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Data Card Data Card Data Card
  • 13.
    New Seven Q.C.Tools Affinity Diagrams Constructing an Affinity Diagram Group Method Approach Slide 4 0f 7 Select a topic Collect verbal data by brainstorming Discuss info collected until everyone understands it thoroughly Write each item on separate data card Spread out all cards on table
  • 14.
    New Seven Q.C.Tools Affinity Diagrams Constructing an Affinity Diagram Group Method Approach (cont.) Slide 5 0f 7 Move data cards into groups of similar themes (natural affinity for each other) Combine statements on data cards to new Affinity statement Make new card with Affinity statement Continue to combine until less than 5 groups
  • 15.
    New Seven Q.C.Tools Affinity Diagrams Constructing an Affinity Diagram Group Method Approach (cont.) Slide 6 0f 7 Lay the groups outs, keeping the affinity clusters together Next, complete the diagram
  • 16.
    New Seven Q.C.Tools Affinity Diagrams Completing an Affinity Diagram Slide 7 0f 7 Topic Affinity Statement Data Card Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Affinity Statement Data Card Data Card Data Card Data Card Data Card Data Card Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 17.
    New Seven Q.C.Tools Relations Diagrams For Finding Solutions Strategies by Clarifying Relationships with Complex Interrelated Causes Resolves tangled issues by unraveling the logical connection Allows for “Multi-directional” thinking rather than linear Also known as Interrelationship diagrams Slide 1 0f 7
  • 18.
    New Seven Q.C.Tools Relations Diagrams Advantages of Relations Diagrams Useful at planning stage for obtaining perspective on overall situation Facilitates consensus among team Assists to develop and change people’s thinking Enables priorities to be identified accurately Slide 2 0f 7
  • 19.
    New Seven Q.C.Tools Relations Diagrams Advantages of Relations Diagrams (cont.) Makes the problem recognizable by clarifying the relationships among causes Slide 3 0f 7 Why doesn’t X happen? Primary Cause Primary Cause Primary Cause Primary Cause Tertiary Cause Secondary Cause Secondary Cause Secondary Cause Secondary Cause Tertiary Cause 4th level Cause Tertiary Cause Tertiary Cause 4th level Cause 5th level Cause 6th level Cause Tertiary Cause Secondary Cause
  • 20.
    New Seven Q.C.Tools Relations Diagrams Constructing a Relations Diagram Group Method Approach Slide 4 0f 7 Express the problem in form of “Why isn’t something happening?” Each member lists 5 causes affecting problem Discuss info collected until everyone understands it thoroughly Write each item on a card
  • 21.
    New Seven Q.C.Tools Relations Diagrams Constructing a Relations Diagram Group Method Approach (cont.) Slide 5 0f 7 Move cards into similar groups Asking why, explore the cause-effect relationships, and divide the cards into primary, secondary and tertiary causes Connect all cards by these relationships Further discuss until all possible causes have been identified
  • 22.
    New Seven Q.C.Tools Relations Diagrams Constructing a Relations Diagram Group Method Approach (cont.) Slide 6 0f 7 Connect all related groups Next, complete the diagram Review whole diagram looking for relationships among causes
  • 23.
    New Seven Q.C.Tools Relations Diagrams Completing a Relations Diagram Slide 7 0f 7 Why doesn’t X happen? Primary Cause Primary Cause Primary Cause Primary Cause Tertiary Cause Secondary Cause Secondary Cause Secondary Cause Secondary Cause Tertiary Cause 4th level Cause Tertiary Cause Tertiary Cause 4th level Cause 5th level Cause 6th level Cause Tertiary Cause Secondary Cause Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 24.
    New Seven Q.C.Tools Tree Diagrams For Systematically Pursuing the Best Strategies for Attaining an Objective Develops a succession of strategies for achieving objectives Reveals methods to achieve the results. Also known as Systematic diagrams or Dendrograms Slide 1 0f 5
  • 25.
