FUSION FOR IS CONSULTANCY



                            To provide advice on
                            organisation , management
Mission                     and governance of IT
                            Department

                            • Central Government

 Type of clients              Departments
                            • Banks
                            • Higher Education
                              Institutions

Structure                   • Research
                            • Management
                            • Client Contact
FUSION FOR IS CONSULTANCY




                                           COMPANY PROFILE
              ISO 20000
   ITIL

                             • In Fusion, we use the ISO 20000 standard which is the
             Our               1st international standard for IT service management
          experience
                               (ITSM).
                             • We use these standards aligned with process approach
                               defined within the IT Infrastructure Library (ITIL).
                             • We have gained our experience from our successful
                               collaboration with our clients .
Reliable IT Service
PROVEN SUCCESS


A UK-based services business, they have more than 30 years’ experience and
support many customer organisations by utilising ITIL V3 i.e. Costain, Eddie
Stobart, Phones4U
"I am genuinely pleased with the service. I would recommend Fusion
IT to anyone. Thank you for the support and professional guidance.” –
   Mark Dean – ICM Service Manager
PROVEN SUCCESS




They manage the collection, treatment and distribution of water in Yorkshire.
“Winner Service Desk - Service Desk Institute/Computer Weekly – Award –
2008”
“Winner IT Department of the Year - British Computer Society 2010”
"I find the service you provide to be 100% satisfactory. As our
partners, we know Fusion IT are extremely efficient and I would
recommend you without hesitation to any organisation in
planning and implementing an ISO 20000/ITIL V3 Strategy”.
   Julian Halstead– IT Service Management Manager
PROVEN SUCCESS

“ISO 20000 &ITIL V3 - In terms of it being important to the NHS it's for
the same reasons it would be for anybody else really. It shares good
practice, enables the organisations to work across teams - which is something
that's difficult for most organisations but particularly difficult for large
organisations like the NHS.
“Winner – Best IT Service Desk 2011 Health Business Awards

 "Our long term relationship with Fusion IT has proven to be very beneficial to us
and our customers”.

 Clark Disley - NHS Service Desk Manager
BACKGROUND AND ISSUES SUMMARY
Background and Issues Summary

    Problem & Cause                                            Effects
1. Problem
                                                     •    Damage core business
    • Low quality of IT services provided
       by outsource                                  •    Damage public service
2. Cause                                                  activities
    • Unprofessional of Outsource



    Customer Needs                                       Customer Needs
•   Clarify 4 issues

     For Board of Directors
     • How the IT Department is organized and   1.   “Implementation Roadmap” for the
       managed                                       new IT services department
     • How to ensure Professionalism by new
       IT department                            2.   Proposed solution will benefit the
                                                     business and the service provided by
     For Senior Director                             the department
     • Range of services provided by IT
     • Concept of Direct and contracted Staff
Background and Issues Summary

  Establish IT Services Department
                             GOAL
   Establish High Professional IT Services Department

REQUIREMENTS FROM THE DEPARTMENT
   1. Satisfy Organizational Needs
   2. Enhance Business’s Overall Reputation
   3. Benefit the business
   4. Benefit business customers

                                     Proposed


                 “Implementation Roadmap”

                     “Proposed Solution”
PART 1


FOR BOARD OF DIRECTORS
PART 1.1


 HOW THE IT DEPARTMENT
SHOULD BE ORGANIZED AND
       MANAGED
1.1) How IT is organized and managed

                     VISION
We will provide high quality of professional IT services
to increase business value and customer satisfaction
                 in cost-effective way.



                   MISSION
  Continuous improvement to IT service process and people
  Provide high quality of IT services which able to:
    1. Satisfy Organizational Needs
    2. Enhance Overall Reputation
    3. Benefit the business
    4. Benefit business customers
1.1) How IT is organized and managed

                                              STRATEGY
    1.     Organizing and managing IT Dept. following ITIL Framework
    2.     Controlling IT service standard by using ISO20000
    3.     Implement IT Governance though ITIL and ISO 20000

  ITIL is a set of global best practices for IT                                   ISO 20000 is the international standard
    Service Management that focuses on                                                 for IT Service management
aligning IT services with the business needs.                                              That works with ITIL

     ITIL: Information Technology Infrastructure Library




                       Pictures from http://web.bryant.edu/~commtech/itil_fw.html and http://20000.fwtk.org/20000-itil.htm
1.1) How IT is organized and managed

     Manage IT Services Department following ITIL Framework

                                                                                                                      1) Service Desk is a
                                                                                                                     single point of contact
2.1) Service Delivery: looks at                                                                                  for end-users and customers
   long term planning and
       improvement of
     IT service provision                                                                                   2.2) Service Support : concentrate on
                                                                                                            the day-to-day operation and support




                                  SERVICE DELIVERY & SERVICE SUPPORT
           Adopted from APM GROUP, Service Management . [Online]. Last accessed 11 February 2012 at: http://www.bigbossmanagement.net/service-management/
                                                  and RUDD, Colinn (2005), IT Service Management V 2.1b, UK, itSMF Ltd.
CHECK THE APPENDIX FOR
FURTHER DETAILS ON HOW IT IS
  ORGANIZED AND MANAGED
PART 1.2

