Service Catalogue + SLM




7 Steps to deliver and demonstrate value

            Barclay Rae
Consulting, Mentoring + Troubleshooting
  Media + Research

400+ consulting projects since 1994

www.itsmtv.co.uk
www.barclayrae.com


      2
Agenda
Background
SLAs
SLM
Service Catalogue concepts
Delivering and Demonstrating Value
BACKGROUND
The Word on the Street
‘Service Catalogue drives your people. It is a key mechanism in cultural
change, the foundation of customer relationship, and a pivotal tool for
organising effort.’ Rob England

‘Without a service catalog, your public, private, or hybrid cloud is just a fog
bank.’   Frank Bucalo Senior Architect, IT Service

‘Service Catalogs are the cornerstone of service delivery and automation, and
the starting point for any company interested in saving money and improving
relationships with the business.’       Forrester Research

‘The Service Catalog has also proven to be a critical success factor for the
transformation to a Service Management culture. Recognizing that the real
value the IT organization provides to “the business” is not about offering
servers or routers or workstations, it is about offering integrated technology
solutions that optimize critical business processes.’
                                          David M. Colburn, United States Army
Facts & Figures
64% of IT Executives felt that they were 'unable to provide the
business with quantifiable metrics demonstrating the value of IT
services and assets.’                Axios Systems Survey 2009

Only 17% of finance executives agreed with the statement "Our
investments in IT are delivering business value."
        Gartner & IBM survey of 456 senior business executives

96% of respondents identified solid executive sponsorship as either
“Very Important” or “Somewhat Important” to the success of their
Service Catalog project.           EMA Service Catalog Survey 2008

95% of survey respondents ranked detailed requirements as “very
important” or “somewhat important” to the success of their Service
Catalog project and 92% ranked a detailed project plan similarly.
                                   EMA Service Catalog Survey 2008
What Do We Mean By Services?
Analogy: The Airline Business
Large amount of technology, resources, skills and knowledge
deployed to get passengers from A to B, safely and on time.

As passengers, our focal point of the service is the flight and
skill of the pilots.

However every component has a part to play in the success of
the service:

The flight may land on time but delays with baggage result in
passengers being late.
‘SERVICE’
‘A bundle of activities (IT, people and process) combined to

provide a business outcome
What Metrics do we produce?
First Time fix

First Contact Resolution

Response time

Turnaround Time

Abandon Rate

Average Time to Answer

Average Call duration
What Metrics do we produce?
First Time fix             System Availability
First Contact Resolution   Server Availability
Response time              Application Availability
Turnaround Time            System response time
Abandon Rate               No. of incidents
Average Time to Answer     No. of requests
Average Call duration      No. of changes

                           SLA performance
What Metrics do we produce?

o All the 9s…
o Volumes
o IT Processes
o ‘SLA’ performance
o IT Systems performance
Service Expectations
Too much information
IT Services – VFM?
System, not service, reporting
SLAs
SLAs are a waste of time?
Service Level Agreements
What do you mean?

 Patronising
 Irrelevant
 Inappropriate
 IT and system-focussed
 Over-engineered
 Under-estimated
 Un-measureable
 Un-actionable
 Not measured or acted upon
 Generally untroubled by use

