Business analysis: ontwikkeling, toepassing, ervaringenSKA
Business analysis (BA) is een van de snelst groeiende disciplines in de wereld van business en ICT-consultancy. Een snelle opeenvolging van veranderingen in markten en bedrijfsorganisaties, waarvan de impact steeds groter wordt, zorgen hiervoor.
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
This document provides an overview of an introductory project management course. The course covers three key segments: an introduction to project management concepts like the project lifecycle and how projects are organized; the typical project management lifecycle phases from initiation to closing; and how projects are organized through different structures and the roles involved like project managers. The goal is to provide students with little experience an overview of fundamental project management principles.
O documento discute os processos da gerência da integração de projetos. Ele define integração como garantir que todas as áreas de um projeto estejam interligadas. Os principais processos de integração são: 1) Desenvolvimento do Plano do Projeto, que agrega os resultados dos processos de planejamento; 2) Execução do Plano do Projeto, onde o produto é criado; 3) Controle Geral de Mudanças, que mantém a integridade dos planos e coordena mudanças.
Business analysis: ontwikkeling, toepassing, ervaringenSKA
Business analysis (BA) is een van de snelst groeiende disciplines in de wereld van business en ICT-consultancy. Een snelle opeenvolging van veranderingen in markten en bedrijfsorganisaties, waarvan de impact steeds groter wordt, zorgen hiervoor.
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
This document provides an overview of an introductory project management course. The course covers three key segments: an introduction to project management concepts like the project lifecycle and how projects are organized; the typical project management lifecycle phases from initiation to closing; and how projects are organized through different structures and the roles involved like project managers. The goal is to provide students with little experience an overview of fundamental project management principles.
O documento discute os processos da gerência da integração de projetos. Ele define integração como garantir que todas as áreas de um projeto estejam interligadas. Os principais processos de integração são: 1) Desenvolvimento do Plano do Projeto, que agrega os resultados dos processos de planejamento; 2) Execução do Plano do Projeto, onde o produto é criado; 3) Controle Geral de Mudanças, que mantém a integridade dos planos e coordena mudanças.
Introduction to Project Management (workshop) - v.1Mena M. Eissa
This document provides an introduction to project management concepts. It begins with introductions from the presenter and the audience. It then defines key project management terms like project, project management, stakeholders, roles, scope, requirements, deliverables, change, risk and lessons learned. It discusses the triple constraints of scope, time and cost. It also outlines the typical project lifecycle phases of initiating, planning, executing, monitoring/controlling and closing. The document concludes with discussing next steps like certifications and tools to use in project management.
In this presentation we share information on how to map / integrated the PMBOK Guide Process Groups with a Project Life Cycle. The project life cycle can be a generic model or per the SUKAD CAM2P™ Model (The Customizable and Adaptable Methodology for Managing Projects™).
We share this topic because it is a common area of confusion among PMPs and those studying the PMBOK Guide.
This document discusses the process of closing a construction project. It involves several key steps:
1) Creating a punch list of deficiencies to be addressed by the contractor. 2) Issuing a certificate of substantial completion to end liquidated damages when the project is sufficiently complete. 3) Obtaining a certificate of occupancy when the project complies with codes. 4) Demobilizing resources like staff. 5) Financially closing out the project through final payment, releasing guarantees, and settling changes. 6) Formally closing the contract by submitting as-built drawings, manuals, warranties, and test reports. 7) The project manager analyzes costs and gathers feedback. 8) Lessons learned are documented for future projects.
The Agile Product Manager/Owner Dilemma (ProdCampNYC)Rich Mironov
As product managers grapple with Agile and scrum's product owner, how do we define roles, decide waht needs to be done, think broadly about go-to-market instead of narrowly about software creation, and map out a job that mortals could succeeed at?
(This was presented at Product Camp NYC in July '09.)
Increasing the Probability of Success with Continuous Risk ManagementGlen Alleman
Cost and schedule growth is created when unrealistic technical performance expectations, unrealistic cost and schedule estimates, unanticipated technical issues, and poorly performed and ineffective risk management contribute to program technical and programmatic shortfalls
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo
Delay in Construction Contracts: • On-going phenomenon
• Introduction of Critical Path Method (‘CPM’) • Prospective or retrospective analysis
• Observational or modelled
• Dynamic or Static
• Common Methodologies
The document discusses project management processes and defines the five process groups: initiating, planning, executing, monitoring and controlling, and closing. It provides details on each process group, including their key purposes and outputs. Additionally, it describes the interactions between the process groups over time, defines project information and how it flows between processes, and outlines the ten standard project management knowledge areas and their roles.