  How to ensure the Department
operates to an appropriate level of IT
           professionalism
1.2) How to ensure professionalism
        Customer Satisfaction                                 Key Factors to ensure professionalism



            Professionalism                              1.   Process : Good IT service process
          Quality of IT Services                               •   Implementing ITIL, ISO2000 and IT
                                                                   Governance e.g.
                                        T                            •    Continuous service improvement
   P
                     P
                                        E                            •    Problem analysis
   R                                    C
   O
                     E
                                        N
                                                                     •    Service Measurement
   C
                     O
                                        O                            •    Knowledge base
                     P
   E                                    L                2.   People: Professional IT Staff
                     L
   S                                    O
   S
                     E
                                        G                      •   Continuous Development
                                        Y                      •   Evaluated by certification, KPI (Key
                                                                   performance indicator) and competencies
       Continuous People Development
                                                         3.   Technologies: Effective Technologies
       Continuous Service Improvement                          • Use technologies following ITIL guidance ex.
                                                                 Incident and knowledge base software
         ITIL & ISO20000 Standards                                    •    Reduce cost and human resource
               IT Governance
                                                                      •    Reduce time



  ITIL provide the best practice methodologies to improve process, people and technology.

Professional IT Department                  • Good quality of IT
                                              Services                         More Customers &
1) Professional staffs                      • Add business value
2) Good IT Service Process                                                        More Profit
                                            • Reduce Cost
3) Effective Technologies
1.2) How to ensure professionalism
                           IT Services are provided following ITIL framework

             Professional Processes                                                                                    Benefits

User can request service through a single point of
                                                                                         Improved user service, perception and satisfaction.
contact.

Service Desk provides initial assessment of all incidents;
                                                                                         Improved productivity of support staff
make first attempt at incident resolution.


All service requests are recorded and monitored.                                         Eliminate the loss of incidents and service requests


All service requests are classified in terms of urgency,
                                                                                         Reduce business impact of incidents by timely solution
impact and priority.

                                                                                         Improve skills of the IT staff and reduce time to solve
A knowledge base records both problems and solutions.
                                                                                         problems

All service requests have an incident owner who                                          Reduce the time of recovery problem and increase
monitors, tracks and communicates to the requester.                                      satisfaction.

All incidents are recorded into a database in order to
                                                                                         Proactive prevention of problems.
make trend analysis.

The major problems are reviewed to analyse                                               Prevent occurrence of problems due to major
the root cause.                                                                                                                             a
                                                                                         problems that may cause a big impact to the business.

       Adopted from APM GROUP, ITIL: Overview and Benefit. [Online]. Last accessed 12 Feb 2012 at: http://www.itil-officialsite.com/AboutITIL/WhatisITIL.aspx
FOR FURTHER TECHNICAL DETAILS
      ON HOW TO ENSURE
PROFESSIONALISM PLEASE SEE THE
           APPENDIX
PART 2


FOR SENIOR MANAGERS
PART 2.1


RANGE OF SERVICES
2.1) Range of IT services

       Summary Range of ITIL Services
                                                           Client support
                                                 provide
Services provided by IT to users and customers             (Help desk/Service Desk)

      1.   Service Desk                                    Tele-communication
                                                 provide
                                                           Support e.g.
      2.   IT Service Support:                             internet, telephone system
            •    Incident management
            •    Problem management                        Application Support
                                                 provide
            •    Configuration management                  e.g. Accounting and
            •    Change management                         HR application
            •    Release Management

                                                           Systems Support
      3.   IT Service Delivery:                  provide
                                                           e.g. Security, Servers,
            •    Service Level management
                                                           E-mail and network
            •    Financial management
            •    Capacity management
            •    Service Continuity management   provide    Software
            •    Availability management                    Development


           All IT services are managed and organized following ITIL management
FOR FURTHER TECHNICAL DETAILS
    ON RANGE OF IT SERVICES
    PLEASE SEE THE APPENDIX
PART 2.2


CONCEPT OF DIRECT AND
  CONTRACTED STAFF
2.2) Concept of Direct and Contracted Staff
                                                                                              IT DIRECTOR
                      IT DEPARTMENT
       ORGANIZATION STRUCTURE                                                                                                               Contracted Staff
                                                                                                IT MANAGER




           SERVICE                                                      APPLICATION                           SERVICE       SERVICE
                           INCIDENT        PROBLEM          CHANGE                        CONFIG.                                           CAPACITY         AVAILABILIT           FINANCIAL
            DESK                                                         & RELEASE                             LEVEL      CONTINUITY
                           MANAGER         MANAGER          MANAGER                       MANAGER                                           MANAGER          Y MANAGER             MANAGER
           MANAGER                                                       MANAGER                              MANAGER      MANAGER