Generally just about what IT thinks it does
Usually annoying to non-IT people…
The SLA small print…
–   ICT accepts no responsibility whatsoever at any time for anything it might or might not do..
–   The person of the first party shall be ICT, pending approval from the ICT Steering committee. In respect of the
    second party this should be the user community as appropriate. 3 rd parties are not allowed, unless these include free
    alcohol.
–   SLA performance is not guaranteed, but is expected to reach 60% of 90% of the agreed target, except when the DBAs
    and Network team are on a bender.
–   The Service Desk will accept calls from users if they really feel like it They also reserve the right to ask unreasonable
    questions about serial numbers, otherwise all contact is invalid.
–   IT reserve the right to send meaningless automated emails to users at any time.
–   Query response times are expected to be sub-second, unless there is excessive run-time load from QRG tables on the
    JTAG server in X/DOPP. XSPART nodes are enabled for elves, except under BS/0906688, including abusive calls to
    the monkfish database.
–   IT will respond in a timely manner to high-priority business incidents, if they are asked very nicely indeed and also
    made to feel very special and important.
–   System availability will be 100% when not required, patchy at key business times, which are not agreed or
    understood.
–   All requests will be ignored until they are chased up by users or their angry PAs.
–   Requests for PCs will be delivered within 6 months or at least before the requester leaves the organisation – or
    whichever is most convenient for the IT department.
–   Users are responsible for care and maintenance of their own PCs – if not they will be subject to abuse and
    humiliation from young geeky guys with no socials skills and who don’t have any other sort of life and couldn’t get a
    girlfriend.
–   This SLA document is binding and any breach of the aforementioned conditions will result in immediate dismissal
    and summary execution.
–   This SLA will be filed for reference and stored in the private folder D://unused/garbage, marked ‘Do not read’. In the
    event of it being read it will become invalid.
–   Issues or complaints should be escalated to the least responsible person available, and will be ignored.
Why are SLAs like this?
SLAs are often started without services being defined or understood.

There is often little understanding of how to build and negotiate
services and SLAs.

In effect the services are also being defined as well as the SLAs –
perhaps unwittingly.
7 Simple Tips for Successful SLAs
How do you make your SLAs successful…?

1. Start with Services – understand what current
services are provided and what needs to be designed
for improvement.
2. Ask the business what they want…

…or what they think their services are
3. Use simple and appropriate language
4. Keep the SLA realistic and achievable
5. Only set up an SLA that can be measured
6. Keep them short and concise…

…otherwise no one will read them.
7. Keep smiling…!
SLM
CUSTOMERS                 SLM PROJECT          IT SERVICE PROVIDER

       What IT services              Planning              What IT services
       are key to you?                                     do you provide?
                                    Workshops
          Key people                                         Infrastructure
                                    Negotiation
         Key systems                                           Networks
                                    Facilitation
       Key departments
                                  Documentation               Applications
       Key times/targets
                                   Build Service           Service/Help Desk
   When do you need them?            Catalog

                                  Set up reporting           Procurement
How quickly do you need them
         restored?                                              Projects
                                   Set up review
                                   mechanisms
What support information do you
                                                     What are your resource levels?
           need?                     Plan full
                                  implementation          3rd party contracts?
  What reviews do you need?
                                  Ongoing support    What levels of service can you
                                    as needed
                                                               provide?
Service Catalogue Elements
           Elements:
           User Request Catalogue
               For the IT end-user
               Self-service request fulfillment
               Similar to online shopping experience
           Business Service Catalogue View
               For the business customer
               In business terms
               Specific non-IT information
               Business SLAs
           Technical Service Catalogue View
               For the IT provider
               Technical and supply-chain details
               Component level service data
               OLA and Underpinning Contracts
Service Catalogue Elements
Delivering and
Demonstrating Value
Key Questions

• Do we deliver what our customers need via our
  services?
• Can we demonstrate this?
• Would our customers agree?
Moments of truth
•   A customer can log on to the website and buy CDs and DVDs
•   Doctors and medical staff access records when needed
•   Sales staff get information when they need it to help sell products to customers
•   Till and EPOS systems area available to checkout staff.
•   Logistics teams get the information they need to distribute goods to stores
•   Online and communications systems are available to process financial
    transactions between organisations
•   Call centre systems are available and responsive to staff when customers call in
•   Systems are available for access to mobile and broadcast communications
    networks
•   A system user can access their applications when they need to work
•   Support is available, helpful and effective when needed
Overall metrics

         Customer
         Satisfaction
          Net Promoter
              Score                     Overall
                                        IT QOS

       Sales             HR Service   Logistics
       Service
       Treasury          Service      Budget
       Service           Desk
SERVICE CATALOG 7-Step ROUTE MAP                                                     YOU ?
                      Feasibility - work out what benefits will be achievable at what cost – be
   STRATEGY           clear and realistic on expectations.