Portfolio Management in an Agile World - Rick AustinLeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. Rick Austin illustrates how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Strategic Portfolio Management (SPM) provides capabilities for strategic planning, portfolio prioritization, roadmap planning, scenario planning, investment funding, innovation management, agile development, project portfolio management, application portfolio management, and more. These capabilities help organizations connect investments to strategy, optimize resource allocation, accelerate delivery of value, and improve performance. SPM leverages the Now Platform which features workflows, dashboards, surveys, artificial intelligence, mobile apps, cloud integrations, and a common data model.
A contemporaneous time impact analysis (TIA) evaluates the impact of potential delays on a construction project schedule. It involves updating the project schedule, inserting a fragnet of delay-causing activities, and comparing the predicted completion dates before and after the delay. Doing a TIA prospectively helps negotiate time extensions and avoid disputes. The presentation defines TIAs, explains how to prepare and analyze them properly according to industry standards, and discusses their benefits for both owners and contractors.
This document provides an outline for a course on project scheduling and controls. The 3-day course will introduce key concepts in project scheduling including activity sequencing, developing project schedules, schedule updates and change control, and earned value management. Participants will learn to create effective project schedules, implement controls, evaluate metrics and prepare reports. The course aims to prepare attendees to sit for the PMI Scheduling Professional or AACE Project Scheduling Professional certifications. It will use exercises, workshops, and a case study to demonstrate scheduling skills across different project types.
Project planning and control training with legoignitetribes
Project Planning, Analysis and Control with Lego invites participants to take an active role in project planning and control through hands-on modeling with Lego bricks. The course treats everyone as equals and encourages 100% collaboration. Participants simulate construction project management by building Lego models within time and budget constraints while assuming roles like project manager. The goal is to strategize around constraints and gain an understanding of project planning tools and methodologies.
Project Management Life Cycle Methodology Powerpoint Presentation SlidesSlideTeam
Need to present a project plan then our content-ready project management life cycle methodology PowerPoint presentation will tell you how to do it. It takes you through the program lifecycle step by step. The product management PowerPoint template contains all the slides you need for business planning such as planning process, dimensions of planning, elements of lifecycle , objectives, scope, lifecycle phases, critical path method, business planner, activity planning chart, week scheduler, yearly scheduler, project tasks status dashboard, work breakdown structure, stages of business planning, work process, business team performance, timeline, schedule, potential delays in execution, risk identification, progress against baseline schedule, alternatives evaluation and budgeting etc. By using our product development PPT slides, you can showcase topics such as project portfolio, control system, product based planning, process-based system, phased approach, system development lifecycle, task management and business strategy. Download this project management life cycle methodology PPT graphics to create an effective business presentation. Enthuse them with our Project Management Life Cycle Methodology Powerpoint Presentation Slides. Break through the initial diffidence. https://bit.ly/373XJgl
According to the Construction Industry Institute, modularization entails the large-scale transfer of stick-build construction effort from the jobsite to one or more local or distant fabrication shops/yards in order to exploit one or more strategic advantages. Nonetheless, the majority of projects today still do not exploit these strategic advantages to their fullest potential.
Modular Construction has many advantages over conventional stick-build construction. These benefits include shorter schedules, lower cost overall cost, minimal plant site interruption and many more. Strengthen your knowledge of when and why to choose modularization as a project delivery model.
Introduction to Project Management (workshop) - v.1Mena M. Eissa
This document provides an introduction to project management concepts. It begins with introductions from the presenter and the audience. It then defines key project management terms like project, project management, stakeholders, roles, scope, requirements, deliverables, change, risk and lessons learned. It discusses the triple constraints of scope, time and cost. It also outlines the typical project lifecycle phases of initiating, planning, executing, monitoring/controlling and closing. The document concludes with discussing next steps like certifications and tools to use in project management.
In this presentation we share information on how to map / integrated the PMBOK Guide Process Groups with a Project Life Cycle. The project life cycle can be a generic model or per the SUKAD CAM2P™ Model (The Customizable and Adaptable Methodology for Managing Projects™).
We share this topic because it is a common area of confusion among PMPs and those studying the PMBOK Guide.