           SERVICE
          DESK TEAM
           LEADER                                                                                   SERVICE         SERVICE
                                 PROBLEM         CHANGE           RELEASE       CONFIG.                                          CAPACITY               AVAIL.             FINANCIAL
                                                                                                     LEVEL           CONT.
                                 ANALYST        INITIATOR         ANALYST       ANALYST                                          ANALYST               ANALYST              ANALYST
                                                                                                    ANALYST         ANALYST


                                                 CHANGE                                             SERVICE         SERVICE
 SERVICE                         PROBLEM                          SYSTEM        CONFIG.                                          CAPACITY               AVAIL.             FINANCIAL
                     INCIDENT                    PRACTITI                                            LEVEL           CONT.
  DESK                           ANALYST                          ANALYST       ANALYST                                          ANALYST               ANALYST              ANALYST
                      ANALYST                     ONOR                                              ANALYST         ANALYST
 ANALYST


 SERVICE                                                                                   OPERATION
                     INCIDENT                                    DEVELOPER                  (SYSTEM)
  DESK
                      ANALYST                                                               MANAGER
 ANALYST


                                                                APLLICATION
                                                                  SUPPORT
                                                                                 IT OPERATION          SECURITY                                                             Legend
                                                                                    ANALYST            ANALYST                 Some managers
                            Contracted Staff                                                                             can support more than one                         INTERNAL STAFF
 CONTRACT
SERVICE DESK                                                    APPLICATION       DATABASE             DATABASE
                                                                                                                        function to minimize human
  ANALYST
                      1.   Service Desk Analyst                 CONSULTANT         ADMIN.               ADMIN               resource and increase                    EXTERNAL CONTRACTED
                      2.   Application Consultant                                                                         communication flexibility.                     AGENCY STAFF
 CONTRACT
SERVICE DESK          3.   Developer                                              DATABASE              SYSTEM
                                                                DEVELOPER
  ANALYST             4.   Database Consultant                                   CONSULTANT             ADMIN

                                                                                                                              The number of managers and employee
                                                                                                                               in each positions will be assigned later
                                                                                                                                    in manpower analysis phase.
2.2) Concept of Direct and Contracted Staff
                                  Contracted Staff: Service Desk Analyst

               Main Responsibilities                                                   Concept
                                                                                                         Direct Staff
                                                             1. Employ Direct Staff
1. Receive and record all calls from User; deal directly     2. Hire contracted staff when the
   with simple requests and complaints                          number of incidents or IT
2. Provide initial assessment of all incidents; make first      requests are overloaded
                                                                                                       Contracted Staff
   attempt at incident resolution and/or refer to 2nd line   3. Sign Contract 3-12 months
   support                                                   4. The number of direct and
3. Monitor and record all incidents                             contracted staff are defined by
4. Keep users informed on status and progress                   using capacity management.


                                                                                       Benefits

                                                             1. Minimizes the need to hire a lot of people
                                                             2. The number of service desk support can adjust with the
                                                                volume of calls or IT requests.
                                                             3. Some job related to confidential information can assign to
                                                                direct staff.
                      See Appendix slide 13                  4. Minimize cost and human resource                1
2.2) Concept of Direct and Contracted Staff
                        SUMMARY CONCEPTS OF CONTRACTED STAFF

                Application Consultant                                                 Developer

Main Responsibilities: Analyze, design and implement            Main Responsibilities: Develop Software following
                                                                business needs
enterprise application e.g. Enterprise Resource Planning or
                                                                Concept:
Human Resource application
                                                                1. Hire both direct and contracted staff
Reason:
                                                                2. The number of developer is depended on the volume of
1. Enterprise software needs specialist to implement.              software requested.
2. It is expensive to hire direct staff in order to implement   3. Some specific software e.g. mobile application can hire
                                                                   contracted staff
   enterprise system only one time.


                  Database Consultant                                                     Benefits

Main Responsibilities: Analyze, design and implement a
custom database following business needs                        1. Reduce training cost
Reason:                                                         2. Reduce time to implement
1. Some database design needs specialist to reduce              3. Reduce risk of failure
   software developing time, and ensure reliability and         4. No need to always employ for specialist
   performance.
FOR FURTHER TECHNICAL DETAILS
  ON CONCEPT OF DIRECT AND
      CONTRACTED STAFF
    PLEASE SEE THE APPENDIX
PART 3
Implementation Roadmap for
      IT Department
3. IMPLEMENTATION ROADMAP FOR IT DEPARTMENT                                                                                                                                      A
                                               Approach – ITIL Framework , ISO20000 Standard and IT Governance




                                                                                                                                                                  GOAL:

                                                                                                                                                                     Company obtains ISO 20000
                                                                                                                                                                      Certificate
                                                                                                            GOAL:

                                                                                                             Finish implementation of ISO
                                                            GOAL:                                             20000 (Total 16 Months)
Implementation