1. Feasibility        Workshops – these are essential to get people together and moving
                      forward quickly. Get everyone together and at the same level of
2. Workshops          understanding.
3. Customer Liaison   Customer liaison / negotiation - talk to customers and users and get
                      their input in their own words.

                      IT Liaison / Negotiation - liaise and negotiate with IT – keep the focus
    DESIGN            on the business needs (diplomacy required..)

4. IT Liaison         Service Design - what are the service and offerings, how do they
                      integrate with each other and other ITSM processes. What governance
5. Service Design     processes are needed to maintain them?
6. Documentation      Documentation – keep it simple and clear. Don’t let this be driven by
                      technical focus.

                      Implementation – it is essential to get the right people with the right
IMPLEMENTATION        skills and approach involved – much of this work is business
                      negotiation and liaison (albeit with technical understanding). It is
                      therefore not advisable to have junior or overly-technical people
7. Implementation     involved apart from for reference on technical issues.

                      Strong governance and on-going maintenance is essential to ensure
                      that services remain current and relevant.
STRATEGY
 1. Feasibility
 2. Workshops
 3. Customer Liaison


Feasibility - work out what benefits will be achievable at
what cost – be clear and realistic on expectations.

Workshops – these are essential to get people together
and moving forward quickly. Get everyone together and at
the same level of understanding.

Customer liaison / negotiation - talk to customers and
users and get their input in their own words.
High-Level Services List
     SERVICE              FUNCTION              CUSTOMER               USERS                 IT DELIVERY
Name of the    What does this do? i.e.     The ultimate          Who are the users,   This is how IT delivers
service        provides mobile comms,      business customer –   which                this service – support
               makes payments, receives    who pays for the      departments, how     teams, 3rd parties,
               orders, delivers training   service and agrees    many users are       owners, which part of
                                           the SLA               there                the infrastructure are
                                                                                      required
Term          Definition   Current use
Service

Service Offering

Service Catalog
(SC)
 SC User
     Request Portal

     SC Business
      View

     SC Technical
      View

Service Entity


Service Portfolio


SLA

OLA
                                         43
Term                                      Definition                                    Current use
Service             A bundle of activities (IT, people and process) combined to provide a
                    business outcome
Service Offering    A specific task offered as part of a service ( e.g.
                    create/change/remove/retire)
Service Catalog     A framework of services (+ offerings)provided as a multi-level set of Catalog of Services
(SC)                information, including:
 SC User           Front end user-friendly interface for users to get information and     Service Catalog
     Request Portal fulfillment of services and offerings (e.g. like Amazon)
     SC Business    Outputs intended for business customers/users. Identifying service
      View           performance, supply and demand etc. (e.g. reports + scorecards)

     SC Technical   Technical and organizational information to support the IS/IT
      View           organization in delivering the services and offerings (e.g. technical +
                     process documentation)
Service Entity       Features/values recorded as part of the service

                     (e.g. owner, customer, components, SLA)
Service Portfolio    The lifecycle management of Services from pipeline through to             Service Offering (?)
                     retiral. ‘Service Catalog’ is the live service status.
SLA                  Written target for service performance and delivery agreed with
                     customer
OLA                  Internal SLA to define inter-departmental responsibilities required to
                                                                                                          44
                     meet customer SLAs
YU ?

      DESIGN
  4. IT Liaison
  5. Service Design
  6. Documentation


IT Liaison / Negotiation - liaise and negotiate with IT –
keep the focus on the business needs (diplomacy
required..)

Service Design - what are the service and offerings, how
do they integrate with each other and other ITSM
processes. What governance processes are needed to
maintain them?

