This document is a curriculum vitae for Syed Salman Ali, who has over 11 years of experience in quality assurance and quality control, primarily in the oil and gas industry. It outlines his professional qualifications and certifications, computer skills, professional competencies, and previous work experience in roles such as Manager Quality Assurance and Quality Control, Senior QA/QC Engineer, QA/QC Engineer (Welding and NDT), and Assistant QA/QC Engineer. His responsibilities have included managing QA/QC teams, implementing quality management systems, conducting audits and inspections, and ensuring compliance with codes and standards.
I am a Project Management, Operations and Maintenance, and Turnaround Planning Professional with over 30 years of experience, working in the Oil Gas and Petrochemical sector. I am adept in successfully completing capital and maintenance projects as well as turnaround projects on time and within the prescribed budget. I am flexible and adaptable at meeting client requirements and have strong organizational and communication skills, good methodological approaches and use of analytical thinking. I am commercially astute and am a keen team player with the ability to follow procedures and see a problem through to the end.
I am a Project Management, Operations and Maintenance, and Turnaround Planning Professional with over 30 years of experience, working in the Oil Gas and Petrochemical sector. I am adept in successfully completing capital and maintenance projects as well as turnaround projects on time and within the prescribed budget. I am flexible and adaptable at meeting client requirements and have strong organizational and communication skills, good methodological approaches and use of analytical thinking. I am commercially astute and am a keen team player with the ability to follow procedures and see a problem through to the end.
They are the leading Manufacturer of boiler parts like Water Wall Panel, Header, Economizer Coil, Air preheater, Duct, Ceiling Girder, Structural Columns like Box column, Star column, Bracing box etc., & Buckstay beams supplying for M/s. Bharat Heavy Electricals Limited, M/s. Cethar Vessels Limited, M/s ISGEC Heavy Engineering Limited & M/s Doosan Power systems Limited. Kiln shell, Structural columns & Duct Supplying for M/s FLSmidth Limited and Tubular Windmill Tower supplying for M/s. Suzlon Energy Limited.
Medikamentu inducēts QT intervāla pagarināšanās. Laura Sviklāne.Михаил Павлович
QT intervāls atspoguļo kopējo kambaru darbības potenciāla depolarizācijas un repolarizācijas fāzi.
Darbības potenciāls rāda jonu plūsmu cauri šūnu plazmatiskajai membrānai, caur speciāliem no proteīniem veidotiem kanāliem.
QT intervāla pagarināšanās norāda uz miokarda repolarizācijas laika palēnināšanos un difūzu desinhronizāciju, kas nosaka, ka relatīvais sirds cikla refrektārais periods ir garāks.
They are the leading Manufacturer of boiler parts like Water Wall Panel, Header, Economizer Coil, Air preheater, Duct, Ceiling Girder, Structural Columns like Box column, Star column, Bracing box etc., & Buckstay beams supplying for M/s. Bharat Heavy Electricals Limited, M/s. Cethar Vessels Limited, M/s ISGEC Heavy Engineering Limited & M/s Doosan Power systems Limited. Kiln shell, Structural columns & Duct Supplying for M/s FLSmidth Limited and Tubular Windmill Tower supplying for M/s. Suzlon Energy Limited.
Medikamentu inducēts QT intervāla pagarināšanās. Laura Sviklāne.Михаил Павлович
QT intervāls atspoguļo kopējo kambaru darbības potenciāla depolarizācijas un repolarizācijas fāzi.
Darbības potenciāls rāda jonu plūsmu cauri šūnu plazmatiskajai membrānai, caur speciāliem no proteīniem veidotiem kanāliem.
QT intervāla pagarināšanās norāda uz miokarda repolarizācijas laika palēnināšanos un difūzu desinhronizāciju, kas nosaka, ka relatīvais sirds cikla refrektārais periods ir garāks.
A strong Project QA/QC Head , with a diversified experience covering Project Management, Design Department, Site Operations / Engineering & Installations, Commercial Management, Procurement Department, Safety Management, Documentation, Logistic Management, QA/QC Management and customer service. Possess strong work ethic and interpersonal skills paired with a proven career in MEP Projects management and leadership molded to suit varied Project requirements.
1. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 1 Of 8
CCUURRRRIICCUULLUUMM VVIITTAAEE
SSYYEEDD SSAALLMMAANN AALLII SSHHAAHH
MMaannaaggeerr QQuuaalliittyy AAssssuurraannccee && QQuuaalliittyy CCoonnttrrooll
CAREER OBJECTIVE
To pursue a challenging & career oriented position in the field of Quality Assurance and Quality
Control, which offers immense opportunities based on skills, professional expertise, targets
achievement and encouragement to cope the challenges through dedication and commitment.
PERSONAL INFORMATION
Current Designation: Manager Quality Assurance and Quality Control
Total Experience: Over 11 Years
Nationality: Pakistani
Date of Birth: August 13, 1979
Marital Status: Married
Cell Number: +966-54 904 3109
Permanent Address: 132-C, Madinah Block Awan Town Lahore, Pakistan
E-mail: sshasni@hotmail.com
Driving License: Pakistan, Saudi Arabia
PROFESSIONAL QUALIFICATIONS
B.Sc Metallurgical & Materials Engineering (2003).
University of Engineering & Technology, Lahore, Pakistan.
IRCA Registered ISO-9001:2008 QMS Lead Auditor (2012)
Conducted by SGS PAKISTAN (Pvt.) Limited at Royal Palm Golf and Country Club, Lahore-
Pakistan, Certified by IRCA and the International Auditor and Training certification
Association (IATCA).
“Leading Change”-Training Workshop
Two days training session, arranged by IKAN Engineering Services (Pvt.) Limited at Green
Fields Country Club, Lahore, focused at “Bringing the change by Facing the Change”.
Certified Welding Inspector (CSWIP 3.1), From ‘TWI’ UK.
CSWIP CERT No. 22496/2
BGAS Grade 2 - Certification from ‘TWI’ UK.
Certificate No. 31679
Understanding Emotional Intelligence
Conducted by “Spearhead Training UK” held at Dana Club Doha on March 27th & 28th 2006,
Arranged by Descon Engineering Qatar (LLC).
Construction Technology Management & Planning (March 2005)
2. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 2 Of 8
Conducted by Human Resources Department DESCON ENGINEERING LIMITED.
PRIMAVERA 3.0,
DESCON Engineering Limited (DHQ) Lahore.
ASNT Level II in VT, MT, PT, UT, RT,
Materials Testing Services Doha, Qatar.
COMPUTER LITERACY
Microsoft Office ( Word, Excel, Power Point), AutoCAD 2011, Autodesk Inventor 2011, Bentley
Staad Pro v8i, Codeware Compress 2011.
PROFESSIONAL COMPETENCIES AND EXPERTIES
A professional Metallurgist, holding certifications like CSWIP 3.1 and BGAS 2, with over 11 years
of fulltime work experience primarily in Quality Assurance and Quality Control in Oil & Gas industry,
well worsted in Quality and HSE Management Systems review, compliance and auditing. Experienced
in the preparation, certification and maintaining of ASME Quality Control System. Skilled in
development, implementation and maintaining of QHSE Management System, Project Specifications,
Codes and Standards in Manufacturing Organizations & projects. Proficient in Implementation of Audit
program and Auditing of subcontractors/vendors, Internal company IMS audits. Expert in managing the
QHSE Team and preparation, review and implementation of Quality Control Procedures, Preparation of
Project Quality Plan, Inspection and Test Plans, Welding Procedure Specifications, NDE Procedures,
witnessing and approval of welding procedures and welders qualifications, Welding inspections, and
leading from the front the ASME certification and revalidation Audits. Review of RT films and NDE
reports, witnessing of pressure tests, punch listing, pre-commissioning inspection. Review of final QHSE
documentation file for plant hand over, review of corrective actions to close out non conformities.
Leading the team of inspectors and assigning day to day inspection tasks to inspectors and supervising
and monitoring their performance and timely reporting.
PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE
HHEEAADD EENNGGIINNEEEERRIINNGG AANNDD QQUUAALLIITTYY AASSSSUURRAANNCCEE
SESAB International For Industry and Contracting, Jeddah, K.S.A (February 2013 till February 2015)
Manufacturing of Industrial Process Equipment, Steel Structures etc.