                                                             All IT Members obtain ITIL
                 GOAL:                                        Certificate                                                                                              Main Activities
                                                             Finish implementation of ITIL                                                                            - Auditing ISO 20000
                    Recruit all positions                    (8 Months)                                                                                               Certificate
                    Approve IT Plan
                    Approve IT Budget                                                                                                                                 - Continuous Service
                                                                                                                   Main Activities                                     Improvement with ITIL
                    Complete Foundation Training
                                                                                                                   - Implementation ISO20000-1                         - Continuous People
                                                                                                                   - Continuous People                                 development
                                                                    Main Activities                                development
                                                                    - Implementation ITIL
                                                                    - Implementation ISO20000-2
                       Main Activities                              - Continuous People
                       - Transform business plan to IT              development
                       Strategy & IT Plan, and approve
                       - Make & Approve JD, Man-
                       power and Budget
                       - Foundation Training about ITIL

                                                     ** ITIL certificates provide for people, whereas ISO 20000 certificate provides for a company

                                 2 Months                                    8 Months                                         8 Months                                     2 months
                                                                                                    20 Months
                                              Pictures from http://20000.fwtk.org/20000-itil.htm and http://www.isoregistration.us/iso_standards/iso_20000.html
FOR FURTHER TECHNICAL DETAILS
 ON IMPLEMENTATION ROADMAP
   PLEASE SEE THE APPENDIX
PART 4
SUMMARY SOLUTIONS &
     BENEFITS
4. Solution Summary                                A



       Organize and Manage New IT Department
              following ITIL Framework
     and control IT Services Standard by ISO 20000

                 MAIN SOLUTIONS
1.   Single Point of contact: Quick response & improve service quality
2.   Problem Analysis:     Find root cause & Prevent problem recurring
3.   Classify Problem:     Set priority & Reduce big impact
4.   Knowledge base:       Improve IT skills and reduce recovery time
5.   Change Analysis:      Prevent impact from changes to IT system
6.   Client Feedback:      Improve Satisfaction
7.   Continuous Training: Improve Professionalism
4. Summary Benefits                                                                                               A


                         Benefits of ITIL Implementation
           BENEFITS TO BUSINESS                                                                                         IMPROVED IT STAFF


1.   A clear business differentiator from                                                        1.      Improved morale of service delivery and
     competitors                                                                                         recipient staff
2.   Closely aligned to commercial business services                                             2.      Increased competence, capability and
     and products                                                                                        productivity of IT staff
3.   Improved systems/ applications availability                                                 3.      Increased staff retention



             IMPROVED SERVICE                                                                                                  REDUCE COST



1.   Improved customer satisfaction through a more                                               1.      Reduced cost of incident or problems
     professional approach to service delivery                                                   2.      Reduced cost of training
2.   Improved IT services through the use of proven                                              3.      Reduced cost of recruitment and training -
     best practice processes                                                                             hiring ITIL qualified people is easier
3.   A benchmark to measure performance against                                                  4.      Improved ROI (Return of Investment) of IT
     in IT projects or services                                                                  5.      Reduced hidden costs that traditionally increases
4.   Improved delivery of third party services                                                           substantially the TCO (Total Cost of
     through the specification of ITIL                                                                   Ownership)


               Adopted from ILX GROUP, Organizational Benefits to ITIL. [Online]. Last accessed 12 February 2012 at: http://www.itiltraining.com/itil-benefits.asp
4. Summary Benefits                                                                                        A


                    Benefits of ISO20000 Implementation
            BENEFITS TO BUSINESS                                                                         IMPROVED STANDARD

                                                                                       1.     Through the creation of a standard consistent
1.   Alignment of information technology services
                                                                                              approach, aids major organizational changes
     and business strategy
                                                                                       2.     Provides a benchmark type comparison with
2.   Enhanced reputation and perception
                                                                                              best practices
3.   Improved relationship between different
                                                                                       3.     Creation of a stable framework for both
     departments via better definition and more
                                                                                              resource training and service management
     clarity in terms of responsibility and goals
                                                                                              automation

                IMPROVED SERVICE                                                                                REDUCE COST


1.   Creation of a formal framework for current
     service improvement projects
2.   Supports 'interchanging' of service providers                                     1.     Creates competitive advantage via the
     and staff by virtue of the creation of inter-                                            promotion of consistent and cost-effective
     enterprise operational processes                                                         services
3.   Fundamental shift to pro-active rather than re-                                   2.     Reduction of risk and thus cost in terms of
     active processes                                                                         external service receipt
4.   By requiring ownership and responsibility at all
     levels, it creates a progressive ethos and culture


        Adopted from ISO20000 CENTRAL), News & Information for ISO 20000. [Online]. Last accessed 13 February 2012 at: http://20000.fwtk.org/benefits.htm
References
1. APM GROUP(No Date), ITIL: Overview and Benefit. [Online]. Last accessed 12 Feb
   2012 at: http://www.itil-officialsite.com/AboutITIL/WhatisITIL.aspx
2. APM GROUP(No Date), Service Management. [Online]. Last accessed 11 February
   2012 at: http://www.bigbossmanagement.net/service-management/
3. ILX GROUP(No Date), Organizational Benefits to ITIL. [Online]. Last accessed 12
   February 2012 at: http://www.itiltraining.com/itil-benefits.asp
4. ISO20000 CENTRAL(No Date), News & Information for ISO 20000. [Online].
   Last accessed 13 February 2012 at: http://20000.fwtk.org/benefits.htm
5. RUDD, Colinn(2005), IT Service Management V 2.1b, UK, itSMF Ltd.
Credits
Contents Editor:           Revathi Tekkali
Team Management:           Mustak Patel & Mohamed Hagras
Slides Creation:           Traitet Thepbandansuk & Mohamed Hagras
Art Director:              Mohamed Hagras


