The Rampal power station is a proposed 1320 megawatt coal-fired power plant located near the Sundarbans mangrove forest in Bangladesh. The plant is a joint project between Bangladesh and India, with financing from both countries' governments as well as loans. While the Bangladeshi government claims environmental precautions will be taken, opposition argues the plant will endanger the nearby Sundarbans world heritage site through pollution, coal transportation, and water usage. Experts and environmental groups are calling for the plant's relocation to protect the fragile ecosystem.
Rampal and Sundarbans - Effects and Causes Sagar Dash
This a group presentation on Rampal project in Bangladesh. Describing the what is the major issue in Bangladesh will face by doing this project what will be there out come. How much impact on our environment also in our Economy.
Rampal and Sundarbans - Effects and Causes Sagar Dash
This a group presentation on Rampal project in Bangladesh. Describing the what is the major issue in Bangladesh will face by doing this project what will be there out come. How much impact on our environment also in our Economy.
The Department of Environment has approved this faulty EIA submitted by the Power Development Board. The project would be implemented by the governments of Bangladesh and India.
climatic impact on freshwater resources of pakistankiranaftab13
Due to increase in global warming, climate of the world is changing slowly and gradually. It is causing severe impact on freshwater resources and its related fauna and flora.
Sundarban, the mangrobe forest which is great natural beauty of Bangladesh .This presentation shows the various sites of it at a glance. It is a audio visual presentation by which you can see the present secnario os the mangrove forest.
every person should know about the merits and demerits of rampal power station and they should learn about the effects of rampal power station , its harms sundarban. we want electricity bt we do not want to harm sundarban ,here we have to com forward to save sundarban
1320 MW
area of over 1834 acres of land
14 kilometers north of the Sundarbans
In August 2010
29 January 2012
National Thermal Power Corporation and
Bangladesh Power Development Board
Bangladesh India Friendship Power Company (BIFPC)
BPDB and the NTPC agreed to implement the project on a 50:50 equity basis.
Enjoy 15 years tax holiday
USD 1.5 billion
India and Bangladesh will fund the remaining 30% equally
Loans are expected to fund up to 70%
In April 2017 Ex-Im Bank of India
Reliability
Affordability
Abundance
Safety
Department of Environment - 1 August 2013
Environmental Impact Assessment - 2016 Unesco
Plant needs 4.72 millions ton coal per years.
The plant would draw 219,600 cubic meters of water every day
fly ash, coal dust and sulphur, and other toxic chemicals.
Department of Environment - 1 August 2013
Environmental Impact Assessment - 2016 Unesco
Plant needs 4.72 millions ton coal per years.
The plant would draw 219,600 cubic meters of water every day
fly ash, coal dust and sulphur, and other toxic chemicals.
Citizen opposition
Political opposition
Rejects the allegations that the coal-based power plant would adversely affect the world's largest mangrove forest.
The controversy over the power plant and its impact on the Sundarbans was "not based on facts."
The plant will not negatively affect the mangrove forest because the emission of green house gas will be kept at the minimum level
Importing high quality coal, build a 275-meter high chimney.
The water running through it works as a supercritical fluid.
Critical point under high pressures and temperatures, specifically at 22 MPs and 374oC.
Efficiencies can reach around 44%
The Department of Environment has approved this faulty EIA submitted by the Power Development Board. The project would be implemented by the governments of Bangladesh and India.
climatic impact on freshwater resources of pakistankiranaftab13
Due to increase in global warming, climate of the world is changing slowly and gradually. It is causing severe impact on freshwater resources and its related fauna and flora.
Sundarban, the mangrobe forest which is great natural beauty of Bangladesh .This presentation shows the various sites of it at a glance. It is a audio visual presentation by which you can see the present secnario os the mangrove forest.
every person should know about the merits and demerits of rampal power station and they should learn about the effects of rampal power station , its harms sundarban. we want electricity bt we do not want to harm sundarban ,here we have to com forward to save sundarban
1320 MW
area of over 1834 acres of land
14 kilometers north of the Sundarbans
In August 2010
29 January 2012
National Thermal Power Corporation and
Bangladesh Power Development Board
Bangladesh India Friendship Power Company (BIFPC)
BPDB and the NTPC agreed to implement the project on a 50:50 equity basis.
Enjoy 15 years tax holiday
USD 1.5 billion
India and Bangladesh will fund the remaining 30% equally
Loans are expected to fund up to 70%
In April 2017 Ex-Im Bank of India
Reliability
Affordability
Abundance
Safety
Department of Environment - 1 August 2013
Environmental Impact Assessment - 2016 Unesco
Plant needs 4.72 millions ton coal per years.