    New Seven Q.C.Tools Tree Diagrams Advantages of Tree Diagrams Systematic and logical approach is less likely that items are omitted Facilitates agreement among team Are extremely convincing with strategies Slide 2 0f 5 To Accomplish Primary means Constraints Secondary means Secondary means 3rd means 3rd means 3rd means 3rd means 4th means 4th means 4th means 4th means 4th means 4th means 4th means
  • 26.
    Discuss means ofachieving objective (primary means, first level strategy) New Seven Q.C. Tools Tree Diagrams Constructing a Tree Diagram Group Method Approach Slide 3 0f 5 Write Relations Diagram topic (Objective card) Identify constraints on how objective can be achieved Take each primary mean, write ob- jective for achieving it (secondary means)
  • 27.
    New Seven Q.C.Tools Tree Diagrams Constructing an Tree Diagram Group Method Approach (cont.) Slide 4 0f 5 Continue to expand to the fourth level Review each system of means in both directions (from objective to means and means to objective) Add more cards if needed Connect all levels Next, complete the diagram
  • 28.
    New Seven Q.C.Tools Tree Diagrams Completing a Tree Diagram Slide 5 0f 5 To Accomplish 3rd means 3rd means Primary means 3rd means 3rd means Constraints Primary means Secondary means Secondary means Secondary means Secondary means 3rd means 3rd means 3rd means 3rd means 4th means 4th means 4th means 4th means 4th means 4th means 4th means 4th means 4th means 4th means 4th means 4th means Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 29.
    New Seven Q.C.Tools Matrix Diagrams For Clarifying Problems by “Thinking Multidimensionally” Consists of a two-dimensional array to determine location and nature of problem Discovers key ideas by relationships represented by the cells in matrix. Slide 1 0f 7
  • 30.
    New Seven Q.C.Tools Matrix Diagrams Advantages of Matrix Diagrams Enable data on ideas based on extensive experience Clarifies relationships among different elements Makes overall structure of problem immediately obvious Combined from two to four types of diagrams, location of problem is clearer. Slide 2 0f 7
  • 31.
    New Seven Q.C.Tools Matrix Diagrams Advantages of Matrix Diagrams (cont.) 5 types: L-shaped, T-shaped, Y-shaped, X- shaped, and C-shaped Slide 3 0f 7 O O =1 O =4 Principal O =2 O X =5 O Subsidiary =3 X =6 Efficacy Practicability Rank Site QC circle Section/Plant QC circle supporter Section/Plant Manager Leader Member 4th lev el means from Tree diagram O O 1 O 4th lev el means from Tree diagram O O 1 O Hold 4 times/month 4th lev el means from Tree diagram O 3 O At ev ery meeting 4th lev el means from Tree diagram O 2 O 4th lev el means from Tree diagram O X 5 O At least 3 times/year/person 4th lev el means from Tree diagram O O 1 O O 4th lev el means from Tree diagram 4 O Evaluation Responsibilities Remarks
  • 32.
    New Seven Q.C.Tools Matrix Diagrams Constructing a Matrix Diagram Slide 4 0f 7 Write final-level means from Tree diagram forming vertical axis Write in Evaluation categories (efficacy, practicability, and rank) on horizontal axis. Write names along horizontal axis Examine final-level means to identify whom will implement them
  • 33.
    New Seven Q.C.Tools Matrix Diagrams Constructing a Matrix Diagram (cont.) Slide 5 0f 7 Label group of columns as “Responsibilities” Label right-hand end of horizontal axis as “Remarks” Examine each cell and insert the appropriate symbol: Efficacy: O=good, =satisfactory, X=none Practicability: O=good,=satisfactory, X=none
  • 34.
    New Seven Q.C.Tools Matrix Diagrams Constructing a Matrix Diagram (cont.) Slide 6 0f 7 Fill out remarks column and record meanings of symbol Next, complete the diagram Examine cells under Responsibility Columns, insert double-circle for Principal and single-circle for Subsidiary Determine score for each combination of symbols, record in rank column
  • 35.