Contents:
     Company Profile:                       Mohamed Hagras
     Proven Success:                        Mustak Patel
     Background and Issues Summary:         Revathi Tekkali
                                             Traitet Thepbandansuk
     IT Organization and management:        Phong Nguyen
                                             Traitet Thepbandansuk
     How to ensure professionalism:         Traitet Thepbandansuk
     Range of Services:                     Traitet Thepbandansuk
     Direct and Contracted Staff:           Jian Zhao
                                             Traitet Thepbandansuk
     Implementation Roadmap:                Traitet Thepbandansuk
     ISO 20000:                             Afsaneh Tafazzoli Moghaddam
     ITIL V3:                               Mustak Patel
                                             Traitet Thepbandansuk
1.   Afsaneh Tafazzoli Moghaddam
2.   Jian Zhao
3.   Mohamed Hagras
4.   Mustak Patel
5.   Phong Nguyen
6.   Revathi Tekkali
7.   Traitet Thepbandansuk

01 design new_it_service_dept_industrialexpertise_feb12

  • 2.
    FUSION FOR ISCONSULTANCY To provide advice on organisation , management Mission and governance of IT Department • Central Government Type of clients Departments • Banks • Higher Education Institutions Structure • Research • Management • Client Contact
  • 3.
    FUSION FOR ISCONSULTANCY COMPANY PROFILE ISO 20000 ITIL • In Fusion, we use the ISO 20000 standard which is the Our 1st international standard for IT service management experience (ITSM). • We use these standards aligned with process approach defined within the IT Infrastructure Library (ITIL). • We have gained our experience from our successful collaboration with our clients . Reliable IT Service
  • 4.
    PROVEN SUCCESS A UK-basedservices business, they have more than 30 years’ experience and support many customer organisations by utilising ITIL V3 i.e. Costain, Eddie Stobart, Phones4U "I am genuinely pleased with the service. I would recommend Fusion IT to anyone. Thank you for the support and professional guidance.” – Mark Dean – ICM Service Manager
  • 5.
    PROVEN SUCCESS They managethe collection, treatment and distribution of water in Yorkshire. “Winner Service Desk - Service Desk Institute/Computer Weekly – Award – 2008” “Winner IT Department of the Year - British Computer Society 2010” "I find the service you provide to be 100% satisfactory. As our partners, we know Fusion IT are extremely efficient and I would recommend you without hesitation to any organisation in planning and implementing an ISO 20000/ITIL V3 Strategy”. Julian Halstead– IT Service Management Manager
  • 6.
    PROVEN SUCCESS “ISO 20000&ITIL V3 - In terms of it being important to the NHS it's for the same reasons it would be for anybody else really. It shares good practice, enables the organisations to work across teams - which is something that's difficult for most organisations but particularly difficult for large organisations like the NHS. “Winner – Best IT Service Desk 2011 Health Business Awards "Our long term relationship with Fusion IT has proven to be very beneficial to us and our customers”. Clark Disley - NHS Service Desk Manager
  • 7.
  • 8.
    Background and IssuesSummary Problem & Cause Effects 1. Problem • Damage core business • Low quality of IT services provided by outsource • Damage public service 2. Cause activities • Unprofessional of Outsource Customer Needs Customer Needs • Clarify 4 issues For Board of Directors • How the IT Department is organized and 1. “Implementation Roadmap” for the managed new IT services department • How to ensure Professionalism by new IT department 2. Proposed solution will benefit the business and the service provided by For Senior Director the department • Range of services provided by IT • Concept of Direct and contracted Staff
  • 9.
    Background and IssuesSummary Establish IT Services Department GOAL Establish High Professional IT Services Department REQUIREMENTS FROM THE DEPARTMENT 1. Satisfy Organizational Needs 2. Enhance Business’s Overall Reputation 3. Benefit the business 4. Benefit business customers Proposed “Implementation Roadmap” “Proposed Solution”
  • 10.
    PART 1 FOR BOARDOF DIRECTORS
  • 11.
    PART 1.1 HOWTHE IT DEPARTMENT SHOULD BE ORGANIZED AND MANAGED
  • 12.
    1.1) How ITis organized and managed VISION We will provide high quality of professional IT services to increase business value and customer satisfaction in cost-effective way. MISSION  Continuous improvement to IT service process and people  Provide high quality of IT services which able to: 1. Satisfy Organizational Needs 2. Enhance Overall Reputation 3. Benefit the business 4. Benefit business customers
  • 13.