The plant would draw 219,600 cubic meters of water every day
fly ash, coal dust and sulphur, and other toxic chemicals.
Department of Environment - 1 August 2013
Environmental Impact Assessment - 2016 Unesco
Plant needs 4.72 millions ton coal per years.
The plant would draw 219,600 cubic meters of water every day
fly ash, coal dust and sulphur, and other toxic chemicals.
Citizen opposition
Political opposition
Rejects the allegations that the coal-based power plant would adversely affect the world's largest mangrove forest.
The controversy over the power plant and its impact on the Sundarbans was "not based on facts."
The plant will not negatively affect the mangrove forest because the emission of green house gas will be kept at the minimum level
Importing high quality coal, build a 275-meter high chimney.
The water running through it works as a supercritical fluid.
Critical point under high pressures and temperatures, specifically at 22 MPs and 374oC.
Efficiencies can reach around 44%
The Rampal power station is a proposed 1320 megawatt coal-fired power station at Rampal Upazila of Bagerhat District in Khulna, Bangladesh. It is a joint partnership between India's state owned National Thermal Power Corporation and Bangladesh Power Development Board.
Gives a detailed analysis of environmental impact assessment and social impact assessment report..how to do them.. benefits cost benefit analysis..eia..clearance .. ideologies..methods..reports..baseline monitoring..different case studies ..natural preservation..airnimoact..air pollution water pollution noise pollution ..how a eia can be carried out methodological approach.. financial benefits..net present value ..present net value ..cost of incurred..accrued.. environmental effects on public..forest clearence .. it's effect on people ...case studies mrts project ..bridges ..road project ..if u want why the hell making us to type like this idiots..what more to type man.. huh ..why are u wasting our time..all for money stupids.. environment..eia .. environment environmental and social economic assessment environmental and social economic assessment environmental and social economic assessment environmental environmental and social economic assessment social environmental and social economic assessment assessment environmental and environmental and social economic assessment environmental and social economic assessment economic assessment Gives a detailed analysis of environmental impact assessment and social impact assessment report..how to do them.. benefits cost benefit analysis..eia..clearance .. ideologies..methods..reports..baseline monitoring..different case studies ..natural preservation..airnimoact..air pollution water pollution noise pollution ..how a eia can be carried out methodological approach.. financial benefits..net present value ..present net value ..cost of incurred..accrued.. environmental effects on public..forest clearence .. it's effect on people ...case studies mrts project ..bridges ..road project ..if u want why the hell making us to type like this idiots..what more to type man.. huh ..why are u wasting our time..all for money stupids.. environment..eia .. environment environmental and social economic assessment environmental and social economic assessment environmental and social economic assessment environmental environmental and social economic assessment social environmental and social economic assessment assessment environmental and environmental and social economic assessment environmental and social economic assessment economic assessment Gives a detailed analysis of environmental impact assessment and social impact assessment report..how to do them.. benefits cost benefit analysis..eia..clearance .. ideologies..methods..reports..baseline monitoring..different case studies ..natural preservation..airnimoact..air pollution water pollution noise pollution ..how a eia can be carried out methodological approach.. financial benefits..net present value ..present net value ..cost of incurred..accrued.. environmental effects on public..forest clearence .. it's effect on people ...case studies mrts project ..bridges ..road project ..if u want why the hell making us to type like this idiots..what more to
Have you ever wondered how search works while visiting an e-commerce site, internal website, or searching through other types of online resources? Look no further than this informative session on the ways that taxonomies help end-users navigate the internet! Hear from taxonomists and other information professionals who have first-hand experience creating and working with taxonomies that aid in navigation, search, and discovery across a range of disciplines.
0x01 - Newton's Third Law: Static vs. Dynamic AbusersOWASP Beja
f you offer a service on the web, odds are that someone will abuse it. Be it an API, a SaaS, a PaaS, or even a static website, someone somewhere will try to figure out a way to use it to their own needs. In this talk we'll compare measures that are effective against static attackers and how to battle a dynamic attacker who adapts to your counter-measures.
About the Speaker
===============
Diogo Sousa, Engineering Manager @ Canonical
An opinionated individual with an interest in cryptography and its intersection with secure software development.
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion “Competition and Regulation in Professions and Occupations” held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the author’s consent.
Acorn Recovery: Restore IT infra within minutesIP ServerOne
Introducing Acorn Recovery as a Service, a simple, fast, and secure managed disaster recovery (DRaaS) by IP ServerOne. A DR solution that helps restore your IT infra within minutes.