Documentation – keep it simple and clear. Don’t let this be
driven by technical focus.
Service Attributes
•   Description      •   Criticality
•   Business Area    •   Customer Resp.
•   Customer         •   Sourcing Model
•   Users            •   Contingency/DR
•   SLA              •   Portfolio Status
•   Service Type     •   Service Owner
•   IT Delivery      •   Cost/Price
Service Catalog Hierarchy
Service Catalog Hierarchy – Non-IT
Service Catalog Hierarchy – Non-IT
IMPLEMENTATION

  7. Implementation



Implementation – it is essential to get the right people
with the right skills and approach involved – much of
this work is business negotiation and liaison (albeit with
technical understanding). It is therefore not advisable to
have junior or overly-technical people involved apart
from for reference on technical issues.

Strong governance and on-going maintenance is
essential to ensure that services remain current and
relevant.
What are the challenges?
• Developing business/non-IT skills
   • Commercial negotiation
   • Marketing + communications
   • Moving to ‘supply chain’ management
• Overcoming resistance – from IT
• Inertia and lack of momentum
• Old IT/ITIL thinking


‘Walk the walk’ with our
customers
Thank you for listening…
For more information:

bjr@barclayrae.com
@barclayrae
www.barclayrae.com
www.itsmtv.co.uk



     52
Service Catalog Views
R em ove /
User Portal                                 N ew Starter
                                                           C hange
                                                                             C lose
                                                                                           A dditional
                                                                                                                          Lev 1
                                                           Services                        Services
                                                                           Em ployee




                                                                                              System
Telephone   C om puter
                            Mobile
                            Working
                                                 Printer
                                                Services
                                                           A pplications
                                                                               H elp &
                                                                              Support
                                                                                             H osting &
                                                                                                          Professional
                                                                                                           IT Services
                                                                                                                          Lev 2
                                                                                              Security




Telephone                                                       HR          Self Service
               Em ail     Conferencing           Printer                                      H osting     IT Training
 Services                                                  A pplications         Fix




 D esktop      Web           H om e             C entral     Finance                                           IT
             Services                                                      Service D esk      Storage
Telephone                   Working             Printing   A pplications                                  C onsultancy



                                                                                            Security &
 Mobile                                                        Office                                            IT
            Peripherals   Em ail off N et                                                    A ccess
 Phone                                                     A pplications                                  D evelopm ent
                                                                                             C ontrol



                          Touchscreen                          More
            D esktop PC                                                                                    IT Projects
                            Mobility                       A pplications




                                                                                                           IT Service
            Laptop PC                                Services                                               D elivery




                                                 Sub-Services

  Offerings Ğ Provide Move Recover Leaving Configure Refresh Transfer Amend



                                                                                                                            54
Section 1.3                                         Business View


                C om plaints
Services with                         SLA          D em and         B usiness         Portfolio                        B udget    IT Process
                     &                                                                              C SI Initiatives
   C harge                       Perform ance    Managem ent        R esilience    D evelopm ent                       B alance     Manual
                Suggestions




 Individual                                        B usiness       R esilience                                         Monthly
                 C om plaint      RAG Trend                                          Portfolio       Initiatives
 Services &                                         Staffing      C ategories to                                       B udget    H igh Level
                   Trends          Report                                            B riefing       D escribed
   C harge                                        Predictions     A pplications                                        B alance



   Team                                           Project to       R esilience
                Trends from           SLA
 Services &                                        Service         C ategories                                                    Mid Level
                 Questions       D escriptions
  C harge                                         Prediction       Explained


Organisation                                        Project
                Suggestions      H ow SLA is                       R esilience                                                     Links to
   C harge                                         Staffing
                  Logged          Measured                            D etail                                                       Policy
 Sum m ary                                        Prediction



                C om plim ents                                                                                                     Links to
                   Posted
                                                 B A U D em and                                    Screens                          D etail




                                                                                             Sub Screens




                                                                                                                                      55
Section 1.4                                      Technical View


                  B usiness        D isaster                       Translation
  C apacity                                        Perform ance                   C onfiguration      Event          C SI      IT Process
                  R esilience       Events                         B usiness to
  Guidance                                         Support SLA                        D etail      Managem ent   Program m e     Manual
                  Technical       Preparation                       Technical