    1.1) How ITis organized and managed STRATEGY 1. Organizing and managing IT Dept. following ITIL Framework 2. Controlling IT service standard by using ISO20000 3. Implement IT Governance though ITIL and ISO 20000 ITIL is a set of global best practices for IT ISO 20000 is the international standard Service Management that focuses on for IT Service management aligning IT services with the business needs. That works with ITIL ITIL: Information Technology Infrastructure Library Pictures from http://web.bryant.edu/~commtech/itil_fw.html and http://20000.fwtk.org/20000-itil.htm
  • 14.
    1.1) How ITis organized and managed Manage IT Services Department following ITIL Framework 1) Service Desk is a single point of contact 2.1) Service Delivery: looks at for end-users and customers long term planning and improvement of IT service provision 2.2) Service Support : concentrate on the day-to-day operation and support SERVICE DELIVERY & SERVICE SUPPORT Adopted from APM GROUP, Service Management . [Online]. Last accessed 11 February 2012 at: http://www.bigbossmanagement.net/service-management/ and RUDD, Colinn (2005), IT Service Management V 2.1b, UK, itSMF Ltd.
  • 15.
    CHECK THE APPENDIXFOR FURTHER DETAILS ON HOW IT IS ORGANIZED AND MANAGED
  • 16.
    PART 1.2 How to ensure the Department operates to an appropriate level of IT professionalism
  • 17.
    1.2) How toensure professionalism Customer Satisfaction Key Factors to ensure professionalism Professionalism 1. Process : Good IT service process Quality of IT Services • Implementing ITIL, ISO2000 and IT Governance e.g. T • Continuous service improvement P P E • Problem analysis R C O E N • Service Measurement C O O • Knowledge base P E L 2. People: Professional IT Staff L S O S E G • Continuous Development Y • Evaluated by certification, KPI (Key performance indicator) and competencies Continuous People Development 3. Technologies: Effective Technologies Continuous Service Improvement • Use technologies following ITIL guidance ex. Incident and knowledge base software ITIL & ISO20000 Standards • Reduce cost and human resource IT Governance • Reduce time ITIL provide the best practice methodologies to improve process, people and technology. Professional IT Department • Good quality of IT Services More Customers & 1) Professional staffs • Add business value 2) Good IT Service Process More Profit • Reduce Cost 3) Effective Technologies
  • 18.
    1.2) How toensure professionalism IT Services are provided following ITIL framework Professional Processes Benefits User can request service through a single point of Improved user service, perception and satisfaction. contact. Service Desk provides initial assessment of all incidents; Improved productivity of support staff make first attempt at incident resolution. All service requests are recorded and monitored. Eliminate the loss of incidents and service requests All service requests are classified in terms of urgency, Reduce business impact of incidents by timely solution impact and priority. Improve skills of the IT staff and reduce time to solve A knowledge base records both problems and solutions. problems All service requests have an incident owner who Reduce the time of recovery problem and increase monitors, tracks and communicates to the requester. satisfaction. All incidents are recorded into a database in order to Proactive prevention of problems. make trend analysis. The major problems are reviewed to analyse Prevent occurrence of problems due to major the root cause. a problems that may cause a big impact to the business. Adopted from APM GROUP, ITIL: Overview and Benefit. [Online]. Last accessed 12 Feb 2012 at: http://www.itil-officialsite.com/AboutITIL/WhatisITIL.aspx
  • 19.
    FOR FURTHER TECHNICALDETAILS ON HOW TO ENSURE PROFESSIONALISM PLEASE SEE THE APPENDIX
  • 20.
  • 21.
  • 22.
    2.1) Range ofIT services Summary Range of ITIL Services Client support provide Services provided by IT to users and customers (Help desk/Service Desk) 1. Service Desk Tele-communication provide Support e.g. 2. IT Service Support: internet, telephone system • Incident management • Problem management Application Support provide • Configuration management e.g. Accounting and • Change management HR application • Release Management Systems Support 3. IT Service Delivery: provide e.g. Security, Servers, • Service Level management E-mail and network • Financial management • Capacity management • Service Continuity management provide Software • Availability management Development All IT services are managed and organized following ITIL management
  • 23.
    FOR FURTHER TECHNICALDETAILS ON RANGE OF IT SERVICES PLEASE SEE THE APPENDIX
  • 24.
    PART 2.2 CONCEPT OFDIRECT AND CONTRACTED STAFF
  • 25.