This document discusses the process of closing a construction project. It involves several key steps:
1) Creating a punch list of deficiencies to be addressed by the contractor. 2) Issuing a certificate of substantial completion to end liquidated damages when the project is sufficiently complete. 3) Obtaining a certificate of occupancy when the project complies with codes. 4) Demobilizing resources like staff. 5) Financially closing out the project through final payment, releasing guarantees, and settling changes. 6) Formally closing the contract by submitting as-built drawings, manuals, warranties, and test reports. 7) The project manager analyzes costs and gathers feedback. 8) Lessons learned are documented for future projects.
The Agile Product Manager/Owner Dilemma (ProdCampNYC)Rich Mironov
As product managers grapple with Agile and scrum's product owner, how do we define roles, decide waht needs to be done, think broadly about go-to-market instead of narrowly about software creation, and map out a job that mortals could succeeed at?
(This was presented at Product Camp NYC in July '09.)
Increasing the Probability of Success with Continuous Risk ManagementGlen Alleman
Cost and schedule growth is created when unrealistic technical performance expectations, unrealistic cost and schedule estimates, unanticipated technical issues, and poorly performed and ineffective risk management contribute to program technical and programmatic shortfalls
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo
Delay in Construction Contracts: • On-going phenomenon
• Introduction of Critical Path Method (‘CPM’) • Prospective or retrospective analysis
• Observational or modelled
• Dynamic or Static
• Common Methodologies
The document discusses project management processes and defines the five process groups: initiating, planning, executing, monitoring and controlling, and closing. It provides details on each process group, including their key purposes and outputs. Additionally, it describes the interactions between the process groups over time, defines project information and how it flows between processes, and outlines the ten standard project management knowledge areas and their roles.
Portfolio Management in an Agile World - Rick AustinLeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. Rick Austin illustrates how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
it is an overview of project management. concept of project management, scope of project management with example, types of project management, generation and screening, difficulties and its importance.
Strategic Portfolio Management (SPM) provides capabilities for strategic planning, portfolio prioritization, roadmap planning, scenario planning, investment funding, innovation management, agile development, project portfolio management, application portfolio management, and more. These capabilities help organizations connect investments to strategy, optimize resource allocation, accelerate delivery of value, and improve performance. SPM leverages the Now Platform which features workflows, dashboards, surveys, artificial intelligence, mobile apps, cloud integrations, and a common data model.
A contemporaneous time impact analysis (TIA) evaluates the impact of potential delays on a construction project schedule. It involves updating the project schedule, inserting a fragnet of delay-causing activities, and comparing the predicted completion dates before and after the delay. Doing a TIA prospectively helps negotiate time extensions and avoid disputes. The presentation defines TIAs, explains how to prepare and analyze them properly according to industry standards, and discusses their benefits for both owners and contractors.
This document provides an outline for a course on project scheduling and controls. The 3-day course will introduce key concepts in project scheduling including activity sequencing, developing project schedules, schedule updates and change control, and earned value management. Participants will learn to create effective project schedules, implement controls, evaluate metrics and prepare reports. The course aims to prepare attendees to sit for the PMI Scheduling Professional or AACE Project Scheduling Professional certifications. It will use exercises, workshops, and a case study to demonstrate scheduling skills across different project types.
Project planning and control training with legoignitetribes
Project Planning, Analysis and Control with Lego invites participants to take an active role in project planning and control through hands-on modeling with Lego bricks. The course treats everyone as equals and encourages 100% collaboration. Participants simulate construction project management by building Lego models within time and budget constraints while assuming roles like project manager. The goal is to strategize around constraints and gain an understanding of project planning tools and methodologies.
Project Management Life Cycle Methodology Powerpoint Presentation SlidesSlideTeam
Need to present a project plan then our content-ready project management life cycle methodology PowerPoint presentation will tell you how to do it. It takes you through the program lifecycle step by step. The product management PowerPoint template contains all the slides you need for business planning such as planning process, dimensions of planning, elements of lifecycle , objectives, scope, lifecycle phases, critical path method, business planner, activity planning chart, week scheduler, yearly scheduler, project tasks status dashboard, work breakdown structure, stages of business planning, work process, business team performance, timeline, schedule, potential delays in execution, risk identification, progress against baseline schedule, alternatives evaluation and budgeting etc. By using our product development PPT slides, you can showcase topics such as project portfolio, control system, product based planning, process-based system, phased approach, system development lifecycle, task management and business strategy. Download this project management life cycle methodology PPT graphics to create an effective business presentation. Enthuse them with our Project Management Life Cycle Methodology Powerpoint Presentation Slides. Break through the initial diffidence. https://bit.ly/373XJgl
According to the Construction Industry Institute, modularization entails the large-scale transfer of stick-build construction effort from the jobsite to one or more local or distant fabrication shops/yards in order to exploit one or more strategic advantages. Nonetheless, the majority of projects today still do not exploit these strategic advantages to their fullest potential.