  Project to       R esilience
                                                    R A G Trend    Section 1.2                        Event      Initiative
   Service       C ategories to    Preparation                                      H ot Spots                                 H igh Level
                                                      R eport       level 2 -5                       Warning     D escribed
  Prediction     A pplications


  Project to      R esilience
                                  R em ote D R          SLA         Technical        H ot Spot                   Program m e
   Staffing       C ategories                                                                       Event Log                  Mid Level
                                  H ost & em ail   D escriptions   Translation         D etail                      R ead
  Prediction      Explained


                                                                                   Processing                    Search &
                  R esilience                      H ow SLA is                                     Log Search                   Links to
B A U D em and                                                                          by                       Export for
                     D etail                        Measured                                        & Export                     Policy
                                                                                   A pplication                  R eporting


   H osting
                   Im pact &                       Operational                    C onfiguration                                Links to
   C apacity
                  R oot C ause                      Measures                          Item s                                     D etail
    D esign


                                                                                    H ardware
   C urrent
                                                                                   D iscovered
C onsum ption
                                                                                       D etail


 C om ponent                                                                                             Screens
C onsum ption
   B alance



    People
                                                                                                     Sub Screens
   C apacity




                                                                                                                                   56

Service catalogue presentation

  • 1.
    Service Catalogue +SLM 7 Steps to deliver and demonstrate value Barclay Rae
  • 2.
    Consulting, Mentoring +Troubleshooting Media + Research 400+ consulting projects since 1994 www.itsmtv.co.uk www.barclayrae.com 2
  • 3.
  • 4.
  • 5.
    The Word onthe Street ‘Service Catalogue drives your people. It is a key mechanism in cultural change, the foundation of customer relationship, and a pivotal tool for organising effort.’ Rob England ‘Without a service catalog, your public, private, or hybrid cloud is just a fog bank.’ Frank Bucalo Senior Architect, IT Service ‘Service Catalogs are the cornerstone of service delivery and automation, and the starting point for any company interested in saving money and improving relationships with the business.’ Forrester Research ‘The Service Catalog has also proven to be a critical success factor for the transformation to a Service Management culture. Recognizing that the real value the IT organization provides to “the business” is not about offering servers or routers or workstations, it is about offering integrated technology solutions that optimize critical business processes.’ David M. Colburn, United States Army
  • 6.
    Facts & Figures 64%of IT Executives felt that they were 'unable to provide the business with quantifiable metrics demonstrating the value of IT services and assets.’ Axios Systems Survey 2009 Only 17% of finance executives agreed with the statement "Our investments in IT are delivering business value." Gartner & IBM survey of 456 senior business executives 96% of respondents identified solid executive sponsorship as either “Very Important” or “Somewhat Important” to the success of their Service Catalog project. EMA Service Catalog Survey 2008 95% of survey respondents ranked detailed requirements as “very important” or “somewhat important” to the success of their Service Catalog project and 92% ranked a detailed project plan similarly. EMA Service Catalog Survey 2008
  • 7.
    What Do WeMean By Services? Analogy: The Airline Business Large amount of technology, resources, skills and knowledge deployed to get passengers from A to B, safely and on time. As passengers, our focal point of the service is the flight and skill of the pilots. However every component has a part to play in the success of the service: The flight may land on time but delays with baggage result in passengers being late.