    2.2) Concept ofDirect and Contracted Staff IT DIRECTOR IT DEPARTMENT ORGANIZATION STRUCTURE Contracted Staff IT MANAGER SERVICE APPLICATION SERVICE SERVICE INCIDENT PROBLEM CHANGE CONFIG. CAPACITY AVAILABILIT FINANCIAL DESK & RELEASE LEVEL CONTINUITY MANAGER MANAGER MANAGER MANAGER MANAGER Y MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER SERVICE DESK TEAM LEADER SERVICE SERVICE PROBLEM CHANGE RELEASE CONFIG. CAPACITY AVAIL. FINANCIAL LEVEL CONT. ANALYST INITIATOR ANALYST ANALYST ANALYST ANALYST ANALYST ANALYST ANALYST CHANGE SERVICE SERVICE SERVICE PROBLEM SYSTEM CONFIG. CAPACITY AVAIL. FINANCIAL INCIDENT PRACTITI LEVEL CONT. DESK ANALYST ANALYST ANALYST ANALYST ANALYST ANALYST ANALYST ONOR ANALYST ANALYST ANALYST SERVICE OPERATION INCIDENT DEVELOPER (SYSTEM) DESK ANALYST MANAGER ANALYST APLLICATION SUPPORT IT OPERATION SECURITY Legend ANALYST ANALYST Some managers Contracted Staff can support more than one INTERNAL STAFF CONTRACT SERVICE DESK APPLICATION DATABASE DATABASE function to minimize human ANALYST 1. Service Desk Analyst CONSULTANT ADMIN. ADMIN resource and increase EXTERNAL CONTRACTED 2. Application Consultant communication flexibility. AGENCY STAFF CONTRACT SERVICE DESK 3. Developer DATABASE SYSTEM DEVELOPER ANALYST 4. Database Consultant CONSULTANT ADMIN The number of managers and employee in each positions will be assigned later in manpower analysis phase.
  • 26.
    2.2) Concept ofDirect and Contracted Staff Contracted Staff: Service Desk Analyst Main Responsibilities Concept Direct Staff 1. Employ Direct Staff 1. Receive and record all calls from User; deal directly 2. Hire contracted staff when the with simple requests and complaints number of incidents or IT 2. Provide initial assessment of all incidents; make first requests are overloaded Contracted Staff attempt at incident resolution and/or refer to 2nd line 3. Sign Contract 3-12 months support 4. The number of direct and 3. Monitor and record all incidents contracted staff are defined by 4. Keep users informed on status and progress using capacity management. Benefits 1. Minimizes the need to hire a lot of people 2. The number of service desk support can adjust with the volume of calls or IT requests. 3. Some job related to confidential information can assign to direct staff. See Appendix slide 13 4. Minimize cost and human resource 1
  • 27.
    2.2) Concept ofDirect and Contracted Staff SUMMARY CONCEPTS OF CONTRACTED STAFF Application Consultant Developer Main Responsibilities: Analyze, design and implement Main Responsibilities: Develop Software following business needs enterprise application e.g. Enterprise Resource Planning or Concept: Human Resource application 1. Hire both direct and contracted staff Reason: 2. The number of developer is depended on the volume of 1. Enterprise software needs specialist to implement. software requested. 2. It is expensive to hire direct staff in order to implement 3. Some specific software e.g. mobile application can hire contracted staff enterprise system only one time. Database Consultant Benefits Main Responsibilities: Analyze, design and implement a custom database following business needs 1. Reduce training cost Reason: 2. Reduce time to implement 1. Some database design needs specialist to reduce 3. Reduce risk of failure software developing time, and ensure reliability and 4. No need to always employ for specialist performance.
  • 28.
    FOR FURTHER TECHNICALDETAILS ON CONCEPT OF DIRECT AND CONTRACTED STAFF PLEASE SEE THE APPENDIX
  • 29.
  • 30.
    3. IMPLEMENTATION ROADMAPFOR IT DEPARTMENT A Approach – ITIL Framework , ISO20000 Standard and IT Governance GOAL:  Company obtains ISO 20000 Certificate GOAL:  Finish implementation of ISO GOAL: 20000 (Total 16 Months) Implementation  All IT Members obtain ITIL GOAL: Certificate Main Activities  Finish implementation of ITIL - Auditing ISO 20000  Recruit all positions (8 Months) Certificate  Approve IT Plan  Approve IT Budget - Continuous Service Main Activities Improvement with ITIL  Complete Foundation Training - Implementation ISO20000-1 - Continuous People - Continuous People development Main Activities development - Implementation ITIL - Implementation ISO20000-2 Main Activities - Continuous People - Transform business plan to IT development Strategy & IT Plan, and approve - Make & Approve JD, Man- power and Budget - Foundation Training about ITIL ** ITIL certificates provide for people, whereas ISO 20000 certificate provides for a company 2 Months 8 Months 8 Months 2 months 20 Months Pictures from http://20000.fwtk.org/20000-itil.htm and http://www.isoregistration.us/iso_standards/iso_20000.html
  • 31.
    FOR FURTHER TECHNICALDETAILS ON IMPLEMENTATION ROADMAP PLEASE SEE THE APPENDIX
  • 32.
  • 33.
    4. Solution Summary A Organize and Manage New IT Department following ITIL Framework and control IT Services Standard by ISO 20000 MAIN SOLUTIONS 1. Single Point of contact: Quick response & improve service quality 2. Problem Analysis: Find root cause & Prevent problem recurring 3. Classify Problem: Set priority & Reduce big impact 4. Knowledge base: Improve IT skills and reduce recovery time 5. Change Analysis: Prevent impact from changes to IT system 6. Client Feedback: Improve Satisfaction 7. Continuous Training: Improve Professionalism