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Orkestra
UIIN Conference, Madrid, 27-29 May 2024
James Wilson, Orkestra and Deusto Business School
Emily Wise, Lund University
Madeline Smith, The Glasgow School of Art
3. Introduction
The Rampal power station,
also known as the Maitree
Super Thermal Power Project,
is a proposed 1320 Megawatt
coal-fired power station at
Rampal Upazila of Bagerhat
District in Khulna, Bangladesh.
It’s situated 14 kilometres
north of the world's largest
mangrove forest Sundarbans
which is a UNESCO world
heritage site. It will be the
4. Project Details
Sponsor: Bangladesh-India Friendship Power Company
(BIFPC).
Parent company: Bangladesh Power
Development Board(BPDB), National Thermal
Power Corporation (NTPC).
Location: Khulna, Bangladesh.
Projected Area: 1834 acres
Gross Capacity: 1320 MW (2 x 660 MW)
Type: Ultra-Supercritical
Coal Source: Imported (through the Port of Mongla).
Project in service: 2021
5. Financing
• Bangladesh and India will equally share up to 30 %
(each 15%) of the capital of this project as equity.
• The remainder of the capital, which might be equivalent
to USD 1.5 billion, will be taken as bank loans with help
from the NTPC.
6. Agreement
In August 2010, this project was signed between
Bangladesh Power Development Board (BPDB) and India's
state-owned National Thermal Power Corporation (NTPC).
On January 29, 2012, the Bangladesh Power Development
Board signed an agreement with NTPC to build the plant
Agreed to implement the project by 2016.
The BPDB and the NTPC agreed to implement the project
on a 50:50 equity basis.
The NTPC will set up and operate the plant.
7. Government position
The government of Bangladesh rejects the
allegations would adversely affect the world’s
largest mangrove forest.
Importing high quality coal, build a 275 meters
high chimney, Use high art technology.
8. Opposition
On 1 March 2011, a bench of Bangladesh High Court asked the
government "why the construction of the plant should not be
declared illegal". Environmental experts have expressed concerns
that the proposed plant at Rampal might destroy the Sundarbans.
The National Committee on Protection of Oil, Gas, Mineral
Resources, and Power-Port, Environmentalist groups and general
people of Bangladesh vowed to resist the planned inauguration of
the Rampal Power Plant scheduled on 22 October 2013. On 24
September 2013 thousands of people in Bangladesh began a rally
for 5 days and 400 kilometres to oppose the power plant. UNESCO
had scheduled a meeting for 11 July to decide whether to declare
the Sundarbans a "World Heritage Site in Danger," its strongest
possible signal to the two governments and to international lenders
that the plant should not be built.
9. Environment Issue
During the construction of power plant at Rampal ,the
ecosystem will be largely affected due to traffic movements,
oil and chemical spillage and dredging.
The project will use deep tube wells and water of the
Posur River for washing coal, which will push ground level
water down and will completely destroy the ecosystem of
the river .
Transferring activities, shipping and barging activities at
Akram point will generate noise create disturbance to
the wildlife of the Sundarban.
10. The plant will need to import 4.72 million tons of coal per
year. This massive freight will need about 59 ships each
having 80,000-ton capacity that would be taken to the port
on the bank of the Poshur river. The 40 kilometres from the
port to the plant cuts through the Sundarbans and it
includes the river flow path. Environmentalists say these
coal-carrying vehicles are not often covered as they scatter
large amounts of fly ash, coal dust and sulphur, and other
toxic chemicals are released throughout the life of the
project. Carrying large amount of coal through the shallow
rivers also pose a threat as five vessels with load of coal, oil
and potash sank in the nearby rivers.
11. The plant would draw 219,600 cubic metres of water every
day from the Poshur river, and discharge treated waste
water back into that river causing pollutants to be
introduced into the water supply to the detriment of the
mangroves, the marine animals living there and nearby
population.
The predictions made by environment and ecology experts
are that the plant will release toxic gases such as carbon
monoxide, oxides of nitrogen and sulphur dioxide, thereby
putting the surrounding areas and, most importantly,
Sundarban at grave risk.
12. We will get light by killing and
push away our pride Sudarban’s
Natural beauty and precious
animals
13. Resolve
We are not against the project but against building of the
power plant in Rampal. The project can be transferred
anywhere else, far from the Sundarban to protect it . The
experts and environmentalists are really worried about the
Rampal. A great number of concerned people are protesting
against this project.
The government itself is violating environment law by
constructing coal-based power plant at Rampal .