  • 8.
    ‘SERVICE’ ‘A bundle ofactivities (IT, people and process) combined to provide a business outcome
  • 9.
    What Metrics dowe produce? First Time fix First Contact Resolution Response time Turnaround Time Abandon Rate Average Time to Answer Average Call duration
  • 10.
    What Metrics dowe produce? First Time fix System Availability First Contact Resolution Server Availability Response time Application Availability Turnaround Time System response time Abandon Rate No. of incidents Average Time to Answer No. of requests Average Call duration No. of changes SLA performance
  • 11.
    What Metrics dowe produce? o All the 9s… o Volumes o IT Processes o ‘SLA’ performance o IT Systems performance
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
    SLAs are awaste of time?
  • 18.
    Service Level Agreements Whatdo you mean?  Patronising  Irrelevant  Inappropriate  IT and system-focussed  Over-engineered  Under-estimated  Un-measureable  Un-actionable  Not measured or acted upon  Generally untroubled by use Generally just about what IT thinks it does Usually annoying to non-IT people…
  • 19.
    The SLA smallprint… – ICT accepts no responsibility whatsoever at any time for anything it might or might not do.. – The person of the first party shall be ICT, pending approval from the ICT Steering committee. In respect of the second party this should be the user community as appropriate. 3 rd parties are not allowed, unless these include free alcohol. – SLA performance is not guaranteed, but is expected to reach 60% of 90% of the agreed target, except when the DBAs and Network team are on a bender. – The Service Desk will accept calls from users if they really feel like it They also reserve the right to ask unreasonable questions about serial numbers, otherwise all contact is invalid. – IT reserve the right to send meaningless automated emails to users at any time. – Query response times are expected to be sub-second, unless there is excessive run-time load from QRG tables on the JTAG server in X/DOPP. XSPART nodes are enabled for elves, except under BS/0906688, including abusive calls to the monkfish database. – IT will respond in a timely manner to high-priority business incidents, if they are asked very nicely indeed and also made to feel very special and important. – System availability will be 100% when not required, patchy at key business times, which are not agreed or understood. – All requests will be ignored until they are chased up by users or their angry PAs. – Requests for PCs will be delivered within 6 months or at least before the requester leaves the organisation – or whichever is most convenient for the IT department. – Users are responsible for care and maintenance of their own PCs – if not they will be subject to abuse and humiliation from young geeky guys with no socials skills and who don’t have any other sort of life and couldn’t get a girlfriend. – This SLA document is binding and any breach of the aforementioned conditions will result in immediate dismissal and summary execution. – This SLA will be filed for reference and stored in the private folder D://unused/garbage, marked ‘Do not read’. In the event of it being read it will become invalid. – Issues or complaints should be escalated to the least responsible person available, and will be ignored.
  • 20.
    Why are SLAslike this?
  • 21.
    SLAs are oftenstarted without services being defined or understood. There is often little understanding of how to build and negotiate services and SLAs. In effect the services are also being defined as well as the SLAs – perhaps unwittingly.
  • 22.
    7 Simple Tipsfor Successful SLAs
  • 23.
    How do youmake your SLAs successful…? 1. Start with Services – understand what current services are provided and what needs to be designed for improvement.
  • 24.
    2. Ask thebusiness what they want… …or what they think their services are
  • 25.
    3. Use simpleand appropriate language
  • 26.
    4. Keep theSLA realistic and achievable
  • 27.
    5. Only setup an SLA that can be measured
  • 28.
    6. Keep themshort and concise… …otherwise no one will read them.
  • 29.
  • 30.
  • 31.
    CUSTOMERS SLM PROJECT IT SERVICE PROVIDER What IT services Planning What IT services are key to you? do you provide? Workshops Key people Infrastructure Negotiation Key systems Networks Facilitation Key departments Documentation Applications Key times/targets Build Service Service/Help Desk When do you need them? Catalog Set up reporting Procurement How quickly do you need them restored? Projects Set up review mechanisms What support information do you What are your resource levels? need? Plan full implementation 3rd party contracts? What reviews do you need? Ongoing support What levels of service can you as needed provide?