    New Seven Q.C.Tools Matrix Diagrams Completing a Matrix Diagram Slide 7 0f 7 O O =1 O =4 Principal O =2 O X =5 O Subsidiary =3 X =6 Efficacy Practicability Rank Site QC circle Section/Plant QC circle supporter Section/Plant Manager Leader Member 4th lev el means from Tree diagram O O 1 O 4th lev el means from Tree diagram O O 1 O Hold 4 times/month 4th lev el means from Tree diagram O 3 O At ev ery meeting 4th lev el means from Tree diagram O 2 O 4th lev el means from Tree diagram O X 5 O At least 3 times/year/person 4th lev el means from Tree diagram O O 1 O O 4th lev el means from Tree diagram 4 O 4th lev el means from Tree diagram O 2 O 4th lev el means from Tree diagram O O 1 O 4th lev el means from Tree diagram O O 1 O Evaluation Responsibilities Remarks Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 36.
    New Seven Q.C.Tools Arrow Diagrams For Working Out Optimal Schedules and Controlling Them Effectively Shows relationships among tasks needed to implement a plan Network technique using nodes for events and arrows for activities Used in PERT (Program Evaluation and Review Technique) and CPM (Critical Path Method) Slide 1 0f 7
  • 37.
    New Seven Q.C.Tools Arrow Diagrams Advantages of Arrow Diagrams Allows overall task to viewed and potential snags to be identified before work starts Leads to discovery of possible improvements Makes it easy to monitor progress of work Deals promptly with changes to plan Improves communication among team Slide 2 0f 7
  • 38.
    New Seven Q.C.Tools Arrow Diagrams Advantages of Arrow Diagrams (cont.) Promotes understanding and agreement among group Slide 3 0f 7 Strategy 1 Constraints Activity 2 4 3 5 9 6 8 7 10 13 12 11
  • 39.
    New Seven Q.C.Tools Arrow Diagrams Constructing an Arrow Diagram Slide 4 0f 7 From strategies on Tree diagram, select one (Objective of Arrow Diagram) Identify constraints to Objective Write all essential activities on separate cards List all activities necessary to achieving Objective
  • 40.
    New Seven Q.C.Tools Arrow Diagrams Constructing an Arrow Diagram (cont.) Slide 5 0f 7 Organize cards in sequential order of activities Remove any duplicate activities Review order of activities, find sequence with greatest amount of activities Arrange parallel activities
  • 41.
    New Seven Q.C.Tools Arrow Diagrams Constructing an Arrow Diagram (cont.) Slide 6 0f 7 Record names and other necessary information Next, complete the diagram Examine path, number nodes in sequence from left to right
  • 42.
    New Seven Q.C.Tools Arrow Diagrams Completing an Arrow Diagram Slide 7 0f 7 Strategy 1 Constraints Activity 2 4 3 5 9 6 8 7 10 13 12 11 Source: Nayatani, Y., The Seven New QC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 43.
    New Seven Q.C.Tools Process Decisions Program Charts For Producing the Desired Result from Many Possible Outcomes Used to plan various contingencies Used for getting activities back on track Steers events in required direction if unanticipated problems occur Finds feasible counter measures to overcome problems Slide 1 0f 7
  • 44.
    Advantages of ProcessDecisions Program Charts (PDPC’s) Facilitates forecasting Uses past to anticipate contingencies Enables problems to pinpointed Illustrates how events will be directed to successful conclusion Enables those involved to understand decision-makers intentions Slide 2 0f 7 New Seven Q.C. Tools Process Decisions Program Charts
  • 45.
    Advantages of PDPC’s(cont.) Fosters cooperation and communication in group Easily modified and easily understood Slide 3 0f 7 New Seven Q.C. Tools Process Decisions Program Charts Start GOAL YES YES NO NO NO NO NO YES NO NO
  • 46.
    Constructing a PDPC Slide4 0f 7 Select a highly effective, but difficult strategy from the Tree diagram Decide on a goal (most desirable outcome) Identify constraints of objective Identify existing situation (Starting point) New Seven Q.C. Tools Process Decisions Program Charts List activities to reach goal and potential problems with each activity
  • 47.
    Constructing an PDPC(cont.) Slide 5 0f 7 Review list. Add extra activities or problems not thought of previously Prepare contingency plan for each step and review what action is needed if step is not achieved Examine carefully to check for inconsistencies and all important factors are included New Seven Q.C. Tools Process Decisions Program Charts
  • 48.