Clients: Saudi Aramco, SK Engineering Korea, Mitsubishi, JGC, SPX (Brussels) etc.
Responsibilities:
To manage staff and sub-consultants engaged in carrying out investigations, feasibility studies,
structural inspections and assessments, and the design and preparation of contract documents
for structural engineering works and fabrication supervision.
To manage and lead a team of structural engineers and detailers.
3. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 3 Of 8
To provide the highest level of technical sufficiency within the Structural Engineering Section,
including the identification and promotion of innovative and practical design solutions.
To assume technical and administrative responsibility for the preparation of quality plans,
scheme programs, estimations, assessments and design work, contract documents, tender
invitation and tender assessments.
To organize and provide technical support and training of project engineers and technical staff
on structural engineering, fabrication supervision.
To review and update technical standards, office procedures, construction techniques, and use
of materials to ensure that specifications and schemes prepared by the Engineering department
reflect best practices.
To provide professional input to the training of graduate engineers and trainee technicians.
To provide input for the estimation and monitoring of bids, resource schedules and targets.
To prepare and present top management, financial, technical and performance reports as
directed.
To liaise with and provide advice to top management and internal and external clients on
technical matters.
To undertake corporate development and management activities as required by the top
management.
To establish quality and reliability standards by studying product and consumer requirements
with other members of management and with production operators, technicians, and
engineers.
To establish raw material standards by studying manufacturing and engineering requirements;
conferring and negotiating with suppliers; devising testing methods and procedures.
To establish in-process product inspection standards by studying manufacturing methods;
devising testing methods and procedures.
To establish standards for the disposition of finished product by devising evaluation tests,
methods, and procedures.
To establish rework standards by devising inspection and physical testing methods and
procedures.
To establish product quality documentation system by writing and updating quality assurance
procedures.
To maintain product quality by enforcing quality assurance policies and procedures and
government requirements; collaborating with other members of management to develop new
product and engineering designs and manufacturing and training methods.
To Prepare product and process quality reports by collecting, analyzing, and summarizing
information and trends.
To Complete quality assurance operational requirements by scheduling and assigning
employees; following up on work results.
To maintain quality assurance staff job results by coaching, counseling, and disciplining
employees; planning, monitoring, and appraising job results.
To maintain professional and technical knowledge by attending educational workshops;
reviewing professional publications; establishing personal networks; participating in
professional societies.
To Achieve financial objectives by preparing the quality assurance budget; scheduling
expenditures; analyzing variances; initiating corrective actions.
To Contribute to team effort by accomplishing related results as needed.
4. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 4 Of 8
MMAANNAAGGEERR QQAAQQCC
SESAB International For Industry and Contracting, Jeddah, K.S.A (February 2013 till February 2015)
Manufacturing of Industrial Process Equipment, Steel Structures etc.
Clients: Saudi Aramco, SK Engineering Korea, Mitsubishi, JGC, SPX (Brussels) etc.
RESPONSIBILITES:
Manage and oversee project quality to ensure compliance to codes, standards, regulations, equipment
specific specifications, and QMS requirements. Advancing quality achievement and performance
improvement throughout the organization.
Managing the development and implementation of the QMS for planning, fabrication, inspection,
documentation, and operations activities including:
1- Planning duties within the QA/QC staff and related work schedules;
2- Establishing service standards for end users (i.e., internal department or external customer);
3- Identifying and developing QA/QC personnel certification requirements and continuing
education/training needs;
4- Providing leadership, mentorship, and direction of all QA/QC personnel.
Taking full responsibility for hold-point releases once all QMS functions have been completed and the
equipment is ready to go into the next work stage. Managing products integrity through a failure
analysis reporting system and following up on recommendations. Oversee supervision of all visual
inspections and NDE, including 3rd party subcontractors. Managing inspection, NDE, and testing plans
for new construction, repair work, and alterations. Identify and develop solutions to correct inspection
function deficiencies. Manage construction processes, plant equipment, inspection and NDE personnel
certification and QMS internal audits.