  • 34.
    Service Catalogue Elements Elements: User Request Catalogue For the IT end-user Self-service request fulfillment Similar to online shopping experience Business Service Catalogue View For the business customer In business terms Specific non-IT information Business SLAs Technical Service Catalogue View For the IT provider Technical and supply-chain details Component level service data OLA and Underpinning Contracts
  • 35.
  • 36.
  • 37.
    Key Questions • Dowe deliver what our customers need via our services? • Can we demonstrate this? • Would our customers agree?
  • 38.
    Moments of truth • A customer can log on to the website and buy CDs and DVDs • Doctors and medical staff access records when needed • Sales staff get information when they need it to help sell products to customers • Till and EPOS systems area available to checkout staff. • Logistics teams get the information they need to distribute goods to stores • Online and communications systems are available to process financial transactions between organisations • Call centre systems are available and responsive to staff when customers call in • Systems are available for access to mobile and broadcast communications networks • A system user can access their applications when they need to work • Support is available, helpful and effective when needed
  • 39.
    Overall metrics Customer Satisfaction Net Promoter Score Overall IT QOS Sales HR Service Logistics Service Treasury Service Budget Service Desk
  • 40.
    SERVICE CATALOG 7-StepROUTE MAP YOU ? Feasibility - work out what benefits will be achievable at what cost – be STRATEGY clear and realistic on expectations. 1. Feasibility Workshops – these are essential to get people together and moving forward quickly. Get everyone together and at the same level of 2. Workshops understanding. 3. Customer Liaison Customer liaison / negotiation - talk to customers and users and get their input in their own words. IT Liaison / Negotiation - liaise and negotiate with IT – keep the focus DESIGN on the business needs (diplomacy required..) 4. IT Liaison Service Design - what are the service and offerings, how do they integrate with each other and other ITSM processes. What governance 5. Service Design processes are needed to maintain them? 6. Documentation Documentation – keep it simple and clear. Don’t let this be driven by technical focus. Implementation – it is essential to get the right people with the right IMPLEMENTATION skills and approach involved – much of this work is business negotiation and liaison (albeit with technical understanding). It is therefore not advisable to have junior or overly-technical people 7. Implementation involved apart from for reference on technical issues. Strong governance and on-going maintenance is essential to ensure that services remain current and relevant.
  • 41.
    STRATEGY 1. Feasibility 2. Workshops 3. Customer Liaison Feasibility - work out what benefits will be achievable at what cost – be clear and realistic on expectations. Workshops – these are essential to get people together and moving forward quickly. Get everyone together and at the same level of understanding. Customer liaison / negotiation - talk to customers and users and get their input in their own words.
  • 42.
    High-Level Services List SERVICE FUNCTION CUSTOMER USERS IT DELIVERY Name of the What does this do? i.e. The ultimate Who are the users, This is how IT delivers service provides mobile comms, business customer – which this service – support makes payments, receives who pays for the departments, how teams, 3rd parties, orders, delivers training service and agrees many users are owners, which part of the SLA there the infrastructure are required
  • 43.
    Term Definition Current use Service Service Offering Service Catalog (SC)  SC User Request Portal  SC Business View  SC Technical View Service Entity Service Portfolio SLA OLA 43
  • 44.
    Term Definition Current use Service A bundle of activities (IT, people and process) combined to provide a business outcome Service Offering A specific task offered as part of a service ( e.g. create/change/remove/retire) Service Catalog A framework of services (+ offerings)provided as a multi-level set of Catalog of Services (SC) information, including:  SC User Front end user-friendly interface for users to get information and Service Catalog Request Portal fulfillment of services and offerings (e.g. like Amazon)  SC Business Outputs intended for business customers/users. Identifying service View performance, supply and demand etc. (e.g. reports + scorecards)  SC Technical Technical and organizational information to support the IS/IT View organization in delivering the services and offerings (e.g. technical + process documentation) Service Entity Features/values recorded as part of the service (e.g. owner, customer, components, SLA) Service Portfolio The lifecycle management of Services from pipeline through to Service Offering (?) retiral. ‘Service Catalog’ is the live service status. SLA Written target for service performance and delivery agreed with customer OLA Internal SLA to define inter-departmental responsibilities required to 44 meet customer SLAs