    Constructing an PDPC(cont.) Slide 6 0f 7 Next, complete the diagram Examine to make sure all contingency plans are adequate New Seven Q.C. Tools Process Decisions Program Charts
  • 49.
    Completing a PDPC Slide7 0f 7 New Seven Q.C. Tools Process Decisions Program Charts Start GOAL YES YES NO NO NO NO NO YES NO NO Source: Nayatani,Y., The SevenNewQC Tools (Tokyo, Japan, 3A Corporation, 1984)
  • 50.
    New Seven Q.C.Tools Matrix Data Analysis Principal Component Analysis Technique quantifies and arranges data presented in Matrix Based solely on numerical data Finds indicators that differentiate and attempt to clarify large amount of information Slide 1 0f 6
  • 51.
    New Seven Q.C.Tools Matrix Data Analysis Advantages of Principal Component Analysis Can be used in various fields (market surveys, new product planning, process analysis) Can be when used when Matrix diagram does not give sufficient information Useful as Prioritization Grid Slide 2 0f 6
  • 52.
    New Seven Q.C.Tools Matrix Data Analysis Constructing a Prioritization Grid Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001) Slide 3 0f 6 Determine your goal, your alternatives, and criteria for decision Place selection in order of importance Sum individual ratings to establish overall ranking (Divide by number of options for average ranking) Apply percentage weight to each option (all weights should add up to 1)
  • 53.
    New Seven Q.C.Tools Matrix Data Analysis Constructing a Prioritization Grid (cont.) Slide 4 0f 6 Rank order each option with respect to criterion (Average the rankings and apply a completed ranking) Multiply weight by associated rank in Matrix (in example, 4 is best, 1 is worst) Result is Importance Score Add up Importance Scores for each option
  • 54.
    New Seven Q.C.Tools Matrix Data Analysis Constructing a Prioritization Grid (cont.) Slide 5 0f 6 See completed the diagram Rank order the alternatives according to importance
  • 55.
    Completing a PrioritizationGrid Slide 6 0f 6 New Seven Q.C. Tools Matrix Data Analysis Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001) Cost Reliability Options Design A .30 .20 3 3 .90 .60 3.2 1 (tie) Design B .40 .10 4 1 1.6 .10 3.0 2 Design C .25 .25 2 4 .50 1 2.5 3 Design D .10 .20 1 3 .10 .60 3.2 1 (tie) 1.05 .75 .26 .19 2 4 Importance Sum Score Option Ranking (least important) Strength Importance score Rank Percentage weight Percentage weight Rank Importance score Percentage weight Rank Importance score Percentage weight Rank Importance score Sum of weights Average weight Criterion Ranking Customer Acceptance (most important) .40 4 1.6 .30 3 .90 .25 1 .25 0.3 3 .90 1.25 2 .40 .25 .75 .10 1 .10 .20 .95 .24 3 Criteria .40 4 3 1.6 .31 1
  • 56.
    Review New Seven Q.C.Tools Affinity Diagrams Relations Diagrams Tree Diagrams Matrix Diagrams Arrow Diagrams Process Decision Program Charts Matrix Data Analysis
  • 57.
    Mental Attitudes - Keenawareness to the actual problem - Eagerness to solve problem - Be highly motivated for the challenge Keys to Successfully Using the New Seven Q.C. Tools Slide 1 0f 5 Four Specific Keys Understand the problem Select the right tool for the job Obtain appropriate verbal data Interpret analytical results
  • 58.
    Keys to SuccessfullyUsing the New Seven Q.C. Tools Slide 2 0f 5 Understand the problem Stage 1 - problem is unclear and not obvious what exact issue should be addressed Stage 2 - problem is obvious, but causes unknown explore causes and single out valid ones Stage 3 - problem and causes are known required action is unknown strategies and plan must be developed 4 Specific Keys
  • 59.