  • 34.
    4. Summary Benefits A Benefits of ITIL Implementation BENEFITS TO BUSINESS IMPROVED IT STAFF 1. A clear business differentiator from 1. Improved morale of service delivery and competitors recipient staff 2. Closely aligned to commercial business services 2. Increased competence, capability and and products productivity of IT staff 3. Improved systems/ applications availability 3. Increased staff retention IMPROVED SERVICE REDUCE COST 1. Improved customer satisfaction through a more 1. Reduced cost of incident or problems professional approach to service delivery 2. Reduced cost of training 2. Improved IT services through the use of proven 3. Reduced cost of recruitment and training - best practice processes hiring ITIL qualified people is easier 3. A benchmark to measure performance against 4. Improved ROI (Return of Investment) of IT in IT projects or services 5. Reduced hidden costs that traditionally increases 4. Improved delivery of third party services substantially the TCO (Total Cost of through the specification of ITIL Ownership) Adopted from ILX GROUP, Organizational Benefits to ITIL. [Online]. Last accessed 12 February 2012 at: http://www.itiltraining.com/itil-benefits.asp
  • 35.
    4. Summary Benefits A Benefits of ISO20000 Implementation BENEFITS TO BUSINESS IMPROVED STANDARD 1. Through the creation of a standard consistent 1. Alignment of information technology services approach, aids major organizational changes and business strategy 2. Provides a benchmark type comparison with 2. Enhanced reputation and perception best practices 3. Improved relationship between different 3. Creation of a stable framework for both departments via better definition and more resource training and service management clarity in terms of responsibility and goals automation IMPROVED SERVICE REDUCE COST 1. Creation of a formal framework for current service improvement projects 2. Supports 'interchanging' of service providers 1. Creates competitive advantage via the and staff by virtue of the creation of inter- promotion of consistent and cost-effective enterprise operational processes services 3. Fundamental shift to pro-active rather than re- 2. Reduction of risk and thus cost in terms of active processes external service receipt 4. By requiring ownership and responsibility at all levels, it creates a progressive ethos and culture Adopted from ISO20000 CENTRAL), News & Information for ISO 20000. [Online]. Last accessed 13 February 2012 at: http://20000.fwtk.org/benefits.htm
  • 36.
    References 1. APM GROUP(NoDate), ITIL: Overview and Benefit. [Online]. Last accessed 12 Feb 2012 at: http://www.itil-officialsite.com/AboutITIL/WhatisITIL.aspx 2. APM GROUP(No Date), Service Management. [Online]. Last accessed 11 February 2012 at: http://www.bigbossmanagement.net/service-management/ 3. ILX GROUP(No Date), Organizational Benefits to ITIL. [Online]. Last accessed 12 February 2012 at: http://www.itiltraining.com/itil-benefits.asp 4. ISO20000 CENTRAL(No Date), News & Information for ISO 20000. [Online]. Last accessed 13 February 2012 at: http://20000.fwtk.org/benefits.htm 5. RUDD, Colinn(2005), IT Service Management V 2.1b, UK, itSMF Ltd.
  • 37.
    Credits Contents Editor: Revathi Tekkali Team Management: Mustak Patel & Mohamed Hagras Slides Creation: Traitet Thepbandansuk & Mohamed Hagras Art Director: Mohamed Hagras Contents:  Company Profile: Mohamed Hagras  Proven Success: Mustak Patel  Background and Issues Summary: Revathi Tekkali Traitet Thepbandansuk  IT Organization and management: Phong Nguyen Traitet Thepbandansuk  How to ensure professionalism: Traitet Thepbandansuk  Range of Services: Traitet Thepbandansuk  Direct and Contracted Staff: Jian Zhao Traitet Thepbandansuk  Implementation Roadmap: Traitet Thepbandansuk  ISO 20000: Afsaneh Tafazzoli Moghaddam  ITIL V3: Mustak Patel Traitet Thepbandansuk
  • 38.
    1. Afsaneh Tafazzoli Moghaddam 2. Jian Zhao 3. Mohamed Hagras 4. Mustak Patel 5. Phong Nguyen 6. Revathi Tekkali 7. Traitet Thepbandansuk

Editor's Notes

  • #14 http://20000.fwtk.org/20000-itil.htm (ISO picture)http://web.bryant.edu/~commtech/itil_fw.html (Picture)http://en.wikipedia.org/wiki/Information_Technology_Infrastructure_Library
  • #15 http://www.bigbossmanagement.net/service-management/RUDD, Colinn (2005), IT Service Management V 2.1b, UK, itSMF Ltd. (Service Support & Delivery)
  • #31 http://20000.fwtk.org/20000-itil.htmhttp://www.isoregistration.us/iso_standards/iso_20000.html
  • #35 revisehttp://www.itiltraining.com/itil-benefits.asp
  • #36 http://20000.fwtk.org/Contact.htm