  • 45.
    YU ? DESIGN 4. IT Liaison 5. Service Design 6. Documentation IT Liaison / Negotiation - liaise and negotiate with IT – keep the focus on the business needs (diplomacy required..) Service Design - what are the service and offerings, how do they integrate with each other and other ITSM processes. What governance processes are needed to maintain them? Documentation – keep it simple and clear. Don’t let this be driven by technical focus.
  • 46.
    Service Attributes • Description • Criticality • Business Area • Customer Resp. • Customer • Sourcing Model • Users • Contingency/DR • SLA • Portfolio Status • Service Type • Service Owner • IT Delivery • Cost/Price
  • 47.
  • 48.
  • 49.
  • 50.
    IMPLEMENTATION 7.Implementation Implementation – it is essential to get the right people with the right skills and approach involved – much of this work is business negotiation and liaison (albeit with technical understanding). It is therefore not advisable to have junior or overly-technical people involved apart from for reference on technical issues. Strong governance and on-going maintenance is essential to ensure that services remain current and relevant.
  • 51.
    What are thechallenges? • Developing business/non-IT skills • Commercial negotiation • Marketing + communications • Moving to ‘supply chain’ management • Overcoming resistance – from IT • Inertia and lack of momentum • Old IT/ITIL thinking ‘Walk the walk’ with our customers
  • 52.
    Thank you forlistening… For more information: bjr@barclayrae.com @barclayrae www.barclayrae.com www.itsmtv.co.uk 52
  • 53.
  • 54.
    R em ove/ User Portal N ew Starter C hange C lose A dditional Lev 1 Services Services Em ployee System Telephone C om puter Mobile Working Printer Services A pplications H elp & Support H osting & Professional IT Services Lev 2 Security Telephone HR Self Service Em ail Conferencing Printer H osting IT Training Services A pplications Fix D esktop Web H om e C entral Finance IT Services Service D esk Storage Telephone Working Printing A pplications C onsultancy Security & Mobile Office IT Peripherals Em ail off N et A ccess Phone A pplications D evelopm ent C ontrol Touchscreen More D esktop PC IT Projects Mobility A pplications IT Service Laptop PC Services D elivery Sub-Services Offerings Ğ Provide Move Recover Leaving Configure Refresh Transfer Amend 54
  • 55.
    Section 1.3 Business View C om plaints Services with SLA D em and B usiness Portfolio B udget IT Process & C SI Initiatives C harge Perform ance Managem ent R esilience D evelopm ent B alance Manual Suggestions Individual B usiness R esilience Monthly C om plaint RAG Trend Portfolio Initiatives Services & Staffing C ategories to B udget H igh Level Trends Report B riefing D escribed C harge Predictions A pplications B alance Team Project to R esilience Trends from SLA Services & Service C ategories Mid Level Questions D escriptions C harge Prediction Explained Organisation Project Suggestions H ow SLA is R esilience Links to C harge Staffing Logged Measured D etail Policy Sum m ary Prediction C om plim ents Links to Posted B A U D em and Screens D etail Sub Screens 55
  • 56.
    Section 1.4 Technical View B usiness D isaster Translation C apacity Perform ance C onfiguration Event C SI IT Process R esilience Events B usiness to Guidance Support SLA D etail Managem ent Program m e Manual Technical Preparation Technical Project to R esilience R A G Trend Section 1.2 Event Initiative Service C ategories to Preparation H ot Spots H igh Level R eport level 2 -5 Warning D escribed Prediction A pplications Project to R esilience R em ote D R SLA Technical H ot Spot Program m e Staffing C ategories Event Log Mid Level H ost & em ail D escriptions Translation D etail R ead Prediction Explained Processing Search & R esilience H ow SLA is Log Search Links to B A U D em and by Export for D etail Measured & Export Policy A pplication R eporting H osting Im pact & Operational C onfiguration Links to C apacity R oot C ause Measures Item s D etail D esign H ardware C urrent D iscovered C onsum ption D etail C om ponent Screens C onsum ption B alance People Sub Screens C apacity 56