    Keys to SuccessfullyUsing the New Seven Q.C. Tools Slide 3 0f 5 Selecting Right tool for the Job Stage 1 - Collect verbal information on events (Affinity Diagram) Stage 2 - Choose tool to identify causes (Relations Diagram / Matrix Diagram) Stage 3 - List strategies and activities (Tree Diagram / Relations Diagram) Plan actual activities (Arrow Diagram / PDPC Chart) 4 Specific Keys (cont.)
  • 60.
    Keys to SuccessfullyUsing the New Seven Q.C. Tools Slide 4 0f 5 Obtaining appropriate verbal data Three types of verbal data: - Facts; factual observations expressed in words - Opinions; factual information colored by opinion - Ideas; New concepts created by analyzing facts .Group Discussions: - Ensures common understanding - All data should be without bias or distortion - Data should fit objective of the analysis 4 Specific Keys (cont.)
  • 61.
    Keys to SuccessfullyUsing the New Seven Q.C. Tools Slide 5 0f 5 Interpreting Analytical Results Information must be obtained for accomplishing objectives from: - Completed diagrams; or - Process of completing diagrams Analyze actual information obtained: - Prepare summarized report with findings, conclusions, and processes used - Check if necessary data has been obtained, if not - Discover the cause and take appropriate action 4 Specific Keys (cont.)
  • 62.
    Practical Application of NewSeven Q.C. Tools Slide 1 0f 5 Complete the following Relations Diagram - Review notes for clarity - Get in groups of 4-5 per table (work as a team!) - Topic - “Using the New Seven QC Tools skillfully” - “Cause cards”- will be provided (not categorized) - Arrange cards to complete diagram (some hints have been provided) Example; Relations Diagram ”Abilities Required for Applying New Seven QC Tools”
  • 63.
    Practical Application of NewSeven Q.C. Tools Slide 2 0f 5 ”Abilities Required for Applying New Seven QC Tools” Use N7 Skillfully Primary Cause Primary Cause Primary Cause Primary Cause Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
  • 64.
    Practical Application of NewSeven Q.C. Tools Slide 3 0f 5 ”Abilities Required for Applying New Seven QC Tools” Cause Statements (hints are in yellow) A Interpret data clearly N Understand seriousness of problem B Select appropriate tool O Think flexibly from various standpoints C Think systematically P Obtain appropriate verbal data D Give opinions Q Expose core of problem E Know what the problem is R Communicate well F Extract necessary information S Accurately understand real problem G Collect reliable verbal data T Have excellent intuition H Think multidimensionally U See to heart of problem I Obtain facts V Select appropriate type of verbal data J Interpret analytical results W Think in terms of word-based diagram K Generate ideas X Express genuine thoughts L Know that distorted data is useless Y Hear and respect other's opinions M Grasp overall pictured Z Generate highly accurate verbal data
  • 65.
    Practical Application of NewSeven Q.C. Tools Slide 4 0f 5 ”Abilities Required for Applying New Seven QC Tools” Use N7 Skillfully Primary Cause Primary Cause Primary Cause B T R Y F I L Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
  • 66.
    Practical Application of NewSeven Q.C. Tools Slide 5 0f 5 Solution for ”Abilities Required for Applying New Seven QC Tools” Use N7 Skillfully E W J P B T H R C Z Y O A M F S U N V K D I Q L X G Source: Foster, S., Managing Quality (Upper Saddle River, NJ: Prentice Hall, 2001)
  • 67.
    Summary New Seven Q.C.Tools 1- Provide Training in Thinking 2- Raise People’s Problem Solving Confidence 3- Increase People’s Ability to Predict Future Events Benefits of New Seven Q.C. Tools 1- Express verbal data diagrammatically 2- Make information visible 3- Organize information intelligibly 4- Clarify overall picture and fine details 5- Get more people involved Roles of New Seven Q.C. Tools
  • 68.
    Bibliography Foster, Thomas. ManagingQuality. An Integrative Approach. Upper Saddle River : Prentice Hall, 2001. Nayatani, Yoshingobu, Eiga, Toru, Futami, Ryoji, Miyagawa, Hiroyuki, and Loftus, John. The Seven New QC Tools: Practical Applications for Managers. Tokyo : 3A Corporation, 1994. “TQM: The 9 TQM Tools.” Internet http://www.iqd.com/pfttools.htm.