MMAANNAAGGEERR QQHHSSEE
IKAN Engineering Services (Pvt.) Limited Lahore (December 2011 till October 2012)
Manufacturing of Industrial Process Equipment, Boilers, Heat Exchangers etc.
Clients: MOL Pakistan, OGDCL (Oil and Gas Development Corporation Limited) Pakistan,
Schlumberger, Telenor Pakistan Etc.
RESPONSIBILITIES:
Ensuring achievement of IKAN’s Integrated Management System (IIMS) Objectives
defined for the QHSE, including those established for continuous improvement. Ensuring that all IMS
documents are in line with the concepts of value addition to the business processes. Ensuring that IMS
documents and actual role performed by Company’s personnel is in line with the concept “ Say what you
do and do what you say”. Implementing QHSE Policy throughout the Company. Planning and conducting
5. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 5 Of 8
Integrated Management System awareness programs throughout the Company. Document and report
findings on the Executive Management Review on the state of Quality Program in the company and
recommend actions for the correction and improvement. Responsible for overseeing preparation of
Project Quality Plan & HSE plan in the light of Project specifications/Customer requirements. Responsible
for establishing IMS objectives, goals and programs for the organization and development of measures to
determine the effectiveness and the contribution of the Quality Control function towards the profitability
and progress of the company. Responsible for providing the frame work for IMS objectives to all Business
Areas and ensure their effectiveness during internal audits. Coordination with external certifying/
surveillance auditors. Responsible for the preparation of schedules for Project Assessment, IMS audits,
coordinate with BAs/BSDs/Projects for effective implementation and to ensure compliance with &
Company’s policies and procedures. Maintain QHSE policies and circulate Company wide. Monitoring
corrective & preventive actions necessary for effectiveness of Integrated Management System. Ensuring
that QHSE documents are in line with Company’s Integrated Management System and remain fully
updated. Ensuring that all the IMS Records are maintained as per the written procedure. Coordinating with
proposal manager in the study of tender documents and specifications especially with regards to QHSE
requirements. Prepare QHSE documents for proposals covering general and project specific tender
requirements. Coordinating with HR and Project Manager for selection and qualification of selected
craftsman required by the BAs/Projects.
Development of Management concurrence to promote a recognized system of rules and
procedures to prevent accident and property loss. Keeps Management regularly informed regarding the
state of HSE effort throughout the Company. Devising pro-active /corrective measures to prevent
accidents and ensures the compliance accordingly. Reports to Management in case non-conformities are
persistently occurring to the HSE related Method Statements and proposed remedial measures. Issuance
of monthly HSE Bulletins to all sites, which include information on unusual accidents, remedial measures
and training material. Playing the role of coordinator, facilitator and advisor to all levels of management
over the QHSE matters. Maintaining an updated statistical record of all inspections, audits and QHSE
performances at all project sites / establishment of Company. Ensuring that all cadres in the Company are
fully aware of the potential hazards that they may experience and imparts necessary training for avoiding
loss or damage to life and property though a formal organizational effort.
SSeenniioorr QQAA//QQCC EEnnggiinneeeerr
DESCON Engineering Limited-Lahore Manufacturing Works
From September 2010 November 2011.
Manufacturing Of Boilers, Heat Exchangers, and Pressure Vessels and a variety of other Indus trial
Equipment related to Oil and Gas, Power Plants, Refineries etc.
Clients: BYCO Oil Pakistan, FFC Pakistan, Aisha Steel Mills Pakistan, Bhikki Power Plant Etc.
Responsibilities
Supervising QA/QC Staff for the inspection of Industrial Equipment like Boilers,
Reactor/Columns/vessels/Heat Exchangers/Fin Fan Coolers/Filter/Tanks/Heater/PSV etc and Piping
made up with materials like Stainless steel, Alloy steels, carbon Steel etc. Assessment of Industrial
6. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 6 Of 8
Equipment and Piping through inspection and NDE and update their Files, based on the damages give
recommendation of repairs and propose repair methods. Preparation of PQP, QA/QC Procedure,
ITP/Inspection Checklist and Method Statements, preparation of WPS, qualification of PQRs and
reviewed the welder’s qualifications, Day to day monitoring of inspection activities during
manufacturing process. Supervision and Monitoring of execution of NDT (RT, MT, PT, UT, Hardness
Testing, Thickness Measurement) and ADVANCE NDT (In-situ Replica Metallographic, Profile RT,
Thickness Checks) by NDT Subcontractor. Provide recommendations for the repair or replacement
work on the finding as a result of NDT in consultation with Company Inspection Engineers. Coordinate
with Company Inspection Department. Supervision of Inspection of Painting and Insulation works.