Modular Construction has many advantages over conventional stick-build construction. These benefits include shorter schedules, lower cost overall cost, minimal plant site interruption and many more. Strengthen your knowledge of when and why to choose modularization as a project delivery model.
Deze SMARTCirculair Projectwijzer Fase 1 is voor teamcaptains die willen winnen.
Stap voor stap ga je door de eerste onderzoeksfase van je project:
Inhoud fase 1
● Onderzoeken
● De Kick-Off met je opdrachtgever
● Projectplanning (HPR) en terugkoppelmomenten met je
opdrachtgever afspreken
● Team samenstellen en (onderzoek)rollen afspreken met
deadlines
● Onderzoek per jurycriterium
● Planologisch onderzoek
● Terugkoppeling naar de opdrachtgever
● Checklist
Als jullie deze eerste onderzoeksfase goed benutten dan weet je al zoveel meer dan heel veel bedrijven om jullie heen.
En zoals Ravi (Technova student) vertelde ‘Ik loop stage bij een architectenbureau en leer de architecten hoe ze kunnen bouwen met natuurlijke bouwmaterialen want daar weten ze niets van.’ Ravi heeft deelgenomen met zijn team en een special Award gewonnen met vernieuwende concepten voor binnenstedelijke verdichting in 2022.
Dit is de projectwijzer 1 voor studententeams / teamcaptains van de SMARTCirculair Bouw OntwerpChallenge 2024.
Bekijk de SMARTCirculair Projectwijzer Fase 2 hieronder of via Slideshare
Hiermee helpt SMARTCirculair het team
Planning en Projectdocument
Teamcaptains overleg, online, elke 14 dagen
(Maatwerk) gastlessen, masterclasses en bedrijfsbezoeken
Projectwijzer voor studententeams
Alles over de finale voorbereidingen op SMARTCirculair.com
Toolkit met heel veel inspiratie en innovatie
Inspiratie, kennis en hulp via de socials (insta en tiktok)
Jullie mediacampagne
Stichting SMARTCirculair heeft zich ontwikkeld tot een projectbureau dat is gespecialiseerd in het verbinden van Onderwijs, Ondernemers en Overheid rond de klimaatthema’s circulair bouwen en de energietransitie. Met deze thema’s en ontwerpopdrachten gaan leerlingen- en studententeams op hun creatieve, eigen’wijze’ en soms ook eigengereide manier aan de slag wat leidt tot verfrissende productconcepten.
Slimme innovatieve concepten voor de circulaire bouw- en energietransitie waarmee we bijdragen aan de human capital agenda, de klimaatambities en het circulair, toekomstbestendig worden in een snel veranderende wereld.
Wij geloven dat in elke student iets groots schuilt. Dat ze beschikken over een grenzeloze inventiviteit en de aanjager zijn van alles waar we in Nederland trots op zijn. SMARTCirculair organiseert wedstrijden die Nederland smart, circulair en klimaatbestendig maken.
Les 2 email- en social media marketing A Swart, ROCVT200
Sessie 1: Project, projectmanagement van A-Z, PRM
1. Sessie 1: Project
van begin tot eind
Inhoud:
oWerken in een projectstructuur
oFasen in een project
oTussenresultaten
oBeheer aspecten : GOKIT
2. Van begin tot eind
o
o
o
o
6 – Fasen, (of 3 fasen)
Beheer aspecten : GOKIT
Risisco’s
Stoppen
BLZ 25 : boek projectmanagement
3. Wat is een project?
o Project management
Tijdelijke samenwerking van een aantal
mensen meestal uit verschillende
vakgebieden
- om binnen een vastgestelde tijd
- een vooraf gesteld doel te bereiken
- met een vastgesteld budget.