Taking ownership of Company’s HSE Policy.
QQAA//QQCC EEnnggiinneeeerr
Zamil Offshore Services Company K.S.A
September 2008 till August 2010
Hook-up, Upgrade Modification & Commissioning Support at BRRI Oil field Jubail K.S.A
Client: SAUDI ARAMCO
Responsibilities
Implementation of Latest Saudi Aramco standards, project specific specifications for NDT,
Welding, and Coating Procedures. Supervised Quality Assurance and Quality Control of activities like
Welding, Piping, NDT, painting, installation of static and rotary equipment at various Oil Platforms at
Offshore BRRI Oil field. Preparation and reviewing of relevant reports and submission to SAUDI
ARAMCO PMT. Reviewing Mill Test Certificates of all received materials specially piping and welding
consumables at platforms to ensure that all piping materials and welding consumables, gases, flux,
filler wires meet the SAUDI ARAMCO requirements and are in good condition prior to use. Took
responsibility to control storage, handling, baking and issuance of consumables to welder at site.
Responsible for the preparation of Preliminary WPS as per ASME IX, AWS D1.1, ASME B 31.3 and
applicable project specs. Conduction of procedure qualification tests as per ASME IX, API 1104, ASME B
31.3 and applicable project specs. Participated in internal Quality Audits for evaluating operational
processes are complying with the project specifications, company procedures, international standards,
applicable codes. Responsible for ensuring that all process/product non-conformities are highlighted
through CAR’S/PAR’S to the relevant supervisor as well as QA/QC Manager for rectification and follow
up. Conduction of Welders qualification tests as per AWS D1.1, ASME IX and applicable project
specifications, their deployment and maintaining welder qualification record. Review of PWHT, UT,
MT, PT reports and Radiographic films.
QQCC EEnnggiinneeeerr ((WWeellddiinngg aanndd NNDDTT))
JAPAN GAS CORPORATION (JGC) K.S.A
July 2007 till June, 2008
Construction of High Olefins Cracking Plant and Ethan Cracking Plant at Rabigh Refinery, Rabigh K.S.A
Client: PETRO RABIGH
7. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 7 Of 8
Responsibilities
Ensure that all Quality Control activities related to Welding and NDT, on site are fully
implemented and maintained throughout all stages of contract execution in accordance with Project
Specifications and Code requirements. Implementation of QIP/ITPs for project. Ensure that all relevant
drawings, codes and/or specifications are applied at Project and only current documents are in use, in
accordance with Master Lists of Documents. Took responsibilities to develop written and draft the
WPS/PQR (For mechanical discipline). Witnessed the execution of PQRs and mechanical testing at labs.
Witnessed Welders Qualification Testing, prepared welder certificates and Cards. Review of NDE
reports, RT Film interpretation, PWHT Report and Charts. Carried out the receiving inspection of
materials. Monitor Fabrication work going on in the site workshop. Liaise with other departments for
inspection activities at site. Carried out Inspections during the preservation of Mechanical Equipment
prior to Installation as per vendor recommendations. Ensured that, procedures, method statements
and ITPs are followed at site. Planned and conducted Quality Management awareness programs on
project.
QQAA//QQCC EEnnggiinneeeerr
DESCON ENGINEERING QATAR L.L.C
8th MAY 2005 to April 2007
Dolphin Upstream and Compression Facilities Project, Ras Lafan Qatar
Client: JGC
Responsibilities
Preparation of Project Quality Plan, Quality Procedures & Work Instructions as per the Client
Specifications. Reviewed Client specifications, Data sheets, bill of material, supplier data requirements
and Technical Bid Evaluation and Purchase Order Quality requirements, Vendor Assessment and Pre-
qualifications. Monitored the implementation of quality management system in project execution;
Supervised the work of the QA/QC inspectors to ensure effective planning, execution and coordination
of all Quality activities and inspection of piping, welding, NDE, PWHT, hardness, PMI, Hydrostatic test,
painting, mechanical completion package. Developed and implement procedures for quality control,
quality audits, and corrective and preventive action system. Monitored and controlled activities
requiring critical success factor for quality of deliverables. Ensured that all the quality data (Computer
based systems and record are maintained properly. Develop the training matrix for all the employees
and conduct trainings for the improvement of Quality of the project. Owned and share company’s
QHSE Policy, vision & mission, core & operating values to ensure their implementation at all work
places. Responsible for the Monitoring of Corrective/Preventive Action Requests and Maintaining of
the Log and ensure timely close out of CARs/PARs. Coordinate investigation of customer complaints
and internal quality failures through root-cause analysis and problem solving methods.
QQAA//QQCC EEnnggiinneeeerr
DESCON ENGINEERING QATAR L.L.C
5th April 2005 to 7th May 2005
Qatar Gas Train 1, Shutdown
Client: CTJV (Chiyoda Technip Joint Venture), Qatar Gas
Responsibilities
Maintenance inspection of Process Equipment like Reactor/Columns/vessels/Heat
Exchangers/Fin Fan Coolers/Filter/Flare Tips replacement/Tanks/Heater/PSV etc and Piping works.
8. Syed Salman Ali (Head Engineering and Quality Assurance)
Page 8 Of 8
Assessment of Process Equipment and Piping through inspection and NDE and update their Files, based
on the damages give recommendation of repairs and propose repair methods, Preparation of PQP,
QA/QC Procedure, ITP/Inspection Checklist and Method Statements, preparation of WPS, Welders
Qualification Testing, Day to day monitoring of inspection activities during shutdown. Supervision and
Monitoring of execution of NDT (RT, MT, PT, UT, Hardness Testing, Thickness Measurement) and
ADVANCE NDT (IRIS, ECT, In-situ Replica Metallography, Profile RT, Thickness Checks) by NDT
Subcontractor. Provide recommendations for the repair or replacement work on the finding as a result
of NDT in consultation of Welding Engineer and Manager QA/QC. Supervision of Inspection of Painting
and Insulation works.
AAssssiissttaanntt EEnnggiinneeeerr
DESCON ENGINEERING QATAR L.L.C
Qatar Gas De-bottlenecking Project (Ras Lafan Qatar)
January 2004 to March 2005
Responsibilities
Ensured the Implementation of Quality Management System. Prepared the reports after
compiling data from Project site. Maintained the CAR/PAR records at the Project site. Prepared the
Audit schedule for the corporate office. Assisted QA Engineer and Incharge QA for the internal audits.
Prepared Training material for QA/QC Staff at office and projects. Ensured all the WPS/PQRs from the
project are properly filed for the record. Assist QA Engineer in preparing Quality Newsletter. Prepare
the Statistical analysis of CARs/PARs for presenting to management. Prepare Project Quality Plans, and
QIPs. Collected the Client Feedback Report from client. Analyzed the Document Change Requests and
share recommendations for improvement with the concerned functionaries. Kept the record of all the
QA/QC Personnel of Company at all locations. Took ownership of Company’s Quality & HSE policies, Core and
Operating Values.
TTrraaiinneeee EEnnggiinneeeerr ((PPaarrtt TTiimmee))
DESCON Engineering Limited-Lahore Manufacturing Works
Manufacturing Of Boilers, Heat Exchangers, and Pressure Vessels and a variety of other Indus trial
Equipment related to Oil and Gas, Power Plants, Refineries etc.
27th November 2002 to December 2004
Responsibilities
Assisted Welding Engineer in execution and compilation of welding procedures,
Welders/Welding Operators qualification testing, In process inspection of pressure vessels, Preparation
of Inspection Data Manuals, Incomming Materials Inspections, dimensional Inspections etc.