7. Projectmatig werken
o Prepare, prepare, prepare, prepare, prepare,
prepare, prepare, prepare, prepare, prepare,
prepare, prepare, prepare, prepare, prepare,
prepare, prepare, prepare, prepare, prepare,
prepare, prepare, prepare, prepare, prepare!
o Goede voorbereiding is ¾ van het werk
o Bekijk de volgende film en schat hoeveel tijd
in de film aan voorbereidingen
wordt besteed !
8. Fases 3 of 6
Meest eenvoudige vorm van een (klein)
project: 3 fasen!
Voorbereiding
Realisatie
Nazorg
9. Fases 3 of 6
Standaard fasen opdeling bij
een projectmatige aanpak :
6 fasen!
Initiatief
Definitie
Ontwerp
Voorbereiding
Realisatie
Nazorg
10. Op te leveren producten bij 6 fasen
Projectvoorstel <
Initiatief
Plan van Aanpak <
Definitie
Ontwerp <
Ontwerp
Detail ontwerp <
Projectopbrengst <
Overdracht <
Voorbereiding
Realisatie
Nazorg
11. Tussenresultaten per fase
o Alle fasen kennen een uitkomst; welke afzonderlijke
resultaten/producten moeten er opgeleverd worden!
o Verzameling van tussenproducten kan het projectresultaat zijn,
maar kunnen ook de stappen zijn naar het projectresultaat zijn.
o Milestone = punt dat bereikt moet worden om verder te gaan.
12. Initiatief fase
Tussenresultaat
projectvoorstel
o Ideeën genereren
o Goedkeuring opdrachtgever
o Aanstellen projectleider
o Inschatting van de impact van
het project
o Schrijven projectvoorstel
Initiatief
Definitie
Ontwerp
Voorbereiding
Realisatie
Nazorg
13. Definitie fase
Tussenresultaat
Plan van Aanpak
o Intakegesprek
o Samenstellen projectteam
o Programma van Eisen (PvE)
o Plannen project
o Schrijven Plan van Aanpak
Initiatief
Definitie
Ontwerp
Voorbereiding
o Goedkeuren PvA
o Kick-off vergadering
Realisatie
Nazorg
14. Ontwerp fase
Tussenresultaat
Ontwerp
o Hoe gaan we het project
uitvoeren
Initiatief
o Wat zal er opgeleverd
worden
o Ontwerp moet voldoende
informatie bevatten voor
alle project medewerkers
Definitie
Ontwerp
Voorbereiding
Realisatie
Nazorg
15. Voorbereiding fase
Tussenresultaat
detail ontwerp
o Van ontwerp naar details
o Engineering
Initiatief
o Logistieke voorbereiding
Definitie
o Afspraken met leveranciers
Ontwerp
o Van begroting naar budget
Voorbereiding
Realisatie
Nazorg
16. projectresultaat
Tussenresultaat realisatie
Realisatie fase
o Uitvoeren activiteiten
o Overleggen stakeholders
Initiatief
Definitie
o Planning bewaken
o Bewaken middelen
Ontwerp
Voorbereiding
o Controleren kwaliteit
o Opleveren projectresultaat
Realisatie
Nazorg
19. Beheer aspecten v/e project : GOKIT
Het projectmanagement richt het project in rondom de aspecten:
o
o
o
o
o
Geld,
Organisatie,
Kwaliteit,
Informatie,
Tijd
20. Beheeraspecten van een project
o
o
o
o
o
o
Bewaking projectbudget
Overleggen
Organiseren
Bewaking kwaliteit
Verspreiding informatie
Aanpassen planning
(G)
(I-O)
(O)
(K)
(I)
(T)
21. Het gaat fout, mislukt…
•
•
•
•
•
•
•
•
Onjuiste planning
Te optimistische planning
Planning niet bijhouden
Start te laat metactiviteit
Onvoldoende bekwaam
‘Andere’ zaken
Te ‘mooi’ willen maken
Onvoldoende
betrokkenheid
• Kleine vertragingen
worden één grote
• Te late leveringen
• Geen tijd voor
herstellen/reparatie
• ‘Gap’ tussen voorbereiding
en afwerking
• Calamiteiten
• Onduidelijk doel
• Definitiewijzigingen
• Veranderende omgeving
• Renteverliezen
• Enz, enz, enz.
22. Stoppen ?
o Stoppen kan altijd/moet altijd kunnen wanneer de
projectopbrengst ontoereikend is !
o Kosten versus baten analyse